Water conservancy project planning method and system

Through the combination of remote sensing technology and manual measurement, we established a hydrogeographic model and conducted zoning analysis, which solved the problems of complexity of water conservancy project planning and long implementation period, and achieved efficient and accurate data support and sustainable development.

CN118761644APending Publication Date: 2024-10-11BEIJING SHENGHECHUAN WATER CONSERVANCY PLANNING & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410789264.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

In the water conservancy project planning method, a variety of sensors and auxiliary machines are used for data collection, and manual analysis and inspection are used for the rest of the work. This results in complex project planning and a long implementation period, which is limited by the complexity and data diversity of water conservancy projects.

Method used

Using a combination of remote sensing technology and manual measurement, a hydrogeographic model is established. Through model simulation analysis and zoning analysis, efficient and accurate data support is provided, and areas that comply with the plan are automatically selected to reduce planning difficulty and risks.

Benefits of technology

It reduces the complexity and difficulty of water conservancy project planning, improves the scientificity and accuracy of decision-making, and ensures the smooth implementation and sustainable development of water conservancy projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761644A_ABST
    Figure CN118761644A_ABST
Patent Text Reader

Abstract

The invention relates to the field of engineering planning, in particular to a hydraulic engineering planning method and system. According to the technical problems, various sensors and auxiliary machines are adopted for data collection, other work is manually analyzed and investigated, and due to the complexity and data diversity of hydraulic engineering, engineering planning is complex, and the implementation period is long; according to the technical scheme, the hydraulic engineering planning method and system comprise data acquisition, historical data calling and model construction; compared with the prior art that a sensor is adopted for data collection, other work is manually analyzed and investigated, and due to the complexity and data diversity of water conservancy projects, engineering planning is complex, and the implementation period is long; the engineering planning method can provide more comprehensive and accurate data support for hydraulic engineering planning by using various modeling and computer analysis means, reduces the complexity and difficulty of hydraulic engineering planning, and ensures smooth implementation and sustainable development of hydraulic engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering planning, and in particular to a water conservancy engineering planning method and system. Background Art

[0002] The water conservancy project planning system is an advanced tool designed to optimize the planning and management process of water conservancy projects. The system uses modern information technology to provide decision makers with efficient and accurate data support, ensuring the smooth implementation and sustainable development of water conservancy projects. The water conservancy project planning system consists of multiple modules, each of which has different tasks. First of all, the data acquisition module plays a vital role. It uses advanced remote sensing technology, geographic information systems, and field surveys to comprehensively collect data on hydrology, geography, and land use. These data not only cover the natural characteristics of water sources such as rivers, lakes, and reservoirs, but also include environmental factors such as climate, soil, and vegetation in the basin, as well as socio-economic information such as land use status and population distribution. Through the integration and analysis of these data, we can better understand the status of water resources and provide strong support for subsequent planning work. Next, the analysis module uses the collected data to build and analyze models. This module uses mathematical models, simulation technology, and other means to predict the demand for water resources. The demand and supply situation can be predicted; through the mining and trend analysis of historical data, we can predict the changes in the supply and demand of water resources in the future, so as to provide a scientific basis for the planning of water conservancy projects; in addition, the analysis module can also evaluate the possible environmental impact of water conservancy projects and provide technical support for the environmental impact assessment of the project; in general, the water conservancy project planning system provides comprehensive and accurate data support for the planning and management of water conservancy projects through the collaborative work of multiple modules; it can not only improve the scientificity and accuracy of decision-making, but also reduce the risks and costs in the construction and operation of water conservancy projects, and promote the sustainable development of water conservancy; therefore, we should attach great importance to the construction and application of the water conservancy project planning system, continuously improve its technical level and service capabilities, and contribute to the development of water conservancy; in the water conservancy project planning method, a variety of sensors and auxiliary machines are used for data collection, and the rest of the work is analyzed and inspected manually. Due to the complexity of water conservancy projects and the diversity of data, the project planning is complicated and the implementation cycle is long. Summary of the invention

[0003] In order to overcome the problems in water conservancy project planning methods, a variety of sensors and auxiliary machines are used for data collection, and the rest of the work is analyzed and investigated manually. Due to the complexity of water conservancy projects and the diversity of data, the project planning is complicated and the implementation cycle is long.

[0004] The technical solution of the present invention is: a water conservancy project planning method, comprising the following steps:

[0005] S11: Data collection, using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the basin planned for the water conservancy project;

[0006] S12: Historical data retrieval: retrieve historical data on hydrology, geography and land use in the basin planned for the water conservancy project;

[0007] S13: Model construction: Based on the data on hydrology, geography and land use in the watershed planned by the water conservancy project collected by remote sensing technology and manual measurement, a hydrogeographic model is established, and historical data on hydrology, geography and land use in the watershed planned by the water conservancy project are input into the model;

[0008] S14: Water conservancy project planning: using the established hydrological and geographical model as a reference to carry out water conservancy project planning;

[0009] S15: Data simulation: input various types of projects to be constructed into the established geographic model, conduct simulation analysis, and determine whether the project planning is reasonable and reliable;

[0010] S16: Construction supervision. During the construction of water conservancy projects, remote sensing technology and manual measurement are used to collect data on the construction process of water conservancy projects and supervise the construction.

[0011] Preferably, by arranging for the retrieval of historical data on hydrology, geography and land use in the river basin planned for the water conservancy project, it can be effectively used in a way that due to climate change, seasonal change and other sudden reasons, the data on hydrology, geography and land use in the river basin planned for the water conservancy project collected by remote sensing technology and manual measurement cannot fully represent the comprehensive information in the river basin, thereby resulting in incomplete and unreliable basis for project planning. It provides comprehensive and accurate data support for the planning and management of water conservancy projects, which can not only improve the scientificity and accuracy of decision-making, but also reduce the risks and costs in the construction and operation of water conservancy projects.

[0012] As a preferred method, when using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the watershed planned for the water conservancy project, the following methods are included:

[0013] A11: Use remote sensing satellites to collect surface geographic information of the watershed planned for water conservancy projects, including vegetation coverage information, river direction information, surface height change information and land use information;

[0014] A12: Use drones or drone groups to collect image information of the watershed planned for the water conservancy project, so as to collect and identify the water and soil erosion information at the boundary between the river and the soil in the watershed planned for the water conservancy project;

[0015] A13: The information of river flow velocity and temperature in the planned watershed of the water conservancy project is collected through various sensors such as flow velocity sensors and temperature sensors;

[0016] A14: Use drones or unmanned boats with lidar to collect riverbed structure information and water level information;

[0017] A15: Soil information of the watershed planned for the water conservancy project is identified through manual collection methods, where the soil information includes soil texture information, soil pH value information, and soil moisture information.

[0018] Preferably, when retrieving historical data on hydrology, geography, land use, etc. within the river basin planned by the water conservancy project, the retrieved content includes: rainfall information within the river basin planned by the water conservancy project, rainfall time information within the river basin planned by the water conservancy project, historical soil erosion data within the river basin planned by the water conservancy project, solar radiation information within the river basin planned by the water conservancy project, and historical vegetation information within the river basin planned by the water conservancy project.

[0019] As a preferred method, when establishing a hydrogeographic model based on data on hydrology, geography and land use in the watershed planned for the water conservancy project collected by remote sensing technology and manual measurement, the following steps are included:

[0020] S21: Based on the surface geographic information of the planned watershed of the water conservancy project collected by remote sensing satellites and the riverbed structure information and water level information of the river collected by laser radar, a simulation model including the surface shape of the planned watershed of the water conservancy project and the shape of the river is established;

[0021] S22: inputting the remaining data on hydrology, geography and land use in the watershed planned by the Daode Water Conservancy Project collected by remote sensing technology and manual measurement into the simulation model to obtain a geographical model;

[0022] S23: partitioning the geographical model into a plurality of groups of regions;

[0023] S24: According to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, each partition is divided into different levels, and the establishment of the geographic model is completed.

[0024] Preferably, when partitioning the geographical model into a plurality of groups of regions, the following steps are included:

[0025] S31: Divide the geographical model according to different soil quality, distance from the river, river water level, river flow rate and various judgment bases, and divide the geographical model according to different methods;

[0026] S32: Overlaying geographical models divided according to various criteria;

[0027] S33: Using the division boundaries generated according to various bases as the partition boundaries, dividing the geographical model, and dividing the base salary model into a number of groups of areas of different sizes.

[0028] Preferably, according to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, and each partition is divided into different levels. When the establishment of the geographic model is completed, the following steps are included:

[0029] S41: Evaluate each indicator of the specific geographical data of each sub-district individually to determine the highest grade of the sub-district;

[0030] S42: Comprehensively evaluate multiple indicators of specific geographic data in each sub-area, perform weighted processing according to different weights, and determine the comprehensive classification of the sub-area; wherein the calculation formula is: A = (∑ i n =0 α i φ i ) / n, where φ i is the i-th indicator of the specific geographic data of each partition, α i is the weight of the i-th indicator;

[0031] S43: The highest grade and the comprehensive grade are combined, and the data with the lowest grade is selected as the final grade of the partition.

[0032] Preferably, by setting up a zoning analysis of the geographic model, on the one hand, the difficulty of conducting geological and hydrological analysis in the watershed of the water conservancy project planning can be reduced, and the workload of the analysis can be reduced. At the same time, in accordance with the requirements of the water conservancy project planning, a variety of computer simulation software can be used to automatically select areas that meet the water conservancy project planning, thereby reducing the difficulty of water conservancy project planning and providing decision makers with efficient and accurate data support, ensuring the smooth implementation and sustainable development of water conservancy projects.

[0033] As a preference, when evaluating each indicator of the specific geographic data of each sub-district separately and determining the highest grade of the sub-district, the calculation principle formula is: β = minθ i , where θ i The classification of each indicator for specific geographical data.

[0034] Preferably, when planning water conservancy projects with the established hydrological and geographical model as a reference, the following steps are included:

[0035] S51: selecting a site according to the construction requirements of the water conservancy project and the level of the zoning in the geographical model, selecting multiple alternative project construction sites, and generating multiple project planning schemes;

[0036] S52: After the site selection is completed, the obtained geographical model is used for simulation, and the impact of each engineering planning scheme on various factors such as the environment and people's livelihood is judged and eliminated;

[0037] S53: Conduct field investigation on the remaining engineering planning schemes, determine the final site selection, and obtain the final engineering planning scheme.

[0038] Preferably, the following steps are included in the construction supervision:

[0039] S61: During the construction of water conservancy projects, multiple data are collected inside and around the water conservancy project construction site, including water level data, river flow data, rainfall data, river sediment content data and temperature data;

[0040] S62: testing multiple indicators separately to determine whether any indicator exceeds a normal threshold;

[0041] S63: Comprehensively weight multiple indicators to determine whether the overall environment is within the normal range.

[0042] A water conservancy project planning system, comprising:

[0043] The data collection module is used to collect data on hydrology, geography and land use in the watershed planned for the water conservancy project;

[0044] The modeling module is used to model the watershed planned by the watershed project according to the data collected by the data collection module to obtain a simulation model;

[0045] The model processing module is used to refine and process the simulation module according to the data collected by the data collection module to obtain a geographic model with various geographic data;

[0046] The simulation analysis module is used to perform mechanical analysis and simulation analysis after inputting engineering planning information into the geographic model;

[0047] The supervision module is used to monitor the hydrological information and other information within the planned watershed of the water conservancy project during the construction of the water conservancy project.

[0048] Beneficial effects of the present invention:

[0049] 1. Compared with the existing water conservancy project planning method, which uses a variety of sensors and auxiliary machines for data collection, and the rest of the work is analyzed and investigated manually, the complexity of water conservancy projects and the diversity of data lead to complex project planning and a long implementation cycle. This project planning method can provide more comprehensive and accurate data support for water conservancy project planning by using a variety of modeling and computer analysis methods, reduce the complexity and difficulty of water conservancy project planning, and ensure the smooth implementation and sustainable development of water conservancy projects.

[0050] 2. By setting up zoning analysis for the geographic model, on the one hand, it can reduce the difficulty of geological and hydrological analysis in the watershed of the water conservancy project planning and reduce the workload of the analysis. At the same time, according to the requirements of the water conservancy project planning, a variety of computer simulation software can be used to automatically select areas that meet the water conservancy project planning, reducing the difficulty of water conservancy project planning, providing decision makers with efficient and accurate data support, and ensuring the smooth implementation and sustainable development of water conservancy projects;

[0051] 3. By setting up zoning analysis of the geographic model, on the one hand, it can reduce the difficulty of geological and hydrological analysis in the basin of water conservancy project planning and reduce the workload of analysis. At the same time, according to the requirements of water conservancy project planning, a variety of computer simulation software can be used to automatically select areas that meet the water conservancy project planning, thereby reducing the difficulty of water conservancy project planning and providing decision makers with efficient and accurate data support, ensuring the smooth implementation and sustainable development of water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 What is shown is a schematic diagram of the workflow of the water conservancy project planning method of the present invention;

[0053] Figure 2 What is shown is a schematic diagram of the structure of the water conservancy project planning system of the present invention. DETAILED DESCRIPTION

[0054] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0055] See also Figure 1 The present invention provides an embodiment: a water conservancy project planning method, comprising the following steps:

[0056] S11: Data collection, using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the basin planned for the water conservancy project;

[0057] S12: Historical data retrieval: retrieve historical data on hydrology, geography and land use in the basin planned for the water conservancy project;

[0058] S13: Model construction: Based on the data on hydrology, geography and land use in the watershed planned by the water conservancy project collected by remote sensing technology and manual measurement, a hydrogeographic model is established, and historical data on hydrology, geography and land use in the watershed planned by the water conservancy project are input into the model;

[0059] S14: Water conservancy project planning: using the established hydrological and geographical model as a reference to carry out water conservancy project planning;

[0060] S15: Data simulation: input various types of projects to be constructed into the established geographic model, conduct simulation analysis, and determine whether the project planning is reasonable and reliable;

[0061] S16: Construction supervision. During the construction of water conservancy projects, remote sensing technology and manual measurement are used to collect data on the construction process of water conservancy projects and supervise the construction.

[0062] Preferably, by arranging for the retrieval of historical data on hydrology, geography, land use, etc. in the river basin planned for the water conservancy project, it can be effectively used in a way that due to climate change, seasonal changes and other sudden reasons, the data on hydrology, geography, land use, etc. in the river basin planned for the water conservancy project collected by remote sensing technology and manual measurement cannot fully represent the comprehensive information in the river basin, thereby resulting in incomplete and unreliable basis for project planning. It provides comprehensive and accurate data support for the planning and management of water conservancy projects, which can not only improve the scientificity and accuracy of decision-making, but also reduce the risks and costs in the construction and operation of water conservancy projects.

[0063] As a preferred method, when using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the watershed planned for the water conservancy project, the following methods are included:

[0064] A11: Use remote sensing satellites to collect surface geographic information of the watershed planned for water conservancy projects, including vegetation coverage information, river direction information, surface height change information and land use information;

[0065] A12: Use drones or drone groups to collect image information of the watershed planned for the water conservancy project, so as to collect and identify the water and soil erosion information at the boundary between the river and the soil in the watershed planned for the water conservancy project;

[0066] A13: The information of river flow velocity and temperature in the planned watershed of the water conservancy project is collected through various sensors such as flow velocity sensors and temperature sensors;

[0067] A14: Use drones or unmanned boats with lidar to collect riverbed structure information and water level information;

[0068] A15: Soil information of the watershed planned for the water conservancy project is identified through manual collection methods, where the soil information includes soil texture information, soil pH value information, and soil moisture information.

[0069] Preferably, when retrieving historical data on hydrology, geography, land use, etc. within the river basin planned by the water conservancy project, the retrieved content includes: rainfall information within the river basin planned by the water conservancy project, rainfall time information within the river basin planned by the water conservancy project, historical soil erosion data within the river basin planned by the water conservancy project, solar radiation information within the river basin planned by the water conservancy project, and historical vegetation information within the river basin planned by the water conservancy project.

[0070] As a preferred method, when establishing a hydrogeographic model based on data on hydrology, geography and land use in the watershed planned for the water conservancy project collected by remote sensing technology and manual measurement, the following steps are included:

[0071] S21: Based on the surface geographic information of the planned watershed of the water conservancy project collected by remote sensing satellites and the riverbed structure information and water level information of the river collected by laser radar, a simulation model including the surface shape of the planned watershed of the water conservancy project and the shape of the river is established;

[0072] S22: inputting the remaining data on hydrology, geography and land use in the watershed planned by the Daode Water Conservancy Project collected by remote sensing technology and manual measurement into the simulation model to obtain a geographical model;

[0073] S23: partitioning the geographical model into a plurality of groups of regions;

[0074] S24: According to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, each partition is divided into different levels, and the establishment of the geographic model is completed.

[0075] Preferably, when partitioning the geographical model into a plurality of groups of regions, the following steps are included:

[0076] S31: Divide the geographical model according to different soil quality, distance from the river, river water level, river flow rate and various judgment bases, and divide the geographical model according to different methods;

[0077] S32: Overlaying geographical models divided according to various criteria;

[0078] S33: Using the division boundaries generated according to various bases as the partition boundaries, dividing the geographical model, and dividing the base salary model into a number of groups of areas of different sizes.

[0079] Preferably, according to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, and each partition is divided into different levels. When the establishment of the geographic model is completed, the following steps are included:

[0080] S41: Evaluate each indicator of the specific geographical data of each sub-district individually to determine the highest grade of the sub-district;

[0081] S42: Comprehensively evaluate multiple indicators of specific geographic data in each sub-area, perform weighted processing according to different weights, and determine the comprehensive classification of the sub-area; wherein the calculation formula is: A = (∑ i n =0 α i φ i ) / n, where φ i is the i-th indicator of the specific geographic data of each partition, α i is the weight of the i-th indicator;

[0082] S43: The highest grade and the comprehensive grade are combined, and the data with the lowest grade is selected as the final grade of the partition.

[0083] Preferably, by setting up a zoning analysis of the geographic model, on the one hand, the difficulty of conducting geological and hydrological analysis in the watershed of the water conservancy project planning can be reduced, and the workload of the analysis can be reduced. At the same time, in accordance with the requirements of the water conservancy project planning, a variety of computer simulation software can be used to automatically select areas that meet the water conservancy project planning, thereby reducing the difficulty of water conservancy project planning and providing decision makers with efficient and accurate data support, ensuring the smooth implementation and sustainable development of water conservancy projects.

[0084] As a preference, when evaluating each indicator of the specific geographic data of each sub-district separately and determining the highest grade of the sub-district, the calculation principle formula is: β = minθ i , where θ i The classification of each indicator for specific geographical data.

[0085] Preferably, when planning water conservancy projects with the established hydrological and geographical model as a reference, the following steps are included:

[0086] S51: selecting a site according to the construction requirements of the water conservancy project and the level of the zoning in the geographical model, selecting multiple alternative project construction sites, and generating multiple project planning schemes;

[0087] S52: After the site selection is completed, the obtained geographical model is used for simulation, and the impact of each engineering planning scheme on various factors such as the environment and people's livelihood is judged and eliminated;

[0088] S53: Conduct field investigation on the remaining engineering planning schemes, determine the final site selection, and obtain the final engineering planning scheme.

[0089] Preferably, the following steps are included in the construction supervision:

[0090] S61: During the construction of water conservancy projects, multiple data are collected inside and around the water conservancy project construction site, including water level data, river flow data, rainfall data, river sediment content data and temperature data;

[0091] S62: testing multiple indicators separately to determine whether any indicator exceeds a normal threshold;

[0092] S63: Comprehensively weight multiple indicators to determine whether the overall environment is within the normal range.

[0093] See also Figure 2 The present invention provides an embodiment: a water conservancy project planning system, comprising:

[0094] The data collection module is used to collect data on hydrology, geography and land use in the watershed planned for the water conservancy project;

[0095] The modeling module is used to model the watershed planned by the watershed project according to the data collected by the data collection module to obtain a simulation model;

[0096] The model processing module is used to refine and process the simulation module according to the data collected by the data collection module to obtain a geographic model with various geographic data;

[0097] The simulation analysis module is used to perform mechanical analysis and simulation analysis after inputting engineering planning information into the geographic model;

[0098] The supervision module is used to monitor the hydrological information and other information within the planned watershed of the water conservancy project during the construction of the water conservancy project.

[0099] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the spirit of the present invention.

Claims

1. A water conservancy project planning method; Features: The following steps are included: S11: Data collection, using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the basin planned for the water conservancy project; S12: Historical data retrieval: retrieve historical data on hydrology, geography and land use in the basin planned for the water conservancy project; S13: Model construction: Based on the data on hydrology, geography and land use in the watershed planned by the water conservancy project collected by remote sensing technology and manual measurement, a hydrogeographic model is established, and historical data on hydrology, geography and land use in the watershed planned by the water conservancy project are input into the model; S14: Water conservancy project planning: using the established hydrological and geographical model as a reference to carry out water conservancy project planning; S15: Data simulation: input various types of projects to be constructed into the established geographic model, conduct simulation analysis, and determine whether the project planning is reasonable and reliable; S16: Construction supervision. During the construction of water conservancy projects, remote sensing technology and manual measurement are used to collect data on the construction process of water conservancy projects and supervise the construction.

2. A water conservancy project planning method according to claim 1, Features: When using remote sensing technology and manual measurement to collect data on hydrology, geography and land use in the basin planned for water conservancy projects, the following methods are included: A11: Use remote sensing satellites to collect surface geographic information of the watershed planned for water conservancy projects, including vegetation coverage information, river direction information, surface height change information and land use information; A12: Use drones or drone groups to collect image information of the watershed planned for the water conservancy project, so as to collect and identify the water and soil erosion information at the boundary between the river and the soil in the watershed planned for the water conservancy project; A13: The information of river flow velocity and temperature in the planned watershed of the water conservancy project is collected through various sensors such as flow velocity sensors and temperature sensors; A14: Use drones or unmanned boats with lidar to collect riverbed structure information and water level information; A15: Soil information of the watershed planned for the water conservancy project is identified through manual collection methods, where the soil information includes soil texture information, soil pH value information, and soil moisture information.

3. A water conservancy project planning method according to claim 2, Features: When retrieving historical data on hydrology, geography and land use within the river basin planned by the water conservancy project, the retrieved content includes: rainfall information within the river basin planned by the water conservancy project, rainfall time information within the river basin planned by the water conservancy project, historical soil erosion data within the river basin planned by the water conservancy project, solar radiation information within the river basin planned by the water conservancy project and historical vegetation information within the river basin planned by the water conservancy project.

4. A water conservancy project planning method according to claim 3, Features: The following steps are included in the establishment of a hydrogeographic model based on the data on hydrology, geography and land use in the watershed planned for the water conservancy project collected by remote sensing technology and manual measurement: S21: Based on the surface geographic information of the planned watershed of the water conservancy project collected by remote sensing satellites and the riverbed structure information and water level information of the river collected by laser radar, a simulation model including the surface shape of the planned watershed of the water conservancy project and the shape of the river is established; S22: inputting the remaining data on hydrology, geography and land use in the watershed planned by the Daode Water Conservancy Project collected by remote sensing technology and manual measurement into the simulation model to obtain a geographical model; S23: partitioning the geographical model into a plurality of groups of regions; S24: According to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, each partition is divided into different levels, and the establishment of the geographic model is completed.

5. A water conservancy project planning method according to claim 4, Features: When partitioning a geographic model into several groups of regions, the following steps are included: S31: Divide the geographical model according to different soil quality, distance from the river, river water level, river flow rate and various judgment bases, and divide the geographical model according to different methods; S32: Overlaying geographical models divided according to various criteria; S33: Using the division boundaries generated according to various bases as the partition boundaries, dividing the geographical model, and dividing the base salary model into a number of groups of areas of different sizes.

6. A water conservancy project planning method according to claim 5, Features: According to the specific geographic data of each partition in the geographic model, each partition of the geographic model is judged and analyzed respectively, and each partition is divided into different levels. When the establishment of the geographic model is completed, the following steps are included: S41: Evaluate each indicator of the specific geographical data of each sub-district individually to determine the highest grade of the sub-district; S42: Comprehensively evaluate multiple indicators of specific geographic data in each sub-area, perform weighted processing according to different weights, and determine the comprehensive classification of the sub-area; wherein the calculation formula is: A = (∑ i n =0 α i φ i ) / n, where φ i is the i-th indicator of the specific geographic data of each partition, α i is the weight of the i-th indicator; S43: The highest grade and the comprehensive grade are combined, and the data with the lowest grade is selected as the final grade of the partition.

7. A water conservancy project planning method according to claim 6, Features: When evaluating each indicator of the specific geographical data of each sub-district separately and judging the highest grade of the sub-district, the calculation principle formula is: β = minθ i , where θ i The classification of each indicator for specific geographical data.

8. A water conservancy project planning method according to claim 7, Features: When planning water conservancy projects with the established hydrological and geographical model as a reference, the following steps are included: S51: selecting a site according to the construction requirements of the water conservancy project and the level of the zoning in the geographical model, selecting multiple alternative project construction sites, and generating multiple project planning schemes; S52: After the site selection is completed, the obtained geographical model is used for simulation, and the impact of each engineering planning scheme on various factors such as the environment and people's livelihood is judged and eliminated; S53: Conduct field investigation on the remaining engineering planning schemes, determine the final site selection, and obtain the final engineering planning scheme.

9. A water conservancy project planning method according to claim 8, Features: The following steps are included in construction supervision: S61: During the construction of water conservancy projects, multiple data are collected inside and around the water conservancy project construction site, including water level data, river flow data, rainfall data, river sediment content data and temperature data; S62: testing multiple indicators separately to determine whether any indicator exceeds a normal threshold; S63: Comprehensively weight multiple indicators to determine whether the overall environment is within the normal range.

10. A water conservancy project planning system, Features: Included are: The data collection module is used to collect data on hydrology, geography and land use in the watershed planned for the water conservancy project; The modeling module is used to model the watershed planned by the watershed project according to the data collected by the data collection module to obtain a simulation model; The model processing module is used to refine and process the simulation module according to the data collected by the data collection module to obtain a geographic model with various geographic data; The simulation analysis module is used to perform mechanical analysis and simulation analysis after inputting engineering planning information into the geographic model; The supervision module is used to monitor the hydrological information and other information within the planned watershed of the water conservancy project during the construction of the water conservancy project.