Active power distribution network scheduling method based on Stackelberg game and multi-subject benefits and medium
Through the Stackelberg game model and improved particle swarm algorithm, combined with the objective functions of distribution network operators, charging stations and power users, the problem of non-maximization of the interests of multiple parties in the existing technology is solved, and the multi-subject interests of the distribution network are maximized. Optimizing scheduling improves the economy and security of the system.
Patent Information
- Application Number
- CN202410720364.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2024-10-11
AI Technical Summary
The existing distribution network dispatch management method cannot ensure the maximization of the interests of distribution network operators, charging stations and power users, and cannot effectively manage the operation dispatch of the distribution network based on the maximization of multi-party interests, ignoring the decentralized decision-making subjects. interactions and competition among them.
An active distribution network dispatching method based on Stackelberg game and multi-agent interests is adopted. By constructing upper-layer and lower-layer models, the economic benefits of distribution network operators and the operating income and electricity costs of charging stations, power users are respectively targeted. Combined with The particle swarm algorithm is improved to solve the problem, and the equilibrium solution of the master-slave game model is obtained to achieve the optimization of multi-agent interests.
Ensure the maximization of the interests of distribution network operators, charging stations and power users, realize the optimization of multi-party interests of active distribution network operation and dispatch, and improve the economy and safety of system operation.
Smart Images

Figure CN118763704A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network dispatching, and in particular to an active distribution network dispatching method and medium based on Stackelberg game and multi-agent interests. Background Art
[0002] Active distribution network is a good form of absorbing renewable energy. Taking full account of various adjustable resources during dispatching can optimize the operating characteristics of active distribution network. In addition to distributed power sources such as wind and light, energy storage system greatly increases the flexibility of distribution network. Its energy storage characteristics break through the limitation of instantaneous balance of electricity in power system, and provide conditions for optimizing the dispatching plan of each component unit in the distribution network over a longer time range. Due to the existence of various dispatchable resources, the operation mode of active distribution network becomes very flexible. By formulating reasonable dispatching plans and realizing source storage and load coordinated optimization, it can smooth out the adverse effects of renewable energy grid connection, enhance the absorption capacity of distribution network for renewable energy, and improve the economy and safety of system operation. At present, there are generally differences in interests among the participating entities in the management of active distribution network. For example, between centralized charging stations and distribution companies, how to balance the reduction of distribution network losses, the increase of profits of charging station developers, and the maximization of auxiliary benefits obtained by charging stations participating in grid dispatching.
[0003] Existing distribution network dispatching management methods mainly rely on centralized optimization models, which usually assume that all decisions are made by a centralized authority and ignore the interaction and competition between decentralized decision-making entities. Existing distribution network dispatching management methods cannot ensure the maximization of the interests of distribution network operators, charging stations and power users, and cannot effectively manage the operation and dispatch of distribution networks based on the maximization of the interests of multiple parties. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the first object of the present invention is to provide an active distribution network scheduling method based on Stackelberg game and multi-subject interests, which can ensure the maximization of the interests of distribution network operators, charging stations and power users, and can realize active distribution network operation scheduling based on the maximization of the interests of multiple parties.
[0005] A second object of the present invention is to provide a computer-readable storage medium.
[0006] A third object of the present invention is to provide an electronic device.
[0007] To achieve the above object, the present invention is implemented through the following technical solutions:
[0008] An active distribution network dispatching method based on Stackelberg game and multi-agent interests, comprising:
[0009] The first objective function is constructed with the goal of maximizing economic benefits for distribution network operators, and the second and third objective functions are constructed with the goals of maximizing daily operating income and minimizing electricity costs for charging stations and power users, respectively.
[0010] A first benefit function is constructed by the first objective function, and the first benefit function is used as an upper model; a second benefit function is constructed by the second objective function and the third objective function, and the second benefit function is used as a lower model; the upper model is used as a leader, and the lower model is used as a follower, and a master-slave game model is obtained by combining them;
[0011] The constraint conditions of the master-slave game model are determined, and based on the constraint conditions, an improved particle swarm algorithm is used to solve the lower model to obtain the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, and the solution result is fed back to the upper model, and the improved particle swarm algorithm is used to solve the upper model to obtain the optimal time-of-use electricity price, thereby obtaining the equilibrium solution of the master-slave game model; distribution network scheduling is performed based on the equilibrium solution of the master-slave game model, thereby realizing active distribution network scheduling with optimal interests of multiple subjects.
[0012] Preferably, the first objective function is expressed as follows:
[0013] B DNO =B sell -C grid -C fluc
[0014] Among them, B DNO is the economic benefit of the distribution network operator, B sell is the electricity sales revenue of the distribution network operator, C grid is the electricity purchase cost of the distribution network operator, C fluc is the load fluctuation cost.
[0015] Preferably, the second objective function is expressed as follows:
[0016]
[0017] Among them, B ESS is the daily operating income of the charging station, t is the time period, T is the entire scheduling period, is the electricity price sold by the distribution network operator during period t, Subsidized price for discharging electricity at charging stations, The operation and maintenance cost of the charging station. are the discharge power and charging power of the charging station during period t respectively, and Δt represents the time interval.
[0018] Preferably, the third objective function is expressed as follows:
[0019]
[0020] Among them, C user The electricity cost for electricity users, is the power consumption of the power user during period t, is the satisfaction cost function of electricity users, is the nominal electricity demand value of the power user in period t.
[0021] Preferably, the first benefit function and the second benefit function are respectively expressed as follows:
[0022] maxU1=B DNO
[0023] minU2=C user -B ESS
[0024] Among them, U1 represents the first benefit function, and U2 represents the second benefit function.
[0025] Preferably, the constraints include power balance constraints, time-of-use electricity price constraints, energy storage operation constraints and demand response constraints.
[0026] Preferably, the improved particle swarm optimization algorithm is a particle swarm optimization algorithm improved based on dynamic inertia weight and random mutation factor.
[0027] Preferably, the random mutation factor is improved to perform a mutation operation after each generation of particle position update is completed; the mutation operation is to randomly select a one-dimensional vector of particles and change the randomly selected one-dimensional vector with a set mutation probability value to achieve the mutation operation.
[0028] To achieve the above-mentioned purpose, the second aspect of the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned active distribution network scheduling method based on Stackelberg game and multi-agent interests is implemented.
[0029] To achieve the above-mentioned purpose, the third aspect of the present invention provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the active distribution network scheduling method based on Stackelberg game and multi-agent interests is implemented.
[0030] The present invention has at least the following technical effects:
[0031] The upper model of the present invention is constructed as a leader with the goal of maximizing the economic benefits obtained by the distribution network operator itself, and the lower model is constructed as a follower with the goal of maximizing the daily operating income of the charging station and minimizing the electricity cost of the power user. Then, the upper model and the lower model are combined to obtain the master-slave game model, and the constraints of the master-slave game model are determined. Based on the constraints, the improved particle swarm algorithm is used to solve the lower model to obtain the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, and the solution result is fed back to the upper model, and the improved particle swarm algorithm is also used to solve the upper model to obtain the optimal time-of-use electricity price, thereby obtaining the master-slave game model equilibrium solution including the optimal time-of-use electricity price, the optimal charging and discharging power and the optimal power consumption of the power user, and then the distribution network is dispatched based on the master-slave game model equilibrium solution, so as to realize the active distribution network dispatching with the best interests of multiple subjects. Therefore, the present invention can ensure the maximization of the interests of the distribution network operators, charging stations and power users, and can realize the active distribution network operation dispatching based on the maximization of the interests of multiple parties.
[0032] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 The present invention is a flowchart of an active distribution network scheduling method based on Stackelberg game and multi-agent interests.
[0034] Figure 2 Schematic diagram of the structure of the power distribution network system according to an embodiment of the present invention.
[0035] Figure 3 Schematic diagram of the day-ahead spot market price forecast according to an embodiment of the present invention.
[0036] Figure 4 This is a schematic diagram of predicting active power of a distributed power supply according to an embodiment of the present invention.
[0037] Figure 5 It is a schematic diagram of total active power forecasting of system load according to an embodiment of the present invention.
[0038] Figure 6 The following is a schematic diagram of the dispatching result of the distribution network in the scenario of an embodiment of the present invention.
[0039] Figure 7 This is a schematic diagram of the dispatching results of the distribution network under scenario 2 of an embodiment of the present invention.
[0040] Figure 8 The figure is a schematic diagram of electricity usage fees for power users in different scenarios according to an embodiment of the present invention.
[0041] Fig. 9Schematic diagram of the satisfaction cost of electricity consumption of power users in different scenarios of an embodiment of the present invention. DETAILED DESCRIPTION
[0042] The present embodiment is described in detail below, and examples of the embodiment are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0043] The active distribution network scheduling method and medium based on Stackelberg game and multi-agent interests of this embodiment are described below with reference to the accompanying drawings.
[0044] Figure 1 FIG. 1 is a flow chart of an active distribution network dispatching method based on Stackelberg game and multi-agent interests according to an embodiment of the present invention. Figure 1 As shown, the method includes:
[0045] Step S1: construct a first objective function with the goal of achieving maximum economic benefits for distribution network operators, and construct a second objective function and a third objective function with the goals of achieving maximum daily operating income and minimum electricity costs for charging stations and power users, respectively.
[0046] Specifically, the distributed power sources of the distribution network consider photovoltaic and wind turbines, and the power generation cost is negligible. The economic benefits of the distribution network operator are mainly obtained by the power sales revenue, power purchase cost and fluctuation cost. The economic benefits of the distribution network operator, that is, the first objective function, are expressed as follows:
[0047] B DNO =B sell -C grid -C fluc (1)
[0048] Among them, B DNO is the economic benefit of the distribution network operator, B sell is the electricity sales revenue of the distribution network operator, C grid is the electricity purchase cost of the distribution network operator, C fluc is the load fluctuation cost.
[0049] The revenue from electricity sales is calculated as follows:
[0050]
[0051] Among them, t is the time period, T is the entire scheduling period, is the electricity price sold by the distribution network operator during period t, is the sales power of the distribution network operator in period t, is the sum of the sales power to charging stations and electricity users, and Δt represents the time interval.
[0052] The cost of purchasing electricity is calculated as follows:
[0053]
[0054] in, is the price of electricity purchased by the distribution network operator from the upper grid during period t, which is equal to the spot market price during period t. It is the power purchased by the distribution network operator from the upper grid during period t.
[0055] The load fluctuation cost is calculated as follows:
[0056]
[0057] Where λ is the load fluctuation cost coefficient, is the average power purchased by the distribution network operator from the upper grid in one day,
[0058] For charging stations, the charging and discharging plan is formulated with the goal of maximizing daily operating income. Assuming that the price at which the charging station purchases and sells electricity to the distribution network operator is equal to the sales price during the current period, the daily operating income of the charging station, i.e. the second objective function, is expressed as follows:
[0059]
[0060] Among them, B ESS is the daily operating income of the charging station, Subsidized price for discharging electricity at charging stations, The operation and maintenance cost of the charging station. are the discharge power and charging power of the charging station during period t respectively. In the same minimum scheduling period, the charging station can only be in one of the states of charging, discharging and floating charging.
[0061] For power users, it is hoped that their electricity costs will be minimized. In order to more comprehensively reflect the interests of power users, in addition to electricity charges, the electricity costs also need to consider the satisfaction costs of power users. The electricity costs of power users, i.e., the third objective function, are expressed as follows:
[0062]
[0063] Among them, C user The electricity cost for electricity users, is the power consumption of the power user during period t, is the satisfaction cost function of electricity users, is the nominal electricity demand value of the power user in period t. Among them, the satisfaction cost function of the power user is expressed as follows:
[0064]
[0065] Among them, a t 、b t is the parameter of the satisfaction cost function, whose value is determined by the specific user characteristics and satisfies a t <1 and a t b t <0. By adjusting the parameter value according to the specific user type, the user's electricity satisfaction can be better simulated.
[0066] Step S2: construct the first benefit function through the first objective function, and the first benefit function is used as the upper model; construct the second benefit function through the second objective function and the third objective function, and the second benefit function is used as the lower model; take the upper model as the leader and the lower model as the follower, and jointly obtain the master-slave game model.
[0067] Specifically, the distribution network operator is the leader, the charging station and the power user are the followers, and the first benefit function and the second benefit function, i.e., the upper model and the lower model are expressed as follows:
[0068] maxU1=B DNO (8)
[0069] minU2=C user -B ESS (9)
[0070] Among them, U1 represents the first benefit function, U2 represents the second benefit function, and the master-slave game model can be obtained by combining equations (8) and (9).
[0071] Step S3: Determine the constraints of the master-slave game model, and based on the constraints, use the improved particle swarm algorithm to solve the lower model to obtain the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, and feed the solution results back to the upper model, and use the improved particle swarm algorithm to solve the upper model to obtain the optimal time-of-use electricity price, thereby obtaining the equilibrium solution of the master-slave game model; based on the equilibrium solution of the master-slave game model, perform distribution network scheduling, thereby realizing active distribution network scheduling with optimal interests of multiple subjects.
[0072] Specifically, there are power balance constraints, time-of-use electricity price constraints, energy storage operation constraints and demand response constraints among distribution network operators, charging stations and electricity users.
[0073] The power balance constraint is expressed as follows:
[0074]
[0075] in, and They refer to the mth photovoltaic power generation and the nth wind turbine power generation respectively; and is the initial load power of the power user in period t and the response power of price-based demand response.
[0076] The TOU electricity price policy formulated by the distribution network operator needs to have the guiding effect of shaving peak loads and filling valley loads, while also taking into account the limitations of power generation costs and user affordability. Therefore, the TOU electricity price constraints are:
[0077]
[0078] Among them, p f 、p p and p g are peak electricity price, normal electricity price and valley electricity price respectively; min and p max are the minimum and maximum values allowed for the sales electricity price respectively.
[0079] In order to ensure the safe operation of the charging station and extend the service life of the battery, during the operation of the charging station, the charging and discharging power and SOC (State of Charge), i.e., the energy storage operation constraints, need to be met:
[0080]
[0081] SOC min ≤SOC t ≤SOC max (14)
[0082] Among them, P ESS Charging and discharging power for charging stations, and They are the maximum charging and discharging power values allowed by the charging station; SOC t is the SOC value of the charging station, SOC min and SOC max They are the minimum and maximum SOC values allowed by the charging station.
[0083] Furthermore, the energy storage operation constraints also include energy storage cycle conservation constraints, which are expressed as follows:
[0084]
[0085] in, The initial charge of the battery is 0; The remaining capacity of the battery at 24. This constraint can also be expressed by the same SOC of the battery at the beginning and end.
[0086] Furthermore, the demand response constraints are expressed as follows:
[0087]
[0088] Among them, e tt It represents the electricity price elasticity coefficient in period t, which measures the influence of electricity price change in period t on load power in period t. Δpt and Δpj represent the electricity price changes in period t and period j respectively. t 、p j are the electricity prices in period t and period j respectively, e tj It represents the price elasticity coefficient of period t to period j. When the distribution network implements the time-of-use electricity price policy, the electricity price p is expressed as:
[0089]
[0090] Among them, T f 、T p 、T g They represent peak time, normal time and valley time respectively.
[0091] In one embodiment of the present invention, the improved particle swarm algorithm is a particle swarm optimization algorithm improved based on dynamic inertia weight and random mutation factor. The random mutation factor is improved to perform a mutation operation after each generation of particle position update is completed; the mutation operation is to randomly select a one-dimensional vector of particles and change the randomly selected one-dimensional vector with a set mutation probability value to achieve the mutation operation.
[0092] Specifically, the particle swarm algorithm uses fitness to judge the quality of particles. The fitness function is the benefit function of the optimization problem. In the iterative process, the particle swarm algorithm updates its speed and position by referring to the individual historical optimal position pBest and the population historical optimal position gBest. The iterative update formula is shown in equations (18) and (19).
[0093]
[0094] Among them, V i k+1 represents the velocity of the i-th particle in the k+1th iteration, w is the dynamic inertia weight, which indicates the degree to which the particle inherits the original velocity, V i k represents the speed of the i-th particle in the k-th iteration, c1 and c2 are the self-learning factor and the group learning factor, respectively, which represent the ability of the particle to learn from its own experience and the group experience, r1 and r2 are two random numbers between [0, 1], which enable the population to maintain the diversity between individuals during the update process, pBest i is the individual historical optimal position of the ith particle, represents the position of the i-th particle at the k-th iteration, represents the position of the i-th particle at the k+1-th iteration.
[0095] The calculation formula of dynamic inertia weight based on linear decreasing method is as follows:
[0096]
[0097] Among them, w max is the maximum value of the dynamic inertia weight, and also the starting value of the dynamic inertia weight, w min is the minimum and final value of the dynamic inertia weight, k max is the maximum number of iterations, k is the current number of iterations, usually, w max =0.9, w min =0.4.
[0098] In this embodiment, a mutation operation is performed after the position update of each generation of particles is completed. A certain dimensional vector of the particle is randomly selected and its value is changed with a certain mutation probability value. The specific calculation formula is as follows:
[0099]
[0100] in, is the position coordinate value of the v-th dimension vector of particle i in the solution space during the k-th iteration; rand is a random number between [0,1]; x v,min and x v,max are the minimum and maximum values of the feasible domain of the v-th dimension vector, α is a random value on [0,1], and γ is the selected mutation probability value.
[0101] In this embodiment, the solution steps of the particle swarm optimization algorithm improved based on dynamic inertia weight and random mutation factor are as follows:
[0102] 1) Input the relevant data of active distribution network dispatch, including the allowable range of time-of-use electricity prices, charging station energy storage operation parameters, charging station energy storage discharge subsidies, wind and solar power forecast output, spot market prices, 24-hour load forecast values, etc.
[0103] 2) Establish a master-slave game model, determine the participants in the game process, and construct the benefit function and game strategy set of the leader distribution network operator and the follower charging stations and power users.
[0104] 3) Randomly initialize the time-of-use electricity price of the distribution network operator in the upper model, and transmit the time-of-use electricity price information to charging stations and electricity users.
[0105] 4) Charging stations and power users formulate optimal electricity usage strategies based on time-of-use electricity prices, and the optimal strategy of followers in the model is solved using an improved particle swarm algorithm.
[0106] 5) The lower followers feed back the optimal electricity usage strategy to the upper leaders, and the distribution network operator optimizes the time-of-use electricity price according to the optimal electricity usage strategy of charging stations and power users. The optimization process also uses the improved particle swarm optimization algorithm.
[0107] 6) Repeat steps 4) and 5) until the error between two consecutive iteration results is less than the specified error value, the game reaches equilibrium, and the iterative solution process of the two-layer model ends.
[0108] When the equilibrium solution of the master-slave game model is obtained That is, when the above multi-stakeholder master-slave game reaches equilibrium, the constraints expressed by the following inequality are satisfied:
[0109]
[0110] Among them, P f , P p and P g are the sets of peak, normal and valley electricity price strategies of distribution network operators, are the optimal peak electricity price, normal electricity price and valley electricity price respectively. are the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, respectively. ESS,t is the charging and discharging power of the charging station during period t, represents the optimal charging and discharging power strategy set of the charging station in the time periods other than time period t, It represents the optimal power consumption strategy set for power users in other time periods except time period t.
[0111] It should be noted that under this optimal strategy, the interests of all game participants are balanced. If any party changes its strategy, the balance of interests will be destroyed.
[0112] The embodiment of the present invention uses the IEEE33 node system to verify the effectiveness of the active distribution network dispatching master-slave game model established in this paper that considers the interests of multiple subjects. Figure 2 As shown in the figure, the energy storage in the system is owned by the charging station and is actively charged and discharged. All node power users participate in price-based demand response. Figure 2 PV and WT represent photovoltaic and wind turbine respectively, and ESS represents energy storage system corresponding to charging station. B =12.66kV, reference power S B=1MVA, the voltage of each node is allowed to range from 0.9 to 1.1 (pu), and the original line parameters remain unchanged. Node 15 is connected to PV, nodes 4 and 33 are connected to WT, and nodes 14 and 33 are connected to ESS. The technical parameters of each device are shown in Table 1. All nodes in the system participate in price-based demand response, and the distribution network implements time-of-use electricity prices. The division of peak and valley periods of the distribution network, the sales price of each period, and the load electricity price elasticity coefficient are shown in Tables 2 and 3 respectively.
[0113] Table 1 Technical parameters of each equipment
[0114]
[0115]
[0116] Table 2 Time-of-use electricity price list for distribution network
[0117]
[0118] Table 3 Load price elasticity coefficient table
[0119] Time Peak hours Normal period Valley period Peak hours -0.10 0.016 0.012 Normal period 0.016 -0.10 0.01 Valley period 0.012 0.01 -0.10
[0120] The day-ahead spot market forecast price for distribution networks is shown in Figure 3 In addition, the system load and wind turbine and photovoltaic output can be seen in Figure 4 and Figure 5 The peak electricity price set by the distribution network operator shall not exceed 1.2 yuan / kWh, and the off-peak electricity price shall not be less than 0.3 yuan / kWh. For every kWh of energy storage discharged, a discharge subsidy of 0.5 yuan can be obtained.
[0121] To analyze the effect of this model, the following two different scenarios are set:
[0122] Scenario 1: With the goal of maximizing the benefits of distribution network operators, the distribution network operators set electricity prices, and charging stations and electricity users respond to electricity usage behaviors based on the electricity prices. However, the distribution network operators do not receive feedback from charging stations and electricity users.
[0123] Scenario 2: All stakeholders in the distribution network use the active distribution network master-slave game model established in this paper to optimize time-of-use electricity prices and electricity consumption behaviors.
[0124] The dispatching of the distribution network system under the two scenarios is as follows: Figure 6 and Figure 7 As shown in the figure, in scenario 1, the peak-to-valley transfer rate of the load is more obvious, and the charging and discharging power of the charging station at noon is relatively small; in scenario 2, the peak-to-valley transfer rate of the load is lower, and the charging and discharging power of the charging station at noon is relatively large.
[0125] The optimized distribution network time-of-use electricity prices under the two scenarios are shown in Table 4.
[0126] Table 4 Time-of-use electricity prices under different optimization objectives
[0127]
[0128] The interests of distribution network operators, charging stations and electricity users in scenarios 1 and 2 are shown in Table 5.
[0129] Table 5 Interests of each subject under different optimization objectives
[0130]
[0131] The electricity cost of users in scenarios 1 and 2 is as follows Figure 8 and Fig. 9 As shown. Figure 8 As can be seen from the user electricity cost chart, the user electricity cost in scenario 1 is 54,989.50 yuan, and the user electricity cost in scenario 2 is 45,634.11 yuan. Considering the interests of multiple entities, the user's electricity cost has been reduced by 17.01% due to the main factor of lower electricity prices. Fig. 9 It can be seen from the user satisfaction cost graph that the satisfaction costs in scenarios one and two are 7081.71 yuan and 3981.23 yuan respectively. The user satisfaction cost in scenario one is higher than that in scenario two. Especially during the peak electricity consumption period, the user satisfaction cost value of scenario one reaches a large value, indicating that the user's electricity consumption experience is poor at this time.
[0132] In summary, the upper model of the present invention is constructed as a leader with the goal of maximizing the economic benefits obtained by the distribution network operator itself, and the lower model is constructed as a follower with the goal of maximizing the daily operating income of the charging station and minimizing the electricity cost of the power user. Then, the upper model and the lower model are combined to obtain the master-slave game model, and the constraints of the master-slave game model are determined. Based on the constraints, the improved particle swarm algorithm is used to solve the lower model to obtain the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, and the solution result is fed back to the upper model, and the improved particle swarm algorithm is also used to solve the upper model to obtain the optimal time-of-use electricity price, thereby obtaining the master-slave game model equilibrium solution including the optimal time-of-use electricity price, the optimal charging and discharging power and the optimal power consumption of the power user, and then the distribution network is dispatched based on the master-slave game model equilibrium solution, so as to realize the active distribution network dispatching with the best interests of multiple subjects. Therefore, the present invention can ensure the maximization of the interests of the distribution network operators, charging stations and power users, and can realize the active distribution network operation dispatching based on the maximization of the interests of multiple parties. In addition, the distribution network dispatching strategy of the present invention that takes into account the interests of multiple entities not only improves the interests of other market entities, but also increases the overall social benefits, which has a positive effect on promoting the development of the distribution network system.
[0133] Furthermore, the present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned active distribution network scheduling method based on Stackelberg game and multi-agent interests can be implemented.
[0134] Furthermore, the present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the above-mentioned active distribution network scheduling method based on Stackelberg game and multi-agent interests can be implemented.
[0135] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0136] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. An active distribution network dispatching method based on Stackelberg game and multi-agent interests, characterized in that: include: The first objective function is constructed with the goal of maximizing economic benefits for distribution network operators, and the second and third objective functions are constructed with the goals of maximizing daily operating income and minimizing electricity costs for charging stations and power users, respectively. A first benefit function is constructed by the first objective function, and the first benefit function is used as an upper model; a second benefit function is constructed by the second objective function and the third objective function, and the second benefit function is used as a lower model; the upper model is used as a leader, and the lower model is used as a follower, and a master-slave game model is obtained by combining them; The constraint conditions of the master-slave game model are determined, and based on the constraint conditions, an improved particle swarm algorithm is used to solve the lower model to obtain the optimal charging and discharging power of the charging station and the optimal power consumption of the power user, and the solution result is fed back to the upper model, and the improved particle swarm algorithm is used to solve the upper model to obtain the optimal time-of-use electricity price, thereby obtaining the equilibrium solution of the master-slave game model; distribution network scheduling is performed based on the equilibrium solution of the master-slave game model, thereby realizing active distribution network scheduling with optimal interests of multiple subjects.
2. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 1 is characterized in that: The first objective function is expressed as follows: B DNO =B sell -C grid -C fluc Among them, B DNO is the economic benefit of the distribution network operator, B sell is the electricity sales revenue of the distribution network operator, C grid is the electricity purchase cost of the distribution network operator, C fluc is the load fluctuation cost.
3. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 2 is characterized in that: The second objective function is expressed as follows: Among them, B ESS is the daily operating income of the charging station, t is the time period, T is the entire scheduling period, is the electricity price sold by the distribution network operator during period t, Subsidized price for discharging electricity at charging stations, The operation and maintenance cost of the charging station. are the discharge power and charging power of the charging station during period t respectively, and Δt represents the time interval.
4. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 3 is characterized in that: The third objective function is expressed as follows: Among them, C user The electricity cost for electricity users, is the power consumption of the power user during period t, is the satisfaction cost function of electricity users, is the nominal electricity demand value of the power user in period t.
5. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 4 is characterized in that: The first benefit function and the second benefit function are respectively expressed as follows: maxU1=B DNO minU2=C user -B ESS Among them, U1 represents the first benefit function, and U2 represents the second benefit function.
6. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 1, characterized in that: The constraints include power balance constraints, time-of-use electricity price constraints, energy storage operation constraints and demand response constraints.
7. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 1, characterized in that: The improved particle swarm optimization algorithm is a particle swarm optimization algorithm improved based on dynamic inertia weight and random mutation factor.
8. The active distribution network dispatching method based on Stackelberg game and multi-agent interests as claimed in claim 7 is characterized in that: The random mutation factor is improved to perform a mutation operation after each generation of particle position update is completed; the mutation operation is to randomly select a one-dimensional vector of particles and change the randomly selected one-dimensional vector with a set mutation probability value to achieve the mutation operation.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the active distribution network scheduling method based on Stackelberg game and multi-agent interests as described in any one of claims 1 to 8 is implemented.
10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the active distribution network scheduling method based on Stackelberg game and multi-agent interests as described in any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Multi-target game scheduling method and system for power distribution network operator
CN119026816A
Active power distribution network supply and demand side balance control method based on non-cooperative game
CN119482759A
Method and device for determining power utilization strategy, computer program product and electronic equipment
CN119582166A