Micro-grid scheduling method and system

Through the main network management system, real-time monitoring and regulation of the operating mode of the microgrid, and the collaborative work of the energy storage system and distributed power sources, the problem of imbalance of power supply and demand in the microgrid is solved, and the reliability and resource utilization efficiency of the microgrid are improved. , ensuring the stability of power supply.

CN118763748AInactive Publication Date: 2024-10-11HANGZHOU WEIMU TECH CO LTD

Patent Information

Application Number
CN202411244913.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the instability of distributed power sources in the off-grid operation mode, the existing microgrid dispatching method may lead to an imbalance in power supply and demand, resulting in unstable power supply, shortened equipment life, reduced operating efficiency and reduced safety.

Method used

A microgrid dispatching method is proposed. The main grid voltage and frequency are monitored in real time through the main grid management system to determine the operating mode of the microgrid. In the off-grid operating mode, the control parameters are calculated based on the capacity of the distributed power supply and energy storage system. Factors, select the optimal or coordinated power supply microgrid for auxiliary power supply, and use the collaborative work of energy storage systems and distributed power sources to achieve a balance between power supply and demand.

Benefits of technology

It effectively solves the problem of power supply and demand imbalance in the microgrid, improves the reliability and resource utilization efficiency of the microgrid, extends the service life of the equipment, and ensures the stability of the power supply when the main grid voltage or frequency is abnormal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118763748A_ABST
    Figure CN118763748A_ABST
Patent Text Reader

Abstract

The invention discloses a micro-grid dispatching method and system, and relates to the technical field of micro-grid electric energy dispatching, and the method comprises the steps: a main grid management system measures a main grid voltage and a main grid frequency in real time, and determines grid-connected operation or off-grid independent operation of a micro-grid according to the main grid voltage and the main grid frequency; under off-grid operation, the multiple microgrid energy management systems monitor loads in respective microgrids, generated power of the distributed power supplies and capacity of the energy storage systems in real time and transmit the loads, the generated power of the distributed power supplies and the capacity of the energy storage systems to the main grid management system, and the distributed power supplies are distributed according to the load requirements of the microgrids, the generated power of the distributed power supplies and the capacity of the energy storage systems. And when the output power of the working micro-grid is lower than the load demand, controlling the rest micro-grids to supply power to the micro-grids of which the output power is lower than the load demand according to the regulation and control parameter constraint conditions. Therefore, the micro-grid system can allocate electric energy among a plurality of micro-grids according to the regulation and control parameter constraint conditions so as to solve the problem of unbalanced supply and demand of electric power in the micro-grids.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of microgrid power dispatching, and in particular to a microgrid dispatching method and a microgrid dispatching system. Background Art

[0002] Against the backdrop of the increasingly severe global energy crisis and environmental problems, the development and utilization of renewable energy has become an important way to alleviate energy shortages and reduce environmental pollution. Microgrid technology, as a small power generation and distribution system that integrates distributed power generation, energy storage devices, energy conversion equipment, load management and protection devices, can achieve self-control, protection and management, and is a key way to maximize the efficiency of distributed energy. The design of microgrids aims to make full use of renewable energy such as wind energy, solar energy, and biomass energy, and improve the reliability and flexibility of energy supply by connecting to the main grid or operating independently off the grid.

[0003] However, existing microgrid dispatching methods have some obvious limitations when dealing with complex and changeable grid conditions. Especially in the off-grid operation mode of the microgrid, due to the instability of distributed power sources (such as wind and solar energy), the power supply power and energy storage system capacity may not be sufficient to meet the internal load demand of the microgrid at certain times, and the technology of using hydrogen for energy storage in new energy sources is not considered. Traditional dispatching strategies often rely on simple on-grid and off-grid switching mechanisms. When the voltage or frequency of the main grid is abnormal, the microgrid will automatically operate off-grid, but this may cause an imbalance in the supply and demand of electricity within the microgrid, resulting in unstable power supply of the microgrid, shortened life of power supply equipment, reduced operating efficiency and reduced safety of the microgrid. Summary of the invention

[0004] The main purpose of this application is to provide a microgrid scheduling method, which aims to solve the technical problems that when a microgrid is operating independently off-grid, the imbalance of power supply and demand within the microgrid often leads to unstable power supply in the microgrid, shortened life of power-demanding equipment, reduced operating efficiency and decreased safety of the microgrid.

[0005] To achieve the above-mentioned purpose, the present application proposes a microgrid scheduling method, which is applied to a microgrid system, wherein the microgrid system includes multiple microgrids, each of which includes a distributed power supply, an energy storage system, an AC bus, an inverter, and a microgrid energy management system. The microgrid system is communicatively connected to a main grid management system, and the main grid management system is used to control each of the microgrids to be incorporated into or separated from the main grid. The method includes the following steps: The main grid management system measures the main grid voltage (V) and the main grid frequency (f) in real time, and determines the operation mode of the microgrid according to the main grid voltage (V) and the main grid frequency (f), wherein the operation mode includes a grid-connected operation mode and an off-grid independent operation mode; In the off-grid operation mode, the microgrid energy management systems of the plurality of microgrids monitor the loads in their respective microgrids, the power generation of the distributed power sources and the capacity of the energy storage system in real time, and transmit the information to the main grid management system; The main grid management system controls the remaining microgrids according to the load demand, distributed power supply power and energy storage system capacity connected to the microgrid, and provides auxiliary power supply to the microgrid whose output power is lower than the load demand according to the control parameter constraints when the output power of any one or more of the working microgrids is lower than the load demand.

[0006] In one embodiment, the energy storage system includes a battery and a hydrogen storage tank, and the control parameter constraints include: The main grid management system uses a first calculation formula to calculate the control parameter factor of each microgrid; When there is a microgrid whose control parameter factor λ is greater than 1 among the multiple microgrids, the microgrid with a larger value of the control parameter factor among the multiple microgrids is selected in sequence as the optimal power supply microgrid, and the microgrid whose output power is lower than the load demand is supplied with power; When there are microgrids whose control parameter factors λ are all less than 1 among the multiple microgrids, the microgrids whose sum of λ is greater than 1 are selected for collaborative power supply; wherein the first calculation formula is specifically: λ = ; Among them, Po is the real-time distributed power generation power of the microgrid, B is the load demand of the microgrid, is the microgrid battery weight coefficient, is the weight coefficient of the hydrogen storage tank of the microgrid, ε is the percentage of the battery capacity of the microgrid, P is the power required by a microgrid with insufficient power, and Rt is the percentage of the hydrogen storage tank capacity of the microgrid.

[0007] In one embodiment, the method further comprises: In the off-grid operation mode, the main grid management system continuously monitors the real-time load demand and distributed power supply power in each microgrid, and after processing by the time series analysis model, predicts the power deviation data between the generated power and load demand of the microgrid system at different times, so as to generate the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power supply.

[0008] In one embodiment, the energy storage system further includes an electrolyzer, and the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source include: When the power deviation data of the microgrid system exceeds the limit, the excess power generated by the microgrid system is dispatched to charge the batteries in the plurality of microgrids; And / or, when the power deviation data of the microgrid system exceeds the limit, the electrolyzers in the microgrid are controlled to start working to generate hydrogen and store it.

[0009] In one embodiment, the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source further include: When the power deviation data of the microgrid system exceeds the limit, and the maximum charging power of the battery and the maximum input power of the electrolyzer cannot meet the excess power deviation data, the power generation power of the distributed power source in the microgrid system is reduced.

[0010] In one embodiment, the distributed power source further includes a diesel generator, the energy storage system further includes a hydrogen fuel cell, and the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source further include: When the power deviation data of the microgrid system is insufficient, controlling the electric energy stored in the battery and / or the hydrogen fuel cell to supplement the microgrid system; When the power deviation data of the microgrid system is missing and the maximum discharge power of the battery and the hydrogen fuel cell cannot meet the missing power deviation data, the diesel generator is controlled to start working to replenish energy for the microgrid system.

[0011] In one embodiment, when the power deviation data of the microgrid system is insufficient and the maximum discharge power of the battery and the hydrogen fuel cell cannot meet the insufficient power deviation data, after starting the diesel generator to supplement the microgrid system, the method further includes: Priorities are set for the loads in the multiple microgrids. When the power deviation data of the microgrid system is missing, the maximum discharge power of the battery and the hydrogen fuel cell, and the power generation power of the diesel generator cannot meet the missing power deviation data, the loads are controlled to be cut out of the microgrid according to the set load priority.

[0012] In one embodiment, the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source further include: The power balance constraint relationship of the microgrid system is constructed, and its mathematical description formula includes: ; The power constraint relationship of distributed power generation is: ; in, is the power generation of distributed power in the microgrid system at time i, is the load demand of the microgrid system at time i, is the hydrogen fuel cell discharge power of the microgrid system at time i, is the discharge power of the battery in the microgrid system at time i, is the battery charging power of the microgrid system at time i, is the input power of the electrolyzer of the microgrid system at time i, is the photovoltaic power generation power of the microgrid system at time i, is the wind power generation power of the microgrid system at time i, is the power generated by the diesel generator in the microgrid system at time i.

[0013] In addition, to achieve the above purpose, the present application also proposes a microgrid dispatching system, including the microgrid dispatching method as described above, and the system includes: A microgrid energy management system unit, a main network management system unit, and a two-way communication interface, wherein the microgrid energy management system unit is configured with a real-time data acquisition module and an instruction execution module; the main network management system unit is configured with a main network status monitoring module, a data analysis and processing module, a microgrid dispatching and control module, and an emergency response module, and information exchange between the microgrid and the main network is realized through the two-way communication interface.

[0014] In one embodiment, the system further comprises: Distributed energy storage optimization configuration module, which is used to optimize the location and capacity configuration of the energy storage system according to the specific layout of the microgrid, load characteristics and distributed power characteristics; The distributed energy storage optimization configuration module is also used to adopt a mixed integer linear programming (MILP) optimization method to solve the following formula to determine the optimal configuration: st; ; in, Indicates Whether to install energy storage system at each location, Indicates The type of energy storage system installed at each location, is the installation cost, is the operating cost, It is The maximum energy storage capacity that can be installed at each location, It is the minimum energy storage requirement for the system and determines the specific installation location and type.

[0015] One or more technical solutions proposed in this application have at least the following technical effects: a microgrid scheduling method, applied to a microgrid system, the microgrid system includes multiple microgrids, each microgrid includes a distributed power supply, an energy storage system, an AC bus, an inverter and a microgrid energy management system, the microgrid system is connected to the main grid management system, the main grid management system is used to control each of the microgrids to be connected to the main grid or disconnected from the main grid, the method includes the following steps: the main grid management system measures the main grid voltage (V) and the main grid frequency (f) in real time, and determines the microgrid according to the main grid voltage (V) and the main grid frequency (f). Operation mode, the operation mode includes a grid-connected operation mode and an off-grid independent operation mode; in the off-grid operation mode, the microgrid energy management systems of the multiple microgrids monitor the loads in their respective microgrids, the power generation of the distributed power sources and the capacity of the energy storage system in real time, and transmit them to the main grid management system; the main grid management system controls the remaining microgrids to provide auxiliary power supply to the microgrids whose output power is lower than the load demand according to the load demand, the power of the distributed power sources and the capacity of the energy storage system connected to the microgrid, according to the control parameter constraints when the output power of any one or more of the microgrids is lower than the load demand. In this way, the main grid management system of this scheme monitors and controls the operation mode between the microgrid system and the main grid through the microgrid energy management system, and when the voltage or frequency of the main grid is abnormal or the main grid fails, the microgrid system can allocate electric energy between multiple microgrids according to the control parameter constraints to solve the problem of imbalance in power supply and demand within the microgrid. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0018] Figure 1 A flowchart of the first embodiment of the microgrid dispatching method of the present application is provided; Figure 2 A flow chart of the second embodiment of the microgrid dispatching method of the present application; Figure 3 A flowchart of a sub-step of step S400 provided for the microgrid scheduling method of the present application; Figure 4A flowchart of another sub-step of step S400 provided for the microgrid scheduling method of the present application; Figure 5 This is a schematic diagram of the device structure of the hardware operating environment involved in the microgrid dispatching system of the embodiment of the present application.

[0019] Description of Figure Numbers: 1001-real-time data acquisition module; 1002-emergency response module; 1003-microgrid dispatching and control module; 1004-instruction execution module; 1005-microgrid energy management system unit; 1006-main grid management system unit; 1007-main grid status monitoring module; 1008-data analysis and processing module; 1009-distributed energy storage optimization configuration module.

[0020] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0021] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0022] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0023] The main solution of the embodiment of the present application is: each microgrid energy management system unit within the microgrid system continuously monitors the load within its own microgrid, the generated power of the distributed power source and the capacity of the energy storage system, and manages and controls the microgrid system to perform grid-connected or off-grid operation mode through the main grid management system. When the microgrid system is off-grid, the main grid management system controls the auxiliary power supply to the microgrid whose output power is lower than the load demand according to the constraints of the regulation parameters.

[0024] In this embodiment, for ease of description, the following description is made by taking the identification of the main network management system unit as the execution subject.

[0025] The existing microgrid dispatching methods have some obvious limitations when dealing with complex and changeable grid conditions. Especially in the off-grid operation mode of the microgrid, due to the instability of distributed power sources (such as wind and solar energy), the power supply power and energy storage system capacity may be insufficient to meet the internal load demand of the microgrid at certain times, and the technology of using hydrogen for energy storage in new energy sources is not considered. Traditional dispatching strategies often rely on simple on-grid and off-grid switching mechanisms. When the voltage or frequency of the main grid is abnormal, the microgrid will automatically operate off-grid, but this may cause an imbalance in the supply and demand of electricity within the microgrid, resulting in unstable power supply of the microgrid, shortened life of power supply equipment, reduced operating efficiency and reduced safety of the microgrid.

[0026] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a main network management system unit, etc. The main network management system unit is taken as an example to illustrate this embodiment and the following embodiments.

[0027] Based on this, an embodiment of the present application provides a microgrid scheduling method, which is applied to a microgrid system, wherein the microgrid system includes multiple microgrids, each microgrid includes a distributed power supply, an energy storage system, an AC bus, an inverter, and a microgrid energy management system, and the microgrid system is connected to the main grid management system, and the main grid management system is used to control each of the microgrids to be incorporated into the main grid or to be separated from the main grid. Figure 1 , Figure 1 This is a flow chart of the first embodiment of the microgrid scheduling method of the present application.

[0028] In this embodiment, the microgrid scheduling method includes steps S100 to S300: Step S100, the main grid management system measures the main grid voltage (V) and the main grid frequency (f) in real time, and determines the operation mode of the microgrid according to the main grid voltage (V) and the main grid frequency (f), wherein the operation mode includes a grid-connected operation mode and an off-grid independent operation mode; Step S200, in the off-grid operation mode, the microgrid energy management systems of the plurality of microgrids monitor in real time the loads in their respective microgrids, the power generation power of the distributed power sources and the capacity of the energy storage system, and transmit the information to the main grid management system; Step S300, the main grid management system controls the remaining microgrids to provide auxiliary power supply to the microgrid whose output power is lower than the load demand according to the load demand, distributed power supply power and energy storage system capacity connected to the microgrid when the output power of any one or more of the working microgrids is lower than the load demand according to the control parameter constraints.

[0029] In this embodiment, the constructed microgrid system integrates multiple distributed power sources in the microgrid (such as one or more of wind distributed power sources, photovoltaic distributed power sources, and biomass distributed power sources), energy storage systems (including supercapacitors, batteries, and hydrogen storage tanks), AC busbars, inverters, loads, and microgrid energy management systems. As the energy supply unit of the microgrid, the distributed power source is connected to the AC busbar through an inverter. The inverter converts the voltage of the electric energy of the distributed power source to meet the AC power demand of the power grid. As a key balancing unit, the energy storage system is connected to the AC busbar through an inverter. It can store excess electric energy and release electric energy when needed to ensure the balance of power supply and demand. The load is directly connected to the AC busbar to reflect the actual power demand. The battery status of the battery is detected by EMS, and the power quality monitoring device, smart meter and other equipment are combined to detect the power quality and power generation of the distributed power source. The smart meter is equipped with a sensor network and a machine learning model to detect the actual amount of electric energy used by the load. The capacity of the hydrogen storage tank is checked by contactless radar technology. The microgrid energy management system (data processor) is the brain of the system, responsible for real-time monitoring of the operating status of multiple microgrids, including changes in their respective load demand, the power output in their respective distributed power sources, and the capacity status of their respective energy storage systems, and exchanges data and executes instructions with the main network management system to determine the operating mode of the microgrid system. It is worth mentioning that the microgrid output power refers to the power in an output state in which the distributed power sources in the microgrid, the discharge power of the energy storage system and the generation power of the backup power supply work together to provide electrical energy for the microgrid.

[0030] In this embodiment, the main grid management system is responsible for monitoring the voltage (V) and frequency (f) of the entire main grid, which are key indicators for determining whether each microgrid in the microgrid system is connected to the main grid or operates independently off the grid. When the voltage and frequency of the main grid are normal, the microgrid system maintains parallel operation with the main grid, and can serve as a supplement or load balance for the main grid; it is worth mentioning that this solution only discusses the state of the microgrid system operating in an off-grid mode with the main grid when the voltage or frequency of the main grid is abnormal or the main grid fails.

[0031] In this embodiment, multiple microgrid energy management systems not only obtain detailed operating data within the microgrid in real time, but are also responsible for transmitting this information to the main grid management system. Through this real-time data interaction, the main grid management system can fully grasp the operating status of the microgrid, including load demand, power output of distributed power sources, and available capacity of the energy storage system, providing a basis for subsequent scheduling decisions, output strategies, and energy storage strategies.

[0032] In this embodiment, in the off-grid operation mode, the main grid management system can monitor the operation status of all microgrids. Once it is found that the internal power of a microgrid is insufficient to meet its load demand, the system will start the allocation mechanism. At this time, the main grid management system will calculate a control parameter factor λ based on the real-time data of other microgrids, especially their remaining output power and energy storage capacity. In this embodiment, the energy storage system includes a battery and a hydrogen storage tank, and the control parameter constraint condition includes: the main grid management system calculates the control parameter factor λ of each microgrid = Then, multiple control parameter factors with larger values ​​are selected in sequence to determine the optimal power supply microgrid to supply power to the microgrid whose output power is lower than the load demand, where Po is the power generation power of the real-time distributed power source of the microgrid, B is the load demand of the microgrid, is the microgrid battery weight coefficient, is the weight coefficient of the hydrogen storage tank of the microgrid, ε is the percentage of the battery capacity of the microgrid, P is the power required by a microgrid with insufficient power, and Rt is the percentage of the hydrogen storage tank capacity of the microgrid; if there are multiple microgrids whose control parameter factors λ are not greater than 1, then the microgrids whose sum of λ is greater than 1 are selected for collaborative power supply. In this way, electric energy can be allocated between multiple microgrids in a microgrid system that uses electric-hydrogen hybrid energy storage technology for energy storage. It is worth mentioning that the battery weight coefficient and hydrogen storage tank weight coefficient in each microgrid can be determined based on the ratio of the maximum energy storage capacity of the battery in each microgrid to the maximum energy storage capacity of the hydrogen in the hydrogen storage tank after conversion and release by the hydrogen fuel cell.

[0033] Specifically, the main grid management system continuously measures the voltage (V) and frequency (f) of the main grid, and determines the grid-connected or off-grid operation strategy of the microgrid system based on the stability of V and f. For example, when the main grid voltage is 220V, the frequency is 50Hz, and the fluctuation is within ±5%, the microgrid system maintains a grid-connected state with the main grid; otherwise, if it exceeds this range, the microgrid system switches to an off-grid mode with the main grid.

[0034] In this embodiment, the microgrid system and the main grid are in off-grid mode. The main grid management system monitors the real-time data of each microgrid. If the power generation capacity of a microgrid is found to be is lower than its load demand B, then use the formula λ= ; to calculate the control parameter factor λ of other microgrids. For example, if the maximum energy storage of the battery of microgrid A is set to 30KWH and the maximum energy storage of the hydrogen storage tank (after conversion and release by the hydrogen fuel cell) is set to 20KWH, the maximum energy storage of the microgrid energy storage system is 50KW, and the proportion of the maximum energy storage of the battery of microgrid A to the maximum energy storage of the microgrid energy storage system is set to 60%. , the ratio of the maximum storage energy of the hydrogen storage tank of microgrid A to the maximum storage energy of the microgrid energy storage system is set as 40% , the microgrid management system detects in real time that the power generation power Po=100kW, the load demand B=90kW, and the hydrogen storage tank capacity ratio =0.8 (i.e. 80% of the full capacity of the hydrogen storage tank), the battery capacity ratio ε=0.8 (i.e. 80% of the full capacity of the battery), the power required by the microgrid A with insufficient power supply P=20kW, then the control parameter factor λ of the microgrid is =0.4.

[0035] In this embodiment, the control parameter factor ranking and power supply decision: the main grid management system ranks the λ values ​​calculated by all microgrids, and selects the microgrid with the largest λ value and greater than 1 to supply power to the microgrid with insufficient power. As in the above example, if the λ of microgrid B is 1.2 and greater than 1, microgrid B supplies power to microgrid A. It can also be that microgrid B has λ=0.9 and microgrid C has λ=0.8, then microgrid B and microgrid C jointly supply power to microgrid A. It can also be that microgrid B has λ=-0.1 and microgrid C has λ=1.3, and microgrid C supplies power to microgrid A and microgrid B. In this way, multiple microgrids in the microgrid system can flexibly dispatch electric energy, so that the microgrid system can effectively balance power supply and demand when in off-grid operation mode, thereby improving the reliability and resource utilization efficiency of the microgrid system.

[0036] In a feasible implementation manner, step S300 may include step S400: Step S400, in the off-grid operation mode, the main grid management system continuously monitors the real-time load demand and distributed power supply power in each microgrid, and after processing by the time series analysis model, predicts the power deviation data between the generated power and the load demand of the microgrid system at different times, so as to generate the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power supply.

[0037] In this embodiment, a microgrid is designed and implemented by designing and implementing a microgrid including a wind turbine, a solar photovoltaic panel as a distributed power source, an energy storage system consisting of a hydrogen storage tank, a fuel cell and a battery, an AC bus, a bidirectional inverter, various loads (such as residential, commercial and industrial electricity), a diesel generator as a backup power source, and a microgrid energy management system (data processor) that can detect the battery status of the battery through EMS, a power quality monitoring device, a smart meter and other equipment to detect the power quality and power generation of the distributed power source, the smart meter is equipped with a sensor network and a machine learning model to detect the actual amount of electric energy used by the load, and the capacity of the hydrogen storage tank is checked by non-contact radar technology. Among them, all distributed power sources and hydrogen fuel cells (connected to hydrogen storage tanks) and batteries in the energy storage system of each microgrid are connected to the AC bus through an inverter, and the load is directly connected to the AC bus. The microgrid energy management system is responsible for real-time data collection and sending data to the main network management system, and executing control instructions sent by the main network management system.

[0038] In this embodiment, the time series analysis model will be trained and calibrated using historical data to more accurately predict the power deviation data at different moments in the future. These historical data include, but are not limited to, past load demand data, distributed power generation data, energy storage system charging and discharging data, and distributed power quality data operation status. By comprehensively analyzing these data, the time series analysis model can predict the power deviation data between the power generation and load demand of the microgrid system at different times, thereby predicting the different working conditions faced by each microgrid in the microgrid system, thereby providing a scientific basis for the main network management system to generate the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source for each microgrid. In addition, the model can also consider external factors such as weather changes, seasonal load fluctuations, etc., to further improve the accuracy of the prediction. In this way, the main network management system can flexibly respond to various working conditions of each microgrid in the off-grid operation mode, ensuring the reliability and economy of the microgrid under the off-grid mode control.

[0039] Specifically, according to the power balance constraint relationship of the microgrid system, its mathematical description formula includes: ; The power constraint relationship of distributed power generation is: ; in, is the power deviation data of the microgrid system at time i, is the load demand of the microgrid system at time i, is the hydrogen fuel cell discharge power of the microgrid system at time i, is the discharge power of the battery in the microgrid system at time i, is the battery charging power of the microgrid system at time i, is the input power of the electrolyzer of the microgrid system at time i, is the photovoltaic power generation power of the microgrid system at time i, is the wind power generation power of the microgrid system at time i, is the power generated by the diesel generator of the microgrid system at time i. By optimizing the microgrid system through the above power constraint relationship, it can ensure that the system can achieve efficient energy utilization and sustainable development of the environment while meeting the load demand.

[0040] In a feasible implementation, step S400 may include steps A401-A402: Step A401, when the power deviation data of the microgrid system exceeds the limit, dispatching the excess power generated by the microgrid system to charge the batteries in the plurality of microgrids; In this embodiment, when the prediction model predicts that the power deviation data between the generated power and the load demand in multiple microgrids of the microgrid system exceeds the limit, the excess generated power is scheduled in advance according to the control parameter constraints to consume the excess generated power to charge the battery in the microgrid.

[0041] In this embodiment, the microgrid system can set priorities based on the capacity ratio of the batteries when charging the batteries in each microgrid, and preferentially dispatch excess power generation to microgrids with relatively low battery capacities for battery charging, so as to prevent overcharging of batteries with relatively high capacities, over-discharging of batteries with relatively low capacities, and a decrease in the load demand response capability of microgrids with relatively low capacity batteries.

[0042] In this embodiment, the microgrid system can be set according to the charging and discharging status of the batteries in each microgrid and the battery charging and discharging constraints. The battery charging and discharging constraints can be set by setting a safe charging and discharging capacity ratio threshold range to prevent overcharging and over-discharging of the battery. The excess power generation power is also used to ensure that the battery capacity ratio reaches the maximum threshold of the safe charging capacity ratio before stopping the dispatch of electric energy to charge the battery, so as to avoid frequent changes in the charging and discharging status of the battery, which may shorten the battery life.

[0043] Step A402, and / or, when the power deviation data of the microgrid system exceeds the limit, control the electrolyzers in the microgrid to start working to generate hydrogen and store it.

[0044] In this embodiment, the microgrid system also includes an electrolyzer for utilizing electricity to electrolyze water to produce hydrogen. When the prediction model predicts that the power deviation data between the power generation power and the load demand in multiple microgrids of the microgrid system exceeds the limit, the excess power generation is scheduled in advance according to the control parameter constraints to consume the excess power generation to control the start-up of the electrolyzers in the multiple microgrids to produce hydrogen and store it in a hydrogen storage tank. In this way, the microgrid system can consume the excess power generation through batteries and / or electrolyzers.

[0045] In this embodiment, the electrolyzer can automatically adjust its working state according to factors such as the excess data size of the power deviation data, the charge and discharge state of the battery, the battery capacity ratio, and the ambient temperature. For example, when the power deviation data is excessively large, the electrolyzer will start to work at a higher current density to quickly consume the excess power generation and produce more hydrogen. On the contrary, if the power deviation data is excessively small, the electrolyzer will operate at a lower current density to maintain the stability of the system and extend the life of the equipment.

[0046] Based on steps A401 to A402, the microgrid system can start additional idle electrolyzers in multiple microgrids or increase the input power of the electrolyzers to increase the rate of hydrogen production when the power deviation data exceeds the limit. It can also charge spare batteries in multiple microgrids or increase the charging rate of working batteries. The microgrid system consumes excess power generation rate of distributed power sources by changing the working state of the electrolyzer and the charging and discharging state of the battery.

[0047] In a feasible implementation manner, after steps A401-A402, step A403 is further included: Step A403, when the power deviation data of the microgrid system exceeds the limit, and the maximum charging power of the battery and the maximum input power of the electrolyzer cannot meet the excess power deviation data, the power generation power of the distributed power source in the microgrid system is reduced.

[0048] In this embodiment, when the prediction model predicts that the power deviation data between the power generation power and the load demand in multiple microgrids of the microgrid system exceeds the limit, and the maximum charging power of the battery and the maximum input power of the electrolyzer cannot meet the excess power deviation data, the power generation power can be reduced by controlling the control mode of the distributed power sources of one or more microgrids in the microgrid system, or by controlling the operating status of the distributed power sources in the microgrid.

[0049] In summary, through the above methods, the microgrid system can effectively deal with the problem of excess power deviation. Through the coordinated work of batteries, electrolyzers and distributed power sources, not only can the difference between power generation and load be balanced, but also the excess electricity can be converted into hydrogen for storage to provide guarantee for future energy needs. In addition, by reasonably scheduling the working status of batteries and electrolyzers, the microgrid system can extend the service life of equipment, more effectively reduce peak loads and fill valleys, and improve the stability and reliability of the system.

[0050] In a feasible implementation manner, steps A404-A405 are further included based on steps A401-A403: Step A404, when the power deviation data of the microgrid system is insufficient, controlling the electric energy stored in the battery and / or the hydrogen fuel cell to supplement the microgrid system; In this embodiment, when the prediction model predicts that the power deviation data between the power generation power and the load demand in the microgrid system exceeds the limit, the battery and the hydrogen fuel cell can be used to generate the power. The stored electric energy is adjusted to ensure the power balance of the microgrid system. Specifically, when the prediction model shows that the power deviation data is insufficient, the main grid control system will send a control instruction to the microgrid energy management system to start the discharge process of the battery and hydrogen fuel cell. The battery will release the stored electric energy to the microgrid system to make up for the difference between the generated power and the load demand. At the same time, the hydrogen fuel cell will also generate electricity through chemical reactions to further supplement the power supply of the microgrid system.

[0051] In the embodiment, the coordinated work of the battery and the hydrogen fuel cell can effectively provide a stable power supply when the power generation is insufficient. Through this flexible adjustment mechanism, the microgrid system can achieve higher reliability and stability, providing users with continuous and stable power services.

[0052] Step A405, when the power deviation data of the microgrid system is missing and the maximum discharge power of the battery and the hydrogen fuel cell cannot meet the missing power deviation data, the diesel generator is controlled to start working to replenish energy for the microgrid system.

[0053] In this embodiment, if the discharge power of the battery and hydrogen fuel cell cannot completely make up for the power shortage of the microgrid system, the main grid control system will take further measures to ensure the stability of power supply. At this time, the control system will send a start command to the diesel generator, which will then start and start generating electricity to provide additional power support for the microgrid system.

[0054] In summary, through the multi-level energy replenishment mechanism, the microgrid system can cope with various emergencies and ensure the continuity and stability of power supply without affecting the load operation status. At the same time, this flexible adjustment strategy also enables the microgrid system to more efficiently utilize various energy sources and improve the overall energy utilization efficiency when facing fluctuations in renewable energy generation power.

[0055] In a feasible implementation manner, based on steps A401-A405, step A406 is also included: Step A406, setting priorities for the loads in the multiple microgrids. When the power deviation data of the microgrid system is missing, the maximum discharge power of the battery and the hydrogen fuel cell, and the power generation power of the diesel generator cannot meet the missing power deviation data, the loads are controlled to be cut out of the microgrid according to the set load priority.

[0056] In this embodiment, it is worth mentioning that in the microgrid system, the priority setting of the load is an important measure to ensure that the critical load can still obtain power supply when there is a power shortage. The setting of the load priority is usually based on factors such as the importance of the load, the dependence on the power supply, and the impact on the operation of the entire system. For example, key facilities such as hospitals, fire stations, and communication base stations are usually given a higher priority, while some non-critical commercial or industrial loads may be given a lower priority.

[0057] In this embodiment, when the prediction model shows that the power deviation data of the microgrid system is insufficient and the total power generation of the battery, hydrogen fuel cell and diesel generator still cannot meet the load demand, the control system will perform load shedding operations according to the pre-set load priority. First, the system will try to cut off those loads with lower priority to reduce the power gap. This process is automated to ensure rapid response in emergency situations and guarantee the power supply of critical loads.

[0058] In summary, through this multi-level energy replenishment mechanism and load priority management, the microgrid system can maximize the power supply of key loads in the face of extreme situations, while ensuring the stable operation of the entire system. This flexible adjustment strategy not only improves the reliability of the microgrid system, but also enhances the adaptability of the microgrid system in various complex environments, providing strong technical support for the development of future smart grids.

[0059] This application also provides a microgrid dispatching system, please refer to Figure 4 , the microgrid dispatching system device includes the microgrid dispatching method as described above, and the system includes: A microgrid energy management system unit 1005, a main grid management system unit 1006, and a two-way communication interface, wherein the microgrid energy management system unit 1005 is configured with a real-time data acquisition module 1001 and an instruction execution module 1004; the main grid management system unit 1006 is configured with a main grid status monitoring module 1007, a microgrid dispatching control module 1003 and an emergency response module 1002, and information exchange between the microgrid and the main grid is realized through the two-way communication interface.

[0060] In this embodiment, the microgrid energy management system unit 1005: This unit integrates a real-time data acquisition module 1001 and an instruction execution module 1004. The real-time data acquisition module 1001 is responsible for collecting information from the AC bus, distributed power sources, energy storage systems and loads, including data such as current, voltage, power and energy storage level, such as detecting the battery status of the battery through EMS, detecting the power quality and power generation of the distributed power source through the combination of power quality monitoring devices and smart meters and other equipment, and the smart meter is equipped with a sensor network and a machine learning model to detect the actual power used by the load. The capacity of the hydrogen storage tank is checked by non-contact radar technology, etc. The instruction execution module 1004 adjusts the charging and discharging strategy of the energy storage system, optimizes the output of the distributed power source, or performs load management operations such as dynamic load balancing according to the analysis results and the instructions issued by the main grid management system.

[0061] In this embodiment, the main grid management system unit 1006 includes a main grid status monitoring module 1007, a data analysis and processing module 1008, a microgrid dispatching and control module 1003, and an emergency response module 1002. The main grid status monitoring module 1007 tracks key parameters such as the voltage and frequency of the main grid in real time to provide a basis for operation decisions. The microgrid dispatching and control module 1003 determines the grid-connected or off-grid mode of the microgrid according to the main grid status, and formulates and issues dispatching instructions according to the feedback information of the microgrid energy management system. The data analysis and processing module 1008 (data processor) uses algorithms or models based on these real-time data, combined with historical loads and power output modes, to predict future load demand, distributed power generation power, and the capacity ratio of the energy storage system to ensure the accuracy of data processing. The emergency response module 1002 quickly starts the emergency plan when an abnormality occurs in the main grid or microgrid, such as starting the backup power supply and adjusting the power exchange between microgrids to ensure the continuity and stability of power supply.

[0062] In this embodiment, the main network management system unit 1006 and the microgrid energy management system unit 1005 communicate with each other through a two-way communication interface, and can communicate with each other through Ethernet, CAN communication, 485 communication and other methods.

[0063] In this embodiment, the "main grid management system" and the "main grid management system unit 1006" are essentially the same concept, that is, the core management system responsible for monitoring the entire main grid status, communicating with the microgrid energy management system, making grid connection or disconnection decisions, and processing the data reported by the microgrid energy management system unit 1005 (i.e., the microgrid energy management system) through algorithms or models. Both refer to the advanced control unit that monitors the main grid voltage (Vm) and frequency (fm) and determines the microgrid operation mode accordingly.

[0064] In one embodiment, the system further comprises: Distributed energy storage optimization configuration module 1009, which is in communication with the microgrid energy management system unit 1005, and is used to optimize the location and capacity configuration of the energy storage system according to the specific layout, load characteristics and distributed power supply characteristics of the microgrid; The distributed energy storage optimization configuration module 1009 is also used to adopt a mixed integer linear programming (MILP) optimization method to solve the following formula to determine the optimal configuration: st; ;in, Indicates Whether the energy storage system is installed at each location (1 means installed, 0 means not installed), Indicates The type of energy storage system installed at each location (different types of codes are used depending on the characteristics of the energy storage system), is the installation cost, is the operating cost, It is The maximum energy storage capacity that can be installed at each location, It is the minimum energy storage requirement for the system and determines the specific installation location and type.

[0065] In this embodiment, the distributed energy storage optimization configuration module 1009: The distributed energy storage optimization configuration module 1009 optimizes the location, type and capacity of the energy storage system in the microgrid through an algorithm model. Factors to be considered include but are not limited to the load characteristics of each node, the geographical location of the distributed power source, the grid impedance, etc. The optimal configuration is determined by solving the following formula using optimization methods such as mixed integer linear programming (MILP): st; ; in, Indicates Whether the energy storage system is installed at each location (1 means installed, 0 means not installed), Indicates The type of energy storage system installed at each location (different types of codes are used depending on the characteristics of the energy storage system), is the installation cost, is the operating cost, It is The maximum energy storage capacity that can be installed at each location, is the minimum energy storage requirement of the system and determines the specific installation location and type. st is used to determine the constraints of the optimal configuration of the energy storage system to ensure that the optimization process is carried out within the practical range. It is the constraint condition for the mixed integer linear rule to optimize the capacity (the constraint condition is ).

[0066] In this embodiment, It means starting from the lower limit and ending at the upper limit, adding up all the items marked with index i, for all i and The Nsite constraint states that the sum of all yi should be equal to a constant Nsite, which is the number of sites. , where one of the constraints is the sum of the maximum storage capacities of all installed energy storage systems Should be greater than or equal to the minimum total energy storage required by the system , another constraint, states that the total number of sites that have installed energy storage systems should be equal to the total number of sites considered for installing energy storage systems , restrictions on variables, must take values ​​in the interval [0, 1], which means they can be considered as some kind of ratio or weight; They can only take on the values ​​0 or 1, which means they can be considered binary variables, indicating whether a certain event occurred or not, or whether a certain decision was chosen or not.

[0067] In this embodiment, it is assumed that in a microgrid containing 5 distributed power supply nodes, the optimal energy storage configuration scheme needs to be determined. Through the above optimization model, considering factors such as the load forecast of each node, the output characteristics of the distributed power supply, and the installation cost, the optimal solution calculated is: install large-capacity lithium-ion batteries at nodes 1 and 3, and install small-capacity hydrogen storage tanks, hydrogen fuel cells, and electrolyzers at node 5. This configuration not only meets the total energy storage demand of the microgrid, but also achieves the best cost-effectiveness, effectively improving the self-sufficiency and overall operating efficiency of the microgrid. In an actual power grid fault simulation test, the configuration scheme successfully maintained the continuous power supply of important loads during the main grid outage, verifying the effectiveness of the system optimization configuration.

[0068] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A microgrid dispatching method, applied to a microgrid system, wherein the microgrid system includes multiple microgrids, each microgrid includes a distributed power supply, an energy storage system, an AC bus, an inverter, and a microgrid energy management system, the microgrid system is communicatively connected with a main grid management system, and the main grid management system is used to control each of the microgrids to be incorporated into or separated from the main grid, characterized in that: The method comprises the following steps: The main grid management system measures the main grid voltage (V) and the main grid frequency (f) in real time, and determines the operation mode of the microgrid according to the main grid voltage (V) and the main grid frequency (f), wherein the operation mode includes a grid-connected operation mode and an off-grid independent operation mode; In the off-grid operation mode, the microgrid energy management systems of the plurality of microgrids monitor the loads in their respective microgrids, the power generation of the distributed power sources and the capacity of the energy storage system in real time, and transmit the information to the main grid management system; The main grid management system controls the remaining microgrids according to the load demand, distributed power supply power and energy storage system capacity connected to the microgrid, and provides auxiliary power supply to the microgrid whose output power is lower than the load demand according to the control parameter constraints when the output power of any one or more of the working microgrids is lower than the load demand.

2. The microgrid dispatching method according to claim 1, characterized in that: The energy storage system includes a battery and a hydrogen storage tank, and the control parameter constraints include: The main grid management system uses a first calculation formula to calculate the control parameter factor of each microgrid; When there is a microgrid whose control parameter factor λ is greater than 1 among the multiple microgrids, the microgrid with a larger value of the control parameter factor among the multiple microgrids is selected in sequence as the optimal power supply microgrid, and the microgrid whose output power is lower than the load demand is supplied with power; When there are microgrids whose control parameter factors λ are all less than 1 among the multiple microgrids, the microgrids whose sum of λ is greater than 1 are selected for collaborative power supply; wherein the first calculation formula is specifically: λ= ; Among them, Po is the real-time distributed power generation power of the microgrid, B is the load demand of the microgrid, is the microgrid battery weight coefficient, is the weight coefficient of the hydrogen storage tank of the microgrid, ε is the percentage of the battery capacity of the microgrid, P is the power required by a microgrid with insufficient power, and Rt is the percentage of the hydrogen storage tank capacity of the microgrid.

3. The microgrid dispatching method according to claim 2, characterized in that: The method further comprises: In the off-grid operation mode, the main grid management system continuously monitors the real-time load demand and distributed power supply power in each microgrid, and after processing by the time series analysis model, predicts the power deviation data between the generated power and load demand of the microgrid system at different times, so as to generate the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power supply.

4. The microgrid dispatching method according to claim 3, characterized in that: The energy storage system further includes an electrolyzer, and the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source include: When the power deviation data of the microgrid system exceeds the limit, the excess power generated by the microgrid system is dispatched to charge the batteries in the plurality of microgrids; And / or, when the power deviation data of the microgrid system exceeds the limit, the electrolyzers in the microgrid are controlled to start working to generate hydrogen and store it.

5. The microgrid dispatching method according to claim 4, characterized in that: The corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source also include: When the power deviation data of the microgrid system exceeds the limit, and the maximum charging power of the battery and the maximum input power of the electrolyzer cannot meet the excess power deviation data, the power generation power of the distributed power source in the microgrid system is reduced.

6. The microgrid dispatching method according to claim 3, characterized in that: The distributed power source further includes a diesel generator, the energy storage system further includes a hydrogen fuel cell, and the corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source further include: When the power deviation data of the microgrid system is insufficient, controlling the electric energy stored in the battery and / or the hydrogen fuel cell to supplement the microgrid system; When the power deviation data of the microgrid system is missing and the maximum discharge power of the battery and the hydrogen fuel cell cannot meet the missing power deviation data, the diesel generator is controlled to start working to replenish energy for the microgrid system.

7. The microgrid dispatching method according to claim 6, characterized in that: When the power deviation data of the microgrid system is insufficient and the maximum discharge power of the battery and the hydrogen fuel cell cannot meet the insufficient power deviation data, after starting the diesel generator to supplement the microgrid system, the method further includes: Priorities are set for the loads in the multiple microgrids. When the power deviation data of the microgrid system is missing, the maximum discharge power of the battery and the hydrogen fuel cell, and the power generation power of the diesel generator cannot meet the missing power deviation data, the loads are controlled to be cut out of the microgrid according to the set load priority.

8. The microgrid dispatching method according to any one of claims 4 to 7, characterized in that: The corresponding charging and discharging strategy of the energy storage system and the output strategy of the distributed power source also include: The power balance constraint relationship of the microgrid system is constructed, and its mathematical description formula includes: ; The power constraint relationship of distributed power generation is: ; in, is the power generation of distributed power in the microgrid system at time i, is the load demand of the microgrid system at time i, is the hydrogen fuel cell discharge power of the microgrid system at time i, is the discharge power of the battery in the microgrid system at time i, is the battery charging power of the microgrid system at time i, is the input power of the electrolyzer of the microgrid system at time i, is the photovoltaic power generation power of the microgrid system at time i, is the wind power generation power of the microgrid system at time i, is the power generated by the diesel generator in the microgrid system at time i.

9. A microgrid dispatching system, characterized in that: The microgrid dispatching method according to any one of claims 1 to 8, wherein the system comprises: A microgrid energy management system unit, a main network management system unit, and a two-way communication interface, wherein the microgrid energy management system unit is configured with a real-time data acquisition module and an instruction execution module; the main network management system unit is configured with a main network status monitoring module, a data analysis and processing module, a microgrid dispatching and control module, and an emergency response module, and information exchange between the microgrid and the main network is realized through the two-way communication interface.

10. The microgrid dispatching system according to claim 9, characterized in that: The system further comprises: Distributed energy storage optimization configuration module, which is used to optimize the location and capacity configuration of the energy storage system according to the specific layout of the microgrid, load characteristics and distributed power characteristics; The distributed energy storage optimization configuration module is also used to adopt a mixed integer linear programming optimization method to solve the following formula to determine the optimal configuration: ; ; in, Indicates Whether to install energy storage system at each location, Indicates The type of energy storage system installed at each location, is the installation cost, is the operating cost, It is The maximum energy storage capacity that can be installed at each location, It is the minimum energy storage requirement for the system and determines the specific installation location and type.

Citation Information

Patent Citations

  • Real-time coordination and control method of photovoltaic micro-grid system

    CN104242337A

  • Micro-grid energy storage scheduling method

    CN104779634A

  • Micro-grid scheduling method

    CN105896610A

  • Multi-microgrid management system and method suitable for traffic network

    CN116454900A

Cited By

  • Intelligent power supply and distribution management system and method for large-scale power grid

    CN119543315A

  • Micro-grid energy management optimization method and system in distribution micro-grid collaborative interaction scene

    CN119990478A

  • Fan power optimal configuration method and system based on transmission tower group

    CN120601534A

  • A Method and System for Optimal Power Configuration of Wind Turbines Based on Transmission Tower Clusters

    CN120601534B

  • Automatic power regulation and control method for micro-grid

    CN120784858A