Whole-enterprise affair online node management and control method and device based on digital-intelligent electricity combination platform, and medium

By using the BP neural network evaluation model and influence coefficient in the enterprise-wide business online node management and control system, the order of information push is optimized, the problems of inaccurate like evaluation and information overload are solved, and efficient and accurate information transmission and resource allocation are achieved. , improving the project management effect.

CN118764534AActive Publication Date: 2024-10-11ANHUI FANGNENG ELECTRIC TECH CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411221396.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-10-11
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

In the process of enterprise-wide business online node management and control, the likes and evaluation methods may not reflect the true quality of task completion, and the label information notes and push functions can easily lead to information overload, making it difficult to effectively filter out the content that really needs attention.

Method used

Through the enterprise-wide business online node management and control method based on the digital intelligence and power platform, the BP neural network is used to build a push priority evaluation model, and the push information priority is generated by combining the timeliness impact coefficient of the work node, the information entropy impact coefficient and the interactivity impact coefficient. degree, and adjust the push order through the information sorting table to achieve intelligence and optimization of information push.

Benefits of technology

It significantly improves the efficiency of work node management and information push, ensures the accuracy and timeliness of information transmission, reduces information overload, improves decision-making quality and resource allocation, and enhances project management effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118764534A_ABST
    Figure CN118764534A_ABST
Patent Text Reader

Abstract

The invention discloses a whole-enterprise affair online node management and control method and device based on a digital intelligent power combination platform and a medium, and relates to the technical field of whole-enterprise affair online node management and control, and the method comprises the following steps: obtaining work node evaluation data and push information evaluation data; constructing a push priority evaluation model based on a bp neural network according to the work node evaluation data and the push information evaluation data, and generating push information priority; generating a push information sorting table according to the push information priority, and pushing work node information based on the push information sorting table; an enterprise work plan is obtained, a progress three-color evaluation mechanism is established, and the three colors comprise green, yellow and red; and adjusting the pushing sequence of the working node information according to a progress three-color evaluation mechanism. According to the method and the device, the problem that the content really needing to be concerned is difficult to effectively screen out due to the fact that the label information remark and push function can generate information overload is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of online node management and control of enterprise-wide services. More specifically, the present invention relates to a method, device and medium for online node management and control of enterprise-wide services based on a digital and intelligent integrated power platform. Background Art

[0002] Leveraging the existing enterprise-wide online node management and control methods, devices, and media based on the Digital Intelligence Power Integration Platform, a module for enterprise-wide online node management and control of key tasks will be built, forming a digital management and control tool. This system classifies and refines common work progress nodes, aggregates and inputs work node information, and implements standardized management and control. This system also enables a visual display of processes and nodes, promoting the transformation of key task management into work orders.

[0003] Establish a "Like" evaluation mechanism for management. Leverage market-based marketing models to develop a management evaluation strategy. Use "Like" to quickly and easily evaluate task nodes, and the "Evaluation" function allows for specific evaluations. Functions such as "Follow," "Favorite," "Pin," and "Forward" tasks can be set up for work nodes to help management focus on key tasks. Labeling, annotation, and push notifications based on the node's work content can effectively support the timely communication of work requirements.

[0004] Implement accompanying management and control throughout all stages according to the work plan. Establish a three-color evaluation mechanism for work progress: on-time completion is recorded as a green card, overdue completion is recorded as a yellow card, and further overdue completion after urging is recorded as a red card. The evaluation results can serve as an important basis for assessment or supervision. Implement an on-site verification mechanism for work nodes, and formulate evaluation standards based on progress, personnel performance, and work quality. Focus on verifying whether the progress of tasks is lagging or ahead of schedule, the consistency of on-site progress and the system, the implementation of coordinated issues, and the performance of responsible personnel. Strengthen the scientific nature of the task process and promptly correct any problems found.

[0005] For example, the intelligent node management and control service system announced in the invention patent with announcement number CN117938636B provides a dynamic generation mechanism for distributed centerless node resource identifiers. The resource identifiers are globally unique, understandable, machine-readable, and extensible, and support full network synchronization. It supports real-time monitoring of node resource status, and effectively monitors training resources by dynamically acquiring status information of infrastructure, experimental platforms, and training resources. It provides operation diagnosis and fault location capabilities, and can quickly diagnose and locate faults based on abnormal alarm information of monitored resources, thereby achieving multi-dimensional control of training resources. It provides remote process call functions, and realizes one-click sending and return status of commands such as remote resource deployment, start and stop control, and resource recovery. Remote asynchronous calls provide strong support for the rapid construction of an integrated training simulation experiment operating environment, and provide accurate, efficient, and real-time technical guarantees for training simulation experiments.

[0006] For example, the invention patent announcement with announcement number CN112187532A discloses a node management and control method and system. The management platform is connected to the management network through a management platform, a tenant node, and a router. The router corresponds to the tenant network one-to-one. Each tenant network contains multiple tenant nodes. Each tenant node establishes a communication connection with the network platform through the tenant network, the router corresponding to the tenant network, and the management network. The method includes: the management platform obtains an operation command and determines that the tenant node corresponding to the operation command is the target node; the management platform searches for the communication connection corresponding to the target node and writes the operation command into the communication connection corresponding to the target node; the target node obtains the operation command from the corresponding communication connection, executes the operation command, and returns the result of executing the operation command to the management platform. This application can greatly reduce the occupancy of the IP resources of the management network and increase the number of manageable tenant nodes.

[0007] The above disclosed technical solutions have at least the following technical problems: While the "like" evaluation method used in the online node management process of enterprise-wide business operations is simple, it may not reflect the true quality of task completion. Likes may be more inclined to personal preferences or biases rather than objective standards; In addition, the tag information annotation and push functions may cause information overload, making it difficult to effectively filter out the content that really needs attention. In response to the above problems, the present invention proposes a solution. Summary of the Invention

[0008] In order to overcome the above-mentioned defects of the prior art, the embodiments of the present invention provide a method, device and medium for online node management of enterprise-wide business based on a digital and intelligent integrated electrical platform. Through information push evaluation of online nodes of enterprise-wide business, the problem of information overload caused by label information annotation and push functions is solved, which makes it difficult to effectively screen out the content that really needs attention.

[0009] To achieve the above object, the present invention provides the following technical solutions: The method for online node management and control of enterprise-wide business based on the digital and intelligent power integration platform includes the following steps: classify and refine common work nodes for the entire enterprise, and summarize and enter work node information; set labels, information notes and push functions for work nodes based on the digital and intelligent power integration platform; obtain work node evaluation data and push information evaluation data; build a push priority evaluation model based on the BP neural network according to the work node evaluation data and push information evaluation data, and generate push information priority; generate a push information ranking table according to the push information priority, and push work node information based on the push information ranking table; obtain the enterprise work plan, establish a three-color progress evaluation mechanism, and the three colors include green, yellow and red; adjust the push order of work node information according to the three-color progress evaluation mechanism.

[0010] In a preferred embodiment, the digital and intelligent power integration platform is used to set labels, information notes and push functions for working nodes, specifically: based on NLP, key features of working nodes are extracted and labels are generated; based on a predefined label library, working nodes are classified and identified; the labels in the label library include task type, priority, time sensitivity and custom labels related to the enterprise's specific business; based on an automated algorithm, labels are automatically matched and assigned according to the attributes and historical data of the nodes.

[0011] In a preferred embodiment, the working node evaluation data includes a working node timeliness influence coefficient; the push information evaluation data includes a push information entropy influence coefficient and a push information interactivity influence coefficient.

[0012] In a preferred embodiment, the specific method for obtaining the timeliness impact coefficient of the work node is as follows: obtain the historical key time points of each work node, the historical key time points include the planned start time, the planned completion time and the actual completion time; calculate the time deviation and the remaining time based on the historical key time points; build a task dependency graph based on each work node, and record the predecessor tasks and subsequent tasks of each work node, and use a directed graph to represent the task dependency relationship; determine the node influence range based on the edges and nodes in the task dependency graph, and obtain the node influence weight; calculate the node delay impact coefficient based on the node influence weight; based on the delay impact coefficient of each node on the directed graph path after a specific node in the task dependency graph, summarize the delay impact coefficients and calculate the node importance; calculate the work node timeliness impact coefficient based on the preset work node timeliness impact coefficient calculation formula according to the node importance, time deviation and remaining time.

[0013] In a preferred embodiment, the specific method for obtaining the information entropy influence coefficient of the push information is as follows: collect all push text data of the information to be pushed and simplify the text data; calculate the push word frequency probability of the push text data based on a preset word frequency model; calculate the information entropy of the push text data based on the push word frequency probability; and calculate the information entropy influence coefficient of the push information by combining the information entropy of the push text data with the preset enterprise special word weights.

[0014] In a preferred embodiment, the specific method for obtaining the push information interactivity influence coefficient is as follows: based on historical interaction event types, an information interaction set is obtained, wherein the information interaction set includes various push information and their interaction events and event results; a preset interaction score is assigned to various interaction event types in the information interaction set; a regression model is constructed based on the information interaction set and the corresponding interaction scores to generate the push information interactivity influence coefficient.

[0015] A device for an enterprise-wide online business node management method based on a digital and intelligent electrical platform is characterized in that it includes a node division module, an information push module, a push detailed analysis module, an information priority analysis module, an information sorting module, a three-color evaluation module and a secondary push module; the node division module is used to classify and refine common work nodes for the entire enterprise and summarize and enter work node information; the information push module is used to set labels, information notes and push functions for work nodes based on the digital and intelligent electrical platform; the push detailed analysis module is used to obtain work node evaluation data and push information evaluation data; the information priority analysis module is used to construct a push priority evaluation model based on the bp neural network according to the work node evaluation data and the push information evaluation data, and generate push information priority; the information sorting module is used to generate a push information sorting table according to the push information priority, and push work node information based on the push information sorting table; the three-color evaluation module is used to obtain the enterprise work plan and establish a three-color progress evaluation mechanism, the three colors including green, yellow and red; the secondary push module is used to adjust the push order of work node information according to the three-color progress evaluation mechanism.

[0016] A computer-readable storage medium stores a computer program, characterized in that when the computer program is executed by a processor, it implements a method for online node management and control of enterprise-wide business based on a digital and intelligent power platform.

[0017] The technical effects and advantages of the method, device, and medium for managing and controlling enterprise-wide online business nodes based on the digital intelligence and electrical platform provided by the present invention are as follows: 1. The present invention significantly improves the efficiency of work node management and information push by classifying and refining common work nodes across the entire enterprise, and performing intelligent label setting, information annotation, and push function configuration on the digital and intelligent power platform. By classifying the strategic impact, time sensitivity, risk level, and other characteristics of the nodes in detail, as well as optimizing label generation and annotations based on NLP and automated algorithms, the system ensures the accuracy and timeliness of information transmission. In addition, the push information is dynamically evaluated using the timeliness impact coefficient, information entropy impact coefficient, and interactivity impact coefficient, which supports intelligent adjustment and priority optimization of information push, effectively reduces information overload, improves decision-making quality, optimizes resource allocation, and enhances project management effectiveness.

[0018] 2. The present invention significantly improves the efficiency and accuracy of information push by constructing a push priority evaluation model based on the BP neural network. First, the technology comprehensively evaluates the priority of each node information by comprehensively considering the timeliness influence coefficient of the work node, the information entropy influence coefficient of the push information, and the interactivity influence coefficient of the push information, thereby ensuring that the most urgent and complex information can be processed first. Secondly, the generation of the push information sorting table and the adjustment of the information push order enable high-priority information to be conveyed in a timely manner under a limited load, effectively avoiding information overload and delays. The three-color progress evaluation mechanism further optimizes the push strategy, and by classifying the status of the work nodes, ensures that the information of the red card nodes is pushed first, thereby promoting the control and management of the project progress. Overall, these measures not only improve the efficiency and accuracy of information processing, but also optimize resource allocation, enhance the relevance and real-time nature of information transmission, and ultimately achieve effective management and scheduling of enterprise work nodes. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a structural diagram of a method for online node management and control of enterprise-wide services based on a digital and intelligent integrated power platform according to the present invention.

[0020] Figure 2 This is a structural schematic diagram of an enterprise-wide business online node management and control device based on a digital and intelligent power integration platform according to the present invention. DETAILED DESCRIPTION

[0021] The following will provide a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.

[0022] Example 1, Figure 1 The present invention provides a method for managing and controlling enterprise-wide online nodes based on a digital intelligence and electrical platform, comprising the following steps: S1, classify and extract common work nodes across the entire enterprise, and summarize and enter work node information.

[0023] In this embodiment, the classification and extraction of enterprise-wide common work nodes are specifically as follows: The core of classification and refinement is to clarify the characteristics and management requirements of each work node, ensuring that different types of nodes are properly handled throughout the entire management and control process; First, work nodes must be categorized based on their impact on the company's strategic goals. Nodes that have a direct impact on the company's strategic goals are classified as strategic core nodes. These nodes play a decisive role in achieving the company's overall goals, so information on these nodes must be given the highest priority in the system to ensure timely follow-up and processing by management. Second, work nodes must be categorized according to their time sensitivity. Urgent nodes are the most prioritized because they have strict deadlines; delays can prevent subsequent tasks from being carried out on time. Next, the classification of work nodes should also take into account their risk level. For high-risk nodes, the system must prioritize relevant information. These nodes often involve tasks that are technically difficult or have potentially significant consequences. Therefore, once a problem is discovered, the company must take immediate action to prevent the risk from escalating or getting out of control. In addition, classification work should also cover the cross-departmental collaboration needs of task nodes. Nodes involving collaboration among multiple departments require special attention. The successful completion of such nodes often determines the progress and quality of the entire project. Therefore, the system should ensure that information push for such nodes is prioritized to ensure smooth coordination between departments. Finally, classification and refinement must also be based on the completion and historical performance of the nodes. For nodes with high completion that are close to completion, the system can appropriately lower the priority of their information push. For nodes with poor historical performance and low completion, the system must increase their push priority to encourage management to pay more attention and invest resources to ensure that the task is completed within the specified time.

[0024] It should be noted that in the process of node classification, in-depth analysis is required based on the different actual needs of the enterprise; the business characteristics, strategic goals, project complexity, cross-departmental collaboration needs and risk management requirements of each enterprise are different. Through a comprehensive analysis of these actual needs, the rationality and scientific nature of node classification can be ensured.

[0025] S2, based on the digital and intelligent power platform, sets labels, information notes and push functions for working nodes.

[0026] In this embodiment, the tag, information note, and push function are set for the working node based on the digital and intelligent power integration platform, specifically: Extract key features of working nodes and generate labels based on NLP; Classify and identify working nodes based on a predefined tag library; The tags in the tag library include task type, priority, time sensitivity, and custom tags related to the company's specific business; Based on automated algorithms, labels are automatically matched and assigned according to node attributes and historical data.

[0027] The information note function is based on structured data input and natural language generation technology; in work nodes, note information is usually used to record the specific requirements, progress or problems of the task; in order to ensure the uniformity and traceability of information, the system uses structured data input methods, such as preset templates and options, to reduce the arbitrariness of manual input; at the same time, the system also applies natural language generation technology to automatically generate concise note suggestions based on existing task data and progress, to assist users in filling in and improve efficiency.

[0028] The push function relies on intelligent push algorithms and real-time communication technology. The intelligent push algorithm determines the time and target of information push based on the priority rules set in advance and the real-time status of the nodes. The algorithm uses a model based on BP neural network, which can predict and optimize the effect of information push through training on a large amount of historical data; real-time communication technology ensures that push information can be conveyed to relevant personnel immediately, which is achieved through an integrated enterprise communication platform, such as instant messaging, email or internal enterprise notification system; the system will also automatically record the receipt and response status during push to ensure closed-loop management of information.

[0029] S3, obtains the working node evaluation data and push information evaluation data.

[0030] In this embodiment, the working node evaluation data includes the working node timeliness influence coefficient; the push information evaluation data includes the push information entropy influence coefficient and the push information interactivity influence coefficient.

[0031] The work node timeliness impact coefficient is used to assess the urgency of a work node and its impact on the priority of pushed information. By analyzing the deviation of a node's actual progress from the scheduled schedule, combined with the node's deadline and the importance of the task, the timeliness impact coefficient quantifies the node's timeliness requirements. Specifically, the timeliness impact coefficient takes into account the remaining time until the node's completion deadline, the degree of progress lag, and the impact on subsequent tasks. If a node's completion deadline is approaching and the progress lag is significant, its timeliness impact coefficient is high, indicating that the pushed information of this node should be prioritized. This coefficient ensures that the pushed key information is promptly communicated to the relevant personnel, effectively supporting the smooth progress of tasks and the timely completion of projects.

[0032] Analyzing the timeliness impact coefficient of work nodes has the following advantages for analyzing and evaluating the priority of push information: Improve task response speed: By measuring the timeliness impact coefficient of nodes, the most urgent tasks and nodes can be identified, ensuring that the push information of these nodes is processed first. This prioritization helps speed up the response to critical tasks and reduce delays. Optimize resource allocation: The timeliness impact coefficient helps identify which work nodes are critical to the overall project progress. Prioritizing the push of information about these nodes ensures that resources and attention are focused on the parts that are critical to project completion, thereby improving resource utilization efficiency. Enhanced project management: Understanding the impact of timeliness on nodes can provide project managers with clearer task prioritization, helping them track and adjust progress more effectively, ensuring projects proceed according to the established schedule. Reduce risk: By prioritizing those nodes with the highest timeliness impact, the risks of delays can be reduced. This early warning mechanism can identify potential problems in a timely manner, take measures to intervene, and reduce the risk of project failure. Improving the relevance of information delivery: The timeliness impact coefficient ensures that the pushed information matches the actual urgency of the task, making the information delivery more tailored to actual needs. This targeted push improves the relevance and practicality of information, increasing user attention and response. Support dynamic adjustment: The timeliness impact coefficient can be updated in real time as the project progresses, thereby supporting dynamic adjustment of push strategies; as the task priority changes, the priority of pushed information can be adjusted in a timely manner to ensure that the information push always meets the current actual needs.

[0033] The specific method for obtaining the timeliness impact coefficient of the work node is as follows: Obtain the historical key time points of each work node, including the planned start time, planned completion time and actual completion time; Calculate time deviation and remaining time based on historical key time points; Build a task dependency graph based on each work node, record the predecessor and successor tasks of each work node, and use a directed graph to represent the task dependency relationship; Determine the node influence range based on the edges and nodes in the task dependency graph and obtain the node influence weight; Calculate the node delay impact coefficient based on the node influence weight; Based on the delay impact coefficients of each node on the directed graph path after a specific node in the task dependency graph, the delay impact coefficients are summarized and the node importance is calculated; According to the node importance, time deviation and remaining time, the work node timeliness impact coefficient is calculated based on the preset work node timeliness impact coefficient calculation formula.

[0034] The specific calculation formula of the node importance is as follows:

[0035] The specific method for obtaining the timeliness impact coefficient of the work node is as follows:

[0036] Where, is the timeliness impact coefficient of the working node, is the time deviation, For the remaining time, is the importance of the i-th node, is the label of the subsequent path node of node i in the directed graph, p is the total number of subsequent path nodes of node i in the directed graph, is the jth node, is the node influence weight of the j-th node.

[0037] It should be noted that the time deviation indicates the degree of deviation of the actual progress of the node from the plan. When the time deviation is a positive value, it means that the node progress is lagging behind; when it is a negative value, it means that the node progress is ahead of schedule.

[0038] The information entropy impact coefficient of pushed information is a metric that quantifies the complexity and uncertainty of pushed information. Information entropy is a key concept in information theory, used to measure the randomness and information content of information. In pushed information, the information entropy impact coefficient reflects the richness and information content of the information by calculating the entropy value of the information content. Specifically, higher information entropy indicates more complex information content and greater uncertainty, requiring more processing and attention. This coefficient helps determine which information, due to its higher uncertainty and information content, should be prioritized for push notifications to relevant personnel, thereby improving the efficiency and accuracy of information delivery.

[0039] Analyzing the information entropy impact coefficient of push information has the following advantages for analyzing and evaluating the priority of push information: Quantifying information complexity: The information entropy impact coefficient quantifies the complexity and amount of information being pushed. High information entropy indicates that the information is complex and has high uncertainty, requiring priority processing to ensure a comprehensive understanding of the information. This helps identify content that requires focus, thereby improving processing efficiency. Improve information processing accuracy: By measuring information entropy, we can determine which pushed information contains more valid data and detailed content. Information with high information entropy may contain key details and implicit information. Prioritizing this information can reduce omissions and misunderstandings, and improve information processing accuracy. Optimize information prioritization: The information entropy impact coefficient sets a priority sorting standard for pushed information based on content complexity. Content with high information entropy is prioritized in the sorting process, ensuring that complex and important information can be conveyed to relevant personnel in the shortest possible time, improving the overall information flow management efficiency. Enhancing the relevance of information delivery: The information entropy impact coefficient helps identify information that requires more attention due to its complexity and large data volume. This approach ensures that the information delivered not only meets actual needs but also specifically meets users' information needs, thereby improving the relevance of information delivery. Support for dynamic priority adjustment: In a dynamic environment, the complexity and importance of information may change. The information entropy impact coefficient can reflect these changes in real time, supporting dynamic adjustment of the priority of pushed information based on actual conditions, ensuring that information push always meets the latest business needs. Reduce the risk of information overload: By prioritizing content with high information entropy, we can effectively reduce the interference of low-priority, repetitive information and reduce the risk of information overload; this can help users focus on the most valuable and most important information, thereby improving decision-making quality.

[0040] The specific method for obtaining the information entropy influence coefficient of the push information is as follows: Collect all push text data of information to be pushed and simplify the text data; Calculate the push word frequency probability of the pushed text data based on the preset word frequency model; Calculate the information entropy of the pushed text data based on the pushed word frequency probability; The information entropy of the pushed text data is combined with the preset enterprise special word weights to calculate the information entropy influence coefficient of the pushed information.

[0041] The specific calculation formula of the preset word frequency model is as follows:

[0042] The specific calculation formula of the push information entropy influence coefficient is as follows:

[0043] Where, is the probability of the word in the kth push information, M is the total number of words in the push information, is the vocabulary probability, is the information entropy influence coefficient of the pushed information, The weight of special words for the enterprise.

[0044] The interactive impact coefficient of a push message measures the frequency and depth of interaction between a push message and its recipients. This coefficient reflects the message's actual impact and interactive value by analyzing the recipient's feedback, responses, and further interactions (such as comments, likes, and shares). A higher interactive impact coefficient indicates that the message has generated significant user engagement and interaction, implying a higher level of importance and urgency. Therefore, the interactive impact coefficient helps prioritize push messages that effectively prompt user action, thereby improving the effectiveness and speed of message delivery.

[0045] Analyzing the interaction impact coefficient of push information has the following advantages for analyzing and evaluating the priority of push information: Improve interaction effects: The interaction impact coefficient can identify the most attractive and influential information for users by measuring the user feedback and interaction generated by the information. Prioritizing the push of highly interactive information helps to increase information participation and actual application effects. Enhance information relevance: High interactivity generally indicates that information is more relevant and useful to users. By analyzing interactivity, we can prioritize information that is most likely to attract user attention, thereby ensuring the relevance and effectiveness of information delivery. Optimize resource allocation: The interaction impact coefficient can help identify which information effectively triggers user responses and actions. This allows you to rationally allocate push resources, focusing more on information that generates high user engagement and improving resource efficiency. Real-time priority adjustment: The interactivity impact coefficient provides a basis for dynamic priority adjustment. As user behavior changes, the interactivity of information will also change. Timely updating of the interactivity impact coefficient can dynamically adjust push priorities, ensuring the real-time and flexibility of push strategies. Improve decision-making quality: By comprehensively analyzing information interactivity, we can more accurately assess the importance and urgency of information. Using interactivity as one of the evaluation criteria can improve the accuracy of data-driven decision-making and ensure that the most valuable information for the business or users is prioritized. Reduce information redundancy: Analyzing the interactivity of information can help identify which information has been widely interacted with, thereby reducing the push of duplicate or low-interaction information, reducing the risk of information redundancy, and improving the clarity and pertinence of information delivery.

[0046] The specific method for obtaining the push information interactivity influence coefficient is as follows: Based on the historical interaction event types, an information interaction set is obtained, wherein the information interaction set includes various push information and their interaction events and event results; Assigning preset interaction scores to various interaction event types in the information interaction set; A regression model is constructed based on the information interaction set and the corresponding interaction score to generate the push information interaction impact coefficient.

[0047] The specific calculation formula of the push information interaction influence coefficient is as follows:

[0048] Where, is the interaction influence coefficient of push information, … is the preset interaction score corresponding to the interaction event, … is the proportion of interaction events in all interaction events, is the type of interaction event, n is the number of the interaction event, and e is a natural number.

[0049] This embodiment significantly improves the efficiency of work node management and information push by classifying and refining common work nodes across the entire enterprise, and performing intelligent label setting, information annotation, and push function configuration on the Digital Intelligence and Power Integration Platform. By classifying the strategic impact, time sensitivity, risk level, and other characteristics of the nodes in detail, as well as optimizing label generation and annotations based on NLP and automated algorithms, the system ensures the accuracy and timeliness of information transmission. In addition, the push information is dynamically evaluated using the timeliness impact coefficient, information entropy impact coefficient, and interactivity impact coefficient, supporting intelligent adjustment and priority optimization of information push, effectively reducing information overload, improving decision-making quality, optimizing resource allocation, and enhancing project management effectiveness.

[0050] In Example 2, S4, a push priority evaluation model is constructed based on the BP neural network according to the working node evaluation data and the push information evaluation data to generate the push information priority.

[0051] In this embodiment, a push priority evaluation model is constructed based on the BP neural network according to the working node evaluation data and the push information evaluation data to generate the push information priority, specifically: The acquired work node timeliness impact coefficient, push information entropy impact coefficient, and push information interactivity impact coefficient are used to establish a push priority evaluation model to generate push information priority; The calculation formula for the push information priority is as follows:

[0052] Where TS is the priority of push information, It is the preset proportional coefficient of the working node timeliness impact coefficient. is the information entropy influence coefficient of the pushed information, It is the preset proportional coefficient of the interaction coefficient of the pushed information. is the timeliness impact coefficient of the working node, is the information entropy influence coefficient of the pushed information, It is the interaction influence coefficient of pushed information.

[0053] S5: Generate a push information ranking table according to the push information priority, and push the working node information based on the push information ranking table.

[0054] In this embodiment, the push information sorting table is specifically as follows: The push information of each node is sorted in descending order based on the corresponding push information priority, and the working node information is pushed from top to bottom according to the push information sorting table under limited information load.

[0055] S6, obtain the enterprise work plan and establish a three-color progress evaluation mechanism, where the three colors include green, yellow, and red.

[0056] In this embodiment, the enterprise work plan is obtained and a three-color progress evaluation mechanism is established, specifically: A three-color evaluation mechanism for work progress has been established, with on-time completion being recorded as a green card, overdue completion being recorded as a yellow card, and overdue again after being urged being completed being recorded as a red card.

[0057] S7, adjust the order of pushing work node information according to the three-color progress evaluation mechanism.

[0058] In this embodiment, the order of pushing work node information is adjusted according to the three-color progress evaluation mechanism, specifically: Adjust the order of information push according to the priority of each node; give priority to pushing red card node information, followed by yellow card node information, and finally green card node information. The order of information push is executed according to the push information sorting table based on the three-color evaluation mechanism.

[0059] This embodiment significantly improves the efficiency and accuracy of information push by constructing a push priority evaluation model based on the BP neural network. First, this technology comprehensively evaluates the priority of information at each node by comprehensively considering the timeliness influence coefficient of the work node, the information entropy influence coefficient of the push information, and the interactivity influence coefficient of the push information, thereby ensuring that the most urgent and complex information can be processed first. Secondly, the generation of the push information sorting table and the adjustment of the information push order enable high-priority information to be conveyed in a timely manner under limited load, effectively avoiding information overload and delays. The three-color progress evaluation mechanism further optimizes the push strategy. By classifying the status of the work nodes, it ensures that information from the red-card nodes is pushed first, thereby promoting the control and management of the project progress. Overall, these measures not only improve the efficiency and accuracy of information processing, but also optimize resource allocation, enhance the relevance and real-time nature of information transmission, and ultimately achieve effective management and scheduling of enterprise work nodes.

[0060] Example 3, Figure 2 It is an online node management and control method for enterprise-wide business based on the digital and intelligent integrated power platform, including a node division module, an information push module, a push detailed analysis module, an information priority analysis module, an information sorting module, a three-color evaluation module, and a secondary push module.

[0061] The node division module is used to classify and refine common work nodes across the enterprise and summarize and enter work node information; The information push module is used to set labels, information notes and push functions for work nodes based on the digital and intelligent power platform; Push detailed analysis module, used to obtain work node evaluation data and push information evaluation data; The information priority analysis module is used to build a push priority evaluation model based on the BP neural network according to the work node evaluation data and the push information evaluation data, and generate the push information priority; An information sorting module is used to generate a push information sorting table according to the priority of the pushed information, and push the working node information based on the push information sorting table; A three-color evaluation module is used to obtain the enterprise work plan and establish a three-color progress evaluation mechanism. The three colors include green, yellow, and red; The secondary push module is used to adjust the push order of work node information according to the three-color progress evaluation mechanism.

[0062] The above formulas are all dimensionless and numerical calculations. The formulas are obtained by collecting a large amount of data and performing software simulation to obtain the latest real situation. The preset parameters in the formulas are configured by technicians in this field according to actual conditions.

[0063] The above embodiments may be implemented in whole or in part through software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product.

[0064] Those skilled in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0065] In addition, each functional module in each embodiment of the present application may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.

[0066] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of this application. Therefore, the scope of protection of this application should be based on the scope of protection of the claims.

[0067] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. The enterprise-wide online node management and control method based on the digital intelligence power platform is characterized by: The steps include: Classify and refine common work nodes across the enterprise, and summarize and enter work node information; Based on the Digital Intelligence Power Integration Platform, set labels, information notes and push functions for working nodes; Obtain work node evaluation data and push information evaluation data; According to the work node evaluation data and the push information evaluation data, a push priority evaluation model is built based on the bp neural network to generate the push information priority; Generate a push information sorting table according to the push information priority, and push the work node information based on the push information sorting table; Obtain the enterprise work plan and establish a three-color progress evaluation mechanism, the three colors include green, yellow and red; Adjust the order of pushing work node information according to the three-color progress evaluation mechanism.

2. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 1 is characterized in that: The digital intelligence power integration platform is based on setting labels, information notes and push functions for working nodes, specifically: Extract key features of working nodes based on NLP and generate labels; Classify and identify working nodes based on a predefined tag library; The tags in the tag library include task type, priority, time sensitivity, and custom tags related to the company's specific business; Based on automated algorithms, labels are automatically matched and assigned according to node attributes and historical data.

3. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 2 is characterized in that: The working node evaluation data includes the working node timeliness influence coefficient; the push information evaluation data includes the push information information entropy influence coefficient and the push information interactivity influence coefficient.

4. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 3 is characterized in that: The specific method for obtaining the timeliness influence coefficient of the working node is as follows: Obtain the historical key time points of each work node, including the planned start time, planned completion time, and actual completion time; Calculate time deviation and remaining time based on historical key time points; Build a task dependency graph based on each work node, record the predecessor and successor tasks of each work node, and use a directed graph to represent the task dependency relationship; Determine the node influence range based on the edges and nodes in the task dependency graph and obtain the node influence weight; Calculate the node delay impact coefficient based on the node impact weight; Based on the delay impact coefficient of each node on the directed graph path after a specific node in the task dependency graph, each delay impact coefficient is summarized to calculate the node importance; According to the node importance, time deviation and remaining time, the working node timeliness impact coefficient is calculated based on the preset working node timeliness impact coefficient calculation formula.

5. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 4 is characterized in that: The specific method for obtaining the information entropy influence coefficient of the push information is as follows: Collect all the push text data of the information to be pushed and simplify the text data; Calculate the push word frequency probability of the push text data based on a preset word frequency model; Calculate the information entropy of the pushed text data based on the pushed word frequency probability; The information entropy of the pushed text data is combined with the preset enterprise special word weights to calculate the information entropy influence coefficient of the pushed information.

6. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 5 is characterized in that: The specific method for obtaining the push information interaction influence coefficient is as follows: Based on the historical interaction event types, an information interaction set is obtained, wherein the information interaction set includes various push information and interaction events and event results thereof; Assigning preset interaction scores to various types of interaction events in the information interaction set; A regression model is constructed based on the information interaction set and the corresponding interaction score to generate the push information interaction influence coefficient.

7. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 6 is characterized in that: The specific calculation formula of the node importance is as follows: The specific calculation formula of the working node timeliness influence coefficient is as follows: In the formula, is the timeliness impact coefficient of the working node, is the time deviation, For the remaining time, is the importance of the i-th node, is the number of the subsequent path node of node i in the directed graph, p is the total number of subsequent path nodes of node i in the directed graph, is the jth node, is the node influence weight of the j-th node.

8. The method for managing and controlling enterprise-wide business online nodes based on the digital intelligence power integration platform according to claim 7 is characterized in that: The specific calculation formula of the preset word frequency model is as follows: The specific calculation formula of the push information entropy influence coefficient is as follows: In the formula, is the probability of the word in the kth push information, M is the total number of words in the push information, is the vocabulary probability, is the information entropy influence coefficient of the pushed information, It is the weight of special words for enterprises.

9. A device using the method for managing and controlling enterprise-wide business online nodes based on a digital intelligence and electrical platform as described in any one of claims 1 to 8, characterized in that: It includes node division module, information push module, push detailed analysis module, information priority analysis module, information sorting module, three-color evaluation module and secondary push module; The node division module is used to classify and refine the common work nodes of the entire enterprise and summarize and enter the work node information; The information push module is used to set labels, information notes and push functions for working nodes based on the digital and intelligent power platform; Push detailed analysis module, used to obtain work node evaluation data and push information evaluation data; The information priority analysis module is used to build a push priority evaluation model based on the BP neural network according to the work node evaluation data and the push information evaluation data, and generate the push information priority; An information sorting module is used to generate a push information sorting table according to the push information priority, and push the work node information based on the push information sorting table; A three-color evaluation module is used to obtain the enterprise work plan and establish a three-color progress evaluation mechanism, wherein the three colors include green, yellow and red; The secondary push module is used to adjust the push order of work node information according to the three-color progress evaluation mechanism.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, it implements the method for online node management and control of the entire enterprise's business based on the digital and intelligent power integration platform as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Information project whole-process management system

    CN111192001A

  • Construction log display method based on visualization

    CN117313960A

  • Multitask scheduling method and device based on heterogeneous distributed cluster

    CN118227291A

  • Office cooperation system and method based on artificial intelligence

    CN118521272A

  • Workflow systems and methods

    US20230206181A1