Method and device for reporting partial discharge detection data of GIS (Gas Insulated Switchgear) equipment

By dynamically adjusting the amount of GIS equipment partial discharge detection data sent, based on the presence or absence of detection data and the number of events, the problem of data redundancy and high processing pressure in the GIS equipment partial discharge detection system is solved, and the efficiency of large-scale management is improved. and accuracy.

CN118764741APending Publication Date: 2024-10-11THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411052394.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing GIS equipment partial discharge detection system faces the problems of excessive redundant data and high system storage and processing pressure in large-scale monitoring. It is difficult to effectively manage partial discharge, which affects the purpose of large-scale management.

Method used

By constructing multiple partial discharge detection units, the amount of data sent to the remote server is dynamically adjusted according to whether there is a partial discharge event in the detection data. More unit data is sent when there is an event, and less unit data is sent when there is no event, optimizing the data. traffic and storage space.

Benefits of technology

Effectively manages partial discharge detection data, reduces data communication volume and storage pressure, and improves the efficiency and accuracy of the system in large-scale management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118764741A_ABST
    Figure CN118764741A_ABST
Patent Text Reader

Abstract

The invention provides a GIS equipment partial discharge detection data reporting method and device, and belongs to the field of partial discharge detection.The method comprises the steps that m partial discharge detection units are constructed; receiving detection data of the m partial discharge detection units; whether a partial discharge event exists in the detection data or not is judged, and when the partial discharge event exists in the detection data, the detection data of n partial discharge detection units in the m partial discharge detection units are sent to a remote server; and when the partial discharge event does not exist in the detection data, q partial discharge detection units in the m partial discharge detection units are selected, and the detection data of the q partial discharge detection units are sent to the remote server. According to the method, the partial discharge detection unit which sends the detection data to the remote server is dynamically adjusted, the data communication traffic between the local server and the remote server is reduced, and the storage space of the remote server is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of partial discharge detection, and in particular to a method and device for reporting partial discharge detection data of GIS equipment. Background Art

[0002] Gas Insulated Switchgear (GIS) uses SF6 gas as insulation and arc extinguishing medium, and encapsulates circuit breakers, disconnectors, grounding switches, transformers, bushings, lightning arresters, busbars and other components in a closed grounded metal shell. Due to the good arc extinguishing performance of SF6, GIS equipment has the advantages of compact structure, small footprint, easy installation, simple operation and maintenance, and long maintenance cycle, and is widely used in 110~1000kV substations.

[0003] GIS partial discharge detection is mainly achieved through live detection and online detection. Since partial discharge is highly random, it is very likely to be missed during live detection, so online partial discharge detection is crucial to the safe and stable operation of GIS equipment.

[0004] The GIS partial discharge detection system includes partial discharge detection sensors, signal acquisition units, monitoring hosts, and comprehensive monitoring and analysis platforms. The partial discharge detection sensors are used to couple electromagnetic signals, currents, sound waves, and other signals generated by partial discharge in GIS equipment; the signal acquisition unit receives the output signal of the partial discharge detection sensor, filters, amplifies, detects, samples, and processes the signal, converts it into a digital signal output, and then sends it to the monitoring host through a wired or wireless communication network to carry out a small-scale partial discharge defect analysis. In order to meet the monitoring of large-scale partial discharge, the monitoring host needs to send the data before and after the partial discharge defect analysis to the remote comprehensive monitoring and analysis platform, so as to facilitate the management of partial discharge from a larger range. For example, a monitoring host is deployed in area A to perform partial discharge detection in area A, a monitoring host is deployed in area B to perform partial discharge detection in area B, and a comprehensive monitoring and analysis platform is deployed in city C to monitor, analyze, and predict partial discharge in all areas of the city (including areas A and B). Due to the establishment of a hierarchical partial discharge detection system, the higher the partial discharge detection system, the larger the amount of data it faces. If the reported data is not managed, on the one hand, there will be a lot of redundant data, and on the other hand, the pressure of system storage and processing will be large, making it difficult to achieve the purpose of large-scale management of partial discharge. Summary of the invention

[0005] In view of this, the present application proposes a method and device for reporting partial discharge detection data of GIS equipment.

[0006] Based on the above purpose, the present application provides a method and device for reporting partial discharge detection data of GIS equipment, including:

[0007] Constructing m partial discharge detection units, each of which includes at least one signal acquisition unit, each of which corresponds to at least one partial discharge detection sensor, and m>1;

[0008] Receiving detection data of the m partial discharge detection units;

[0009] Determine whether there is a partial discharge event in the detection data, and when there is a partial discharge event in the detection data, send detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m;

[0010] When there is no partial discharge event in the detection data, q partial discharge detection units are selected from the m partial discharge detection units, and the detection data of the q partial discharge detection units are sent to the remote server, q>1 and q <m。

[0011] In some embodiments, the method for reporting partial discharge detection data of GIS equipment, sending the detection data of n partial discharge detection units among the m partial discharge detection units to the remote server, comprises:

[0012] Determine that there are x partial discharge events in the detection data of m partial discharge detection units, x>1;

[0013] Determine the number of the n partial discharge detection units according to x, where n is positively correlated with x;

[0014] The detection data of n partial discharge detection units are sent to the remote server.

[0015] In some embodiments, selecting q partial discharge detection units from the m partial discharge detection units and sending the detection data of the q partial discharge detection units to the remote server includes:

[0016] Determine a reporting period t1 of the partial discharge detection unit and a partial discharge event detection period t2 of the partial discharge detection unit;

[0017] The number q of partial discharge detection units is determined according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2.

[0018] In some embodiments, the number q of partial discharge detection units is determined according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2, where k is a configuration coefficient, and k can adjust the period for sending the detection data of all partial discharge detection units to the remote server. The larger k is, the longer the period is. The q partial discharge detection units include:

[0019]

[0020] In some embodiments, the method for reporting partial discharge detection data of GIS equipment further includes:

[0021] Acquire information of a second local server, where the second local server includes m' partial discharge detection units, where m'>1;

[0022] Receive the detection data of the m' partial discharge detection units

[0023] Determining whether the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units contain a partial discharge event;

[0024] When the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units both have partial discharge events, the first server priority p1 and the second server priority p2 are determined, p1>p2, and the detection data of n partial discharge detection units out of the m partial discharge detection units and the detection data of n' partial discharge detection units out of the m' partial discharge detection units are sent to the remote server, and n>n'.

[0025] In some embodiments, the method for reporting partial discharge detection data of GIS equipment further includes:

[0026] When the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units do not contain partial discharge events, the first server priority p1 and the second server priority p2 are determined, p1>p2, the detection data of q partial discharge detection units out of the m partial discharge detection units and the detection data of q' partial discharge detection units out of the m' partial discharge detection units are sent to the remote server, and q>q'.

[0027] In some embodiments, the method for reporting partial discharge detection data of GIS equipment further includes:

[0028] When the detection data of the m partial discharge detection units show a partial discharge event and the detection data of the m' partial discharge detection units do not show a partial discharge event, the detection data of n partial discharge detection units among the m partial discharge detection units and the detection data of q' partial discharge detection units among the m' partial discharge detection units are sent to the remote server, and n>q'.

[0029] Based on the same concept, the present application also provides a device for reporting partial discharge detection data of GIS equipment, including:

[0030] Construction module: construct m partial discharge detection units, wherein the partial discharge detection unit includes at least one signal acquisition unit, each signal acquisition unit in the at least one signal acquisition unit corresponds to at least one partial discharge detection sensor, and m>1;

[0031] Receiving module: receiving detection data of the m partial discharge detection units;

[0032] The first judgment module is used to judge whether there is a partial discharge phenomenon in the detection data;

[0033] A first sending module: when there is a partial discharge event in the detection data, sending the detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m;

[0034] The second sending module: when there is no partial discharge event in the detection data, select q partial discharge detection units from the m partial discharge detection units, and send the detection data of the q partial discharge detection units to the remote server, q>1 and q <m。

[0035] Based on the same concept, the present application also provides an electronic device, including: one or more processors; a storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the method for reporting local discharge detection data of GIS equipment as described in any of the above items.

[0036] Based on the same concept, the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute the method for reporting partial discharge detection data of GIS equipment as described in any of the above items. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments will be briefly introduced below. Obviously, the drawings in the following description only relate to some embodiments of the present invention, but are not intended to limit the present invention.

[0038] Figure 1 It is a flow chart of a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application;

[0039] Figure 2 It is a schematic diagram of the system structure corresponding to a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application;

[0040] Figure 3 This is another flow chart of a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application;

[0041] Figure 4 It is a flow chart of determining the number of partial partial discharge detection units in a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application;

[0042] Figure 5 It is another flow chart of a method for reporting partial discharge detection data of GIS equipment provided by an embodiment of the present application;

[0043] Figure 6 This is a schematic diagram of a device for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application.

[0044] Figure 7 is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application;

[0045] Figure 8 It is a schematic diagram of a storage medium provided according to an embodiment of the present application. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] Unless otherwise defined, the technical or scientific terms used herein shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the patent application specification and claims of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. The words "include" or "comprises" and similar words mean that the technical features appearing before the word include the technical features listed after the word and their equivalents, but do not exclude other technical features.

[0048] The on-line partial discharge detection system for GIS includes partial discharge detection sensors, signal acquisition units, monitoring hosts, and an integrated monitoring and analysis platform. The partial discharge detection sensors are used to couple electromagnetic signals, currents, acoustic waves, etc. generated by partial discharges in GIS equipment; the signal acquisition units receive the output signals of the partial discharge detection sensors, process the signals through filtering, amplification, detection, sampling, etc., convert them into digital signals for output, and then send them to the monitoring host through a wired or wireless communication network for small-scale partial discharge defect analysis. To meet the monitoring of large-scale partial discharges, the monitoring host needs to send the data before and after partial discharge defect analysis to the remote integrated monitoring and analysis platform, which is convenient for managing partial discharges in a larger scope. For example, a monitoring host is deployed in Area A for partial discharge detection in Area A, a monitoring host is deployed in Area B for partial discharge detection in Area B, and an integrated monitoring and analysis platform is deployed in City C to monitor, analyze, and predict partial discharges in all districts within the city (including Area A and Area B). Since a hierarchical partial discharge detection system is established, the higher-level partial discharge detection systems face a larger amount of data. If the reported data is not managed, on the one hand, there is a large amount of redundant data, and on the other hand, the pressure on system storage and processing is large, making it difficult to achieve the purpose of managing partial discharges in a large scope. Therefore, in order to improve the efficiency of reporting partial discharge detection data for GIS equipment, a method for reporting partial discharge detection data for GIS equipment is required.

[0049] At least one embodiment of the present application provides a method for reporting partial discharge detection data for GIS equipment. The control method includes: constructing m partial discharge detection units, where the partial discharge detection unit includes at least one signal acquisition unit, and each signal acquisition unit in the at least one signal acquisition unit corresponds to at least one partial discharge detection sensor, m > 1; receiving the detection data of the m partial discharge detection units; determining whether there is a partial discharge event in the detection data. When there is a partial discharge event in the detection data, sending the detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, n > 1 and n ≤ m; when there is no partial discharge event in the detection data, selecting q partial discharge detection units among the m partial discharge detection units and sending the detection data of the q partial discharge detection units to the remote server, q > 1 and q < m. This method constructs equipment partial discharge detection units and dynamically adjusts the partial discharge detection units that send detection data to the remote server according to whether there is a partial discharge event in the detection unit, ensuring that the remote server can obtain complete partial discharge detection data while reducing the data communication volume between the local server and the remote server and saving the storage space of the remote server.

[0050] At least one embodiment of the present application further provides a device for reporting partial discharge detection data of GIS equipment, including a construction module: constructing m partial discharge detection units, the partial discharge detection unit including at least one signal acquisition unit, each signal acquisition unit in the at least one signal acquisition unit corresponds to at least one partial discharge detection sensor, m>1; a receiving module: receiving detection data of the m partial discharge detection units; a first judgment module: judging whether there is a partial discharge phenomenon in the detection data; a first sending module: when there is a partial discharge event in the detection data, sending the detection data of n partial discharge detection units in the m partial discharge detection units to a remote server, n>1 and n≤m; a second sending module: when there is no partial discharge event in the detection data, selecting q partial discharge detection units in the m partial discharge detection units, and sending the detection data of the q partial discharge detection units to the remote server, q>1 and q <m。

[0051] At least one embodiment of the present disclosure further provides an electronic device, comprising: one or more processors and a storage device; the storage device is used to store one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the methods for reporting local discharge detection data of GIS equipment provided in the embodiments of the present disclosure.

[0052] At least one embodiment of the present disclosure further provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute any one of the methods for reporting partial discharge detection data of GIS equipment provided in the embodiments of the present disclosure.

[0053] Figure 1 FIG. 1 is a flow chart of a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application. Figure 1 As shown, the method includes:

[0054] Step 102: construct m partial discharge detection units, each of which includes at least one signal acquisition unit, each of which corresponds to at least one partial discharge detection sensor, and m>1;

[0055] The signal acquisition unit can collect one or more online detection data of partial discharge of GIS equipment, such as one or more of the partial discharge detection data of GIS equipment such as high-frequency current, ultrasonic wave, infrared temperature, ground current and load current; in addition, the signal acquisition unit can collect the detection data of one or more partial discharge detection sensors of GIS equipment, such as the detection data of multiple ultrasonic sensors.

[0056] Step 104: receiving detection data of the m partial discharge detection units;

[0057] Step 106: determining whether there is a partial discharge event in the detection data, and when there is a partial discharge event in the detection data, sending detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m;

[0058] Step 108: When there is no partial discharge event in the detection data, select q partial discharge detection units from the m partial discharge detection units, and send the detection data of the q partial discharge detection units to the remote server, where q>1 and q <m。

[0059] Figure 2 FIG. 1 is a schematic diagram of a system structure corresponding to a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application. Figure 2 As shown in the figure, the GIS partial discharge detection system includes a partial discharge detection sensor, a signal acquisition unit, a monitoring host, and a comprehensive monitoring and analysis platform. The partial discharge detection sensor is used to couple the electromagnetic signals, currents, sound waves and other signals generated by partial discharge in the GIS equipment. A partial discharge detection sensor is arranged at the part of the GIS equipment to be detected. The partial discharge detection sensor can be a partial discharge detection sensor of the same type (such as an ultra-high frequency partial discharge detection sensor) or a partial discharge detection sensor of different types (such as an ultra-high frequency partial discharge detection sensor and an ultrasonic partial discharge detection sensor). Different types of partial discharge detection sensors work together; the signal acquisition unit receives the output signal of the partial discharge detection sensor, filters, amplifies, detects, samples, and processes the signal, converts it into a digital signal output, and then sends it to the monitoring host through a wired or wireless communication network to carry out a small-scale partial discharge defect analysis. In order to meet the monitoring of large-scale partial discharge, the monitoring host needs to send the data before and after the partial discharge defect analysis to the remote comprehensive monitoring and analysis platform, so as to facilitate the management of partial discharge from a larger range.

[0060] Figure 3 FIG. 1 is another flow chart of a method for reporting partial discharge detection data of GIS equipment provided by an embodiment of the present application. Figure 3 As shown,

[0061] Step 1: The monitoring host builds a partial discharge detection unit;

[0062] Step 2: The monitoring host sends the information of the partial discharge detection unit to the comprehensive monitoring and analysis platform;

[0063] Step 3: The comprehensive monitoring and analysis platform saves the partial discharge detection unit information;

[0064] Step 4: The monitoring host receives the partial discharge detection data sent by the first partial discharge detection unit set;

[0065] Step 5: The monitoring host determines whether there is a partial discharge signal. If there is a partial discharge signal, the monitoring host sends the detection data of all or part of the partial discharge detection units in the first partial discharge detection unit set to the comprehensive monitoring and analysis platform;

[0066] Step 6: The monitoring host receives the partial discharge detection data sent by the second partial discharge detection unit set;

[0067] Step 7: The monitoring host determines whether there is a partial discharge signal in the partial discharge detection data sent by the second partial discharge detection unit set. If there is no partial discharge signal, the partial discharge detection data of the partial discharge detection unit is locally saved within a certain time range, and the detection data of some partial discharge detection units in the second partial discharge detection unit set are sent to the comprehensive monitoring and analysis platform.

[0068] A method for determining some of the partial discharge detection units in the first partial discharge detection unit set and some of the partial discharge detection units in the second partial discharge detection unit set is as follows:

[0069] Determine whether there is a partial discharge event in the detection data, and when there is a partial discharge event in the detection data, send detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m;

[0070] When there is no partial discharge event in the detection data, q partial discharge detection units are selected from the m partial discharge detection units, and the detection data of the q partial discharge detection units are sent to the remote server, q>1 and q <m。

[0071] Figure 4 FIG. 1 is a flow chart of determining the number of partial discharge detection units in a method for reporting partial discharge detection data of a GIS device provided in an embodiment of the present application. Figure 4 As shown, the method includes:

[0072] Step 402: Determine that there are x partial discharge events in the detection data of m partial discharge detection units, where x>1;

[0073] Step 404: Determine the number of the n partial discharge detection units according to x, where n is positively correlated with x; specifically:

[0074]

[0075] Since there are x partial discharge events in m partial discharge detection units, the number n of partial partial discharge detection units in the m partial discharge detection units is positively correlated with x, specifically x Positively correlated, through x Positive correlation can increase the number of partial discharge detection units that send detection data to the remote server, thereby improving the accuracy of partial discharge detection and positioning.

[0076] Step 406: Send the detection data of n partial discharge detection units to the remote server.

[0077] Further, the selecting q partial discharge detection units from the m partial discharge detection units and sending the detection data of the q partial discharge detection units to the remote server includes:

[0078] Determine a reporting period t1 of the partial discharge detection unit and a partial discharge event detection period t2 of the partial discharge detection unit;

[0079] The number q of partial discharge detection units is determined according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2.

[0080] The determining the number q of partial discharge detection units according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2 includes:

[0081]

[0082] Since there is no partial discharge event in the partial discharge detection data, the number q of partial partial discharge detection units is determined by considering the reporting cycle, the partial discharge event detection cycle and the number of partial discharge detection units. By reporting the detection data of q partial discharge detection units in each reporting cycle t1, the detection data of all partial discharge detection units are uploaded to the remote server within (m / q)*t1 cycles, and the remote server can comprehensively manage the data of all partial discharge detection units, so that the remote server can comprehensively judge the operating status of all partial discharge detection units.

[0083] Figure 5 FIG. 1 is another flow chart of a method for reporting partial discharge detection data of GIS equipment provided in an embodiment of the present application. Figure 5 As shown, the method includes:

[0084] Step 502: Acquire information of a second local server, where the second local server includes m' partial discharge detection units, where m'>1;

[0085] Step 504: receiving detection data of the m' partial discharge detection units;

[0086] Step 506: determining whether the detection data of the m partial discharge detection units and the detection data of the m′ partial discharge detection units contain a partial discharge event;

[0087] Step 508: When the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units both have partial discharge events, determine the first server priority p1 and the second server priority p2, p1>p2, and send the detection data of n partial discharge detection units out of the m partial discharge detection units and the detection data of n' partial discharge detection units out of the m' partial discharge detection units to the remote server, n>n'.

[0088] By judging the partial discharge conditions of multiple local servers, the detection data of the partial discharge detection units of multiple local servers are comprehensively managed, and the coordination and scheduling capabilities of the remote server between multiple local servers are improved. By considering the priorities of different local servers, the detection data of local servers with high priorities can be processed first, improving the real-time processing of the detection data of the partial discharge detection units of local servers with high priorities, and improving the efficiency of remote servers.

[0089] Further, when there is no partial discharge event in the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units, the first server priority p1 and the second server priority p2 are determined, p1>p2, and the detection data of q partial discharge detection units out of the m partial discharge detection units and the detection data of q' partial discharge detection units out of the m' partial discharge detection units are sent to the remote server, q>q'.

[0090] By judging the partial discharge conditions of multiple local servers, the detection data of the partial discharge detection units of multiple local servers are comprehensively managed, and the coordination and scheduling capabilities of the remote server between multiple local servers are improved. By considering the priorities of different local servers, the detection data of local servers with high priorities can be processed first, improving the real-time processing of the detection data of the partial discharge detection units of local servers with high priorities, and improving the efficiency of remote servers.

[0091] Further, when the detection data of the m partial discharge detection units indicate a partial discharge event and the detection data of the m' partial discharge detection units do not indicate a partial discharge event, the detection data of n partial discharge detection units among the m partial discharge detection units and the detection data of q' partial discharge detection units among the m' partial discharge detection units are sent to the remote server, and n>q'.

[0092] By judging the partial discharge conditions of multiple local servers, the detection data of the partial discharge detection units of multiple local servers are comprehensively managed, and the coordination and scheduling capabilities of the remote server between multiple local servers are improved. By considering the priorities of different local servers, the detection data of local servers with high priorities can be processed first, improving the real-time processing of the detection data of the partial discharge detection units of local servers with high priorities, and improving the efficiency of remote servers.

[0093] Figure 6 A device 600 for reporting partial discharge detection data of GIS equipment is shown, comprising:

[0094] Construction module 610: used to construct m partial discharge detection units, wherein the partial discharge detection unit includes at least one signal acquisition unit, each signal acquisition unit in the at least one signal acquisition unit corresponds to at least one partial discharge detection sensor, and m>1;

[0095] Receiving module 620: used to receive detection data of the m partial discharge detection units;

[0096] The first judgment module 630 is used to judge whether there is a partial discharge phenomenon in the detection data;

[0097] A first sending module 640: when there is a partial discharge event in the detection data, sending the detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m;

[0098] The second sending module is used for selecting q partial discharge detection units from the m partial discharge detection units when there is no partial discharge event in the detection data, and sending the detection data of the q partial discharge detection units to the remote server, q>1 and q <m。

[0099] The device system provided in the embodiment of the present disclosure can achieve the same working process and technical effect as the method embodiment for reporting partial discharge detection data of GIS equipment, which will not be repeated here, and please refer to the previous description.

[0100] At least one embodiment of the present disclosure further provides an electronic device 700, referring to Figure 7 The electronic device 700 includes: one or more processors 710 and a storage device 720; the storage device 720 is used to store one or more programs. When the one or more programs are executed by one or more processors, the one or more processors implement any method for reporting local discharge detection data of GIS equipment provided in the embodiments of the present disclosure.

[0101] At least one embodiment of the present application further provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute any one of the methods for reporting partial discharge detection data of GIS equipment provided in the embodiments of the present disclosure.

[0102] At least one embodiment of the present disclosure also provides a computer executable instruction storage medium which may be a non-transitory computer readable storage medium. For example, Figure 8 A schematic diagram of a non-transitory computer-readable storage medium provided for at least one embodiment of the present disclosure.

[0103] For example, Figure 8 As shown, computer-readable instructions 801 are non-temporarily stored on a computer-readable storage medium 800. For example, when the computer-readable instructions 801 are executed by a processor, one or more steps in the method for reporting partial discharge detection data of GIS equipment described above can be executed.

[0104] For example, the storage medium 800 may be applied to the electronic device 700. For example, the storage medium 700 may include the memory 720 in the electronic device 700.

[0105] The above description is only a preferred embodiment of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present disclosure (but not limited to) by each other to form a technical solution.

[0106] There are a few points to note:

[0107] (1) The drawings of the embodiments of the present disclosure only relate to the structures related to the embodiments of the present disclosure, and other structures may refer to the general design.

[0108] (2) In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0109] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the protection scope of the present invention. The protection scope of the present invention is determined by the appended claims.

Claims

1. A method for reporting partial discharge detection data of GIS equipment, applied to a first local server, comprising: Constructing m partial discharge detection units, each of which includes at least one signal acquisition unit, each of which corresponds to at least one partial discharge detection sensor, and m>1; Receiving detection data of the m partial discharge detection units; Determine whether there is a partial discharge event in the detection data, and when there is a partial discharge event in the detection data, send detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m; When there is no partial discharge event in the detection data, q partial discharge detection units are selected from the m partial discharge detection units, and the detection data of the q partial discharge detection units are sent to the remote server, q>1 and q <m。 2. According to the method for reporting partial discharge detection data of GIS equipment in claim 1, the step of sending the detection data of n partial discharge detection units among the m partial discharge detection units to the remote server comprises: Determine that there are x partial discharge events in the detection data of m partial discharge detection units, x>1; Determine the number of the n partial discharge detection units according to x, where n is positively correlated with x; The detection data of n partial discharge detection units are sent to the remote server.

3. According to the method for reporting partial discharge detection data of GIS equipment in claim 1, the step of selecting q partial discharge detection units from the m partial discharge detection units and sending the detection data of the q partial discharge detection units to the remote server comprises: Determine a reporting period t1 of the partial discharge detection unit and a partial discharge event detection period t2 of the partial discharge detection unit; The number q of partial discharge detection units is determined according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2.

4. The method for reporting partial discharge detection data of GIS equipment according to claim 3, wherein the number q of partial discharge detection units is determined according to the number m of partial discharge detection units, the reporting period t1 and the partial discharge event detection period t2, comprising:

5. The method for reporting partial discharge detection data of GIS equipment according to claim 1, further comprising: Acquire information of a second local server, where the second local server includes m' partial discharge detection units, where m'>1; Receiving detection data of the m' partial discharge detection units; Determining whether the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units contain a partial discharge event; When the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units both have partial discharge events, the first server priority p1 and the second server priority p2 are determined, p1>p2, and the detection data of n partial discharge detection units out of the m partial discharge detection units and the detection data of n' partial discharge detection units out of the m' partial discharge detection units are sent to the remote server, and n>n'.

6. The method for reporting partial discharge detection data of GIS equipment according to claim 5, further comprising: When the detection data of the m partial discharge detection units and the detection data of the m' partial discharge detection units do not contain partial discharge events, the first server priority p1 and the second server priority p2 are determined, p1>p2, the detection data of q partial discharge detection units out of the m partial discharge detection units and the detection data of q' partial discharge detection units out of the m' partial discharge detection units are sent to the remote server, and q>q'.

7. The method for reporting partial discharge detection data of GIS equipment according to claim 5, further comprising: When the detection data of the m partial discharge detection units show a partial discharge event and the detection data of the m' partial discharge detection units do not show a partial discharge event, the detection data of n partial discharge detection units among the m partial discharge detection units and the detection data of q' partial discharge detection units among the m' partial discharge detection units are sent to the remote server, and n>q'.

8. A device for reporting partial discharge detection data of GIS equipment, comprising: Construction module: construct m partial discharge detection units, wherein the partial discharge detection unit includes at least one signal acquisition unit, each signal acquisition unit in the at least one signal acquisition unit corresponds to at least one partial discharge detection sensor, and m>1; Receiving module: receiving detection data of the m partial discharge detection units; The first judgment module is used to judge whether there is a partial discharge phenomenon in the detection data; A first sending module: when there is a partial discharge event in the detection data, sending the detection data of n partial discharge detection units among the m partial discharge detection units to a remote server, where n>1 and n≤m; The second sending module: when there is no partial discharge event in the detection data, select q partial discharge detection units from the m partial discharge detection units, and send the detection data of the q partial discharge detection units to the remote server, q>1 and q <m。 9. An electronic device, comprising: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method for reporting partial discharge detection data of GIS equipment as described in any one of claims 1-7.

10. A storage medium comprising computer executable instructions, wherein the computer executable instructions, when executed by a computer processor, are used to execute the method for reporting partial discharge detection data of GIS equipment as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Method and device for notifying partial discharge event

    CN119342100A