Efficient flange blank machining process
Through fully automated flange blank processing technology, combined with electric heating and multi-stage stamping and cooling processing, the problem of excessive manual participation and distortion in flange processing is solved, efficiency and yield are improved, and the accuracy of product flatness is ensured.
Patent Information
- Application Number
- CN202411024379.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-15
AI Technical Summary
Too much manual involvement in the flange processing process leads to low work efficiency, and high-temperature raw materials are prone to plane distortion and unevenness during stamping, resulting in low yield.
Fully automated flange blank processing technology is adopted, including material preparation, electric heating, first punch stamping, screw press forging, second punch inner diameter punching, rotating circulating water tank cooling and palletizing inspection. Industrial robots are used for material transfer, and are equipped with Flatten the mold to prevent twisting.
It improves work efficiency and yield, ensures the accuracy of product flatness, reduces manual participation, and solves the problem of distortion of high-temperature raw materials during stamping.
Smart Images

Figure CN118768437A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flange processing, and in particular to a high-efficiency flange blank processing technology. Background Art
[0002] Flange, also known as flange or flange, is a part that connects pipes to each other. It is mainly connected to the pipe end. There are holes on the flange. Bolts are used to connect the two flanges. Gaskets are used to seal the flanges. Flange is a disc-shaped part, which is most common in pipeline engineering. Flanges are used in pairs. Stainless steel flanges are mainly made of stainless steel materials. Stainless steel flanges have the characteristics of strong rigidity, corrosion resistance, pitting resistance, rust resistance and difficulty in wear.
[0003] There is too much manual involvement in the flange processing, such as the product transfer operation between the various stamping parts, which leads to low work efficiency. In addition, during the stamping operation of general flanges, since the raw materials are at high temperature and soft, the plane is prone to distortion and unevenness, which leads to a low yield. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide an efficient flange blank processing technology, provide a complete flange production line, fully automated operation, high yield rate while also improving work efficiency, good use effect.
[0005] In order to solve the above technical problems, the present invention provides 1. an efficient flange blank processing process, comprising the following steps: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: The material punched by the S5 punch press is transferred to a rotary circulating water tank for product cooling to obtain the final blank; S7: Palletize the blanks after cooling in S6, and inspect and put them into storage after palletizing.
[0006] Furthermore, the maximum working pressure of the first punch press in step S3 is 1250T.
[0007] Furthermore, the maximum working pressure of the second punch press in step S5 is 450T.
[0008] Furthermore, the maximum working pressure of the screw press in step S4 is 1000T.
[0009] Furthermore, in step S5, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted or uneven.
[0010] Furthermore, the electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace with the following parameters: power 1200w, furnace temperature 1200°C, and heating time 22 seconds.
[0011] Furthermore, industrial robots are arranged between the electric heating furnace, the first punching machine, the screw press, the second punching machine, and the rotary circulating water tank to perform material transfer operations.
[0012] Beneficial effects of the present invention: 1. The present invention provides a complete flange production line with fully automated operation, which improves work efficiency and has good use effect; 2. When punching the inner diameter, a flattening die is set to ensure that the flatness of the product will not be distorted, which solves the problem in the prior art that the raw materials are in a high temperature state and have a relatively soft hardness, which easily causes the plane to be distorted during punching. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a process flow chart of the present invention. DETAILED DESCRIPTION
[0014] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.
[0015] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0016] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0017] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0018] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0019] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0020] Reference Figure 1 As shown, an embodiment of a high-efficiency flange blank processing process of the present invention includes the following steps: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: The material punched by the S5 punch press is transferred to a rotary circulating water tank for product cooling to obtain the final blank; S7: Palletize the blanks after cooling in S6, and inspect and put them into storage after palletizing.
[0021] The specific parameters of each component in the above steps are as follows: the maximum working pressure of the first punch in step S3 is 1250T; the maximum working pressure of the second punch in step S5 is 450T; the maximum working pressure of the screw press in step S4 is 1000T; the electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace, and the parameters are as follows: power 1200w, furnace temperature 1200℃, heating time 22 seconds.
[0022] In step S5, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted, which solves the problem in the prior art that the raw materials are in a high temperature state and have a relatively soft hardness, and the surface is easily distorted during punching.
[0023] Industrial robots are installed between the electric heating furnace, the first punching machine, the screw press, the second punching machine, and the rotary circulating water tank to perform material transfer operations, turning the entire production line into a fully automated production line and reducing manual participation.
[0024] The above-described embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Equivalent substitutions or changes made by those skilled in the art based on the present invention are within the protection scope of the present invention. The protection scope of the present invention shall be subject to the claims.
Claims
1. An efficient flange blank processing technology, It is characterized in that The steps include: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: The material punched by the S5 punch press is transferred to a rotary circulating water tank for product cooling to obtain the final blank; S7: Palletize the blanks after cooling in S6, and inspect and put them into storage after palletizing.
2. The high-efficiency flange blank processing process according to claim 1, It is characterized in that The maximum working pressure of the first punch press in step S3 is 1250T.
3. The high-efficiency flange blank processing process according to claim 1, It is characterized in that The maximum working pressure of the second punch press in step S5 is 450T.
4. The high-efficiency flange blank processing process according to claim 1, It is characterized in that The maximum working pressure of the screw press in step S4 is 1000T.
5. The high-efficiency flange blank processing process according to claim 1, It is characterized in that In step S5, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted or uneven.
6. The high-efficiency flange blank processing process according to claim 1, It is characterized in that The electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace, and the parameters are as follows: power 1200w, furnace temperature 1200°C, and heating time 22 seconds.
7. The high-efficiency flange blank processing process according to claim 1, It is characterized in that Industrial robots are arranged between the electric heating furnace, the first punching machine, the screw press, the second punching machine and the rotary circulating water tank to perform material transfer operations.
Citation Information
Patent Citations
Large wind power flange cake base pressing and double punching complex technology
CN102248103A
Flange manufacturing technology
CN110202327A
Flange production process for improving raw material utilization rate
CN111230037A
Process for forging and forming welding neck flanges for connecting pipelines
CN112475203A
Automatic production process for large flange
CN113198961A