Automatic production line for new energy charging pile production and production process
By using the matching installation of folding blocks and connecting blocks and structures such as chucks, chucks, gears, etc. in the cutting machine of the charging pile production line, the problem of insufficient applicability of the cutting machine to plates of different weights is solved, and the stable limit of the plates is achieved. , improving production efficiency and product quality.
Patent Information
- Application Number
- CN202411181419.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing charging pile production line, the cutting machine has low applicability to plates of different weights, which causes the plates to easily move or position deviation during the cutting process, affecting production efficiency and product quality.
An automatic production line for the production of new energy charging piles is designed. By using the matching installation of folding blocks and connecting blocks in the cutting machine, combined with structures such as chucks, slots, gears and springs, the plate is limited and stabilized. Accommodates boards of different weights and shapes.
It improves the applicability and use effect of the cutting machine, ensures the stability and accuracy of the plate during the cutting process, and enhances the automation level of the production line.
Smart Images

Figure CN118768980A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of charging pile production, and in particular to an automatic production line and production process for producing new energy charging piles. Background Art
[0002] With the development and promotion of new energy technologies, electric vehicles have become an important force in promoting energy conservation and emission reduction in the transportation sector. As an important part of electric vehicle infrastructure, the demand for charging piles is growing, and their production efficiency and quality are directly related to the popularity of electric vehicles. In the production of charging piles, starting from plate cutting, through grinding, stamping, welding, assembly, testing, spraying to final packaging, the entire production process is highly automated, ensuring production efficiency and product quality. Cutting is one of the key preliminary processes, which directly affects the progress of subsequent processes and the final quality of the product.
[0003] In the prior art, traditional metal sheet cutting machines usually place the sheet directly on the placement table of the machine during operation, and then use laser for cutting. This method can improve the cutting accuracy. When a heavier sheet is placed on the cutting table, it can be kept in place more firmly due to its own gravity to prevent displacement during the cutting process. However, for lighter sheets, gravity alone is often unable to achieve effective limiting, which can easily lead to slight movement or position deviation of the sheet during the laser cutting process. If the operator tries to manually fix the sheet to reduce displacement, it will not only increase the work intensity, but also bring safety hazards. This leads to the low adaptability of the cutting machine to sheets of different weights, affecting its overall use effect.
[0004] Therefore, an automatic production line and production process for the production of new energy charging piles are needed to solve the problem that the applicability of the cutting machine in the existing automatic production line is low, resulting in poor use effect. Summary of the invention The purpose of the present invention is to provide an automatic production line and production process for producing new energy charging piles to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an automatic production line for producing new energy charging piles, comprising a cutting machine body, a placement plate is installed in the middle of the cutting machine body, two assembly blocks are installed on the left and right sides of the placement plate, a fitting groove is opened between the middle parts of the two assembly blocks on the left and right sides, a fixing block is inserted into the inner wall of the fitting groove, a gear is installed on the top of the fixing block, connecting blocks are inserted on the front and back sides of the top of the fixing block, and the connecting blocks are meshed with the gears, a folding block is hinged on the adjacent side of the connecting blocks on the left and right sides, and a fitting plate is hinged on the other side of the folding block, the connecting block is inserted into the separated side of the fitting grooves on the left and right sides, and the folding block is inserted into the adjacent side of the fitting grooves on the left and right sides.
[0006] Preferably, a card slot 1 is provided on the side close to the connecting blocks on the left and right sides, and a card head is installed on the side close to the folding blocks on the front and rear sides. When the folding blocks and the connecting blocks are matched and installed, the card head is inserted into the inner wall of the card slot 1.
[0007] Preferably, the assembly block is provided with plug-in grooves on both the front and rear sides of the bottom, plug-in blocks are plugged into the inner walls of the plug-in grooves, movable blocks are plugged into the left and right sides of the bottom of the fixed block, and a second slide groove is provided on both the front and rear sides of the inside of the movable block, and a limit block is installed on the inner wall of the second slide groove, and springs are installed on the side of the limit blocks on the left and right sides away from the plug-in blocks.
[0008] Preferably, the side of the limit blocks on the left and right sides close to the assembly block is installed between the insertion block, and the end of the springs on the left and right sides away from the limit blocks is installed on the inner wall of the second slide groove.
[0009] Preferably, movable grooves are provided on the upper sides of the assembly blocks on the left and right sides, pull rods are inserted on the front and rear sides of the fixed block, a plurality of rubber clamping balls are installed on the outer side of the upper part of the pull rod, a protrusion is installed on the bottom end of the pull rod, a slide groove 1 is provided on the bottom of the fixed block, a plurality of clamping grooves 2 are provided on the front and rear sides of the upper part of the fixed block, and two tension springs are installed between the two movable blocks on the left and right sides.
[0010] Preferably, the rubber card ball is clamped on the inner wall of the second card slot, the protrusion is inserted between the two moving blocks and pushes the moving block, the protrusion is inserted on the inner wall of the first slide slot, the moving block is slidably connected to the inner wall of the first slide slot, and the bottom of the moving block is attached to the bottom of the fitting slot, and the middle part of the tension spring passes through the bottom of the fixed block and is arranged on the inner wall of the first slide slot.
[0011] Preferably, storage grooves are provided on the front and rear sides of the fixed block, two oil outlet grooves are provided on the front and rear sides of the fixed block, a fixing groove is provided on the top of the oil outlet groove, a rubber ball is installed on the inner wall of the fixing groove, a piston is inserted on the upper side of the inner wall of the oil outlet groove, two limiting grooves are provided on the front and rear sides of the interior of the fixed block, an L-shaped block is installed on the inner wall of the limiting groove, installation grooves are provided on the left and right sides of the bottom of the fixed block, and a sponge frame is installed on the inner wall of the installation groove.
[0012] Preferably, the separated sides of the L-shaped blocks on the front and rear sides are installed between the pistons, and the close sides are inserted into the inner wall of the slide groove. When the L-shaped block moves, the piston pushes the rubber ball, and the rubber ball is in an extruded and deformed state on the inner wall of the fixed groove. The inner ring wall of the sponge frame fits with the outer side of the moving block, the bottom of the oil outlet groove is set on the upper side of the sponge frame, and the top is set on the bottom wall of the storage groove.
[0013] Preferably, the folding blocks on the front and rear sides are symmetrically arranged, the fixing blocks on the left and right sides are symmetrically arranged, and the fixing blocks on the left and right sides are respectively arranged on both sides of the placement plate.
[0014] A production process, including an automatic production line for producing new energy charging piles, the process comprising the following steps: In the production line, the plate first needs to be cut by the cutting machine body. At this time, the position of the fixed block is adjusted so that it can be installed with the two moving blocks and the placement plate, and the folding block is separated from the fitting groove. At this time, the folding block is adjusted and assembled with the connecting block, and the gear and the connecting block as well as the fitting plates on the left and right sides are used to cooperate with the plate to achieve the function of limiting the plate. When the fixed block needs to be adjusted, the pull rod is used to adjust it upwards, so that the moving block is reset to the bottom of the fixed block and adjusted upwards, and the cooperation between the moving block, the spring and the limit block is used to realize the assembly between the fixed block and the two assembly blocks; when the fixed block needs to be disassembled, the plug block is used to fit the two assembly blocks and adjust it upwards, and the cooperation between the moving block and the plug block is used to realize the disassembly and assembly of the fixed block; When the lubricity of the moving block needs to be increased, the pull rod is used to continue to adjust upwards, and the position of the L-shaped block inside the installation groove is adjusted. At this time, the piston is adjusted to the inner wall of the fixed groove, and the oil outlet groove and the piston are used to cooperate to increase the lubricity of the moving block. At the same time, the rubber ball and the fixed groove are used to cooperate to achieve the piston blocking the oil outlet groove. The fixing block can be assembled and disassembled according to the use requirements. The fixing block has multiple uses and rich functions.
[0015] Compared with the prior art, the present invention has the following beneficial effects: The automatic production line and production process for the production of new energy charging piles proposed in the present invention, by matching and installing the folding block and the connecting block, and using the clamping head to clamp to the inner wall of the plug-in slot, can make the bonding plates on the left and right sides fit tightly with the two sides of the plate when placing the metal plate, and at the same time, through adjustment, it can adapt to plates of different weights, thereby improving the use effect of the cutting machine. This enables the cutting machine to adapt to plates of different shapes, further improving its applicability. BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 It is a stereogram of the present invention; Figure 2 This is a schematic diagram of the structure of the placement plate of the present invention; Figure 3 This is a schematic diagram of the folding block structure of the present invention; Figure 4 This is a schematic diagram of the structure after the folding blocks of the present invention are spliced; Figure 5 It is a schematic diagram of the fitting groove structure of the present invention; Figure 6 This is a schematic diagram of the structure of the chuck of the present invention; Figure 7 This is a schematic diagram of the assembly block structure of the present invention; Figure 8 for Figure 7 Structural cross-section at AA in the middle; Fig. 9 It is a front view of the fixing block of the present invention; Fig.10 for Fig. 9 Structural cross-section at the middle BB; Fig.11 for Fig. 9 Structural cross-section at the middle CC; Fig.12 This is a schematic diagram of the structure of the fixed block of the present invention; Fig.13 for Fig.12 Structural cross-section at DD in the middle; Fig.14 for Fig.12 Structural cross-section at EE; Fig.15 This is a schematic diagram of the plug structure of the present invention; Fig.16 It is a schematic diagram of the structure of the mobile block of the present invention; Fig.17 for Fig.16 Structural cross-section at FF in the middle; Fig.18 This is a schematic diagram of the bottom structure of the fixing block of the present invention; Fig.19 This is a schematic diagram of the L-shaped block structure of the present invention; Fig. 20It is a schematic diagram of the structure of the laminated board of the present invention.
[0016] In the figure: 1. Cutting machine body; 2. Placement plate; 3. Assembly block; 4. Fixed block; 5. Connection block; 6. Folding block; 7. Moving slot; 8. Fitting slot; 9. Gear; 10. Slot 1; 11. Chuck; 12. Plug-in slot; 13. Moving block; 14. Insert block; 15. Pull rod; 16. Storage slot; 17. Slide slot 1; 18. Sponge frame; 19. Bump; 20. Oil outlet slot; 21. Piston; 22. Rubber ball; 23. Fixed slot; 24. Mounting slot; 25. Slot 2; 26. Rubber card ball; 27. L-shaped block; 28. Tension spring; 29. Slide slot 2; 30. Spring; 31. Limit block; 32. Limit slot; 33. Fitting plate. DETAILED DESCRIPTION
[0017] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Example 1: Please refer to Figure 1-Figure 20 The present invention provides a technical solution: an automatic production line for producing new energy charging piles, including a cutting machine body 1, a placing plate 2 is installed in the middle of the cutting machine body 1, two assembly blocks 3 are installed on the left and right sides of the placing plate 2, and a fitting groove 8 is opened between the middle parts of the two assembly blocks 3 on the left and right sides, and a fixing block 4 is plugged into the inner wall of the fitting groove 8, a gear 9 is installed on the top of the fixing block 4, and connecting blocks 5 are plugged into the front and rear sides of the top of the fixing block 4, and the connecting block 5 is meshed with the gear 9, so as to facilitate the adjustment of the positions of the front and rear connecting blocks 5 so as to make Using metal sheets with inclined surfaces of different shapes, the adjacent sides of the left and right connecting blocks 5 are hinged with folding blocks 6, and the other side of the folding block 6 is hinged with a fitting plate 33, the connecting block 5 is inserted into the separated sides of the left and right fitting grooves 8, and the folding block 6 is inserted into the adjacent sides of the left and right fitting grooves 8; the front and rear folding blocks 6 are symmetrically arranged, the left and right fixing blocks 4 are symmetrically arranged, and the left and right fixing blocks 4 are respectively arranged on both sides of the placement plate 2, so as to facilitate the limitation of the metal sheet and prevent it from shifting, thereby improving the use effect of the cutting machine body 1.
[0019] First, adjust the folding block 6 so that the connecting block 5 and the folding block 6 are matched and installed. Then, place the metal sheet on the top of the placement plate 2, and let its two sides fit with one side of the bonding plate 33 respectively. And use the engagement between the connecting block 5 and the gear 9 to adjust the front and rear connecting blocks 5 to make them in a staggered state. At the same time, the bonding plate 33 and the folding block 6 are hinged, so that it can be used with plates of different weights and plates of different shapes, thereby improving the use effect of the cutting machine body 1.
[0020] Embodiment 2: On the basis of embodiment 1, in order to realize the clamping and fixing of the spliced connecting block 5 and the folding block 6 together for subsequent use, a clamping slot 10 is provided on the adjacent side of the left and right connecting blocks 5, and a clamping head 11 is installed on the adjacent side of the front and rear folding blocks 6. When the folding block 6 and the connecting block 5 are matched and installed, the clamping head 11 is inserted into the inner wall of the clamping slot 10, so that the connecting block 5 and the folding block 6 are matched and installed by plugging the clamping head 11 into the inner wall of the clamping slot 10.
[0021] First, fold the folding block 6, and insert the clamping head 11 on one side into the inner wall of the clamping slot 10, so as to match and install the connecting block 5 with the folding block 6, and then use the clamping head 11 to increase the stability of the installation between the folding block 6 and the connecting block 5 for subsequent processing and use.
[0022] Embodiment 3: On the basis of embodiment 2, in order to improve the stability of the fixed block 4 after being folded and hidden, the bottom of the assembly block 3 is provided with a plug-in groove 12 on both sides, and the inner wall of the plug-in groove 12 is plugged with a plug-in block 14. The bottom of the fixed block 4 is plugged with a moving block 13 on both sides, and the inside of the moving block 13 is provided with a second slide groove 29 on both sides. The inner wall of the second slide groove 29 is installed with a limit block 31, and the limit block 31 plays a limiting role, thereby preventing the plug-in block 14 from escaping from the second slide groove 29, and the limit blocks 31 on the left and right sides are away from A spring 30 is installed on one side of the plug block 14; the left and right limit blocks 31 are installed between the plug block 14 on one side close to the assembly block 3, and the ends of the left and right springs 30 away from the limit blocks 31 are installed on the inner wall of the slide groove 29, so that the elastic force of the spring 30 is used to drive the limit blocks 31 to slide, and drive the plug block 14 to be plugged into the inner wall of the plug-in groove 12, thereby clamping the fixed block 4 between the two assembly blocks 3, and allowing the fixed block 4 to be installed on the inner wall of the fitting groove 8, thereby improving the installation stability of the fixed block 4 after being folded and hidden.
[0023] First, push the fixed block 4 downward to move it along the fitting groove 8. At this time, it will squeeze the insertion block 14 and drive the limit block 31 to slide along the inner wall of the second slide groove 29, while squeezing the spring 30. At this time, the insertion block 14 will remain in contact with the inner wall of the fitting groove 8. After moving to a certain position, the spring 30 will push the limit block 31 to slide along the inner wall of the second slide groove 29, while driving the insertion block 14 to be plugged into the inner wall of the insertion groove 12, and make the bottom of the moving block 13 fit between the fitting groove 8, thereby jamming the fixed block 4 and the fitting groove 8 and improving its installation stability.
[0024] Embodiment 4: On the basis of embodiment 3, in order to facilitate pulling the fixed block 4 upward, it is matched and installed between the two assembly blocks 3 so as to slide the fixed block 4 forward and backward, and it is convenient for users to select according to needs. The upper sides of the left and right assembly blocks 3 are provided with movable grooves 7, and the front and rear sides of the fixed block 4 are plugged with pull rods 15. A plurality of rubber balls 26 are installed on the upper outer side of the pull rod 15, and a protrusion 19 is installed on the bottom end of the pull rod 15. A slide groove 17 is provided at the bottom of the fixed block 4, and a plurality of slots 25 are provided on the front and rear sides of the upper part of the fixed block 4. Two tension springs 28 are installed between the two movable blocks 13 on the left and right sides; the rubber ball 26 is clamped on the inner wall of the slot 25, so that by pulling the pull rod 15 upward, the rubber ball 26 is driven to move upward with it, so that the pull rod 15 can be adjusted upward twice, and the protrusion 19 is inserted between the two movable blocks 13 and pushes the movable block 13. When the pull rod 15 is pulled upward, the elastic force of the tension spring 28 is used to drive the two moving blocks 13 to slide and reset on the inner wall of the slide groove 17, thereby facilitating the subsequent removal of the fixed block 4 for user selection.
[0025] First, pull the pull rod 15 upward to drive the two rubber balls 26 on the lower side to be inserted into the inner walls of the two upper slots 25. This is the first adjustment, and drive the protrusion 19 upward. The elastic force of the tension spring 28 drives the two moving blocks 13 to slide toward the middle of the inner wall of the slide slot 17 and fit between the inclined surfaces on both sides of the protrusion 19. Then, pull the fixed block 4 to slide upward along the inner wall of the fitting groove 8, and at the same time, let the bottom of the moving block 13 leave the fitting groove 8. When the movable block 13 is pushed, the stopper 31 is pushed and pushed along the inner wall of the second slide groove 29, and the spring 30 is squeezed at the same time, so that the movable block 14 is kept in contact with the inner wall of the fitting groove 8. When the movable block 13 is moved to the inner wall of the movable groove 7, the spring 30 pushes the movable block 14 to be inserted into the inner wall of the movable groove 7. At this time, the pull rod 15 can be pushed downward to drive the protrusion 19 to push the two movable blocks 13, so that the two sides thereof are inserted into the inner wall of the movable groove 7, and the tension spring 28 is in a stretched state. When the fixed block 4 is no longer needed, the pull rod 15 is pulled upward and the protrusion 19 at its bottom is disengaged from the two moving blocks 13. At this time, the moving block 13 will be pulled to the inner wall of the slide groove 17 due to the elastic force of the tension spring 28, so that the moving block 13 will be disengaged from the inner wall of the moving groove 7. Since the moving block 13 is completely hidden in the inner wall of the slide groove 17, the arc surface of one side of the plug-in block 14 will be disengaged from the arc surface of the moving groove 7 and driven to the other side of the moving groove 7. At this time, the fixed block 4 can be pulled upward, and the arc surface of the plug-in block 14 can be pushed to the inner wall of the moving block 13 while contacting one side of the moving groove 7, and then continue to pull it upward to disengage it from the fitting groove 8, so that the user can select it as needed.
[0026] Embodiment 5: On the basis of embodiment 4, in order to increase the lubricity between the moving block 13 and the moving groove 7, storage grooves 16 are provided on the front and rear sides of the fixed block 4, two oil outlet grooves 20 are provided on the front and rear sides of the fixed block 4, a fixed groove 23 is provided on the top of the oil outlet groove 20, a rubber ball 22 is installed on the inner wall of the fixed groove 23, a piston 21 is inserted on the upper side of the inner wall of the oil outlet groove 20, two limiting grooves 32 are provided on the front and rear sides of the interior of the fixed block 4, an L-shaped block 27 is installed on the inner wall of the limiting groove 32, mounting grooves 24 are provided on the left and right sides of the bottom of the fixed block 4, and a sponge frame 18 is installed on the inner wall of the mounting groove 24; the separated sides of the L-shaped blocks 27 on the front and rear sides are installed between the piston 21, and the close sides are inserted into the inner wall of the slide groove 17, the L-shaped block 27 When moving, the piston 21 pushes the rubber ball 22, and the rubber ball 22 is in an extruded deformation state on the inner wall of the fixed groove 23, so that when the pull rod 15 is pulled upward to the second section position, the protrusion 19 at its bottom will push the L-shaped block 27 upward to slide along the inner wall of the fixed groove 23, thereby driving the piston 21 to slide upward and squeeze the rubber ball 22, so that the lubricating oil flows to the sponge frame 18 through the oil outlet groove 20, so as to increase the lubricity between the moving block 13 and the moving groove 7. The inner ring wall of the sponge frame 18 fits with the outer side of the moving block 13, and the bottom of the oil outlet groove 20 is set on the upper side of the sponge frame 18, and the top is set on the bottom wall of the storage groove 16, so as to facilitate the lubricating oil in the storage groove 16 to flow to the sponge frame 18 through the oil outlet groove 20, thereby increasing the lubricity of the moving block 13.
[0027] When it is necessary to increase the lubricity of the moving block 13, the pull rod 15 is pulled upward twice, so that the two clamping heads 11 on the lower side follow the pull rod 15 to separate from the fixed block 4, which will drive the protrusion 19 to move upward, and drive the two L-shaped blocks 27 to move upward, thereby driving the piston 21 to move upward, and inserting it into the inner wall of the fixed groove 23 while squeezing the rubber ball 22. At this time, the oil outlet groove 20 can be used to guide the lubricating oil on the inner wall of the storage groove 16 through the hole on the lower side of the piston 21 to the bottom of the oil outlet groove 20, and let it flow to the surface of the sponge frame 18, and let the sponge frame 18 absorb it. After completion, the pull rod 15 is reset, and the elastic force of the rubber ball 22 itself is used to push the piston 21 to move downward and block the oil outlet groove 20. At this time, the rubber card ball 26 will be stuck on the inner wall of the card groove 25, so that when the protrusion 19 is used to squeeze and push the two moving blocks 13, the lubricating liquid in the sponge frame 18 is coated on the outer side of the moving block 13, thereby improving its lubricity.
[0028] Embodiment 6: Based on Embodiment 5, a production process includes an automatic production line for producing new energy charging piles, and the process includes the following steps: In the production line, the plate first needs to be cut by the cutting machine body 1. At this time, the position of the fixed block 4 is adjusted so that it can be installed with the two moving blocks 13 and the placement plate 2, and the folding block 6 is separated from the fitting groove 8. At this time, the folding block 6 is adjusted and fitted with the connecting block 5, and the gear 9 and the connecting block 5 as well as the fitting plates 33 on the left and right sides cooperate with the plate to achieve the function of limiting the plate. When the fixed block 4 needs to be adjusted, the pull rod 15 is used to adjust upwards, so that the moving block 13 is reset to the bottom of the fixed block 4 and adjusted upwards, and the cooperation between the moving block 13, the spring 30 and the limit block 31 is used to achieve the function of fitting the fixed block 4 and the two assembly blocks 3; when the fixed block 4 needs to be disassembled, the plug block 14 is used to fit the two assembly blocks 3 and adjust upwards, and the cooperation between the moving block 13 and the plug block 14 is used to achieve the function of disassembling the fixed block 4; When the lubricity of the moving block 13 needs to be increased, the pull rod 15 is further adjusted upward, and the position of the L-shaped block 27 inside the mounting groove 24 is adjusted. At this time, the piston 21 is adjusted to the inner wall of the fixed groove 23, and the oil outlet groove 20 and the piston 21 are used to cooperate to increase the lubricity of the moving block 13. At the same time, the rubber ball 22 and the fixed groove 23 are used to cooperate to achieve the effect of the piston 21 blocking the oil outlet groove 20. The fixing block 4 can be assembled and disassembled according to the use requirements. The fixing block 4 has multiple uses and rich functions.
[0029] In actual use, first pull the pull rod 15 to move upward, driving the two rubber balls 26 on the lower side to be inserted into the inner walls of the two upper slots 25. This is the first section adjustment, and drives the protrusion 19 to move upward. The elastic force of the tension spring 28 drives the two moving blocks 13 to slide toward the middle of the inner wall of the slide slot 17, and fit between the inclined surfaces on both sides of the protrusion 19, and then pull the fixed block 4 to slide upward along the inner wall of the fitting groove 8, and at the same time let the bottom of the moving block 13 leave the fitting groove 8. At this time, the insertion block 14 will be squeezed and pushed and drive the limit block 31 to slide along the inner wall of the slide slot 29, and at the same time squeeze the spring 30. At this time, the insertion block 14 will keep in contact with the inner wall of the fitting groove 8. When it moves to the inner wall of the moving groove 7, the spring 30 will push the limit block 31 along the inner wall of the slide slot 29 Slide, and at the same time drive the plug block 14 to be inserted into the inner wall of the moving groove 7. At this time, the pull rod 15 can be pushed downward to drive the protrusion 19 to squeeze the two moving blocks 13, so that both sides of them are inserted into the inner wall of the moving groove 7, and the tension spring 28 is in a stretched state. After completion, the folding block 6 is folded, and the clamping head 11 on one side of it is inserted into the inner wall of the clamping groove 10, so that the connecting block 5 and the folding block 6 are matched and installed, and then the metal sheet is placed on the top of the placement plate 2, and its two sides are respectively fitted with one side of the bonding plate 33, and the meshing between the connecting block 5 and the gear 9 is used to adjust the front and rear connecting blocks 5 to make them in a staggered state. At the same time, the bonding plate 33 and the folding block 6 are hinged, so that it can be used for plates with different slopes, thereby improving the use effect of the cutting machine body 1; When the fixed block 4 is not needed, the pull rod 15 is pulled upwards to allow the protrusion 19 at the bottom to disengage from the two moving blocks 13. At this time, the moving block 13 will be pulled to the inner wall of the slide groove 17 due to the elastic force of the tension spring 28, so that the moving block 13 will be separated from the inner wall of the moving groove 7. Since the moving block 13 is completely hidden in the inner wall of the slide groove 17, the arc surface of one side of the plug block 14 will be separated from the arc surface of the moving groove 7 and driven to the other side of the moving groove 7. At this time, the fixed block 4 can be pulled upwards, and the arc surface of the plug block 14 can be pushed to the inner wall of the moving block 13 while contacting one side of the moving groove 7, and then continue to pull it upwards to disengage from the fitting groove 8, so that the user can select it as needed; When it is necessary to increase the lubricity of the moving block 13, the pull rod 15 is pulled upward twice, so that the two clamping heads 11 on the lower side follow the pull rod 15 to separate from the fixed block 4, which will drive the protrusion 19 to move upward, and drive the two L-shaped blocks 27 to move upward, thereby driving the piston 21 to move upward, and inserting it into the inner wall of the fixed groove 23 while squeezing the rubber ball 22. At this time, the oil outlet groove 20 can be used to guide the lubricating oil on the inner wall of the storage groove 16 through the hole on the lower side of the piston 21 to the bottom of the oil outlet groove 20, and let it flow to the surface of the sponge frame 18, and use the sponge frame 18 to absorb it. After completion, the pull rod 15 is reset, and the elastic force of the rubber ball 22 itself is used to push the piston 21 to move downward and block the oil outlet groove 20. At this time, the rubber card ball 26 will be stuck on the inner wall of the card groove 25, so that when the protrusion 19 is used to squeeze and push the two moving blocks 13, the lubricating liquid in the sponge frame 18 is coated on the outer side of the moving block 13, thereby improving its lubricity.
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An automatic production line for producing new energy charging piles, comprising a cutting machine body (1), a placement plate (2) being installed in the middle of the cutting machine body (1), and two assembly blocks (3) being installed on both the left and right sides of the placement plate (2), characterized in that: A mating groove (8) is provided between the middle parts of the two assembly blocks (3) on the left and right sides, a fixing block (4) is inserted into the inner wall of the mating groove (8), a gear (9) is installed on the top of the fixing block (4), connecting blocks (5) are inserted into the front and rear sides of the top of the fixing block (4), and the connecting blocks (5) and the gear (9) are meshingly connected, a folding block (6) is hinged on the adjacent side of the connecting blocks (5) on the left and right sides, and a fitting plate (33) is hinged on the other side of the folding block (6), the connecting block (5) is inserted into the separated side of the mating grooves (8) on the left and right sides, and the folding block (6) is inserted into the adjacent side of the mating grooves (8) on the left and right sides.
2. The automatic production line for producing new energy charging piles according to claim 1 is characterized in that: A card slot 1 (10) is provided on the adjacent side of the left and right connecting blocks (5), and a card head (11) is installed on the adjacent side of the front and rear folding blocks (6). When the folding blocks (6) and the connecting blocks (5) are matched and installed, the card head (11) is inserted into the inner wall of the card slot 1 (10).
3. The automatic production line for producing new energy charging piles according to claim 1 is characterized in that: The bottom of the assembly block (3) is provided with a plug-in slot (12) on both the front and rear sides, and the inner wall of the plug-in slot (12) is plugged with an insert block (14). The bottom of the fixed block (4) is provided with a movable block (13) on both the left and right sides, and the inside of the movable block (13) is provided with a second slide slot (29) on both the front and rear sides, and a limit block (31) is installed on the inner wall of the second slide slot (29), and a spring (30) is installed on the side of the limit blocks (31) on the left and right sides away from the insert block (14).
4. The automatic production line for producing new energy charging piles according to claim 3 is characterized by: The side of the limit blocks (31) on the left and right sides close to the assembly block (3) is installed between the insert block (14), and the end of the springs (30) on the left and right sides away from the limit blocks (31) is installed on the inner wall of the second slide groove (29).
5. The automatic production line for producing new energy charging piles according to claim 3 is characterized by: The upper sides of the assembly blocks (3) on the left and right sides are provided with movable grooves (7), the front and rear sides of the fixed block (4) are plugged with pull rods (15), the upper outer side of the pull rod (15) is equipped with a plurality of rubber clamping balls (26), the bottom end of the pull rod (15) is equipped with a protrusion (19), the bottom of the fixed block (4) is provided with a slide groove (17), the front and rear sides of the upper part of the fixed block (4) are provided with a plurality of clamping grooves (25), and two tension springs (28) are installed between the two movable blocks (13) on the left and right sides.
6. The automatic production line for producing new energy charging piles according to claim 5 is characterized by: The rubber locking ball (26) is locked in the inner wall of the second locking groove (25), the protrusion (19) is inserted between the two moving blocks (13) and pushes the moving block (13), the protrusion (19) is inserted in the inner wall of the first slide groove (17), the moving block (13) is slidably connected to the inner wall of the first slide groove (17), and the bottom of the moving block (13) is attached to the bottom of the fitting groove (8), and the middle part of the tension spring (28) passes through the bottom of the fixed block (4) and is arranged on the inner wall of the first slide groove (17).
7. The automatic production line for producing new energy charging piles according to claim 5 is characterized by: The fixing block (4) is provided with storage grooves (16) on both the front and rear sides, and two oil outlet grooves (20) on both the front and rear sides. A fixing groove (23) is provided on the top of the oil outlet groove (20). A rubber ball (22) is installed on the inner wall of the fixing groove (23). A piston (21) is inserted on the upper side of the inner wall of the oil outlet groove (20). Two limiting grooves (32) are provided on both the front and rear sides of the fixing block (4). L-shaped blocks (27) are installed on the inner walls of the limiting grooves (32). The fixing block (4) is provided with installation grooves (24) on both the left and right sides of the bottom, and a sponge frame (18) is installed on the inner wall of the installation groove (24).
8. The automatic production line for producing new energy charging piles according to claim 7 is characterized in that: The separated sides of the L-shaped blocks (27) on the front and rear sides are installed between the piston (21), and the adjacent sides are plugged into the inner wall of the first slide groove (17). When the L-shaped block (27) moves, the piston (21) squeezes the rubber ball (22), and the rubber ball (22) is in an extruded and deformed state on the inner wall of the fixed groove (23). The inner ring wall of the sponge frame (18) fits the outer side of the moving block (13). The bottom of the oil outlet groove (20) is arranged on the upper side of the sponge frame (18), and the top is arranged on the bottom wall of the storage groove (16).
9. The automatic production line for producing new energy charging piles according to claim 1 is characterized by: The folding blocks (6) on the front and rear sides are symmetrically arranged, the fixing blocks (4) on the left and right sides are symmetrically arranged, and the fixing blocks (4) on the left and right sides are respectively arranged on both sides of the placement plate (2).
10. A production process, comprising the automatic production line for producing new energy charging piles according to any one of claims 1 to 9, characterized in that: The process The following steps are involved: In the production line, the plate first needs to be cut through the cutting machine body (1). At this time, the position of the fixed block (4) is adjusted so that it can be installed by using the two moving blocks (13) and the placement plate (2), and the folding block (6) is separated from the fitting groove (8). At this time, the folding block (6) is adjusted and fitted with the connecting block (5), and the gear (9) and the connecting block (5) and the fitting plates (33) on the left and right sides cooperate with the plate to achieve the function of limiting the plate. When the fixed block (4) needs to be adjusted, the pull rod (15) is used to adjust it upwards, so that the movable block (13) is reset to the bottom of the fixed block (4) and adjusted upwards. At the same time, the movable block (13) cooperates with the spring (30) and the limit block (31) to achieve the function of assembling the fixed block (4) and the two assembly blocks (3); when the fixed block (4) needs to be disassembled, the plug block (14) is used to fit with the two assembly blocks (3) and adjust it upwards. At the same time, the movable block (13) and the plug block (14) cooperate to achieve the function of disassembling the fixed block (4); When the lubricity of the movable block (13) needs to be increased, the pull rod (15) is further adjusted upwards, and the position of the L-shaped block (27) inside the mounting groove (24) is adjusted. At this time, the piston (21) is adjusted to the inner wall of the fixed groove (23), and the oil outlet groove (20) and the piston (21) are matched to increase the lubricity of the movable block (13). At the same time, the rubber ball (22) and the fixed groove (23) are matched to block the oil outlet groove (20) with the piston (21). The fixing block (4) is assembled and disassembled according to use requirements; the fixing block (4) has multiple uses and is rich in functions.
