Balance beam device for replacing steel wire rope and working method

By designing the balancing beam device and corresponding working methods, and using the pulley set and pressure plate on the balancing beam, one new steel wire rope can be used to replace two steel wire ropes, which solves the problems of waste of manpower and low efficiency in the replacement of steel wire ropes in the existing technology, and improves efficiency. Replacement speed and efficiency.

CN118771237APending Publication Date: 2024-10-15LAIWU STEEL YINSHAN SECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411048978.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing method of replacing steel wire ropes requires two steel wire ropes of equal length, and requires two people to cooperate, resulting in a heavy workload and low operating efficiency.

Method used

Design a device that includes a balancing beam and a fixed pulley on the balancing beam. By welding the rope ends of the old and new steel wire ropes, and using the fixed pulley and movable pulley set on the balancing beam, a new steel wire rope can be used to replace the two steel wire ropes. The steps include preparing the new steel wire rope. , connect and wrap, cut the joints, and fix the unwrapped parts.

Benefits of technology

The replacement of two steel wire ropes is completed with a new steel wire rope, which significantly reduces the workload and time, improves the operating efficiency, reduces the operating intensity, and the steel wire rope replacement speed is fast.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118771237A_ABST
    Figure CN118771237A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hoisting steel wire rope replacement equipment, and particularly discloses a balance beam device for replacing a steel wire rope and a working method. A first balance beam fixed pulley and a second balance beam fixed pulley are rotationally installed on the two sides of the balance beam respectively, a steel wire rope of the first balance beam fixed pulley is connected with a steel wire rope on the second balance beam fixed pulley, two pressing plate holes are drilled in the upper portion of the balance beam, and a first balance beam pressing plate and a second balance beam pressing plate are installed in the two pressing plate holes respectively. The first balance beam pressing plate and the second balance beam pressing plate are used for fixing a steel wire rope on the balance beam; according to the balance beam device for replacing the steel wire ropes and the working method, the structure of the balance beam is improved, replacement of the two steel wire ropes is completed through one steel wire rope, the needed time is short, labor is saved, the workload is reduced, the working efficiency is improved, the working intensity is greatly reduced, and the steel wire rope replacement speed is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lifting wire rope replacement equipment, and in particular to a balance beam device and a working method for replacing a wire rope. Background Art

[0002] The crane wire rope with the balance beam 1 is two independent wire ropes. Figure 1 As shown, the wire rope winding is usually that the first wire rope end is fixed on the drum 6 by the first pressure plate 4, a part of the wire rope is wound on the drum 6, and then sequentially passes through the first movable pulley of the movable pulley group 8 set on the same side as the first pressure plate 4, a fixed pulley of the fixed pulley group 7 on the same side, and the second movable pulley of the movable pulley group 8, and then the other end of the wire rope passes through the pin 2 and is fixed to the balance beam with a wire rope clamp. The second wire rope winding method is symmetrical to the first one, the second wire rope end is fixed on the drum 6 by the second pressure plate 5, a part of the wire rope is wound on the drum 6, and then sequentially passes through the first movable pulley of the movable pulley group 8 set on the same side as the second pressure plate 5, a fixed pulley of the fixed pulley group 7 on the same side, and the second movable pulley of the movable pulley group 8, and then the other end of the wire rope passes through the pin 3 and is fixed to the balance beam with a wire rope clamp. At present, the main features of the wire rope replacement method include: preparing: two reels of wire rope and two rope releasers. If there is only one reel of wire rope, it is necessary to manually release and cut off a wire rope, and cut: all the old wire ropes wound on the drum 6 are put down, and the two old wire ropes pull two new wire ropes at the same time. This replacement method requires the preparation of two wire ropes of equal length, and the new wire rope heads need to be pulled to the balance beam 1 twice. In the process of pulling the new wire rope, two people are required to be responsible for the speed of each rope releaser. The workload is increased, so the operating efficiency is not high, and more maintenance workers are required. Therefore, it is urgent to design a balance beam device and working method for replacing wire ropes to solve the problem of waste of manpower and low operating efficiency in the existing replacement of two wire ropes. Summary of the invention

[0003] In view of the problems existing in the prior art, the object of the present invention is to provide a balance beam device and a working method for replacing a steel wire rope.

[0004] The technical solution adopted by the present invention to solve its technical problems is: a balance beam device for replacing a steel wire rope, comprising a balance beam and a balance beam fixed pulley, the balance beam fixed pulley comprising a balance beam fixed pulley 1 and a balance beam fixed pulley 2, the balance beam fixed pulley 1 and the balance beam fixed pulley 2 are respectively rotatably installed on both sides of the balance beam, the steel wire rope of the balance beam fixed pulley 1 is connected to the steel wire rope on the balance beam fixed pulley 2, two pressure plate holes are drilled on the upper part of the balance beam, the balance beam pressure plate 1 and the balance beam pressure plate 2 are respectively installed in the two pressure plate holes, and the balance beam pressure plate 1 and the balance beam pressure plate 2 fix the steel wire rope on the balance beam.

[0005] A working method of a balance beam device for replacing a steel wire rope comprises the following steps:

[0006] S1. Preparation: prepare a new wire rope;

[0007] S2. Connection: welding the rope ends of the new steel wire rope and the old steel wire rope;

[0008] S3, Winding 1: Lift the drum, the old wire rope pulls the new wire rope, the other end of the old wire rope is coiled on the rope reel, and passes through the movable pulley block, the fixed pulley block, the balance beam fixed pulley 1 and the balance beam fixed pulley 2 on the balance beam until the new wire rope is wound on the drum;

[0009] S4, cutting: when the joint of the new steel wire rope and the old steel wire rope leaves the drum, cut the joint and fix the cut end of the new steel wire rope on the drum with the second pressing plate;

[0010] S5, Winding 2: Continue to lift the drum. When the number of wire rope circles wound on the drum reaches X, stop lifting.

[0011] S6. Fixation: Pull the other end of the unfixed wire rope onto the crane, fix it with the first pressure plate, lift the drum until the number of turns of the drum is X, install the limit switch of the drum, and finally fix the wire rope on the balance beam with the balance beam pressure plate 1 and balance beam pressure plate 2.

[0012] Specifically, after preparing the new wire rope in step S1, a rope release device is prepared and placed on site, the movable pulley block of the wire rope winding system is placed in the working area, the number of turns of the wire rope on the drum is counted and recorded as X turns, and the limit switch on the drum is removed.

[0013] Specifically, before welding the rope ends of the new steel wire rope and the old steel wire rope in step S2, the first and second pressing plates on both sides of the drum are removed, one rope end of the old steel wire rope is thrown down, and the other end of the old steel wire rope is also lowered through the guardrail.

[0014] Specifically, after the drum stops lifting in step S5, a wire rope of the same length as the second pressure plate wire rope that has not entered the movable pulley block is released from the new wire rope release device and cut to form a rope head, and the drum is lowered until all the wire ropes on the drum fall down.

[0015] The present invention has the following beneficial effects:

[0016] The balance beam device and working method for replacing steel wire ropes designed in the present invention improve the structure of the balance beam, and the replacement of two steel wire ropes is completed by one steel wire rope, which shortens the time required, saves effort, reduces workload, improves work efficiency, greatly reduces work intensity, and accelerates the replacement of steel wire ropes. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the use status of the crane wire rope in the prior art.

[0018] Figure 2 It is a structural schematic diagram of a balance beam device for replacing a wire rope.

[0019] In the figure: 1-balance beam; 2-pin one; 3-pin two; 4-first pressure plate; 5-second pressure plate; 6-reel; 7-fixed pulley block; 8-movable pulley block; 9-fixed pulley one of balance beam; 10-fixed pulley two of balance beam; 11-balance beam pressure plate one; 12-balance beam pressure plate two. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely further describe the technical solutions in the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0021] like Figure 2 As shown, a balance beam device for replacing a steel wire rope comprises a balance beam 1, two balance beam fixed pulleys and two balance beam pressure plates, the balance beam fixed pulley comprises a balance beam fixed pulley 1 9 and a balance beam fixed pulley 2 10, the balance beam fixed pulley 1 9 and the balance beam fixed pulley 2 10 are respectively rotatably installed on both sides of the balance beam 1, the steel wire rope of the balance beam fixed pulley 1 9 is connected with the steel wire rope on the balance beam fixed pulley 2 10, two pressure plate holes are drilled on the upper part of the balance beam 1, the balance beam pressure plate 1 11 and the balance beam pressure plate 2 12 are respectively installed in the two pressure plate holes, the balance beam pressure plate 1 11 and the balance beam pressure plate 2 12 fix the steel wire rope on the balance beam 1, and the steel wire rope passes through the fixed pulley group 7 and the movable pulley group 8 and is wound around the drum 6.

[0022] A working method of a balance beam device for replacing a steel wire rope comprises the following steps:

[0023] Preparation: prepare a new coil of wire rope, place a rope release device on site, place the movable pulley block 8 of the wire rope winding system in the working area, count the number of turns of the wire rope on the drum 6 and record it as X turns, remove the limit switch on the drum 6 (the limit switch on the drum 6 is not shown in the figure).

[0024] Connection: remove the first pressing plate 4 and the second pressing plate 5 on both sides of the drum 6, throw down one end of the old wire rope, weld the end of the new wire rope to the end of the old wire rope, and lower the other end of the old wire rope through the guardrail.

[0025] Winding 1: lifting drum 6, the old wire rope pulls the new wire rope, the other end of the old wire rope is coiled onto the rope reel, passing through the movable pulley group 8, the fixed pulley group 7, the balance beam fixed pulley 1 9 and the balance beam fixed pulley 2 10 on the balance beam 1, until the new wire rope is wound onto the drum 6.

[0026] Cutting: When the joint of the new steel wire rope and the old steel wire rope leaves the drum 6, the joint is cut and the cut end of the new steel wire rope is fixed to the drum 6 with the second pressing plate 5.

[0027] Winding 2: Continue to lift the drum 6. When the number of wire rope circles wound on the drum 6 reaches X, stop lifting. Release the wire rope of the same length as the wire rope of the second pressure plate 5 that has not entered the movable pulley block 8 from the new wire rope release device, cut it to form a rope head, and lower the drum 6 until all the wire ropes on the drum 6 fall down.

[0028] Fixing: Pull the other end of the unfixed wire rope onto the crane, fix it with the first pressure plate 4, lift the drum 6 until the number of turns of the drum 6 is X, install the limit switch of the drum 6, and finally fix the wire rope on the balance beam 1 with the balance beam pressure plate 1 11 and the balance beam pressure plate 2 12.

[0029] A method for replacing crane wire ropes, which completes the replacement of two wire ropes through one wire rope, takes a short time, saves effort, reduces workload, improves operation efficiency, greatly reduces operation intensity, and has a fast wire rope replacement speed.

[0030] The present invention is not limited to the above-mentioned implementation modes, and anyone should be aware of the structural changes made under the enlightenment of the present invention, and all those having the same or similar technical solutions as the present invention fall within the protection scope of the present invention.

[0031] The techniques, shapes, and structural parts not described in detail in the present invention are all well-known techniques.

Claims

1. A balance beam device for replacing a steel wire rope, characterized in that: It includes a balance beam and a balance beam fixed pulley, wherein the balance beam fixed pulley includes a balance beam fixed pulley 1 and a balance beam fixed pulley 2, the balance beam fixed pulley 1 and the balance beam fixed pulley 2 are respectively rotatably installed on both sides of the balance beam, the steel wire rope of the balance beam fixed pulley 1 is connected with the steel wire rope on the balance beam fixed pulley 2, two pressure plate holes are drilled on the upper part of the balance beam, the balance beam pressure plate 1 and the balance beam pressure plate 2 are respectively installed in the two pressure plate holes, and the balance beam pressure plate 1 and the balance beam pressure plate 2 fix the steel wire rope on the balance beam.

2. The working method of the balance beam device for replacing a steel wire rope according to claim 1, characterized in that: The following steps are involved: S1. Preparation: prepare a new wire rope; S2. Connection: welding the rope ends of the new steel wire rope and the old steel wire rope; S3, Winding 1: Lift the drum, the old wire rope pulls the new wire rope, the other end of the old wire rope is coiled on the rope reel, and passes through the movable pulley block, the fixed pulley block, the balance beam fixed pulley 1 and the balance beam fixed pulley 2 on the balance beam until the new wire rope is wound on the drum; S4, cutting: when the joint of the new steel wire rope and the old steel wire rope leaves the drum, cut the joint and fix the cut end of the new steel wire rope on the drum with the second pressing plate; S5, Winding 2: Continue to lift the drum. When the number of wire rope circles wound on the drum reaches X, stop lifting. S6. Fixation: Pull the other end of the unfixed wire rope onto the crane, fix it with the first pressure plate, lift the drum until the number of turns of the drum is X, install the limit switch of the drum, and finally fix the wire rope on the balance beam with the balance beam pressure plate 1 and balance beam pressure plate 2.

3. The working method of the balance beam device for replacing a steel wire rope according to claim 2, characterized in that: After preparing the new wire rope in step S1, a rope release device is prepared and placed on site, the movable pulley block of the wire rope winding system is placed in the working area, the number of turns of the wire rope on the drum is counted and recorded as X turns, and the limit switch on the drum is removed.

4. The working method of the balance beam device for replacing a steel wire rope according to claim 2, characterized in that: Before welding the rope ends of the new steel wire rope and the old steel wire rope in step S2, the first and second pressing plates on both sides of the drum are removed, one rope end of the old steel wire rope is thrown down, and the other end of the old steel wire rope is also lowered through the guardrail.

5. The working method of the balance beam device for replacing a steel wire rope according to claim 2, characterized in that: After the drum stops lifting in step S5, a wire rope of the same length as the second pressure plate wire rope that has not entered the movable pulley block is released from the new wire rope release device and cut to form a rope head, and the drum is lowered until all the wire ropes on the drum fall down.