Stiff composite pile body internal force testing method

By designing and installing high-precision optical fiber sensors, collecting strain data, and calculating the internal force distribution of the pile body, the problem of sensor damage and composite pile internal force analysis is solved, and the efficient and accurate internal force testing of the stiff composite pile body is achieved.

CN118774181APending Publication Date: 2024-10-15NANTONG YANGLU RAILWAY DEV & CONSTR CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410002819.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-21
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing testing methods have deficiencies in sensor layout, installation and loss, resulting in a low sensor survival rate during the construction of stiff composite piles, affecting testing efficiency and accuracy. There is also a lack of internal force analysis methods for composite pile types.

Method used

A stiff composite pile pile body internal force testing method is adopted. By designing the arrangement and connection of optical fiber sensors, using an optical fiber demodulator to collect strain data, the pile body axial force, side friction resistance and bending moment distribution are calculated, combined with high-precision optical fiber sensors. and detailed steps to ensure test accuracy and efficiency.

Benefits of technology

It effectively reduces sensor damage, improves the survival rate of fiber optic sensors, achieves efficient and accurate testing of the internal force of the stiff composite pile body, and determines the distribution of the internal force of the pile body and its variation with depth.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774181A_ABST
    Figure CN118774181A_ABST
Patent Text Reader

Abstract

The invention discloses a stiff composite pile body internal force testing method. The method comprises the following steps that S1, the length of an optical fiber patch cord is calculated, an optical fiber sensor is connected, and optical fiber strings suitable for all core piles are machined; s2, embedding optical fiber strings and leads into the corresponding core piles; s3, after construction of cement-soil mixing piles on the periphery of the stiff composite pile is completed, the core piles are concentrically implanted to the preset burial depth, and meanwhile connection of optical fiber strings between the core piles is completed; s4, collecting the strain of each test point under each stage of load in the loading and unloading test process of the stiff composite pile by using an optical fiber demodulator; and S5, according to the strain data of each measuring point, the distribution condition of the pile body axial force, the pile body side friction resistance and the pile body bending moment along with the depth and the change rule of the pile body bending moment along with the pile top load are determined, the survival rate of the optical fibers in the field testing process is improved, the process is organized and ordered, the steps are simple and reasonable, and the stiff composite pile body internal force testing can be efficiently and accurately completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pile foundation monitoring test and field test, and in particular to a method for testing the internal force of a rigid composite pile. Background Art

[0002] In the foundation design of coastal projects, pile foundations are usually used to transfer the upper load to the deep bearing layer due to the weakness of the surface soil. In recent years, the requirements for the bearing performance of foundation forms have been increasing, and traditional pile types are difficult to meet economically. Therefore, based on the cement-soil mixing pile, a composite pile type - the rigid composite pile - has been proposed and widely used in soft soil foundations. The rigid composite pile is a new type of pile formed by implanting high-strength precast concrete piles into the cement-soil mixing pile before it is formed. It combines the high bearing capacity of the core pile with the stiffness of the cement-soil pile and has good working characteristics together. For an emerging pile type, the bearing performance and displacement control ability of the pile foundation are important indicators for evaluating the engineering characteristics of the pile type. Therefore, in practical applications, it is necessary to conduct internal force tests on the rigid composite pile to ensure the safety and stability of the foundation pile and improve the quality of the project.

[0003] Existing testing methods lack consideration for sensor placement, installation, and pile connection losses, often leading to technical issues such as irrational sensor placement, insufficient protection, and a lack of remedial measures. This results in a low sensor survival rate within the pile after construction is completed, affecting test efficiency and accuracy. Furthermore, because rigid composite piles are composite pile types, the analysis method for their internal forces requires further clarification, different from that of traditional pile types. Summary of the Invention

[0004] The purpose of the present invention is to provide a method for testing the internal force of a rigid composite pile body, which effectively reduces the damage to the sensor during the construction process of the rigid composite pile and improves the survival rate of the optical fiber during the on-site test. The process is orderly and the steps are simple and reasonable, and the internal force test of the rigid composite pile body can be completed efficiently and accurately.

[0005] The technical solution of the present invention is achieved as follows:

[0006] A method for testing the internal force of a rigid composite pile, the method comprising the following steps:

[0007] S1: Preparation stage: Design the arrangement of measuring points in each section of the rigid composite pile according to the length and number of sections of the core pile, calculate the length of the optical fiber jumper and connect the optical fiber sensor to process it into an optical fiber string suitable for each section of the core pile;

[0008] S2: Installation stage: bury the optical fiber string and lead wires into the corresponding core piles;

[0009] S3: Construction phase: After completing the cement-soil mixing pile construction around the rigid composite pile, the core piles are concentrically planted to the preset burial depth, and the fiber optic strings between each core pile section are connected simultaneously;

[0010] S4: Testing stage: using an optical fiber demodulator to collect the strain at each measuring point of the rigid composite pile under each load level during the loading and unloading test;

[0011] S5: Analysis phase: The pile axial force, pile lateral friction and pile bending moment are converted through the strain data at each measuring point, so as to determine the distribution of pile axial force, pile lateral friction and pile bending moment with depth and their variation with pile top load.

[0012] Furthermore, in step S1, optical fiber strings are symmetrically arranged on both sides of the core pile, and the strains at the depths of the tensile and compressive sides of the pile foundation are measured respectively. During the test, the horizontal force direction of the core pile is in the same plane as the optical fiber strings on both sides.

[0013] Furthermore, in step S1, a jumper wire of equal length is provided behind the optical fiber string of each core pile as a return line, and each core pile needs to be provided with a separate lead wire and return line to connect to the ground surface.

[0014] Furthermore, the optical fiber sensor uses a high-precision strain sensing optical fiber with an accuracy of ±0.05% FS, a resolution of ±0.1% FS, a reflectivity ≥90%, a wavelength range of 1510-1590nm, and a diameter of 0.6-1mm. The operating temperature should be between -40-100°C.

[0015] Furthermore, the step S2 specifically includes the following steps:

[0016] S20: Use a cutting machine to symmetrically cut a 3-5mm wide and 3-5mm deep wiring groove on both sides of the core pile along the pile body direction. Open a right-angled triangle wiring groove with a length of 10-15mm and a height of 20-30mm on the tail end surface of each core pile. Use an electric drill to drill a wiring hole with a diameter of 5-7mm into the core pile at both ends to form a wiring groove.

[0017] S21: Connect a telescopic hose to the inside and outside of the pile at the wiring hole at the top of the core pile. The diameter should match the wiring hole and the length should be such that the telescopic hose is greater than twice the pile head height when extended. Tighten the telescopic hose and fix the connection between the telescopic hose and the wiring hole with structural adhesive.

[0018] S22: After pre-pulling the optical fiber, use 502 glue to fix the 3-5cm jumpers at both ends of the optical fiber to the side wall of the wiring trough at the corresponding measuring point. Then use AB glue to fix the optical fiber at the measuring point to the side wall. After the optical fibers at all measuring points of the section are fixed, place the remaining jumpers of the optical fiber string of the section pile into the wiring trough. The return line is led back to the top through the triangular groove at the tail end, through the wiring hole and the telescopic hose, and introduced into the top of the core pile. The reserved jumpers at both ends of the optical fiber string are coiled, tied with tape, and fixed to the inner wall with 502 glue for later use.

[0019] S23: Place the lead wire and return wire used for the optical fiber string at the lower core pile of the core pile into the wiring trough, and insert both ends into the pipe pile through the wiring holes. Coil up the extra reserved jumper wires, tie them up, and apply 502 glue to fix them for later use.

[0020] S24: Use clay to block the wiring holes in the groove, fill the groove with the prepared structural adhesive, and use a scraper to level the surface of the core pile. Wait 24 hours for the structural adhesive to completely cure before rotating the core pile. Repeat steps S23 and S24 to lay the optical fiber sensor on the other side of the core pile.

[0021] Furthermore, in step S3, when the core piles are docked, the upper and lower wiring grooves are placed on the same vertical line. When the lower core pile is implanted to a preset height, the wiring is stopped, and the upper pile is lifted to a preset height at the tail end. The jumpers fixed on the inner walls of the upper and lower core piles are removed, and the fiber cores are fused one by one. A heat shrink tube is wrapped around the fused part, and it is heated, tightened, and fixed with a hot air gun for protection. After all the jumpers are docked, the telescopic hose at the top outlet of the lower core pile is extended and docked to the tail outlet of the upper pile, and structural glue is filled at the docking point to fix it. Finally, a layer of heat insulation cotton is tied around the telescopic hose. The pile connection construction can only be carried out after the optical fiber jumpers on both sides are successfully docked.

[0022] Furthermore, in step S4, the optical fiber demodulator collects the wavelengths at each measuring point under each level of load, and during the test, the strain at each level of load at each measuring point is converted by the difference between the wavelength at each level of load at each measuring point and the initial wavelength;

[0023] The strain data converted from the measured wavelength difference is used to calculate the axial force of the pile at a certain depth section of the rigid composite pile core:

[0024] N i =εEA

[0025] Where: N i is the axial force at depth i of the core pile; ε is the strain at the measuring point, converted from the measured wavelength difference; E is the equivalent elastic modulus of the core pile; and A is the cross-sectional area of ​​the core pile. By calculating the difference in axial force at each depth, the average side friction of the core pile at each depth can be calculated.

[0026] The bending moment of the rigid composite pile at a certain depth section is calculated as follows:

[0027]

[0028] Where: Mi is the bending moment of the core pile at the depth of the measuring point i, EI z is the core pile cross-sectional inertia moment; ε t and ε c Respectively represent the tensile and compressive strains at each cross-section measuring point; the distance between the tensile and compressive strain measuring points at the b0 section, from which the pile axial force, average lateral friction resistance and bending moment distribution at each measuring point depth of the rigid composite pile core can be obtained.

[0029] The beneficial effects of the present invention are: the test method effectively reduces the damage to the sensor during the construction process of the rigid composite pile, improves the survival rate of the optical fiber during the field test, the process is orderly, the steps are simple and reasonable, and the internal force test of the rigid composite pile body can be completed efficiently and accurately. The pile body axial force, pile body lateral friction resistance and pile body bending moment are converted by strain data at each measuring point, so as to determine the distribution of the pile body axial force, pile body lateral friction resistance and pile body bending moment with depth and their change law with the pile top load. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0031] Figure 1 This is a flow chart of internal force testing of a rigid composite pile according to the present invention;

[0032] Figure 2 This is a schematic diagram of the pile axial force test results of the present invention;

[0033] Figure 3 Schematic diagram of pile side friction test results of the present invention;

[0034] Figure 4 It is a schematic diagram of the pile bending moment test results of the present invention. DETAILED DESCRIPTION

[0035] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0036] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.

[0037] According to the method for testing the internal force of a rigid composite pile body according to an embodiment of the present invention, Figure 1 The internal force test of a PHC pipe pile with a core pile consisting of three sections and a length of 10m requires the following operations:

[0038] Step 1: Design the arrangement of measuring points in each section of the rigid composite pile according to the length and number of sections of the core pile. Calculate the length of the fiber optic jumper and connect the fiber optic sensor to form a fiber optic string suitable for each section of the core pile.

[0039] In step one, before installation, the relationship between the optical fiber's wavelength change and strain is calibrated through indoor testing. To separately measure the strain at each measuring point depth on the tensile and compressive sides of the pile when bending, two identical optical fiber strings and their connecting wires are required in a core pile section. To ensure effective connection between the jumpers, a 1m length must be reserved at the end of the optical fiber string when it is introduced into and out of each core pile section. In the top core pile section, since the jumper cable must be brought out to the surface and connected to the optical fiber interrogator, the reserved length can be appropriately extended. The specific length depends on the distance between the core pile position and the test position allowed by the interrogator.

[0040] In addition, to prevent the fiber jumper from breaking midway and preventing data from being collected from the lower pile section, each section of the core pile's fiber string must be equipped with a jumper of equal length as a return line. For example, if a core pile section is 1 meter long, a jumper length of 2(1+1) meters is required for the fiber string on one side of that section. The optical fiber is then fused to the designated measuring point of that section to complete the fiber string for that section. Furthermore, each section of the core pile requires a separate lead and return line connected to the ground. For example, for the fiber string in the nth section of the core pile, two jumpers without any optical fibers connected to them must be installed in the 1st to the n-1th sections of the core pile to connect them to the ground. Thus, to complete the internal force test on both sides of the nth section of the core pile, at least 4(n-1) jumpers of 1+2 meters in length and two fiber strings of 2(1+1) meters in length with optical fiber sensors are required.

[0041] The length of a core pile section is 10m. The fiber optic string on one side of the core pile section needs to be prepared with a jumper length of 22m. The optical fiber is fused to the specified position of the measuring point of the core pile section to complete the production of the fiber optic string of the core pile section. In addition, each section of the core pile needs to be individually equipped with a lead wire and a loop wire to connect to the ground. For example, the optical fiber string in the third section of the core pile from the ground needs to be connected to the ground by two jumpers that are not connected to any optical fibers in the first and second sections of the core pile. Therefore, in order to complete the internal force test on both sides of the third section of the core pile, at least 8 jumpers with a length of 12m are required (4 of which are pre-buried in the second section of the core pile and 4 are pre-buried in the first section of the core pile) and two 22m long optical fiber strings with optical fiber sensors (pre-buried in the third section of the core pile); in order to complete the internal force test on both sides of the second section of the core pile, at least 4 jumpers with a length of 12m are required (pre-buried in the first section of the core pile) and two 22m long optical fiber strings with optical fiber sensors (pre-buried in the second section of the core pile); in order to complete the internal force test on both sides of the first section of the core pile, at least two 22m long optical fiber strings with optical fiber sensors (pre-buried in the first section of the core pile) are required.

[0042] It should be noted that the optical fiber sensor in the optical fiber string uses a high-precision strain sensing optical fiber with an accuracy of ±0.05% FS, a resolution of ±0.1% FS, a reflectivity ≥90%, a wavelength range of 1510-1590 nm, and a diameter of 0.6-1 mm. Its operating temperature should be between -40 and 100°C to prevent the temperature changes during the hydration reaction of the surrounding cement soil from damaging the optical fiber.

[0043] Step 2: embed the optical fiber string and lead wires into the corresponding core piles.

[0044] Optical fibers are arranged along the pile body on both sides of the core pile. Prefabricated PHC pipe piles are typically used for the core of rigid composite piles. A 3-5mm wide and 3-5mm deep wiring trough is cut symmetrically along the pile body on both sides of the core pile using a cutting machine. A right-angled triangular wiring trough, 10-15mm long and 20-30mm high, is cut at the end of each core pile. The troughing stops just before the steel hoops at both ends of the pipe pile. Instead, a 5-7mm diameter wiring hole is drilled into the pile at both ends of the trough using an electric drill. The sidewalls of the trough are polished smooth, and the trough and hole are cleaned. A retractable hose is connected to the inside and outside of the core pile at the wiring hole at the top of the core pile. The diameter matches the wiring hole, and the length ensures that the hose, when extended, is greater than twice the height of the pile head. The hose is tightened and secured to the wiring hole with structural adhesive. After pre-stretching the optical fiber to a certain extent, use 502 glue to fix the 3-5cm jumpers on both sides of the optical fiber to the side wall of the wiring trough at the corresponding measuring point. Then use AB glue to fix the optical fiber at the measuring point to the side wall so that the optical fiber is close to the side wall of the wiring trough. After the optical fibers of all measuring points of the section are fixed, put the remaining jumpers of the optical fiber string of the section pile into the wiring trough. The return line is led back to the top through the triangular groove at the tail end, through the wiring hole and the telescopic hose, and introduced into the top of the pipe pile. The extra jumpers at both ends of the optical fiber string are coiled and tied with tape. Apply 502 glue to the inner wall and secure it until ready for use. Place the lead and return wires for the fiber optic string on the lower section of the pile into the wiring trough, insert both ends through the wiring holes and guide them into the pile. Coil up the extra jumper wires, tie them together, and apply 502 glue to secure them until ready for use. Once all the wires are placed and secured in the trough, seal the wiring holes with clay, fill the trough with the prepared structural glue, and use a scraper to smooth the surface of the pile. Allow the structural glue to completely cure for 24 hours before rotating the pile. Repeat this process until all fiber optic strings on six sides of the three core piles are installed.

[0045] Step 3: After completing the construction of cement-soil mixing piles around the rigid composite piles, concentrically implant the core piles to the preset burial depth, and simultaneously complete the connection of the optical fiber strings between each section of the core piles.

[0046] Using a cutting, mixing, and high-pressure jet grouting method, cement-soil mixing piles are constructed around the rigid composite piles at the designated pile locations. Following this construction, core piles are directly and concentrically placed using static pressure. The third core pile is placed first, ensuring the tail end enters the soil first. The second pile is then used to install the third pile until the top end is at a suitable height for operation. The second pile is then hoisted to a suitable height for operation at the tail end. When connecting the core piles, the wiring troughs of the two pile sections are aligned. The jumpers attached to the inner walls of the upper and lower pile sections are removed and the fiber cores are fused to each other. Heat shrink tubing is applied around the fused section and tightened with a heat gun for protection. Once all jumpers are connected, the expansion hose at the top outlet of the lower core pile is extended and connected to the tail outlet of the upper pile section. Structural adhesive is applied to secure the connection, and a layer of insulation is tied around the expansion hose. Once the fiber jumpers on both sides have been successfully connected, the pile connection is completed. The second pile section is lowered, and the third and second core piles are welded together. Then lift the second section of the core pile and plant it downwards. Use the first section of the pile to plant the second section of the pile to a suitable operating height at the top, then stop. Lift the first section of the pile to a suitable operating height at the tail end. When docking the core piles, always keep the wiring troughs of the two sections of the piles on the same vertical line. Remove the jumpers fixed on the inner walls of the upper and lower sections of the pipe piles, match them one by one and weld the fiber cores. Cover the outer part of the welded part with a heat shrink tube, heat and tighten it with a hot air gun to protect it. After all the jumpers are docked, extend the telescopic hose at the top outlet of the lower core pile and dock it to the outlet at the tail end of the upper pile. Fill the docking place with structural glue to fix it, and finally tie a layer of heat insulation cotton around the telescopic hose. After the optical fiber jumpers on both sides have completed the above operations and docked successfully, proceed with the pile connection construction, lower the first section of the pile, and weld the second and first section core piles together. Finally, lift the first section of the pile and plant it to the specified burial depth to complete the entire rigid composite pile construction.

[0047] Step 4: Using an optical fiber demodulator to collect the strain at each measuring point of the rigid composite pile under each load level during the loading and unloading test.

[0048] After the construction of the rigid composite pile is completed, it is necessary to wait 28 days for the outer cement soil pile to finally set before testing can begin. Take out the optical fiber jumper originally fixed on the inner wall of the top of the first section core pile and lead it to the position where testing is allowed, connect the optical fiber demodulator and start testing. If it is necessary to load the top of the pile during the test, it is necessary to place a layer of pads with a cable outlet groove between the top of the pile and the jack to lead out the wires; if a pedestal is required to be constructed on the top of the pile, it is necessary to set up a channel in the pedestal before construction to lead out the wires and then cast the pedestal; when the on-site environment is relatively harsh, the jumper can be replaced with a better-protected optical cable. During the test, the optical fiber demodulator measures the wavelength under each level of load at each measuring point. The strain under each level of load at each measuring point is converted by the difference between the wavelength under each level of load at each measuring point and the initial wavelength (that is, the wavelength measured in the no-load state before the test).

[0049] Step 5: Analysis phase: The strain data at each measuring point are used to convert the pile axial force, pile lateral friction and pile bending moment, thereby determining the distribution of the pile axial force, pile lateral friction and pile bending moment with depth and their variation with the pile top load.

[0050] The strain data converted from the measured wavelength difference is used to calculate the axial force of the pile at a certain depth section of the rigid composite pile core using the following formula (1):

[0051] N i =εEA (1)

[0052] Where: N i is the axial force of the core pile at the depth of the core pile measuring point i, ε is the strain at the measuring point converted from the measured wavelength difference; E is the equivalent elastic modulus of the core pile, and A is the cross-sectional area of ​​the core pile. By calculating the difference in the axial force of the core pile at each depth, the average side friction resistance of the core pile at each depth can be obtained. The bending moment of the core pile at a certain depth section of the rigid composite pile can be calculated using the following formula (2):

[0053]

[0054] Where Mi is the bending moment of the core pile at the depth of the measuring point i, EI z is the core pile cross-sectional inertia moment; ε t and ε c Respectively represent the tensile and compressive strains at each cross-section measuring point; the distance between the tensile and compressive strain measuring points at the b0 cross section. The distribution of the pile axial force, pile side friction, and pile bending moment with depth and their variation with pile top load are determined as follows: Figure 2-Figure 4 At this point, the internal force test of the rigid composite pile body of the PHC pipe pile with a core pile consisting of three sections and a length of 10m has been completed.

[0055] The above description is only a preferred specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes based on the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, and the changes should be covered by the scope of protection of the present invention.

Claims

1. A method for testing the internal force of a rigid composite pile, characterized in that: The test method comprises the following steps: S1: Preparation stage: Design the arrangement of measuring points in each section of the core pile according to the length and number of sections of the rigid composite pile core pile, calculate the length of the optical fiber jumper and connect the optical fiber sensor to process it into an optical fiber string suitable for each section of the core pile; S2: Installation stage: bury the optical fiber string and lead wire into the corresponding core piles; S3: Construction stage: After completing the construction of cement-soil mixing piles around the rigid composite piles, the core piles are concentrically implanted to the preset burial depth, and the optical fiber strings between each section of the core piles are connected at the same time; S4: Testing stage: using an optical fiber demodulator to collect the strain at each measuring point of the rigid composite pile under each load level during the loading and unloading test; S5: Analysis stage: The axial force, lateral friction and bending moment of the pile body are converted through the strain data at each measuring point, so as to determine the distribution of the axial force, lateral friction and bending moment of the pile body with depth and their variation with the pile top load.

2. A method for testing internal forces of a rigid composite pile according to claim 1, characterized in that: In step S1, optical fiber strings are symmetrically arranged on both sides of the core pile, and the strains at the depths of the tensile and compressive sides of the pile foundation are measured respectively. During the test, the horizontal force direction of the core pile is in the same plane as the optical fiber strings on both sides.

3. A method for testing internal forces of a rigid composite pile according to claim 1, characterized in that: In step S1, a jumper wire of equal length is arranged behind the optical fiber string of each core pile as a return line, and each core pile needs to be individually provided with a lead wire and a return line connected to the ground surface.

4. A method for testing internal forces of a rigid composite pile according to any one of claims 1 to 3, characterized in that: The optical fiber sensor adopts a high-precision strain sensing optical fiber with an accuracy of ±0.05% FS, a resolution of ±0.1% FS, a reflectivity of ≥90%, a wavelength range of 1510-1590nm, and a diameter of 0.6-1mm. The operating temperature should be between -40-100°C.

5. The method for testing internal forces of a rigid composite pile according to claim 1, characterized in that: The step S2 specifically includes the following steps: S20: A 3-5mm wide and 3-5mm deep wiring groove is symmetrically opened on the surface of both sides of the core pile along the pile body direction with a cutting machine, a 10-15mm long and 20-30mm high right-angled triangle return wiring groove is opened on the tail end surface of each core pile, and a 5-7mm diameter wiring hole is drilled into the core pile at both ends with an electric drill to form a wiring groove; S21: Connect a telescopic hose to the inside and outside of the pile at the wiring hole at the top of the core pile. The diameter of the hose should match the wiring hole, and the length should be such that the hose is greater than twice the pile head height when extended. Tighten the hose and fix the connection between the hose and the wiring hole with structural adhesive. S22: After pre-pulling the optical fiber, use 502 glue to fix the 3-5 cm jumpers at both ends of the optical fiber on the side wall of the wiring trough at the location of the corresponding measuring point, and then use AB glue to fix the optical fiber at the measuring point on the side wall. After the optical fibers at all measuring points of the section pile are fixed, put the remaining jumpers of the optical fiber string of the section pile into the wiring trough, and lead the return line back to the top through the tail end triangular groove and pass through the wiring hole and the telescopic hose to the top of the core pile. Coil the reserved jumpers at both ends of the optical fiber string, tie them with tape, and apply 502 glue to fix them on the inner wall for use; S23: Place the lead wire and return wire used for the optical fiber string of the core pile at the lower part of the core pile into the wiring groove, and respectively pass the two ends through the wiring holes to introduce them into the pipe pile, and coil up the extra reserved jumper wires, tie them up, and apply 502 glue to fix them for later use; S24: Use clay to plug the wiring holes in the groove, fill the groove with the prepared structural adhesive, and use a scraper to level the surface of the core pile. Wait for 24 hours for the structural adhesive to completely cure before rotating the core pile. Repeat steps S23 and S24 to lay the optical fiber sensor on the other side of the core pile.

6. A method for testing internal forces of a rigid composite pile according to claim 5, characterized in that: In the step S3, when the core piles are connected, the upper and lower wiring grooves are placed on the same vertical line. When the lower core pile is implanted to a preset height, the implantation stops, the upper pile is lifted to a preset height at the tail end, the jumpers fixed on the inner walls of the upper and lower core piles are removed, the fiber cores are fused one by one, a heat shrink tube is wrapped around the fused part, and a hot air gun is used to heat, shrink and fix it for protection. After all the jumpers are connected, the telescopic hose at the top outlet of the lower core pile is extended and connected to the outlet at the tail end of the upper pile, and structural glue is filled at the connection point to fix it. Finally, a layer of heat insulation cotton is tied around the telescopic hose. The pile connection construction can be carried out only after the optical fiber jumpers on both sides have completed the operation and connected successfully.

7. A method for testing internal forces of a rigid composite pile according to claim 1, characterized in that: In step S4, the optical fiber demodulator collects the wavelengths at each measuring point under each level of load, and during the test, the difference between the wavelength at each level of load at each measuring point and the initial wavelength is used to convert the strain at each level of load at each measuring point; The strain data converted from the measured wavelength difference is used to calculate the pile axial force at a certain depth section of the rigid composite pile core: N i =εEA Where: N i is the axial force of the core pile at the depth of measuring point i, ε is the strain at the measuring point converted according to the measured wavelength difference; E is the equivalent elastic modulus of the core pile, and A is the cross-sectional area of ​​the core pile. By calculating the difference in the axial force of the core pile at each depth, the average side friction resistance of the core pile at each depth can be obtained. The bending moment of the pile at a certain depth section of the rigid composite pile core is calculated: Where: Mi is the bending moment of the pile at the depth of the core pile measuring point i, EI z is the moment of inertia of the core pile section; ε t and ε c They represent the tensile and compressive strains at the measuring points of each section respectively; b0 is the spacing between the tensile and compressive strain measuring points at the section, from which the axial force, average lateral friction and bending moment distribution of the rigid composite pile core at each measuring point depth can be obtained.

Citation Information

Cited By

  • Monitoring device for bearing capacity of stiff composite pile

    CN119803741A

  • A monitoring device for the bearing capacity of a rigid composite pile

    CN119803741B