Quickly-connected anti-seismic fabricated shear wall structure and method

By using the welding and fixation method of embedded steel bars and adjustable connectors in the shear wall, the construction process is simplified, the problems of complex and high cost of traditional connection methods are solved, and the seismic performance and connection strength of the shear wall are improved.

CN118774294AActive Publication Date: 2024-10-15SHANDONG JIANZHU UNIV

Patent Information

Application Number
CN202411125564.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-15
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The traditional connection method of prefabricated concrete shear walls is complex and cumbersome, making it difficult to adapt to positional deviations during the construction process, affecting the seismic performance and connection strength of the shear walls, and requiring the use of customized components, which increases costs.

Method used

Embedded bars set at intervals and connectors with adjustable positions are used. The connectors are fixed by welding and vertical bars are interspersed to simplify the construction process, reduce the difficulty and cost of connection, and ensure the accuracy and flexibility of the connection.

Benefits of technology

It achieves fast and accurate connection of shear walls, improves the integrity and seismic performance of the structure, reduces the cost and difficulty of connection, and adapts to a certain range of position deviations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774294A_ABST
    Figure CN118774294A_ABST
Patent Text Reader

Abstract

The invention discloses an anti-seismic assembly type shear wall structure capable of being quickly connected and a method, and relates to the field of prefabricated part connecting structures. The structure comprises a first shear wall and a second shear wall which are arranged at an interval, a vertical seam is formed between the two walls, and embedded ribs are arranged between the two walls. The first connecting piece and the second connecting piece are aligned and welded with the embedded bars, and the vertical bars penetrate through the connecting pieces, so that the construction process is simplified, a large number of binding steel bars or using customized parts are not needed, and the connecting difficulty and cost are reduced. In addition, the first connecting piece and the second connecting piece which are adjustable in position allow position deviation within a certain range, accuracy and flexibility of connection are ensured, and therefore integrity and anti-seismic performance of the structure are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of prefabricated component connection structures, and in particular to a rapidly connectable earthquake-resistant assembled shear wall structure and method. Background Art

[0002] In the field of construction, especially in the design of high-rise buildings, reinforced concrete shear walls are widely used due to their excellent in-plane stiffness and bearing capacity. However, the traditional cast-in-place construction method has many limitations, including high resource consumption and serious environmental pollution. In contrast, prefabricated assembled structures can significantly reduce construction waste, reduce noise pollution on construction sites, and improve project quality. Among them, the assembled steel-concrete shear wall is a high-performance combined shear wall form. It fully utilizes the advantages of concrete and steel through the effective synergy of the two materials, thereby improving the bearing capacity of the overall structure.

[0003] At present, the common connection method of prefabricated concrete shear wall panels is to form a vertical joint between two shear walls, and then pour concrete to complete the connection by setting circular steel bars and vertical steel bars in the vertical joints. In this connection method, the circular steel bars need to be pre-arranged at the vertical joint position and fixed by steel wire tying; then, the vertical steel bars are inserted into the square area formed by the circular steel bars, and steel wires and supporting formwork are also required for positioning. Finally, the vertical joints are connected into a whole by pouring concrete. This method is not only complex in structure and cumbersome in construction process, but also reduces the hysteresis performance and seismic resistance of the shear wall after assembly.

[0004] In order to overcome these shortcomings, existing technical solutions have proposed an improved connection mechanism, such as a prefabricated shear wall connection mechanism and its construction method disclosed in Chinese Patent Publication No. CN113775078A. This solution embeds specific anchors and steel anchor rings in the prefabricated shear wall in advance, so that during the installation process, only the circular cross-section steel bar needs to be passed through the center hole of the steel anchor ring to complete the connection, without the need for additional binding work, thus simplifying the construction steps and improving the construction efficiency.

[0005] Although the above solution provides a certain degree of convenience, there are still some limitations. First, the solution requires the use of specially designed steel anchor rings and anchors, which increases costs. Second, in order to ensure that the circular cross-section steel bars can be inserted smoothly, the steel anchor rings between adjacent shear walls must be precisely aligned. However, in the actual construction process, due to the influence of various factors, there is often a certain degree of position deviation between adjacent shear walls, and the existing structure is difficult to adapt to these deviations, affecting the accurate connection of the circular cross-section steel bars. Summary of the invention

[0006] Based on this, the purpose of the present invention is to provide a seismic resistant assembled shear wall structure and method that can be quickly connected to solve the existing problems.

[0007] To achieve the above object, the present invention provides the following technical solutions: A quick-connectable seismic assembled shear wall structure, comprising: The first shear wall and the second shear wall are arranged at intervals, and the opposite sides of the two shear walls are provided with a plurality of groups of embedded reinforcements at intervals from top to bottom; A plurality of groups of first connecting members and second connecting members, both types of connecting members are covered on the outside of the embedded reinforcement of the corresponding side shear wall, and the two types of connecting members are plugged into each other; A plurality of vertical bars, which sequentially penetrate the first connecting member and the second connecting member from top to bottom, and are used to connect the first shear wall and the second shear wall into a whole; The elastic sleeve is installed between the embedded reinforcement and the connecting parts to buffer the interaction force between two adjacent shear walls and enhance the seismic effect of the shear wall.

[0008] Preferably, the first connecting member comprises a first bottom plate, first overlapping edges respectively arranged at the upper ends of both sides of the first bottom plate, and a first connecting edge extending horizontally outwardly along the first bottom plate; the two first overlapping edges extend toward the center away from one end of the first bottom plate to form a first overlapping edge that can be movably overlapped with the embedded reinforcement; the first connecting edge and the first bottom plate are penetrated by a plurality of first connecting holes that cooperate with the vertical reinforcement; Preferably, the second connecting member includes a second base plate, second overlapping edges respectively arranged at the lower ends of both sides of the second base plate, and a second connecting edge extending horizontally outward along the second base plate; the two second overlapping edges extend toward the center away from one end of the second base plate to form a second overlapping edge that can be movably overlapped with the embedded reinforcement, and the second connecting edge and the second base plate are penetrated by a plurality of second connecting holes that are opposite to the first connecting holes one by one.

[0009] Preferably, the two first overlapping edges are in an arc-shaped bending shape adapted to the cross section of the embedded reinforcement, and the two first overlapping edges extend horizontally toward a side close to each other to form a pair of first limiting plates, and the spacing between the two first limiting plates is adapted to the width of the second connecting edge; The two second overlapping edges are in an arc-shaped bend adapted to the cross-section of the embedded reinforcement, and the bottoms of the two second overlapping edges extend horizontally toward the side approaching each other to form a pair of second limiting plates, and the spacing between the two second limiting plates is adapted to the width of the first connecting edge.

[0010] By adopting the above technical solution, the gap between the two first limiting plates is just enough for the second connecting edge to be inserted, and the gap between the two second limiting plates is just enough for the first connecting edge to be inserted. This design ensures the precise alignment of the first connecting member and the second connecting member in the vertical seam, facilitates the positioning of the first connecting hole and the second connecting hole and the subsequent vertical rib insertion process.

[0011] Preferably, the bottom of the first overlapping edge and the second overlapping edge is a semi-arc structure, which is used to limit the vertical movement of the embedded reinforcement when it is connected to the first connecting member or the second connecting member, so as to ensure the stability of the first connecting member and the second connecting member when the first shear wall and the second shear wall are butt-jointed.

[0012] The inner diameter of the arc formed by the first overlapping edge and the second overlapping edge is larger than the outer diameter of the embedded reinforcement and smaller than 1.5 times of the outer diameter of the embedded reinforcement.

[0013] Preferably, the circumferential side surface of each overlapping edge is provided with a plurality of welding grooves penetrating the side wall of the overlapping edge, and the plurality of welding grooves extend in a direction parallel to the embedded reinforcement.

[0014] Preferably, at least one group of positioning members is provided between each group of first connecting members and second connecting members, and the positioning members are provided with multiple groups of vertical plug holes at intervals. The vertical reinforcement sequentially passes through the first connecting members, the plug holes and the second connecting members to connect the two shear walls as a whole.

[0015] Preferably, the outer wall of the elastic sleeve is provided with friction grooves, and the side wall of the elastic sleeve is provided with a plurality of arc grooves along the length direction of the embedded ribs, the arc grooves penetrate the side wall of the elastic sleeve, and the positions of the arc grooves correspond to those of the welding grooves.

[0016] Preferably, after the first connecting member and the second connecting member are butt-jointed, a shock absorbing kit is further provided on the outside, the shock absorbing kit is sleeved on the outside of the first connecting member and the second connecting member, and is a stretchable folding structure, and through holes for vertical ribs to pass through are provided on the upper and lower sides of the shock absorbing kit; The shock absorbing kit includes a three-layer structure, namely an inner layer, a middle layer and an outer layer. The inner layer and the outer layer are both made of polyurethane and have friction patterns on their inner walls. The middle layer is a spring assembly, which includes support plates on both sides and springs fixed inside the support plates.

[0017] The present invention also discloses a construction method according to the above shear wall structure, comprising the following steps: Step 1: overlap the first connecting member and the second connecting member on the corresponding embedded reinforcements of the two walls respectively; Step 2, pre-position the first connecting member, place the positioning member into the first plugging groove on the upper end surface of the first bottom plate, align the second plugging groove on the lower end surface of the second bottom plate with the upper end of the positioning member, so that the first connecting holes and the second connecting holes are accurately aligned with the help of the positioning member, and after their positions are fixed, the first connecting member and the second connecting member are respectively welded and fixed to the corresponding embedded ribs through the first welding groove and the second welding groove, so as to complete the accurate alignment of the first connecting member and the second connecting member; Step 3, weld and fix the embedded reinforcements at different heights to the first connecting pieces and the second connecting pieces, and pass the vertical reinforcements through the first connecting pieces and the second connecting pieces to complete the connection between the first shear wall and the second shear wall. Then, set up the formwork, pour in mortar for casting and shaping, and complete the quick connection between the first shear wall and the second shear wall.

[0018] By adopting the above technical solution, the first connector and the second connector are welded and fixed to the embedded bars in the vertical joints between the first shear wall and the second shear wall, and the vertical bars are passed through the first connector and the second connector at different heights in sequence. Compared with the original connection method, the construction process is significantly simplified. Only the first connector and the second connector need to be welded and fixed, and there is no need to bundle a large number of steel bars or use customized parts, thereby greatly reducing the difficulty and cost of connecting adjacent shear walls. In addition, the positional deviation of adjacent shear walls within a certain range is allowed by the adjustable first connector and the second connector, ensuring accurate and flexible connection even in the case of positional deviation in actual construction.

[0019] The present invention is further configured such that first arc-shaped guide edges are symmetrically provided on the edges of the two first limiting plates and on one side close to the first connecting edge, and second arc-shaped connecting edges adapted to the first arc-shaped guide edges are formed between the edges on both sides of the second connecting edge and the second bottom plate; Second arc-shaped guide edges are symmetrically arranged on the edges of the two second limiting plates and on one side close to the second connecting edge, and first arc-shaped connecting edges adapted to the second arc-shaped guide edges are formed between the two side edges of the first connecting edge and the first bottom plate.

[0020] By adopting the above technical solution, the matching design of the first arcuate guide edge and the second arcuate connecting edge and the second arcuate guide edge and the first arcuate connecting edge helps to ensure the precise alignment between the first connecting member and the second connecting member. At the same time, these arcuate guide edges can also guide the correct installation of the two connecting members, simplifying the construction process and improving construction efficiency.

[0021] The present invention is further configured such that the first connection hole is circular and adapted to the cross section of the vertical rib, and a plurality of first connection holes are overlapped and distributed along a straight line to form first vertical rib placement positions that are distributed at intervals; The second connection holes are circular in shape to match the cross section of the vertical ribs, and a plurality of second connection holes are overlapped and distributed along a straight line to form second vertical rib placement positions that are spaced apart; The straight lines where the first connection holes and the second connection holes are located coincide with the midlines of the length directions of the first bottom plate and the second bottom plate.

[0022] By adopting the above technical solution, the distribution of the first connecting holes and the second connecting holes forms the first vertical rib placement positions and the second vertical rib placement positions which are distributed at intervals, ensuring that the vertical ribs can be accurately aligned between the first connecting member and the second connecting member, thereby achieving rapid installation and fixation of the vertical ribs.

[0023] The present invention is further configured such that the number of the first connection holes is 2N+1, N=2, 3, 4, each interval between first connection holes is a first vertical rib placement position, and the number of the second connection holes and the number of the second vertical rib placement positions are the same as the first connection holes and the first vertical rib placement positions.

[0024] By adopting the above technical solution, the number and distribution of the first connecting holes and the second connecting holes ensure that the vertical reinforcement can be accurately aligned and inserted between the first connecting member and the second connecting member, thereby realizing the rapid installation and fixation of the vertical reinforcement. By increasing the number of the first connecting holes, the second connecting holes and the vertical reinforcement, the connection strength between the shear walls can be further enhanced, thereby further improving the integrity and seismic performance of the structure.

[0025] The present invention is further configured such that a circle of first plug-in grooves, which are similar to the overlapping shapes of the first connecting holes and are relatively enlarged, are formed on the outer peripheral sides of the first connecting holes and on the upper end surface of the first base plate; a circle of second plug-in grooves, which are similar to the overlapping shapes of the second connecting holes and are relatively enlarged, are formed on the outer peripheral sides of the second connecting holes and on the lower end surface of the second base plate; a positioning member is interlocked and inserted between the first plug-in groove and the second plug-in groove; the outer shape of the positioning member is adapted to the first plug-in groove and the second plug-in groove and a plug-in hole having the same overlapping shape as the first connecting holes is formed on its inner side.

[0026] By adopting the above technical solution, the design of the first plug slot and the second plug slot and the use of the positioning member ensure the precise alignment between the first connector and the second connector, and at the same time, the plug hole inside the positioning member matches the shape of the first connection hole, so that the vertical rib can be quickly and accurately inserted into place. The above structure can ensure the accuracy of the connection between the first connector and the second connector and the stability of the structure, and welding and fixing are performed only after they are precisely aligned, thereby enhancing the seismic performance of the overall structure.

[0027] The present invention is further configured such that the first overlap edge is bent in an arc shape and a plurality of first welding grooves are arranged around the peripheral surface thereof, and the plurality of first welding grooves are distributed in a direction parallel to the embedded reinforcement; The second lap edge and the second lap side both have an arc-shaped bent portion, and the outer side walls of the second lap edge and the second lap side are surrounded by the arc-shaped bent portion and penetrated with a plurality of second welding grooves, which are distributed in a direction parallel to the embedded reinforcement.

[0028] By adopting the above technical solution, the first welding groove and the second welding groove can further facilitate the welding and fixing of the first overlapping edge and the second overlapping edge with the embedded reinforcement, and can obtain a larger contact area, thereby improving the connection strength and the stability of the structure. The above structure not only simplifies the construction process and improves the construction efficiency, but also ensures the accuracy of the connection and the stability of the structure, thereby enhancing the seismic performance of the overall structure.

[0029] The present invention is further configured such that the first welding groove and the second welding groove are both distributed in a linear manner.

[0030] By adopting the above technical solution, the linear distribution design of the first welding groove and the second welding groove ensures that the first overlapping edge and the second overlapping edge can obtain a larger contact area when being welded and fixed with the embedded reinforcement, thereby improving the connection strength and structural stability.

[0031] The present invention is further configured such that the first connecting member and the second connecting member are formed by cutting and integrally bending plate-like steel sheets.

[0032] By adopting the above technical solution, the first connecting member and the second connecting member are formed by cutting and integrally bending plate-shaped steel sheets, which not only simplifies the manufacturing process and reduces the production cost, but also ensures the structural strength and stability of the connecting members.

[0033] The present invention is further configured such that the extension length of the first bottom plate and the second bottom plate is L1, the extension length of the first connecting edge and the second connecting edge is L2, and L1=L2; The outer sleeve of the embedded reinforcement is provided with an elastic sleeve, the size of the elastic sleeve matches the size of the embedded reinforcement, the inner wall is fixedly connected to the embedded reinforcement, and the outer wall is provided with friction patterns to enhance the seismic effect of the shear wall; the elastic sleeve is provided with arc grooves along the length direction of the embedded reinforcement, and the arc grooves correspond to the positions of the first welding groove and the second welding groove respectively, to facilitate the welding of the embedded reinforcement with the first connecting piece and the second connecting piece; the thickness of the elastic sleeve is 1 / 4-1 / 3 of the radius of the embedded reinforcement.

[0034] After the first connecting member and the second connecting member are connected, a shock-absorbing kit is further arranged in the horizontal direction. The shock-absorbing kit is sleeved on the outside of the first connecting member and the second connecting member. The shock-absorbing kit is a folding structure. A bending groove is arranged at a position corresponding to the edge of the first connecting member and the second connecting member. The bending groove is used to match and fix the shock-absorbing kit with the first connecting member and the second connecting member; Velcro is arranged at both sides of the shock-absorbing kit. The Velcro is used to tightly fix the shock-absorbing kit with the first connecting member and the second connecting member to enhance the shock-absorbing effect of the connection structure; empty grooves are arranged on the upper and lower sides of the shock-absorbing kit to avoid affecting the insertion and fixation of the vertical ribs.

[0035] The shock absorbing kit includes a three-layer structure, namely an inner layer, a middle layer and an outer layer. The inner layer and the outer layer are both made of polyurethane material, and friction patterns are arranged on the inner walls thereof; the middle layer is a spring assembly, and its two sides are fixedly connected to the inner layer and the outer layer to enhance the shock absorbing effect; the spring assembly includes support plates on both sides and springs fixed inside the support plates.

[0036] By adopting the above technical solution, the extension length of the first base plate and the second base plate is equal to the extension length of the first connecting edge and the second connecting edge, which ensures the symmetry and stability of the connecting parts during installation and helps to improve the alignment accuracy between the connecting parts.

[0037] In summary, the present invention mainly has the following beneficial effects: The present invention simplifies the construction process by using the first connector and the second connector to be welded to the embedded reinforcement and passing the vertical reinforcement through these connectors, without the need to bundle a large number of reinforcement bars or use customized parts, thereby reducing the difficulty and cost of connection. In addition, the first connector and the second connector that can be adjusted in position allow position deviation within a certain range, ensuring the accuracy and flexibility of the connection, thereby improving the integrity and seismic performance of the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the local structure of the embedded reinforcement in the vertical joint in the present invention; Figure 3 It is a schematic diagram of an exploded structure highlighting the connection between the first connecting member and the second connecting member in the present invention; Figure 4 This is one of the three-dimensional structural schematic diagrams highlighting the first connecting member in the present invention; Figure 5 This is the second three-dimensional structural schematic diagram highlighting the first connecting member in the present invention; Figure 6 It is a schematic diagram of a top view of the structure highlighting the second connecting member in the present invention; Figure 7 This is one of the three-dimensional structural schematic diagrams highlighting the second connecting member in the present invention; Figure 8 This is the second three-dimensional structural schematic diagram highlighting the second connecting member in the present invention; Fig. 9 It is a schematic diagram of a top view of the structure highlighting the second connecting member in the present invention; Fig.10 A bottom view structural diagram highlighting the second connecting member in the present invention; Fig.11 It is a schematic diagram of the three-dimensional structure of the highlight positioning member in the present invention; Fig.12 Schematic diagram of the unfolded structure of the shock absorbing kit in the present invention Fig.13 It is a schematic diagram of the cross-sectional structure of the shock absorbing kit in the present invention.

[0039] In the figure: 10, first shear wall; 20, second shear wall; 30, vertical seam; 40, embedded reinforcement; 50, first connecting piece; 51, first base plate; 52, first overlapping edge; 521, first overlapping edge; 53, first connecting edge; 54, first connecting hole; 55, first limiting plate; 56, first arc-shaped guide edge; 57, first arc-shaped connecting edge; 58, first plug-in slot; 59, first welding slot; 60, second connecting piece; 61, second base plate; 62, second overlapping edge; 621, second overlapping edge; 63, second connecting edge; 64, second connecting hole; 65, second limiting plate; 66, second arc-shaped guide edge; 67, second arc-shaped connecting edge; 68, second plug-in slot; 69, second welding slot; 70, vertical reinforcement; 80, positioning piece; 81, plug-in hole; 90, elastic sleeve. DETAILED DESCRIPTION

[0040] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0041] The following describes an embodiment of the present invention based on its overall structure.

[0042] The present invention discloses a quick-connectable seismic assembled shear wall structure. Figure 1-13 As shown, the first shear wall 10 and the second shear wall 20 are arranged at intervals, a vertical seam 30 is formed between the first shear wall 10 and the second shear wall 20, and the first shear wall 10 and the second shear wall 20 are respectively provided with a plurality of pairs of embedded bars 40 facing the vertical seam 30, each pair of embedded bars 40 includes two rod-shaped embedded bars 40 distributed in parallel along the same horizontal plane, and the plurality of pairs of embedded bars 40 are arranged at equal intervals along the extending direction of the vertical seam 30; The first connecting member 50 is a sheet metal bending structure with an opening at the top, specifically including a horizontal first bottom plate 51, first overlapping edges 52 vertically bent toward the upper ends along both sides of the first bottom plate 51, and a first connecting edge 53 extending horizontally outward along the first bottom plate 51. The first overlapping edges 52 form an arc-shaped first overlapping edge 521 that can be flexibly overlapped with the embedded reinforcement 40. A plurality of first connecting holes 54 are penetrated through the first connecting edge 53 and the first bottom plate 51. The two first overlapping edges 521 are in an arc-shaped bending shape adapted to the cross-section of the embedded reinforcement 40, and the two first overlapping edges 521 extend horizontally toward one side approaching each other to form a pair of first limiting plates 55, and the spacing between the two first limiting plates 55 is adapted to the width of the second connecting edge 63.

[0043] The sheet metal bending structure with an opening at the bottom of the second connecting member 60 includes a horizontal second bottom plate 61, second overlapping edges 62 bent vertically downward along both sides of the second bottom plate 61, and a second connecting edge 63 extending horizontally outward along the second bottom plate 61. A second overlapping edge 621 that can be movably overlapped with the embedded rib 40 is formed between the second overlapping edge 62 and the bottom plate. A plurality of second connecting holes 64 corresponding to the first connecting holes 54 are penetrated between the second connecting edge 63 and the second bottom plate 61; the two second overlapping edges 621 are in an arc-shaped bending shape adapted to the cross section of the embedded rib 40, and the two The bottom of the second overlapping edge 62 extends horizontally toward the side close to each other to form a pair of second limiting plates 65. The spacing between the two second limiting plates 65 is adapted to the width of the first connecting edge 53. The gap between the two first limiting plates 55 is just enough for the second connecting edge 63 to be inserted, and the gap between the two second limiting plates 65 is just enough for the first connecting edge 53 to be inserted. Such a design ensures the precise alignment of the first connecting member 50 and the second connecting member 60 in the vertical seam 30, facilitates the positioning of the first connecting hole 54 and the second connecting hole 64 and the subsequent plug-in process of the vertical rib 70.

[0044] The first overlap edge 521 and the second overlap edge 621 are welded and fixed to the embedded rib 40. The first overlap edge 521 is curved and has a plurality of first welding grooves 59 extending around its circumferential surface, and the plurality of first welding grooves 59 are distributed in a direction parallel to the embedded rib 40. The first welding grooves 59 and the second welding grooves 69 are both distributed in a linear manner. The linear distribution design of the first welding grooves 59 and the second welding grooves 69 ensures that the first overlap edge 521 and the second overlap edge 621 can obtain a larger contact area when being welded and fixed to the embedded rib 40, thereby improving the connection strength and the stability of the structure.

[0045] The bottom of the first lap edge 521 and the second lap edge 621 is a semi-arc structure, which is used to limit the vertical movement of the embedded reinforcement 40 when it is connected to the first connecting member 50 and the second connecting member 60 to ensure the stability of the first connecting member 50 and the second connecting member 60 when the first shear wall 10 and the second shear wall 20 are connected; the inner diameter of the arc formed by the first lap edge 521 and the second lap edge 621 is larger than the outer diameter of the embedded reinforcement and less than 1.5 times the outer diameter of the embedded reinforcement 40.

[0046] By using the first connector 50 and the second connector 60 to weld and fix the embedded reinforcement 40 in the vertical joint 30 between the first shear wall 10 and the second shear wall 20, and passing the first connector 50 and the second connector 60 of different heights in sequence through the vertical reinforcement 70, the construction process is significantly simplified compared to the original connection method. Only the first connector 50 and the second connector 60 need to be welded and fixed, and there is no need to bundle a large number of steel bars or use customized parts, thereby greatly reducing the difficulty and cost of connecting adjacent shear walls. In addition, the positional deviation of adjacent shear walls within a certain range is allowed by the adjustable first connector 50 and the second connector 60, ensuring that accurate and flexible connection can be achieved even in the case of positional deviation in actual construction.

[0047] The first connecting member 50 and the second connecting member 60 are formed by cutting and integrally bending plate-shaped steel sheets, which not only simplifies the manufacturing process and reduces the production cost, but also ensures the structural strength and stability of the connecting members.

[0048] The first arc-shaped guide edges 56 are symmetrically arranged on the edges of the two first limiting plates 55 and close to the first connecting edge 53. The second arc-shaped connecting edges 67 adapted to the first arc-shaped guide edges 56 are formed between the edges of the second connecting edge 63 and the second bottom plate 61. A second arc-shaped guide edge 66 is symmetrically provided on the edge of the two second limiting plates 65 and on one side close to the second connecting edge 63. A first arc-shaped connecting edge 57 adapted to the second arc-shaped guide edge 66 is formed between the two side edges of the first connecting edge 53 and the first bottom plate 51. The matching design of the first arc-shaped guide edge 56 and the second arc-shaped connecting edge 67 as well as the second arc-shaped guide edge 66 and the first arc-shaped connecting edge 57 helps to ensure the precise alignment between the first connecting member 50 and the second connecting member 60. At the same time, these arc-shaped guide edges can also guide the correct installation of the two connecting members, simplify the construction process, and improve construction efficiency.

[0049] The first connection holes 54 are circular in shape to match the cross section of the vertical rib 70 , and a plurality of first connection holes 54 are overlapped and distributed along a straight line to form first vertical rib placement positions (not shown in the figure) that are spaced apart; The second connection holes 64 are circular in shape to match the cross section of the vertical rib 70 , and a plurality of second connection holes 64 are overlapped and distributed along a straight line to form second vertical rib placement positions (not shown in the figure) that are spaced apart; Among them, the straight line where the first connecting holes 54 and the second connecting holes 64 are located coincides with the midline of the length direction of the first bottom plate 51 and the second bottom plate 61, and the distribution of the first connecting holes 54 and the second connecting holes 64 forms a first vertical rib placement position and a second vertical rib placement position that are spaced apart, ensuring that the vertical rib 70 can be accurately aligned between the first connecting member 50 and the second connecting member 60, thereby achieving rapid installation and fixation of the vertical rib 70.

[0050] The number of the first connecting holes 54 is 2N+1, N=2, 3, 4, and each first connecting hole 54 is a first vertical reinforcement placement position. The number of the second connecting holes 64 and the number of the second vertical reinforcement placement positions are the same as the first connecting holes 54 and the first vertical reinforcement placement positions. The number and distribution of the first connecting holes 54 and the second connecting holes 64 ensure that the vertical reinforcement 70 can be accurately aligned and inserted between the first connecting member 50 and the second connecting member 60. In this embodiment, N=3, that is, the number of the first connecting holes 54 and the second connecting holes 64 is 7, forming 4 first vertical reinforcement placement positions and 4 second vertical reinforcement placement positions, thereby realizing the rapid installation and fixation of the vertical reinforcement 70. By increasing the number of the first connecting holes 54, the second connecting holes 64 and the vertical reinforcement 70, the connection strength between the shear walls can be further enhanced, and the integrity and seismic performance of the structure can be further improved.

[0051] A circle of first plug-in grooves 58 with a shape similar to the overlapping shapes of the first connecting holes 54 and relatively enlarged are formed on the outer peripheral sides of the first connecting holes 54 and on the upper end surface of the first bottom plate 51. A circle of second plug-in grooves 68 with a shape similar to the overlapping shapes of the second connecting holes 64 and relatively enlarged are formed on the outer peripheral sides of the second connecting holes 64 and on the lower end surface of the second bottom plate 61. A positioning member 80 is inserted between the first plug-in grooves 58 and the second plug-in grooves 68. The outer shape of the positioning member 80 is adapted to the first plug-in grooves 58 and the second plug-in grooves 68 and a plug-in hole 81 with the same overlapping shape as the first connecting holes 54 is formed on its inner side. The design of the first plug-in grooves 58 and the second plug-in grooves 68 and the use of the positioning member 80 ensure the precise alignment between the first connecting member 50 and the second connecting member 60. At the same time, the plug-in hole 81 inside the positioning member 80 matches the shape of the first connecting hole 54, so that the vertical rib 70 can be quickly and accurately inserted into place. The above structure can ensure the accuracy of the connection between the first connecting member 50 and the second connecting member 60 and the stability of the structure. They are welded and fixed only after they are accurately aligned, thereby enhancing the anti-seismic performance of the overall structure. In order to further improve the anti-seismic performance, elastic abutment parts are provided at both the upper and lower ends of the positioning member. The elastic abutment parts are in contact with the rigid first bottom plate 51 and the second bottom plate 61, which can further buffer the vibration impact.

[0052] The second lap edge 621 and the second lap edge 62 both have an arc-shaped bent portion, and the outer side walls of the second lap edge 621 and the second lap edge 62 are provided with a plurality of second welding grooves 69 around the arc-shaped bent portion, and the plurality of second welding grooves 69 are distributed in a direction parallel to the embedded reinforcement 40. The first welding groove 59 and the second welding groove 69 can further facilitate the welding and fixing of the first lap edge 521 and the second lap edge 621 with the embedded reinforcement 40, and can obtain a larger contact area, thereby improving the connection strength and the stability of the structure. The above structure not only simplifies the construction process and improves the construction efficiency, but also ensures the accuracy of the connection and the stability of the structure, thereby enhancing the seismic performance of the overall structure.

[0053] The extension length of the first bottom plate 51 and the second bottom plate 61 is L1, and the extension length of the first connecting edge 53 and the second connecting edge 63 is L2, L1=L2, and the extension length of the first bottom plate 51 and the second bottom plate 61 is equal to the extension length of the first connecting edge 53 and the second connecting edge 63, which ensures the symmetry and stability of the connecting parts during installation and helps to improve the alignment accuracy between the connecting parts.

[0054] The outer sleeve of the embedded reinforcement 40 is provided with an elastic sleeve, the size of the elastic sleeve matches the size of the embedded reinforcement 40, the inner wall is fixedly connected to the embedded reinforcement 40, and the outer wall is provided with friction patterns to enhance the seismic effect of the shear wall; the elastic sleeve is provided with arc grooves along the length direction of the embedded reinforcement 40, and the arc grooves correspond to the positions of the first welding groove 59 and the second welding groove 69 respectively, to facilitate the welding of the embedded reinforcement 40 with the first connecting piece 50 and the second connecting piece 60; the thickness of the elastic sleeve is 1 / 4-1 / 3 of the radius of the embedded reinforcement 40.

[0055] After the first connecting member 50 and the second connecting member 60 are connected, a shock-absorbing kit is further arranged in the horizontal direction. The shock-absorbing kit is sleeved on the outside of the first connecting member 50 and the second connecting member 60. It is a folding structure. A bending groove is arranged at a position corresponding to the edge of the first connecting member 50 and the second connecting member 60. The bending groove is used to match and fix the shock-absorbing kit with the first connecting member 50 and the second connecting member; Velcro is arranged at both sides of the shock-absorbing kit. The Velcro is used to tightly fix the shock-absorbing kit with the first connecting member 50 and the second connecting member 60 to enhance the shock-absorbing effect of the connection structure; empty grooves are arranged on the upper and lower sides of the shock-absorbing kit to avoid affecting the insertion and fixation of the vertical ribs 70.

[0056] The shock-absorbing kit includes a three-layer structure, namely an inner layer, a middle layer and an outer layer. The inner layer and the outer layer are both made of polyurethane material, and friction patterns are arranged on the inner walls thereof; the middle layer is a spring assembly, and its two sides are fixedly connected to the inner layer and the outer layer to enhance the shock-absorbing effect; the spring assembly includes support plates on both sides and springs fixed inside the support plates.

[0057] The specific construction process of the shear wall structure is as follows: First, in the vertical joint 30 between the first shear wall 10 and the second shear wall 20, two pairs of embedded bars 40 are found at the same horizontal height, and a pair of first connecting members 50 and a second connecting member 60 are taken out. The first overlapping edge 521 of the first connecting member 50 and the second overlapping edge 621 of the second connecting member 60 are overlapped on the two pairs of embedded bars 40 respectively, and the movement of the embedded bars 40 is restricted by the semi-arc structure at the bottom of the first overlapping edge 521 and the second overlapping edge 621. A shear wall 10 and a second shear wall 20; insert the positioning member 80 into the first plugging groove 58 and the second plugging groove 68 outside the plurality of first connecting holes 54 and the second connecting holes 64, such as pre-positioning the first connecting member 50, placing the positioning member 80 into the first plugging groove 58 on the upper end surface of the first bottom plate 51, and then placing the second connecting member 60 on another embedded rib 40, so that the second plugging groove 68 on the lower end surface of the second bottom plate 61 is aligned with the upper end of the positioning member 80, so that the plurality of first connecting members The connecting hole 54 and the second connecting hole 64 are accurately aligned with the assistance of the positioning member 80. After their positions are fixed, the first connecting member 50 and the second connecting member 60 are respectively welded and fixed to the corresponding embedded reinforcement 40 through the first welding groove 59 and the second welding groove 69 to complete the accurate alignment of the first connecting member 50 and the second connecting member 60. The shock absorbing kit is fixed to the first connecting member 50 and the second connecting member 60 through Velcro, and then the vertical reinforcement 70 can be inserted in turn so that it is located at the first vertical reinforcement placement position and the second vertical reinforcement placement position of the interval. Repeat the above process, and the embedded reinforcement 40 at different heights in the vertical seam 30 are all welded and fixed to the first connecting member 50 and the second connecting member 60, and the vertical reinforcement 70 passes through the above-mentioned first connecting member 50 and the second connecting member 60 to complete the connection between the first shear wall 10 and the second shear wall 20. Then, the formwork can be erected, and mortar can be poured for casting and shaping to complete the quick connection between the first shear wall 10 and the second shear wall 20.

[0058] The present invention simplifies the construction process by using the first connector 50 and the second connector 60 to be welded to the embedded reinforcement 40, and passing the vertical reinforcement 70 through these connectors, without the need to bundle a large number of reinforcement bars or use customized components, thereby reducing the difficulty and cost of connection. In addition, the adjustable first connector 50 and the second connector 60 allow position deviation within a certain range, ensuring the accuracy and flexibility of the connection, thereby improving the integrity and seismic performance of the structure.

[0059] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A quick-connectable seismic assembled shear wall structure, characterized in that: include: A first shear wall (10) and a second shear wall (20) are arranged at intervals, and a plurality of groups of embedded reinforcement bars (40) are arranged at intervals from top to bottom on opposite sides of the two shear walls; A plurality of groups of first connecting members (50) and second connecting members (60), both types of connecting members being coated on the outside of the embedded reinforcement of the corresponding side shear wall, and the two types of connecting members being plugged into each other; A plurality of vertical ribs (70) passing through the first connecting member (50) and the second connecting member (60) in sequence from top to bottom, and used to connect the first shear wall (10) and the second shear wall (20) into a whole; The elastic sleeve (90) is installed between the embedded reinforcement (40) and the connecting piece, and is used to buffer the interaction force between two adjacent shear walls, thereby enhancing the earthquake resistance effect of the shear walls.

2. The quick-connectable seismic assembled shear wall structure according to claim 1, characterized in that: The first connecting member (50) comprises a first bottom plate (51), first overlapping edges (52) respectively arranged at the upper ends of both sides of the first bottom plate (51), and a first connecting edge (53) extending horizontally outwardly along the first bottom plate (51); one end of the two first overlapping edges (52) away from the first bottom plate (51) extends toward the center to form a first overlapping edge (521) that can be movably overlapped with the embedded reinforcement (40); and a plurality of first connecting holes (54) cooperating with the vertical reinforcement (70) are formed through the first connecting edge (53) and the first bottom plate (51).

3. The quick-connectable seismic assembled shear wall structure according to claim 2, characterized in that: The second connecting member (60) comprises a second bottom plate (61), second overlapping edges (62) respectively arranged at the lower ends of both sides of the second bottom plate (61), and a second connecting edge (63) extending horizontally outwardly along the second bottom plate (61); one end of the two second overlapping edges (62) away from the second bottom plate (61) extends toward the center to form a second overlapping edge (621) that can be movably overlapped with the embedded reinforcement (40); the second connecting edge (63) and the second bottom plate (61) are penetrated by a plurality of second connecting holes (64) corresponding to the first connecting holes (54) one by one.

4. The quick-connectable seismic assembled shear wall structure according to claim 3, characterized in that: The two first overlapping edges (521) are in an arc-shaped bending shape adapted to the cross section of the embedded rib (40), and the two first overlapping edges (521) extend horizontally toward a side close to each other to form a pair of first limiting plates (55), and the spacing between the two first limiting plates (55) is adapted to the width of the second connecting edge (63); The two second overlapping edges (621) are in an arc-shaped bend shape adapted to the cross section of the embedded rib (40), and the bottoms of the two second overlapping edges (62) extend horizontally toward a side close to each other to form a pair of second limiting plates (65), and the spacing between the two second limiting plates (65) is adapted to the width of the first connecting edge (53).

5. The quick-connectable seismic assembled shear wall structure according to claim 3, characterized in that: The bottom of the first overlapping edge (521) and the bottom of the second overlapping edge (621) are semi-arc structures, which are used to limit the vertical movement of the embedded reinforcement (40) when connected to the first connecting member (50) or the second connecting member (60), so as to ensure the stability of the first connecting member (50) and the second connecting member (60) when the first shear wall (10) and the second shear wall (20) are butt-jointed.

6. The quick-connectable seismic assembled shear wall structure according to claim 3, characterized in that: A plurality of welding grooves penetrating the side wall of the overlapping edge are provided on the circumferential side surface of each overlapping edge (521), and the plurality of welding grooves extend in a direction parallel to the embedded ribs (40).

7. The quick-connectable seismic assembled shear wall structure according to claim 6, characterized in that: At least one group of positioning members (80) is provided between each group of first connecting members (50) and second connecting members (60), and the positioning members (80) are provided with a plurality of groups of vertical plug holes (81) at intervals, and the vertical ribs (70) sequentially penetrate the first connecting members (50), the plug holes (81) and the second connecting members (60) to connect the two shear walls as a whole.

8. The quick-connectable seismic assembled shear wall structure according to claim 7, characterized in that: The outer wall of the elastic sleeve (90) is provided with friction patterns, and the side wall of the elastic sleeve is provided with a plurality of arcuate grooves along the length direction of the embedded rib (40), the arcuate grooves penetrate the side wall of the elastic sleeve, and the positions of the arcuate grooves correspond to those of the welding grooves.

9. The quick-connectable seismic assembled shear wall structure according to claim 8, characterized in that: After the first connecting member (50) and the second connecting member (60) are butt-jointed, a shock absorbing kit is further provided on the outside thereof. The shock absorbing kit is sleeved on the outside of the first connecting member (50) and the second connecting member (60) and is a stretchable foldable structure. Through holes are provided on the upper and lower sides of the shock absorbing kit for vertical ribs to pass through. The shock absorbing kit includes a three-layer structure, namely an inner layer, a middle layer and an outer layer. The inner layer and the outer layer are both made of polyurethane and have friction patterns on their inner walls. The middle layer is a spring assembly, which includes support plates on both sides and springs fixed inside the support plates.

10. A construction method for a quick-connectable seismic assembled shear wall structure according to claim 1, characterized in that: The steps include: Step 1, overlap the first connecting member (50) and the second connecting member (60) on the corresponding embedded reinforcements (40) of the two walls respectively; Step 2, pre-positioning the first connecting member (50), inserting the positioning member (80) into the first plugging groove (58) on the upper end surface of the first bottom plate (51), so that the second plugging groove (68) on the lower end surface of the second bottom plate (61) is aligned with the upper end of the positioning member (80), so that the first connecting holes (54) and the second connecting holes (64) are accurately aligned with the assistance of the positioning member (80), and after their positions are fixed, the first connecting member (50) and the second connecting member (60) are respectively welded and fixed to the corresponding embedded ribs (40) through the first welding groove (59) and the second welding groove (69), so that the first connecting member (50) and the second connecting member (60) are accurately aligned; Step 3, the embedded reinforcements (40) at different heights are welded and fixed to the first connecting pieces (50) and the second connecting pieces (60), and the vertical reinforcements (70) are passed through the first connecting pieces (50) and the second connecting pieces (60), so as to complete the connection between the first shear wall (10) and the second shear wall (20), and then the formwork can be set up, and mortar can be poured and cast to form, so as to complete the quick connection between the first shear wall (10) and the second shear wall (20).

Citation Information

Patent Citations

  • Fabricated shear wall connecting mechanism, shear wall and shear wall construction method

    CN113775078A

  • Connecting structure of fabricated shear wall

    CN211523614U

  • Connecting structure of fabricated shear wall

    CN212689203U

  • Precast wall structure construction method

    KR101748781B1

  • An apparatus for manufactuing dry electrode powder

    KR1020250058425A

Cited By

  • Stirrup assembly type shear wall structure

    CN120211413A

  • A stirrup assembled shear wall structure

    CN120211413B