Hole bottom grouting and leaking stoppage device for oil and gas pipeline sea and land rock mass directional drilling

By using grouting steel pipes and expansion rubber bladder devices in directional drilling of marine and land rock masses, high-pressure injection of slurry has solved the problems of water inflow and grout leakage in directional drilling of sea and land rock masses, improved grouting plugging efficiency and reduced costs.

CN118774673APending Publication Date: 2024-10-15ZHEJIANG ELECTRIC POWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411131122.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-17
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

During the process of directional drilling through sea and land rock masses, high groundwater pressure causes mud leakage and hole wall blockage. Existing grouting plugging methods are difficult to effectively seal the cracks at the bottom of the hole, especially under high pressure, it is difficult to penetrate the slurry into the formation fissures.

Method used

A grouting leak-stopping device including a grouting steel pipe, a water-injecting steel pipe and an expansion rubber bladder is designed. The slurry is injected under high pressure and the expansion rubber bladder is used to form a sealed space to ensure that the slurry is effectively injected deep into the formation fissures.

Benefits of technology

It effectively solves the problems of water inflow and grout leakage during directional drilling of sea and land rock masses, improves grouting and leakage plugging efficiency, reduces costs, and ensures effective plugging of the bottom of the hole.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774673A_ABST
    Figure CN118774673A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of oil and gas transmission, and particularly discloses a hole bottom grouting and leaking stoppage device for oil and gas pipeline sea and land rock mass directional drilling, which comprises a drilling hole wall and fractures distributed on the surface of the drilling hole wall; the injection assembly comprises a grouting steel pipe, a water injection steel pipe, a grouting opening and a water injection steel pipe end plate, the injection assembly is inserted into the inner side of the hole wall of the drill hole, the outer wall of the grouting steel pipe is sleeved with the water injection steel pipe, and the grouting opening is formed in the end, close to the inner side of the hole wall of the drill hole, of the grouting steel pipe; according to the grouting steel pipe end plate, a sealed space is formed near the grouting opening, and when the pressure of grout is increased, the grout can be effectively injected into the deep position of a stratum fracture. The problems of water burst and slurry leakage when the sea-land rock mass encounters a fracture zone and a joint dense zone during directional drilling crossing are effectively solved, the risk of directional drilling crossing of the sea-land rock mass is greatly reduced, the grouting and leaking stoppage efficiency during directional drilling crossing is improved, and the cost of directional drilling crossing of the sea-land rock mass is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas transportation, and in particular relates to a hole bottom grouting and plugging device for directional drilling of marine and land rock bodies of oil and gas pipelines. Background Art

[0002] In recent years, directional drilling technology has been increasingly used in the crossing of marine and terrestrial rock masses. Compared with mountain tunnels, small-diameter directional drilling has certain advantages in terms of cost and construction period. However, in the process of directional drilling through marine and terrestrial rock masses, due to the complex geology of marine and terrestrial rock masses, there is a large amount of groundwater in the rock fissures. When the marine and terrestrial rock mass to be crossed is high, the groundwater pressure is relatively large. When the guide hole is drilled to the fissure of the marine and terrestrial rock mass, the groundwater will quickly gush out through the borehole, and the gushing groundwater will also quickly destroy the mud performance. When the groundwater pressure is low, the fissures will also cause a large amount of mud to leak. In addition, it will also bring risks such as block falling and collapse of the hole wall. Ordinary mud plugging can no longer meet the requirements. In order to ensure the smooth implementation of directional drilling of marine and terrestrial rock masses, it is necessary to adopt cement slurry grouting to seal the underground fissures.

[0003] At present, the method of grouting into holes to plug leaks in the oil drilling industry is relatively mature, and commonly used methods include: cement pump injection method, injection device injection method, hole injection method and dry material delivery method.

[0004] The water pump injection method uses a water pump to press cement slurry into the leaking or collapsed rock formation in the hole through the drill pipe to achieve the purpose of plugging the leak. This method requires a large amount of cement slurry and has high requirements on the rheology of the slurry. When the cracks at the bottom of the hole are far away from the hole mouth, the grouting effect is poor.

[0005] The injector injection method uses different types of injectors to inject cement slurry with a small water-cement ratio. This method mostly uses piston injectors, which have poor rheological properties and are difficult to press into deep formation fissures.

[0006] The hole injection method directly introduces a high-concentration cement slurry into the borehole, and uses the water level difference between the hole and the formation fissure to press the cement slurry in. This method cannot block groundwater when the rock mass is tall and there is high-pressure groundwater in the formation fissure.

[0007] The dry material placement method is to fill a plastic bag with cement, lower it into the hole with the drill bit, and stir it with the drill bit. After stirring and tamping, the slurry will enter the cracks to stop leaks.

[0008] The above methods can only allow the slurry to enter the surface rock formation cracks, which are not suitable for high-pressure grouting, and most of them only plug the boreholes. The cement slurry penetrates into the surface cracks or is squeezed into the crack leakage layer through the impact of the drill bit. It is difficult to meet the requirements of grouting and plugging at the bottom of directional drilling in marine and terrestrial rock masses. Because most directional drilling crossings require hole expansion, such as plugging leaks in the pilot hole stage according to the ordinary grouting method of the oil drilling industry, water or slurry leakage will still occur in the formation during the hole expansion stage. Therefore, when grouting and plugging directional drilling crossings in marine and terrestrial rock masses, the cement slurry needs to overcome the initial stress of the formation and groundwater under high pressure, so that the slurry can be injected and the diffusion radius is increased, forming splitting grouting, and injected into the deep cracks of the formation. Even after multiple hole expansions, it can meet the plugging requirements. Summary of the invention

[0009] The object of the present invention is to provide a bottom hole grouting plugging device for directional drilling of sea and land rock masses of oil and gas pipelines, so as to solve the problems raised in the above-mentioned background technology.

[0010] To achieve the above object, the present invention provides the following technical solutions:

[0011] A bottom grouting and plugging device for directional drilling of sea and land rock mass of oil and gas pipelines, comprising: a borehole wall and cracks, wherein the cracks are distributed on the surface of the borehole wall;

[0012] An injection assembly, the injection assembly comprises a grouting steel pipe, a water injection steel pipe, a grouting port and a water injection steel pipe end plate, the injection assembly is inserted into the inner side of the borehole wall, the water injection steel pipe is sleeved on the outer wall of the grouting steel pipe, the grouting port is opened at one end of the grouting steel pipe close to the inner side of the borehole wall, the water injection steel pipe end plate is fixedly connected to the outer wall of the grouting steel pipe, and one end of the water injection steel pipe close to the inner side of the borehole wall is fixedly connected to the surface of the water injection steel pipe end plate;

[0013] A fixing component, wherein the fixing component is arranged on the outer wall of a water injection steel pipe, the fixing component comprises a rib flange and bolts, the rib flange is welded and connected to the outer wall of the water injection steel pipe, the surface of the rib flange is abutted and connected with an expansion rubber bag, the number of the rib flanges is two groups, the two ends of the expansion rubber bag are respectively abutted and squeezed on the outer surface of the water injection steel pipe by two groups of rib flanges, the edge of the rib flange near one end of the grouting port is smaller than the edge size of the other group of rib flanges, and the edge of the other group of rib flanges is higher than the expansion rubber bag, the surface of the rib flange arranged near one end of the grouting port is connected with bolts, the surface of the bolts is threadedly connected with two groups of nuts, the surfaces of the two groups of nuts are abutted and connected with protective angle steels, and the outer wall of the water injection steel pipe is provided with water injection holes.

[0014] A method for plugging leaks by grouting at the bottom of a hole during directional drilling of a marine or land rock mass of an oil and gas pipeline comprises the following steps:

[0015] S1. Opening holes in marine and land rock mass: When the directional drill in marine and land rock mass encounters water gushing from the cracks during drilling the guide hole, stop drilling, withdraw the drill rod, and perform grouting to plug the leak as follows:

[0016] S2. Grouting plugging:

[0017] S21. Insert the grouting and water injection pipe from the soil entry end, and lower the end of the grouting pipe to a point no more than 10m away from the water gushing point;

[0018] S22, turn on the water injection pump, inject water into the water injection pipe, and keep the pressure stable after the water pressure reaches 0.5Mpa;

[0019] S23, turn on the grouting pump, inject grout into the grouting pipe, the grouting pressure is 1Mpa higher than the water pressure, and the pressure is maintained for 0.5-1 hour;

[0020] S24, turn off the water injection pump and the grouting pump, wait for the rubber bag to shrink, and observe the water gushing from the hole. If the hole continues to gushing, move the grouting pipe and the water injection pipe protection angle steel m backward, and continue to repeat S22 and S23 steps 2 to 3 times;

[0021] S25. After making sure that there is no water gushing out of the hole, turn off the water injection pump and grouting pump, and after the rubber bag shrinks, pull out the grouting and water injection pipes.

[0022] Preferably, the grouting and water injection pipes in S2 are connected to the grouting pump and the water injection pump on the ground and are equipped with a pressure gauge.

[0023] Preferably, the cement slurry for grouting the grouting pipe in S2 adopts double liquid slurry, the ratio of cement slurry to water glass slurry is 2:1, the water-cement ratio of the cement slurry is 0.6, and the grouting pressure should be greater than the water gushing pressure by more than 1Mpa.

[0024] Preferably, before grouting and plugging in S2, the staff measures the change in the length of the drill rod to infer the depth of the borehole, thereby determining the required depth of grouting and water injection pipe insertion.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The present invention provides a sealing plug device near the grouting port to inject high-pressure slurry into the cracks under the hole, so that a sealed space is formed near the grouting port. When the slurry pressure is increased, the slurry can be effectively injected into the deep cracks of the formation. It effectively solves the problems of water gushing and slurry leakage when encountering broken zones and joint-dense zones during directional drilling of marine and terrestrial rock bodies, greatly reduces the risk of directional drilling of marine and terrestrial rock bodies, greatly improves the efficiency of grouting and plugging leakage during directional drilling, and reduces the cost of directional drilling of marine and terrestrial rock bodies. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the structure of the rubber bag not expanding during grouting of the present invention;

[0028] Figure 2 It is a schematic diagram of the structure of the rubber bag when it expands during grouting of the present invention.

[0029] In the figure: 1. Drill hole wall; 2. Crack; 3. Grouting steel pipe; 4. Water injection steel pipe; 5. Grouting port; 6. Water injection steel pipe end plate; 7. Expansion rubber bag; 8. Rib flange; 9. Bolt; 10. Protective angle steel; 11. Water injection hole. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Example:

[0032] See also Figure 1 - Figure 2 As shown, a bottom hole grouting plugging device for directional drilling of marine and terrestrial rock mass of oil and gas pipelines comprises a borehole wall 1 and cracks 2, wherein the cracks 2 are distributed on the surface of the borehole wall 1;

[0033] An injection assembly, the injection assembly includes a grouting steel pipe 3, a water injection steel pipe 4, a grouting port 5 and a water injection steel pipe end plate 6. The injection assembly is inserted into the inner side of the borehole wall 1, the water injection steel pipe 4 is sleeved on the outer wall of the grouting steel pipe 3, the grouting port 5 is opened at one end of the grouting steel pipe 3 close to the inner side of the borehole wall 1, the water injection steel pipe end plate 6 is fixedly connected to the outer wall of the grouting steel pipe 3, and one end of the water injection steel pipe 4 close to the inner side of the borehole wall 1 is fixedly connected to the surface of the water injection steel pipe end plate 6;

[0034] A fixing component is arranged on the outer wall of the water injection steel pipe 4, and the fixing component includes a rib flange 8 and bolts 9. The rib flange 8 is welded and connected to the outer wall of the water injection steel pipe 4. The surface of the rib flange 8 is abutted and connected with an expansion rubber bag 7. There are two groups of rib flanges 8. The two ends of the expansion rubber bag 7 are respectively abutted and squeezed on the outer surface of the water injection steel pipe 4 by the two groups of rib flanges 8. The edge of the rib flange 8 close to one end of the grouting port 5 is smaller than the edge size of the other group of rib flanges 8, and the edge of the other group of rib flanges 8 is higher than the expansion rubber bag 7.

[0035] The surface of the rib flange 8 arranged near one end of the grouting port 5 is connected with a bolt 9, and the surface of the bolt 9 is threadedly connected with two groups of nuts, and the surfaces of the two groups of nuts are abutted and connected with a protective angle steel 10, and the outer wall of the water injection steel pipe 4 is provided with a water injection hole 11.

[0036] As can be seen from the above, when the staff determines the sea and land rock mass borehole that needs grouting, the water injection steel pipe 4 and the grouting steel pipe 3 are inserted into the borehole, and then the grouting steel pipe 3 and the water injection steel pipe 4 are respectively connected to the grouting pump and the water injection pump on the ground, and a pressure gauge is configured. The expansion rubber bag 7 is outside the water injection steel pipe 4, and two ribbed flanges 8 with ribs are welded outside the water injection steel pipe 4. The two ends of the expansion rubber bag 7 are clamped by the ribbed flanges 8 to form a sealed space with the water injection steel pipe 4.

[0037] The surface of the water injection steel pipe 4 is provided with a water injection hole 11, wherein the position of the water injection hole 11 is just wrapped in the middle position where the two ends of the expansion rubber bag 7 are clamped by the rib flange 8. When the water injection pressure increases, the expansion rubber bag 7 is filled with water and expanded, ensuring that the outer surface of the expansion rubber bag 7 is closely fitted with the borehole wall, so that a sealed cavity is formed between the sealing plug and the end of the guide hole, meeting the requirements of grouting pressure boosting. In order to reduce the friction damage between the expansion rubber bag 7 and the borehole wall under the hole, the right rib flange 8 is connected to the expansion rubber bag 7 and a circle of protective angle steel 10 is considered for protection, and the edge of the left rib flange 8 is higher than the expansion rubber bag 7. When the grouting pipe is lowered into the borehole, the hole wall is not smooth. In order to protect the expansion rubber bag 7 from being scratched, flanges are set at both ends of the expansion rubber bag 7. The width of the flange is larger than the distance between the outer edge of the rubber bag and the wall of the grouting pipe.

[0038] The injected cement slurry adopts double liquid slurry, the ratio of cement slurry to water glass slurry is 2:1, the water-cement ratio of cement slurry is 0.6, and the grouting pressure should be greater than the water gushing pressure by more than 1Mpa.

[0039] The method for plugging leakage by grouting at the bottom of a hole in a directional drilling of a marine rock mass comprises the following steps:

[0040] Drilling holes in marine and land rock mass: When the marine and land rock mass directional drill encounters water gushing from the cracks during the pilot hole drilling, stop drilling, withdraw the drill rod, and inject grout to plug the leaks as follows:

[0041] Grouting plugging: insert the grouting and water injection pipe from the soil entry end, and lower the end of the grouting pipe to a distance no greater than 10m from the water gushing point; turn on the water injection pump to inject water into the water injection pipe, and keep the pressure stable after the water pressure reaches 0.5Mpa; turn on the grouting pump to inject grout into the grouting pipe, and the grouting pressure should be 1Mpa greater than the water gushing pressure, and keep the pressure for 0.5-1 hour;

[0042] Close the water injection pump and grouting pump, wait for the rubber bag to shrink, and observe the water gushing from the hole. If water continues to gush from the hole, move the grouting pipe and water injection pipe back 10m, and repeat steps S22 and S23 2 to 3 times. After confirming that water does not gush from the hole, close the water injection pump and grouting pump, wait for the rubber bag to shrink, and then pull out the grouting and water injection pipes.

[0043] The grouting and water injection pipes are connected to the grouting pump and water injection pump on the ground and equipped with pressure gauges. Before grouting and plugging, the staff will measure the change in the length of the drill rod to estimate the depth of the borehole, so as to determine the required insertion depth of the grouting and water injection pipes. The grouting pump and water injection pump can use the same equipment. It is recommended to use a three-bar plunger grouting pump. The pressure of the grouting pump should not be less than 8MPa and the displacement should not be less than 0.2m3 / min. The pressure gauge should be earthquake-resistant and the pressure range should not be less than 10MPa.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A bottom grouting and plugging device for directional drilling of sea and land rock bodies of oil and gas pipelines, characterized in that: include: A borehole wall (1) and cracks (2), wherein the cracks (2) are distributed on the surface of the borehole wall (1); An injection assembly, the injection assembly comprising a grouting steel pipe (3), a water injection steel pipe (4), a grouting port (5) and a water injection steel pipe end plate (6); the injection assembly is inserted into the inner side of a borehole wall (1); the water injection steel pipe (4) is sleeved on the outer wall of the grouting steel pipe (3); the grouting port (5) is provided at one end of the grouting steel pipe (3) close to the inner side of the borehole wall (1); the water injection steel pipe end plate (6) is fixedly connected to the outer wall of the grouting steel pipe (3); and one end of the water injection steel pipe (4) close to the inner side of the borehole wall (1) is fixedly connected to the surface of the water injection steel pipe end plate (6); A fixing assembly is provided on the outer wall of a water injection steel pipe (4), the fixing assembly comprises a rib flange (8) and bolts (9), the rib flange (8) is welded to the outer wall of the water injection steel pipe (4), the surface of the rib flange (8) is abutted and connected with an expansion rubber bag (7), the number of the rib flanges (8) is two groups, the two ends of the expansion rubber bag (7) are respectively abutted and squeezed on the outer surface of the water injection steel pipe (4) by the two groups of rib flanges (8), the edge of the rib flange (8) close to one end of the grouting port (5) is smaller than the edge size of the other group of rib flanges (8), and the edge of the other group of rib flanges (8) is higher than the expansion rubber bag (7). The surface of the rib flange (8) arranged near one end of the grouting port (5) is connected with a bolt (9), the surface of the bolt (9) is threadedly connected with two groups of nuts, the surfaces of the two groups of nuts are abutted and connected with protective angle steels (10), and the outer wall of the water injection steel pipe (4) is provided with a water injection hole (11).

2. The method for plugging leaks by grouting at the bottom of a hole during directional drilling of a marine or land rock mass of an oil and gas pipeline according to claim 1, characterized in that: The following steps are involved: S1. Opening holes in marine and land rock mass: When the directional drill in marine and land rock mass encounters water gushing from the cracks during drilling the guide hole, stop drilling, withdraw the drill rod, and perform grouting to plug the leak as follows: S2. Grouting plugging: S21. Insert the grouting and water injection pipe from the soil entry end, and lower the end of the grouting pipe to a point no more than 10m away from the water gushing point; S22, turn on the water injection pump, inject water into the water injection pipe, and keep the pressure stable after the water pressure reaches 0.5Mpa; S23, turn on the grouting pump, inject grout into the grouting pipe, the grouting pressure is 1Mpa higher than the water pressure, and the pressure is maintained for 0.5-1 hour; S24, turn off the water injection pump and grouting pump, wait for the rubber bag to shrink, and observe the water gushing from the hole. If the hole continues to gushing, move the grouting pipe and water injection pipe backward by 10m, and repeat S22 and S23 steps 2 to 3 times; S25. After making sure that there is no water gushing out of the hole, turn off the water injection pump and grouting pump, and after the rubber bag shrinks, pull out the grouting and water injection pipes.

3. The bottom hole grouting and plugging device for directional drilling of sea and land rock bodies of oil and gas pipelines according to claim 1 is characterized by: The grouting and water injection pipes in S2 are connected to the grouting pump and the water injection pump on the ground and are equipped with a pressure gauge.

4. The bottom hole grouting and plugging device for directional drilling of sea and land rock bodies of oil and gas pipelines according to claim 1 is characterized by: The cement slurry for grouting the grouting pipe in S2 adopts double liquid slurry, the ratio of cement slurry to water glass slurry is 2:1, the water-cement ratio of cement slurry is 0.6, and the grouting pressure should be greater than the water gushing pressure by more than 1Mpa.

5. The bottom hole grouting and plugging device for directional drilling of sea and land rock bodies of oil and gas pipelines according to claim 1 is characterized by: Before the grouting and plugging in S2, the staff measures the change in the length of the drill rod to infer the depth of the borehole, thereby determining the required depth of grouting and water injection pipe insertion.