High-pressure common-rail fuel injector test bed and pressure control method thereof

By analyzing the pressure and flow data in real time in the high-pressure common rail injector test bench, calculating the rail pressure demand factor, and adjusting the oil pump power, the problem of inaccurate pressure control on the test bench is solved, the test effect and accuracy are improved, and the service life of the engine is extended. life.

CN118775122APending Publication Date: 2024-10-15TAIAN NANTAI TESTING EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411139946.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing high-pressure common rail injector test bench is inaccurate in pressure control, which reduces the credibility of the test results and affects the optimization of the combustion process.

Method used

A test bench including an oil pump, common rail cavity, solenoid valve, pulse signal generator, pressure sensor, oil unloading pipe and pressure control module is used to obtain pressure and flow data in real time, analyze the injection time period and injection characteristic parameters, and merge the working conditions Stable interval, calculate the rail pressure demand factor, and adjust the operating power of the oil pump to achieve precise pressure control.

Benefits of technology

It improves the pressure control accuracy and test effect of the test bench, ensures the uniformity and adequacy of the injector under different working conditions, and extends the service life of the engine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775122A_ABST
    Figure CN118775122A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of Internet of Things control, in particular to a high-pressure common-rail fuel injector test bed and a pressure control method thereof. The test bed comprises an oil pump, a common rail cavity, an electromagnetic valve, a pulse signal generator, a pressure sensor, an oil discharging pipe, a flow sensor and a pressure control module. A pulse signal generator in the test bed is used for generating a pulse signal and controlling the opening and closing of the electromagnetic valve; the pressure sensor is used for measuring pressure data in the common rail cavity; the flow sensor is used for measuring flow data in the oil discharging pipe; the pressure control module obtains pressure data, flow data and pulse signals in real time, analyzes the obtained data, obtains the rail pressure demand factor at the current time, and regulates and controls the operation power of the oil pump based on the current rail pressure demand factor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of Internet of Things control, and in particular to a high-pressure common rail injector test bench and a pressure control method thereof. Background Art

[0002] The high-pressure common rail injector test bench is a device used for high-pressure common rail injector performance testing. The fuel injection system is installed on the high-pressure common rail injector test bench. The fuel atomization quality is directly related to the efficiency and emission performance of the combustion process. Inaccurate control of the injection pressure may cause the fuel to be insufficiently atomized in the combustion chamber, thereby affecting the uniformity and sufficiency of the combustion. By optimizing the injection process through the test bench, reliable technical support is provided for the combustion optimization of the engine under various working conditions. Ultimately, these improvement measures will make the engine more efficient and environmentally friendly in actual operation and extend its service life.

[0003] In the existing methods for testing the performance of injectors, the pressure control unit or module generally uses the amount of fuel injected at a fixed time to detect the injection pressure, and estimates the injector injection pressure by measuring the volume of the injected fuel. However, the sprayed atomized fuel will have residual fuel in the pipeline. At this time, the estimation of the injector injection pressure by measuring the volume or mass of the injected fuel will be affected, resulting in inaccurate pressure control of the test bench, causing the credibility of the test results of the test bench to be reduced, which is not conducive to optimizing the combustion process or the optimization results are not ideal. Summary of the invention

[0004] In order to solve the technical problem that the pressure control of the high-pressure common rail injector test bench is inaccurate and affects the test effect, the purpose of the present invention is to provide a high-pressure common rail injector test bench and a pressure control method thereof. The technical scheme adopted is as follows:

[0005] A high-pressure common rail injector test bench, the test bench comprising: an oil pump, a common rail chamber, a solenoid valve, a pulse signal generator, a pressure sensor, an oil discharge pipe, a flow sensor and a pressure control module;

[0006] The pulse signal generator is used to generate a pulse signal to control the opening and closing of the solenoid valve; the pressure sensor is used to measure the pressure data in the common rail cavity; the flow sensor is used to measure the flow data in the oil unloading pipe; the pressure control module is used to adjust the operating power of the oil pump and perform pressure control on the high-pressure common rail injector test bench;

[0007] The pressure control module acquires the pressure data, the flow data and the pulse signal in real time; and acquires the injection time period according to the fluctuation characteristics of the pulse signal;

[0008] According to the difference characteristics between the pressure data and the flow data in each injection time period, the injection characteristic parameters of each injection time period are obtained; according to the similar characteristics of the injection characteristic parameters of adjacent injection time periods, the injection time periods are merged to obtain the stable working condition interval at the current time;

[0009] According to the distribution characteristics of all the injection time periods within the stable operating range at the current time, combined with the fluctuation characteristics of the injection characteristic parameters, the rail pressure demand factor at the current time is obtained; and the operating power of the oil pump is regulated based on the current rail pressure demand factor.

[0010] Furthermore, the pulse signal includes a high-level pulse and a low-level pulse, wherein the high-level pulse corresponds to the opening of the solenoid valve; and the low-level pulse corresponds to the closing of the solenoid valve.

[0011] Furthermore, the method for obtaining the injection time period includes:

[0012] Each time period during which the solenoid valve is opened is regarded as a fuel injection time period.

[0013] Furthermore, the method for acquiring the injection characteristic parameters includes:

[0014] Subtract the pressure data from the flow data at the same time to obtain the pressure-flow difference at each moment in the injection time period;

[0015] The injection characteristic parameters of each injection time period are obtained according to the distribution characteristics of the pressure-flow difference at all different moments in each injection time period.

[0016] Furthermore, the method for obtaining the injection characteristic parameters of each injection time period according to the distribution characteristics of all the pressure-flow differences in each injection time period includes:

[0017] The deflection of all the pressure-flow differences in each injection time period is used as the corresponding injection characteristic parameter.

[0018] Furthermore, the method for obtaining the stable operating range includes:

[0019] The injection time periods that are adjacent in time sequence and have the same positive and negative signs of the injection characteristic parameters are merged to obtain a stable operating range; when the injection characteristic parameter is 0, the corresponding injection time period can be merged with the injection time periods corresponding to positive and negative signs at the same time.

[0020] Furthermore, the method for obtaining the rail pressure demand factor includes:

[0021] According to the violent fluctuation characteristics of the injection characteristic parameter within the stable operating range, a first demand factor is obtained; the violent fluctuation characteristics of the injection characteristic parameter are positively correlated with the first demand factor;

[0022] Obtaining the start time of the injection time period that is the earliest in the operating condition stability interval, obtaining the end time of the injection time period that is the latest in the operating condition stability interval, and using the time interval between the start time and the end time as a reference time interval;

[0023] taking the ratio of all the injection time periods within the reference time period as a second demand factor;

[0024] The rail pressure demand factor at the current time is acquired according to the first demand factor and the second demand factor; the first demand factor and the second demand factor are both positively correlated with the rail pressure demand factor.

[0025] Furthermore, the method for regulating the operating power of the oil pump based on the current rail pressure demand factor includes:

[0026] The rail pressure demand factor is mapped to a preset value range, and the product of the mapped value and the operating power of the oil pump at the current time is used as the power adjustment amount; the power adjustment amount is input into the PID controller to adjust the operating power of the oil pump.

[0027] Furthermore, the center point of the preset value range is 0.

[0028] The present invention also proposes a pressure control method for a high-pressure common rail injector test bench, wherein the method uses the high-pressure common rail injector test bench to perform pressure control.

[0029] The present invention has the following beneficial effects:

[0030] In the embodiment of the present invention, a pulse signal generator is used to generate a pulse signal to control the opening and closing of the solenoid valve to simulate the injection demand; the pressure data in the common rail cavity is monitored in real time by a pressure sensor, the flow data in the oil discharge pipe is monitored in real time by a flow sensor, various data are collected in a pressure control module for analysis, and the working power of the oil pump is controlled to perform pressure control; considering that the test pays more attention to various data during the injection, the injection time period is firstly selected to narrow the analysis scope; the injection characteristic parameters are further obtained to accurately characterize the injection process, which can reflect the injection characteristics of the injector under different working conditions, and similar injection time periods are combined and analyzed to identify the stable working state of the test bench within a period of time, so as to facilitate the subsequent optimization of the pressure control strategy according to the overall characteristics within this period of time, realize a smoother control process, and improve the test effect and pressure control accuracy of the test bench; further, by analyzing the overall injection law in the stable working condition interval and the fluctuation characteristics of the injection characteristic parameters, an accurate rail pressure demand factor is obtained to provide a basis for the subsequent control of the operating power of the oil pump; finally, the current rail pressure demand factor regulates the operating power of the oil pump, performs pressure control, and maintains the operation of the high-pressure common rail injector test bench. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A schematic diagram of a high-pressure common rail injector test bench provided by one embodiment of the present invention;

[0033] Figure 2 A flow chart of a data processing method for a pressure control module provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0034] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of a high-pressure common rail injector test bench and its pressure control method proposed by the present invention, its specific implementation method, structure, features and effects, in conjunction with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0035] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0036] The specific scheme of a high-pressure common rail injector test bench and a pressure control method thereof provided by the present invention is described in detail below with reference to the accompanying drawings.

[0037] See also Figure 1 , which shows a schematic diagram of a high-pressure common rail injector test bench provided by an embodiment of the present invention, specifically including: a fuel tank, an oil pump, a common rail chamber, a solenoid valve, a pulse signal generator, an injector, a pressure sensor, various pipelines, a protective cover, an oil unloading pipe, a flow sensor and a pressure control module.

[0038] In the embodiment of the present invention, after the fuel injector equipment is installed by professionals, the fuel tank is opened, and the fuel in the fuel tank is transferred to the common rail chamber through the oil pump. The common rail chamber accumulates high-pressure fuel to avoid fuel pressure fluctuations in the oil storage tank causing unstable fuel injection pressure; when the solenoid valve is opened, fuel is sprayed out from the injector, collected through the protective cover to the oil unloading pipe and returned to the fuel tank.

[0039] Among them, the pulse signal generator is used to generate pulse signals to control the opening and closing of the solenoid valve; the pressure sensor is used to measure the pressure data in the common rail cavity; the flow sensor is used to measure the flow data in the oil unloading pipe; the pressure control module is used to adjust the operating power of the oil pump and perform pressure control on the high-pressure common rail injector test bench.

[0040] During the operation of the test bench, the pulse signal generator, pressure sensor and flow sensor transmit their data to the pressure control module in real time through the data cable. The pressure control module processes the data and outputs the control signal to control the working power of the oil pump. The pressure control module can be composed of chips such as FPGA that can perform data processing. The pressure control module performs the following operations: Figure 2 For the method shown, see Figure 2 , which shows a flow chart of a data processing method of a pressure control module provided by an embodiment of the present invention, specifically comprising:

[0041] Step S101: acquiring pressure data, flow data and pulse signal in real time; acquiring the injection time period according to the fluctuation characteristics of the pulse signal.

[0042] During the operation of the high-pressure common rail injector test bench, when the pressure in the common rail cavity reaches the preset pressure, it is recorded as the start time of the test. Various sensors collect data at a collection frequency of 60Hz, and the pulse signal generator generates random pulse signals in real time. The pulse signal contains high-level pulses and low-level pulses. The duration of each pulse signal is random and the probability of occurrence is random, which is used to control the opening and closing of the solenoid valve and simulate the random use of the injector.

[0043] It should be noted that, in one embodiment of the present invention, the high-level pulse corresponds to the opening of the solenoid valve, and the low-level pulse corresponds to the closing of the solenoid valve. When the solenoid valve is opened, the injector sprays oil outward. In other embodiments of the present invention, other acquisition frequencies can also be used. The preset pressure is related to the specific test plan and is no longer limited here.

[0044] Real-time acquisition of pressure data, flow data and pulse signals provides a basis for subsequent analysis; considering that the test pays more attention to the data during injection, so as to analyze the test pressure state of the injection pipe, the injection time period is first screened out to narrow the analysis scope and increase the efficiency of the test bench.

[0045] Preferably, in one embodiment of the present invention, each time period during which the solenoid valve is opened is regarded as a fuel injection time period.

[0046] It should be noted that the flow data and pressure data are also normalized, specifically using the sigmoid function, and time series alignment to eliminate the dimension effect for subsequent calls.

[0047] Step S102: according to the difference characteristics of the pressure data and the flow data in each injection time period, the injection characteristic parameters of each injection time period are obtained; according to the similar characteristics of the injection characteristic parameters of adjacent injection time periods, the injection time periods are merged to obtain the stable operating condition interval of the current time.

[0048] Taking into account that the pressure data represents the pressure of the fuel in the common rail cavity, and the flow data represents the amount of fuel injected through the injector, at different time points in the injection process, the change in the relationship between pressure and flow reflects the working state of the injector. According to the difference characteristics of the pressure data and the flow data in each injection time period, the injection characteristic parameters are obtained to accurately characterize the injection process, which can reflect the injection characteristics of the injector under different working conditions; then the injection time periods with similar injection characteristics are merged and analyzed to identify the stable working state of the test bench within a period of time, so that the pressure control strategy can be optimized according to the overall characteristics of this period of time, and a smoother control process can be achieved, thereby improving the test effect of the test bench and the pressure control accuracy. Therefore, according to the similar characteristics of the injection characteristic parameters of adjacent injection time periods, the injection time periods are merged to obtain the stable operating range of the current time.

[0049] Preferably, in one embodiment of the present invention, considering that the uniformity of the injection of the fuel injector is reflected in that after the fuel is injected, the injection pressure is relatively stable and the spray uniformity is high, so that the rate at which the fuel reaches the baffle is uniform and the flow data in the oil unloading pipe is stable, the more stable the difference between the pressure data and the flow data at the same time, the stronger the uniformity of the injection of the fuel injector is, and the injection characteristic parameters are obtained through the uniformity of the injection to characterize the injection characteristics of the injection time period;

[0050] Based on this, the pressure data is subtracted from the flow data at the same moment to obtain the pressure-flow difference at each moment in the injection time period;

[0051] According to the distribution characteristics of the downward pressure flow difference at all different times in each injection time period, the injection characteristic parameters of each injection time period are obtained to prepare for the subsequent merging of similar injection time periods to analyze the rail pressure demand and ultimately control the pressure.

[0052] Preferably, in one embodiment of the present invention, considering that the skewness can capture the asymmetry of data distribution, during the injection process of the injector, the distribution of the pressure-flow difference may not be symmetrical. By calculating the skewness, the subtle differences in fuel injection can be reflected, and the distinction of the injection time periods under different working conditions can be enhanced, which is convenient for subsequent more accurate division and judgment of different injection states and improves the control accuracy of the test bench. Therefore, the skewness of all pressure-flow differences in each injection time period is used as the corresponding injection characteristic parameter, and the skewness is used to represent the distribution characteristics of all pressure-flow differences in the injection time period.

[0053] Preferably, in one embodiment of the present invention, considering that the skewness has the same sign, it means that the distribution characteristics of the pressure-flow difference in different injection time periods are similar, the injection state is similar, and therefore the injection characteristic parameters are similar. Therefore, the injection time periods with adjacent timing and the same positive and negative signs of the injection characteristic parameters are merged to obtain a stable operating condition interval.

[0054] It should be noted that, in one embodiment of the present invention, when the injection characteristic parameter is 0, the corresponding injection time period can be merged with the injection time periods corresponding to positive and negative signs at the same time. The injection time period with a skewness of 0, that is, the injection characteristic parameter is 0, can be repeatedly merged into different operating condition stability intervals. For example, there are several adjacent injection time periods whose injection characteristic parameter symbols constitute the sequence of: [positive, 0, negative, negative]. After merging, the following are obtained: [positive, 0] and [0, negative, negative]. With a longer operating condition stability interval, more analyzable data can be provided for the follow-up. In other embodiments of the present invention, it can be stipulated that the injection time period with an injection characteristic parameter of 0 is only merged once, and merged into an injection time period at the front of the timing, such as [positive, 0, negative, negative]. After merging, the following are obtained: [positive, 0] and [negative, negative]. This avoids repeated analysis and reduces the amount of calculation.

[0055] It should be noted that skewness is a technical means well known to those skilled in the art and will not be described in detail.

[0056] In another embodiment of the present invention, the implementer may also subtract the flow data from the pressure data at the same moment to obtain the flow pressure difference for analysis, and then obtain the injection characteristic parameters to obtain the stable operating range.

[0057] In another embodiment of the present invention, the implementer may also normalize or map the injection characteristic parameters to a certain threshold interval, and when the difference between the injection characteristic parameters of all injection time periods that are adjacent in time sequence and merged is less than a certain preset value, the injection characteristic parameters of the adjacent injection time periods are considered to be similar, so as to analyze the similar characteristics of the injection characteristic parameters of the adjacent injection time periods;

[0058] For example: the injection characteristic parameters are normalized. When the injection characteristic parameters of adjacent injection time periods are merged and the difference between them is less than or equal to 0.2, the injection time periods are merged. As an example: there is a sequence of injection characteristic parameters [0.5, 0.6, 0.55, 0.75, 0.6], which are merged into [0.5, 0.6, 0.55] and [0.75, 0.6]. Since the difference between 0.75 and 0.5 is too large and the similarity feature is too low, they cannot be merged into the same stable operating range.

[0059] Step S103: according to the distribution characteristics of all injection time periods in the stable working condition range at the current time, combined with the fluctuation characteristics of the injection characteristic parameters, the rail pressure demand factor at the current time is obtained; and the operating power of the oil pump is regulated based on the current rail pressure demand factor.

[0060] In the working process of the injector, instantaneous pressure fluctuations and flow changes are inevitable. If the test bench is adjusted too frequently according to the instantaneous data, it may cause frequent changes in the oil pump power, increase the response time and control difficulty of the system, and easily damage the oil pump. The distribution characteristics of all injection time periods in the stable working condition interval can present the overall injection law of the stable working condition interval, and then estimate the pressure demand. At the same time, the fluctuation characteristics of the injection characteristic parameters can reflect the dynamic changes in the stable working condition interval and help judge the stable state of pressure. According to the distribution characteristics of all injection time periods in the stable working condition interval at the current time, combined with the fluctuation characteristics of the injection characteristic parameters, the instantaneous fluctuation can be smoothed to obtain a more stable and accurate rail pressure demand factor. The pressure control is smoother, which is conducive to the smooth operation of the test bench. Therefore, according to the distribution characteristics of all injection time periods in the stable working condition interval at the current time, combined with the fluctuation characteristics of the injection characteristic parameters, the rail pressure demand factor at the current time is obtained.

[0061] Preferably, in one embodiment of the present invention, considering that the more violent the fluctuation of the injection characteristic parameter is, the greater the difference in the injection characteristics of different injection time periods in the stable operating range is, the more unstable the pressure of the common rail cavity is, and the greater the demand for pressure is, the first demand factor is obtained according to the violent fluctuation characteristics of the injection characteristic parameter in the stable operating range; the violent fluctuation characteristics of the injection characteristic parameter are positively correlated with the first demand factor;

[0062] Considering that the greater the proportion of all injection time periods on the time axis in the stable operating condition interval, the longer the injection time is, the greater the fuel consumption may be, the more it is necessary to maintain the pressure stability of the common rail cavity, and the greater the demand for pressure, so the start time of the injection time period with the earliest timing in the stable operating condition interval is obtained, and the end time of the injection time period with the latest timing is obtained, and the time interval between the start time and the end time is used as the reference time period;

[0063] The proportion of all injection time periods in the reference time period is used as the second demand factor;

[0064] The rail pressure demand factor at the current time is obtained according to the first demand factor and the second demand factor; the first demand factor and the second demand factor are both positively correlated with the rail pressure demand factor.

[0065] As an example, the calculation formula of the rail pressure demand factor includes: Among them, X q W represents rail pressure demand factor; f Indicates the injection characteristic parameters of the injection time period that is the earliest in the stable operating range; W e Indicates the injection characteristic parameters of the injection time period with the latest timing within the stable operating range; L p It indicates the total length of all injection time periods within the stable operating range, and also the total length of all injection time periods within the reference time period; L b The length of the base time period.

[0066] In the calculation formula of the rail pressure demand factor, the greater the absolute value of the difference between the injection characteristic parameters of the first and last injection time periods within the stable operating range, the greater the change of the injection characteristic parameters over time, the greater the difference in injection characteristics, the more violent the fluctuation, the more unstable the pressure in the common rail cavity, and the greater the demand for pressure, so |W f -W e |As the first demand factor, the larger the first demand factor, the larger the rail pressure demand factor; the larger the proportion of all injection time periods in the reference time period, the larger the second demand factor The larger it is, the longer the injection time is, the greater the fuel consumption may be, the more it is necessary to maintain the pressure stability of the common rail chamber, the greater the demand for pressure, the larger the second demand factor, and the larger the rail pressure demand factor.

[0067] In another embodiment of the present invention, considering that the larger the variance of the data is, the more drastic the fluctuation of the data is, the implementer may also obtain any two injection time periods within the stable operating range, combine them, obtain the absolute value of the difference of the injection characteristic parameters corresponding to the combination, and use the variance of the absolute value of the difference corresponding to all the combinations as the first demand factor, or as the third demand factor, to supplement the first demand factor and the second demand factor, for example, the product of the first demand factor, the second demand factor and the third demand factor is used as the rail pressure demand factor; and because the longer the time of each injection is, the greater the pressure consumption of the common rail cavity is, and the greater the demand for pressure is, the total length of all injection time periods within the stable operating range may be obtained, and the ratio of the number of all injection time periods may be used as the second demand factor, or as the fourth demand factor to supplement, for example, the product of the first demand factor, the second demand factor and the fourth demand factor is used as the rail pressure demand factor, and the product of the first demand factor, the second demand factor, the third demand factor and the fourth demand factor is used as the rail pressure demand factor.

[0068] In another embodiment of the present invention, the calculation formula of the rail pressure demand factor can also be: Where tanh() represents the hyperbolic tangent function; || represents taking the absolute value; Y avg Represents the average value of the injection characteristic parameters of all injection time periods within the stable operating range; tanh(|Y avg |) represents the fifth demand factor; the remaining parameters are The two places have the same meaning and will not be repeated here. avg The more it deviates from 1, the more unstable the difference between the pressure data and the flow data during the injection period is, and the more unstable the injection state is. avg |) is larger, the greater the pressure demand is, and the greater the rail pressure demand factor is.

[0069] It should be noted that the rail pressure demand factor may also be obtained by a positive correlation method of addition, for example, weighted summing the first demand factor and the second demand factor with the same weight, and using the summed result as .

[0070] After analyzing the rail pressure demand at the current time, the operating power of the oil pump can be adjusted based on the current rail pressure demand factor, and pressure control can be performed to maintain the operation of the high-pressure common rail injector test bench.

[0071] Preferably, in one embodiment of the present invention, the rail pressure demand factor is mapped to a preset value range, and the product of the mapped value and the operating power of the oil pump at the current time is used as the power adjustment amount; the power adjustment amount is input into the PID controller to adjust the operating power of the oil pump.

[0072] It should be noted that the center point of the preset value range is 0.

[0073] As an example, the preset value range is [-0.5, 0.5]. After the rail pressure demand factor is normalized, the value range is shifted to [-0.5, 0.5]. Specifically, the sigmoid function can be used for normalization.

[0074] In another embodiment of the present invention, the target operating power after adjustment is calculated and input into the PID controller for adjustment. The calculation formula of the target operating power includes: S'=S×(1+X'); wherein S' represents the target operating power; S represents the current operating power; and X' represents the mapping value of the rail pressure demand factor.

[0075] It should be noted that regulating power through a PID controller is a technical means well known to those skilled in the art, which will not be elaborated here; when the target operating power is greater than and equal to the maximum operating power of the oil pump, the current operating power is maintained unchanged; when it is monitored that the pressure in the common rail cavity or the pipeline pressure reaches the preset maximum pressure threshold, the pumping of fuel is stopped and the oil pump is temporarily shut down. The specific preset maximum operating power and preset maximum pressure threshold are related to the test equipment and can be obtained through the experimental manual or production manual, etc., which will not be elaborated here.

[0076] The present invention also provides a pressure control method for a high-pressure common rail fuel injector test bench, which uses the high-pressure common rail fuel injector test bench provided by the present invention to test the high-pressure common rail fuel injector.

[0077] In one embodiment of the present invention, the high-pressure common rail injector test bench can also upload the monitoring data and the processing results of the pressure control module to the Internet of Things platform in real time, or visualize the data to facilitate analysis by relevant personnel.

[0078] In summary, in order to solve the technical problem that the pressure control of the high-pressure common rail injector test bench is inaccurate and affects the test results, the present invention provides a high-pressure common rail injector test bench and its pressure control method. The test bench proposed in the embodiment of the present invention includes: an oil pump, a common rail chamber, a solenoid valve, a pulse signal generator, a pressure sensor, an oil discharge pipe, a flow sensor and a pressure control module; the pulse signal generator in the test bench is used to generate a pulse signal to control the opening and closing of the solenoid valve; the pressure sensor is used to measure the pressure data in the common rail chamber; the flow sensor is used to measure the flow data in the oil discharge pipe; the pressure control module obtains the pressure data, flow data and pulse signal in real time, analyzes the obtained data, obtains the rail pressure demand factor at the current time, and regulates the operating power of the oil pump based on the current rail pressure demand factor.

[0079] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0080] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A high pressure common rail injector test bench, characterized in that: The test bench includes: an oil pump, a common rail chamber, a solenoid valve, a pulse signal generator, a pressure sensor, an oil discharge pipe, a flow sensor and a pressure control module; The pulse signal generator is used to generate a pulse signal to control the opening and closing of the solenoid valve; the pressure sensor is used to measure the pressure data in the common rail cavity; the flow sensor is used to measure the flow data in the oil unloading pipe; the pressure control module is used to adjust the operating power of the oil pump and perform pressure control on the high-pressure common rail injector test bench; The pressure control module acquires the pressure data, the flow data and the pulse signal in real time; and acquires the injection time period according to the fluctuation characteristics of the pulse signal; According to the difference characteristics between the pressure data and the flow data in each injection time period, the injection characteristic parameters of each injection time period are obtained; according to the similar characteristics of the injection characteristic parameters of adjacent injection time periods, the injection time periods are merged to obtain the stable working condition interval at the current time; According to the distribution characteristics of all the injection time periods within the stable operating range at the current time, combined with the fluctuation characteristics of the injection characteristic parameters, the rail pressure demand factor at the current time is obtained; and the operating power of the oil pump is regulated based on the current rail pressure demand factor.

2. A high pressure common rail injector test bench according to claim 1, characterized in that: The pulse signal includes a high-level pulse and a low-level pulse, wherein the high-level pulse corresponds to the opening of the solenoid valve; and the low-level pulse corresponds to the closing of the solenoid valve.

3. A high pressure common rail injector test bench according to claim 2, characterized in that: The method for obtaining the injection time period includes: Each time period during which the solenoid valve is opened is regarded as a fuel injection time period.

4. A high pressure common rail injector test bench according to claim 1, characterized in that: The method for acquiring the injection characteristic parameters includes: Subtract the pressure data from the flow data at the same time to obtain the pressure-flow difference at each moment in the injection time period; The injection characteristic parameters of each injection time period are obtained according to the distribution characteristics of the pressure-flow difference at all different moments in each injection time period.

5. A high pressure common rail injector test bench according to claim 4, characterized in that: The method for obtaining the injection characteristic parameters of each injection time period according to the distribution characteristics of all the pressure-flow differences in each injection time period includes: The deflection of all the pressure-flow differences in each injection time period is used as the corresponding injection characteristic parameter.

6. A high pressure common rail injector test bench according to claim 5, characterized in that: The method for obtaining the working condition stability interval includes: The injection time periods that are adjacent in time sequence and have the same positive and negative signs of the injection characteristic parameters are merged to obtain a stable operating range; when the injection characteristic parameter is 0, the corresponding injection time period can be merged with the injection time periods corresponding to positive and negative signs at the same time.

7. The high pressure common rail injector test bench according to claim 1, characterized in that: The method for obtaining the rail pressure demand factor includes: According to the violent fluctuation characteristics of the injection characteristic parameter within the stable operating range, a first demand factor is obtained; the violent fluctuation characteristics of the injection characteristic parameter are positively correlated with the first demand factor; Obtaining the start time of the injection time period that is the earliest in the operating condition stability interval, obtaining the end time of the injection time period that is the latest in the operating condition stability interval, and using the time interval between the start time and the end time as a reference time interval; taking the ratio of all the injection time periods within the reference time period as a second demand factor; The rail pressure demand factor at the current time is acquired according to the first demand factor and the second demand factor; the first demand factor and the second demand factor are both positively correlated with the rail pressure demand factor.

8. The high-pressure common rail injector test bench according to claim 1, characterized in that: The method for regulating the operating power of the oil pump based on the current rail pressure demand factor includes: The rail pressure demand factor is mapped to a preset value range, and the product of the mapped value and the operating power of the oil pump at the current time is used as the power adjustment amount; the power adjustment amount is input into the PID controller to adjust the operating power of the oil pump.

9. A high pressure common rail injector test bench according to claim 8, characterized in that: The center point of the preset value range is 0.

10. A pressure control method for a high-pressure common rail injector test bench, characterized in that: The method uses a high-pressure common rail injector test bench as described in any one of claims 1 to 9 to perform pressure control.