Inter-hole delay time calculation method for protecting strip mine slope

By obtaining and analyzing the main vibration frequency sample set of open-pit mine slope blasting seismic waves, combined with the Bootstrap method and interval estimation, and the out-of-phase vibration reduction theory, the optimal delay time between holes is determined, which solves the problem of excessive blasting vibration in the existing technology. , achieving effective protection of the open-pit mine slope.

CN118776402APending Publication Date: 2024-10-15NORTH CHINA UNIVERSITY OF SCIENCE AND TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410764500.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

It is difficult to effectively determine the delay time between blasting holes on the slope of an open-pit mine with existing technology, leading to disputes caused by excessive blasting vibration, and theoretical research is insufficient to deduce a reasonable delay time.

Method used

By obtaining sample sets of main vibration frequencies of open-pit mine slope blasting seismic waves with different blast center distances, calculating the average value, using the Bootstrap method to perform repeated sampling simulations, and determining the confidence interval of the overall mean value of the main vibration frequencies. Combining interval estimation and out-of-phase vibration reduction theory, calculate Optimum delay time between holes.

Benefits of technology

It effectively reduces the vibration impact of mine blasting on the open-pit mine slope, is simple and easy to implement, and is suitable for conditions where there is less blasting seismic wave sample data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776402A_ABST
    Figure CN118776402A_ABST
Patent Text Reader

Abstract

The invention discloses an inter-hole delay time calculation method for protecting a strip mine side slope, and relates to the technical field of blasting engineering.The method comprises the steps that strip mine side slope blasting seismic wave main vibration frequency sample sets with different blasting center distances are obtained; calculating an average value of the strip mine slope blasting seismic wave main vibration frequency sample sets with different blasting center distances; carrying out repeated sampling simulation on strip mine slope blasting seismic wave main vibration frequency samples with different blasting center distances by adopting a Bootstrap method; obtaining a total mean confidence interval of main vibration frequencies of blasting seismic waves with different blasting center distances; determining a main vibration frequency interval according to the intersection of the total mean confidence intervals of the main vibration frequencies of the blasting seismic waves with different blasting center distances, and taking integer frequencies in the main vibration frequency interval as dominant frequencies; and determining the optimal inter-hole delay time according to the dominant frequency and an inter-hole delay time calculation formula. The vibration influence of mine blasting on the strip mine slope can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of blasting engineering, and in particular to a method for calculating the delay time between holes for protecting the slope of an open-pit mine. Background Art

[0002] In order to solve the disputes caused by excessive vibration of mining production blasting, it is necessary to optimize the delay time between holes and reduce the blasting vibration intensity caused by large hole diameter and large charge. The key to the successful implementation of millisecond differential blasting with digital electronic detonators is how to determine a reasonable delay time. At present, the method of determining the delay time between holes in open-pit deep hole blasting is mainly based on theoretical research, and the method of inferring the delay time between holes by the main vibration frequency of the blasting seismic wave has not been found. Summary of the invention

[0003] The purpose of the present invention is to provide a method for calculating the delay time between holes for protecting the open-pit mine slope, which can reduce the vibration influence of mine blasting on the open-pit mine slope.

[0004] To achieve the above object, the present invention provides a method for calculating the inter-hole delay time for protecting the open-pit mine slope, comprising:

[0005] Obtaining a main vibration frequency sample set of an open-pit mine slope blasting seismic wave at different blast center distances; the open-pit mine slope blasting seismic wave main vibration frequency sample set includes a plurality of main vibration frequencies;

[0006] Calculate the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blast center distances;

[0007] The Bootstrap method is used to simulate the repeated sampling of the main vibration frequency samples of the open-pit mine slope blasting seismic waves at different blast center distances.

[0008] According to the average value of the main vibration frequency sample set of blasting seismic waves in open-pit mine slopes at different blasting center distances and the sampling simulation results, the overall mean confidence interval of the main vibration frequency of blasting seismic waves at different blasting center distances is obtained.

[0009] According to the intersection of the confidence intervals of the overall mean values ​​of the main vibration frequencies of blasting seismic waves at different explosion center distances, the main vibration frequency interval is determined, and the integer frequency in the main vibration frequency interval is taken as the dominant frequency;

[0010] The optimal delay time between holes is determined based on the dominant frequency and the calculation formula for the delay time between holes.

[0011] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: the present invention adopts a method combining interval estimation and phase-shifted vibration reduction theory to calculate the optimal delay time between holes, which is suitable for calculating the delay time between holes under the condition of less blasting seismic wave sample data. The required data is easy to obtain, and the calculation method is simple. Mining blasting is carried out based on the optimal delay time between holes, which can effectively reduce the vibration impact of mining blasting on open-pit mine slopes. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0013] Figure 1 A flow chart of a method for calculating the inter-hole delay time for protecting an open-pit mine slope provided by the present invention;

[0014] Figure 2 It is the distribution diagram of the empirical distribution function of the sample set X1;

[0015] Figure 3 This is a curve showing how the average value of the standard deviation of the sample set X1 changes with the number of sampling times.

[0016] Figure 4 This is a curve chart showing the change of the average value of the sample set X1 with the number of sampling times. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] The purpose of the present invention is to provide a method for calculating the delay time between holes for protecting the slope of an open-pit mine. The delay time between holes is calculated by combining interval estimation with staggered phase vibration reduction theory, providing a new research idea for the calculation of the delay time between holes.

[0019] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0020] like Figure 1 As shown, the method for calculating the inter-hole delay time for protecting the open-pit mine slope provided by the present invention includes:

[0021] Step 1: Obtain a sample set of main vibration frequencies of blasting seismic waves of open-pit mine slopes at different blasting center distances. The sample set of main vibration frequencies of blasting seismic waves of open-pit mine slopes includes multiple main vibration frequencies. In this embodiment, sample data of main vibration frequencies of blasting seismic waves of single-shot hole open-pit mine slopes at different blasting center distances are obtained.

[0022] Step 2: Calculate the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blast center distances.

[0023] Specifically, the following formula is used to calculate the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blast center distances:

[0024]

[0025] in, is the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance, m is the number of main vibration frequencies in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave, x i is the i-th main vibration frequency in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave.

[0026] In addition, the sample standard deviation S of the explosion center distance can also be calculated * :

[0027]

[0028] Step 3: Use the Bootstrap method to perform repeated sampling simulation on the main vibration frequency samples of blasting seismic waves in open-pit mine slopes at different blasting center distances.

[0029] Specifically, step 3 includes:

[0030] (1) For any blast center distance, the main vibration frequencies in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance are arranged in ascending order to obtain an ascending sample set.

[0031] (2) Construct an empirical distribution function based on the ascending sample set:

[0032]

[0033] Among them, F m (x) is the function value of the empirical distribution function, x is the parameter of the empirical distribution function, which represents the main vibration frequency, x (1) is the first main oscillation frequency in the ascending sample set, x (i) is the ith main vibration frequency in the ascending sample set, x (m) is the mth main vibration frequency in the ascending sample set, and m is the number of main vibration frequencies in the main vibration frequency sample set of blasting seismic waves in open-pit mine slope.

[0034] (3) Based on the empirical distribution function, a random sampling method with replacement is used to repeatedly sample the main vibration frequency samples of the open-pit mine slope blasting seismic wave at the blast center distance to obtain multiple Bootstrap sample sets. The number of samplings is the same as the number of main vibration frequencies in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance. Multiple Bootstrap sample sets can reflect the overall characteristics.

[0035] (4) Calculate the average value of each Bootstrap sample set as the sampling simulation result. Arrange the average values ​​of multiple Bootstrap sample sets in ascending order.

[0036] Step 4: According to the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blasting center distances and the sampling simulation results, the overall mean confidence interval of the main vibration frequency of the blasting seismic wave at different blasting center distances is obtained.

[0037] Specifically, step 4 includes:

[0038] (1) For any blast center distance, the correction amount is determined according to the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance and the sampling simulation results:

[0039]

[0040] Among them, β is the correction amount, Q is the number of Bootstrap sample sets, is the indicative function value of the j-th Bootstrap sample set, is the average value of the j-th Bootstrap sample set, is the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance, Φ -1 [·] is the inverse function of the standard normal distribution function.

[0041] (2) According to the deviation correction amount, determine the confidence interval of the overall mean value of the main vibration frequency of the blasting seismic wave at the explosion center distance: [k a ,k b ]; where k a is the lower limit of the confidence interval, k b is the upper limit of the confidence interval, a and b are decimals in [0,1], a=Φ(z α / 2 +2β), b=Φ(z 1-α / 2 +2β), β is the correction amount, z α / 2 is the standard normal distribution number, z 1-α / 2 is the upper 1-α / 2 quantile of the standard normal distribution, α=0.05, Φ() is the standard normal distribution function.

[0042] Step 5: Determine the main vibration frequency interval according to the intersection of the overall mean confidence intervals of the main vibration frequencies of blasting seismic waves at different explosion center distances, and take the integer frequencies within the main vibration frequency interval as the dominant frequencies.

[0043] Specifically, the intersection of the overall mean confidence intervals of the main vibration frequencies of blasting seismic waves at multiple explosion center distances is taken to obtain the overall mean confidence interval of the main vibration frequencies of blasting seismic waves, and the main vibration frequencies within the overall mean confidence interval of the main vibration frequencies of blasting seismic waves are rounded to the integer to obtain the dominant frequency.

[0044] Step 6: Determine the optimal delay time between holes based on the dominant frequency and the delay time calculation formula between holes.

[0045] First determine the delay time range between holes:

[0046] when When , the vibration velocity superposition is zero, so the optimal delay time between holes is: Among them, Δt is the optimal delay time between holes, T is the main vibration period of blasting seismic wave, f is the dominant frequency, k = 0, 1, 2, 3..., n, n is a natural number.

[0047] Finally, field tests were conducted according to the optimal delay time between holes to compare whether the peak value of the vibration velocity of the particle blasting on the open-pit mine slope was reduced.

[0048] The following is an example of the calculation process of the optimal delay time between holes using the horizontal tangential main vibration frequency of single-hole blasting seismic waves at different blast center distances.

[0049] (1) The distance from the explosion center is less than 350 m, X1 = (25.51, 18.23, 10.31, 22.86, 23.58, 15.72, 22.82, 18.94, 21.79, 19.81, 26.6, 21.17, 22.26, 28.41, 16.28, 22.52, 32.05, 21.67, 26.04, 23.81, 17.99, 18.88, 24.43, 30.12);

[0050] The distance from the explosion center is 300-500m, X2=(11.31, 22.12, 13.89, 22.56, 20.55, 13.09, 42.37, 21.9, 18.66, 22.97, 38.46, 25.51, 16.67, 20.78, 25, 22.76, 47.17, 32.89, 39.06, 22.63, 17.36, 10.87, 10.42, 19.16, 18.83, 19.53);

[0051] The distance from the explosion center is 500-650m, X3=(18.38, 42.37, 47.17, 24.18, 29.76, 26.32, 17.12, 28.94, 23.19, 34.25, 17.12, 13.81, 20, 34.25, 27.47, 23.81, 14.12, 23.81, 24.7, 11.06, 25.45, 23 .19, 29.68, 21.52, 36.76, 22.62, 14.71, 29.07, 21.01, 19.09, 20.33, 23.15, 24.88, 37.31, 33.33, 20.16, 16.67, 11.85, 29.68, 22.2, 14.12, 20.21, 21.67, 13.51, 29.47);

[0052] The distance from the explosion center is greater than 650m, X4=(22.23, 25.25, 23.15, 15.72, 33.78, 20.37, 29.41, 21.01, 28.73, 24.29, 16.08, 23.36, 23.15, 18.8, 16.89, 35.71, 28.87, 12.56, 19.52, 17.72, 24.75);

[0053] The unit of the main oscillation frequency is Hz.

[0054] (2) Taking the samples with a distance from the explosion center less than 350 meters as an example (the same analysis method is used for the other samples), the sample mean Sample standard deviation S * =4.82, using Bootstrap method to perform resampling simulation on sample set X1, the empirical distribution function F of sample set X1 m The distribution of (x)(m=24) is as follows Figure 2 As shown. 24 (x) Perform random sampling with replacement to estimate the population distribution function. Figure 3 is the curve of the average value of the standard deviation of the sample set X1 changing with the number of samplings, Figure 4 This is the curve of the average value of the sample set X1 changing with the sampling number. The results show that when the sampling number is greater than 1000, the average value of the Bootstrap sample standard deviation and the average value of the mean value of X1 have reached stability, so the Bootstrap sampling number can be taken as 1000.

[0055] (3) The percentile method is used to perform interval estimation on sample set X1, and the 95% confidence interval of the population mean corresponding to sample set X1 is [20.56, 23.78]. The same method is used to perform interval estimation on sample sets X2 to X4. Table 1 shows the mean confidence intervals of different sample sets. As shown in Table 1, the intersection of the Bootstrap method mean confidence intervals of different sample sets is 22.27Hz to 23.78Hz, rounded to 23Hz.

[0056] Table 1 Confidence interval estimation results of the mean of the main vibration frequency

[0057]

[0058] (4) According to the principle of phase shift vibration reduction of blasting seismic waves, when Δt = T / 2, the half-phase difference time of each harmonic in the main vibration frequency is 1 / 2f, the superposition velocity of the blasting seismic wave is zero, and the vibration reduction effect is the best. The main vibration frequency is rounded to 23Hz, and the dominant frequency 23Hz is brought into The calculated delay time is 21.7ms, so the optimal delay time between holes is rounded to 22ms.

[0059] (5) The mine production blasting test was carried out with a delay time of 22ms between holes and an original delay time of 42ms between holes. The borehole diameter was 310mm, the number of holes was 18, the hole spacing was 7m-8m, the row spacing was 6m-7m, the hole arrangement was diamond-shaped, and the blasting was divided into three rows, with 6 boreholes in each row. Digital detonators were used to accurately control the blasting time between holes and rows, and the series-parallel method was used to detonate each hole, with a delay of 100ms between rows. Four monitoring points were set up on adjacent slopes in the mining area, and the TC-4850N blasting vibration meter was used to observe the blasting vibration data of the slopes in the open-pit mining area. The blasting vibration data of different monitoring points are shown in Table 2.

[0060] Table 2 Blasting vibration data at different monitoring points

[0061]

[0062]

[0063] As shown in Table 2, compared with the original inter-hole delay time of 42ms, the blasting vibration velocity of different monitoring points is reduced by adopting the blasting scheme with an inter-hole delay time of 22ms. The horizontal axial vibration reduction rate of monitoring point A is 12.74%, the horizontal tangential vibration reduction rate is 28.3%, and the vertical vibration reduction rate is 10.52%; the horizontal axial vibration reduction rate of monitoring point B is 27.81%, the horizontal tangential vibration reduction rate is 22.84%, and the vertical vibration reduction rate is 22.81%; the horizontal axial vibration reduction rate of monitoring point C is 13.28%, the horizontal tangential vibration reduction rate is 59.33%, and the vertical vibration reduction rate is 15.17%; the horizontal axial vibration reduction rate of monitoring point D is 47.48%, the horizontal tangential vibration reduction rate is 58.43%, and the vertical vibration reduction rate is 9.64%.

[0064] The present invention adopts a method combining interval estimation and phase-shift vibration reduction theory, which is particularly suitable for calculating the inter-hole delay time under the condition of less blasting seismic wave sample data. The required data is easy to obtain and the calculation method is simple, which can effectively reduce the vibration impact of mine blasting on open-pit mine slopes.

[0065] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A method for calculating the delay time between holes for protecting the slope of an open pit mine, characterized in that: The method for calculating the inter-hole delay time for protecting the open-pit mine slope includes: Obtaining a main vibration frequency sample set of an open-pit mine slope blasting seismic wave at different blast center distances; the open-pit mine slope blasting seismic wave main vibration frequency sample set includes a plurality of main vibration frequencies; Calculate the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blast center distances; The Bootstrap method is used to simulate the repeated sampling of the main vibration frequency samples of the open-pit mine slope blasting seismic waves at different blast center distances. According to the average value of the main vibration frequency sample set of blasting seismic waves in open-pit mine slopes at different blasting center distances and the sampling simulation results, the overall mean confidence interval of the main vibration frequency of blasting seismic waves at different blasting center distances is obtained. According to the intersection of the confidence intervals of the overall mean values ​​of the main vibration frequencies of blasting seismic waves at different explosion center distances, the main vibration frequency interval is determined, and the integer frequency in the main vibration frequency interval is taken as the dominant frequency; The optimal delay time between holes is determined based on the dominant frequency and the calculation formula for the delay time between holes.

2. The method for calculating the inter-hole delay time for protecting the open-pit mine slope according to claim 1, characterized in that: The following formula is used to calculate the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at different blast center distances: in, is the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance, m is the number of main vibration frequencies in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave, x i is the i-th main vibration frequency in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave.

3. The method for calculating the delay time between holes for protecting the open-pit mine slope according to claim 1, characterized in that: The Bootstrap method is used to simulate the repeated sampling of the main vibration frequency samples of the open-pit mine slope blasting seismic wave at different blast center distances, including: For any blast center distance, the main vibration frequencies in the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance are arranged in ascending order to obtain an ascending sample set; Constructing an empirical distribution function according to the ascending sample set; Based on the empirical distribution function, a random sampling method with replacement is used to repeatedly sample the main vibration frequency samples of the open-pit mine slope blasting seismic waves at the blast center distance to obtain multiple Bootstrap sample sets; Calculate the average value of each Bootstrap sample set as the sampling simulation result.

4. The method for calculating the inter-hole delay time for protecting the open-pit mine slope according to claim 3 is characterized in that: The empirical distribution function is: Among them, F m (x) is the function value of the empirical distribution function, x is the parameter of the empirical distribution function, which represents the main vibration frequency, x (1) is the first main oscillation frequency in the ascending sample set, x (i) is the ith main vibration frequency in the ascending sample set, x (m) is the mth main vibration frequency in the ascending sample set, and m is the number of main vibration frequencies in the main vibration frequency sample set of blasting seismic waves in open-pit mine slope.

5. The method for calculating the delay time between holes for protecting the open-pit mine slope according to claim 3, characterized in that: According to the average value of the main vibration frequency sample set of blasting seismic waves in open-pit mine slopes at different blasting center distances and the sampling simulation results, the overall mean confidence interval of the main vibration frequency of blasting seismic waves at different blasting center distances is obtained, including: For any blast center distance, the deviation correction amount is determined according to the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance and the sampling simulation result; According to the deviation correction amount, the confidence interval of the overall mean value of the main vibration frequency of the blasting seismic wave at the explosion center distance is determined.

6. The method for calculating the delay time between holes for protecting the open-pit mine slope according to claim 5, characterized in that: Use the following formula to determine the amount of correction: Among them, β is the correction amount, Q is the number of Bootstrap sample sets, is the indicative function value of the j-th Bootstrap sample set, is the average value of the j-th Bootstrap sample set, is the average value of the main vibration frequency sample set of the open-pit mine slope blasting seismic wave at the blast center distance, Φ -1 [·] is the inverse function of the standard normal distribution function.

7. The method for calculating the delay time between holes for protecting the open-pit mine slope according to claim 5, characterized in that: The confidence interval of the overall mean of the main vibration frequency of the blasting seismic wave at the explosion center distance is [k a ,k b ]; where k a is the lower limit of the confidence interval, k b is the upper limit of the confidence interval, a and b are decimals in [0,1], a=Φ(z α / 2 +2β), b=Φ(z 1-α / 2 +2β), β is the correction amount, z α / 2 is the standard normal distribution number, z 1-α / 2 is the upper 1-α / 2 quantile of the standard normal distribution, α=0.05, Φ() is the standard normal distribution function.

8. The method for calculating the inter-hole delay time for protecting the open-pit mine slope according to claim 1, characterized in that: The optimal delay time between the holes is: Among them, Δt is the optimal delay time between holes, T is the main vibration period of blasting seismic wave, f is the dominant frequency, k = 0, 1, 2, 3..., n, n is a natural number.