Multi-objective optimization method for equipment support decision based on task unit decomposition model

Through the multi-objective optimization method based on the task unit decomposition model, the problem of low efficiency in allocation of Army HCBD equipment maintenance support resources has been solved, systematic resource optimization allocation has been achieved, mission completion rate and resource satisfaction rate have been improved, and costs have been reduced.

CN118780433APending Publication Date: 2024-10-15ARMOR ACADEMY OF CHINESE PEOPLES LIBERATION ARMY
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202410907226.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively solve the multi-objective optimization problem of Army HCBD equipment maintenance and support resources. It lacks systematic resource allocation and decision-making methods, resulting in low resource deployment and scheduling efficiency.

Method used

A multi-objective optimization method based on the task unit decomposition model is adopted to optimize the configuration of equipment maintenance support resources, including personnel, equipment and Equipment optimization decisions.

Benefits of technology

It has achieved a systematic and optimized allocation of Army HCBD equipment maintenance and support resources, improved resource allocation efficiency, improved mission completion rate, equipment availability and resource satisfaction rate, and reduced overall costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780433A_ABST
    Figure CN118780433A_ABST
Patent Text Reader

Abstract

The invention provides a multi-objective optimization method for equipment support decision based on a task unit decomposition model. The multi-objective optimization method comprises the following steps: constructing an HCBD equipment simulation model for HCBD equipment; establishing an HCBD equipment task unit decomposition model; constructing an equipment guarantee optimization decision model; constructing a support personnel manpower optimization decision model; constructing a support equipment optimization decision model; and based on the HCBD equipment task unit decomposition model, the equipment guarantee optimization decision-making model, the guarantee personnel manpower optimization decision-making model and the guarantee equipment optimization decision-making model, adopting a multi-target particle swarm optimization algorithm or a maintenance guarantee resource marginal optimization algorithm based on heuristic search to execute maintenance guarantee simulation evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to equipment support modeling and optimization decision, and in particular to a multi-objective optimization method for equipment support decision based on a task unit decomposition model. Background Art

[0005] There are some studies on task modeling at home and abroad. In summary, they focus on the following aspects:

[0006] 1) Modeling according to the task process (sequence): In general, combat and training tasks can be divided into three major stages: pre-battle (training) preparation, during combat (training), and combat (training), and each stage can be further subdivided.

[0007] 2) Decompose according to the level of equipment combat units: It can be divided into top-level combat units, middle-level combat units, basic combat units, etc. Different combat units have different task levels, which can be described separately.

[0008] 3) Mission feature description: abstract the mission into some characteristic indicators, such as equipment quantity, equipment performance, combat style, etc.

[0009] In summary, the commonly used methods for task modeling include the Integrated Definition of Enterprise Functions (IDEF) method, functional decomposition, and other conceptual modeling graphical representation methods. In general, the above methods for modeling and describing tasks have their own characteristics, but in summary, most of them only describe the system from a graphical method, without truly modeling from a mathematical perspective. Moreover, the descriptions are not systematic enough, and they are only described from a certain aspect. For the analysis of support requirements, the above single description is not enough to solve the problem of determining support requirements and support resource requirements. It is necessary to describe combat and training tasks comprehensively and systematically. Through the description of the task process, the temporal relationship and logical relationship of the task can be clearly seen. Through the description of task characteristics, the task objectives (effectiveness) can be determined, and the connection between task objectives and support requirements can be further established.

[0010] The particle swarm optimization (PSO) algorithm is a swarm intelligence optimization algorithm proposed by Kennedy and Eberhart in 1995. It regards each individual in the population as a particle without volume and mass in the search space. These particles fly at a certain speed in the search space, and their speed is dynamically adjusted according to their own flight experience and the flight experience of the entire population. The advantage of PSO is that the process is simple and easy to implement, the algorithm parameters are concise, and no complex adjustments are required. This method has a good effect on solving multi-objective decision-making (optimization) problems and is suitable for solving problems such as task-based resource demand prediction.

[0011] Judging from the above description, on the one hand, there are relatively few methods and models for determining the demand for support resources based on tasks. Although some have been proposed based on tasks, they are not closely integrated with the tasks. On the other hand, most of them focus on determining the demand for a single goal or constraint (criteria) or a single resource (such as personnel, equipment, and facilities). They do not determine the demand for equipment support resources based on the concept of integrated comprehensive support, based on support units, and based on comprehensive failure rates and comprehensive combat loss rates.

[0012] For task-based resource provisioning, there are multiple objectives and multiple constraints, which is a multi-objective optimization problem. The above algorithm cannot be effectively implemented. Therefore, the present invention intends to use a modern evolutionary multi-objective optimization algorithm to solve it.

[0013] In this field, China has developed a series of tool products mainly for support resource management, such as maintenance resource information management system, warehousing system, procurement system, etc. In terms of auxiliary decision-making for maintenance resources, it is still mainly at the theoretical research level. At present, there are few maintenance support resource optimization decision-making systems, and there are relatively few systems for support resource calculation. They are mainly concentrated in the fields of support resource planning in the development stage and equipment optimization in the use stage. There is a lack of overall support resource optimization models and systems for HCBD. The present invention will use the results of this study as the basis for system development to form a multi-objective optimization decision-making system for maintenance support of HCBD. Summary of the invention

[0014] The present invention mainly aims at the problem of insufficient methods and means for optimizing decision-making of maintenance and support resources of HCBD equipment of the Army. Taking typical HCBD equipment as the research object and the comprehensive optimization analysis method of equipment maintenance and support resources as the basis, the present invention develops an equipment maintenance and support resource optimization decision-making system, establishes optimization configuration methods and models of three types of key maintenance and support resources (personnel, support equipment, and materials) for representative combat and training tasks of typical HCBD, develops a maintenance and support resource optimization decision-making system and conducts example verification, realizes the optimization decision of existing maintenance and support resource configuration, breaks through the key technologies of deployment, decision-making and dynamic scheduling of maintenance and support resources of HCBD equipment of the Army, forms the engineering application method and application example of maintenance and support resource optimization analysis technology of HCBD equipment group, and provides method and means support for improving the efficiency of maintenance and support resource configuration of HCBD equipment of the Army.

[0015] Specifically, a multi-objective optimization method for equipment support decision-making based on a task unit decomposition model is provided, which includes:

[0016] First, a HCBD equipment simulation model is constructed for the HCBD equipment, wherein the HCBD equipment simulation model includes an equipment group model and an equipment model itself; the equipment group model includes:

[0017] The combat unit model describes the name of the troop unit, the type of equipment deployed, the number of equipment, the tasks performed, and the deployment location;

[0018] An equipment usage model, which describes the call and use requirements of equipment and communicates with the combat unit model according to the equipment requirements of basic tasks;

[0019] The equipment model itself includes:

[0020] Equipment model, which describes the basic properties of equipment, including: equipment code, equipment name, failure rate, unit price, weight, volume, and maintenance type;

[0021] Component structure model, which describes the hierarchical relationship between equipment, the subordinate relationship between equipment and system, and the number of single machine installations. The same equipment may belong to different superior components or different systems.

[0022] System model, which describes a system of equipment models. Usually, the system will not fail or be repaired directly, but the system will be repaired by repairing the underlying equipment;

[0023] Equipment model, which describes the definition of the affiliation between systems, and the affiliation between systems and equipment models;

[0024] Second, establish the HCBD equipment task unit decomposition model; it includes:

[0025] Describe the typical mission process of the troops and break down the mission process into various stages of events from start to finish;

[0026] In view of the events in each stage, the comprehensive functional decomposition technology is used to decompose and divide the equipment combat and training tasks;

[0027] Based on the typical task process of the troops, a set of meta-tasks is established; the set is:

[0028] MT={mt0,mt1,mt2,…,mt K}mt0where K is the number of meta-tasks in the set;

[0029] Third, build an equipment support optimization decision-making model;

[0030] Fourth, build a human resource optimization decision-making model for support personnel;

[0031] Fifth, build a decision-making model for optimizing security equipment;

[0032] Sixth, based on the HCBD equipment task unit decomposition model, the material support optimization decision model, the support personnel manpower optimization decision model, and the support equipment optimization decision model, a multi-objective particle swarm optimization algorithm or a maintenance support resource marginal optimization algorithm based on heuristic search is used to perform maintenance support simulation evaluation, and an output report including five indicators including task completion rate, equipment availability, spare parts satisfaction rate, resource satisfaction rate, and overall cost is obtained. Combined with the constructed objective function, the advantages and disadvantages of the maintenance support plan are evaluated.

[0033] Preferably, the equipment combat and training tasks are decomposed and divided into: combat scenarios, combat missions, subtasks, and metatasks; wherein the subtasks are intermediate task nodes in the mission decomposition process, which can be further decomposed into metatasks and subtasks; the metatasks are basic tasks, and their basic attributes include the capability requirements of task processing, the time requirements of task processing, the regional location of the task, and the priority of the task; the capability requirements of the metatasks can be described by vectors, and the metatasks are recorded as mt i The capacity requirement vector is RC i , then RC i =[rc0,rc1,rc2,…rc H ], where H is the capability dimension in the distributed combat system.

[0034] Preferably, the step of constructing the equipment support optimization decision model includes: determining the equipment support probability P and the availability of use, wherein:

[0035] First, calculate the system's equipment security probability according to the following formula:

[0036]

[0037] Where: A o ——availability of use; T BF — mean time between failures; ——mean time to repair; T SR ——Average supply response time; P——Probability of equipment support;

[0038] Determine the component equipment security probability P based on the system equipment security probability P i , according to the complexity and characteristics of the system, directly use the P value as P i Value, for P i If the values ​​are different, take P = min (P i ), i=1,2,3,…,q;

[0039] Using component A oi Find the A of the system o , for the series system:

[0040]

[0041] Where: A o ——availability; q——number of equipment types; T BFi ——mean time between failures of the i-th component; ——average maintenance time of the i-th component; T SR ——Average supply response time; P i ——Probability of guarantee of the i-th equipment;

[0042] Secondly, calculate the quantity of equipment required;

[0043] Finally, control the equipment inventory.

[0044] Preferably, the calculation of the equipment demand quantity adopts an equipment optimization model based on a marginal optimization algorithm, which uses an inventory strategy of (S-1, S), and uses an availability calculation formula as shown below:

[0045]

[0046] Wherein, UTILF is the utilization rate of the system; EFRT is the effective failure rate; EPRT is the effective preventive maintenance rate, which indicates the frequency of preventive maintenance work on the system at the site (within each use time); MDTC is the mean corrective maintenance downtime, which is the average unavailability time of each system caused by corrective maintenance; MDTP is the mean preventive maintenance downtime, which is the average unavailability time of each system caused by preventive maintenance.

[0047] Preferably, the construction of the support personnel manpower optimization decision model includes: determining the basis of personnel demand, determining the personnel type, and determining the number of personnel; the step of determining the number of personnel includes:

[0048] a) Based on FMECA and RCMA analysis, determine the preventive maintenance and corrective maintenance work, and further determine all maintenance work to be implemented;

[0049] b) forecast the annual number of man-hours required for each task, including determining the frequency of maintenance tasks and the number of man-hours required to complete each maintenance task;

[0050] c) Determine the total number of personnel required based on the working hours spent on maintenance throughout the year.

[0051] The formula for predicting the total number of equipment maintenance personnel is as follows:

[0052]

[0053] Where: M——total number of maintenance personnel; T N ——(calendar days in the whole year - non-maintenance working days)×(daily working hours), also known as annual time base; ε——equipment planned repair downtime rate; N——total number of equipment; M H ——The estimated number of maintenance work hours per year for each piece of equipment (maintenance work hour quota for each piece of equipment);

[0054] After predicting the number of equipment maintenance personnel required, the analysis results should be compared with the professional staffing of troops with similar equipment, and corresponding adjustments should be made to preliminarily determine the number of each professional staff and correct it based on the equipment's deployment requirements and usage.

[0055] Preferably, the construction of the support equipment optimization decision model includes: determining the type of support equipment and the number of support equipment; the number of support equipment is determined by the proportional matching method: let λ be the equipment failure rate, and the probability of requiring maintenance of the support equipment in the time interval [0, t] is:

[0056] F(t)=1-e -λt

[0057] Assuming that the maintenance time of the maintenance equipment follows an exponential distribution and μ is the average repair rate, the probability of completing the maintenance work within the time interval [0, t] is:

[0058] M(t)=1-e -u.t

[0059] Assuming that the probability of the equipment remaining intact is P0, then:

[0060] e -λt =P0

[0061] From this formula, we can calculate a time t, which means the probability that the equipment remains intact in the time period [0, t] is P0;

[0062] The probability of equipment repair within the time period [0, t] is required to be P1. The calculation of n pieces of maintenance equipment required to achieve this probability is:

[0063]

[0064] Therefore, continuous iterative calculations can be used to eventually calculate the appropriate number n of maintenance and support equipment.

[0065] Preferably, the steps of the multi-objective particle swarm optimization algorithm are as follows: initialize particle positions; calculate fitness values; initialize the historical optimal pbest as itself and find the global optimal gbest; update the position and speed according to the position and speed formulas; recalculate fitness; update the historical optimal pbest and the global optimal gbest according to the fitness; exit the calculation when convergence or the maximum number of iterations is reached.

[0066] Preferably, the multi-objective particle swarm optimization algorithm further comprises:

[0067] Initialize the population and Archive set: assign initial values ​​to the parameters, generate the initial population P1, and copy the non-inferior solutions in P1 to the Archive set to obtain A1;

[0068] Evolution produces the next generation of groups;

[0069] Archive set truncation operation;

[0070] Output the particle information in the Archive set;

[0071] Check the particle information, and exit the calculation when convergence or the maximum number of iterations is reached;

[0072] The step: the method of evolving the next generation population further comprises:

[0073] Calculate the density information of particles in the Archive set;

[0074] Based on the density information, the gBest particle gj,t is selected from At for the particle Pj,t in the group. The quality of the particle determines the convergence performance of the MOPSO algorithm and the diversity of the non-inferior solution set. For the particles in the Archive, the lower the density value, the greater the probability of selection, and vice versa. The number of particles in the Archive set that are better than the number of particles in the group is used to evaluate its search potential. The more particles that are better than the number of particles in the group, the stronger its search potential, and vice versa.

[0075] Update the position and velocity of particles in the group. The particles in the group search for the optimal solution under the guidance of gBest and pBest.

[0076] Preferably, the mathematical model corresponding to the maintenance support resource marginal optimization algorithm is:

[0077] Min.f(X)=(1-f1(X),1-f2(X),1-f3(X),1-f4(X),f5(X))

[0078] stT≤Tmax

[0079] Min. is the objective function to be optimized, X represents the input variable to be optimized, st represents the cost constraint, that is, the overall cost T cannot exceed the cost limit Tmax; task completion rate ≥ M; equipment availability ≥ A0; equipment satisfaction rate ≥ F; resource utilization rate ≥ U; f(x) is the objective function.

[0080] Preferably, the maintenance support resource marginal optimization algorithm performs the following steps under the condition of satisfying the cost constraint:

[0081] Step 1: According to the remaining cost, calculate the remaining available cost space remaining_c=C-c1, and sort the NBO of each equipment from high to low to obtain a sequence:

[0082] sort_descend[NBO1, NBO2, NBO3, ..., NBO n ]

[0083] Sort the satisfaction rate (1-NRW / NR) of each resource from low to high, or the shortage rate NRW / NR from high to low to get the sequence:

[0084] sort_descend[NRW / NR1, NRW / NR2, NRW / NR3, ..., NRW / NR n ]

[0085] In the order of NBO and NRW / NR from high to low, remain_c is replenished by adding 1 to the number of equipment in short supply one by one (the number of replenishments can be optimized according to the indicator mechanism) until the cost reaches the cost constraint;

[0086] Step 2: According to the adjusted input scheme, execute the evaluation calculation model in the maintenance support resource optimization decision software to obtain the output of the corresponding input scheme, and determine whether the five evaluation indicators of the output meet the requirements or determine whether the number of iterations is met. If not, execute the next step, otherwise stop;

[0087] Step 3: Allocate the number of equipment and resources between sub-sites, allocate the number of equipment with an NBO index of 0, and the number of resources with a shortage rate NRW / NR index of 0, and subtract 1 from the NBO of equipment and the NRW / NR of resources with a shortage rate of 0. According to step 1, reallocate the remaining available funds to the equipment and resources with NBO and NRW / NR indicators from high to low, and then adjust according to the next evaluation results and go to step 2. BRIEF DESCRIPTION OF THE DRAWINGS

[0088] Figure 1 It is a technical implementation method of the present invention;

[0089] Figure 2 Modeling process for the equipment model of the present invention;

[0090] Figure 3 This is a diagram of the troops' typical combat mission process;

[0091] Figure 4 For training mission profile;

[0092] Figure 5 It is the mission profile for beach landing;

[0093] Figure 6 It is a meta-task sequence diagram;

[0094] Figure 7 It is the functional decomposition diagram of the task unit;

[0095] Figure 8 Optimize the cost-effectiveness curve of the model for multi-echelon inventory;

[0096] Fig. 9 Analytical flow chart for determining maintenance personnel;

[0097] Fig.10 Determines processes for equipment maintenance support equipment needs;

[0098] Fig.11 This is the basic process of genetic algorithm;

[0099] Fig.12 is the inertia weight curve;

[0100] Fig.13 The basic principle of marginal optimization algorithm for maintenance support resources;

[0101] Fig.14 This is an optimization example for the MOP problem;

[0102] Fig.15 Optimize algorithm flow for maintenance guarantee resource margin. DETAILED DESCRIPTION

[0103] Models can take various forms, and there is no unified classification principle. According to the form of the model, the equipment system model can be divided into physical model, mathematical model, structural model and simulation model.

[0104] According to the project goals and requirements, the HCBD equipment system model is constructed using a simulation model. The equipment system model contains two levels: one is the equipment group model, and the other is the equipment model itself, each with a different modeling method.

[0105] 1. Build equipment system model

[0106] 1.1 Equipment Group Model

[0107] The construction of the equipment group model is divided into the following parts:

[0108] (1) Combat unit model

[0109] The combat unit model describes the unit name, deployed equipment model, and equipment quantity. The combat unit is equivalent to the combat HCBD. Each unit supports the joint deployment and joint operations of multiple equipment. In the combat unit model, there is no need to expand the equipment itself, and only the equipment model level needs to be described. For example, a certain HCL has 112 ZTZA tanks, 108 ZBDA infantry fighting vehicles, and 28 ZSDA tracked armored transport vehicles. Tables 1 and 2 can be used to describe the combat unit and equipment composition respectively.

[0110] Table 1 Combat unit model - combat unit description

[0111]

[0112] Table 2 Combat unit-equipment composition

[0113]

[0114] (2) Equipment usage model

[0115] Describe the equipment call and use requirements, and communicate with the combat unit model based on the requirements of basic tasks, especially the equipment requirements of basic tasks.

[0116] 1.2 Equipment Model

[0117] The present invention will establish an equipment system model from the perspective of optimizing maintenance and support resources. The composition of the equipment is mainly constructed using a simulation model. The elements of the model include the composition of the equipment model, the basic properties of the underlying components, the main system functions, etc.

[0118] The equipment model structure is to establish the relationship between equipment, system, component and equipment according to the equipment structure decomposition, including the affiliation and the number of single machine installations. The main modeling process is as follows: Figure 2 shown.

[0119] (1) Equipment model, which describes the basic properties of the equipment, such as equipment code, equipment name, failure rate, unit price, weight, volume, maintenance type, etc. The maintenance types include: LRU, DU, PRU, SRU, SPRU, DP, among which LRU, DU, and PRU are field replaceable units, LRU is a repairable part, PRU is a partially repairable part (it will be scrapped after a certain number of repairs), and DU is a consumable part; SRU, SPRU, and DP are workshop replaceable units, SRU is a repairable part, and DP is a consumable part.

[0120] (2) Component structure model, which describes the hierarchical relationship between equipment, the subordinate relationship between equipment and system, and the number of single machine installations. The same equipment may belong to different superior components or different systems.

[0121] (3) System model: describes a system of equipment models. Normally, the system will not fail or be repaired directly, but will be repaired by repairing the underlying equipment.

[0122] (4) Equipment model, which describes the definition of the affiliation between systems and the affiliation between systems and equipment models.

[0123] 1.3 Basic assumptions of the equipment system model with the goal of optimizing maintenance support resources

[0124] The focus of the present invention is on the optimization decision of maintenance support resources. Therefore, in the equipment system modeling, the influence of the equipment system on the demand for maintenance support resources is mainly considered, and the following simplified assumptions are made:

[0125] (1) The maintenance resource demand of equipment has no direct relationship with the physical structure and mathematical model of the equipment, system, and components, but is only related to the failure type of the component and the maintenance process.

[0126] (2) Regardless of the type of connection, as long as a failure occurs, it will trigger maintenance support activities. Only the equipment availability and task completion rate will be affected. Therefore, when modeling equipment, only the series and parallel relationships between components are considered.

[0127] (3) Equipment composition and function mainly affect the failure rate in different tasks. For example, the power system usually does not work in shooting training, and the weapon system usually does not work in long-range raid missions. This impact can be achieved through the joint mission model.

[0128] (4) Maintenance support resources are called upon through maintenance activities. Maintenance activities are aimed at preventive maintenance and corrective maintenance tasks of equipment or components. Preventive maintenance and corrective maintenance are determined by the mission plan and mission cycle of the equipment, so equipment, tasks and support resources can be connected in series.

[0129] 2. HCBD equipment task unit decomposition model

[0130] 2.1 Equipment Operation and Training Task Decomposition

[0131] To pre-position and optimize equipment support resources for tasks, we first need to clarify what the task is. Different methods are used to optimize support resources, and the degree of detail required for task decomposition is also different. If the analytical method is used to optimize support resource allocation, the task may not need to be decomposed too finely; if the modeling and simulation method is used to pre-position and optimize support resources, the task needs to be decomposed and explained in detail. The following focuses on describing tasks using task classification and comprehensive decomposition technology.

[0132] 2.2 Description of the typical mission process of the troops

[0133] Taking mobile combat missions as an example, when commanders receive combat missions, they should immediately obtain battlefield intelligence information through various channels such as sensors (detectors) deployed in multi-dimensional space, the Internet, and databases, grasp the battlefield situation, formulate mobile combat plans, conduct forced marches according to the requirements of mobile combat missions, and deploy troops. Then, they should issue combat orders through the battlefield information network system to various combat groups dispersed in multiple regions, and command each combat group to enter their respective standby areas according to the combat plan. Each combat formation conducts intelligence reconnaissance in a designated standby area through a variety of intelligence acquisition methods, summarizes their own intelligence information, and transmits it to the combat command organization after information processing. The command organization quickly locates the combat target after assisted decision-making through the information system, and formulates a combat plan and distributes it to each combat formation. After receiving the combat plan, each combat formation quickly mobilizes and deploys forces, and maneuvers to the target area to prepare for battle. After the commander issues an order, each combat formation begins its own combat mission, and conducts coordinated operations, support and defense under the unified command, control and coordination of the command organization. After the mission is completed, the battlefield is cleaned up and the battle is withdrawn. The basic process of the above task activities can be used Figure 3 It describes the various stages of events that the troops experience during a mission from beginning to end.

[0134] 2.3 Task Classification

[0135] In order to have uniformity, equipment combat and training tasks can be summarized and classified into: fixed tasks, regeneration tasks and continuous tasks. Fixed tasks are task plans formulated based on a single task in the execution profile, such as daily training tasks, combat reconnaissance tasks, air strike tasks, etc., usually with a short mission time and a single target. Regeneration tasks refer to tasks that last for a long time, and a single piece of equipment cannot meet the time requirements of the task at one time due to factors such as energy and resources, and require equipment to perform them alternately in batches. Regeneration tasks can be divided into multiple subtasks on the timeline. Each subtask has the same process as a fixed task. Continuous tasks refer to tasks that some equipment can usually perform for a long time. If a failure occurs during the execution process, it will not affect the execution of the task if it can be repaired within the specified time. The task process of a continuous task is the same as that of a fixed task.

[0136] For example, the training mission in the training field and the beach landing mission at the mission front. Different missions can be defined for different field sites. The training mission is only performed in three fields: training field 1, training field 2, and training field 3. The beach landing mission is performed at the mission front. The training mission type is a fixed mission; the beach landing mission type is a regeneration mission.

[0137] The main tasks are described as follows:

[0138] (1) Combat training missions are carried out twice a day, with an interval of 12 hours between each mission.

[0139] (2) If there is an abnormality in the system, a 15-minute delay is allowed for each training task.

[0140] (3) Each beach landing mission lasts for 1 month (730 hours), with each sub-task taking 1.5 hours.

[0141] The beach landing mission requires at least 6 main battle tanks and 4 infantry fighting vehicles, and the training mission requires at least 1 main battle tank.

[0142] The mission profile created by the analysis can be viewed through the mission profile view. The training mission and beach landing mission profiles are as follows: Figure 4 and Figure 5 As shown (generated for the simulation system).

[0143] 2.4 Comprehensive decomposition technology

[0144] The use of comprehensive functional decomposition technology (functional decomposition, granular decomposition, and phase division) to decompose and describe combat and training tasks is a relatively common method, including levels such as combat scenarios, combat missions, subtasks, and meta-tasks.

[0145] Definition 1: Operational scenarios contain a wealth of operational information, including operational environment, operational situation, operational forces and weapons and equipment, operational background events, and other factors. Operational scenarios are the basis for command decision-makers to formulate mission plans. For commanders, operational scenarios are all known conditions and boundary conditions for operations.

[0146] Definition 2: The combat mission is the combat task of a certain level or region assigned to a commander at that level or region. In reality, the combat mission is usually a reflection of the intention of the superior. The combat mission is macroscopic, general, and even vague, and cannot be understood and executed by grassroots combat units. The execution of the mission requires a commander at a certain level or region to break it down and explain it in detail, and at the same time define the behavioral boundaries of the grassroots execution units in executing specific tasks. The combat mission is the question of the combat proposition faced by the commander.

[0147] Definition 3: Subtasks are intermediate task nodes in the mission decomposition process, which assist in establishing mission decomposition and refinement ideas. Subtasks can be further decomposed into meta-tasks and sub-tasks.

[0148] Definition 4: A meta-task is a task that does not need to be further decomposed or called a basic task. If it is further decomposed, the force units that perform the task also need to be subdivided.

[0149] A combat operation is usually a collection of meta-tasks, which is denoted as:

[0150] MT={mt0,mt1,mt2,…,mt K}mt0 (K is the number of meta-tasks in the set)

[0151] The basic attributes of meta-tasks include the capacity requirements for task processing, the time requirements for task processing, the regional location of the task, and the priority of the task.

[0152] Under the conditions of integrated joint operations, the processing of tasks usually requires the coordinated execution of multiple capabilities. The capability requirements of meta-tasks can be described by vectors. For a specific campaign operation, the capability requirements of meta-tasks are consistent with the capability classification of combat resources, that is, the vector dimension is the same as the resource classification type. i The capacity requirement vector is RC i , then RC i =[rc0,rc1,rc2,…rc H ](H is the capability dimension in the distributed combat system, that is, the type of combat resource division).

[0153] The time requirement of meta-task processing is the specified task processing time window, denoted by meta-task mt i The time requirement is RT i , the actual processing time of the meta-task is iT i , then only RTi ≥iT i The meta-task is considered to be successfully processed only when

[0154] The regional position of the meta-task is the central coordinate position of the mission area, expressed in coordinate form, that is, the meta-task mt i The regional position can be expressed as (x i ,y i ).

[0155] The attribute data of meta-tasks are usually described in the form of data tables. The priority of meta-tasks indicates the sequential relationship of meta-task execution. There may be serial or parallel relationships between meta-tasks, and circular links are not allowed. Therefore, the sequential relationship between meta-tasks can usually be expressed in the form of Figure 6 Indicates that the sequence diagram of the meta-task describes the order in which the tasks are executed.

[0156] Definition 5: Combat resources are what commanders can use to command operations in a distributed environment. Combat resources can be physical combat resources, such as tanks, self-propelled anti-aircraft guns, etc., or information resources, such as situation information, command information (commands, plans), decision information, etc. At the campaign planning level, resource management is usually divided into resource types according to combat styles, such as offensive operations, defensive operations, and surprise operations. The division of resource types is the basis for the analysis of combat unit capabilities. The resource types are divided into ty1, ty2, ...ty h .

[0157] Definition 6: Combat units are carriers of combat resource capabilities. In a distributed combat environment, combat units can be nodes that control combat platform resources, or they can be organized units that fight independently at a certain level, such as infantry companies, tank companies, engineering detachments, etc. Combat units do not have a fixed organizational form and equipment configuration, but are defined according to the needs of combat command organizations. Usually, combat units are relatively concentrated forces in regional distribution, such as ship platforms, aircraft platforms, army company-level organizations, etc.

[0158] Tasks are derived from the decomposition of combat missions. Different decomposition methods of combat missions (such as target decomposition, functional decomposition, domain decomposition, and mixed decomposition, etc.) determine different task starting points and different task types. Similarly, different decomposition granularities also determine different sets of subtasks. Generally, the choice of specific decomposition techniques and model granularity (the amount of tasks in the task decomposition) by task planners should depend on the computational efficiency of the design process and its supporting algorithms. Under the condition of determining the model granularity, the results obtained by decomposition are similar, although accompanied by different decomposition methods.

[0159] First, according to the principle of decomposition granularity, in the process of mission decomposition, subtasks are decomposed. When the execution requirements of subtasks are associated with the capability vector of combat resources, they are regarded as meta-tasks and no longer decomposed. For example, the meta-task of capturing high ground has execution requirements including the offensive combat capability of ground forces and the fire support capability of other combat units. Its capability requirement vector can be expressed as R = [r1, r2, ... r n ].

[0160] The second is to construct a combat phase sequence according to the principle of phase division. Combat phase division is a consideration of the combat process and sequence of actions. In the process of subtask decomposition, consider whether it is necessary to further decompose the meta-task from the phase division of subtask execution or realization. For example, in the functional decomposition technology of this case, the subtask offensive operation first needs to clear the sea mines, control or suppress the high ground near the beach, and then land on the beach.

[0161] It should be noted here that there are many methods and approaches to mission decomposition, such as decomposition by objectives, decomposition by functions, decomposition by regions, decomposition by operational dimensions, decomposition by operational directions, etc. Therefore, in the process of decomposing specific combat missions, there is usually no completely single decomposition result, but rather the result of alternating between multiple decomposition methods. For example, the landing combat mission adopts the objective decomposition into occupying the main objective, while the subtask (occupying the landing objective) can be further decomposed into offensive operations and defensive operations against the target according to function. If a certain decomposition method is used in major aspects or major issues during the mission decomposition process, it is called the decomposition result of a certain method. For example Figure 7 Shown is a functional breakdown diagram.

[0162] According to different decomposition paths and methods, the following meta-task analysis set can be obtained: ① Clear the mines in the landing sea area (recorded as mt0); ② Implement fire suppression and special operations on the North Beach Heights to support the North Beach landing operation (recorded as mt1); ③ Implement the North Beach landing (recorded as mt2); ④ Implement the South Beach landing (recorded as mt3); ⑤ Clear the mines on the north road (recorded as mt4); ⑥ Encounter battle on the north road, possible encounter with enemy armored forces (recorded as mt5); ⑦ Blow up the bridge to prevent enemy reinforcements from crossing the river (recorded as mt6); ⑧ Destroy the missile position in the port (recorded as mt7); ⑨ Medical rescue in the north area (recorded as mt8); ⑩ Seize the port (recorded as mt9); 11 Clear the mines on the south road (recorded as mt10); 10 ); 12 South Route Encounter, possible encounter with enemy armored forces (recorded as mt 11 ); 13 destroyed the airport missile position (represented as mt 12 ); 14 seize the airport (represented as mt 13 ); 15 South District Medical Rescue (represented as mt 14 ); 16 North Zone Air Defense (represented as mt 15 ); 17 North Area Small Boat Defense (represented as mt16 ); 18 North Area Submarine Defense (denoted as mt 17 ); 19 South Zone Air Defense (represented as mt 18 ); 20 South Area Small Boat Defense (recorded as mt 19 ); 21 South Area Submarine Defense (denoted as mt 20 ).

[0163] Based on the above process and method, the equipment combat and training tasks can be decomposed step by step according to the above steps until a set of meta-tasks is obtained.

[0164] 3. Constructing equipment support optimization decision-making model and its application method

[0165] 3.1 Single Item Optimization Model

[0166] 3.1.1 Determine the equipment support probability P

[0167] First, calculate the system's equipment security probability according to formula (1):

[0168]

[0169] Where:

[0170] A o — availability for use;

[0171] T BF — mean time between failures;

[0172] — mean time to repair;

[0173] T SR — average supply response time;

[0174] P——Probability of equipment support.

[0175] Determine the component equipment security probability P based on the system equipment security probability P i At this time, different methods can be used according to the complexity and characteristics of the system. Usually, the P value is directly used as P i , value, for P i If the values ​​are different, take P = min (P i )(i=1,2,3,…,q).

[0176] Or adopt a bottom-up synthesis method, using the A oi Find the A of the system o , such as for the series system:

[0177]

[0178] Where:

[0179] A o — availability for use;

[0180] q——Number of equipment types;

[0181] T BFi ——mean time between failures of the i-th component;

[0182] ——average maintenance time of the i-th component;

[0183] T SR — average supply response time;

[0184] P i ——Probability of ensuring the availability of the i-th type of equipment.

[0185] 3.1.2 Calculate the quantity of equipment required

[0186] For parts with a constant failure rate, such as commonly used electronic products, complex systems, and products that have undergone aging tests and regular maintenance, they are all exponential life parts. The calculation model for the equipment demand for exponential life parts is:

[0187]

[0188] Where:

[0189] S——the quantity of equipment required for a certain component in the equipment;

[0190] P——Required equipment satisfaction rate;

[0191] N——the number of machine uses of a certain component in the equipment;

[0192] λ——failure rate of a certain component in the equipment;

[0193] t——Cumulative working time during the turnover period.

[0194] When Nλt>5, normal distribution can be used for calculation, and the calculation formula is simplified to:

[0195]

[0196] In the formula, u p ——Normal distribution quantile, which can be found in GB4086.1.

[0197] For products whose lifespans obey the Weibull distribution (generally electromechanical parts), such as ball bearings, relays, switches, circuit breakers, certain capacitors, electron tubes, magnetrons, potentiometers, gyroscopes, motors, aircraft generators, batteries, hydraulic pumps, air turbine engines, gears, valves, material fatigue parts, etc., they are all Weibull life parts. Assuming their shape parameter is β, scale parameter is η, position parameter is γ, replacement cycle is t, and equipment guarantee probability is P, the equipment demand calculation model of Weibull life parts is:

[0198]

[0199] Where:

[0200] E——average life expectancy,

[0201] (Assume position parameter γ = 0)

[0202] K——coefficient of variation,

[0203]

[0204] For products (mainly mechanical parts) whose lifespans follow a normal distribution, such as merge rings, gearboxes, reducers, etc. Assume that the mean lifespan of the product is E, the standard deviation is σ, the replacement cycle is t (if it is wear lifespan, t is working time; if it is corrosion or aging lifespan, t can be approximated by calendar time), and the equipment guarantee probability is P. The equipment demand calculation model is:

[0205]

[0206] 3.1.3 Equipment Inventory Control

[0207] The inventory control room controls the storage volume of equipment at an appropriate level, which not only meets the needs of use and maintenance with a certain probability of equipment availability, but also minimizes the cost of equipment. According to the consumption law of equipment, the purpose of controlling equipment inventory can be achieved by reasonably selecting ordering methods and controlling the purchase volume.

[0208] There is a category of equipment that is not large in quantity, but its unit price is very high, even exceeding the total price of hundreds of other equipment. For this type of high-priced equipment, key control should be adopted, and its inventory should be strictly controlled according to the probability of availability. New parts can be ordered one-to-one based on consumption. Key parts for mission success should also be protected, and their inventory should be maintained at a high probability of availability. For equipment with a long order period, serious shortages, and equipment that needs to be ordered from abroad, larger quantities can be ordered at one time, and a higher inventory level can be appropriately maintained. For accessories with high consumption and low prices, they can be purchased in the nearby market. For most general equipment, the economic order quantity method is used to determine the storage quota.

[0209] The principle of economic ordering is to optimize between multiple orders (which results in increased equipment acquisition costs) and fewer orders (which results in maintaining a higher level of inventory and increasing storage costs). In other words, ordering forms acquisition costs, while inventory forms storage costs. Economic ordering is to make "ordering costs C b " is equal to "storage cost Ca", and the minimum point after the combination of these two costs is the ideal order quantity. The total inventory cost is:

[0210]

[0211] Where:

[0212] C 总 - total inventory costs;

[0213] C a - storage costs;

[0214] C b - ordering costs;

[0215] C h - storage costs of each item in inventory;

[0216] C p ——Average handling cost per order;

[0217] Q——order quantity;

[0218] D – Annual demand quantity.

[0219] Derivative the above equation with respect to Q and solve for Q * , we get the equation for "economic order quantity" (EOQ):

[0220]

[0221] The number of orders per year is:

[0222]

[0223] 3.1.4 Cost Calculation

[0224] The initial equipment purchase cost estimate model is usually used to calculate equipment costs.

[0225] First, summarize the equipment costs according to the initial equipment supply list. The total amount of equipment costs is C SI The calculation formula is:

[0226]

[0227] Where:

[0228] C SI——Total amount of equipment costs;

[0229] n——Number of equipment types;

[0230] l——Number of equipment configured;

[0231] S i - the number of equipment i;

[0232] C i ——The initial unit price of equipment i.

[0233] If the price index and wage index are taken into consideration, the subsequent equipment cost model of formula (5) is used for calculation:

[0234]

[0235] Where:

[0236] C SH ——The total amount of subsequent equipment costs;

[0237] n——Number of equipment types;

[0238] S i - the number of equipment i;

[0239] C hi ——Unit price of subsequent equipment i.

[0240] The unit price of subsequent equipment i can be calculated by formula (6):

[0241] C hi =C i ×(x1r1+x2r2) (6)

[0242] Where:

[0243] C i ——initial unit price of equipment i;

[0244] r1——the price index of the annual fee for the purchase of subsequent equipment relative to the initial equipment;

[0245] x1——weighted number of price index;

[0246] r2 – the price index of the subsequent equipment purchased relative to the annual fee of the initial equipment;

[0247] x2——weighted number of price index.

[0248] 3.2 Multi-level inventory optimization model

[0249] Traditional inventory theory uses the single-item method, which calculates the quantity of a certain equipment and weighs the storage fee and ordering cost of the equipment inventory. The single-item method has been used for many years, and it is relatively simple and easy to implement because it only needs to make decisions on the quantity of inventory equipment purchased without considering other equipment. However, the disadvantages of the single-item method are also obvious: in its decision-making process, it is impossible to control the total investment cost of the equipment and the availability of the equipment, so the equipment availability or total investment may be unreasonable. This problem will not exist when using the system method.

[0250] V-Metric is a systematic method that uses marginal analysis to provide the optimal performance-cost ratio curve for equipment. Each point on the curve corresponds to a set of equipment reserve strategies. It can calculate the availability corresponding to any set of inventory quantities.

[0251] 3.2.1 Basic principles of the model

[0252] When using the model method to calculate the number of equipment, the Poisson distribution calculation model has been widely used in engineering practice. Generally speaking, the exponential life distribution is suitable for electronic products, complex systems, and products that have undergone aging tests and regular maintenance. The model used to calculate the number of equipment for products with exponential life distribution is the Poisson distribution. The Poisson distribution equipment calculation model is shown in formula (7):

[0253]

[0254] Where, λ is the unit failure rate;

[0255] T——system working time;

[0256] k – number of faults.

[0257] The basis of the repairable inventory theory is the queuing theory proposed by Palm in 1938. Its significance lies in that it enables us to estimate the steady-state probability distribution of the number of equipment under repair through the mean of the demand probability distribution and the repair time distribution.

[0258] Palm's Theorem: If the demand for an item of equipment follows a Poisson process with an annual mean of λ, and the repair time of each faulty part is independent of each other, then the steady-state probability distribution of the number of repaired parts follows a Poisson distribution with a mean of λT.

[0259] Since there is no queue or mutual influence in the repair time when there are only a few pieces of equipment, this theorem is also called the "infinite channel queue hypothesis". However, this theorem does not need to measure the shape of the repair distribution, so it has received widespread attention. For any specified average time T, if its distribution is not considered, the steady-state probability distribution of the number of repaired equipment pieces follows a Poisson distribution with a mean of λT.

[0260] 3.2.2 Availability, life guarantee cost and its optimization principle

[0261] The (S-1, S) inventory strategy is used in the equipment optimization model based on the marginal optimization algorithm. The (S-1, S) inventory strategy is: assuming that S is the inventory level (i.e., inventory quantity), the inventory level is continuously checked during the inventory management process. When a demand is met and the inventory level drops to S-1 units, the warehouse immediately places an order of 1 unit from the supply source to restore the inventory level to S units. The (S-1, S) inventory problem can be treated as a queuing theory problem.

[0262] The availability calculation formula is shown in formula (8):

[0263]

[0264] Where, UTILF is the utilization of the system;

[0265] EFRT – effective failure rate;

[0266] EPRT - Effective Preventive Maintenance Rate, which indicates the frequency of preventive maintenance work on the system at the site (per use time);

[0267] MDTC – Mean downtime for corrective maintenance, which is the average downtime of each system due to corrective maintenance;

[0268] MDTP – Mean downtime for preventive maintenance, which is the average unavailability time of each system due to preventive maintenance.

[0269] The average downtime is defined as Divide the numerator and denominator of formula (8) by (EFRT+EPRT), and we get

[0270]

[0271] Substituting the average downtime MDTO = UTILF·MDT into formula (9), we can obtain:

[0272]

[0273] EFRT is the effective failure rate,

[0274]

[0275] EPRT is the effective preventive maintenance rate.

[0276]

[0277] The national standard defines the mean maintenance interval MTBM as:

[0278]

[0279] According to formula (11), (12), (13), we can get

[0280]

[0281] Substituting formula (14) into formula (10), we can derive the classic availability calculation formula:

[0282]

[0283] Among them, MDTO is the average downtime, which is the comprehensive result of the mean corrective maintenance downtime (MDTC), the mean preventive maintenance downtime (MDTP) and the utilization rate (UTILF). When preventive maintenance and utilization rate are not considered, there is

[0284]

[0285] In the equipment optimization model based on the marginal optimization algorithm, the mean corrective maintenance downtime MDTC is the sum of the following three indicators:

[0286] MDTC=WT+MRPT+TRT (17)

[0287] Where:

[0288] WT——average waiting time, which is the time from the time the equipment demand is generated and the order is placed to the time the required equipment is obtained at the inventory location;

[0289] MRPT – Mean Repair Turnaround Time, which includes any waiting time for resources other than equipment;

[0290] TRT – Transportation time to and from the system repair station.

[0291] Substituting formula (17) into formula (16), we can obtain:

[0292]

[0293] In addition, the usage availability defined in the marginal optimization algorithm can also be expressed as follows:

[0294]

[0295] Where, EBO is the expected equipment order quantity of the system;

[0296] UTILF – system utilization;

[0297] EFRT – effective failure rate;

[0298] EPRT - Effective Preventive Maintenance Rate, which indicates the frequency of preventive maintenance work on the system at the site (per use time);

[0299] RST0R——System corrective maintenance resupply time;

[0300] RST0C——System preventive maintenance resupply time.

[0301] In the model, the average equipment waiting time WT of a certain equipment type is i for:

[0302]

[0303] Where, EBO i ——The expected number of equipment orders for a certain type of equipment, or the number of equipment shortages;

[0304] DRT i ——The equipment demand rate per unit time for a certain type of equipment.

[0305] EBO is the expected number of future orders for a certain equipment. i It is related to the equipment inventory s. The relationship is as follows:

[0306]

[0307] In the formula, i is the type of equipment;

[0308] s——equipment inventory;

[0309] x——equipment demand;

[0310] P(k,λt)——The probability that the equipment demand is k.

[0311] Equipment demand rate DRT of a certain equipment type i It can be calculated from the following related factors: product failure rate, mean maintenance interval, number of products in the system, total number of systems, system utilization factor, environmental factor, replacement rate factor, failure rate application factor and other external requirements. i The calculation formula is:

[0312] DRT i =UTILF×QTYPS×QTYPM×FRT

[0313] Where, UTILF – system utilization;

[0314] QTYPS – the number of systems to be covered;

[0315] QTYPM - the number of a certain equipment installed in each system;

[0316] FRT - Failure rate of equipment.

[0317] The average waiting time WT of the system can be obtained by the average waiting time WT of each product. i The weighted coefficient is the ratio of the equipment demand rate of each product to the total equipment demand rate of all products.

[0318] Equipment availability A o Related to the system's expected equipment order quantity EBO, equipment A o Achieving the maximum is equivalent to minimizing EBO. In the multi-level inventory optimization model, the basic method for optimizing equipment is:

[0319]

[0320] In the formula, NOR is the number of unavailable equipment, NOR = NS × (1-A), and NS is the total number of equipment.

[0321] Therefore, the equipment optimization problem can be reduced to the following integer programming problem:

[0322]

[0323] Where, k is the equipment category number;

[0324] S k - inventory of equipment of category k;

[0325] (EBO) k - delayed deliveries of equipment of category k;

[0326] C k - the price of equipment of category k;

[0327] L——Total cost constraint.

[0328] From the formula, we can see that this problem is actually a one-dimensional resource allocation problem. The resource here is the cost. The marginal optimization method can be used to solve this problem. The marginal optimization algorithm has been widely used in linear programming because of its simple principle, fast calculation speed, and convenient computer programming.

[0329] In the equipment optimization process based on the marginal optimization algorithm, the optimization can be performed according to formula (20):

[0330]

[0331] In the formula, δ is the ratio of the expected reduction in equipment shortage to the unit price of the equipment;

[0332] EBO(s-1)——The expected equipment shortage when the equipment quantity is S-1;

[0333] EBO(s)——Expected equipment shortage when the equipment quantity is S;

[0334] C——Unit price of equipment.

[0335] The algorithm flow of the marginal optimization method is as follows:

[0336] (1) For each component in the system, the initial inventory is set to "0", denoted as S0, and the system availability A at this time is calculated 10 ;

[0337] (2) Increase the inventory of each component and keep the inventory of other components unchanged, and calculate A respectively. 11 , A 12 ……A 1n ;

[0338] (3) Calculate the increase in system availability ΔA 1k (ΔA 1k =A 1k -A 10 , k=0,1,…,n), find ΔA 1k / C i (k=0,1,…,n) maximum value, add 1 to the corresponding product inventory, and record the inventory plan at this time as S1;

[0339] (4) Based on the equipment inventory plan S1, return to the second step. By analogy, we can get inventory plans S1, S2, and so on. k , these solutions are the inventory solutions that maximize the system availability.

[0340] 3.2.3 Main output

[0341] The output of the multi-level inventory optimization model includes cost-effectiveness curve, inventory strategy, ordering strategy, system indicators and many other contents.

[0342] (1) Cost-effectiveness curve

[0343] The Cost / Efficiency Curve is an important output of the multi-level inventory optimization model. The horizontal axis in the figure is the guarantee cost, and the vertical axis is various performance parameters. Each point on the curve represents an inventory plan. Select any point, the horizontal axis of the point represents the life guarantee cost of this inventory plan, and the vertical axis represents the best performance parameter that the system can achieve under this inventory plan.

[0344] The performance parameters included in the cost-effectiveness curve include:

[0345] Use availability (A, Availability);

[0346] Equipment satisfaction rate (FIRT, Fill Rate);

[0347] Risk of Shortage (ROS);

[0348] Probability of No Backorder (PNB);

[0349] Expected Number of Backorders (EBO);

[0350] Mean Down Time (MDT)

[0351] Mean Corrective Down Time (MDTC)

[0352] Mean Operational Down Time (MDTO);

[0353] Number of Systems Not Operational Ready (NOR)

[0354] Average waiting time (WT, Mean Waiting Time).

[0355] (2) Inventory plan

[0356] The multi-level inventory optimization model can provide initial material planning, subsequent material planning, war storage material planning and shipboard material planning, and can obtain the storage quantity of each component at different sites.

[0357] (3) Ordering strategy

[0358] The multi-level inventory optimization model can provide ordering strategies for obsolete parts and partially repairable parts, site equipment storage quantity, reorder point, reorder quantity, and reorder interval.

[0359] (4) System indicators

[0360] The multi-level inventory optimization model can calculate relevant indicators about the equipment system, such as inherent availability (AINHE), operational availability (A), mean time between maintenance (MTBM), mean time between failures (MTBF), mean time between preventive maintenance (MTBPM), mean downtime (MDT) and other parameters.

[0361] 4. Constructing a human resource optimization decision-making model and its method for support personnel

[0362] The number of operating personnel is determined based on the main functional allocation of the equipment, which is relatively easy; the determination of maintenance personnel is more complicated and must be calculated through use and maintenance work analysis, based on the characteristics of the equipment and maintenance tasks, using a maintenance personnel estimation model.

[0363] The utilization rate method is currently widely used. The core of the utilization rate method is to calculate the number of personnel based on the utilization rate of each maintenance personnel per day. The basic idea is: first, based on the results of the maintenance work analysis, we can get the tasks and time that a certain level of repairman of a certain profession at a certain repair level should complete. Then, the total maintenance hours for the whole year are determined by comprehensively considering the frequency of maintenance work (number of maintenance times), the total number of equipment, and the annual working hours. Finally, the working time available for maintenance throughout the year is determined based on the utilization rate of the personnel, and the number of maintenance personnel of each repair level and each profession is calculated.

[0364] 4.1 Main Basis for Determining Personnel Demand

[0365] When determining the professional type, technical level and number of maintenance personnel, the main basis is as follows:

[0366] (1) Results of the support analysis;

[0367] (2) Maintenance work and requirements during peacetime and wartime;

[0368] (3) Daily equipment use and maintenance personnel requirements;

[0369] (4) Demand for operators and maintenance personnel of similar equipment;

[0370] (5) The establishment of maintenance personnel at each maintenance level of the unit;

[0371] (6) Professional settings and training scale of affiliated units, etc.

[0372] 4.2 Methods for determining personnel requirements

[0373] When determining the demand for equipment maintenance and support personnel, the user department often puts forward the personnel quota and the cultural level that the soldiers can reach as constraints for determining personnel requirements to the contractor. During the use of equipment, it is necessary to organize maintenance personnel training, carry out maintenance work, and adjust personnel allocation according to the actual use and maintenance conditions. The number, professional and technical level of maintenance personnel are determined according to different user units and maintenance levels, usually in the following steps.

[0374] (1) Determine the professional type and technical level requirements. Based on the analysis of use and maintenance work, the professional work of different natures is classified, and reference is made to previous equipment use and maintenance work experience and the professional division of labor of personnel serving in similar equipment. Various methods are used to determine the profession of maintenance personnel and their corresponding skill levels.

[0375] (2) Determine the number of maintenance personnel. Determining the number of maintenance personnel is relatively complicated because maintenance personnel usually do not have a one-to-one correspondence with specific equipment. Therefore, when determining the number of maintenance personnel required to support a certain equipment, it is necessary to do necessary analysis and estimation. Usually, this can be determined using relevant analysis results and calculation models.

[0376] 4.2.1 Method for determining personnel type

[0377] The determination of personnel types mainly involves the professional and technical level of the personnel. For the determination of personnel types, based on the results of the supportability analysis, such as the type of maintenance work, the interval between maintenance work, the timing of maintenance work and other information, and referring to the reasonable and unreasonable aspects of the daily personnel configuration of the equipment and the personnel configuration mode of similar equipment, different determination methods can be used to determine the main personnel types. There are many methods to determine the type of personnel, and most of them are qualitative methods, such as the expert scoring method and the similarity system method. The expert scoring method has been introduced when determining the maintenance equipment, and here we mainly introduce the similarity system method.

[0378] As a qualitative analysis method, the similar system method inevitably has certain limitations. There are great difficulties in determining the specific number of personnel, but it is a fast and effective method to determine the type of personnel. In reality, when determining personnel needs, there is a lack of necessary data in many cases. In particular, our army started this work relatively late, and there is a big gap between data mining, data construction, and data reserves and developed countries. Qualitative analysis is necessary to a certain extent. In practice, when people analyze something, they must first select a familiar similar system for comparison, and then have a certain perceptual understanding and further specific analysis. Therefore, the basic idea of ​​the similar system method is: the analyst first selects equipment that is similar to the pending equipment, and then determines the type of support personnel for the pending equipment based on the selection of the type of support personnel for the similar equipment. According to the specific situation, you can choose similar whole equipment, or you can choose a similar system in the equipment, or even a specific subsystem. The selection of similar equipment is based on professional classification, that is, based on a certain type of profession, determine the similar system of the pending equipment, that is, the benchmark comparison system. For example, for a certain XX main battle tank, for a tank repairman, the chassis system of the ZTZA type and the XX type main battle tank is very similar, and the confirmed similar equipment is the ZTZA type tank; while for an ordnance worker, the confirmed similar equipment is the ZTZA type tank, that is, the weapon system of the ZTZA type tank and the XX type main battle tank is very similar. When determining the similar system, the following items must be met:

[0379] (1) Equipment structure and function similar to the equipment to be determined;

[0380] (2) A maintenance level similar to that of the equipment to be determined;

[0381] (3) workload similar to that of the equipment to be determined;

[0382] (4) Annual maintenance frequency similar to that of the equipment to be determined;

[0383] (5) The number of equipment that is similar to the equipment to be determined;

[0384] (6) Personnel establishment that is similar to the equipment to be determined;

[0385] Under normal circumstances, for pending equipment, there are very few similar systems that can be used as whole equipment. Even if they exist, the personnel types determined by using them directly as benchmark comparison systems are also very inaccurate. In this way, the pending equipment can be divided into sufficiently small local systems, and similar systems can be found for each local system within the scope of the entire equipment system local system. The personnel type status of each local system of the pending equipment can be determined based on the personnel type configuration status of the similar systems, and then a balance analysis can be performed to determine the overall personnel type status of the pending equipment. There is no clearly defined procedure for this method. As long as you follow its method and ideas, you can achieve the desired effect.

[0386] 4.2.2 Method for determining the number of personnel

[0387] There are many ways to estimate the number of maintenance personnel, depending on the characteristics of the equipment and the maintenance work. The main ones are as follows.

[0388] (1) Direct calculation method

[0389] The number of maintenance personnel required for each maintenance organization (level) is directly related to the workload of the maintenance equipment of the maintenance organization, and can be directly calculated from the man-hours required for each maintenance task, such as:

[0390]

[0391] In the formula, M is the number of maintenance personnel required by a maintenance organization (level);

[0392] R——The number of equipment models that a maintenance organization (level) is responsible for maintaining;

[0393] k j ——Number of maintenance work items for equipment of type j;

[0394] n j ——The number of equipment of type J that a maintenance organization (level) is responsible for maintaining;

[0395] f ji ——The average annual frequency of maintenance work item i for equipment of type j;

[0396] H ji ——Number of man-hours required to complete item i of maintenance work for equipment of type j;

[0397] H0——Number of maintenance hours required to be completed by each maintenance personnel per year;

[0398] η——Correction coefficient of maintenance workload. If the workload increased due to battle damage or the time occupied by sick leave and other non-maintenance work is taken into account, η>1.

[0399] In addition, the total maintenance workload of different professions can be calculated from the use and maintenance work analysis summary table, and the number of professionals can be roughly estimated according to formula (21).

[0400]

[0401] Where M i ——Number of professionals in category i;

[0402] T i ——The workload of the i-th category of professional maintenance of a single piece of equipment;

[0403] N——the total number of equipment that needs maintenance each year;

[0404] H d - working hours per person per day;

[0405] D y ——effective working days per year;

[0406] y i ——Attendance rate.

[0407] (2) Analytical calculation method

[0408] The main steps of the analytical calculation method are as follows:

[0409] a) Based on FMECA and RCMA analysis, determine the preventive maintenance and corrective maintenance work, and further determine all maintenance work to be implemented;

[0410] b) forecast the annual number of man-hours required for each task, including determining the frequency of maintenance tasks and the number of man-hours required to complete each maintenance task;

[0411] c) Determine the total number of personnel required based on the working hours spent on maintenance throughout the year.

[0412] The formula for predicting the total number of equipment maintenance personnel is as follows:

[0413]

[0414] Where:

[0415] M——total number of maintenance personnel;

[0416] T N ——(calendar days in a year - non-maintenance working days) × (daily working hours), also known as annual time base;

[0417] ε——Equipment planned repair downtime rate;

[0418] N——total number of equipment;

[0419] M H——The estimated number of maintenance work hours for each equipment each year (the maintenance work quota for each equipment).

[0420] After predicting the number of equipment maintenance personnel required, the analysis results should be compared with the professional staffing of troops with similar equipment, and corresponding adjustments should be made to preliminarily determine the number of each professional staff and correct it based on the equipment's deployment requirements and usage. Fig. 9 Flowchart for analysis to identify maintenance personnel.

[0421] It is worth noting that when determining the number of maintenance personnel and technical level requirements, it is necessary to control the excessive requirements for the number and skills of maintenance personnel. When there is a large gap between the number of personnel and technical level requirements and the actual number of personnel available, the equipment-related support issues should be influenced by developing easy-to-use support equipment and improving training methods to improve training effectiveness, so that the equipment is easy to operate and maintain, thereby reducing the maintenance workload and lowering the number and technical level requirements for maintenance personnel.

[0422] (3) Utilization rate calculation method

[0423] The name of the "utilization rate calculation method" comes from an indefinite parameter in the algorithm - the utilization rate per person per day. This algorithm is more scientific and closest to objective reality. The main source of information is the report of maintenance work analysis, in which the tasks and time that a repairman of a certain level of a certain profession should complete at a certain repair level can be retrieved.

[0424] a) Determine the total working hours of a repairman of a certain profession and grade at a certain repair level throughout the year

[0425] Step 1: Determine the number of repairs

[0426] After the maintenance work is merged and the maintenance interval is determined, the number of maintenance times at a certain repair level can be determined according to formula (23):

[0427] N a =N0T0 / T a (twenty three)

[0428] Where, a——repair level (such as minor repair, medium repair, etc.);

[0429] N0 – the total number of equipment (such as armored vehicles, aircraft, artillery, etc.) of a unit;

[0430] T0——the average number of motor hours consumed per vehicle (per aircraft, per artillery piece, etc.) per year;

[0431] T a - the repair interval for a product at repair level a;

[0432] N a—Annual maintenance frequency of a product at repair level a;

[0433] Step 2: Determine the total working hours of a repairman of a certain level and profession in the last repair of a bicycle at a certain repair level

[0434]

[0435] In the formula, n is the number of products;

[0436] i——the i-th product;

[0437] t aijk ——Maintenance hours for a repairman of level k in the jth profession to repair the product at repair level a.

[0438] (Note: n represents the number of tasks that a repairman of a certain profession and level needs to complete at repair level a. For example, a repairman needs to repair the gearbox, gear transmission box, command the crane engine, etc. during minor repairs. The total number of these tasks is represented by n)

[0439] Step 3: Determine the total working hours of a repairman of a certain level and profession at a certain repair level throughout the year

[0440]

[0441] b) Determine the total number of repairmen at a certain repair level

[0442] Step 1: Determine the number of repairmen of a certain profession and grade at a certain repair level throughout the year

[0443]

[0444] Where, M is the number of working days in a year;

[0445] L – number of working hours per day;

[0446] ε——Time utilization rate per person per day.

[0447] Step 2: Determine the number of repairmen of a certain profession at a certain repair level throughout the year

[0448]

[0449] Where, p is the technical level of a certain profession.

[0450] Step 3: Determine the number of repairmen at a certain repair level throughout the year

[0451]

[0452] Where:

[0453] R a— the number of repairmen at repair level a;

[0454] w—indicates the professional number of this type of equipment;

[0455] λ1—trade-off coefficient (usually between 1 and 1.5). Since the amount of repair tasks varies each year, it can be determined based on the actual situation of medium or minor repairs each year;

[0456] λ2—trade-off coefficient (usually between 1 and 1.5). Since some corrective maintenance situations may also need to be dealt with during preventive maintenance, it should be determined according to the actual situation;

[0457] (4) Determination of wartime maintenance personnel requirements

[0458] When determining the number and technical level requirements of maintenance personnel during wartime, in order to meet the mobility requirements of battlefield repair organizations, maintenance professionals can be considered as mobile battlefield repair teams. Mobile teams usually participate in normal maintenance operations, but should receive regular battlefield repair training to achieve a combination of peacetime and wartime. The determination of the number and expertise of battlefield repair personnel must obtain necessary information from battle damage assessment analysis. Usually, battlefield repairs are estimated based on the number of damaged equipment that can be repaired by mobile maintenance teams every day and night. The degree of damage to equipment can be divided into four levels, namely minor damage, moderate damage, severe damage and scrap. Each level specifies the items of damage and the scope of damage. The estimation formula for the number of mobile teams (G) is as follows

[0459]

[0460] Where, N is the total number of equipment;

[0461] α——combat participation rate;

[0462] β i ——Level I casualty ratio per day and night;

[0463] n i ——The number of equipment with level i damage that can be repaired by the mobile repair team every day and night.

[0464] The required data can be obtained from battle damage assessment or simulation test as well as analysis of relevant historical data (such as minor damage n 轻 =2~3; medium damage n 中 =1).

[0465] 5. Constructing a decision model and method for optimizing equipment support

[0466] Although there is no recognized and mature method to calculate the types and quantities of support equipment, it is usually determined by analogy and estimation methods used in engineering.

[0467] Equipment support equipment refers to the general term for various machines, electrical appliances, instruments, etc. required for equipment maintenance. Generally, it includes disassembly and maintenance tools, test instruments, diagnostic equipment, cutting machines and welding equipment, and repair process devices. In addition, some maintenance and repair engineering vehicles, towing vehicles, machining vehicles and other mobile maintenance engineering vehicles also belong to maintenance support equipment. Maintenance equipment is an important part of maintenance support resources. During the equipment life cycle, it must be considered and planned early, and supplemented and improved in time during the use stage.

[0468] There are many ways to classify maintenance equipment. According to its use, maintenance equipment can be divided into repair equipment and tools, measurement and calibration equipment, test, measurement and diagnostic equipment, experimental equipment, handling equipment, training equipment, etc. The most common classification method is to divide it into general equipment and special equipment according to the versatility of the equipment. General equipment refers to maintenance equipment that is generally widely used and has multiple uses, which can be classified as general maintenance equipment. For example: hand tools, compressors, hydraulic cranes, oscilloscopes, voltmeters, etc. Special equipment refers to equipment specially developed for a certain equipment to perform a specific maintenance function, which can be classified as special equipment. For example, electronic testing equipment developed to monitor the function of a certain component on a certain type of equipment. Special equipment should be developed and purchased at the same time as the equipment.

[0469] 5.1 Factors to be considered in determining equipment maintenance and support equipment

[0470] Experience has shown that due to improper determination of maintenance equipment, some equipment has been idle for a long time, and some equipment is seriously insufficient, which has a direct impact on the use and maintenance of the equipment, and seriously affects the mobility and support capabilities of the support system. Therefore, the correct and reasonable selection of maintenance equipment is the first link in the equipment management work of support resources. This must be strictly controlled to select maintenance equipment that is technologically advanced, economically cost-effective, and practical in work and matches the equipment. When determining maintenance equipment, the following factors should be considered:

[0471] ① Based on the number of equipment to be maintained and the mission time, the random arrival rate and number of equipment to be repaired are estimated;

[0472] ② Repair time (including inspection time) or average repair time of equipment;

[0473] ③ Ensure the design characteristics of the equipment, including reliability, maintainability, test and installation time, ease of operation and utilization, in addition to mission functions and performance;

[0474] ④ Work and environmental factors, including the length of the workday, staff efficiency, and human-related environmental factors such as temperature and noise;

[0475] ⑤ Consider the setting of each maintenance level and its division of tasks. Based on the results of the use and maintenance task analysis and the maintenance level analysis, comprehensively consider each maintenance level and maintenance task. Make a comprehensive balance of the types of items to be repaired at each level, the test functions to be completed, the expected workload and equipment utilization. Priority should be given to the use of the troops' existing maintenance equipment; when the number, functions and performance of the existing equipment cannot meet the equipment maintenance needs, consider supplementing maintenance equipment;

[0476] ⑥ The variety and quantity of special equipment should be reduced to a minimum. When planning maintenance equipment in equipment configuration, general maintenance equipment should be given priority, especially homemade products or commercially available goods, provided that the maintenance requirements are met;

[0477] ⑦ Comprehensively consider the applicability, effectiveness, economy and the guarantee of the equipment itself;

[0478] ⑧ Equipment (tools) at the grassroots and relay levels should emphasize standardization, generalization, serialization, integration and miniaturization. On the basis of meeting functional and performance requirements, they should be simple, flexible, lightweight, easy to maintain, and easy to transport and carry.

[0479] 5.2 Main tasks for determining equipment maintenance requirements

[0480] By applying the supportability analysis and referring to the existing equipment technical operation data and the daily or selected equipment maintenance support plan, the specific requirements of the maintenance equipment can be determined according to the maintenance work to be completed at each maintenance level, and the maintenance capabilities of each maintenance level can be evaluated accordingly. When analyzing each maintenance work, it is necessary to provide the demand data on the type and quantity of maintenance equipment to support the work, and use these data to determine the total demand for maintenance equipment required at each maintenance level. The maintenance equipment required at the grassroots level should be less than that at the relay level, otherwise the maintenance tasks need to be reallocated. When weighing the costs, if it is necessary to equip very expensive maintenance equipment, careful research should be conducted, and cheap substitutes should be sought as much as possible, and even the support plan can be modified if necessary. According to the relationship between the maintenance work and the support equipment determined in the supportability analysis, the functional requirements of the support equipment and the parameter description of the unit under test, and referring to the number of equipment deployed and the annual use time, the types and quantities of support equipment required at each maintenance level can be determined. It should be noted that the basic principle of selecting support equipment is to give priority to general support equipment, followed by special support equipment; and the support equipment is determined in the order of existing support equipment, partial modification of existing support equipment, continued use of shelf products, modification of shelf products, and newly developed support equipment. Before determining the maintenance equipment, it is necessary to demonstrate and determine the combat and technical requirements including reliability and maintainability, formulate a complete plan, explain the work to be done, strictly implement the prescribed operating procedures, clarify the interface with related professional work, and make arrangements for costs and progress. The implementation of the plan for determining the type and quantity of support equipment ensures the implementation of the determined maintenance equipment requirements. Fig.10 The process of determining the demand for maintenance support equipment is given.

[0481] The types, performance, and quantity of equipment equipped by maintenance organizations at all levels must be compatible with the technology used in equipment maintenance and the amount of maintenance tasks, and must match the technical level of maintenance personnel. The types and quantities of equipment equipped must not only ensure the completion of maintenance tasks, but also take into account the utilization and economy of the equipment. The requirements for equipment put forward by the security analysis are an important basis for determining the equipment to be equipped. In actual work, the number of equipment equipped can be calculated according to the given maintenance task volume and maintenance man-hour quota. During the equipment use stage, the performance (including reliability) and completeness of the maintenance equipment must be tested in maintenance practice, and improvements and supplements must be made as needed. Such improvements and supplements must also follow the above process.

[0482] 5.3 Method for determining equipment maintenance equipment type

[0483] Based on the equipment maintenance work type, maintenance timing, maintenance level, and maintenance environment determined by the supportability analysis results, and referring to the equipment daily maintenance equipment requirements and the maintenance equipment requirements of similar equipment, a preliminary list of maintenance support equipment required for the equipment can be determined. In determining the preliminary list of maintenance equipment, a variety of methods can be used to assist. Since there are relatively few factors to consider in determining the type of maintenance equipment, and there are a large number of similar equipment to refer to, the procedures of the auxiliary methods used are mostly not complicated, and the expert scoring method is mainly used.

[0484] As a qualitative analysis method, the expert scoring method is extremely effective in the preliminary determination of the list of types of maintenance support resources. This method is based on the determination of the types of preventive maintenance and corrective maintenance work, maintenance intervals, and the merging of maintenance work through support analysis. Experts who have accumulated rich experience in design, testing, production, use, and maintenance in equipment development, use, and maintenance are invited to score the types of resources that may be used in maintenance work. Decision makers conduct weighted analysis based on the weights of each expert, and finally determine a preliminary list of resource types based on the score ratio. It is very simple to use an expert system to determine the types of maintenance equipment. All possible maintenance equipment options are listed, and an evaluation team composed of experts gives them scores. Each single equipment is summarized according to the weight coefficient of each expert. According to the score, while weighing the funding needs, the required maintenance equipment can be selected.

[0485] When the experts in the evaluation team have finished scoring, they are summarized and the overall expert evaluation score of a certain equipment is calculated using the following formula:

[0486]

[0487] Where, M is the overall expert evaluation score of a certain equipment;

[0488] β i ——The weight coefficient of the i-th expert;

[0489] p i ——The evaluation score of the equipment by the ith expert;

[0490] n——the total number of experts in the assessment team.

[0491] List the maintenance equipment, compare the size of M, and determine the preliminary list of maintenance equipment through trade-off analysis. Next, screen, merge, and synthesize the preliminary list of maintenance equipment, and determine the final list of maintenance support equipment based on the following work:

[0492] ① Analyze each support equipment one by one and consider its necessity in maintenance. If it is dispensable, refer to the following points to determine whether to delete it;

[0493] ② Analyze the feasibility of technical implementation of the guarantee equipment;

[0494] ③ Conduct cost analysis on security equipment and determine the benefits of equipping the security equipment;

[0495] ④ Combine the same items proposed by the same system in various analyses;

[0496] ⑤Synthesize the same or similar items proposed by different systems in various analyses;

[0497] ⑥ Analyze whether the proposed support equipment meets the combat and technical index requirements proposed by the user.

[0498] 5.4 Method for determining the number of equipment maintenance equipment

[0499] 5.4.1 Direct calculation method

[0500] This method directly determines the equipment demand based on the equipment hourly quota. d , and its calculation formula is:

[0501]

[0502] Where, N is the total number of equipment under maintenance;

[0503] t F - the standard number of working hours for a certain equipment required to repair a piece of equipment;

[0504] T E ——The effective working time of each maintenance equipment throughout the year, T E =T N (1-ε).

[0505] Among them, T N The working time available for maintenance in the whole year = (calendar days in the whole year - holidays in the whole year - non-maintenance working days in the whole year) × (one day and night working time). Non-maintenance working days refer to the time used for military, political and business learning and other activities; ε is the equipment planned repair downtime rate.

[0506] 5.4.2 Proportional Matching Method

[0507] This method uses the average working time of maintenance support equipment to match its quantity. The principle is that in order for the equipment to achieve a certain success probability, its maintenance work must be completed within a certain period of time. Therefore, if the average maintenance time of a maintenance equipment is known and cannot meet the requirements, maintenance support equipment must be added to reduce the downtime of the equipment. Let λ be the equipment failure rate, and the probability of requiring maintenance support equipment maintenance in the time interval [0, t] is:

[0508] F(t)=1=e -λt

[0509] Assuming that the maintenance time of the maintenance equipment follows an exponential distribution and μ is the average repair rate, the probability of completing the maintenance work within the time interval [0, t] is:

[0510] M(t)=1-e -u.t

[0511] Assuming that we require the probability of the equipment remaining intact to be P0, then:

[0512] e -λt =P0

[0513] From this formula, we can calculate a time t, which means that the probability that the equipment remains intact during the time period [0, t] is P0.

[0514] Now we require that the probability of equipment repair in the time period [0, t] is P1, and we need n pieces of maintenance equipment to achieve this probability:

[0515]

[0516] Therefore, continuous iterative calculations can be used to eventually calculate the appropriate number n of maintenance and support equipment.

[0517] 5.4.3 Queuing Theory

[0518] The maintenance process of maintenance support equipment can be regarded as a random service system (queuing system), with the support equipment as the service provider and the maintenance items as the customers. According to the supportability analysis requirements, the downtime of the equipment has a certain time limit. Therefore, in order to consider that the downtime does not exceed a certain specified time limit, the queuing theory can be used to determine the number of maintenance equipment.

[0519] Assuming that the process of equipment needing to use maintenance equipment follows an exponential distribution, the time interval for the use of maintenance equipment (the time interval between two customers arriving one after another) follows an exponential distribution. Let the average time interval for the use of maintenance equipment (the average time interval between two customers arriving one after another) MT = 1 / λ, and the probability of using maintenance equipment (the probability of a customer arriving) in the time interval [0, t] is:

[0520] F(t)=1-e -λt

[0521] Assuming that the faulty equipment can be queued in time when it needs repair, the use process of the repair equipment meets the following three conditions:

[0522] ① The number of equipment requiring maintenance (customer arrivals) in non-overlapping intervals is independent of each other;

[0523] ② For sufficiently small time Δt, the probability that one item needs to use maintenance equipment (customer arrival) in the interval (t, t+Δt) is independent of t and is approximately proportional to Δt;

[0524] ③For sufficiently small time Δt, the probability that two or more items require maintenance equipment (customer arrival) is negligible compared to the probability of one.

[0525] Therefore, the process of equipment maintenance (customer arrival) can be regarded as a Poisson process. The probability that there are n items that need maintenance (arriving customers) within time t follows the Poisson distribution:

[0526]

[0527] Generally, we believe that the service time (service time) of maintenance equipment follows an exponential distribution, and the average maintenance time MTTR = 1 / μ, where μ is the average repair rate (average service rate). The probability of repair (the probability of completing the service) within the time interval [0, t] is:

[0528] M(t)=1-e -μ.t

[0529] According to Kendall-Lee's classification method, the equipment maintenance process is a queuing system that can be expressed as follows:

[0530] (M / M / C):

[0531] It indicates that the equipment needs maintenance (customer arrival) is a Poisson process, the maintenance time (service time) follows an exponential distribution, there are C maintenance equipment (service desks); random service, the number of equipment that needs maintenance (system customer capacity) is unlimited, and the number of maintenance times (customer sources) is unlimited in the queuing system.

[0532] The average utilization rate (service intensity) of the maintenance support equipment of this system is:

[0533]

[0534] In the formula, λ is the maintenance rate (customer arrival rate);

[0535] μ——repair rate (service rate).

[0536] According to the transformation, the operating indicators of the system can be determined:

[0537]

[0538] In the formula, λ is the maintenance rate (customer arrival rate);

[0539] μ——repair rate (service rate);

[0540] C——Number of maintenance and support equipment (number of service units).

[0541] Average number of items awaiting maintenance:

[0542]

[0543] Average waiting time for maintenance (queue time):

[0544]

[0545] In the formula, λ is the maintenance rate (customer arrival rate);

[0546] Lq - the average number of defective parts waiting to be repaired.

[0547] Average downtime (the time customers spend in the system):

[0548]

[0549] Where, Wq is the average waiting time for repair (queue time);

[0550] μ—Repair rate (service rate).

[0551] According to the calculation method of the above operating indicators, we can completely deduce the number of maintenance equipment (service stations) required through known conditions:

[0552] (1) Given the equipment maintenance rate, average maintenance time, and operational downtime requirement, these conditions can be substituted into formula (32) to calculate the minimum number of maintenance equipment required;

[0553] (2) Given the equipment maintenance rate, average maintenance time, and operational requirement that the waiting time for repairs should not exceed TD, substituting these conditions into formula (31), the minimum number of maintenance equipment required can be calculated;

[0554] (3) Given the equipment maintenance rate and average maintenance time, how to equip maintenance equipment in an economical and reasonable way? From the perspective of combat requirements, the more maintenance equipment there is, the fewer equipment waiting for maintenance, the shorter the average waiting time for maintenance, and the better the combat effect; however, when the number of maintenance equipment increases to a certain level, there may be a waste of idle time for maintenance equipment. We believe that the ideal configuration is when the number of equipment waiting for maintenance C (including equipment being repaired) is exactly equal to the captain. Substituting these conditions into formula (30), the optimal number of maintenance equipment can be simulated.

[0555] 5.4.4 Genetic Algorithm

[0556] After the equipment maintenance and support simulation is realized, when only the changes in equipment plans are considered, each plan corresponds to an equipment performance value: task completion rate, usage availability, equipment satisfaction rate, etc., and the constraint is equipment utilization. At this time, the equipment optimization problem can be transformed into an optimization problem. When solving large-scale scheduling optimization problems, the efficiency of traditional exact solution algorithms is often very low, and genetic algorithms can be used to solve this problem.

[0557] (1) Algorithm Introduction

[0558] The idea of ​​Genetic Algorithm (GA) was first proposed by American scholar John Holland. It is inspired by the idea of ​​"survival of the fittest" in Darwin's theory of evolution and biological genetics, combining system science with biology and using computer programming to implement an intelligent optimization algorithm. Since the 1990s, more and more scholars have successfully used genetic algorithms to solve optimization problems in various fields, such as workshop scheduling, project scheduling, path planning, image processing, and data mining.

[0559] Genetic algorithms simulate the process of biological population evolution and contain many terms related to biological evolution theory. The following is a brief description of the relevant concepts:

[0560] Individual: Simulates a specific biological individual, which is a point in the algorithm solution domain, that is, a possible solution to the problem to be optimized, and is the specific object of algorithm optimization.

[0561] Population: Simulates biological groups in nature. A population contains multiple individuals, which is equivalent to a solution set. The population size is the total number of individuals in the population.

[0562] Chromosome: simulates the chromosome of an organism. A chromosome is an arrangement of genes. Generally, a chromosome represents an individual, called a genotype individual. In genetic algorithms, chromosomes are used to encode specific problems, usually represented by one-dimensional or multi-dimensional strings.

[0563] Gene: The basic unit that makes up chromosomes. Gene length refers to the number of consecutive genes on a certain segment of chromosome.

[0564] Fitness: simulates the degree of adaptability of organisms to the environment, used to compare the pros and cons of individuals. The higher the fitness value, the stronger the adaptability of the individual, that is, the higher the satisfaction of the solution. The fitness function is the functional relationship between the individual and the fitness value.

[0565] Selection: Selection refers to selecting a certain number of individuals from the current population to enter the next generation of the population according to pre-designed rules. Generally, individuals with larger fitness values ​​are retained because they carry more genetic information that is beneficial to evolution, but a small number of individuals with poorer fitness should also be retained to maintain the diversity of the population. Common selection strategies include: elite retention, roulette, and tournament strategies.

[0566] Crossover: Crossover refers to the process of randomly exchanging gene fragments of two chromosomes to generate new individuals. Its main purpose is to generate new candidate solutions and expand the search space of the algorithm. Crossover is the main way for genetic algorithms to conduct global searches. Common crossover strategies include single-point crossover, shuffle crossover, and uniform crossover.

[0567] Mutation: Mutation refers to the operation of randomly changing a gene fragment on a chromosome to generate a new individual. Its main purpose is to increase the difference between individuals. It is also the main means for genetic algorithms to jump out of the local optimal state. Common mutation operations include: binary mutation, differential mutation, and Gaussian mutation.

[0568] (2) Basic algorithm flow

[0569] like Fig.11 As shown in the figure, the genetic algorithm simulates the evolutionary process of survival of the fittest in nature through multiple rounds of iterations. Each iteration is a local search, and the entire iteration is the process of approaching the optimal solution through local search. The execution process is as follows:

[0570] First, it is necessary to design a chromosome encoding scheme and an objective function for the optimization problem; then, the initial population is generated in a random manner, thus entering the population iteration process: according to the pre-set stopping criteria, it is determined whether the convergence conditions of the algorithm are met. If not, a series of crossover and mutation operators are used to apply certain operations to the individuals in the population to generate new individuals; next, a certain number of new individuals are selected through the selection operator to replace the original old individuals, thereby obtaining a new generation of population and starting the fitness evaluation again; finally, the optimal solution is output when the termination conditions are met.

[0571] (3) Analysis of algorithm advantages and disadvantages

[0572] Genetic algorithms have the advantages of simple and easy-to-understand processes and high global search efficiency. They are an effective and easy-to-implement algorithm for solving optimization problems. However, the application of classical genetic algorithms in many practical problems is not very ideal. Due to the poor local optimization ability of the algorithm, it often reaches a convergence state very quickly, and has the disadvantage of being easily "premature".

[0573] In recent years, research has mostly used hybrid genetic algorithms to improve the shortcomings of genetic algorithms. The basic idea of ​​the hybrid genetic algorithm is to borrow ideas from other optimization algorithms to optimize local search strategies before selecting new individuals to enter the next generation of the population, so that new individuals move in the direction of the local optimum, or use other algorithms to increase the diversity of the population and expand the scope of the search.

[0574] In a hybrid genetic algorithm, the genetic algorithm generally dominates the global optimization process, while other algorithms improve the local search process. Through the complementarity of multiple optimization techniques, the hybrid genetic algorithm usually has more powerful performance than a single algorithm.

[0575] 5.4.5 Analogy

[0576] The analogy method can also be called the empirical method. Its basic idea is that analysts first select similar equipment to the newly developed equipment, and then determine the number of support equipment required for the newly developed equipment based on the support equipment matching of similar equipment. This method is simple, but the accuracy is not high, and it is currently more commonly used.

[0577] The matching ratio and matching principle are determined according to the organization of the troops, maintenance plan, and maintenance professional division. The matching ratio varies depending on the equipment. For example, the matching ratio of a certain ship type of equipment system is: 1:1; 1:4; 1:8; 1:24. This ratio can be changed. The so-called 1:4 means that 1 piece of support equipment is equipped for every 4 pieces of equipment.

[0578] The general principles for selecting the matching ratio are as follows:

[0579] (1) For equipment that is frequently used, half of the support equipment required before and after use or when it is deployed again shall be equipped at a ratio of 1:1. For equipment that is not frequently used, half of the support equipment required shall be equipped at a ratio of 1:4 or 1:8 depending on the situation.

[0580] (2) The support equipment commonly used by repair or specialized teams shall be equipped at a ratio of 1:4, and the support equipment not commonly used shall be equipped at a ratio of 1:8 or 1:24.

[0581] (3) Half of the support equipment used in non-normal situations is equipped at a ratio of 1:24.

[0582] It should be noted that the matching ratio is related to the number of equipment in each support unit. When different equipment is used, corresponding matching ratios and selection criteria should be formulated.

[0583] 6. Multi-objective optimization method for equipment maintenance support resources

[0584] 6.1 Multi-objective Particle Swarm Optimization Algorithm

[0585] 6.1.1 Mathematical Description of Optimization Problems

[0586] make represents the n-dimensional search space, let X = (x1, x2, ..., x n )∈S represents a decision vector, X∈[X min ,X max ] n represents the boundary constraint. Let F(X)=(f1(x),f2(x),...,f nf (x)) contains n f The objective vector of the objective function, taking minimization as an example, the multi-objective optimization problem can be described as:

[0587] min F(X)

[0588] X∈[X min ,X max ] n

[0589] It is difficult to optimize all objectives at the same time in multi-objective optimization. A solution may reduce other objectives while improving some objectives. Therefore, we need to find a Pareto solution, that is, not improving any objectives without reducing other objectives. There may be multiple Pareto solutions in multi-objective optimization problems. The following are some definitions of Pareto solutions:

[0590] Definition 1 (Domination) A decision vector X1 dominates a decision vector X2, denoted as X1 < X2, and satisfies the following two conditions:

[0591] (1) X1 is not inferior to X2 in all objectives, that is, f k (X1)≤f k (X2), k∈[1,n f ];

[0592] (2) X1 is strictly superior to X2 in at least one objective, that is, f k (X1)<f k (X2), k∈[1,n f ].

[0593] Definition 2 (Pareto Optimality) A decision vector X * is Pareto optimal, then there does not exist a decision variable X≠X * ∈S governs it, that is f k (X)<f k (X*), k∈[1,n f ].

[0594] Definition 3 (Pareto Optimal Set) All Pareto optimal decision vectors constitute the Pareto optimal set P*, that is,

[0595] Definition 4 (Pareto Optimal Frontier): The set of objective vectors (multiple objective functions) corresponding to all Pareto optimal solutions in the Pareto optimal set P*, that is, F * ={f = (f1 (x * ),f2(x * ),...,f nf (x * ))|X * ∈P *}.

[0596] Assume there are n types of equipment, m types of personnel, h types of equipment, and the unit price is c i , unit volume or weight is g i , then the decision vector (x1,...,x n ,x n+1 ,...,x n+m ,x n+m+1 ,...,x n+m+h ), and the following objective function:

[0597] Efficiency A=-f1(x i ), i∈[0,n+m+h], x i Is a positive integer; (regression equation, needs to be calculated)

[0598] Total cost (Total of unit price*quantity)

[0599] Equipment scale (Total of unit volume or weight*quantity)

[0600] Staff size (Total number of people)

[0601] Convert the problem to minF(X), F(X) = {f1(x), f2(x), f3(x), f4(x)}.

[0602] 6.1.2 Particle Swarm Optimization Algorithm

[0603] (1) Overview

[0604] Particle Swarm Optimization (PSO) was first proposed by Eberhart and Kennedy in 1995. Its basic concept originated from the study of bird flock foraging behavior. Imagine a scenario where a group of birds are randomly searching for food. There is only one piece of food in the area. All birds do not know where the food is, but they know how far away the food is from their current location. A simple and effective strategy is to search for the individual closest to the food in the flock. The PSO algorithm is inspired by this biological population behavior characteristic and is used to solve optimization problems.

[0605] Use a particle to simulate the above-mentioned bird individuals. Each particle can be regarded as a search individual in the n-dimensional search space. The current position of the particle corresponds to a candidate solution to the optimization problem. The flight process of the particle is the search process of the individual. The flight speed of the particle can be dynamically adjusted according to the historical optimal position of the particle and the historical optimal position of the population. Particles have only two properties: speed and position. Speed ​​represents the speed of movement, and position represents the direction of movement. The optimal solution searched by each particle individually is called the individual extreme value pbest, and the optimal individual extreme value in the particle group is used as the current global optimal solution gbest. Iterate continuously and update the speed and position until the termination condition is met.

[0606] The basic particle swarm optimization algorithm can be roughly divided into two categories: global particle swarm optimization algorithm and local particle swarm optimization algorithm. The former converges quickly but is prone to prematurely falling into the local optimum; the latter converges slowly but is more likely to find the global optimal solution. The following introduces the basic logic of finding Pareto solutions of the two algorithms in detail through the single objective minimization problem.

[0607] (2) Standard Particle Swarm Optimization Algorithm

[0608] Assuming the search space is n-dimensional, particle i tracks the two optimal positions and updates its own velocity V i =(v i1 , ..., v id , ..., v in ) and position X i =(x i1 , ..., x id , ..., x in ), one is the individual's historical optimal position pbest i =(p i1 , ..., p id , ..., p in ), and the other is the global historical optimal position gbest = (g1, ..., g d , ..., g n), the velocity update formula of particle i in the dth dimension at time t+1 is shown in formula (33):

[0609] V id (t+1)=ωV id (t)+C1random(0,1)(P id (t)-X id (t))+C2random(0,1)

[0610] (g d (t)-X id (t)) (33)

[0611] The position update formula is shown in formula (34):

[0612] X id (t+1)=X id (t)+V id (t+1) (34)

[0613] Among them, ω is called the inertia weight (an adjustable parameter in actual calculations), ω≥0, when its value is large, the global search capability is strong and the local search capability is weak; when its value is small, the global search capability is weak and the local search capability is strong; C1 and C2 are acceleration constants (generally 1.4995 or 2 in actual calculations); random(0,1) is a uniform random number; d=1,2,...,n represents the dimension of the particle velocity and position vectors; t represents the number of iterations (in actual calculations, the number of iterations t can be used as a condition for terminating the search, for example, setting t=1000 means stopping after 1000 searches).

[0614] Individual historical best position pbest i is the optimal position that particle i has experienced from the beginning to now. The mathematical expression of the individual historical optimal position at time t+1 is as follows:

[0615] if f(X i (t+1))≥f(pbest i (t)), pbest i (t+1)=pbest i (t)

[0616] If f(X i (t+1))<f(pbest i (t)), pbest i (t+1)=X i (t+1)

[0617] Among them, f is the fitness function (the objective function in actual calculation).

[0618] gbest is the best position experienced by all particles in the population so far, usually the individual best position. Assuming that the number of particles in the population is N, the global historical best position gbest(t) at time t is determined as follows:

[0619] f(gbest(t))=min{f(pbest1(t)), f(pbest2(t)),...f(pbestN(t))}

[0620] The algorithm steps are as follows:

[0621] Create a population of N particles and randomly generate the initial decision vector and initial velocity;

[0622] for each particle i=1,2,...N do

[0623] if f(X i (t+1))<f i (pbest i (t))then% Individual optimal position setting

[0624] pbest i (t+1)=X i (t+1);

[0625] end

[0626] if f i (pbest i (t+1))<f(gbest(t))then%Global optimal position setting

[0627] gbest(t+1)=pbest i (t+1);

[0628] end

[0629] end

[0630] for each particle i=1,2,...N do

[0631] Update the particle velocity using equation (33);

[0632] Update the particle position using equation (34);

[0633] end

[0634] until the termination condition is met

[0635] (3) Local Particle Swarm Optimization Algorithm

[0636] The difference between the local particle swarm optimization algorithm and the global optimization algorithm is that each particle needs to determine a local neighborhood, and information propagates within the neighborhood to reflect the local environment, thereby diversifying the search for the optimal direction and avoiding premature maturity and falling into the local optimum. When selecting the neighborhood, the particle is better to select the strategy according to the number. First, this strategy does not need to calculate the distance between two points in space, which helps to simplify the algorithm. Second, it does not need to consider the current position of the particle in the population, which is more conducive to the transmission of useful information. Third, the neighborhoods overlap with each other, which helps to share information between small neighborhoods.

[0637] Assuming the search space is n-dimensional, particle i tracks the individual historical optimal position pbest i =(p i1 , ..., p id , ..., p in ), instead of tracking the global best historical position, the second is to track the best position in the neighborhood, that is, the local best historical position lbest i =(l i1 , ..., l id , ..., l in ), the velocity update formula of particle i at time t is shown in formula (35):

[0638] V id (t+1)=ωV id (t)+C1random(0,1)(P id (t)-X id (t))+C2random(0,1)

[0639] (l id (t)-X id (t)) (35)

[0640] The particle position update formula is shown in formula (36):

[0641] X id (t+1)=X id (t)+V id (t+1) (36)

[0642] In order to better explain the neighborhood and local optimality, the ring neighborhood topology is selected as the research object. According to the particle numbering strategy, the above assumes that the number of particles in the population is N and the dimension of the decision vector is n (that is, the number of initial decision vectors is N and the dimension of the decision vector is n). Then the particles in the ring neighborhood topology can choose 2n particles in their neighborhood. N When n directly adjacent particles communicate, N = 1, the particle is connected to its left and right adjacent particles. N When =N-1, a fully interconnected structure is formed.

[0643] Local optimal position lbest i is the particle in its neighborhood N i The optimal position among all particles in is determined as follows:

[0644]

[0645] in n N i is half the number of particles in the neighborhood of particle i.

[0646] The algorithm steps are as follows:

[0647] Create a population of N particles and randomly generate the initial decision vector and initial velocity:

[0648] repeat

[0649] for each particle i=1,2,...N do

[0650] if f(X i (t+1))<f i (pbest i (t))then% Individual optimal position setting

[0651] pbest i (t+1)=X i (t+1);

[0652] end

[0653] if f i (pbest i (t+1))<f i (lbest i (t))then%Neighborhood optimal position setting

[0654] lbest i (t+1)=pbest i (t+1);

[0655] end

[0656] end

[0657] for each particle i=1,2,...N do

[0658] Update the particle velocity using equation (35);

[0659] Update the particle position using equation (36);

[0660] end

[0661] until the termination condition is met

[0662] (4) Multi-objective particle swarm optimization algorithm

[0663] The main task of multi-objective optimization is to find the Pareto optimal set. Usually three goals need to be achieved: ① maximize the number of Pareto optimal solutions and maintain the non-dominated solutions that have been found; ② minimize the distance between the non-dominated solution and the Pareto frontier; ③ maximize the distribution of solutions, and then obtain a Pareto solution vector that is as smooth and evenly distributed as possible. There are two difficulties: ① how to maintain the non-dominated solutions that have been found; ② how to select a guide to guide the particles to fly to the Pareto front.

[0664] Maintenance of external archives: For the difficult point ①, external archives are used to store the global optimal position and the local optimal position. Two types of solutions are allowed to enter: ① solutions that are not dominated by any member in the external archive; ② solutions that dominate some members of the external archive (in this case, the dominated solution will be deleted from the external archive). The external archive truncation method is used to improve the diversity of solutions while controlling the size.

[0665] Global guide selection: The global guide selection of the multi-objective particle swarm optimization algorithm should ensure the diversity of solutions and converge as quickly as possible, while improving the global and local search capabilities. The overall idea is to evaluate the individual density of particles in the external archive and select the solution in the relatively sparse area as the global guide. Let L be the maximum diagonal length of the search space, N is the population size, n is the decision vector dimension, x is the number of nodes, and n is the number of nodes. id represents the d-dimensional coordinate value of the ith particle, x d ' represents the mean value of the d-dimensional coordinates of all particles, and the average particle distance is defined as follows:

[0666]

[0667] D(t) expresses the degree of distribution dispersion among individuals in a population. The smaller the value, the worse the diversity.

[0668] Inertia weight selection: The inertia weight ω is adaptively adjusted using the following formula, that is, the population diversity information is used as a guiding factor, and ω is adjusted nonlinearly as the population diversity changes:

[0669]

[0670] The inertia weight adjustment curve is as follows: Fig.12 As shown in Figure 2, reasonable adjustment of the inertia weight can better balance the convergence speed and solution diversity.

[0671] The general process of the multi-objective particle swarm optimization algorithm is as follows:

[0672] Initialize particle positions (usually randomly generated with uniform distribution);

[0673] Calculate the fitness value (generally the objective function value - the object of optimization);

[0674] Initialize the historical optimal pbest to itself and find the global optimal gbest;

[0675] Update the position and speed according to the position and speed formula;

[0676] Recalculate fitness;

[0677] Update the historical optimal pbest and the global optimal gbest according to the fitness;

[0678] The algorithm exits when convergence or the maximum number of iterations is reached.

[0679] a) Initialize the group and Archive set

[0680] Assign initial values ​​to the parameters, generate the initial population P1, and copy the non-inferior solutions in P1 to the Archive set to obtain A1. Let the current evolutionary generation be t, and complete the contents of b) to d) when t is less than the total evolutionary generation.

[0681] b) Evolution produces the next generation of population

[0682] Assume that the currently evolving particle j completes ① to ③ when j is smaller than the group size.

[0683] ① Calculate the density information of particles in the Archive

[0684] The target space is divided into small areas by grids, and the number of particles contained in each area is used as the density information of the particles. The more particles a particle contains in the grid, the greater its density value, and vice versa. Taking the two-dimensional target space minimization optimization problem as an example, the specific implementation process of the density information estimation algorithm is as follows:

[0685] Step 1 Calculate the boundary of the target space at generation t (minF1 t ,maxF1 t ) and (minF2 t ,maxF2 t );

[0686] Step 2 Calculate the modulus of the grid:

[0687]

[0688] Step 3 Traverse A t For the particles in the set, calculate the number of the grid where they are located;

[0689] For particle i, the grid number where it is located consists of the following two parts:

[0690]

[0691] Step 4 Calculate the grid information and the density estimation value of the particles.

[0692] Among them, G = M × M is the number of grids to be divided in the target space, Int() is the rounding function, and F1 t and F2 t are the objective function values of particle i.

[0693] ② For the particle Pj,t in the population, select its gBest particle gj,t in At. The mass of the gj,t particle determines the convergence performance of the MOPSO algorithm and the diversity of the non-dominated solution set. The selection basis is the density information of the particles in the Archive set. Specifically, for the particles in the Archive, the lower their density value, the greater the selection probability, and vice versa; use the number of particles in the Archive set that are superior to the particles in the population to evaluate its search potential. The more particles in the Archive set that are superior to the particles in the population, the stronger its search potential, and vice versa. The specific implementation of the algorithm is as follows:

[0694] Step l Calculate A t In which, due to P j,t the particle set A j

[0695] FOR k = 1 TO 丨A t 丨

[0696] A j = A j + {A k,t 丨A k,t CP j,t , A k,t ∈ A t}

[0697] NEXT

[0698] Step 2 Calculate the particle set G with the minimum density in A j j

[0699] G j = min{Density(A k ), k = 1, 2,..., |A j |, A k ∈ Aj}

[0700] Step 3 IF 丨G j 丨>1 THEN g j,t =Rand{G j ,t}

[0701] Among them, |A t | represents the number of particles contained in A t ; A j is used to store the members in A t that are better than particle P j,t ; the particle with the smallest density in A j is stored in G j ; Density(A k ) calculates the density estimate value of particle Ak; Rand{G j ,t} represents randomly selecting a member from G j ,t.

[0702] ③ Update the positions and velocities of the particles in the population. The particles in the population search for the optimal solution under the guidance of gBest and pBest. The specific implementation of the algorithm is as follows:

[0703] D is the dimension of the decision variable; Rand() is to generate a random number, w is the inertia weight; c1, c2 are learning factors; x is the contraction factor, R1, R2 are random numbers between [0,1]; p l j,t and g l j,t are the i-th decision component values of pBest and gBest of particle j. After evolving to obtain a new generation of population P t+1 , the non-dominated solutions in P t+1 are saved to the Archive set. The specific implementation of the algorithm is as follows:

[0704]

[0705] FOR k = 1 TO 丨P t+1 丨

[0706] A t+1 =A t+1 +{P t,t+1 |P k,t+1 <P i,t+1 OR P k,t+1 ~P i,t+1 , i = 1,2,...,|P t+1 |, i≠k}

[0707] NEXT

[0708] ELSE

[0709] FOR k = 1 TO |P| t+1 |

[0710] A t+1 = A t+1 + {P k,t+1 |P k,t+1 <A i,t OR P k,t+1 ~A i,t , i = 1, 2,..., |P| t+1 , i ≠ k}

[0711] NEXT

[0712] END IF

[0713] Among them, P k,t+1 represents the k-th particle in P. When the Archive set is an empty set, directly copy the non-dominated solutions in P to the Archive set; when the Archive set is not empty, as long as the particle in P t+1 is superior to or independent of a certain particle in the Archive set, then insert this particle into the Archive set. t+1 t+1

[0714] c) Truncation operation of the Archive set

[0715] When the number of particles in the Archive set exceeds the specified size, it is necessary to delete the redundant individuals to maintain the stable size of the Archive set. For grid k with more than 1 particle, calculate the number of particles PN to be deleted in this grid according to the following formula, and then randomly delete PN particles in grid k.

[0716]

[0717] Among them, Grid[k] represents the number of particles contained in grid k.

[0718] d) Output the particle information in the Archive set. Check the result, and exit the algorithm if it converges or reaches the maximum number of iterations.

[0719] 6.2 Heuristic Search-based Marginal Optimization Algorithm for Maintenance Support Resources

[0720] 6.2.1 Optimization Principle

[0721] ​​By giving input plans (equipment plans, personnel and equipment plans, equipment unit prices, resources, etc.), the maintenance support simulation evaluation algorithm model is executed to obtain output reports on five indicators, including task completion rate, equipment availability, spare parts satisfaction rate, resource satisfaction rate, and overall cost. Combined with the constructed objective function, the pros and cons of the plans are evaluated, and an automatic optimization algorithm is used according to the pros and cons results to automatically adjust the input plans until the optimal solution is obtained. Fig.13 The basic principle of maintenance support resource marginal optimization algorithm is given.

[0722] In the optimization decision of maintenance support resources, it is necessary to be able to process no less than 2,000 types of equipment, no less than 20 storage sites, and no less than 200 types of resources at the same time. Combined with the research on the existing mainstream equipment optimization algorithms and the actual characteristics and needs of the project, and in-depth understanding of the characteristics of the maintenance support resource evaluation model, the preliminary analysis shows that the traditional marginal optimization algorithm cannot be directly applied to the current application scenario, but its core idea is of reference significance. On this basis, combined with the respective characteristics of the maintenance support resource optimization decision software and the marginal optimization algorithm, an improved marginal optimization algorithm with heuristic search is proposed, which can fully utilize the performance evaluation function of the maintenance support resource optimization simulation software and the advantages of the marginal optimization algorithm in equipment optimization, and can largely avoid the shortcomings of the traditional marginal optimization algorithm with large computational complexity and low computational efficiency.

[0723] 6.2.2 Algorithm Idea

[0724] The maintenance support resource optimization problem belongs to the MOP problem, which requires that under the premise of meeting the cost constraint, the equipment plan and personnel equipment plan should be arranged to maximize the task completion rate, equipment availability, equipment satisfaction rate, resource utilization rate, and minimize the overall equipment cost. Its conceptual mathematical model can be expressed as:

[0725] Min.f(X)=(1-f19X),1-f2(X),1-f3(X),1-f4(X),f5(X))

[0726] stT≤Tmax

[0727] Min. is the objective function to be optimized, X represents the input variable to be optimized, and st represents the cost constraint, that is, the overall cost T cannot exceed the cost limit Tmax.

[0728] Task completion rate ≥ M (specified value)

[0729] Equipment availability ≥ A0 (specified value)

[0730] Equipment satisfaction rate ≥ F (specified value)

[0731] Resource utilization ≥ U (specified value)

[0732] 6.2.3 Pareto Optimal Solutions

[0733] As Fig.14 shown in the example of the optimization problem, for the MOP problem, the objective functions f1 and f2 are conflicting. Since A1 < B1 and A2 > B2, that is to say, the improvement of one objective function requires the reduction of the other objective function as the price. The solutions A and B are called non-inferior solutions, or Pareto optimal solutions. The purpose of the multi-objective optimization algorithm is to find these Pareto optimal solutions.

[0734] For the MOP problem, there generally exist only satisfactory solutions or acceptable non-inferior solutions to the problem, which are called Pareto optimal solutions, and the number is often multiple. In fact, the Pareto optimal solutions are a set. When solving the MOP, all Pareto optimal solutions need to be found first, and then one or more solutions are selected from the Pareto optimal solution set as the optimal solutions to the MOP problem according to the objective strategy.

[0735] The concept of the optimal solution is defined as follows:

[0736] Definition 1 (dominance relationship in the decision space): Let p and q be any two different individuals in the evolutionary population Pop. When the following two conditions are satisfied, p is said to dominate q:

[0737] (1) For all sub-objectives, p is not worse than q, that is, f k (p) ≤ f k (q), (k = 1, 2,..., r);

[0738] (2) There is at least one sub-objective such that p is better than q. That is, there exists l ∈ {1, 2,..., r} such that f l (p) < f l (q);

[0739] Among them, r is the number of sub-objectives. It is said that p dominates q, that is, p is non-dominated and q is dominated, which can be expressed as p > q, where ">" means dominance.

[0740] Definition 2 (dominance relationship in the objective space): Let U = (u1, u2,..., u r ) and V = (v1, v2,..., v r ) be two vectors in the objective space. U is said to dominate V if and only if u k ≤ v k , (k = 1, 2,..., r), and there exists h ∈ {1, 2,..., r} such that u h < v h , which can be expressed as U > V.

[0741] Definition 3 (Pareto optimal solution): If X′=(x′1,x′2,…x′ n ) is a Pareto optimal solution (or non-inferior solution) if and only if there is no solution X″=(x″1,x″2,…,x″ n ), so that X″〉X′.

[0742] Definition 4 (Pareto optimal solution set): The set of all Pareto optimal solutions is called the Pareto optimal solution set (or non-inferior solution set), denoted by Ps.

[0743] The marginal optimization algorithm based on heuristic search is an improvement on the multi-objective optimization algorithm that achieves Pareto optimal solution based on marginal effect. On the basis of the principle of marginal optimization algorithm, it combines core indicators such as task completion rate, equipment availability, equipment satisfaction rate, and resource utilization rate to perform heuristic optimization on resource allocation methods.

[0744] 6.2.4 Algorithm Flow

[0745] The marginal optimization algorithm of maintenance support resources designs different processes for the following two situations: one is that the cost constraint is met; the other is that the cost constraint is exceeded and the core indicators do not meet the threshold requirements.

[0746] (1) Cost Constraint Satisfaction

[0747] When the cost constraints are met, a heuristic search is performed on the number of equipment and resources based on core indicators such as NBO and resource satisfaction rate.

[0748] Step 1: According to the remaining cost, sort the NBO and resource satisfaction rate to supplement the equipment and resource quantity. For example, if the current configuration plan cost is c1 and the cost constraint is C, then calculate the remaining available cost space remaining_c=C-c1, and sort the NBO of each equipment from high to low to get the sequence:

[0749] sort_descend[NBO1, NBO2, NBO3, ..., NBO n ]

[0750] Sort the satisfaction rate (1-NRW / NR) of each resource from low to high, or the shortage rate NRW / NR from high to low to get the sequence:

[0751] sort_descend[NRW / NR1, NRW / NR2, NRW / NR3, ..., NRW / NR n ]

[0752] In the order of NBO and NRW / NR from high to low, remain_c is replenished by adding 1 to the number of equipment in short supply one by one (the number of replenishments can be optimized according to the indicator mechanism) until the cost reaches the cost constraint;

[0753] Step 2: According to the adjusted input scheme, execute the evaluation calculation model in the maintenance support resource optimization decision software to obtain the output of the corresponding input scheme, and determine whether the five evaluation indicators of the output meet the requirements (or determine whether the number of iterations is met). If not, execute the next step, otherwise stop;

[0754] Step 3: Allocate the number of equipment and resources between sub-sites, the number of equipment with NBO index of 0, and the number of resources with shortage rate NRW / NR index of 0, and reduce the NBO of equipment and NRW / NR of 0 by 1 (the reduction can be optimized according to the indicator mechanism). For example, equipment A is configured among SIT1, SIT2, SIT3, and WORKSHOP. WORKSHOP is the parent node and the rest are child nodes. If the NBO of SIT1, SIT2, and SIT3 are all 0, but the NBO of WORKSHOP shows that equipment A is in short supply, then take out 1 equipment from each of the three sites SIT1, SIT2, and SIT3 and calculate the remaining available cost space remain_c_new at this time. According to step 1, the remaining available cost is reallocated to the equipment and resources with NBO and NRW / NR indexes from high to low, and then adjusted according to the next evaluation result, and go to step 2;

[0755] (2) Expenses exceed constraints and core indicators do not meet threshold requirements

[0756] When the cost constraint is exceeded and the core indicators do not meet the threshold requirements, heuristic replenishment of spare parts / resources is performed between the parent site and the child site.

[0757] Step 1: First, allocate the number of equipment and resources among the sub-sites, allocate the number of equipment with NBO index of 0 and the number of resources with shortage rate NRW / NR index of 0, and reduce the NBO of equipment and NRW / NR of resources with 0 by 1 (the reduction of the number can be optimized according to the indicator mechanism). For example, equipment A is allocated among SIT1, SIT2, SIT3, and WORKSHOP. WORKSHOP is the parent node and the rest are child nodes. If the NBO of SIT1, SIT2, and SIT3 are all 0, but the NBO of WORKSHOP shows that equipment A is in short supply, then take out 1 equipment from each of the three sites SIT1, SIT2, and SIT3 and calculate the remaining available cost space remaining_c_new at this time;

[0758] Step 2: Allocate costs among all sites. If the conditions are still not met after allocating the number of equipment among the sub-sites, then count all sites with NBO of 0 according to NBO. Each site reduces the configuration of one corresponding type of equipment / resource, which will generate cost space C_space. Then, according to the maintenance guarantee evaluation results, the cost space is reasonably allocated to the required sites. The allocation plan is shown in each step of 1. The specific process is as follows Fig.15 shown.

Claims

1. A multi-objective optimization method for equipment support decision-making based on a task unit decomposition model, which includes: First, a HCBD equipment simulation model is constructed for the HCBD equipment, wherein the HCBD equipment simulation model includes an equipment group model and an equipment model itself; the equipment group model includes: The combat unit model describes the name of the troop unit, the type of equipment deployed, the number of equipment, the tasks performed, and the deployment location; An equipment usage model, which describes the call and use requirements of equipment and communicates with the combat unit model according to the equipment requirements of basic tasks; The equipment model itself includes: Equipment model, which describes the basic properties of equipment, including: equipment code, equipment name, failure rate, unit price, weight, volume, and maintenance type; Component structure model, which describes the hierarchical relationship between equipment, the subordinate relationship between equipment and system, and the number of single machine installations. The same equipment may belong to different superior components or different systems. System model, which describes a system of equipment models. Usually, the system will not fail or be repaired directly, but the system will be repaired by repairing the underlying equipment; Equipment model, which describes the definition of the affiliation between systems, and the affiliation between systems and equipment models; Second, establish the HCBD equipment task unit decomposition model; it includes: Describe the typical mission process of the troops and break down the mission process into various stages of events from start to finish; In view of the events in each stage, the comprehensive functional decomposition technology is used to decompose and divide the equipment combat and training tasks; Based on the typical task process of the troops, a set of meta-tasks is established; the set is: MT={mt0,mt1,mt2,…,mt K }mt0where K is the number of meta-tasks in the set; Third, build an equipment support optimization decision-making model; Fourth, build a human resource optimization decision-making model for support personnel; Fifth, build a decision-making model for optimizing security equipment; Sixth, based on the HCBD equipment task unit decomposition model, the material support optimization decision model, the support personnel manpower optimization decision model, and the support equipment optimization decision model, a multi-objective particle swarm optimization algorithm or a maintenance support resource marginal optimization algorithm based on heuristic search is used to perform maintenance support simulation evaluation, and an output report including five indicators including task completion rate, equipment availability, spare parts satisfaction rate, resource satisfaction rate, and overall cost is obtained. Combined with the constructed objective function, the advantages and disadvantages of the maintenance support plan are evaluated.

2. The multi-objective optimization method according to claim 1, characterized in that: The equipment combat and training tasks are decomposed and divided into: combat scenarios, combat missions, subtasks, and metatasks; wherein the subtasks are intermediate task nodes in the mission decomposition process, which can be further decomposed into metatasks and subtasks; the metatasks are basic tasks, and their basic attributes include the capability requirements for task processing, the time requirements for task processing, the regional location of the task, and the priority of the task; the capability requirements of the metatasks can be described by vectors, and the metatasks are recorded as mt i The capacity requirement vector is RC i , then RC i =[rc0,rc1,rc2,…rc H ], where H is the capability dimension in the distributed combat system.

3. The multi-objective optimization method according to claim 1, characterized in that: The step of constructing the equipment support optimization decision model includes: determining the equipment support probability P and the availability of use, wherein: First, calculate the system's equipment security probability according to the following formula: Where: A o ——availability of use; T BF — mean time between failures; ——mean time to repair; T SR ——Average supply response time; P——Probability of equipment support; Determine the component equipment security probability P based on the system equipment security probability P i , according to the complexity and characteristics of the system, directly use the P value as P i Value, for P i If the values ​​are different, take P = min (P i ), i=1,2,3,…,q; Using component A oi Find the A of the system o , for the series system: Where: A o ——availability; q——number of equipment types; T BFi ——mean time between failures of the i-th component; ——average maintenance time of the i-th component; T SR ——Average supply response time; P i ——Probability of guarantee of the i-th equipment; Secondly, calculate the quantity of equipment required; Finally, control the equipment inventory.

4. The multi-objective optimization method according to claim 3, characterized in that: The calculation of the equipment demand quantity adopts an equipment optimization model based on a marginal optimization algorithm, which uses an inventory strategy of (S-1, S), and the availability calculation formula is as follows: Where, UTILF is the utilization rate of the system; EFRT is the effective failure rate; EPRT is the effective preventive maintenance rate, which indicates the frequency of preventive maintenance work on the system at the site (within each use time); MDTC is the mean corrective maintenance downtime, which is the average unavailability time of each system caused by corrective maintenance; MDTP – Mean downtime for preventive maintenance, which is the average unavailability time of each system due to preventive maintenance.

5. The multi-objective optimization method according to claim 1, characterized in that: The construction of the support personnel manpower optimization decision model includes: determining the basis of personnel demand, determining the personnel type, and determining the number of personnel; the step of determining the number of personnel includes: a) Based on FMECA and RCMA analysis, determine the preventive maintenance and corrective maintenance work, and further determine all maintenance work to be implemented; b) forecast the annual number of man-hours required for each task, including determining the frequency of maintenance tasks and the number of man-hours required to complete each maintenance task; c) Determine the total number of personnel required based on the working hours spent on maintenance throughout the year. The formula for predicting the total number of equipment maintenance personnel is as follows: Where: M——total number of maintenance personnel; T N ——(calendar days in a year - non-maintenance working days) × (daily working hours), also known as annual time base; ε——equipment planned repair downtime rate; N——total number of equipment; M H ——The estimated number of maintenance work hours per equipment per year (maintenance work hour quota for each equipment); After predicting the number of equipment maintenance personnel required, the analysis results should be compared with the professional staffing of troops with similar equipment, and corresponding adjustments should be made to preliminarily determine the number of each professional staff and correct it based on the equipment's deployment requirements and usage.

6. The multi-objective optimization method according to claim 1, characterized in that: The construction of the support equipment optimization decision model includes: determining the type of support equipment and the number of support equipment; the number of support equipment is determined by the proportional matching method: let λ be the equipment failure rate, and the probability of requiring maintenance of the support equipment in the time interval [0, t] is: F(t)=1-e -λt Assuming that the maintenance time of the maintenance equipment follows an exponential distribution and μ is the average repair rate, the probability of completing the maintenance work within the time interval [0, t] is: M(t)=1-e -u.t Assuming that the probability of the equipment remaining intact is P0, then: have been -λt =P0 From this formula, we can calculate a time t, which means the probability that the equipment remains intact in the time period [0, t] is P0; The probability of equipment repair within the time period [0, t] is required to be P1. The calculation of n pieces of maintenance equipment required to achieve this probability is: Therefore, continuous iterative calculations can be used to eventually calculate the appropriate number n of maintenance and support equipment.

7. The multi-objective optimization method according to claim 1, characterized in that: The steps of the multi-objective particle swarm optimization algorithm are as follows: initialize particle positions; calculate fitness values; initialize the historical optimal pbest as itself and find the global optimal gbest; update the position and speed according to the position and speed formulas; recalculate fitness; update the historical optimal pbest and the global optimal gbest according to the fitness; exit the calculation when convergence or the maximum number of iterations is reached.

8. The multi-objective optimization method according to claim 7, characterized in that: The multi-objective particle swarm optimization algorithm further comprises: Initialize the population and Archive set: assign initial values ​​to the parameters, generate the initial population P1, and copy the non-inferior solutions in P1 to the Archive set to obtain A1; Evolution produces the next generation of groups; Archive set truncation operation; Output the particle information in the Archive set; Check the particle information, and exit the calculation when convergence or the maximum number of iterations is reached; The step: the method of evolving the next generation population further comprises: Calculate the density information of particles in the Archive set; Based on the density information, the gBest particle gj,t is selected from At for the particle Pj,t in the group. The quality of the particle determines the convergence performance of the MOPSO algorithm and the diversity of the non-inferior solution set. For the particles in the Archive, the lower the density value, the greater the probability of selection, and vice versa. The number of particles in the Archive set that are better than the number of particles in the group is used to evaluate its search potential. The more particles that are better than the number of particles in the group, the stronger its search potential, and vice versa. Update the position and velocity of particles in the group. The particles in the group search for the optimal solution under the guidance of gBest and pBest.

9. The multi-objective optimization method according to claim 1, characterized in that: The mathematical model corresponding to the maintenance support resource marginal optimization algorithm is: Min.f(X)=(1-f1(X),1-f2(X),1-f3(X),1-f4(X),f5(X)) stT≤Tmax Min. is the objective function to be optimized, X represents the input variable to be optimized, st represents the cost constraint, that is, the overall cost T cannot exceed the cost limit Tmax; task completion rate ≥ M; equipment availability ≥ A0; equipment satisfaction rate ≥ F; resource utilization rate ≥ U; f(x) is the objective function.

10. The multi-objective optimization method according to claim 1, characterized in that: The maintenance support resource marginal optimization algorithm performs the following steps under the condition of satisfying the cost constraint: Step 1: According to the remaining cost, calculate the remaining available cost space remaining_c=C-c1, and sort the NBO of each equipment from high to low to obtain a sequence: sort_descend[NBO1,NBO2,NBO3,......,NBO n ] Sort the satisfaction rate (1-NRW / NR) of each resource from low to high, or the shortage rate NRW / NR from high to low to get the sequence: sort_descend[NRW / NR1,NRW / NR2,NRW / NR3,......,NRW / NR n ] In the order of NBO and NRW / NR from high to low, remain_c is replenished by adding 1 to the number of equipment in short supply one by one (the number of replenishments can be optimized according to the indicator mechanism) until the cost reaches the cost constraint; Step 2: According to the adjusted input scheme, execute the evaluation calculation model in the maintenance support resource optimization decision software to obtain the output of the corresponding input scheme, and determine whether the five evaluation indicators of the output meet the requirements or determine whether the number of iterations is met. If not, execute the next step, otherwise stop; Step 3: Allocate the number of equipment and resources between sub-sites, allocate the number of equipment with an NBO index of 0, and the number of resources with a shortage rate NRW / NR index of 0, and subtract 1 from the NBO of equipment and the NRW / NR of resources with a shortage rate of 0. According to step 1, reallocate the remaining available funds to the equipment and resources with NBO and NRW / NR indicators from high to low, and then adjust according to the next evaluation results and go to step 2.

Citation Information

Cited By

  • Estimation method and device of aerial material sharing cost

    CN117237027A

  • Multi-strategy improved distributed cross-domain collaborative task allocation optimization method

    CN119670987A

  • A multi-strategy improved distributed cross-domain collaborative task allocation optimization method

    CN119670987B

  • Equipment configuration optimization method

    CN120146325A