Substation system risk assessment method and device, electronic equipment and medium

By determining the evaluation indicators of substation nodes and establishing a probability model of attack susceptibility, the accuracy problem of risk assessment faced by the substation system is solved, and the accuracy of the assessment results and network security are improved.

CN118780592APending Publication Date: 2024-10-15GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410735863.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing technology makes it difficult to accurately assess the risks faced by substation systems, especially in terms of cyber attacks, which may lead to the expansion of major blackouts.

Method used

By determining the true value of the evaluation index of the substation node, an attack event susceptibility probability model is established, the attack event susceptibility probability of each node is calculated, and risk assessment is performed based on the importance ranking results, providing scientific basis to improve the accuracy of the assessment.

Benefits of technology

It achieves a quantitative evaluation of the importance of substation nodes, provides a scientific basis for substation system risk assessment, improves the accuracy of risk assessment results, and enhances network security defense capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780592A_ABST
    Figure CN118780592A_ABST
Patent Text Reader

Abstract

The invention discloses a substation system risk assessment method and device, electronic equipment and a storage medium. The method comprises the following steps: determining a true value of an evaluation index of each substation node in a substation system; establishing an attack event susceptibility probability model of the substation nodes, and calculating the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index; and according to the attack event susceptibility probability, carrying out importance ranking on each transformer substation node in the transformer substation system, determining an importance ranking result, and according to the importance ranking result, carrying out risk assessment on the transformer substation system. According to the technical scheme of the embodiment of the invention, quantitative evaluation of the importance of the substation nodes is realized, a scientific basis is provided for risk evaluation of a substation system, and the accuracy of a risk evaluation result is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a substation system risk assessment method, device, electronic equipment and storage medium. Background Art

[0002] The power system mainly includes the processes of power generation, transmission, distribution and consumption. Among them, substations, as places for power conversion and information aggregation, play an important role in the safety, stability and economic operation of power systems. In recent years, major power outages caused by cyber attacks have occurred frequently in foreign countries. The power information and physical security incidents caused by cyber attacks have caused serious economic losses and adverse social impacts. In a substation system, if an important substation is attacked by a cyber attack, the entire substation will lose pressure, further expanding the scope of the accident, which will cause a major power outage in the substation system. Therefore, a substation system risk assessment method is urgently needed to accurately assess the risks that substations may encounter. Summary of the invention

[0003] The present invention provides a substation system risk assessment method, device, electronic equipment and storage medium, which realizes the quantitative evaluation of the importance of substation nodes, provides a scientific basis for substation system risk assessment, and improves the accuracy of risk assessment results.

[0004] According to one aspect of the present invention, a substation system risk assessment method is provided, the method comprising:

[0005] Determine the true value of the evaluation index of each substation node in the substation system;

[0006] Establishing a probability model for the susceptibility of attack events of substation nodes, and calculating the susceptibility probability of attack events of each substation node according to the probability model for the susceptibility of attack events and the true value of the evaluation index;

[0007] The importance of each substation node in the substation system is ranked according to the probability of susceptibility to attack events, an importance ranking result is determined, and a risk assessment of the substation system is performed according to the importance ranking result.

[0008] According to another aspect of the present invention, a substation system risk assessment device is provided, the device comprising:

[0009] An evaluation index determination module is used to determine the true value of the evaluation index of each substation node in the substation system;

[0010] A probability model building module, used to build a probability model of attack event susceptibility of substation nodes, and calculate the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index;

[0011] The system risk assessment module is used to sort the importance of each substation node in the substation system according to the probability of susceptibility of the attack event, determine the importance sorting result, and perform risk assessment on the substation system according to the importance sorting result.

[0012] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0013] at least one processor; and

[0014] a memory communicatively connected to the at least one processor; wherein,

[0015] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the substation system risk assessment method described in any embodiment of the present invention.

[0016] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the substation system risk assessment method described in any embodiment of the present invention when executed.

[0017] The technical solution of the embodiment of the present invention determines the true value of the evaluation index of each substation node in the substation system; establishes an attack event susceptibility probability model for the substation node, and calculates the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index; sorts the importance of each substation node in the substation system according to the attack event susceptibility probability, determines the importance sorting result, and conducts risk assessment on the substation system according to the importance sorting result. The technical solution of the embodiment of the present invention reflects the importance of each substation node in the substation system through the attack event susceptibility probability calculated from the true value of the evaluation index of each substation node, realizes the quantitative evaluation of the importance of the substation node, provides a scientific basis for the risk assessment of the substation system, and improves the accuracy of the risk assessment results.

[0018] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0020] Figure 1 is a flow chart of a substation system risk assessment method provided according to Embodiment 1 of the present invention;

[0021] Figure 2 is a flow chart of a substation system risk assessment method provided according to Embodiment 2 of the present invention;

[0022] Figure 3 is a structural schematic diagram of a substation system provided according to Embodiment 2 of the present invention;

[0023] Figure 4 is a schematic structural diagram of a substation system risk assessment device provided according to Embodiment 3 of the present invention;

[0024] Figure 5 It is a structural schematic diagram of an electronic device for implementing the substation system risk assessment method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] Embodiment 1

[0028] Figure 1 A flowchart of a substation system risk assessment method is provided for the first embodiment of the present invention. This embodiment is applicable to the case of risk assessment of a substation system including multiple substation nodes. The method can be executed by a substation system risk assessment device. The substation system risk assessment device can be implemented in the form of hardware and / or software. The substation system risk assessment device can be configured in an electronic device. Figure 1 As shown, the method includes:

[0029] S110. Determine the true value of the evaluation index of each substation node in the substation system.

[0030] The substation system is a complex network that includes multiple substations in a region and power lines composed of different substations and cables. A substation node refers to a substation among multiple substations in a region. In a substation system, the evaluation index of each substation node usually involves multiple aspects, such as reliability, safety, economy, etc. By determining the true value of the evaluation index of each substation node, the performance of each substation node in the substation system related to the evaluation index can be evaluated.

[0031] Optionally, the evaluation index includes the substation node voltage level; determining the true value of the evaluation index of each substation node in the substation system, including: obtaining the voltage of each substation node in the substation system and the highest voltage among the voltages of all substation nodes in the substation system; taking the ratio of the voltage of each substation node to the highest voltage as the true value of the substation node voltage level of each substation node.

[0032] Among them, the substation node voltage level is used to characterize the importance of the voltage of a certain substation in the entire substation system. It can be understood that the higher the substation node voltage level of the substation, the higher its importance in the substation system.

[0033] In an embodiment of the present invention, the evaluation index of each substation node includes the substation node voltage level, and the importance of the voltage of each substation node in the substation system can be evaluated by determining the true value of the substation node voltage level of each substation node in the substation system. After obtaining the voltage of each substation node in the substation system and the highest voltage among the voltages of all substation nodes in the substation system, the true value of the substation node voltage level of each substation node can be calculated according to the following formula:

[0034] v i =V i / Vmax ;

[0035] Among them, v i refers to the substation node voltage level of the ith substation node, V i refers to the voltage of the ith substation node, V max It refers to the highest voltage among all substation nodes in the substation system.

[0036] Optionally, the evaluation index includes substation node capacity; determining the true value of the evaluation index of each substation node in the substation system, including: obtaining the current transmission capacity of each substation node in the substation system and the rated capacity of the substation system; taking the ratio of the current transmission capacity of each substation node to the rated capacity as the true value of the substation node capacity of each substation.

[0037] Among them, the current transmission capacity of the substation node refers to the maximum power allowed to be transmitted by the substation node when the power line is normal. The rated capacity of the substation system refers to the maximum power that the entire substation system can carry. The substation node capacity is used to characterize the importance of the transmission capacity of a substation in the entire substation system. The higher the substation node capacity of the substation, the higher its importance in the substation system.

[0038] In the embodiment of the present invention, even if a certain substation node has a small number of adjacent substation nodes, as long as the substation node has a high current transmission capacity, the substation node also plays an important role in the substation system. Therefore, the evaluation index of each substation node may include the substation node capacity, and the importance of the current transmission capacity of each substation node in the substation system may be evaluated by determining the true value of the substation node capacity of each substation node in the substation system. After obtaining the current transmission capacity of each substation node in the substation system and the rated capacity of the substation system, the true value of the substation node capacity of each substation node may be calculated according to the following formula:

[0039] s i =S i / S0;

[0040] S i= ∑ i,j S ij ;

[0041] Among them, s i refers to the substation node capacity of the i-th substation node, S i refers to the current transmission capacity of the ith substation node, S0 refers to the rated capacity of the substation system, and S ijIt refers to the transmission capacity of the power line formed by the i-th substation node and its adjacent j-th node.

[0042] Optionally, the evaluation index includes substation node cohesion; determining the true value of the evaluation index of each substation node in the substation system, including: determining a first number of substation nodes in the substation system, a first arithmetic mean of the shortest distance between substation nodes in the substation system, a second number of substation nodes in the substation system after each substation node is shrunk, and a second arithmetic mean of the shortest distance between substation nodes in the substation system after each substation node is shrunk; determining a first network cohesion of the substation system based on the first number and the first arithmetic mean, and determining a second network cohesion after each substation node is shrunk based on the second number and the second arithmetic mean; determining the true value of the node cohesion of each substation node based on the first network cohesion and the second network cohesion.

[0043] Among them, node contraction refers to contracting a substation node and its k adjacent nodes into a new node. In other words, it is to treat these k+1 nodes as a whole and form a substation system with other substation nodes. Network cohesion is used to measure the degree of connection between substation nodes in the substation system and the overall stability of the system. It is usually defined as the inverse of the product of the number of nodes and the average shortest path. Node cohesion is used to reflect the degree of centralization of substation nodes in the substation system. The greater the node cohesion of the substation node, the more core the substation node is in the substation system.

[0044] In an embodiment of the present invention, the evaluation index of each substation node includes the substation node cohesion, and the importance of each substation node in the substation system can be evaluated by determining the true value of the substation node cohesion of each substation node in the substation system. First, the first number of substation nodes in the substation system, the first arithmetic mean of the shortest distance between substation nodes in the substation system, the second number of substation nodes in the substation system after the contraction of each substation node, and the second arithmetic mean of the shortest distance between substation nodes in the substation system after the contraction of each substation node can be determined, and the network cohesion of the substation system before and after the contraction of each substation node is calculated according to the following formula:

[0045]

[0046]

[0047] in, It refers to the first network cohesion of the substation system. refers to the second network cohesion of the substation system after the i-th substation node is contracted, N1 refers to the first number of substation nodes in the substation system, N 2i refers to the second number of substation nodes in the substation system after the i-th substation node is contracted, L1 refers to the first arithmetic mean of the shortest distance between substation nodes in the substation system, L 2i It refers to the second arithmetic mean of the shortest distance between substation nodes in the substation system after the i-th substation node is contracted, d ij refers to the distance between the i-th substation node and the j-th substation node, U1 refers to the set of substation nodes in the substation system, and U 2i It refers to the set of substation nodes in the substation system after the i-th substation node is shrunk.

[0048] Afterwards, the node cohesion of each substation is calculated according to the following formula:

[0049]

[0050] Among them, IMC(i) refers to the substation node cohesion of the i-th substation node, It refers to the first network cohesion of the substation system. It refers to the second network cohesion of the substation system after the i-th substation node is shrunk.

[0051] Finally, in order to avoid excessive differences in node cohesion, after determining the node cohesion of each substation node, it also includes: normalizing the node cohesion of each substation node, and using the normalized result as the true value of the node cohesion. Optionally, the calculation formula for normalizing the node cohesion of each substation node is as follows:

[0052]

[0053] Among them, IMC h (i) refers to the true value of the substation node cohesion of the i-th substation node, IMC(i) refers to the substation node cohesion of the i-th substation node, and N1 refers to the first number of substation nodes in the substation system.

[0054] Optionally, the evaluation index includes the load shedding amount of the substation node; determining the true value of the evaluation index of each substation node in the substation system, including: determining the number of power lines in the substation system and the load shedding amount of each substation node in the substation system when each line fails; using the optimal load reduction algorithm to determine the true value of the substation node load shedding amount of each substation node based on the total number of substation nodes in the substation system, the number of power lines and the load shedding amount of each substation node when each line fails.

[0055] The load shedding of a substation node refers to the amount of electricity corresponding to the active disconnection or reduction of a part of the power load in order to maintain the stability of the system during the operation of the substation system. The optimal load shedding algorithm is used to minimize the load shedding and reduce economic losses while ensuring the safe and stable operation of the substation system.

[0056] In an embodiment of the present invention, the evaluation index of each substation node includes the load shedding amount of the substation node, and the importance of each substation node in the substation system can be evaluated by determining the true value of the load shedding amount of each substation node in the substation system. After determining the number of power lines in the substation system and the load shedding amount of each substation node in the substation system when each line fails, the true value of the load shedding amount of each substation node can be calculated according to the following formula:

[0057]

[0058] Among them, M i refers to the load shedding amount of the ith substation node, N refers to the total number of substation nodes in the substation system, m refers to the number of power lines in the substation system, and M i,j It refers to the load shedding amount of the i-th substation node when the j-th power line fails.

[0059] S120: Establish an attack event susceptibility probability model for substation nodes, and calculate the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index.

[0060] Among them, the attack event susceptibility probability model is used to evaluate the probability of each substation node in the substation system encountering an attack event based on the true value of the evaluation index. It can be understood that the higher the importance of the substation node in the substation system, the greater the probability of it encountering an attack event.

[0061] In an embodiment of the present invention, the attack event susceptibility probability model of the substation node can be established, and the attack event susceptibility probability of each substation node can be calculated according to the true value of the evaluation index of each substation node input into the model. Optionally, when constructing the attack event susceptibility probability model, the sample data composed of the true value of the evaluation index in the historical attack event can be learned by a machine learning algorithm to generate the attack event susceptibility probability model of the substation node.

[0062] S130, ranking the importance of each substation node in the substation system according to the probability of attack event susceptibility, determining the importance ranking result, and performing risk assessment on the substation system according to the importance ranking result.

[0063] In the embodiment of the present invention, since the higher the importance of the substation node in the substation system, the greater the probability of encountering an attack event, the importance of each substation node in the substation system can be reflected by the probability of attack event susceptibility of each substation node, and each substation node can be ranked by importance. When performing risk assessment on the substation system, the substation node with higher importance, that is, higher probability of attack event susceptibility, can be determined according to the importance ranking result, the threats and potential impacts that the substation node may face are analyzed, and corresponding risk mitigation measures are formulated.

[0064] The technical solution of the embodiment of the present invention determines the true value of the evaluation index of each substation node in the substation system; establishes an attack event susceptibility probability model for the substation node, and calculates the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index; sorts the importance of each substation node in the substation system according to the attack event susceptibility probability, determines the importance sorting result, and conducts risk assessment on the substation system according to the importance sorting result. The technical solution of the embodiment of the present invention reflects the importance of each substation node in the substation system through the attack event susceptibility probability calculated by the true value of the evaluation index of each substation node, realizes the quantitative evaluation of the importance of the substation node, provides a scientific basis for the risk assessment of the substation system, and improves the accuracy of the risk assessment results.

[0065] Embodiment 2

[0066] Figure 2 This is a flow chart of a substation system risk assessment method provided by Embodiment 2 of the present invention. The embodiment of the present invention is optimized based on the above embodiment. For solutions not described in detail in the embodiment of the present invention, please refer to the above embodiment. Figure 2 As shown, the method includes:

[0067] S210: Determine the true value of the evaluation index of each substation node in the substation system.

[0068] S220: Determine a standardized value of the evaluation indicator, and determine a weight of the evaluation indicator according to the standardized value.

[0069] Among them, the standardized value is a statistic that describes the relative position of the data. The standardized value is obtained by processing the original data to make it conform to a specific standard or a unified dimension.

[0070] In an embodiment of the present invention, the true value of the evaluation index of each substation node can be standardized to obtain the standardized value of the evaluation index, and then the weight of each evaluation index can be determined according to the standardized value of the evaluation index by using the entropy weight method.

[0071] Optionally, determining the standardized value of the evaluation indicator, and determining the weight of the evaluation indicator based on the standardized value, includes: standardizing the true value of the evaluation indicator according to the type of the evaluation indicator to obtain the standardized value of the evaluation indicator; determining the information entropy of the evaluation indicator according to the standardized value, and determining the information utility value of the evaluation indicator according to the information entropy; determining the weight of the evaluation indicator according to the information utility value.

[0072] Among them, the types of evaluation indicators include benefit type and cost type. Benefit type indicators include substation node voltage level, substation node capacity and substation node cohesion, and cost type indicators include substation node load shedding. In the entropy weight method, information entropy is used to judge the degree of dispersion of each evaluation indicator, and information utility value is used to measure the effectiveness and value of information. The two are inversely proportional, that is, the smaller the information entropy of a certain evaluation indicator, the greater its information utility value.

[0073] In the embodiment of the present invention, when determining the true value of the evaluation index of each substation node in the substation system, it is necessary to first standardize the true value of the evaluation index according to the type of the evaluation index. Specifically, for benefit-type indicators, that is, the voltage level of the substation node, the capacity of the substation node, and the cohesion of the substation node, the true value of the evaluation index can be standardized by formula (1), and for cost-type indicators, that is, the load shedding amount of the substation node, the true value of the evaluation index can be standardized by formula (2). Formulas (1) and (2) are as follows:

[0074]

[0075]

[0076] Among them, Y ij refers to the standardized value of the jth evaluation index of the i-th substation node, Xij It refers to the true value of the jth evaluation index of the i-th substation node, min(X j ) refers to the minimum value of the jth evaluation index of all substation nodes, max(X j ) refers to the maximum value of the jth evaluation index of all substation nodes. Among them, the evaluation indexes 1-4 are the substation node voltage level, substation node capacity, substation node cohesion and substation node load shedding.

[0077] Afterwards, the information entropy of the evaluation index can be calculated by the standardized value of the evaluation index, and the information utility value of the evaluation index can be determined according to the information entropy. Optionally, the information entropy of the evaluation index can be determined according to the standardized value, and the information utility value of the evaluation index can be determined according to the information entropy, and the calculation formula is as follows:

[0078]

[0079]

[0080] d j =1-E j ;

[0081] Among them, E j refers to the information entropy of the jth evaluation index, N refers to the total number of substation nodes in the substation system, and P ij It refers to the proportion of the standardized value of the jth evaluation index of the i-th substation node to the sum of the standardized values ​​of the jth evaluation index of all substation nodes. j It refers to the information utility value of the j-th evaluation indicator.

[0082] Finally, after determining the information utility value of the evaluation index, the weight of the evaluation index can be determined according to the information utility value of the evaluation index. Optionally, the weight of the evaluation index is determined according to the information utility value, and the calculation formula is as follows:

[0083]

[0084] Among them, w j refers to the weight of the jth evaluation index, d j It refers to the information utility value of the j-th evaluation indicator.

[0085] S230. Determine a linear function between the attack event susceptibility probability and the evaluation index according to the evaluation index and the weight, and obtain an attack event susceptibility probability model for the substation node.

[0086] In the embodiment of the present invention, the linear relationship between the probability of attack event susceptibility of the substation node and the evaluation index can be determined by the weight of the evaluation index determined in step S220, thereby obtaining a linear function between the probability of attack event susceptibility and the evaluation index as the attack event susceptibility probability model of the substation node. Optionally, the linear function between the probability of attack event susceptibility and the evaluation index is determined, and its specific formula is as follows:

[0087] D i =w1v i +w2s i +w3IMC h (i)+w4M i ;

[0088] Among them, D i refers to the probability of attack event susceptibility of the i-th substation node, v i refers to the substation node voltage level of the ith substation node, s i refers to the substation node capacity of the i-th substation node, IMC h (i) refers to the substation node cohesion of the i-th substation node, M i It refers to the load shedding amount of the ith substation node, and w1-w4 are the weights of the 1st to 4th evaluation indicators respectively.

[0089] S240, ranking the importance of each substation node in the substation system according to the probability of attack event susceptibility, determining the importance ranking result, and performing risk assessment on the substation system according to the importance ranking result.

[0090] In the embodiment of the present invention, in order to verify the effectiveness of the technical solution of the present invention, a simulation is performed using a node test system. For example, Figure 3 A schematic diagram of the structure of a substation system is shown in FIG. Figure 3 As shown, substation nodes 30, 31, and 34 are 500kV substations directly connected to the power plant, and substation nodes 3, 6, 16, 23, and 26 are set as high-importance substations. Through the technical solution of the present invention, the attack event susceptibility probability of the substation nodes in the above substation system is calculated, and the substation nodes are sorted by importance according to the attack event susceptibility probability. The front part of the importance sorting result is (30, 31, 34) → 16 → 6 → 3 → 26 → 23. According to the result, the substation nodes with high importance can be determined, providing a scientific basis for the risk assessment of the substation system, thereby enhancing its network security defense capability and deterrence capability, and ensuring the network security of the substation system.

[0091] The technical solution of the embodiment of the present invention determines the true value of the evaluation index of each substation node in the substation system; determines the standardized value of the evaluation index, and determines the weight of the evaluation index according to the standardized value; determines the linear function between the probability of attack event susceptibility and the evaluation index according to the evaluation index and the weight, and obtains the probability model of attack event susceptibility of the substation node; sorts the importance of each substation node in the substation system according to the probability of attack event susceptibility, determines the importance sorting result, and conducts risk assessment on the substation system according to the importance sorting result. The technical solution of the embodiment of the present invention reflects the importance of each substation node in the substation system through the probability of attack event susceptibility calculated by the true value of the evaluation index of each substation node, realizes the quantitative evaluation of the importance of the substation node, provides a scientific basis for the risk assessment of the substation system, and improves the accuracy of the risk assessment result.

[0092] Embodiment 3

[0093] Figure 4 This is a schematic diagram of the structure of a substation system risk assessment device provided by Embodiment 3 of the present invention. Figure 4 As shown, the device comprises:

[0094] An evaluation index determination module 310 is used to determine the true value of the evaluation index of each substation node in the substation system;

[0095] A probability model building module 320 is used to build a probability model of attack event susceptibility of substation nodes, and calculate the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index;

[0096] The system risk assessment module 330 is used to rank the importance of each substation node in the substation system according to the probability of susceptibility to attack events, determine the importance ranking result, and perform risk assessment on the substation system according to the importance ranking result.

[0097] Optionally, the evaluation index includes a substation node voltage level; the evaluation index determination module 310 includes:

[0098] A substation node voltage acquisition unit, used to acquire the voltage of each substation node in the substation system and the highest voltage among the voltages of all substation nodes in the substation system;

[0099] The first evaluation index true value determination unit is used to use the ratio of the voltage of each substation node to the highest voltage as the true value of the substation node voltage level of each substation node.

[0100] Optionally, the evaluation index includes substation node capacity; the evaluation index determination module 310 includes:

[0101] A transmission capacity acquisition unit, used to acquire the current transmission capacity of each substation node in the substation system and the rated capacity of the substation system;

[0102] The second evaluation index real value determination unit is used to take the ratio of the current transmission capacity of each substation node to the rated capacity as the real value of the substation node capacity of each substation.

[0103] Optionally, the evaluation index includes substation node cohesion; the evaluation index determination module 310 includes:

[0104] A node shrinkage parameter determination unit, used to determine a first number of substation nodes in the substation system, a first arithmetic mean of the shortest distances between substation nodes in the substation system, a second number of substation nodes in the substation system after shrinkage of each substation node, and a second arithmetic mean of the shortest distances between substation nodes in the substation system after shrinkage of each substation node;

[0105] a network cohesion determination unit, configured to determine a first network cohesion of the substation system according to the first number and the first arithmetic mean, and determine a second network cohesion after each substation node is shrunk according to the second number and the second arithmetic mean;

[0106] The third evaluation index true value determination unit is used to determine the true value of the node cohesion of each substation node according to the first network cohesion and the second network cohesion.

[0107] Optionally, the evaluation index includes the load shedding amount of the substation node; the evaluation index determination module 310 includes:

[0108] A load shedding amount determination unit, used to determine the number of power lines in the substation system and the load shedding amount of each substation node in the substation system when a fault occurs in each line;

[0109] The fourth evaluation indicator true value determination unit is used to adopt an optimal load reduction algorithm to determine the true value of the substation node load shedding amount of each substation node according to the total number of substation nodes in the substation system, the number of power lines and the load shedding amount of each substation node when a failure occurs in each line.

[0110] Optionally, the probability model building module 320 includes:

[0111] An evaluation index weight determination unit, used to determine a standardized value of the evaluation index, and determine a weight of the evaluation index according to the standardized value;

[0112] The probability model building unit is used to determine the linear function between the attack event susceptibility probability and the evaluation index according to the evaluation index and the weight, and obtain the attack event susceptibility probability model of the substation node.

[0113] Optionally, the evaluation index weight determination unit includes:

[0114] A standardized value determination subunit, used for performing a standardized process on the true value of the evaluation indicator according to the type of the evaluation indicator to obtain a standardized value of the evaluation indicator;

[0115] an information utility value determination subunit, configured to determine the information entropy of the evaluation indicator according to the standardized value, and determine the information utility value of the evaluation indicator according to the information entropy;

[0116] The evaluation index weight determination subunit is used to determine the weight of the evaluation index according to the information utility value.

[0117] The substation system risk assessment device provided in the embodiment of the present invention can execute the substation system risk assessment method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0118] Embodiment 4

[0119] Figure 5 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0120] like Figure 5As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0121] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0122] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a substation system risk assessment method.

[0123] In some embodiments, the substation system risk assessment method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the substation system risk assessment method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the substation system risk assessment method in any other appropriate manner (e.g., by means of firmware).

[0124] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0125] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0126] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0127] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0128] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0129] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0130] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0131] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A substation system risk assessment method, It is characterized in that The method comprises: Determine the true value of the evaluation index of each substation node in the substation system; Establishing a probability model for the susceptibility of attack events of substation nodes, and calculating the susceptibility probability of attack events of each substation node according to the probability model for the susceptibility of attack events and the true value of the evaluation index; The importance of each substation node in the substation system is ranked according to the probability of susceptibility to attack events, an importance ranking result is determined, and a risk assessment of the substation system is performed according to the importance ranking result.

2. The method according to claim 1, It is characterized in that The evaluation index includes the voltage level of the substation node; Determine the true value of the evaluation index of each substation node in the substation system, including: Acquire the voltage of each substation node in the substation system and the highest voltage among the voltages of all substation nodes in the substation system; The ratio of the voltage of each substation node to the highest voltage is used as the true value of the substation node voltage level of each substation node.

3. The method according to claim 1, It is characterized in that The evaluation index includes substation node capacity; Determine the true value of the evaluation index of each substation node in the substation system, including: Acquire the current transmission capacity of each substation node in the substation system and the rated capacity of the substation system; The ratio of the current transmission capacity of each substation node to the rated capacity is used as the real value of the substation node capacity of each substation.

4. The method according to claim 1, It is characterized in that The evaluation index includes substation node cohesion; Determine the true value of the evaluation index of the substation node in the substation system, including: Determine a first number of substation nodes in the substation system, a first arithmetic mean of the shortest distances between substation nodes in the substation system, a second number of substation nodes in the substation system after each substation node is shrunk, and a second arithmetic mean of the shortest distances between substation nodes in the substation system after each substation node is shrunk; Determine a first network cohesion degree of the substation system according to the first number and the first arithmetic mean, and determine a second network cohesion degree after each substation node is shrunk according to the second number and the second arithmetic mean; The true value of the node cohesion of each substation node is determined according to the first network cohesion and the second network cohesion.

5. The method according to claim 1, It is characterized in that The evaluation index includes the load shedding amount of the substation node; Determine the true value of the evaluation index of each substation node in the substation system, including: Determining the number of power lines in the substation system and the load shedding amount of each substation node in the substation system when a failure occurs in each line; An optimal load shedding algorithm is adopted to determine the true value of the load shedding amount of each substation node according to the total number of substation nodes in the substation system, the number of power lines and the load shedding amount of each substation node when a failure occurs in each line.

6. The method according to claim 1, It is characterized in that Establish a probability model for the susceptibility of substation nodes to attack events, including: Determining a standardized value of the evaluation indicator, and determining a weight of the evaluation indicator according to the standardized value; According to the evaluation index and the weight, a linear function between the attack event susceptibility probability and the evaluation index is determined to obtain an attack event susceptibility probability model of the substation node.

7. The method according to claim 6, It is characterized in that Determining a standardized value of the evaluation indicator, and determining a weight of the evaluation indicator according to the standardized value, comprising: Standardizing the true value of the evaluation indicator according to the type of the evaluation indicator to obtain a standardized value of the evaluation indicator; Determine the information entropy of the evaluation indicator according to the standardized value, and determine the information utility value of the evaluation indicator according to the information entropy; The weight of the evaluation index is determined according to the information utility value.

8. A substation system risk assessment device, It is characterized in that The device comprises: An evaluation index determination module is used to determine the true value of the evaluation index of each substation node in the substation system; A probability model building module, used to build a probability model of attack event susceptibility of substation nodes, and calculate the attack event susceptibility probability of each substation node according to the attack event susceptibility probability model and the true value of the evaluation index; The system risk assessment module is used to sort the importance of each substation node in the substation system according to the probability of susceptibility of the attack event, determine the importance sorting result, and perform risk assessment on the substation system according to the importance sorting result.

9. An electronic device, It is characterized in that The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the substation system risk assessment method according to any one of claims 1 to 7.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the substation system risk assessment method according to any one of claims 1 to 7 when executed.