Geological environment treatment and ecological restoration method for abandoned mine
Through detailed investigation of abandoned mines and the design of targeted treatment plans, including geological treatment, environmental treatment and ecological restoration measures, and the establishment of a monitoring-assessment-early warning system, the geological environment treatment and ecological restoration problems of abandoned mines have been solved, and geological and ecological restoration have been achieved. Ecological safety restoration.
Patent Information
- Application Number
- CN202410889489.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-15
AI Technical Summary
Abandoned mine geological environment management and ecological restoration are faced with problems of geological disasters, environmental pollution and ecological damage, including underground goaf collapse, solid waste pollution and vegetation damage, leading to increased geological disasters and environmental risks, affecting biodiversity and ecological functions. .
Through investigating the geological, environmental and ecological status of abandoned mines, we design targeted treatment plans, including geological treatment, environmental treatment and ecological restoration measures, such as underground space arrangement, solid waste treatment, vegetation restoration and ecological park construction, and establish long-term Monitoring-evaluation-early warning system to dynamically grasp governance effects and risks.
It effectively solves the geological environment management and ecological restoration problems of abandoned mines, reduces the risks of geological disasters and environmental pollution, restores vegetation and animal and plant habitats, and ensures geological and ecological safety.
Smart Images

Figure CN118780604A_ABST
Abstract
Description
Technical Field
[0001] The invention provides a method suitable for the geological environment treatment and ecological restoration of abandoned mines, belonging to the technical field of mine geological disaster treatment and ecological environment restoration. Background Art
[0002] There are 8,000 state-owned mines and 110,000 collective mines in my country. According to the results of environmental remote sensing monitoring of mining resource development across the country in 2017, the land area occupied by mineral resource development across the country is about 3.62 million hectares, of which 2.3 million hectares are historical relics and the responsible persons have disappeared, and 1.32 million hectares are mines under construction / production, and the area is still increasing at a rate of 46,700 hectares per year.
[0003] Abandoned mines include land that has been damaged by mining activities and cannot be used without treatment. There are four types of abandoned mines: (1) underground voids formed by mining; (2) large void areas formed as minerals are mined, that is, abandoned pits; (3) waste rock piles formed by the stripping of topsoil, mining waste rock and accumulation of low-grade ore; (4) if the mine involves mineral processing, it is also the tailings waste formed by the discharge of the residue after the concentrate is selected by the ore sorting method.
[0004] If the geological environment management during the mining process and the supervision measures after the suspension of production are not in place, geological disasters and environmental ecological damage are likely to occur, which may manifest in the following ways: (1) Underground mining areas collapse, causing ground collapse, subsidence and cracking, and even forming local small earthquakes; (2) In addition to damaging and occupying land resources and surface landscapes, surface mining areas and waste rock and waste material storage areas may also cause secondary geological disasters such as landslides and mudslides due to subsidence, collapse and collapse; (3) Mine water discharge during underground mining damages the groundwater system, and the heavy metals and other substances associated with the waste rock and tailings produced by mining and selection may migrate to the site soil or groundwater through surface / groundwater immersion and rainwater leaching due to changes in environmental media, causing secondary pollution; (4) Surface vegetation is destroyed, aggravating soil erosion, destroying and changing the habitat of wild animals and plants, affecting biodiversity, and other environmental and ecological functions.
[0005] In response to the above problems, the present invention proposes a method for geological environment management and ecological restoration of abandoned mines, including front-end mine geological, environmental and ecological status assessment and hazard analysis, and targeted design of suitable management and restoration plans based on the analysis results. After the design plan is implemented, the later stage also includes the construction of a long-term monitoring-assessment-early warning system to dynamically grasp the geological safety and environmental ecology of abandoned mines after management, and conduct risk control or take intervention measures according to actual conditions to ensure the geological environment and ecological safety of abandoned mines after management. Summary of the invention
[0006] The purpose of the present invention is to provide a method for geological environment management and ecological restoration of abandoned mines. It can be applied to various abandoned mines, including but not limited to coal mines, non-ferrous metal mines and quarries. There may be goafs or goafs underground and on the surface of the mines. There may be solid wastes such as mining waste rock and ore dressing waste residue stored on the surface. In addition to destroying the vegetation in the mining area, the mining process may also cause certain damage to the ecology of the habitats and living environments of animals and plants in and near the area.
[0007] There are three main potential risks for abandoned mines of this type: (1) In terms of geological hazards, the collapse and subsidence of the mined-out areas may induce landslides, mudslides, and even trigger small local earthquakes in the region; (2) In terms of the environment, solid wastes such as waste rock and ore dressing tailings left over from mining may contain environmental hazards such as heavy metals, which may migrate to the soil and groundwater in the mine or surrounding areas through rainwater leaching or groundwater / surface water immersion, posing environmental risks. At the same time, they may also spread to environmental receptors through dust and other pathways; (3) In terms of ecology, the main problem is the destruction of vegetation during mining. In addition, the interference with animals in the region and surrounding areas during the mining process is also an ecological problem.
[0008] In order to achieve the above-mentioned purpose, an embodiment of the present invention provides a method for geological environment management and ecological restoration of abandoned mines, which comprises the following steps:
[0009] Conduct a current status survey on the abandoned mine and obtain survey results; the current status survey includes: geological, environmental and ecological aspects;
[0010] Design a geological management plan based on the geological survey results in the current situation survey;
[0011] Design an environmental governance plan based on the environmental findings of the current situation survey;
[0012] Design an ecological restoration plan based on the ecological findings from the status survey.
[0013] Optionally, the current geological situation survey includes: investigation of the goaf areas of the abandoned mines and analysis of the risk of geological disasters.
[0014] Optionally, the goaf survey includes: counting the three-dimensional space of the goaf underground and the scope and area of goaf and collapse on the surface, and calculating the stress conditions and load parameters of the underground and above-ground areas according to relevant stratum structures and rock formation characteristics.
[0015] Optionally, the geological disaster risk analysis includes: judging whether there are fractures, collapses and subsidences underground based on the stress condition analysis.
[0016] Optionally, the environmental status survey includes: determining the harmful substances in solid wastes such as waste rock and tailings left over from the abandoned mines based on the harmful substances in solid wastes such as waste rock and tailings left over.
[0017] Optionally, the ecological status survey includes: using satellite remote sensing images or aerial images to analyze the degree of ecological damage to vegetation and animal and plant habitats in the abandoned mine area.
[0018] Optionally, the geological treatment plan includes the following steps:
[0019] Whether the underground shafts and tunnels of the abandoned mine contain water, the groundwater level, and whether the backfill or filling materials contain potential pollution sources, determines whether it is necessary to organize the underground space in advance;
[0020] Eliminate hazards in the underground space after tidying up;
[0021] Performing surface backfilling and slope treatment on the surface above the underground space after the preparation;
[0022] A mountain water drainage system is established based on the rainfall and mountain shape in the area where the abandoned mine is located.
[0023] Optionally, the environmental governance scheme includes the following steps:
[0024] Solidifying, stabilizing, blocking and preventing seepage of the solid waste;
[0025] The solid waste is used as backfill or filling material.
[0026] Optionally, the ecological restoration method comprises the following steps:
[0027] Carrying out regional vegetation restoration on the surface of the abandoned mine;
[0028] Establish artificial scenic spots or ecological parks to carry out ecological development projects.
[0029] Through the above technical solution, the problems of geological environment management and ecological restoration of abandoned mines have been solved.
[0030] Other features and advantages of the embodiments of the present invention will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:
[0032] Figure 1A schematic diagram of the abandoned mine geological environment management and ecological restoration process provided by the present invention;
[0033] Figure 2 It is a structural schematic diagram of the current situation investigation of the current situation assessment in the flow chart of the present invention;
[0034] Figure 3 A schematic diagram of the geological management structure designed in the flow chart of the present invention;
[0035] Figure 4 It is a structural schematic diagram of the geological disaster risk monitoring and evaluation in the flow chart of the present invention;
[0036] Figure 5 It is a schematic diagram of the structure of the method and steps for geological environment management and ecological restoration of an abandoned mine in Inner Mongolia in a specific implementation manner of the present invention. DETAILED DESCRIPTION
[0037] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.
[0038] like Figure 1 As shown:
[0039] The current situation assessment includes three parts: current situation investigation, audience analysis and risk assessment. Through these three steps, the current situation of the entire abandoned mine can be fully and accurately grasped. Combined with the background of the mine area and the specific audience profile of the surrounding area, the audience includes various surrounding people and animal populations, etc. According to their exposure routes and risk acceptability, the risks of the three combined factors of hazards / pollution sources, contact degree and exposure routes are accurately measured and assessed, the risks and hazards of the current situation of the mine are clarified, and the tasks and effect requirements of the restoration and governance content are clarified.
[0040] The embodiment of the present invention provides a method for geological environment management and ecological restoration of abandoned mines, which comprises the following steps:
[0041] like Figure 2 As shown, a survey result is obtained by conducting a current situation survey on the abandoned mine; the current situation survey includes: geological aspects, environmental aspects and ecological aspects;
[0042] The geological survey includes: goaf survey, covering underground and above ground, mainly using various technical means to accurately count the underground three-dimensional space and the scope and area of goaf / collapse on the surface, calculate the stress conditions and load parameters of underground and above ground areas according to the relevant stratum structure and rock formation characteristics, and quantify whether the structure is stable and whether there are limit states such as instability; geological disaster risk analysis, based on the above-mentioned stress analysis, judge whether there are possibilities of fractures, collapses and subsidence underground, and whether there are risks of collapse, settlement and other risks of dangerous squares, slope protection and strata on the ground;
[0043] The environmental investigation includes: environmental pollution analysis, based on the total content and leaching degree of harmful substances in solid waste such as waste rock and tailings, combined with the rainfall, surface runoff and groundwater conditions in the area, to determine the pollution risk of potential pollutants that may migrate to the soil and groundwater through liquid leaching and meteorological dust;
[0044] The ecological survey includes: vegetation-ecological damage. Through historical data, satellite remote sensing images or aerial photography, the degree of damage to vegetation in the mining area during the historical and current time periods is grasped. At the same time, the similarities and differences between the animals and plants in and around the area and the control points are counted, and the degree of ecological damage to the habitats of animals and plants in the area other than vegetation is analyzed.
[0045] Design a geological management plan based on the geological survey results in the current situation survey;
[0046] Design an environmental governance plan based on the environmental findings of the current situation survey;
[0047] Design an ecological restoration plan based on the ecological findings from the status survey.
[0048] Optionally, the current geological situation survey includes: investigation of the goaf areas of the abandoned mines and analysis of the risk of geological disasters.
[0049] Optionally, the survey of the goaf areas of the abandoned mines includes: counting the three-dimensional space of the goaf areas underground and the range and area of goaf and collapse on the surface, and calculating the stress conditions and load parameters of the underground and above-ground areas based on relevant stratum structures and rock formation characteristics.
[0050] Optionally, the geological disaster risk analysis includes: judging whether there are fractures, collapses and subsidences underground based on the stress condition analysis.
[0051] Optionally, the environmental status survey includes: determining the harmful substances in solid wastes such as waste rock and tailings left over from the abandoned mines based on the harmful substances in solid wastes such as waste rock and tailings left over.
[0052] Optionally, the ecological status survey includes: using satellite remote sensing images or aerial images to analyze the degree of ecological damage to vegetation and animal and plant habitats in the abandoned mine area.
[0053] Optionally, the geological treatment plan includes the following steps:
[0054] Whether the underground shafts and tunnels of the abandoned mine contain water, the groundwater level, and whether the backfill or filling materials contain potential pollution sources, determines whether it is necessary to organize the underground space in advance;
[0055] Eliminate hazards in the underground space after tidying up;
[0056] Performing surface backfilling and slope treatment on the surface above the underground space after the preparation;
[0057] A mountain water drainage system is established based on the rainfall and mountain shape in the area where the abandoned mine is located.
[0058] The main contents of the geological control plan are as follows: Figure 3 As shown, firstly, according to the previous analysis of the stratum stress, the management tasks of the underground goaf are determined. Whether the underground shafts and tunnels contain water, the groundwater level, and whether there are potential pollution sources in the backfill / filling materials, etc., determines whether it is necessary to organize the underground space in advance. If there are soluble pollutants in the backfill / filling materials and there is groundwater immersion in the goaf, which may cause potential pollutants to migrate to the groundwater, it is necessary to carry out pre-treatment such as shaft and tunnel water extraction and groundwater barrier in advance. After organization, it is decided to adopt filling or backfilling methods according to the spatial position of the shaft and tunnel and the flowability of the backfill / filling materials. If the shaft and tunnel space is large and the top plate is close to the ground, direct backfilling can be adopted after ground blasting. If the underground space is tortuous and it is difficult to reach the designed position by direct backfilling, raw materials can be compounded with cement and other materials to form a flowing filling material and then filled with a high-pressure pump; after the stability of the underground goaf is strengthened by backfilling or filling, the surface is prepared for collapse and subsidence according to the results of exploration and geological disaster analysis. Some dangerous rocks and earth with high risks are eliminated and shaped to actively remove the source of harm; after the surface of the eliminated dangerous areas is leveled, the pits and other areas are backfilled according to the site collapse situation and stability requirements, and slopes are built in areas where slope protection is needed. By reconstructing the surface structure and form of the mine, the surface geological conditions of the mine are further stabilized, and geological disasters such as landslides, mudslides, and large-scale subsidence are eliminated. The shape of the mine is repaired to provide a basis for subsequent landscape and ecological shaping; after the above-mentioned treatment is completed, it is also necessary to establish a suitable mountain water / rainwater drainage system according to the rainfall and mountain shape of the mine area to avoid extreme conditions such as heavy rains, which will damage the repair and treatment areas and form new disasters or potential disasters.
[0059] Optionally, the environmental governance scheme includes the following steps:
[0060] Solidifying, stabilizing, blocking and preventing seepage of the solid waste;
[0061] The solid waste is used as backfill or filling material.
[0062] Mainly for solid wastes such as waste rock and ore dressing tailings that may exist in abandoned mines, the first thing is to avoid the generation of dust, and secondly, for the dissolution of harmful substances such as heavy metals in solid wastes, solidification stabilization, barrier and anti-seepage and other treatment and control measures can be taken. The best way to dispose of this part of solid waste is to use it as a resource for the previous geological disaster control, as backfill / filling material, but the premise is that the material performance requirements and environmental risks need to be demonstrated, and it must meet the relevant design standards and requirements.
[0063] Optionally, the ecological restoration method comprises the following steps:
[0064] Carrying out regional vegetation restoration on the surface of the abandoned mine;
[0065] Establish artificial scenic spots or ecological parks to carry out ecological development projects.
[0066] The first step is to restore the vegetation in the area. Artificial planting and greening of vegetation that has been encroached upon and destroyed during the mining process should be carried out. The greening plan should be suitable for the characteristics of the region. Secondly, the original habitat of animals and plants should be restored as much as possible. The regional ecological environment should be reshaped through artificial nesting, bionic passages, and improved food chains. It can even be combined with regional planning to build new artificial attractions, ecological parks, or special agricultural parks and other in-depth ecological development projects.
[0067] Through the implementation of the above technical solutions, the problems of geological governance and environmental restoration have been well solved. If the following monitoring and evaluation are carried out, the above goals can be better achieved.
[0068] After the completion of the governance and restoration project, a monitoring and evaluation system will need to be established to conduct long-term dynamic monitoring of the geological hazard risks, regional environmental risks and ecological conditions of the mine after governance. A quantitative evaluation system will be established based on relevant data. According to the dynamic fluctuations of the three, the elimination and superposition of potential risks can be grasped at any time, and appropriate adjustment and control measures can be taken according to the magnitude of the changes.
[0069] The geological disaster monitoring and assessment system is as follows: Figure 4As shown, first, accurately monitor the rainfall in the mining area. Rainfall is the biggest direct cause of geological disasters in mining areas after governance. Focus on the annual rainfall concentration period and improve early warning capabilities for heavy rainfall weather; secondly, monitor water level related information, including surface soil moisture content, surface water level and groundwater level. The rise in water level and the increase in moisture content can easily cause changes in the bearing capacity of the mountain and structure and imbalance in the limit state, thereby causing geological disasters; thirdly, set up displacement monitoring points at relevant points on the surface and deep underground, which can be set up simultaneously during the governance stage to capture the initial tiny changes in geological disasters such as collapse, subsidence and settlement, grasp local and tiny data in advance, and provide a basis for early prediction; finally, establish a full-time video surveillance system for the treated mines and high-risk slopes under key supervision, so that management personnel can intuitively grasp the relevant changes at any time.
[0070] Regional environmental risks are mainly assessed through online monitoring of regional dust, regular monitoring of soil and groundwater quality in and around the mine area, etc., to dynamically grasp environmental changes in the region and determine whether pollution or risks have occurred. Ecological conditions are mainly assessed through dynamic changes in regional vegetation conditions, including remote sensing satellites, aerial photography, and periodic statistics. At the same time, the number of animals in the region is surveyed, the total number of species, and the frequency of activity are tested to evaluate changes in the ecological environment of regional animal and plant habitats.
[0071] Control measures:
[0072] For the above-mentioned monitoring and evaluation system, when the system shows that the risks in geological disasters, regional environment and ecology exceed the acceptable level, it is necessary to initiate governance or control measures to reduce the relevant risks to an acceptable range.
[0073] In terms of geological disasters, if there are collapses and other situations, determine the source of risk. If the moisture content and water level are affected by rainfall and other factors affecting the bearing capacity, consider taking precipitation and strengthening mountain water / rainwater diversion measures. If the structural safety is affected by factors such as settlement, consider reinforcement engineering means. If there are warnings such as sudden disasters, the first consideration is to evacuate nearby personnel and objects. For regional environmental risks, dust can be dealt with by strengthening thatching and regreening. If soil and groundwater exceed the standard, take measures such as barrier walls and changes in groundwater use. The ecological aspect is mainly improved through regreening projects and strengthening of post-management.
[0074] The following is a specific example of an abandoned mine:
[0075] An abandoned mine is located in the western part of Inner Mongolia, bordering Shaanxi and Ningxia. It was built in 1975 and produces about 80,000 tons of iron ore annually. It stopped production in 2015. There are mainly two mined-out sections underground, and there are some open-pit and subsidence areas on the surface. Waste rock from the mining process is accumulated near the wellhead and flotation tailings are also accumulated in the mining area. As of 2019, the underground space and structure are unclear, and there are geological disaster risks such as collapse, subsidence and mudslides on the surface. The land in the mining area has been occupied and the vegetation has been severely damaged. According to relevant national requirements, mine restoration is required. Combined with the method of the present invention, the method and steps of geological environment management and ecological restoration of abandoned mines are as follows. The main process and schematic diagram are as follows Figure 5 shown.
[0076] (1) Current situation assessment.
[0077] The current status of abandoned mines includes three aspects: geology, environment and ecology. Exploration and measurement found that the area is located at the junction of sandification and desert, with little rainfall and low groundwater level throughout the year. There is no water accumulation in the underground shafts and tunnels. Using 3D scanning technology (UK Endoscopic 3D laser scanners are used to image and model the 3D structure of underground goafs. Based on drilling cores, the stratigraphic structure is analyzed and relevant bearing capacity parameters are tested. The current status and forecast of ground subsidence areas, subsidence areas and mountains are evaluated in accordance with the standard "Specifications for Geological Hazard Hazard Assessment" (DZ / T0286-2015). The scope and area of surface subsidence areas and subsidence areas are measured through aerial modeling. The area and volume of waste rock and mineral processing tailings left on the ground are counted. Based on the early raw material composition table, full heavy metal content tests and leaching toxicity tests are carried out to clarify potential pollutants. For vegetation-ecological damage, the main purpose is to calculate the damage by counting the land area occupied by mines and comparing it with the surrounding vegetation. Animals are mainly observed through long-term unmanned photography and other means to count whether there are any abnormalities in animal activities in the mining area compared with the surrounding areas.
[0078] Audience analysis of the mining area. Through investigation, there are no residents in the mining area, no important transportation routes or construction facilities, but the second mining section is about 100m away from the National Sihemu Nature Reserve (a national nature reserve). There is no water source in the mining area, and the types of land resources destroyed are grassland and mining land. The aquifers in the mining area are mainly loose rock pore water and bedrock fissure water, both of which are recharged by atmospheric precipitation. The rock strata are weakly water-rich, and the recharge amount is very small. The groundwater is in the form of underground runoff. The groundwater in this area is very deep from the surface, and the aeration zone is basically not rich in groundwater.
[0079] Risk assessment. Through the above analysis, the main risks in this area are that there are many underground and above-ground goafs, unstable structures, and possible geological disaster risks such as landslides, collapses and subsidence. At the same time, the remaining solid waste may cause mudslides and potential pollutant diffusion, and the mining area has serious land encroachment and vegetation destruction.
[0080] (2) Scheme design.
[0081] Through the above analysis, geological disasters are mainly caused by the lack of support in underground goafs and surface collapse areas. Potential settlement and collapse may cause a series of geological disasters. Therefore, firstly, according to the three-dimensional measurement model of the underground goaf, a suitable surface blasting port is selected to form the surface recharge inlet of the underground goaf by blasting. The remaining waste rock and ore dressing tailings are backfilled from this place. According to the matching strength of the calculated bearing capacity, cement and other materials are added to make the backfill strength meet the relevant requirements. After the underground goaf is backfilled to restore the bearing capacity, the surface is repaired according to the investigation results. Rocks and earth are removed to eliminate potential dangers, and then the surface is leveled. Depressions and collapsed areas are backfilled. The backfill materials can be solid waste left over from the mining area or other materials. The backfill strength is implemented in accordance with the strength standards of exploration and design. Revetments and embankments are set up in some areas of the surface backfill to strengthen the holding capacity and maintain the overall stability of the mine ground. Mountain and water separation ditches and drainage channels are set up at the boundary of the mine to exclude mountain water from other areas. Rainwater diversion ditches and channels are used within the mine to divert rainwater to prevent rainwater from eroding and damaging the repaired part of the mountain.
[0082] Environmental governance and control mainly focus on waste rock and ore dressing tailings left in mining areas. According to monitoring, the main components of waste rock are stable, and the leaching toxicity of heavy metals and other environmentally harmful substances is low. It can be used mainly for backfilling underground and surface mined areas. Ore dressing tailings have some heavy metal leaching, and its leaching toxicity is reduced by adding curing agents and stabilizers. This part of the material is used as much as possible in areas above the contact area of underground and surface water, and upper and lower isolation measures are taken to avoid pollution through liquid phase migration. Some of the remaining solid waste that has not been recycled is treated by surface covering and greening.
[0083] In terms of ecological restoration, the area is mainly affected by mining, which has encroached on land and destroyed vegetation. Since there are still a large number of industrial facilities and structures in the mining area, and limited by the natural environment and species characteristics of the region, a plan of simultaneous restoration of vegetation and historical and cultural ecology is adopted, and industrial equipment and structures are transformed into industrial heritage attractions and display museums. Measures for greening the repair and management areas are strengthened, and local characteristic attractions are created as a whole. An ecological agricultural area suitable for the local environment is built. By building new artificial bird nests and improving the animal food chain, the plant and animal ecology in the area is restored, and the restored ecology is combined with the legacy structures in the mining area to create a characteristic ecological tourism park.
[0084] (3) Implementation of the plan.
[0085] Construction should be carried out in accordance with the planning and design content. During the construction process, more attention should be paid to the protection of the mining area's environment and ecology to avoid new damage caused by engineering construction.
[0086] (4) Monitoring, evaluation and control measures.
[0087] After the abandoned mine remediation project is completed, it is necessary to build a long-term monitoring-assessment-early warning system to conduct long-term monitoring of geological safety, environment and ecology, and to quantify risks through data. Once the relevant risk limits are exceeded, control measures will be initiated to avoid geological disasters, environmental pollution and ecological damage.
[0088] Among them, geological safety monitoring includes establishing a monitoring system for the entire mining area and key high-risk areas such as slopes. Management personnel can grasp the current situation at any time, focus on monitoring rainfall, and monitor the moisture content of the surface, underground space and surface water level to grasp the adverse effects of rainfall, underground and surface water on the mountain. By monitoring the displacement of the surface and deep layers, risks can be prevented.
[0089] Environmental monitoring mainly monitors the dust in the entire area, and the periodic changes in the quality of soil and groundwater in the region and its surrounding areas to determine whether the solid waste under treatment or risk control will migrate and spread or form new pollution.
[0090] Ecological monitoring mainly uses remote sensing, aerial photography, etc. to determine whether the vegetation in a region is damaged, and uses statistics and other means to determine whether the living environment and ecology of animals and plants have improved and are suitable for their inhabitants.
[0091] Regulatory measures, based on the above-mentioned monitoring-evaluation-early warning system, take corresponding measures according to the existing risks and the degree of harm.
[0092] Through the above technical solution, the problems of geological environment management and ecological restoration of abandoned mines have been solved.
[0093] At this point, those skilled in the art should recognize that, although the exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications that conform to the principles of the present invention can still be directly determined or derived based on the contents disclosed in the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all such other variations or modifications.
Claims
1. A method for geological environment management and ecological restoration of abandoned mines, characterized in that: The steps include: 1) Conducting a status survey on the abandoned mine and obtaining survey results; the status survey includes geological, environmental and ecological aspects; 2) Designing a geological management plan based on the geological survey results in the current situation survey; 3) Designing environmental governance plans based on the environmental findings of the current situation survey; 4) Designing an ecological restoration plan based on the ecological findings of the status quo survey.
2. The method for environmental governance and ecological restoration according to claim 1, characterized in that: The current geological situation survey includes: investigation of the goaf areas of the abandoned mines and analysis of the geological disaster risks.
3. The method for environmental management and ecological restoration according to claim 2, characterized in that: The goaf survey includes: counting the three-dimensional space of the goaf underground and the scope and area of goaf and collapse on the surface, and calculating the stress conditions and load parameters of the underground and above-ground areas based on the relevant stratum structure and rock formation characteristics.
4. The method for environmental governance and ecological restoration according to claim 3, characterized in that: The geological disaster risk analysis includes: judging whether there are fractures, collapses and subsidences underground based on the stress analysis.
5. The environmental governance and ecological restoration method according to claim 1, characterized in that: The environmental status survey includes: judging the harmful substances in the solid wastes such as waste rock and tailings left over from the abandoned mines.
6. The environmental governance and ecological restoration method according to claim 1, characterized in that: The ecological status survey includes: using satellite remote sensing images or aerial images to analyze the degree of ecological damage to vegetation and animal and plant habitats in the abandoned mine area.
7. The environmental governance and ecological restoration method according to claim 1, characterized in that: The geological treatment program includes the following steps: ① Whether the underground shafts and tunnels of the abandoned mine contain water, the groundwater level, and whether the backfill or filling materials have potential pollution sources, determine whether it is necessary to organize the underground space in advance; ② Eliminate hazards in the underground space after tidying up; ③ Carry out surface backfilling and slope treatment on the surface above the underground space after the preparation; ④ Establish a mountain water drainage system based on the rainfall and mountain shape in the area where the abandoned mine is located.
8. The environmental governance and ecological restoration method according to claim 1, characterized in that: The environmental governance program includes the following steps: ① Solidifying, stabilizing, isolating and preventing the seepage of the solid waste; ② Using the solid waste as backfill or filling material.
9. The environmental governance and ecological restoration method according to claim 1, characterized in that: The ecological restoration method comprises the following steps: ① Carry out regional vegetation restoration on the surface of the abandoned mine; ② Establish artificial scenic spots or ecological parks to carry out ecological development projects.