Risk assessment method and system for compressor unit of oil and gas station

By analyzing the domino effect relationship and failure modes between compressor units in oil and gas stations, a three-dimensional risk matrix chromatogram is constructed, which solves the problem of low risk assessment accuracy in traditional RCM technology and achieves more accurate equipment risk assessment.

CN118780607APending Publication Date: 2024-10-15BEIJING UNIV OF CHEM TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410900873.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Traditional RCM technology cannot identify the risk relationship between equipment in oil and gas stations in detail, and does not consider the interaction between equipment, resulting in low accuracy of risk assessment results.

Method used

By determining the domino effect relationship between compressor units in oil and gas stations, calculating failure probability and frequency, constructing a three-dimensional risk matrix chromatogram, and combining fuzzy risk reasoning and the analytic hierarchy process to evaluate the risk status of the compressor unit.

Benefits of technology

It improves the accuracy of risk assessment results, takes into account the interaction between equipment, quantifies the risk of domino failure, and enhances the accuracy of equipment risk assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780607A_ABST
    Figure CN118780607A_ABST
Patent Text Reader

Abstract

The invention provides a risk assessment method for compressor units in an oil and gas station. The risk assessment method comprises the following steps: determining a domino effect relationship among the compressor units in the oil and gas station; determining a failure probability under the domino effect relationship, and executing probability conversion between the failure probability and a fault frequency to obtain the fault frequency; constructing a three-dimensional risk matrix chromatogram corresponding to the fault frequency; and performing equipment fuzzy risk calculation on the compressor unit by using the three-dimensional risk matrix chromatogram, and determining the risk state of the compressor unit. According to the method, the mutual influence relationship between the equipment in the station is fully considered, so that the equipment risk assessment is more in line with the actual situation, and the obtained risk assessment result is more accurate. The invention further provides a risk assessment system for the oil and gas station compressor unit, a computer readable storage medium and electronic equipment, which have the above beneficial effects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of equipment safety monitoring, and in particular to a risk assessment method, system, computer-readable storage medium and electronic device for a compressor unit in an oil and gas station. Background Art

[0002] As an intermediate station in the natural gas transportation process, the oil and gas station plays the role of the "heart" in the long-distance transportation of natural gas, providing power for the stable transportation of natural gas. As the core power equipment in the oil and gas station, the compressor unit continuously provides power for the transportation of natural gas, and is an extremely critical compressor unit in the oil and gas station. Therefore, by conducting a risk analysis on the failure mode of the compressor unit and timely mastering the operating status of the compressor unit, it is extremely important to ensure the normal operation of the compressor unit. Therefore, by conducting a risk analysis on the failure mode of the compressor unit and timely mastering the operating status of the compressor unit, it is extremely important to ensure the normal operation of the compressor unit. At present, the theory and application of RCM (Reliability Centered Maintenance) have been introduced into the formulation of air force and civil aviation maintenance plans, and its effects have been tracked and affirmed. In the petrochemical system, the application of RCM not only avoids excessive maintenance and reduces maintenance costs, but also improves the reliability of equipment. However, traditional RCM technology determines the risk level of equipment through qualitative risk level analysis. It is unable to identify in detail the risk relationship between each device in the risk assessment among many devices. In addition, traditional RCM technology conducts risk assessment research based on the compressor unit itself, without considering the mutual influence relationship between equipment in the station, and the risk assessment results are of low accuracy. Summary of the invention

[0003] The purpose of the present application is to provide a risk assessment method, system, computer-readable storage medium and electronic device for a compressor unit in an oil and gas station, taking into account the mutual influence between the equipment in the station, and improving the accuracy of the risk assessment results in the oil and gas station.

[0004] In order to solve the above technical problems, the present application provides a risk assessment method for oil and gas station compressor units. The specific technical solution is as follows:

[0005] Determining the domino effect relationship between the compressor units in the oil and gas station;

[0006] Determining a failure probability under the domino effect relationship, and performing a probability conversion between the failure probability and the failure frequency to obtain the failure frequency;

[0007] Constructing a three-dimensional risk matrix chromatogram corresponding to the fault frequency;

[0008] The three-dimensional risk matrix chromatogram is used to perform equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group.

[0009] Optionally, determining the domino effect relationship between the compressor units in the oil and gas station comprises:

[0010] Determine the failure probability of the compressor unit in the oil and gas station, and determine the inherent risk of the equipment based on the failure probability;

[0011] A domino effect risk analysis is performed on the compressor unit based on the inherent risk of the equipment to determine the domino effect relationship.

[0012] Optionally, determining the failure probability under the domino effect relationship, and performing probability conversion between the failure probability and the failure frequency to obtain the failure frequency includes:

[0013] The weight proportion of the failure mode is determined by using the analytic hierarchy process;

[0014] Calculate the failure probability affected by the domino effect relationship under each failure mode of the compressor unit by using the weight proportion;

[0015] The failure probability is converted into the failure frequency using a conversion formula.

[0016] Optionally, constructing the three-dimensional risk matrix chromatogram corresponding to the fault frequency includes:

[0017] Determine the risk level representation value corresponding to the fault frequency based on the triangular fuzzy number;

[0018] The importance coefficient values ​​of the fault frequency, the fault consequence and the difficulty of detection are set, and a three-dimensional risk matrix is ​​calculated based on the risk level characterization value; the sum of the importance coefficient values ​​of the fault frequency, the fault consequence and the difficulty of detection is 1;

[0019] Draw a three-dimensional risk matrix chromatogram corresponding to the three-dimensional risk matrix.

[0020] Optionally, performing equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group includes:

[0021] Constructing a fuzzy rule base according to the three-dimensional risk matrix chromatogram;

[0022] Calculating the risk value of each failure mode of the compressor unit based on the fuzzy rule base;

[0023] A risk status corresponding to the risk value is determined.

[0024] Optionally, performing a domino effect risk analysis on the compressor unit based on the inherent risk of the equipment to determine the domino effect relationship includes:

[0025] Obtaining an equipment layout diagram corresponding to the oil and gas station, and determining a distance matrix between equipment based on the equipment layout diagram;

[0026] The probability data of damage to the station equipment caused by the shock wave overpressure is calculated using a standard normal Gaussian distribution function model according to the distance matrix between the equipment;

[0027] Determine the probability vector of domino efficiency after the initial event occurs;

[0028] The domino effect relationship between the equipment in the oil and gas station is determined according to the possibility data and the probability vector.

[0029] Optionally, the conversion formula is:

[0030]

[0031] Among them, a and b represent the upper and lower limits of the fault frequency level interval, respectively, c and d represent the upper and lower limits of the failure probability level interval, respectively, x represents the failure frequency of the failure mode, and y represents the corresponding failure probability.

[0032] The present application also provides a risk assessment system for an oil and gas station compressor unit, comprising:

[0033] A domino effect calculation module, used to determine the domino effect relationship between the compressor units in the oil and gas station;

[0034] A failure frequency calculation module, used to determine the failure probability under the domino effect relationship, and perform probability conversion between the failure probability and the failure frequency to obtain the failure frequency;

[0035] A risk calculation module, used to construct a three-dimensional risk matrix chromatogram corresponding to the fault frequency;

[0036] The risk assessment module uses the three-dimensional risk matrix chromatogram to perform equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group.

[0037] The present application also provides a computer-readable storage medium having a computer program stored thereon, and the computer program implements the steps of the above-mentioned method when executed by a processor.

[0038] The present application also provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps of the above-mentioned method when calling the computer program in the memory.

[0039] The present application provides a risk assessment method for compressor groups in an oil and gas station, comprising: determining the domino effect relationship between the compressor groups in the oil and gas station; determining the failure probability under the domino effect relationship, and performing a probability conversion between the failure probability and the fault frequency to obtain the fault frequency; constructing a three-dimensional risk matrix chromatogram corresponding to the fault frequency; and performing equipment fuzzy risk calculation on the compressor group using the three-dimensional risk matrix chromatogram to determine the risk status of the compressor group.

[0040] This application introduces the domino effect principle, fully considers the mutual influence relationship between the equipment in the station, and quantifies the influence of the domino effect between the equipment as the failure probability under the domino effect relationship. The risk of equipment is composed of the inherent risk of the equipment and the domino failure risk between the equipment. The domino failure risk between the equipment is calculated from the perspective of the oil and gas station system, so that the equipment risk assessment is more in line with the actual situation and the risk assessment results are more accurate.

[0041] The present application also provides a risk assessment system for an oil and gas station compressor unit, a computer-readable storage medium, and an electronic device, which have the above-mentioned beneficial effects and will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0043] Figure 1 A flow chart of a risk assessment method for a compressor unit in an oil and gas station provided in an embodiment of the present application;

[0044] Figure 2 A schematic diagram of a three-dimensional risk matrix chromatogram is provided for the embodiment of the present application;

[0045] Figure 3 A schematic diagram of a fuzzy number function of an input variable provided in an embodiment of the present application;

[0046] Figure 4 A schematic diagram of a fuzzy number function of an output variable provided in an embodiment of the present application;

[0047] Figure 5 A schematic diagram of the layout of the main equipment provided in the embodiment of the present application;

[0048] Figure 6 A device spacing mapping surface diagram provided in an embodiment of the present application;

[0049] Figure 7 A domino effect risk diagram between devices provided in an embodiment of the present application;

[0050] Figure 8 A failure mode risk unit distribution diagram of a compressor unit 1 provided in an embodiment of the present application;

[0051] Fig. 9 A distribution diagram of the risk level of the compressor unit 1 failure mode provided in an embodiment of the present application;

[0052] Fig.10 A comparison chart of risk levels of compressor units provided in an embodiment of the present application;

[0053] Fig.11 A comparison chart of the risk values ​​of the compressor unit 1 provided in the embodiment of the present application;

[0054] Fig.12 A comparison chart of the risk values ​​of the compressor unit 2 provided in the embodiment of the present application;

[0055] Fig.13 A comparison chart of the risk values ​​of the compressor unit 3 provided in the embodiment of the present application;

[0056] Fig.14 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0057] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0058] Domino effect analysis can make up for the shortcomings of RCM technology, that is, by analyzing the layout of equipment in the station, adding the risk of domino failure between equipment on the basis of inherent risk of equipment, thereby improving the accuracy of equipment risk assessment. Fuzzy risk reasoning can quantify the risk assessment indicators of RCM, which can not only accurately determine the risk level of equipment, but also quantify the risk of equipment, making it easier to intuitively depict the risk severity of each equipment.

[0059] This application combines RCM technology with the domino effect and fuzzy risk reasoning, proposes a fuzzy risk assessment method for oil and gas station dynamic equipment that takes the domino effect into account, and analyzes the risk level and risk value of the six main failure modes of the compressor unit in a station. Specifically, first, the domino failure probability and total failure probability of the compressor are calculated by combining the layout diagram of the equipment in the oil and gas station with the inherent risk of the equipment; secondly, the nine-point scaling method is used to calculate the impact weight value of each failure mode of the compressor unit; then, the fuzzy reasoning method is used to construct a three-dimensional risk matrix of the compressor failure mode, and then the "IF-THEN" fuzzy rule base is constructed; finally, the risk value of each failure mode of the compressor is calculated based on the three-dimensional risk matrix.

[0060] See also Figure 1 , Figure 1 A flow chart of a risk assessment method for a compressor unit in an oil and gas station provided in an embodiment of the present application, the method comprising:

[0061] S101: Determine the domino effect relationship between the compressor units in the oil and gas station;

[0062] S102: determining a failure probability under the domino effect relationship, and performing a probability conversion between the failure probability and the failure frequency to obtain the failure frequency;

[0063] S103: constructing a three-dimensional risk matrix chromatogram corresponding to the fault frequency;

[0064] S104: Utilizing the three-dimensional risk matrix chromatogram to perform equipment fuzzy risk calculation on the compressor group, and determining the risk status of the compressor group.

[0065] Step S101 first performs domino effect analysis between devices:

[0066] The general idea of ​​domino effect risk analysis between equipment is to determine the failure probability of the compressor unit in the oil and gas station, and determine the inherent risk of the equipment based on the failure probability. Then, based on the inherent risk of the equipment, the domino effect risk analysis of the compressor unit is performed to determine the domino effect relationship. The specific process is described as follows:

[0067] First, perform the failure probability and inherent risk analysis of the static equipment in the oil and gas station. Since the inherent risk of the equipment is affected by the failure probability of the equipment and the danger index of the equipment, and the failure probability and danger index of the same equipment are also the same. The failure probability and danger index of the compressor unit are shown in Table 1, where COF is the "failure probability" and C is the "danger index":

[0068] Table 1 Failure probability and hazard index of compressor unit

[0069] equipment COF C <![CDATA[R G ]]> Compressor unit <![CDATA[6.0×10 -3 ]]> 90.828 <![CDATA[5.45×10 -1 ]]>

[0070] The management system correction factor is obtained by summarizing the 101 questions in the management system assessment workbook and converting each question into a management system correction factor. The mathematical expression is:

[0071]

[0072] Where: S is the evaluation parameter of the management system for each problem in the work manual.

[0073] The inherent risk of equipment is related to the failure probability and hazard index of the equipment. The calculation formula of inherent risk is shown in formula (2):

[0074] R G =POF×C i (2);

[0075] In the formula, R G is the inherent risk of the equipment; POF is the probability of equipment failure; C i is the risk index of the ith device.

[0076] The domino effect risk of equipment is mainly affected by the failure risk of each equipment in the oil and gas station and the distance between the equipment. Therefore, by drawing a simple layout diagram of the main equipment in the station, the distance matrix between the equipment can be calculated.

[0077] This embodiment uses a standard normal Gaussian distribution function model to calculate the possibility of damage to station equipment caused by shock wave overpressure. The calculation formula is as follows:

[0078]

[0079] Where f is the possibility of damage to the station equipment; Y is the unit of the target equipment damage probability; σ and u refer to the variance and median of the Gaussian distribution function, respectively.

[0080] Through the above analysis steps, we can determine the probability vector F of the domino effect after the initial event occurs:

[0081]

[0082] In the formula, f ij It represents the probability that the initial accident of the i-th device will lead to a domino accident in the j-th device due to the domino effect; n is the number of devices.

[0083] The domino effect risk calculation formula for equipment is as follows:

[0084]

[0085] In the formula, P0 is the initial probability of the event, Cj is the risk index of the jth device, and D refers to the relevant parameters affected by the domino effect.

[0086] In an oil and gas station, for example, if the probability of a leak in the equipment leading to a vapor cloud explosion is 0.04, then the initial event probability P0 is:

[0087] P0=0.04POF(6);

[0088] In order to introduce the risk of domino effect between equipment to compressor units into the RCM analysis process, this application converts the failure frequency of RCM analysis of dynamic equipment (mainly including pumps and compressor units) with the failure probability of RBI analysis of static equipment, and then superimposes it with the domino effect probability, so as to obtain the total risk of dynamic equipment after considering the domino effect risk. By analyzing the FMEA (Failure Mode and Effects Analysis) table of a compressor, 6 common failure modes are selected for risk reasoning analysis.

[0089] The idea of ​​conversion analysis between the failure frequency and failure probability of equipment is as follows: first, the analytic hierarchy process is used to determine the weight ratio of the failure mode to calculate the risk of each failure mode of the compressor unit; secondly, the domino effect risk of each failure mode of the compressor unit is analyzed; then, the failure frequency risk of each failure mode of the compressor unit is analyzed; finally, the total failure frequency risk of each failure mode of the compressor unit is analyzed based on the domino effect risk and the failure frequency risk.

[0090] The specific process is described as follows:

[0091] The first step is to use the hierarchical analysis method to determine the weight ratio of the failure mode;

[0092] Through the judgment and evaluation of each fault mode, the consistent judgment matrix is ​​obtained according to the nine-point scaling method as shown in formula (7):

[0093]

[0094] The eigenvalue and CR value of the consistency judgment matrix are calculated to determine whether it passes the consistency test.

[0095] The meaning of the nine-point scale is shown in Table 2:

[0096] Table 2 Meaning of the nine-point scale method

[0097] Scale meaning 1 Indicates that two factors are equally important. 3 Indicates that one factor is slightly more important than the other factor. 5 Indicates that one factor is significantly more important than the other factor when compared with the other factor. 7 Indicates that one factor is more important than the other. 9 Indicates that one factor is extremely more important than the other. 2,4,6,8 The median of the above two adjacent judgments reciprocal <![CDATA[Judgment a for comparison between factor i and j ij , then judgment a for comparison between factor j and i ji = 1 / a ij >

[0098] Then, the weight matrix of each failure mode of the compressor unit is calculated according to the arithmetic mean method:

[0099]

[0100] Step 2: Risk analysis of domino effect of various failure modes of compressor units:

[0101] By calculating the domino effect between the equipment in the station, the domino failure probability R of the compressor unit can be obtained. D According to the risk ratio of each failure mode of the compressor unit, the domino effect risk R of each failure mode can be calculated. M for:

[0102]

[0103] Step 3: Failure frequency risk analysis of each failure mode of the compressor unit:

[0104] By analyzing the FMEA table of a compressor unit, it can be concluded that the six fault modes with higher fault frequencies are: vibration or abnormal noise, surge, seal leakage, abnormal outlet medium temperature, high bearing temperature and abnormal shutdown. Then, the fault frequency of each fault mode is statistically analyzed, as shown in Table 3:

[0105] Table 3 Failure probability of failure mode

[0106] Failure Mode Failure frequency Vibration or abnormal noise 6 Surge 0.6 Seal leakage 3.91 Abnormal outlet medium temperature 2.3 High bearing temperature 3.22 Abnormal shutdown 1.6

[0107] Step 4: Total risk analysis of failure frequency of each failure mode of the compressor unit:

[0108] In order to introduce the risk of domino effect between equipment to the compressor unit into the RCM analysis process, this application converts the failure frequency of the RCM analysis of dynamic equipment with the failure probability of the RBI analysis of static equipment, and then superimposes it with the domino effect probability, so as to obtain the total risk of the dynamic equipment after considering the domino effect risk.

[0109] In this regard, the conversion between fault frequency and failure probability and the related calculation steps of this application are as follows:

[0110] 1. Convert the failure frequency into the failure probability in RBI analysis according to the risk level (proportional conversion for each level).

[0111] 2. Add the failure probability and the domino failure probability to get the total failure probability.

[0112] 3. Convert the total failure probability into the total failure frequency by reverse calculation according to step 1.

[0113] 4. Convert the total failure frequency into fuzzy numbers for risk calculation.

[0114] The conversion formula between fault frequency and failure probability is as follows:

[0115]

[0116] Where a and b represent the upper and lower limits of the fault frequency level interval, respectively; c and d represent the upper and lower limits of the failure probability level interval, respectively; x represents the failure frequency of the failure mode, and y represents the corresponding failure probability value.

[0117] The overall idea of ​​constructing a three-dimensional risk matrix chromatogram is: first, determine the risk level representation value based on triangular fuzzy numbers; then, calculate the three-dimensional risk matrix based on failure frequency, failure consequences, and difficulty of detection; finally, draw a three-dimensional risk matrix chromatogram. The specific process is described as follows:

[0118] First, the risk level characterization value is determined based on the triangular fuzzy number:

[0119] Before risk reasoning, it is necessary to define the fuzzy linguistic variables of input and output and determine the corresponding membership functions, which can be done by the following steps: First, the input variables (failure probability value, failure consequence value) and output variables (risk value) are regarded as fuzzy linguistic variables and are consistent with the risk matrix. After that, the levels of input variables and output variables are represented by triangular fuzzy numbers A = [a, b, c] on the domain [0, 10], as shown in Table 4, including the levels of input variables low (L), lower (RL), medium (M), higher (RH), high (H) and the levels of output variables low (L), medium (M), higher (RH), high (H). Finally, the membership functions of input variables and output variables can be obtained through the triangular fuzzy numbers of fuzzy variables.

[0120] Table 4 Triangular fuzzy numbers of fuzzy linguistic variables

[0121] grade Low (L) Lower (RL) Medium (M) Higher (RH) High (H) enter (0,0,2.5) (0,2.5,5) (2.5,5,7.5) (5,7.5,10) (7.5,10,10) Output (0,2,4) — (2,4,6) (4,6,8) (6,8,10)

[0122] In fuzzy control, the fuzzification of input variables is to map input variables from precise real values ​​to fuzzy language variables, so as to make them suitable for fuzzy logic reasoning. According to the membership function of the input variables, the horizontal coordinates of the intersection of two adjacent membership functions are taken as the dividing points of each risk level, and the level distribution range of the input variables can be obtained as shown in Table 5.

[0123] Table 5. Level interval distribution of fuzzy linguistic variables of input function

[0124]

[0125] Since the risk of the compressor unit is ultimately measured by the risk value obtained by fuzzy logic reasoning, the median of the level interval of the fuzzy linguistic variables of each input function is taken as the representation value of the risk level to calculate the three-dimensional risk matrix. The median of the level interval of the fuzzy linguistic variables of each input function is shown in Table 6:

[0126] Table 6: Median table of level intervals of fuzzy linguistic variables of input function

[0127]

[0128] Secondly, a three-dimensional risk matrix is ​​calculated based on failure frequency, failure consequences, and difficulty of detection:

[0129] Due to the different importance of the failure frequency, failure consequence and difficulty of detection of the compressor unit, the importance of the failure frequency, failure consequence and difficulty of detection are set to 40%, 40% and 20% respectively. Based on this, the three-dimensional risk matrix is ​​calculated. The calculation results are shown in Table 7:

[0130] Table 7 Three-dimensional risk matrix numerical table

[0131]

[0132] Note: The three numbers in the combination column in the table represent the risk level combination of failure frequency, failure consequence and difficulty of detection, where 1 represents low (L), 2 represents lower (RL), 3 represents medium (M), 4 represents higher (RH) and 5 represents high (H).

[0133] Based on the four risk levels in the output function level interval distribution table, the risk levels in the three-dimensional risk matrix numerical table are divided, and a three-dimensional risk matrix chromatogram is drawn as shown in Figure 2 shown.

[0134] The overall idea of ​​fuzzy risk reasoning analysis of equipment is: first, build a fuzzy rule base based on the three-dimensional risk matrix chromatogram; then, calculate the risk value of each failure mode of the compressor unit based on the fuzzy rule base. The specific process is described as follows:

[0135] Constructing a fuzzy rule base based on the three-dimensional risk matrix chromatogram:

[0136] Taking the 5×5×5 risk matrix chromatogram as an example, it is converted into a fuzzy rule base. There are 125 fuzzy rules in total, some of which are shown in Table 8:

[0137] Table 8 Fuzzy rule base

[0138]

[0139] Calculate the risk value of each failure mode of the compressor unit based on the fuzzy rule base:

[0140] Firstly, the input and output membership functions of the fuzzy risk system are established according to the evaluation criteria of the failure probability, failure consequence level and equipment risk level of the equipment. Figure 3 and Figure 4 , Figure 3 A schematic diagram of a fuzzy number function of an input variable provided in an embodiment of the present application, and Figure 4 A schematic diagram of a fuzzy number function of an output variable provided in an embodiment of the present application.

[0141] The failure probability level table and the failure consequence level table are matched with the level interval distribution table of the fuzzy linguistic variables, and then the failure probability and the failure consequence are mapped from the real value to the fuzzy number to obtain the corresponding fuzzy number. The calculation formula is shown in formula (11):

[0142]

[0143] In the formula, x represents a fuzzy number, ξ represents the true value of the failure probability or failure consequence; high Indicates the upper bound of the level to which the true value belongs; ξ low It indicates the lower bound of the level to which the true value belongs, and p and q correspond to the level distribution interval in Table 6, indicating the lower and upper limits of the interval respectively.

[0144] The following is a detailed introduction to the technical solution of this application in conjunction with specific implementation cases. The dynamic equipment in the oil and gas station is the key power equipment for the collection, purification, storage and transportation of natural gas and oil. Therefore, the dynamic equipment in the oil and gas station is used to verify the accuracy and rationality of this application.

[0145] As the core power equipment in oil and gas stations, compressor units continuously provide power for the transportation of natural gas and are extremely critical dynamic equipment in oil and gas stations. Summarizing the failure modes of station dynamic equipment, clarifying the acceptable risk level, and improving the equipment and facility asset integrity management system will help to maximize the effective operation of the equipment and facility system and eliminate the unsafe state of equipment and facilities in a timely manner. Therefore, risk analysis of dynamic equipment in oil and gas stations is very necessary.

[0146] First, determine the domino effect relationship between the compressor units in the oil and gas station. The first step is to analyze the failure probability and inherent risk of static equipment in the oil and gas station. By analyzing the three influencing factors of the equipment, namely the general factor, mechanical factor and process factor, the evaluation value details of the compressor unit are shown in Table 9:

[0147] Table 9 Equipment Correction Factor

[0148] Evaluation criteria Judges' scores Universal Factor 1 Mechanical Factor 5 Process Factor 0 Total score 6

[0149] The similar failure frequency, management system correction factor, equipment correction factor and failure probability of the compressor unit are shown in Table 10:

[0150] Table 10 Failure probability of compressor unit

[0151] equipment <![CDATA[P k ]]> <![CDATA[F h ]]> <![CDATA[F D ]]> PoF Compressor unit <![CDATA[6.00×10 -3 ]]> 0.203 6 <![CDATA[7.308×10 -3 ]]>

[0152] Combining the equipment hazard index with the inherent risk calculation formula, the inherent risk of each equipment in the station is calculated. The calculation results are shown in Table 11:

[0153] Table 11 Equipment inherent risks

[0154] equipment COF C Inherent risks Compressor unit 1 <![CDATA[6.0×10 -3 ]]> 90.828 <![CDATA[5.45×10 -1 ]]> Compressor unit 2 <![CDATA[6.0×10 -3 ]]> 90.828 <![CDATA[5.45×10 -1 ]]> Compressor unit 3 <![CDATA[6.0×10 -3 ]]> 90.828 <![CDATA[5.45×10 -1 ]]>

[0155] Before conducting a domino risk analysis on the equipment, it is necessary to first draw the location layout information of the main equipment in the station. The plan layout diagram of the main equipment in the station is as follows: Figure 5 As shown, Figure 5 A schematic diagram of the plan layout of the main equipment provided in the embodiment of the present application.

[0156] According to the plan layout diagram of the main equipment of the oil and gas station, the main equipment of the station is first numbered, and then the distance between each equipment is calculated. The numbering of each equipment is shown in Table 12:

[0157] Table 12 Equipment No.

[0158] equipment serial number equipment serial number Filter separator 1 1 Heat exchanger 1 11 Filter separator 2 2 Heat exchanger 2 12 Filter separator 3 3 Heat exchanger 3 13 Filter separator 4 4 Ultrasonic flow meter 1 14 Cyclone separator 1 5 Ultrasonic flow meter 2 15 Cyclone separator 2 6 Ultrasonic flow meter 3 16 Cyclone separator 3 7 Ultrasonic flow meter 4 17 Cyclone separator 4 8 Compressor unit 1 18 Ball barrel 1 9 Compressor unit 2 19 Ball barrel 2 10 Compressor unit 3 20

[0159] According to the schematic diagram of the main equipment layout of the station, the distance between each device is calculated, and the equipment distance mapping surface diagram is drawn through the equipment distance matrix. Figure 6 As shown, Figure 6 The device spacing mapping surface diagram provided in the embodiment of the present application facilitates direct observation of the distance relationship between devices.

[0160] According to the distance relationship between the devices, this application calculates the maximum overpressure of the explosion shock wave in the positive phase to estimate the probability of device failure caused by the domino effect between the devices. i,j Calculate and draw the domino effect risk map between devices through the domino effect failure probability matrix. Figure 7 As shown, Figure 7 The domino effect risk diagram between devices provided in the embodiment of the present application is provided by Figure 7 It can be seen that the smaller the distance between devices, the higher the probability of domino effect failure.

[0161] The domino failure probability of the compressor unit is calculated according to formulas (2) to (6) in the above embodiment, and the results are shown in Table 13:

[0162] Table 13 Domino effect risk of compressor units

[0163]

[0164]

[0165] After that, the conversion between fault frequency and failure probability is performed. First, the weight ratio of the fault mode is determined by using the hierarchical analysis method:

[0166] Since each failure mode of the compressor unit has different effects on the normal operation of the compressor, the relative importance of each failure mode is determined by pairwise comparison through the hierarchical analysis method, and then the impact weight value of each failure mode is obtained.

[0167] By investigating the subjective judgment and evaluation of experts on each fault mode, the consistent judgment matrix is ​​obtained according to the nine-point scaling method as shown in formula (12):

[0168]

[0169] The eigenvalue λ of the consistent judgment matrix can be calculated by Python max =6.049, and CR =7.93×10 -3 <0.1, passed the consistency test.

[0170] The weights are then calculated using the arithmetic mean method:

[0171] The first step is to normalize each column;

[0172] The second step is to add the columns of the normalized matrix to obtain a column vector;

[0173] The third step is to divide this column vector by n to obtain the weight matrix w, where n is the original number of columns.

[0174] The consistent judgment matrix is ​​calculated by Python, and the weight matrix of each failure mode of the compressor unit is obtained as follows:

[0175]

[0176] When performing the domino effect risk analysis of each failure mode of the compressor unit, based on the weight matrix of each failure mode of the compressor unit calculated above, the domino effect risk of each failure mode of the three compressor units is calculated, and the results are shown in Table 14:

[0177] Table 14 Failure probability of compressor unit affected by domino effect

[0178]

[0179]

[0180] When analyzing the failure frequency risk of each failure mode of the compressor unit, the failure frequency of each failure mode of the compressor unit is converted into failure probability through formula (10). The conversion results are shown in Table 15:

[0181] Table 15 Failure probability of failure mode

[0182] Failure Mode Failure frequency Failure probability Vibration or abnormal noise 6 <![CDATA[4.996×10 -1 ]]> Surge 0.6 <![CDATA[2.543×10 -3 ]]> Seal leakage 3.91 <![CDATA[4.628×10 -2 ]]> Abnormal outlet medium temperature 2.3 <![CDATA[7.175×10 -3 ]]> High bearing temperature 3.22 <![CDATA[1.807×10 -2 ]]> Abnormal shutdown 1.6 <![CDATA[5.268×10 -3 ]]>

[0183] Finally, the total risk analysis of the failure frequency of each failure mode of the compressor unit is performed: Combining the failure frequency of each failure mode of the compressor unit itself and the impact of the station domino effect on the compressor unit, the total risk of the failure frequency of each failure mode is shown in Table 16:

[0184] Table 16 Total risk of compressor unit failure probability

[0185]

[0186] The failure probability of each failure mode of the compressor unit is converted into the failure frequency by formula (10). The conversion results are shown in Table 17:

[0187] Table 17 Total risk of compressor unit failure frequency

[0188]

[0189] In the third phase, equipment fuzzy risk reasoning analysis is performed.

[0190] First, calculate the fault frequency fuzzy number:

[0191] In order to conduct risk analysis on the failure modes of the compressor unit, the failure frequency of each failure mode can be converted into a fuzzy number by formula (11), as shown in Table 18:

[0192] Table 18 Fuzzy number of compressor unit fault frequency

[0193]

[0194] Fuzzy number calculation of fault consequences and difficulty in detection

[0195] Since the risk measures of failure consequences and difficulty in detection are both qualitative analyses, the median of the corresponding risk level interval is taken as its fuzzy number to calculate the risk value. The fuzzy values ​​of failure consequences and difficulty in detection are shown in Table 19:

[0196] Table 19 Fault consequences and fuzzy numbers of difficulty in detection

[0197]

[0198]

[0199] Based on the mapping conditions of the membership function and the fuzzy rule base mentioned above, the risk value of the compressor unit failure mode is calculated by the FuzzyLogic Designer program in Matlab software. The calculation results are shown in Tables 20 to 22:

[0200] The risk values ​​of compressor unit 1 are shown in Table 20:

[0201] Table 20 Risk value of compressor unit 1

[0202]

[0203] The risk values ​​of compressor unit 2 are shown in Table 21:

[0204] Table 21 Risk value of compressor unit 2

[0205]

[0206] The risk values ​​of compressor unit 3 are shown in Table 22:

[0207] Table 22 Risk value of compressor unit 3

[0208]

[0209]

[0210] The risk unit diagrams of each facet of the three-dimensional risk matrix are as follows: Figure 8 As shown, Figure 8 The risk unit distribution diagram of the compressor unit 1 fault mode provided in the embodiment of the present application represents the five-layer expansion diagram from the inside to the outside of the three-dimensional risk matrix from left to right. Taking the calculation result of the compressor unit 1 as an example, the risk unit position distribution of each fault mode in the three-dimensional risk matrix is ​​as follows: Figure 8 shown.

[0211] The risk level is represented as follows: Fig. 9 As shown in the figure, from left to right, they represent four risk levels: low (L), medium (M), relatively high (RH) and high (H). Taking the calculation results of compressor unit 1 as an example, the risk values ​​of each fault mode are distributed in the risk unit position in the three-dimensional risk matrix as shown in the figure. Fig. 9 As shown, Fig. 9 This is a failure mode risk level distribution diagram of the compressor unit 1 provided in an embodiment of the present application.

[0212] pass Fig. 9It can be seen that among the six main failure modes of compressor unit 1, the risk level of surge is M, the risk level of seal leakage, high bearing temperature and abnormal outlet medium temperature is RH, and the risk level of abnormal shutdown and vibration or abnormal noise is H. It can be seen that the risk level of the failure mode of compressor unit 1 is high, and it is necessary to formulate a maintenance plan for the failure mode of the compressor unit in time.

[0213] Without considering the influence of the domino effect of the station on the various failure modes of the compressor unit, the risk value of each failure mode is calculated by fuzzy risk reasoning. The calculation results are shown in Table 19:

[0214] Based on the above calculation of the original risk value of each failure mode of the compressor unit and the risk value considering the domino effect, a comparison chart of the risk levels of the three groups of compressor units before and after considering the domino effect can be obtained, as shown in the figure: Fig.10 As shown, Fig.10 A comparison chart of compressor unit risk levels provided in an embodiment of the present application.

[0215] pass Fig.10 It can be seen that the risk level of abnormal outlet medium temperature and abnormal shutdown increases after being affected by the domino effect, while the risk levels of other failure modes remain unchanged.

[0216] Based on the above calculation of the original risk value of each failure mode of the compressor unit and the risk value considering the domino effect, a comparison chart of the risk values ​​of the three groups of compressor units before and after considering the domino effect can be obtained, as shown in Figures 11 to 13 As shown, Fig.11 This is a comparison chart of the risk values ​​of the compressor unit 1 provided in the embodiment of the present application. Fig.12 This is a comparison chart of the risk values ​​of the compressor unit 2 provided in the embodiment of the present application. Fig.13 A comparison chart of the risk values ​​of the compressor unit 3 provided in the embodiment of the present application.

[0217] pass Figures 11 to 13 It can be seen that abnormal shutdown is greatly affected by the risk of station domino effect, surge and abnormal outlet temperature are second, and vibration or abnormal noise, high bearing temperature and seal leakage are less affected by the station domino effect.

[0218] The embodiment of the present application introduces a fuzzy reasoning method to measure the compressor unit failure mode through risk values, thereby quantifying the risks of different failure modes. The severity of the compressor unit failure mode risk can be judged by ranking the risk values, thus avoiding the occurrence of risk knots. However, the traditional RCM analysis method can only perform qualitative analysis on the risk of dynamic equipment, but cannot distinguish the risk severity of different failure modes of the same risk level, which easily leads to risk knots.

[0219] This application introduces the principle of domino effect, fully considers the mutual influence relationship between the equipment in the station, and quantifies the impact of domino effect between equipment as domino failure probability. The risk of equipment is composed of the inherent risk of the equipment and the risk of domino failure between equipment. The domino failure risk between equipment is calculated from the perspective of the oil and gas station system, making the equipment risk assessment more in line with the actual situation. However, the traditional RCM analysis method only conducts risk assessment on a single device when determining the risk level, without considering the mutual influence relationship between equipment in the oil and gas station, making the risk assessment result inconsistent with reality.

[0220] This application establishes a conversion relationship between failure probability and fault frequency, converts the domino failure probability and fault frequency, and then superimposes them to obtain the total risk of each failure mode of the compressor unit in the entire oil and gas station system, making the risk assessment result more accurate. The traditional RCM analysis method only considers the impact of the failure frequency of the dynamic equipment itself on the equipment risk, but does not consider the impact of the domino effect risk.

[0221] The present application also provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed, the steps provided in the above embodiment can be implemented. The storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0222] The present application also provides a risk assessment system for an oil and gas station compressor unit, comprising:

[0223] A domino effect calculation module, used to determine the domino effect relationship between the compressor units in the oil and gas station;

[0224] A failure frequency calculation module, used to determine the failure probability under the domino effect relationship, and perform probability conversion between the failure probability and the failure frequency to obtain the failure frequency;

[0225] A risk calculation module, used to construct a three-dimensional risk matrix chromatogram corresponding to the fault frequency;

[0226] The risk assessment module uses the three-dimensional risk matrix chromatogram to perform equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group.

[0227] The present application also provides an electronic device, see Fig.14 , a structural diagram of an electronic device provided in an embodiment of the present application, such as Fig.14 As shown, a processor 1410 and a memory 1420 may be included.

[0228] Among them, the processor 1410 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 1410 may be implemented in at least one hardware form of DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). The processor 1410 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a CPU (Central Processing Unit); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 1410 may be integrated with a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 1410 may also include an AI (Artificial Intelligence) processor, which is used to process computing operations related to machine learning.

[0229] The memory 1420 may include one or more computer-readable storage media, which may be non-transitory. The memory 1420 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 1420 is at least used to store the following computer program 1421, wherein, after the computer program is loaded and executed by the processor 1410, it can implement the relevant steps in the method performed by the electronic device side disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 1420 may also include an operating system 1422 and data 1423, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 1422 may include Windows, Linux, Android, etc.

[0230] In some embodiments, the electronic device may further include a display screen 1430 , an input / output interface 1440 , a communication interface 1450 , a sensor 1460 , a power source 1470 , and a communication bus 1480 .

[0231] certainly, Fig.14 The structure of the electronic device shown does not constitute a limitation on the electronic device in the embodiments of the present application. In actual applications, the electronic device may include Fig.14 More or fewer components than shown, or combinations of certain components.

[0232] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other. For the system provided in the embodiment, since it corresponds to the method provided in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0233] The present application uses specific examples to illustrate the principles and implementation methods of the present application, and the description of the above embodiments is only used to help understand the method and core ideas of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

[0234] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.

Claims

1. A risk assessment method for oil and gas station compressor units, characterized in that: include: Determining the domino effect relationship between the compressor units in the oil and gas station; Determining a failure probability under the domino effect relationship, and performing a probability conversion between the failure probability and the failure frequency to obtain the failure frequency; Constructing a three-dimensional risk matrix chromatogram corresponding to the fault frequency; The three-dimensional risk matrix chromatogram is used to perform equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group.

2. The risk assessment method according to claim 1, characterized in that: Determining the domino effect relationship between the compressor units in the oil and gas station comprises: Determine the failure probability of the compressor unit in the oil and gas station, and determine the inherent risk of the equipment based on the failure probability; A domino effect risk analysis is performed on the compressor unit based on the inherent risk of the equipment to determine the domino effect relationship.

3. The risk assessment method according to claim 1, characterized in that: The determining of the failure probability under the domino effect relationship and performing probability conversion between the failure probability and the failure frequency to obtain the failure frequency includes: The weight proportion of the failure mode is determined by using the analytic hierarchy process; Calculate the failure probability affected by the domino effect relationship under each failure mode of the compressor unit by using the weight proportion; The failure probability is converted into the failure frequency using a conversion formula.

4. The risk assessment method according to claim 1, characterized in that: The constructing of the three-dimensional risk matrix chromatogram corresponding to the fault frequency comprises: Determine the risk level representation value corresponding to the fault frequency based on the triangular fuzzy number; The importance coefficient values ​​of the fault frequency, the fault consequence and the difficulty of detection are set, and a three-dimensional risk matrix is ​​calculated based on the risk level characterization value; the sum of the importance coefficient values ​​of the fault frequency, the fault consequence and the difficulty of detection is 1; Draw a three-dimensional risk matrix chromatogram corresponding to the three-dimensional risk matrix.

5. The risk assessment method according to claim 1, characterized in that: The performing equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group comprises: Constructing a fuzzy rule base according to the three-dimensional risk matrix chromatogram; Calculating the risk value of each failure mode of the compressor unit based on the fuzzy rule base; A risk status corresponding to the risk value is determined.

6. The risk assessment method according to claim 2, characterized in that: The performing domino effect risk analysis on the compressor unit based on the inherent risk of the equipment to determine the domino effect relationship comprises: Obtaining an equipment layout diagram corresponding to the oil and gas station, and determining a distance matrix between equipment based on the equipment layout diagram; The probability data of damage to the station equipment caused by the shock wave overpressure is calculated using a standard normal Gaussian distribution function model according to the distance matrix between the equipment; Determine the probability vector of domino efficiency after the initial event occurs; The domino effect relationship between the equipment in the oil and gas station is determined according to the possibility data and the probability vector.

7. The risk assessment method according to claim 3, characterized in that: The conversion formula is: Among them, a and b represent the upper and lower limits of the fault frequency level interval, respectively, c and d represent the upper and lower limits of the failure probability level interval, respectively, x represents the failure frequency of the failure mode, and y represents the corresponding failure probability.

8. A risk assessment system for oil and gas station compressor units, characterized in that: include: A domino effect calculation module, used to determine the domino effect relationship between the compressor units in the oil and gas station; A failure frequency calculation module, used to determine the failure probability under the domino effect relationship, and perform probability conversion between the failure probability and the failure frequency to obtain the failure frequency; A risk calculation module, used to construct a three-dimensional risk matrix chromatogram corresponding to the fault frequency; The risk assessment module uses the three-dimensional risk matrix chromatogram to perform equipment fuzzy risk calculation on the compressor group to determine the risk status of the compressor group.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the risk assessment method according to any one of claims 1 to 7 are implemented.

10. An electronic device, characterized in that: The method comprises a memory and a processor, wherein a computer program is stored in the memory, and when the processor calls the computer program in the memory, the steps of the risk assessment method according to any one of claims 1 to 7 are implemented.