A railway intermediate station knowledge training method and system
By acquiring knowledge of intermediate railway stations and generating text and video data for training, and combining this with train timetables to determine the learning method, the problem of low training efficiency was solved, and the practical application of knowledge and improved learning outcomes were achieved.
Patent Information
- Application Number
- CN202411246311.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-06
AI Technical Summary
Existing technologies are inefficient for knowledge training at railway intermediate stations, making it difficult to effectively apply the trained knowledge to work tasks.
By acquiring relevant knowledge about intermediate railway stations, training method information is generated from text and video data. Train timetables are used to determine the learning styles of trainees, and suitable learning methods are determined in conjunction with practical tasks.
It improves training efficiency, enables training knowledge to be directly applied to practice, adapts to the learning styles of different trainees, and enhances learning outcomes.
Smart Images

Figure CN118780955B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway knowledge training, and in particular to a railway intermediate station knowledge training method and system. Background Art
[0002] The existing technology usually adopts the traditional training by teachers in the classroom, and then the learning status of the staff is tested through examinations. However, since the knowledge required for training at the railway intermediate station is very complicated, this method can only memorize the knowledge points and is difficult to be put into the work tasks of the railway intermediate station, resulting in low training efficiency. Summary of the invention
[0003] The purpose of the present invention is to provide a railway intermediate station knowledge training method and system to improve the above-mentioned problems.
[0004] In order to achieve the above objectives, the present application provides the following technical solutions:
[0005] On the one hand, an embodiment of the present application provides a railway intermediate station knowledge training method, the method comprising:
[0006] Acquiring first information, wherein the first information includes training knowledge related to railway intermediate stations;
[0007] generating first training method information according to the first information, wherein the first training method information includes training the trainee by using text data;
[0008] generating second training method information according to the first information, wherein the second training method information includes training the trainee by using video data;
[0009] generating a first train operation diagram according to the first training method, and generating a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained;
[0010] The learning method required by the personnel to be trained is determined according to the first train operation diagram and the second train operation diagram.
[0011] In a second aspect, an embodiment of the present application provides a railway intermediate station knowledge training system, the system comprising:
[0012] An acquisition module, used to acquire first information, wherein the first information includes relevant training knowledge of railway intermediate stations;
[0013] A first processing module, configured to generate first training method information according to the first information, wherein the first training method information includes training the trainee by using text data;
[0014] A second processing module is used to generate second training method information according to the first information, wherein the second training method information includes training the trainee by using video data;
[0015] A third processing module is used to generate a first train operation diagram according to the first training method, and generate a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained;
[0016] The fourth processing module is used to determine the learning method required by the trainee according to the first train operation diagram and the second train operation diagram.
[0017] In a third aspect, an embodiment of the present application provides a device, the device comprising a memory and a processor. The memory is used to store a computer program; the processor is used to implement the steps of the above-mentioned railway intermediate station knowledge training method when executing the computer program.
[0018] In a fourth aspect, an embodiment of the present application provides a readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above-mentioned railway intermediate station knowledge training method are implemented.
[0019] The beneficial effects of the present invention are:
[0020] The present invention extracts the first information and converts the first information into first training method information and second training method information for the trainees to learn, and judges the knowledge mastery of the trainees according to the train operation diagrams drawn by the trainees under different learning methods. It not only enables the trainees to apply the learned knowledge to practice, but also determines the learning method suitable for the trainees through practical tasks, thereby effectively improving the learning efficiency.
[0021] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0023] Figure 1The figure is a flow chart of the railway intermediate station knowledge training method described in an embodiment of the present invention.
[0024] Figure 2 Schematic diagram of the topological structure of the railway intermediate station knowledge training system described in an embodiment of the present invention.
[0025] Figure 3 It is a schematic diagram of the structure of the railway intermediate station knowledge training equipment described in an embodiment of the present invention.
[0026] Labels in the figure: 800, railway intermediate station knowledge training equipment; 801, processor; 802, memory; 803, multimedia component; 804, I / O interface; 805, communication component. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0028] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0029] Embodiment 1:
[0030] This embodiment provides a method for knowledge training of railway intermediate stations. It can be understood that a scenario can be laid out in this embodiment, for example: a scenario of providing knowledge training to the staff of railway intermediate stations before taking up their posts.
[0031] See also Figure 1 , the figure shows that the method includes step S1, step S2, step S3, step S4 and step S5, which specifically include:
[0032] Step S1, obtaining first information, wherein the first information includes relevant training knowledge of railway intermediate stations;
[0033] In this step, a large amount of text data related to railway intermediate stations is obtained, where the data source can be research papers, news reports, etc. These text data record the knowledge, work tasks and work skills that railway intermediate stations need to master.
[0034] Step S2, generating first training method information according to the first information, wherein the first training method information includes training the trainee by using text data;
[0035] The step S2 also includes step S21, step S22, step S23, step S24 and step S25, which specifically include:
[0036] Step S21, obtaining preset keyword information;
[0037] In this step, the preset keyword information is keywords that characterize the operation content and operation nature of the intermediate station.
[0038] Step S22, determining keyword information of each sentence in the first information;
[0039] In this step, the preset keyword information may be words related to the operation content and operation nature of the intermediate station, and specifically may be shunting plan, shunting personnel, shunting operation, and the like.
[0040] Step S23, calculating the similarity between the keyword information in each sentence and the preset keyword information to obtain similarity information;
[0041] Step S24, extracting the first information according to the similarity information to obtain key training information;
[0042] In this step, since the knowledge related to the railway intermediate station is very complicated, the first information can be extracted using the similarity information, and only the knowledge related to the skills of the training staff in the railway intermediate station is extracted, filtering out a large amount of invalid training knowledge.
[0043] Step S25: Generate a training text according to the key training information to obtain first training method information.
[0044] In this step, knowledge related to the skills of the training staff is used as key training information to generate relevant training texts for the trainees to study on their mobile phones.
[0045] Step S3, generating second training method information according to the first information, wherein the second training method information includes training the trainee using video data;
[0046] In this step, the first information is extracted to obtain key training information, and then corresponding video images and audio information are configured for the key training information to generate video data in the form of online courses for the trainees to study on their mobile phones.
[0047] Step S4: generating a first train operation diagram according to the first training method, and generating a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained;
[0048] In this step, after the same trainee has studied through two different learning methods, a train operation diagram is drawn to judge the trainee's knowledge mastery level. This not only enables the trainee to apply the learned knowledge to the task, but also can further judge which training method the trainee can better understand the knowledge according to the difference between the first train diagram and the second train diagram, so as to improve learning efficiency.
[0049] Step S5: determining the learning method required by the trainee according to the first train operation diagram and the second train operation diagram.
[0050] The step S5 also includes step S51, step S52 and step S53, which specifically include:
[0051] Step S51: determining first operation information according to the first train operation diagram, where the first operation information includes the operation efficiency of the first train operation diagram;
[0052] The step S51 also includes step S511, step S512, step S513 and step S514, which specifically include:
[0053] Step S511, acquiring second information, third information and fourth information according to the first train operation diagram, wherein the second information includes the total running time of the train in each section and the number of trains passing in each section, the third information includes the stop time of the train at each station and the number of trains received and dispatched at each station within a unit time, and the fourth information includes the running distance of the train, the technical speed of the train and the operating stop time;
[0054] Step S512: determining an input index corresponding to the first train operation diagram according to the second information and the third information;
[0055] The step S512 also includes step S5121, step S5122, step S5123 and step S5124, which specifically include:
[0056] Step S5121, determining a unit time cost coefficient in each section according to the number of trains passing through each section;
[0057] In this step, taking into account the different busyness of different sections, the unit time cost coefficient in each section cannot be considered the same. In this step, the time cost coefficient when the number of trains passing through the section is less than 50 is set to 0.9; the time cost coefficient when the number of trains passing through the section is less than 80 and greater than or equal to 50 is set to 0.95; the time cost coefficient when the number of trains passing through the section is less than 130 and greater than or equal to 80 is set to 1.0; the time cost coefficient when the number of trains passing through the section is less than 160 and greater than or equal to 130 is set to 1.1; the time cost coefficient when the number of trains passing through the section is greater than or equal to 160 is set to 1.2.
[0058] Step S5122, determining the train's occupation index of the interval resources according to the unit time cost coefficient in each of the intervals and the total running time of the train in each interval, to obtain a first occupation index;
[0059] In this step, the specific calculation process of the first occupancy index includes:
[0060] ;
[0061] In the above formula, represents the first occupancy index, represents the unit time cost coefficient of the train in the i-th interval, represents the total running time of the train in interval i, and n represents the total number of intervals.
[0062] Step S5123, determining a unit time cost coefficient in each station according to the number of times each station receives and sends trains in a unit time;
[0063] In this step, taking into account the large differences in the busyness between different stations in different time periods, this step uses the number of train reception and dispatching times at the station per unit time as an indicator for evaluating the busyness of the station. Specifically, the unit time cost coefficient of a station receiving and dispatching trains less than 10 per unit time is set to 0.9; the unit time cost coefficient of a station receiving and dispatching trains less than 20 but greater than or equal to 10 per unit time is set to 0.95; the unit time cost coefficient of a station receiving and dispatching trains equal to 20 per unit time is set to 1; the unit time cost coefficient of a station receiving and dispatching trains less than 25 but greater than 20 per unit time is set to 1.1; the unit time cost coefficient of a station receiving and dispatching trains greater than or equal to 25 per unit time is set to 1.2.
[0064] Step S5124: determine the train's occupancy index of station resources according to the unit time cost coefficient in each station and the stop time of the train at each station to obtain a second occupancy index.
[0065] In this step, the specific calculation process of the second occupancy index includes:
[0066] ;
[0067] In the above formula, represents the second occupancy index, represents the unit time cost coefficient of the train in the jth station, represents the stop time of the train at station j, m represents the total number of stations. It should be noted that the maximum value of the operating stop time and the technical stop time of the train in station j is selected as the stop time of the train at station j.
[0068] Step S513: determining the output index corresponding to the first train operation diagram according to the fourth information;
[0069] In this step, the running distance of the train can reflect the amount of work completed by the train. The running distance of the train can be determined by summing up the distances of the sections passed by the train. The specific calculation process of the technical speed of the train is:
[0070] ;
[0071] In the above formula, is the technical speed of train n, , , , are the running time, slow travel time, additional start time, and additional stop time of train n in section i, is the preset value. When train n stops at the next station after section i, Take 1, x represents the running distance of the train, and h represents the number of sections passed in the first train operation diagram.
[0072] Step S514: Send the input index and the output index to an operation efficiency evaluation model to obtain first operation information.
[0073] In this step, the efficiency evaluation model is the DEA model. The DEA model is an evaluation model based on the relative effectiveness of input-output data. Input indicators and output indicators are defined in this application. By inputting them into the DEA model, the operating efficiency corresponding to the first operating diagram can be output.
[0074] Step S52: determining second operation information according to the second train operation diagram, where the second operation information includes the operation efficiency of the second train operation diagram;
[0075] In this step, the determination of the operating efficiency of the second train operation diagram is the same as the determination of the operating efficiency of the first train operation diagram, so it is not repeated here.
[0076] Step S53: determining the learning method required by the person to be trained according to the first operation information and the second operation information.
[0077] In this step, the size of the first operating information and the second operating information is judged. If the first operating information is larger than the second operating information, it means that the person to be trained is more sensitive to text data and is more suitable for the first training method; if the second operating information is larger than the first operating information, it means that the person to be trained is more sensitive to audio and video data and is more suitable for the second training method. In the present invention, different learning methods are generated to determine which learning method is easier for the person to be trained to understand the training knowledge, and use it in the work task, thereby effectively improving the learning efficiency.
[0078] After step S5, the method further includes steps S6, S7, S8, S9, S10, S11 and S12, which specifically include:
[0079] Step S6, obtaining an optimized mathematical model of the train operation diagram;
[0080] The step S6 also includes step S61, step S62 and step S63, which specifically include:
[0081] Step S61, obtaining a preset objective function, where the objective function is used for the optimal section occupancy time of the train;
[0082] In this step, the preset objective function is specifically:
[0083] ;
[0084] In the above formula, represents the optimal interval occupancy time of the train, represents the arrival time of train l at the final station, represents the arrival time of train f at the final station, represents the departure time of train l at the originating station, It indicates the departure time of train f at the originating station. It should be noted that l indicates the train with the latest arrival time, and f indicates the train with the earliest departure time.
[0085] Step S62: Establish interval running time constraints and stop time constraints to obtain constraint conditions;
[0086] In this step, the interval running time constraints specifically include:
[0087] ;
[0088] In the above formula, L represents the train set; Represents the set of stations that the train passes through; represents the arrival time of train i from station s to the next station s+1, represents the departure time of train i at station s, represents the pure running time of train i in the interval (s, s+1), represents the additional departure time of train i at station s, represents the additional stop time of train i at station s+1, represents the running time redundancy of train i in the interval (s, s+1); represents the stop plan of train i at station s, where the stop is 1; Represents the stop plan of train i at station s+1.
[0089] The stop time constraints include:
[0090] ;
[0091] In the above formula, represents the departure time of train i at station s, represents the arrival time of train i at station s, represents the stop plan of train i at station s, where the stop is 1. represents the stop time of train i at station s, It indicates the redundant stop time of train i at station s.
[0092] Step S63: Optimize the preset objective function according to the constraint conditions to obtain an optimized mathematical model of the train operation diagram.
[0093] Step S7, establishing a space-time grid world model according to the optimized mathematical model of the train operation diagram;
[0094] In this step, the space-time grid world model can conveniently display the train operation position, constraint distribution and other information directly in the time and space dimensions during the train operation, and automatically construct features based on real-time simulation grid matrix information.
[0095] Step S8, using the space-time grid world model to perform simulation to obtain a matrix diagram;
[0096] In this step, the use of the space-time grid world model to simulate and obtain a matrix diagram is a technical solution well known to those skilled in the art, so it will not be described here in detail.
[0097] Step S9, constructing a training environment for the intelligent agent according to the matrix diagram and the preset Markov reward process model, and using the training environment to train the intelligent agent to obtain a trained intelligent agent;
[0098] In this step, the reward value corresponding to the state transition after each simulation is calculated based on the preset Markov reward process, and the reward values corresponding to all state transitions are summed to obtain the reward sum after completing a simulation. The intelligent agent is iteratively trained using a deep reinforcement learning algorithm until the reward sum after each simulation approaches a preset threshold, and the training is stopped to obtain a trained intelligent agent.
[0099] Step S10, obtaining an optimized train operation diagram according to the interaction between the trained intelligent agent and the spatiotemporal grid world model;
[0100] In this step, real-time simulation can be performed by the intelligent agent interacting with the space-time grid world model to obtain an optimized train operation diagram.
[0101] Step S11, comparing the optimized train operation diagram with the first train operation diagram to obtain a comparison result;
[0102] In this step, the optimized train operation diagram is compared with the first train operation diagram drawn after the trainees are trained by the first training method, and the differences are determined to obtain the comparison results.
[0103] Step S12: training the personnel to be trained according to the comparison result.
[0104] In this step, by comparing the differences, the knowledge that the trainees have not mastered when drawing the train operation diagram can be effectively pointed out, so that they can understand and master it in a targeted manner, further improving the training efficiency.
[0105] Embodiment 2:
[0106] like Figure 2 As shown, this embodiment provides a railway intermediate station knowledge training system, the system includes an acquisition module, a first processing module, a second processing module, a third processing module and a fourth processing module, which specifically include:
[0107] An acquisition module, used to acquire first information, wherein the first information includes relevant training knowledge of railway intermediate stations;
[0108] A first processing module, configured to generate first training method information according to the first information, wherein the first training method information includes training the trainee by using text data;
[0109] A second processing module is used to generate second training method information according to the first information, wherein the second training method information includes training the trainee by using video data;
[0110] A third processing module is used to generate a first train operation diagram according to the first training method, and generate a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained;
[0111] The fourth processing module is used to determine the learning method required by the trainee according to the first train operation diagram and the second train operation diagram.
[0112] It should be noted that, regarding the system in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.
[0113] Embodiment 3:
[0114] Corresponding to the above method embodiment, this embodiment also provides a railway intermediate station knowledge training device, and the railway intermediate station knowledge training device described below and the railway intermediate station knowledge training method described above can refer to each other.
[0115] Figure 3 FIG. 8 is a block diagram of a railway intermediate station knowledge training device 800 according to an exemplary embodiment. Figure 3 As shown, the railway intermediate station knowledge training device 800 may include: a processor 801 and a memory 802. The railway intermediate station knowledge training device 800 may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.
[0116] The processor 801 is used to control the overall operation of the railway intermediate station knowledge training device 800 to complete all or part of the steps in the above-mentioned railway intermediate station knowledge training method. The memory 802 is used to store various types of data to support the operation of the railway intermediate station knowledge training device 800, and these data may include, for example, instructions for any application or method operating on the railway intermediate station knowledge training device 800, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the railway intermediate station knowledge training device 800 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.
[0117] In an exemplary embodiment, the railway intermediate station knowledge training device 800 can be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, referred to as ASIC), digital signal processors (Digital Signal Processor, referred to as DSP), digital signal processing devices (Digital Signal Processing Device, referred to as DSPD), programmable logic devices (Programmable Logic Device, referred to as PLD), field programmable gate arrays (Field Programmable Gate Array, referred to as FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned railway intermediate station knowledge training method.
[0118] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned railway intermediate station knowledge training method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the railway intermediate station knowledge training device 800 to complete the above-mentioned railway intermediate station knowledge training method.
[0119] Embodiment 4:
[0120] Corresponding to the above method embodiment, a readable storage medium is also provided in this embodiment. The readable storage medium described below and the railway intermediate station knowledge training method described above can refer to each other.
[0121] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the railway intermediate station knowledge training method of the above method embodiment.
[0122] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.
[0123] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0124] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A railway intermediate station knowledge training method, characterized in that: include: Acquiring first information, wherein the first information includes training knowledge related to railway intermediate stations; generating first training method information according to the first information, wherein the first training method information includes training the trainee by using text data; generating second training method information according to the first information, wherein the second training method information includes training the trainee by using video data; generating a first train operation diagram according to the first training method, and generating a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained; determining a learning method required by the trainee according to the first train operation diagram and the second train operation diagram; Wherein, judging the learning method required by the trainee according to the first train operation diagram and the second train operation diagram includes: determining first operation information according to the first train operation diagram, wherein the first operation information includes an operation efficiency of the first train operation diagram; determining second operation information according to the second train operation diagram, wherein the second operation information includes an operation efficiency of the second train operation diagram; Determining the learning method required by the person to be trained according to the first operation information and the second operation information; After determining the learning method required by the trainee according to the first train operation diagram and the second train operation diagram, the method further includes: Obtaining the optimized mathematical model of the train operation diagram; Establishing a space-time grid world model according to the optimized mathematical model of the train operation diagram; Using the space-time grid world model to perform simulation to obtain a matrix diagram; Constructing a training environment for an intelligent agent according to the matrix diagram and a preset Markov reward process model, and using the training environment to train the intelligent agent to obtain a trained intelligent agent; Obtaining an optimized train operation diagram according to the interaction between the trained intelligent agent and the spatiotemporal grid world model; Comparing the optimized train operation diagram with the first train operation diagram to obtain a comparison result; Training the personnel to be trained according to the comparison results; The optimized mathematical model for obtaining the train operation diagram includes: Obtaining a preset objective function, where the objective function is used for an optimal section occupancy time of a train; Establish interval operation time constraints and stop time constraints to obtain constraint conditions; Optimizing the preset objective function according to the constraint conditions to obtain an optimized mathematical model of the train operation diagram; The interval running time constraints specifically include: In the above formula, L represents the train set; S i Represents the set of stations that the train passes through; represents the arrival time of train i from station s to the next station s+1, represents the departure time of train i at station s, represents the pure running time of train i in the interval (s, s+1), represents the additional departure time of train i at station s, represents the additional stop time of train i at station s+1, represents the running time redundancy of train i in the interval (s, s+1); represents the stop plan of train i at station s, where the stop is 1; Represents the stop plan of train i at station s+1.
2. The railway intermediate station knowledge training method according to claim 1 is characterized in that: Generating first training method information according to the first information includes: Get preset keyword information; Determining keyword information of each sentence in the first information; Calculating the similarity between the keyword information in each sentence and the preset keyword information to obtain similarity information; Extracting the first information according to the similarity information to obtain key training information; A training text is generated according to the key training information to obtain first training method information.
3. The railway intermediate station knowledge training method according to claim 1 is characterized in that: Determining first operation information according to the first train operation diagram includes: acquiring second information, third information and fourth information according to the first train operation diagram, wherein the second information includes the total running time of the train in each section and the number of trains passing in each section, the third information includes the stop time of the train at each station and the number of trains received and dispatched at each station within a unit time, and the fourth information includes the running distance of the train, the technical speed of the train and the operating stop time; Determine an input index corresponding to the first train operation diagram according to the second information and the third information; Determine an output indicator corresponding to the first train operation diagram according to the fourth information; The input index and the output index are sent to an operation efficiency evaluation model to obtain first operation information.
4. The railway intermediate station knowledge training method according to claim 3 is characterized in that: Determining an input index corresponding to the first train operation diagram according to the second information and the third information includes: Determine the unit time cost coefficient in each section according to the number of trains passing through each section; Determine the train occupation index of the interval resources according to the unit time cost coefficient in each of the intervals and the total running time of the train in each interval, and obtain a first occupation index; Determine the unit time cost coefficient in each station according to the number of times each station receives and sends trains in unit time; The train occupancy index of station resources is determined according to the unit time cost coefficient in each station and the stop time of the train at each station to obtain a second occupancy index.
5. The railway intermediate station knowledge training method according to claim 4 is characterized in that: The specific calculation process of the first occupancy index includes: In the above formula, T1 represents the first occupancy index, k i represents the unit time cost coefficient of the train in the i-th interval, T2 represents the total running time of the train in interval i, and n represents the total number of intervals.
6. A railway intermediate station knowledge training system, using the railway intermediate station knowledge training method as claimed in any one of claims 1 to 5, characterized in that: include: An acquisition module, used to acquire first information, wherein the first information includes relevant training knowledge of railway intermediate stations; A first processing module, configured to generate first training method information according to the first information, wherein the first training method information includes training the trainee by using text data; A second processing module is used to generate second training method information according to the first information, wherein the second training method information includes training the trainee by using video data; A third processing module is used to generate a first train operation diagram according to the first training method, and generate a second train operation diagram according to the second training method, wherein the first train operation diagram and the second train operation diagram are drawn by the same person to be trained; The fourth processing module is used to determine the learning method required by the trainee according to the first train operation diagram and the second train operation diagram.
