Large ship rubber fender injection molding equipment

By designing step-by-step rotating servo motors and rotary rod components in large-scale ship rubber fender injection molding equipment, combined with a temperature difference detection and adjustment mechanism, the problems of excessive equipment resistance and uneven rubber heat are solved, and more stable injection molding and molding are achieved. .

CN118789774AInactive Publication Date: 2024-10-18WUHU PINGAN RUBBER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411045950.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In large-scale ship rubber fender injection molding equipment, the electric heating injection molding furnace needs to store a large amount of rubber, resulting in excessive equipment resistance, excessive force on the auger when rotating, and uneven heat in the rubber causing cracks in the molded product.

Method used

A device including an electric heating injection molding furnace, annular baffle, servo motor, central shaft and three-stage rotating rod is designed. The servo motor and rotating rod assembly are rotated step by step to reduce the force on the hinge blades, and a temperature difference detection and adjustment mechanism is used to increase the heat of the rubber. Uniformity.

Benefits of technology

It reduces the torque burden on the hinge blades at the initial start-up stage, ensures the uniformity of rubber heat, and avoids the occurrence of cracks in molded products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118789774A_ABST
    Figure CN118789774A_ABST
Patent Text Reader

Abstract

The invention discloses large ship rubber fender injection molding equipment, and relates to the technical field of injection molding, the large ship rubber fender injection molding equipment comprises an electric heating injection molding furnace, an annular baffle is fixed to the upper end of the electric heating injection molding furnace, a servo motor is fixedly mounted at the center of the annular baffle, and a center shaft is mounted at the center of the interior of the electric heating injection molding furnace; the twisting blade is divided into three parts and rotates step by step, only the first-stage rotating rod is stressed to rotate in the initial starting stage of the servo motor, the adsorption force of rubber borne by the first-stage rotating rod is small, the second-stage rotating rod and the third-stage rotating rod sequentially rotate along with the first-stage rotating rod along with stable operation of the servo motor, and the stable injection molding state is achieved; therefore, the rubber adsorption force borne by the twisting blade in the initial starting stage can be reduced to the minimum, meanwhile, the process requirement that slow injection molding is conducted firstly and then fast injection molding is conducted after stabilization is followed during mold injection molding is met, and the torque borne by the output end of the servo motor in the initial starting stage is reduced to the maximum extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of injection molding, in particular to injection molding equipment for large-scale ship rubber fenders. Background Art

[0002] Rubber fenders, also known as rubber fenders, are installed on docks or ships to absorb the collision energy between ships and docks or between ships when docking or mooring, protecting ships and docks from damage.

[0003] Large ship rubber fenders are generally produced by injection molding. During processing, since large ship rubber fenders require more rubber raw materials, they are generally processed by rubber melting and injection. The specific process is: put enough hard rubber raw materials into the electric heating injection molding furnace, heat and melt them through the electric heating wire on the edge of the furnace body and stir them through the auger. After the raw materials are completely melted, open the lower end outlet and inject the molten rubber liquid in the electric heating injection molding furnace into the fender mold for molding.

[0004] However, there are some problems in the traditional large-scale ship rubber fender injection molding equipment as follows: The electric heating injection molding furnace suitable for injection molding of rubber fenders of large ships is generally set up relatively large, and needs to have a large enough storage space to store rubber. However, the large electric heating injection molding furnace also brings the problem of excessive resistance. When the liquid rubber is a very viscous fluid with a very high density, when the auger inside the electric heating injection molding furnace is started, the dense liquid rubber will be very firmly attached to the twisted blade, and produce a great adsorption force on the twisted blade, so that the auger will be subject to very large resistance in the initial stage of rotation, and the output shaft will produce a great torque, which has a very great test on the output power of the motor, the output shaft and the quality of the twisted blade. With long-term use, the twisted blade is easy to deform; When the electric heating injection molding furnace is melting rubber, the electric heating on the side of the furnace body causes the rubber in the furnace to melt from the outer circle to the center. Since the rubber in the inner and outer circles of the furnace is in direct contact with the heat source, its temperature will always remain high. However, the rubber in the center is far away from the heat source and its temperature is relatively low. Due to the poor fluidity of rubber, it is difficult to effectively exchange the heat of the inner and outer circles of rubber through simple stirring. Therefore, during the injection stage, the rubber liquid output from the injection end has the problem of uneven heat. After the rubber with uneven heat enters the mold, it has different condensation times and is easy to cause cracks in the molded product.

[0005] In view of the above problems, it is urgent to carry out innovative design based on the original large ship rubber fender injection molding equipment. Summary of the invention

[0006] The technical solution of the present invention aims at the technical problem that the existing technical solutions are too single, and provides a solution that is significantly different from the existing technologies. Specifically, the purpose of the present invention is to provide a large-scale ship rubber fender injection molding equipment to solve the above-mentioned background technology. The electric heating injection molding furnace suitable for the injection molding of large-scale ship rubber fenders is generally set to be relatively large, and a sufficiently large storage space is required to store rubber. However, the large-scale electric heating injection molding furnace also brings the problem of excessive resistance. When liquid rubber is a very viscous fluid with extremely high density, when the auger inside the electric heating injection molding furnace is started, the dense liquid rubber will adhere to the twisting blade very firmly, and exert great adsorption force on the twisting blade, so that the auger will be subjected to very large resistance in the initial stage of rotation, and the output shaft will produce a great torque, which puts a great test on the output power of the motor, the output shaft and the quality of the twisting blade. With long-term use, the twisting blade is prone to deformation.

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a large-scale ship rubber fender injection molding equipment, comprising an electric heating injection molding furnace, an annular baffle is fixed on the upper end of the electric heating injection molding furnace, and a servo motor is fixedly installed at the center of the annular baffle, a central shaft is installed at the center of the inside of the electric heating injection molding furnace, and a primary rotating rod is fixed at the lower end of the central shaft, and the outer wall of the central shaft is sequentially sleeved with a third rotating rod and a secondary rotating rod from top to bottom, the central shaft and the servo motor are installed with an elastic connection component, and a temperature difference detection and adjustment mechanism is installed inside the upper end of the electric heating injection molding furnace.

[0008] Preferably, a heater is installed around the outer wall of the electric heating injection molding furnace, a purification mechanism is installed on the upper end of the annular baffle, and a partition curtain is suspended in an annular manner around the air intake at the lower end of the purification mechanism.

[0009] Preferably, the elastic connection assembly includes an output shaft, a slide groove and a first spring, and the output end of the servo motor is fixedly mounted with the output shaft, the upper end of the central shaft is provided with a slide groove, and the T-shaped lower end of the output shaft is slidably arranged inside the slide groove, one end of the first spring is welded to the inner wall of the slide groove, and the other end of the first spring is fixed to the lower surface of the output shaft.

[0010] Preferably, a long cavity groove is opened inside the three-stage rotating rod, and a first sleeve sleeved on the outer wall of the central axis is arranged inside the long cavity groove, the first sleeve is located at the upper end of the short cavity groove, and the first sleeve is threadedly connected to the central axis.

[0011] Preferably, a short cavity groove is opened inside the secondary rotating rod, and a second sleeve sleeved on the outer wall of the central axis is arranged inside the short cavity groove, the second sleeve is located at the upper end of the short cavity groove, and the second sleeve is threadedly connected to the central axis.

[0012] Preferably, the third-level rotating rod, the second-level rotating rod and the first-level rotating rod are provided with hinged blades on the outside, and the hinged blades are conical in design to match the conical shape of the electric heating injection molding furnace, and the third-level rotating rod, the second-level rotating rod and the first-level rotating rod divide the hinged blades into three.

[0013] Preferably, the temperature difference detection and adjustment mechanism includes a temperature detection frame, a sealing slide bar, a sealing slide plate, a second spring, an air outlet and an annular disk, and the temperature detection frame is fixed to the inner wall of the upper end of the electric hot injection molding furnace, the internal sliding of the temperature detection frame is penetrated by one end of a sealing slide bar, and the other end of the sealing slide bar is adjacent to the three-stage rotating rod, the outer wall of the sealing slide bar located inside the temperature detection frame is slidingly provided with a sealing slide plate, and the outer wall of the sealing slide bar is wrapped with a second spring, the upper end at the center of the temperature detection frame is provided with an air outlet, and the outer wall of the upper end of the three-stage rotating rod is fixed with an inclined annular disk.

[0014] Preferably, one end of the second spring is welded to the side wall of the sealing slide bar, and the other end of the second spring is fixed to the side wall of the sealing slide plate, the volume of the space between one side of the sealing slide bar and the temperature detection frame is the same as the volume of the space between one side of the sealing slide plate and the temperature detection frame, and both spaces are sealed and filled with thermal expansion gas, and the outer end surface of the adjacent three-stage rotating rod of the sealing slide bar is arc-shaped and corresponds to the annular disk.

[0015] Compared with the prior art, the present invention has the following beneficial effects: First, the first-stage rotating rod rotates and discharges the rubber at the bottom of the electric heating injection molding furnace into the mold through its external hinged blades to form a certain reserved space. Then the second-stage rotating rod rotates and discharges the rubber in the middle section of the electric heating injection molding furnace downward into the reserved space through its external hinged blades. Finally, the third-stage rotating rod rotates and transports the rubber at the top of the electric heating injection molding furnace downward, dividing the hinged blade into three parts and rotating in steps. At the initial start-up of the servo motor, only the first-stage rotating rod rotates under force, and the rubber adsorption force is small. After the servo motor runs stably, the second-stage rotating rod and the third-stage rotating rod rotate in turn to achieve a stable injection state, thereby reducing the rubber adsorption force on the hinged blade at the initial start-up to a minimum. At the same time, it meets the process requirements of slow injection at the beginning and then fast injection after stabilization during mold injection, thereby minimizing the torque received by the output end of the servo motor at the initial start-up.

[0016] At the same time, the temperature detection frame is horizontally placed on one side of the three-stage rotating rod in the electric heating injection molding furnace, and the air storage space on the left side of the temperature detection frame is located at the position of the rubber outer ring of the electric heating injection molding furnace, and the air storage space on the right side of the temperature detection frame is located at the position of the rubber inner ring of the electric heating injection molding furnace. When the heat difference between the inner and outer ring rubber in the electric heating injection molding furnace is not large, the expansion rate of the expanded gas in the left and right air storage spaces in the temperature detection frame is also roughly the same. Therefore, the relative position of the sealing slide bar and the sealing slide plate will not change. When the heat of the outer ring rubber in the electric heating injection molding furnace is significantly higher than the heat of the inner ring rubber, the expansion rate of the expanded gas in the left air storage space in the temperature detection frame is significantly greater than that of the right air storage space. Therefore, under the expansion and extrusion of the left gas, the sealing slide bar will penetrate the sealing slide plate and move horizontally to the right and compress the second spring. The higher the heat difference between the inner and outer rings, the greater the horizontal movement of the sealing slide bar to the right. As shown in the figure, as the right side of the sealing slide bar As the three-stage rotating rod moves, the arc-shaped end of the sealing slide rod gradually falls into the vertical shadow range of the annular disk. Therefore, when the three-stage rotating rod rotates, the three-stage rotating rod will drive the annular disk to rotate synchronously, and the inclined annular disk will be squeezed and pushed upward when it contacts the arc-shaped surface of the sealing slide rod, so that the annular disk drives the three-stage rotating rod and the two-stage rotating rod, the one-stage rotating rod and the twisted leaf to move upward for a distance synchronously. When the whole moves upward, the twisted leaf will bring up the rubber at the center, so that a certain area of ​​space is formed in the center of the electric heating injection molding furnace. When the gap is generated, the high-temperature rubber on both sides that has not been brought up will quickly add to the space at the center, thereby prompting the inner and outer ring rubber to quickly exchange, and then cooperate with the twisted leaf to stir the injection effect to further improve the uniformity of the rubber heat inside the electric heating injection molding furnace, avoiding the problem of uneven heat output of the rubber liquid at the injection end and the problem of cracks in the molded product due to different condensation times after the rubber with uneven heat enters the mold. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a schematic diagram of the front cross-sectional structure of the present invention; Figure 3 It is a schematic diagram of the front cross-sectional structure of the third-stage rotating rod and the second-stage rotating rod of the present invention; Figure 4 It is a schematic diagram of the extraction and enlarged structure of the central axis, the third-level rotating rod, the second-level rotating rod and the first-level rotating rod of the present invention; Figure 5 It is an enlarged structural schematic diagram of the temperature difference detection and adjustment mechanism of the present invention; Figure 6 For the present invention Figure 4 Enlarged structural diagram at A in the middle.

[0018] In the figure: 1. electric heating injection molding furnace; 11. heater; 2. annular baffle; 3. purification mechanism; 31. partition curtain; 4. central axis; 41. servo motor; 42. output shaft; 43. slide groove; 44. first spring; 5. three-stage rotating rod; 51. first sleeve; 6. two-stage rotating rod; 61. second sleeve; 7. first-stage rotating rod; 8. hinged blade; 9. temperature detection frame; 91. sealing slide rod; 92. sealing slide plate; 93. second spring; 94. air outlet; 95. annular disk. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] See also Figure 1-6 The present invention provides a technical solution: a large-scale ship rubber fender injection molding equipment, comprising an electric heating injection molding furnace 1, an annular baffle 2 is fixed on the upper end of the electric heating injection molding furnace 1, and a servo motor 41 is fixedly installed at the center of the annular baffle 2, a central shaft 4 is installed at the center of the inside of the electric heating injection molding furnace 1, and a primary rotating rod 7 is fixed at the lower end of the central shaft 4, and the outer wall of the central shaft 4 is sequentially sleeved with a tertiary rotating rod 5 and a secondary rotating rod 6 from top to bottom, the central shaft 4 and the servo motor 41 are installed with an elastic connection component, and a temperature difference detection and adjustment mechanism is installed inside the upper end of the electric heating injection molding furnace 1.

[0021] A heater 11 is installed around the outer wall of the electric heating injection molding furnace 1, and a purification mechanism 3 is installed on the upper end of the annular baffle 2, and a partition curtain 31 is suspended in an annular manner around the air intake at the lower end of the purification mechanism 3.

[0022] The elastic connection component includes an output shaft 42, a slide groove 43 and a first spring 44, and the output end of the servo motor 41 is fixedly installed with the output shaft 42, the upper end of the central shaft 4 is provided with a slide groove 43, and the T-shaped lower end of the output shaft 42 is slidably arranged inside the slide groove 43, one end of the first spring 44 is welded to the inner wall of the slide groove 43, and the other end of the first spring 44 is fixed to the lower surface of the output shaft 42.

[0023] A long cavity groove is provided inside the third-stage rotating rod 5, and a first sleeve 51 sleeved on the outer wall of the central shaft 4 is provided inside the long cavity groove. The first sleeve 51 is located at the upper end of the short cavity groove, and the first sleeve 51 is threadedly connected to the central shaft 4.

[0024] A short cavity is formed inside the secondary rotating rod 6 , and a second sleeve 61 sleeved on the outer wall of the central shaft 4 is provided inside the short cavity. The second sleeve 61 is located at the upper end of the short cavity, and the second sleeve 61 is threadedly connected to the central shaft 4 .

[0025] The third-stage rotating rod 5, the second-stage rotating rod 6 and the first-stage rotating rod 7 are provided with hinged blades 8 on the outside, and the hinged blades 8 are conical in design to match the conical shape of the electric heating injection molding furnace 1, and the third-stage rotating rod 5, the second-stage rotating rod 6 and the first-stage rotating rod 7 divide the hinged blade 8 into three.

[0026] The temperature difference detection and adjustment mechanism includes a temperature detection frame 9, a sealing slide bar 91, a sealing plate 92, a second spring 93, an air outlet 94 and an annular disk 95, and the temperature detection frame 9 is fixed to the inner wall of the upper end of the electric heating injection molding furnace 1, and the temperature detection frame 9 slides inside and penetrates one end of the sealing slide bar 91, and the other end of the sealing slide bar 91 is adjacent to the three-stage rotating rod 5, the sealing slide bar 91 is located inside the temperature detection frame 9 and is slidingly provided with a sealing plate 92 on the outer wall, and the outer wall of the sealing slide bar 91 is wrapped with a second spring 93, the upper end at the center of the temperature detection frame 9 is provided with an air outlet 94, and the outer wall of the upper end of the three-stage rotating rod 5 is fixed with an inclined annular disk 95.

[0027] One end of the second spring 93 is welded to the side wall of the sealing slide bar 91, and the other end of the second spring 93 is fixed to the side wall of the sealing slide plate 92. The volume of the space between one side of the sealing slide bar 91 and the temperature detection frame 9 is the same as the volume of the space between one side of the sealing slide plate 92 and the temperature detection frame 9, and both spaces are sealed and filled with thermal expansion gas. The outer end surface of the third-stage rotating rod 5 adjacent to the sealing slide bar 91 is arc-shaped and corresponds to the annular disk 95.

[0028] Working principle: When using this large ship rubber fender injection molding equipment, first Figure 1 and Figure 2 As shown, the partition curtain 31 above the annular baffle 2 is opened and the solid rubber raw material is placed inside the electric heating injection molding furnace 1 through the annular baffle 2 and the heater 11 is started. At this time, the outer ring inside the electric heating injection molding furnace 1 begins to be heated, and the solid rubber near the periphery gradually begins to melt. As the heating continues, the rubber in the furnace melts as a whole, and then the servo motor 41 is started, and the servo motor 41 drives the central shaft 4 to rotate continuously through the output shaft 42.

[0029] When the central shaft 4 rotates, it will first drive the primary rotating rod 7 to rotate. At the same time, since the hinged leaves 8 corresponding to the tertiary rotating rod 5 and the secondary rotating rod 6 are adsorbed by rubber and will not rotate, the central shaft 4 will synchronously drive the first sleeve 51 to fall along the inner wall of the long cavity groove and the second sleeve 61 to fall along the inner wall of the short cavity groove. Then, after the central shaft 4 drives the primary rotating rod 7 to rotate for a certain period, the second sleeve 61 moves to the lowermost end of the short cavity groove. At this time, due to the false "stuck" phenomenon between the second sleeve 61 and the central shaft 4, The center shaft 4 will not stop rotating, so the center shaft 4 will start to carry the secondary rotating rod 6 and the external hinged blade 8 to rotate with the primary rotating rod 7. Finally, after the primary rotating rod 7 and the secondary rotating rod 6 and the external hinged blade 8 rotate for a certain period of time, the first sleeve 51 moves to the lower end of the long cavity groove. At the same time, a false "stuck" phenomenon occurs between the first sleeve 51 and the center shaft 4, but the center shaft 4 will not stop rotating. Therefore, the center shaft 4 will start to carry the tertiary rotating rod 5 to rotate synchronously with the secondary rotating rod 6 and the primary rotating rod 7.

[0030] The effect achieved is: first, the first-stage rotating rod 7 rotates and discharges the rubber at the bottom of the electric heating injection molding furnace 1 into the mold through its external hinged blade 8, forming a certain reserved space, and then the second-stage rotating rod 6 rotates and discharges the rubber in the middle section of the electric heating injection molding furnace 1 downward into the reserved space through its external hinged blade 8, and finally the third-stage rotating rod 5 rotates and transports the rubber at the upper end of the electric heating injection molding furnace 1 downward, dividing the hinged blade 8 into three parts and rotating in steps. At the initial start-up of the servo motor 41, only the first-stage rotating rod 7 is forced to rotate, and the adsorption force of the rubber is relatively small. After the servo motor 41 runs stably, the second-stage rotating rod 6 and the third-stage rotating rod 5 rotate in turn to achieve a stable injection state, thereby being able to minimize the rubber adsorption force on the hinged blade 8 at the initial start-up, and at the same time meeting the process requirements of slow injection at the beginning and fast injection after stabilization during mold injection, thereby minimizing the torque received by the output end of the servo motor 41 at the initial start-up.

[0031] At the same time, Figure 4 and Figure 5As shown, the temperature detection frame 9 is horizontally placed on one side of the three-stage rotating rod 5 in the electric heating injection molding furnace 1, and the air storage space on the left side of the temperature detection frame 9 is located at the position of the rubber outer ring of the electric heating injection molding furnace 1, and the air storage space on the right side of the temperature detection frame 9 is located at the position of the rubber inner ring of the electric heating injection molding furnace 1. When the heat difference between the inner and outer ring rubbers in the electric heating injection molding furnace 1 is not large, the expansion rate of the expanded gas in the left and right air storage spaces in the temperature detection frame 9 is also roughly the same. Therefore, the relative position of the sealing slide bar 91 and the sealing slide plate 92 will not change. When the heat of the outer ring rubber in the electric heating injection molding furnace 1 is significantly higher than the heat of the inner ring rubber, the expansion rate of the expanded gas in the left air storage space in the temperature detection frame 9 is significantly greater than that of the right air storage space. Therefore, under the expansion and extrusion of the left gas, the sealing slide bar 91 will penetrate the sealing slide plate 92 and move horizontally to the right and compress the second spring 93. The higher the heat difference between the inner and outer rings, the greater the horizontal movement of the sealing slide bar 91 to the right. Figure 4 As shown in the figure, as the sealing slide bar 91 moves to the right, the arc-shaped end of the sealing slide bar 91 gradually falls into the vertical shadow range of the annular disk 95. Therefore, when the three-stage rotating rod 5 rotates, the three-stage rotating rod 5 will drive the annular disk 95 to rotate synchronously, and the inclined annular disk 95 will be squeezed and pushed upward when it contacts the arc-shaped surface of the sealing slide bar 91, so that the annular disk 95 drives the three-stage rotating rod 5 and the two-stage rotating rod 6, the first-stage rotating rod 7 and the hinged leaf 8 to move upward for a distance synchronously (the activity space of the output shaft 42 and the slide groove 43 is used to adapt to the upward movement). When the whole moves upward, the twist blade 8 will bring up the rubber at the center, so that a space of a certain area is formed in the center of the electric heating injection molding furnace 1. When a gap is generated, the high-temperature rubber on both sides that has not been brought up will quickly add to the space at the center, thereby prompting the inner and outer ring rubber to quickly exchange, and the effect of stirring and injection molding by the twist blade 8 further improves the uniformity of the heat of the rubber inside the electric heating injection molding furnace 1, avoiding the problem of uneven heat output of the rubber liquid at the injection end and the problem of cracks in the molded product due to different condensation times after the rubber with uneven heat enters the mold.

[0032] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A large ship rubber fender injection molding device, comprising an electric heating injection molding furnace (1), characterized in that: An annular baffle (2) is fixed to the upper end of the electric heating injection molding furnace (1), and a servo motor (41) is fixedly installed at the center of the annular baffle (2); a central shaft (4) is installed at the center of the inside of the electric heating injection molding furnace (1), and a primary rotating rod (7) is fixed to the lower end of the central shaft (4), and a tertiary rotating rod (5) and a secondary rotating rod (6) are sequentially sleeved on the outer wall of the central shaft (4) from top to bottom; an elastic connection component is installed between the central shaft (4) and the servo motor (41), and a temperature difference detection and adjustment mechanism is installed inside the upper end of the electric heating injection molding furnace (1).

2. A large ship rubber fender injection molding equipment according to claim 1, characterized in that: The outer wall of the electric heating injection molding furnace (1) is provided with a heater (11) in a surrounding manner, the upper end of the annular baffle (2) is provided with a purification mechanism (3), and the outer periphery of the air intake port at the lower end of the purification mechanism (3) is provided with a partition curtain (31) in a hanging manner in a ring manner.

3. The large ship rubber fender injection molding equipment according to claim 1 is characterized in that: The elastic connection assembly comprises an output shaft (42), a slide groove (43) and a first spring (44), and the output end of the servo motor (41) is fixedly mounted with the output shaft (42), the upper end of the central shaft (4) is provided with a slide groove (43), and the T-shaped lower end of the output shaft (42) is slidably arranged inside the slide groove (43), one end of the first spring (44) is welded to the inner wall of the slide groove (43), and the other end of the first spring (44) is fixed to the lower surface of the output shaft (42).

4. The large ship rubber fender injection molding equipment according to claim 1 is characterized by: The three-stage rotating rod (5) has a long cavity groove formed inside, and a first sleeve (51) sleeved on the outer wall of the central shaft (4) is provided inside the long cavity groove, the first sleeve (51) is located at the upper end of the short cavity groove, and the first sleeve (51) is threadedly connected to the central shaft (4).

5. The large ship rubber fender injection molding equipment according to claim 1 is characterized by: The secondary rotating rod (6) has a short cavity groove formed inside, and a second sleeve (61) sleeved on the outer wall of the central shaft (4) is provided inside the short cavity groove. The second sleeve (61) is located at the upper end of the short cavity groove, and the second sleeve (61) is threadedly connected to the central shaft (4).

6. The large ship rubber fender injection molding equipment according to claim 1 is characterized by: The third-level rotating rod (5), the second-level rotating rod (6) and the first-level rotating rod (7) are provided with twisted blades (8) on the outside, and the twisted blades (8) are of a conical design that matches the conical shape of the electric heating injection molding furnace (1), and the third-level rotating rod (5), the second-level rotating rod (6) and the first-level rotating rod (7) divide the twisted blades (8) into three.

7. The large ship rubber fender injection molding equipment according to claim 1 is characterized by: The temperature difference detection and adjustment mechanism comprises a temperature detection frame (9), a sealing slide bar (91), a sealing plate (92), a second spring (93), an air outlet (94) and an annular disk (95), and the temperature detection frame (9) is fixed to the inner wall of the upper end of the electric heating injection molding furnace (1), one end of the sealing slide bar (91) is slidably penetrated inside the temperature detection frame (9), and the other end of the sealing slide bar (91) is adjacent to the three-stage rotating rod (5), the outer wall of the sealing slide bar (91) located inside the temperature detection frame (9) is slidably provided with a sealing plate (92), and the outer wall of the sealing slide bar (91) is wound with a second spring (93), the upper end of the temperature detection frame (9) at the center is provided with an air outlet (94), and the outer wall of the upper end of the three-stage rotating rod (5) is fixed with an inclined annular disk (95).

8. The large ship rubber fender injection molding equipment according to claim 7 is characterized by: One end of the second spring (93) is welded to the side wall of the sealing slide bar (91), and the other end of the second spring (93) is fixed to the side wall of the sealing slide plate (92). The volume of the space between one side of the sealing slide bar (91) and the temperature detection frame (9) is the same as the volume of the space between one side of the sealing slide plate (92) and the temperature detection frame (9), and both spaces are sealed and filled with thermal expansion gas. The outer end surface of the third-stage rotating rod (5) adjacent to the sealing slide bar (91) is arranged in an arc shape and corresponds to the annular disk (95).