Method, indicator element and system for operating crane
By using the combination of cantilever elements and indicator elements in the crane, the problems of oscillation and delay when operating the crane are solved, more efficient and intuitive operation control is achieved, and the positioning and movement performance of the crane is improved.
Patent Information
- Application Number
- CN202410413628.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-04-13
- Filing Date
- 2024-04-08
- Publication Date
- 2024-10-18
AI Technical Summary
When operating a crane, rotating boom elements in manual or remote mode can easily cause oscillations. Existing filtering techniques mitigate oscillations but introduce delays, making the control system unintuitive and difficult to operate.
Provide a method by using a cantilever element and an indicator element in a crane. After the indicator element moves to a predetermined position, the cantilever element moves in a control mode to ensure that oscillation does not occur and the operation is optimized through auxiliary functions and feedback mechanisms to reduce cycle times and improved operator control accuracy.
It achieves accelerated overall positioning and fine control of the crane without causing oscillation, reduces the operator's skill requirements and time, and improves operating efficiency and system performance.
Smart Images

Figure CN118790890A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for operating a crane. The invention also relates to an indicator element, a system with a tower crane or a bridge crane using the method and / or the indicator element. Background Art
[0002] Cranes are relatively compliant mechanical structures. Especially when the crane is moved or operated manually or in any remote mode configuration, for example when rotating a boom element, this can result in significant oscillations if the human operator directly controls the speed of movement with an input device. Several techniques exist to filter the operator's user input so that the crane's flexible mode is not excited. While this mitigates the oscillations, the filtering introduces significant delays to the user inputs, which makes the control system unintuitive and difficult for the operator. As a solution, the operator must anticipate those input delays and adjust according to those input delays.
[0003] It is now apparent that there is also a need to provide a method for operating a crane.
[0004] In view of the above, an object of the present invention is to provide a method for operating a crane. Another object of the present invention is to provide an indicator element, a system with a tower crane or a bridge crane using such a method.
[0005] These and other objects, which become apparent on reading the following description, are solved by the subject-matter of the independent claims.The dependent claims refer to preferred embodiments of the invention. Summary of the invention
[0006] According to a first aspect of the disclosure, a method for operating a crane is provided, the method comprising the steps of: providing a crane having a cantilever element and an indicator element, wherein the cantilever element and the indicator element are arranged in a first position. moving the indicator element from the first position to a second position. moving the cantilever element from the first position to the second position, in particular after the indicator element is arranged in the second position.
[0007] The crane may be any type of crane. The crane may be, for example, a construction / tower crane, an indoor EOT bridge crane or a port crane type crane.
[0008] The cantilever element may be any element that needs to be aligned or moved in order to transport or transfer an object or a load from a first location to a second location. The cantilever element is at least indirectly connected to the object or load to be transported or transferred. The cantilever element may be, for example, a crane boom, an arm or a movable trolley. The movable trolley may be arranged on a crane boom or may be part of a bridge crane.
[0009] The indicator element may be a visual aid to indicate the second position or the desired end position of the cantilever element. The indicator element may also be parameter data, such as a distance or angle to a reference point.
[0010] The method according to the invention allows the operator to control the indicator element. Once the indicator element has been positioned as desired, i.e. in the second position or end position, the boom element is moved to the second position in a controlled manner, wherein the customized control ensures that no oscillations occur. Thereby, a cycle time reduction can be achieved and the operator can control the crane more easily. The boom element may start to move even if the indicator element is not yet in the second position.
[0011] Due to the compliance of the structure, tower cranes can exhibit significant oscillations when rotating the boom elements (slewing motion). Oscillations can occur even if the operator attempts to increase the speed reference value gradually and smoothly using an analog input device (e.g. a joystick). It takes a lot of skill and practice for the operator to implicitly learn the compliance of the crane and adjust the input to minimize the oscillations. Therefore, the raw user input can be filtered. While such filtering can mitigate the excitation of flexible modes, it inevitably introduces latency. Controlling a system with latency can be difficult. If you let go of the input device, it is natural to expect the crane to stop immediately. However, due to the filtering, the crane will continue to move for a while. Again, this unintuitive behavior requires time and practice to get used to. In this way, the problem is shifted from the operator implicitly having to learn the compliant mechanical characteristics of the crane to learning the time delay caused by filtering. While the latter is considered easier, it still requires practice and results in a performance loss because the operator must act conservatively (e.g., approach the target position slowly to prevent overshoot).
[0012] The method according to the invention may be an auxiliary function. This means that the operator is fully responsible for the movement of the crane. This means that the method does not target any autonomous operation and therefore does not take into account perception and / or safety aspects. The method may speed up the overall positioning of the crane, since the optimized trajectory generation and position control may allow faster movement without causing oscillations compared to a human operator, while still giving the operator control for manual fine positioning.
[0013] In an embodiment, movement of the cantilever element from the first position to the second position is triggered manually or automatically.Alternatively additionally or alternatively, movement of the indicator element from the first position to the second position is triggered manually or automatically.
[0014] In other words, the cantilever element can be directly controlled by the operator. This means that the operator initiates the movement of the cantilever element by manipulating, for example, a joystick or a similar control device. When the movement of the cantilever element is manually triggered, the cantilever element and the indicator element preferably move simultaneously in at least a part of the area of movement. This allows the operator to see the second position or stop / end position of the cantilever element during the movement of the cantilever element. The indicator element moves to the second position before the cantilever element. More precisely, the indicator element can be operated in front and the cantilever element can be operated behind. The second position of the indicator element is the position where the cantilever element will stop if the operator wants to interrupt the movement at that time (for example by letting go of the joystick or setting the speed reference value to zero). In this case, the second position can also be described as a dynamic second position. Due to input filtering, the cantilever may not stop immediately, but may gradually reduce the speed smoothly.
[0015] Alternatively, after the indicator element is in the second position, the operator manually triggers the movement of the cantilever element. Additionally or alternatively, the cantilever element can be controlled by the operator in a manual mode. Based on the calculated motion profile that can be generated after the indicator element is in the second position, a graphical display can be used to visualize the ideal input. The graphical display can be shown, for example, on a monitor. This provides an auxiliary tool to the operator because the operator is provided with an ideal trajectory to follow.
[0016] Alternatively, the cantilever element can be automatically moved based on a calculated motion profile, which can be generated after the indicator element is in the second position. After the indicator element is in the second position, the automatic movement can be triggered automatically or manually by an operator. The second position can also be a dynamic position. This means that the cantilever element can start to move although the indicator element has not stopped.
[0017] In an embodiment, acoustic or tactile feedback may be provided while moving the boom element. For a pre-programmed target position, an acoustic signal or tactile feedback via the joystick may be triggered once the operator moves towards the target and the crane has reached the position from which it will converge to the desired target if the user lets go of the input device at the corresponding moment. Furthermore, a tactile queue in a force feedback joystick may be employed, indicating whether the operator is following the best possible input trajectory.
[0018] In an embodiment, the indicator element is part of the crane or is connected to the crane. Preferably, the indicator element is movable, such as linear or rotatable, connected or arranged at the crane. The indicator element may be a constructive part. The indicator element may be a protruding element, such as a web element or a similar hardware element. The indicator element may also be described as a marking element or a pointer element. The indicator element is preferably identifiable or visible when the crane is operated. When stationary, the indicator element is parallel to the cantilever element. In motion, the indicator element moves forward or away from the cantilever element. If the operator stops providing input, the indicator element will stop immediately. Subsequently, the cantilever element follows the movement of the indicator element.
[0019] In an embodiment, the indicator element is a digital indicator element and / or a virtual indicator element. In other words, the indicator element may be a graphic element displayed on, for example, a monitor of a tablet computer or an augmented reality device. For example, the graphic display may show the same content as the hardware indicator, but as a virtual arrow pointing in the corresponding direction. When the indicator element is provided as a virtual overlay on the graphic display, the position of the real crane may be illustrated with an overlay showing the position of the crane at the predicted stop position. The indicator element may also be provided as a digital display. This may be, for example, a simple text display, which may, for example, show the predicted additional distance in degrees.
[0020] In an embodiment, the indicator element is configured to be viewed through an augmented reality device. The operator may use augmented reality glasses or a similar device with an augmented reality overlay to move the indicator device to the second position. More precisely, the operator wearing the AR glasses may superimpose a virtual overlay of the crane at the predicted stopping position onto a real-world view of the actual crane.
[0021] In an embodiment, the automatic movement of the boom element is a controlled movement. In an embodiment, the movement of the boom element comprises anti-sway control and / or filtering, in particular notch filtering and / or input shaping. Anti-sway generally refers to load sway. Another aspect is to prevent oscillations that excite the mechanical structure of the crane. While filtering the input signal, the history of the user input is tracked. Based on this, the idea is to pre-calculate at each time step what would happen if the user lets go of the joystick (i.e. produces u(t≥T i )=0) then the crane will stop at the position.
[0022] In case the speed reference changes suddenly to zero, the position remains constant without filtering. However, such a speed reference profile tends to significantly excite gyroscopic oscillations. The speed does not change suddenly to zero, but the speed reference is changed in ramped steps, which results in fewer gyroscopic oscillations being excited. However, this can lead to unexpected extra travel distance.
[0023] For the special case of a sudden switch from maximum / constant speed to zero speed, the additional travel distance can be easily calculated analytically. In the general case (arbitrary user input, additional rate limiter, etc.), the solution can still be obtained by numerical integration. To do this, the simulation is run at each time step during runtime, the history of user inputs from the operator is transmitted through the input filter, and all future inputs are set to zero. The simulation is run until the predicted speed reference value becomes zero (if the filter has a finite time delay, this terminal or final time is known in advance, which is the case for input filtering). In this way, general input filtering can be considered, including input shapers, notch filters, rate limiters, low-pass filters, etc. The position of the crane at the end of the prediction is obtained by numerically integrating the predicted filtered speed reference value. This corresponds to the stop position, i.e. the second position. Since the calculation of the stopping distance is computationally small, it can be run online. If real-time execution is required, the sampling time of the simulation can be increased. This further speeds up the calculation, but at the expense of some loss of prediction accuracy.
[0024] Alternatively, the calculation of the final indicator stop position can also be done with a dynamic model that describes the dynamics of an ideal rigid tower crane that is speed controlled. Therefore, structural compliance and load sway are not considered at all. This dynamic model is then fed with the operator's unfiltered user input. Since the ideal rigid tower crane is speed controlled and the dynamics of the controller are much faster than those of the tower crane, the actual slewing and trolley positions are instantly matched to the corresponding manual speed reference values.
[0025] In an embodiment, the movement of the indicator element is a linear movement or a circular movement.For example, the cantilever element may be a cantilever element of a tower crane or a bridge crane.
[0026] Another aspect of the invention relates to an indicator element, which is configured for use with a crane installation, wherein the indicator element is configured to indicate an end position of a movement of a boom element.
[0027] Another aspect of the invention relates to a system with a tower crane or a bridge crane, which system uses a method according to one of the above-described embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The accompanying drawings are included to provide a further understanding of the present invention and are incorporated in and constitute a part of this application. The accompanying drawings illustrate embodiments of the present invention and together with the description serve to explain the principle of the present invention. The accompanying drawings show:
[0029] Figure 1is a schematic flow chart of an embodiment of a method; and
[0030] Figure 2 is a schematic diagram of the system. DETAILED DESCRIPTION
[0031] Figure 1 An embodiment of a method for operating a crane is shown. In a first step S1, a crane 10 is provided with a jib element 11 and an indicator element 12. The jib element 11 and the indicator element 12 are arranged in a first position. The first position may also be described as a starting position.
[0032] In a next step S2, the indicator element 11 is manually moved from the first position to the second position. The second position may also be described as an end position.
[0033] In a next step S3, a movement of the cantilever element 11 from the first position to the second position is triggered after the indicator element 12 is arranged in the second position. Thereafter, the different steps may be performed multiple times in this sequence.
[0034] Figure 2 A system is shown. In this system, a method according to an embodiment of the invention can be used. The system comprises a crane 10. The crane has a boom element 11 and an indicator element 12.
[0035] The term cantilever element 11 may be understood broadly. For example, the cantilever element 11 may be movable in a linear manner or in a rotational manner. The cantilever element 11 is connected to an object or weight to be transported or transferred.
[0036] The indicator element 12 can be designed as an indicator element 12 according to any of the above-described embodiments.
[0037] The system may be configured to perform the pre-described methods or any other embodiment or combination of embodiments described and disclosed in this application.
[0038] Any disclosure and embodiments described herein relate to the methods for operating cranes and systems listed above or below, and vice versa. The benefits provided by any one of the embodiments and examples are equally applicable to all other embodiments and examples, and vice versa.
[0039] It should be noted that all embodiments of the method disclosed herein can be performed in the order of the steps described. Without departing from the corresponding method, the method proposed herein can be performed in another order of the disclosed steps, unless explicitly mentioned to the contrary below. In addition, the features of the independent claims and their dependent claims can be combined with each other.
[0040] By studying the drawings, the disclosure and the appended claims, other variations of the disclosed embodiments may be understood and implemented by those skilled in the art in practicing the claimed invention. In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite article "a" or "an" does not exclude pluralities. The fact that certain measures are recorded in mutually different dependent claims does not indicate that a combination of these measures cannot be used to advantage. Any reference numerals in the claims should not be interpreted as limiting the scope of the claims.
[0041] Reference numerals list
[0042] 10: Crane
[0043] 11: Cantilever element
[0044] 12: Indicator element
Claims
1. A method for operating a crane, the method comprising the following steps: Providing a crane (10) having a jib element (11) and an indicator element (12), wherein the jib element (11) and the indicator element (12) are arranged in a first position; moving the indicator element (12) from the first position to a second position; After the indicator element (12) is arranged in the second position, the cantilever element (11) is moved from the first position to the second position.
2. The method according to claim 1, wherein the movement of the cantilever element (11) from the first position to the second position is triggered manually or automatically.
3. Method according to claim 1 or 2, wherein the movement of the indicator element (12) from the first position to the second position is triggered manually or automatically.
4. Method according to any of the preceding claims, wherein acoustic or tactile feedback can be provided while moving the cantilever element (11) and / or the indicator element (12).
5. Method according to any of the preceding claims, wherein the indicator element (12) is part of the crane (10) and / or is connected to the crane (10).
6. The method according to any of the preceding claims, wherein the indicator element (12) is a digital indicator element and / or a virtual indicator element (12).
7. The method according to any of the preceding claims, wherein the indicator element (12) is configured to be viewed through an augmented reality device.
8. Method according to any of the preceding claims, wherein the movement of the cantilever element (11) is a controlled movement.
9. Method according to any of the preceding claims, wherein the movement of the cantilever element (11) comprises anti-sway control and / or filtering.
10. Method according to any of the preceding claims, wherein the movement of the indicator element (12) is a linear movement or a circular movement.
11. An indicator element configured for use with a crane device, wherein the indicator element (12) is configured to indicate an end position of a movement of a boom element (11).
12. A system comprising a tower crane or a bridge crane, the system using a method according to any one of claims 1 to 10 and / or an indicator element according to claim 11.