Multi-scene suspension cable type bridge fabrication machine and method
By arranging automated construction units and electric trolleys on the main cables of the suspension bridge, the problems of low construction efficiency and safety hazards of the suspension bridge are solved, and the efficient and stable installation of the steel box girder of the suspension bridge is achieved, which is suitable for construction in a variety of scenarios.
Patent Information
- Application Number
- CN202411116254.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-18
AI Technical Summary
The existing suspension bridge construction technology is inefficient in the construction of long-span suspension bridges, relies on manpower, and is easily affected by wind. It is also difficult to transport and install steel box girders during mountainous and cross-sea construction, and there are safety risks.
Design a multi-scenario suspension bridge-building machine. By setting a bridge-building unit on the main cable and using an electric trolley and a traction rope to form an automated construction mechanism, it can automatically install steel box girders on the suspension bridge and adjust the mechanism according to the construction environment. Shaped to improve stability and precision.
It realizes the automated installation of steel box girders for suspension bridges, significantly saves construction manpower and material costs, improves construction efficiency and quality, reduces the impact of wind resistance, and is suitable for mountain, lake and cross-sea construction.
Smart Images

Figure CN118792967A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to a multi-scenario suspension bridge-building machine, and also to a multi-scenario suspension bridge-building method. Background Art
[0002] A suspension bridge is a bridge that uses cables suspended from towers and anchored at both ends of the bridge as the main load-bearing components of the superstructure. Existing suspension bridge construction processes usually include tower pile foundation construction, tower cap construction, tower construction, anchorage construction, main cable saddle construction, pilot cable traction, catwalk erection, cable system erection, cable clamp and sling installation, and steel box girder installation.
[0003] At present, bridge-building machines are usually used for bridges with many bridge piers. They are installed on the bridge deck to perform sliding construction and cannot be used for large-span suspension bridges. Suspension bridges use cables as the main load-bearing structure. The bridge deck is hung on the main cable through the slings, and the two ends of the main cable are anchored on the bridge tower. This type of bridge generally has a longer span and is suitable for crossing large rivers or canyons. Therefore, it can be well used in mountains, lakes, and across the sea.
[0004] The installation process of steel box girders in existing suspension bridge construction is usually carried out by using a cable-mounted crane installed between the main suspension cable and the catwalk's load-bearing cable. This installation method only has one cable-mounted crane to cooperate with the construction workers on the catwalk and the transport ship below for construction. The sling is lowered vertically, which is easily affected by the wind direction and causes deviation, affecting the construction. The installation process is more dependent on the construction workers on the catwalk, and only one steel box girder can be lifted at the same time, which is inefficient. For the construction of suspension bridges in the mountains, lifting is more difficult because there is no bottom ship to assist in the mountains. The roads in the mountains are often rugged and uneven, and it is difficult to transport heavy machinery and building materials. In addition, the climate in the mountains changes unpredictably, and natural disasters such as rainstorms and avalanches may occur. There are great risks to the existing technology that relies more on manpower.
[0005] Therefore, there is a need for an intelligent cable-suspended bridge-building machine and method that can be used in multiple scenarios such as between mountains, between lakes, and across the sea. Summary of the invention
[0006] Based on the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is to provide a multi-scenario suspension bridge-building machine, which can automatically install the steel box girder of the suspension bridge through the bridge-building part arranged on the main cable part. The designed bridge-building unit can form different bridge-building mechanisms through several arrangements and combinations, which can effectively cope with mountain bridge building, lake bridge building, and cross-sea bridge building, realize the automation of suspension bridge construction, greatly save construction manpower and material costs, and improve efficiency and bridge construction quality.
[0007] The present invention also provides a multi-scenario suspension bridge construction method, which can be directly applied to the construction of existing suspension bridges. Through the designed bridge construction units, they can be arranged and combined to form a "Sichuan" shape or a "mouth" shape, effectively coping with the construction of suspension bridges in mountains, between lakes, and across the sea. Moreover, they can be arranged and combined according to the actual situation to form specific construction methods under various specific circumstances, effectively solving the problem of insufficient intelligence in existing suspension bridge construction and effectively improving the installation efficiency of steel box girders for suspension bridge construction.
[0008] To achieve the above object, the present invention adopts the following technical measures:
[0009] The multi-scenario suspension bridge construction machine of the present invention includes: a main bridge section part, which includes anchor piers located at both ends of the suspension bridge, bridge piers, steel box girders erected on the bridge piers, and cable towers; a main cable part, installed on the main bridge section part, which includes a saddle unit erected as the main body on the tops of two cable towers, and a main cable with both ends connected to two anchor piers and the middle passing through the left and right saddle units; the saddle unit includes a main saddle erected as the main body on the cable tower and a secondary saddle mounting frame, the main saddle is located below the secondary saddle mounting frame, a secondary saddle mounting platform is provided at the top of the secondary saddle mounting frame, and the main cable is erected on the main saddle; a bridge construction part, installed on the main cable part, which includes a secondary saddle installed on the secondary saddle mounting platform, and a bridge construction cable passing through the left and right secondary saddles and connected to two secondary anchor piers at the ends. There are several bridge construction units on the track formed by the front and rear two bridge construction cables. The bridge construction unit is composed of several groups of fixedly connected standard sections. An electric trolley is provided at the bottom of the standard section located above the bridge construction cable, which adheres to the bridge construction cable, and drives the bridge construction unit to move on the bridge construction cable by driving the electric trolley; several groups of bridge construction units on the bridge construction cable form a cluster to hoist and construct the steel box girder.
[0010] Preferably, the main bridge section part further includes a lake surface and a transport ship thereon.
[0011] Furthermore, several transverse bridge-building units are inserted and connected through standard section connecting seats on one side of the cable tower. The left side of the bridge-building unit on the far left is connected to a left first traction rope, and the right side is connected to a left second traction rope. The left first traction rope is directly connected to a winch near the left auxiliary anchor, pulling the leftmost bridge-building unit to the left. The left second traction rope passes through several bridge-building units and is connected to a winch near the right auxiliary anchor, pulling the leftmost bridge-building unit to the right. The vertical positions of the traction ropes are all near the bridge-building cables and can be passed through the auxiliary saddles for retraction. Other saddles can be added near the auxiliary saddles for use by the traction ropes. The right side of the bridge-building unit on the far right is connected to a right first traction rope, and the left side is connected to A right second traction rope is connected, the right first traction rope is directly connected to the winch near the right auxiliary anchor, pulling the rightmost bridge-building unit to move to the right, and the right second traction rope passes through several bridge-building units and is connected to the winch near the left auxiliary anchor, pulling the rightmost bridge-building unit to move to the left; when stable construction is required on the sliding cable, a cluster is formed by several bridge-building units, and the left second traction rope is tightened to the right and the right second traction rope is tightened to the left, so that the bridge-building units at both ends clamp each bridge-building unit toward the middle, and cooperate with the standard section connecting seat thereon to form a stable construction cluster. At this time, the cluster can be controlled by an electric trolley in cooperation with the left first traction rope and the right first traction rope for automated and precise construction.
[0012] Furthermore, two transverse bridge-building units are indirectly connected via a standard section connection seat on a transverse connection unit. The transverse connection unit turns the transverse bridge-building unit 90 degrees to become vertical, thereby reducing the number of standard sections. By arranging standard section connection seats at both ends of the standard sections, it can be directly connected to bridge-building units in other directions.
[0013] Preferably, when the steel box girder is installed by using the bridge-building mechanism formed by the bridge-building unit, the steel box girder is lifted by the crane under the bridge-building unit through the steel box girder lifting rope, and at the same time, the steel box girder stabilizing rope is lowered by other nearby bridge-building units to connect with the transport ship below. Before lifting, the steel box girder is hung on the steel box girder stabilizing rope on all sides and then lifted for transportation. During the transportation, the bridge-building unit above and the transport ship below cooperate with each other, so that the steel box girder stabilizing rope can better stabilize the steel box girder; and for the situation where there is no transport ship in the mountains, an alloy steel box girder stabilizing track is set under the bridge-building units at the two ends of the cluster, and a steel box girder stabilizing rope is pulled up by an electric trolley that corresponds to the horizontal position and can slide up and down. Before the steel box girder is lifted, the steel box girder stabilizing rope is put on all sides with lifting rings, and then the lifting bridge-building unit is used to lift and install it.
[0014] Correspondingly, the present invention also provides a multi-scenario suspension bridge construction method, which is applied to mountain suspension bridge construction, and the steps are as follows:
[0015] S1. Bridge pre-construction: According to the existing procedures, cable tower pile foundation construction, cable tower cap construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk erection, cable system erection, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform is added during the installation process, and the secondary cable saddle is installed on it. Then the bridge cable is erected on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge cable;
[0016] S2. Mountain bridge-building mechanism combination: On one side of the cable tower, a number of bridge-building units and transverse connection units are arranged on the bridge-building cable according to the actual situation. The left second traction rope and the right second traction rope are tightened by the winch to make the group of bridge-building units form a stable cluster. The bridge-building units used on the left and right sides here are special bridge-building units. They are different from other bridge-building units. There are steel box beam stabilizing tracks under them. The electric trolleys on the two tracks are connected by a stabilizing rope. Several construction machines are installed on the bridge-building mechanism in the middle.
[0017] S3. Transportation of steel box girders in the mountains: Due to the winding mountain roads, the steel box girders are transported to one side of the cable tower, and the bridge-building unit is moved near it. The crane of the central bridge-building unit is stably connected to the steel box girder, and then the electric trolley on the stable track of the steel box girder is moved to the same height as the steel box girder, and the stabilizing rope of the steel box girder is buckled into it through the lifting rings around the steel box girder. The specific rope direction and transportation direction of the steel box girder can be adjusted according to the actual situation, that is, the actual position of the stable track of the steel box girder can also be changed; during lifting, the electric trolley on the stable track of the steel box girder lifts and lowers the stabilizing rope of the steel box girder together with the steel box girder, and then the winch is used to pull the left first traction rope and the right first traction rope to make the bridge-building mechanism move on the cable, and after moving to the installation position of the steel box girder, the steel box girder is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the entire mountain suspension bridge construction is completed.
[0018] The multi-scenario suspension bridge construction method of the present invention is applied to lake suspension bridge construction, and the steps are as follows:
[0019] S1. Bridge pre-construction: According to the existing procedures, cable tower pile foundation construction, cable tower cap construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk erection, cable system erection, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform is added during the installation process, and the secondary cable saddle is installed on it. Then the bridge cable is erected on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge cable;
[0020] S2. Lake bridge-building mechanism combination: On one side of the cable tower, a number of bridge-building units and transverse connection units are arranged on the bridge-building cable according to the actual situation. The left second traction rope and the right second traction rope are tightened by the winch so that the group of bridge-building units forms a stable cluster. A number of construction machinery are installed on the bridge-building mechanism in the middle;
[0021] S3. Transportation of steel box girders on lakes: Since the length of the lake is relatively short, the steel box girders are transported to the lake surface by transport ships, and the bridge-building units are moved to the vicinity of the lake. The crane of the middle bridge-building unit is lowered and stably connected to the steel box girder. Then the cranes under the other bridge-building units lower the steel box girder stabilizing rope to the transport ship, which is fixedly connected to the transport ship. The steel box girder stabilizing rope is buckled into the lifting rings around the steel box girder. The specific rope direction and the transportation direction of the steel box girder can be adjusted according to the actual situation. During the lifting, the transport ship below and the bridge-building mechanism above Maintain a vertical line so that the steel box girder will not be blown off track by strong winds during transportation, and then use a winch to pull the left first traction rope and the right first traction rope to move the bridge-building mechanism on the cable, and move the transport ship below synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, lower the steel box girder, and use the crane on the remaining bridge-building unit tracks to drop the construction mechanical arm to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the construction of the entire lake suspension bridge is completed.
[0022] The multi-scenario suspension bridge construction method of the present invention is applied to cross-sea suspension bridge construction, and the steps are as follows:
[0023] S1. Pre-construction of bridge construction: According to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk erection, cable system erection, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform is added during the installation process, and the secondary cable saddle is installed on it. The bridge-building cable is then erected on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge-building cable. Due to the large span of the cross-sea suspension bridge, it is impossible to directly set the anchorages at both ends of the two cable towers. Therefore, the anchorages and secondary anchorages are set at both ends of the leftmost and rightmost cable towers, and several cable towers are passed in the middle. Continuous operation construction can be carried out through the cable towers through the bridge-building cluster;
[0024] S2. Combination of cross-sea bridge-building mechanisms: On the leftmost or rightmost cable tower side, a number of bridge-building units and transverse connection units are arranged on the bridge-building cable according to the actual situation. The left second traction rope and the right second traction rope are tightened by the winch to make the group of bridge-building units form a stable cluster. A longer combination of bridge-building mechanisms can be designed here, that is, a combination of multiple groups of U-shaped bridge-building mechanisms, the specific length of which can be close to the length of two adjacent cable towers. The purpose is to reduce the bending degree of the originally curved bridge-building cables under the rigid structure formed by the combined bridge-building mechanisms, so that the construction is more precise. Especially for cross-sea construction, when it is necessary to cross multiple cable towers for construction, the rigid structure formed by the longer combination of bridge-building mechanisms has great advantages in the transportation, positioning and installation of steel box girders, and a number of construction machinery are installed on the bridge-building mechanism in the middle;
[0025] S3. Hoisting and transporting of the cross-sea steel box girder: Since the cross-sea suspension bridge is relatively long, the steel box girder in the near-shore area is directly hoisted and installed through a long bridge-building mechanism combination. The lifting cluster formed by several tracks on it can simultaneously lift multiple steel box girders to the designated position for installation. In the area far from the land, a group of transport ships transports several steel box girders to the position below the construction site. The bridge-building unit moves to its vicinity. The hoist on the bridge-building unit descends and is stably connected to the steel box girder. Then, the hoists under the other bridge-building units lower the steel box girder stabilizing ropes to the transport ship and fix them to the transport ship. The steel box girder is fixed to the steel box girder stabilizing ropes through the lifting rings around the steel box girder. The specific rope orientation and the steel box girder hoisting and transporting direction can be adjusted according to the actual situation. When hoisting, the transport ship below and the bridge-building mechanism above are kept in a vertical line, so that the steel box girder will not be blown off the track by strong winds during the hoisting and transporting process. Then, the left first traction rope and the right first traction rope are pulled by a winch to make the bridge-building mechanism move on the cable. The transport ship below moves synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, the steel box girder is lowered. The construction robotic arm is dropped by the hoist on the track of the other bridge-building units to measure, position, and install the steel box girder. Until all the steel box girders are hoisted, the entire cross-sea suspension bridge construction is completed.
[0026] As described above, the beneficial effects of the multi-scenario suspension bridge-building machine and method of the present invention are as follows:
[0027] 1. The saddle part of the present invention not only includes the main saddle in the prior art, but also adds a secondary saddle installation platform and a secondary saddle on it, so that the most critical bridge-building part of the present invention is directly installed on the original construction structure, making its application range wider, effectively saving the application cost, and can directly replace the existing steel box girder installation process without greatly changing the entire construction process.
[0028] 2. The bridge-building part of the present invention directly adds a bridge-building cable on the structure similar to the original main cable of the bridge, and it is erected on the secondary saddle and can be connected to the two ends of the anchor or the secondary anchor, so that the entire construction space is effectively utilized, without occupying the original construction space and having a large mechanical equipment automatic construction space.
[0029] 3. The structure of the bridge-building unit of the present invention is simple and can be combined and connected only through several standard sections. However, when several bridge-building units are combined, they can not only form a large-scale coverage of multi-equipment construction in a "Sichuan" shape, but also be adjusted according to the actual situation to form a "mouth" shape, saving a large amount of material costs of the bridge-building units while achieving the same construction effect. At the same time, in addition to the horizontal track, it can also provide a vertical track to further expand the construction coverage range.
[0030] 4. The bridge-building units of the present invention are directly installed on the bridge-building cables. Compared with the original curved and soft cable track structure, the rigid structure formed by a plurality of bridge-building units installed on the bridge-building cables can reduce the curvature of the cables, that is, straighten them to a certain extent, thereby making the construction on them more stable and precise.
[0031] 5. The bridge construction method of the present invention can be applied not only to cable-suspended construction on lakes, but also to the construction of steel box girders without ship transportation in mountains and the transportation construction of continuous steel box girders with multiple cable towers over a large area across the sea. In addition, during the construction process, the construction structure vertically formed by the upper bridge-building cluster and the lower transport ship cluster allows the installation of steel box girders to be more stable, reduces the influence of wind resistance, and prevents deformation from hindering installation. In the mountains, wind resistance resistance construction is carried out by using the steel box girder stabilizing track inside the bridge-building cluster in combination with the stabilizing rope, which effectively improves the stability and accuracy of the entire cable-suspended bridge construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0033] Figure 1 It is a schematic diagram of the overall structure of the multi-scenario cable-suspended bridge-building machine of the present invention;
[0034] Figure 2 It is a structural schematic diagram of the main bridge section of the present invention;
[0035] Figure 3 It is a structural schematic diagram of the main cable part of the present invention;
[0036] Figure 4 It is a structural schematic diagram of the saddle unit of the present invention;
[0037] Figure 5 It is a structural schematic diagram of the bridge-building part of the present invention;
[0038] Figure 6 It is a partial enlarged schematic diagram of the bridge-building unit of the present invention;
[0039] Figure 7 The schematic diagram of the bridge construction unit connection method of the present invention, (a) is one connection method, (b) is another connection method;
[0040] Figure 8 A schematic diagram of the construction method of the cross-lake and cross-sea bridge of the present invention;
[0041] Fig. 9 It is a schematic diagram of the mountain bridge construction method of the present invention.
[0042] Description of reference numerals:
[0043] 1000-Main bridge section:
[0044] 1001-anchor; 1002-bridge pier; 1003-steel box girder; 1004-cable tower; 1005-lake surface; 1006-transport ship;
[0045] 2000-Main cable section:
[0046] 2001-main cable; 2002-sling; 2003-saddle unit; 2003a-main saddle; 2003b-auxiliary saddle mounting frame; 2003c-auxiliary saddle mounting platform;
[0047] 3000-Bridge construction part:
[0048] 3001-bridge-building cable; 3002-auxiliary saddle; 3003-bridge-building unit;
[0049] 4001-standard section connecting seat; 4002a-left first traction rope; 4002b-left second traction rope; 4003a-right second traction rope; 4003b-right first traction rope; 4004-transverse connecting unit; 4005a-steel box girder lifting rope; 4005b-steel box girder stabilizing rope; 4006-steel box girder stabilizing track. DETAILED DESCRIPTION
[0050] Next, combine Figures 1 to 9 The multi-scenario cable-suspended bridge-building machine and method provided by the present invention are introduced in detail.
[0051] Depend on Figure 1 As shown, the multi-scenario suspension bridge-building machine of the present invention includes a main bridge section part 1000 as a main body, a main cable part 2000 installed thereon, and also includes a bridge-building part 3000 installed on the main cable part 2000.
[0052] Depend on Figure 2 As shown, the main bridge section 1000 includes anchors 1001 located at both ends of the suspension bridge, and an approach beam section for connecting to the middle span beam section, the approach beam section is composed of a bridge pier 1002 and a steel box beam 1003 erected on the bridge pier 1002; the main bridge section 1000 also includes two left and right cable towers 1004, which are used to erect cables and connect beam sections; Figure 2 The example shown in the figure is the second embodiment, which is an application scenario across a lake, and therefore also includes a lake surface 1005 and a transport ship 1006 thereon.
[0053] Depend on Figure 3-4As shown, the main cable part 2000 includes a saddle unit 2003 as a main body erected on the top of two cable towers 1004, and a main cable 2001 whose two ends are connected to two anchors 1001 and the middle part passes through the left and right saddle units 2003; the saddle unit 2003 includes a main saddle 2003a and a secondary saddle mounting frame 2003b erected on the cable tower 1004 as a main body, the main saddle 2003a is located below the secondary saddle mounting frame 2003b, and the top of the secondary saddle mounting frame 2003b is provided with a secondary saddle mounting platform 2003c, the main cable 2001 is erected on the main saddle 2003a, and the main cable 2001 is provided with a sling 2002 set downward. It should be noted that, usually, the existing suspension bridge construction only includes the main saddle 2003a. Since the present invention adds the bridge construction part 3000, the auxiliary saddle installation platform 2003c and the auxiliary saddle 3002 are added. Therefore, the present invention can directly replace the steel box girder installation process in the original bridge construction process and change it to a more automated and adaptable bridge construction machine construction.
[0054] Depend on Figure 5-6 As shown, the bridge-building part 3000 includes a secondary saddle 3002 installed on a secondary saddle mounting platform 2003c, and a bridge-building cable 3001 passing through the left and right secondary saddles 3002 and connected to two secondary anchors at the end; it should be noted that, according to actual conditions, both ends of the bridge-building cable 3001 can be connected to the anchor 1001 for construction, or a secondary anchor (similar to the anchor structure) can be newly added for connection construction, and the specific position of the secondary anchor can be modified according to actual conditions; a plurality of bridge-building units 3003 are arranged on the track formed by the front and rear bridge-building cables 3001, and the bridge-building units 3003 are composed of a plurality of groups of fixedly connected standard sections, and the specific length of the components can be modified according to actual conditions. The situation is modified. An electric trolley is provided at the bottom of the standard section above the bridge-building cable 3001. The electric trolley is attached to the bridge-building cable 3001 and can drive the bridge-building unit 3003 to move on the bridge-building cable 3001 by driving the electric trolley. A construction track can be set between the two electric trolleys at the bottom of the bridge-building part 3000. Through the combination of several groups of bridge-building unit construction tracks, a crane can be installed thereon to carry out the transportation construction of the steel box girder 1003. A combination of a crane and a manipulator can also be set thereon to carry out the automated installation construction of the steel box girder. On the bridge-building cable 3001 of the bridge-building part 3000, several groups of bridge-building units 3003 can be used to form a cluster to carry out the lifting construction of the steel box girder 1003.
[0055] Figure 7(a) is a possible connection mode when the bridge-building units 3003 are arranged horizontally without spacing. The figure shows a group of completed bridge-building mechanisms. When a plurality of horizontal bridge-building units 3003 are on one side of the cable tower 1004, they are inserted and connected through the standard section connection seat 4001. The left side of the bridge-building unit 3003 located on the far left is connected to a left first traction rope 4002a, and the right side is connected to a left second traction rope 4002b. The left first traction rope 4002a is directly connected to the left auxiliary anchor attachment. The left second traction rope 4002b passes through several bridge-building units 3003 and is connected to the hoist near the right auxiliary anchor, so as to pull the leftmost bridge-building unit 3003 to move to the right; the vertical position of the traction rope is located near the bridge-building cable 3001, and can pass through the auxiliary saddle 3002 for pulling, and other saddles can also be added near the auxiliary saddle 3002 for use by the traction rope; the bridge-building unit 3001 located on the far right The right side of 003 is connected to a right first traction rope 4003b, and the left side is connected to a right second traction rope 4003a. The right first traction rope 4003b is directly connected to the winch near the right auxiliary anchor, and can pull the rightmost bridge-building unit 3003 to move to the right. The right second traction rope 4003a passes through several bridge-building units 3003 and is connected to the winch near the left auxiliary anchor, and can pull the rightmost bridge-building unit 3003 to move to the left. When stable construction is required on the sliding cable, a cluster can be formed by several bridge-building units. By tightening the left second traction rope 4002b to the right and the right second traction rope 4003a to the left, the bridge-building units 3003 at both ends can be clamped to the middle of each bridge-building unit, and cooperate with the standard section connection seat 4001 thereon to form a stable construction cluster. At this time, the cluster can be controlled by an electric trolley in cooperation with the left first traction rope 4002a and the right first traction rope 4003b to perform automated and precise construction.
[0056] Figure 7 (b) is another possible connection method in which the bridge-building units 3003 are spaced apart, the purpose of which is to save the number of bridge-building units 3003, make the space utilization higher, and achieve the same span area. Figure 7 The connection method (a) may require five sets of bridge-building units, while Figure 7 (b) Only two groups are required to complete; Figure 7 The connection method of (a) is that three transverse bridge-building units 3003 are directly connected through standard section connection seats 4001. Figure 7(b) Two horizontal bridge-building units are indirectly connected through the standard section connection seats 4001 on a horizontal connection unit 4004. The horizontal connection unit 4004 actually turns the horizontal bridge-building unit 3003 by 90 degrees to be vertical, reducing the number of its standard sections. By setting standard section connection seats 4001 at both ends of the standard section, it can be directly connected to other bridge-building units 3003 in different orientations, and a construction track can also be set below it. Therefore, Figure 7 (a) The construction track combination is in a zigzag shape. Figure 7 (b) forms a square shape. Different types can meet different construction needs. Similarly, both zigzag connections and square connections can be designed in a construction cluster.
[0057] From Figure 8-9 As shown, when using the bridge-building mechanism formed by the bridge-building unit 3003 to install the steel box girder 1003, the crane under the bridge-building unit 3003 can lift it through the steel box girder lifting rope 4005a. At the same time, use the steel box girder stabilizing ropes 4005b lowered by the other nearby bridge-building units 3003 to connect with the transport ship 1006 below. Before lifting the steel box girder 1003, hang it around the steel box girder stabilizing ropes 4005b, and then carry out lifting and transportation. During the transportation process, the bridge-building unit 3003 above and the transport ship 1006 below cooperate with each other, so that the steel box girder stabilizing ropes 4005b can better stabilize the steel box girder 1003 and effectively resist environmental impacts such as strong wind weather; for the situation where there is no transport ship in the mountains, alloy steel box girder stabilizing tracks 4006 are set under the bridge-building units 3003 at both ends of the cluster. Electrically operated trolleys that can slide up and down and correspond to each other horizontally on it pull up a steel box girder stabilizing rope 4005b. Before lifting the steel box girder 1003, put the steel box girder stabilizing ropes 4005b on it with slings around the four sides, and then the lifting bridge-building unit 3003 carries out lifting and installation, effectively coping with weather impacts such as strong wind in the mountains.
[0058] Example 1:
[0059] When applied to building a suspension bridge in the mountains, the steps of the multi-scenario suspension bridge-building method of the present invention are:
[0060] S1. Pre-construction of the bridge: Carry out the construction of the tower pile foundation, tower cap, tower, anchor block, main dispersion saddle, pilot cable traction, catwalk erection, cable system erection, and installation of cable clamps and suspension ropes according to the existing procedures. At the same time, during the installation process, add the installation platform 2003c for the auxiliary saddle, install the auxiliary saddle 3002 on it, then install the bridge-building cable 3001 on the auxiliary saddle 3002, and add two end auxiliary anchor blocks and connect them to the bridge-building cable 3001;
[0061] S2. Mountain bridge-building mechanism combination: On one side of the cable tower 1004, a number of bridge-building units 3003 and transverse connection units 4004 are arranged on the bridge-building cable 3001 according to actual conditions. The left second traction rope 4002b and the right second traction rope 4003a are tightened by the winch to form a stable cluster of bridge-building units. The bridge-building units 3003 used on the left and right sides are special bridge-building units. Different from other bridge-building units, they are provided with steel box beam stabilizing tracks 4006, and the electric trolleys on the two tracks are connected by a stabilizing rope; a number of construction machinery, such as a crane, a construction arm, etc., are installed on the bridge-building mechanism in the middle;
[0062] S3. Transportation of steel box girders in the mountains: Due to the winding mountain roads, the steel box girder 1003 is transported to one side of the cable tower 1004, and the bridge-building unit 3003 is moved near it. The crane of the central bridge-building unit is stably connected to the steel box girder, and then the electric trolley on the steel box girder stabilizing track 4006 is moved to the same height as the steel box girder, and the steel box girder stabilizing rope 4005b is buckled into it through the lifting rings around the steel box girder. The specific rope direction and the transportation direction of the steel box girder can be adjusted according to the actual situation, that is, the actual position of the steel box girder stabilizing track 4006 can also be changed; lifting At this time, the electric trolley on the steel box girder stabilizing track 4006 lifts and lowers the steel box girder 1003 together with the steel box girder stabilizing rope 4005b, and then the winch pulls the left first traction rope 4002a and the right first traction rope 4003b to move the bridge-building mechanism on the cable. After moving to the steel box girder installation position, the steel box girder 1003 is lowered, and the construction mechanical arm is dropped by the crane on the remaining bridge-building unit 3003 track to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the entire mountain suspension bridge construction is completed.
[0063] Embodiment 2:
[0064] When applied to lake suspension bridge construction, the steps of the multi-scenario suspension bridge construction method of the present invention are:
[0065] S1. Bridge pre-construction: according to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk erection, cable system erection, cable clamp and sling installation are carried out. At the same time, during the installation process, an auxiliary cable saddle installation platform 2003c is added, and the auxiliary cable saddle 3002 is installed on it, and then the bridge cable 3001 is erected on the auxiliary cable saddle, and auxiliary anchorages are added at both ends and connected with the bridge cable 3001;
[0066] S2. Lake bridge-building mechanism combination: On one side of the cable tower 1004, a number of bridge-building units 3003 and transverse connection units 4004 are arranged on the bridge-building cable 3001 according to actual conditions. The left second traction rope 4002b and the right second traction rope 4003a are tightened by a winch so that the group of bridge-building units forms a stable cluster. A number of construction machinery, such as a crane, a construction arm, etc., are installed on the bridge-building mechanism in the middle;
[0067] S3. Transportation of steel box girders on the lake: Since the lake is short, the steel box girder 1003 is transported to the lake surface 1005 by the transport ship 1006, and the bridge-building unit is moved to its vicinity. The crane of the middle bridge-building unit is lowered and stably connected to the steel box girder, and then the cranes under the other bridge-building units lower the steel box girder stabilizing rope 4005b to the transport ship 1006, which is fixedly connected to the transport ship 1006, and the steel box girder stabilizing rope 4005b is buckled into the steel box girder through the lifting rings around the steel box girder 1003. The specific rope direction and the transportation direction of the steel box girder can be adjusted according to the actual situation. The upper bridge-building mechanism maintains a vertical line so that the steel box girder will not be blown off track by strong winds during transportation. The left first traction rope 4002a and the right first traction rope 4003b are pulled by a winch to move the bridge-building mechanism on the cable, and the transport ship 1006 below moves synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, the steel box girder 1003 is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units 3003 to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the construction of the entire lake suspension bridge is completed.
[0068] Embodiment three:
[0069] When applied to cross-sea suspension bridge construction, the steps of the multi-scenario suspension bridge construction method of the present invention are:
[0070] S1. Pre-construction of bridge construction: according to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk installation, cable system installation, cable clamp and sling installation are carried out. At the same time, during the installation process, a secondary cable saddle installation platform 2003c is added, and the secondary cable saddle 3002 is installed thereon, and then the bridge cable 3001 is installed on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge cable 3001; because the span of the cross-sea suspension bridge is large, it is impossible to directly set the anchorage at both ends of the two cable towers 1004, so the anchorage and secondary anchorage are set at both ends of the leftmost and rightmost cable towers 1004, and several cable towers are passed in the middle, and continuous operation construction can be carried out through the bridge cluster through the cable towers 1004;
[0071] S2. Combination of cross-sea bridge-building mechanisms: On the side of the leftmost or rightmost cable tower 1004, a number of bridge-building units 3003 and transverse connection units 4004 are arranged on the bridge-building cable 3001 according to actual conditions. The left second traction rope 4002b and the right second traction rope 4003a are tightened by a winch so that the group of bridge-building units forms a stable cluster. A longer combination of bridge-building mechanisms can be designed here, that is, a combination of multiple groups of U-shaped bridge-building mechanisms, the specific length of which can be close to the length of two adjacent cable towers. The purpose is to reduce the curvature of the originally curved bridge-building cable 3001 under the rigid structure formed by the bridge-building mechanisms, so that the construction is more precise. Especially for cross-sea construction, when it is necessary to cross multiple cable towers for construction, the rigid structure formed by the longer combination of bridge-building mechanisms has great advantages in the transportation, positioning and installation of steel box girders, and a number of construction machinery, such as cranes and construction arms, are installed on the bridge-building mechanism in the middle;
[0072] S3. Transportation of sea-crossing steel box girders: Since the sea-crossing suspension bridge is relatively long, the steel box girders located near the land are directly transported and installed through a relatively long bridge-building mechanism combination. The lifting cluster formed by several tracks on it can simultaneously lift multiple steel box girders 1003 to the designated location for installation. In the area far from the land, several steel box girders 1003 are transported to the bottom of the construction site by a transport ship cluster. The bridge-building unit 3003 is moved to its vicinity, and the crane on its bridge-building unit is lowered and stably connected to the steel box girder 1003. Then the crane under the remaining bridge-building units 3003 lowers the steel box girder stabilizing rope 4005b to the transport ship 1006, which is fixedly connected to the transport ship 1006 and buckled into the steel box girder 1003 through the lifting rings around the steel box girder 1003. The steel box girder stabilizing rope 4005b, the specific rope direction and the steel box girder transportation direction can be adjusted according to the actual situation; during lifting, the transport ship below maintains a vertical line with the bridge-building mechanism above, so that the steel box girder 1003 will not be blown to the offset track by strong winds during transportation, and then the winch is used to pull the left first traction rope 4002a and the right first traction rope 4003b to make the bridge-building mechanism move on the cable, and the transport ship 1006 below moves synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, the steel box girder is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units 3003 to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the entire cross-sea suspension bridge construction is completed.
[0073] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be understood by anyone familiar with the technology within the technical scope disclosed by the present invention should be included in the scope of the present invention.
Claims
1. Multi-scenario cable-stayed bridge-building machine, characterized in that: include: The main bridge section (1000) includes anchors (1001) located at both ends of the suspension bridge, bridge piers (1002), steel box girders (1003) erected on the bridge piers (1002), and cable towers (1004); The main cable part (2000) is installed on the main bridge section part (1000), and comprises a saddle unit (2003) as a main body erected on the top of two cable towers (1004), and a main cable (2001) whose two ends are connected to two anchors (1001) and the middle part passes through the left and right saddle units (2003); the saddle unit (2003) comprises a main saddle (2003a) as a main body erected on the cable tower (1004) and a secondary saddle mounting frame (2003b), the main saddle (2003a) is located below the secondary saddle mounting frame (2003b), the top of the secondary saddle mounting frame (2003b) is provided with a secondary saddle mounting platform (2003c), and the main cable (2001) is erected on the main saddle (2003a); The bridge-building part (3000) is installed on the main cable part (2000), and includes an auxiliary saddle (3002) installed on an auxiliary saddle installation platform (2003c), and a bridge-building cable (3001) passing through the left and right auxiliary saddles (3002) and connected to two auxiliary anchors at the end. A plurality of bridge-building units (3003) are arranged on the track formed by the front and rear bridge-building cables (3001). The bridge-building units (3003) are composed of a plurality of groups of fixedly connected standard sections. An electric trolley is arranged at the bottom of the standard section above the bridge-building cable (3001), which is attached to the bridge-building cable (3001) and drives the electric trolley to drive the bridge-building unit (3003) to move on the bridge-building cable (3001); a plurality of groups of bridge-building units (3003) are used on the bridge-building cable (3001) to form a cluster to carry out lifting construction on the steel box girder (1003).
2. The multi-scenario cable-suspended bridge-building machine according to claim 1 is characterized in that: The main bridge section (1000) also includes a lake surface (1005) and a transport ship (1006) thereon.
3. The multi-scenario cable-suspended bridge-building machine according to claim 1 is characterized in that: When a plurality of transverse bridge-building units (3003) are on one side of the cable tower (1004), they are connected by inserting a standard section connection seat (4001). The left side of the bridge-building unit (3003) located on the far left is connected to a left first traction rope (4002a), and the right side is connected to a left second traction rope (4002b). The left first traction rope (4002a) is directly connected to a winch near the left auxiliary anchor, pulling the leftmost bridge-building unit (3003) to move to the left. The left second traction rope (4002b) is directly connected to a winch near the left auxiliary anchor. The two traction ropes (4002b) pass through a plurality of bridge-building units (3003) and are connected to a winch near the right auxiliary anchor, pulling the leftmost bridge-building unit (3003) to move to the right; the vertical position of the traction ropes is located near the bridge-building cable (3001), and can pass through the auxiliary saddle (3002) for retraction, and other saddles and the auxiliary saddle (3002) can be added for use by the traction ropes; the right side of the rightmost bridge-building unit (3003) is connected to a right first traction rope (4003) b), the left side is connected to a right second traction rope (4003a), the right first traction rope (4003b) is directly connected to the winch near the right auxiliary anchor, pulling the rightmost bridge-building unit (3003) to move to the right, the right second traction rope (4003a) passes through several bridge-building units (3003) and is connected to the winch near the left auxiliary anchor, pulling the rightmost bridge-building unit (3003) to move to the left; when stable construction is required on the sliding cable A cluster is formed by a number of bridge-building units. By tightening the left second traction rope (4002b) to the right and the right second traction rope (4003a) to the left, the bridge-building units (3003) at both ends clamp the bridge-building units toward the middle, and cooperate with the standard section connecting seat (4001) thereon to form a stable construction cluster. At this time, the cluster can be controlled by an electric trolley in cooperation with the left first traction rope (4002a) and the right first traction rope (4003b) to perform automated and precise construction.
4. The multi-scenario cable-suspended bridge-building machine according to claim 1 is characterized in that: The two transverse bridge-building units are indirectly connected via a standard section connection seat (4001) on a transverse connection unit (4004). The transverse connection unit (4004) turns the transverse bridge-building unit (3003) 90 degrees to become vertical, thereby reducing the number of standard sections. By arranging standard section connection seats (4001) at both ends of the standard section, the standard section can be directly connected to the bridge-building unit (3003) in other directions.
5. The multi-scenario cable-suspended bridge-building machine according to claim 1 is characterized in that: When the steel box girder (1003) is installed by using the bridge-building mechanism formed by the bridge-building unit (3003), the steel box girder is lifted by the crane under the bridge-building unit (3003) through the steel box girder lifting rope (4005a), and at the same time, the steel box girder stabilizing rope (4005b) is lowered by other nearby bridge-building units (3003) to connect with the transport ship (1006) below. Before lifting, the steel box girder (1003) is hung on the steel box girder stabilizing rope (4005b) on all sides and then lifted for transportation. During the transportation process, the bridge-building unit (3003) above and the transport ship (1006) below are in contact with each other. 6) cooperate with each other so that the steel box girder stabilizing rope (4005b) can better stabilize the steel box girder (1003); and for the situation where there is no transport ship in the mountains, an alloy steel box girder stabilizing track (4006) is set under the bridge-building units (3003) at the two ends of the cluster, and an electric trolley that can slide up and down and corresponds to the horizontal position on it pulls up a steel box girder stabilizing rope (4005b). Before the steel box girder (1003) is lifted, the steel box girder stabilizing rope (4005b) is put on the four sides with lifting rings, and then lifted and installed by the lifting bridge-building unit (3003).
6. A multi-scenario suspension bridge construction method using the bridge construction machine according to any one of claims 1 to 5, applied to mountain suspension bridge construction, characterized in that: The steps are: S1. Bridge pre-construction: according to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk installation, cable system installation, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform (2003c) is added during the installation process, and the secondary cable saddle (3002) is installed on it, and then the bridge cable (3001) is installed on the secondary cable saddle (3002), and secondary anchorages are added at both ends and connected to the bridge cable (3001); S2. Mountain bridge-building mechanism combination: On one side of the cable tower (1004), a number of bridge-building units (3003) and transverse connection units (4004) are arranged on the bridge-building cable (3001) according to actual conditions. The left second traction rope (4002b) and the right second traction rope (4003a) are tightened by a winch to form a stable cluster of bridge-building units. The bridge-building units (3003) used on the far left and right are special bridge-building units. Different from other bridge-building units, they are provided with steel box beam stabilizing tracks (4006) underneath, and the electric trolleys on the two tracks are connected by a stabilizing rope; a number of construction machinery are installed on the bridge-building mechanism in the middle; S3. Transportation of steel box beams in the mountains: As the mountain roads are winding, the steel box beam (1003) is transported to one side of the cable tower (1004), and the bridge-building unit (3003) is moved near it. The crane of the central bridge-building unit is stably connected to the steel box beam, and then the electric trolley on the steel box beam stabilizing track (4006) is moved to the same height as the steel box beam, and the steel box beam stabilizing rope (4005b) is buckled through the lifting rings around the steel box beam. The specific rope direction and the transportation direction of the steel box beam can be adjusted according to the actual situation, that is, the actual position of the steel box beam stabilizing track (4006) can also be changed; during lifting The electric trolley on the steel box girder stabilizing track (4006) lifts and lowers the steel box girder stabilizing rope (4005b) together with the steel box girder (1003), and then the winch pulls the left first traction rope (4002a) and the right first traction rope (4003b) to move the bridge-building mechanism on the cable. After moving to the steel box girder installation position, the steel box girder (1003) is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units (3003) to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the entire mountain suspension bridge construction is completed.
7. A multi-scenario suspension bridge construction method using the bridge construction machine according to any one of claims 1 to 5, applied to lake suspension bridge construction, characterized in that: The steps are: S1. Bridge pre-construction: according to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk installation, cable system installation, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform (2003c) is added during the installation process, and the secondary cable saddle (3002) is installed on it, and then the bridge cable (3001) is installed on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge cable (3001); S2. Lake bridge-building mechanism combination: On one side of the cable tower (1004), a plurality of bridge-building units (3003) and transverse connection units (4004) are arranged on the bridge-building cable (3001) according to actual conditions, and the left second traction rope (4002b) and the right second traction rope (4003a) are tightened by a winch so that the group of bridge-building units forms a stable cluster, and a plurality of construction machines are installed on the bridge-building mechanism in the middle; S3. Transportation of steel box girders on the lake: Since the length of the lake is relatively short, the steel box girder (1003) is transported to the lake surface (1005) by a transport ship (1006), and the bridge-building unit is moved to the vicinity thereof. The crane of the middle bridge-building unit is lowered and stably connected to the steel box girder. Then, the cranes under the remaining bridge-building units lower the steel box girder stabilizing rope (4005b) to the transport ship (1006), and the steel box girder stabilizing rope (4005b) is fixedly connected to the transport ship (1006). The steel box girder stabilizing rope (4005b) is buckled into the lifting rings around the steel box girder (1003). The specific rope direction and the transportation direction of the steel box girder can be adjusted according to the actual situation. The transport ship maintains a vertical line with the bridge-building mechanism above so that the steel box girder will not be blown off track by strong winds during transportation. The winch is then used to pull the left first traction rope (4002a) and the right first traction rope (4003b) to move the bridge-building mechanism on the cable. The transport ship (1006) below moves synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, the steel box girder (1003) is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units (3003) to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the construction of the entire lake suspension bridge is completed.
8. A multi-scenario suspension bridge construction method using the bridge construction machine according to any one of claims 1 to 5, applied to cross-sea suspension bridge construction, characterized in that: The steps are: S1. Pre-construction of bridge construction: according to the existing procedures, cable tower pile foundation construction, cable tower foundation construction, cable tower construction, anchorage construction, main loose cable saddle construction, pilot cable traction, catwalk installation, cable system installation, cable clamp and sling installation are carried out. At the same time, a secondary cable saddle installation platform (2003c) is added during the installation process, and the secondary cable saddle (3002) is installed on it, and then the bridge cable (3001) is installed on the secondary cable saddle, and secondary anchorages are added at both ends and connected to the bridge cable (3001); because the span of the cross-sea suspension bridge is large, it is impossible to directly set the anchorage at both ends of the two cable towers (1004), so the anchorage and secondary anchorage are set at both ends of the leftmost and rightmost cable towers (1004), and several cable towers are passed in the middle, and continuous operation construction can be carried out through the bridge cluster through the cable tower (1004); S2. Combination of cross-sea bridge-building mechanisms: On the side of the leftmost or rightmost cable tower (1004), a number of bridge-building units (3003) and transverse connection units (4004) are arranged on the bridge-building cable (3001) according to actual conditions. The left second traction rope (4002b) and the right second traction rope (4003a) are tightened by a winch to form a stable cluster of the bridge-building units. A longer combination of bridge-building mechanisms can be designed here, i.e., a combination of multiple U-shaped bridge-building mechanisms, the specific length of which can be close to the length of two adjacent cable towers. The purpose is to reduce the curvature of the originally curved bridge-building cables (3001) under the rigid structure formed by the combined bridge-building mechanisms, so that the construction is more precise. Especially for cross-sea construction, when it is necessary to cross multiple cable towers for construction, the rigid structure formed by the longer combination of bridge-building mechanisms has great advantages in the transportation, positioning and installation of steel box girders, and a number of construction machinery are installed on the bridge-building mechanism in the middle; S3. Transportation of sea-crossing steel box girders: Since the sea-crossing suspension bridge is relatively long, the steel box girders located near the land are directly transported and installed through a relatively long bridge-building mechanism combination. A lifting cluster formed by a number of tracks on the bridge-building mechanism can simultaneously lift multiple steel box girders (1003) to a designated location for installation. In areas far from the land, a number of steel box girders (1003) are transported to the bottom of the construction site by a transport ship cluster. The bridge-building unit (3003) is moved to its vicinity, and the crane on the bridge-building unit is lowered and stably connected to the steel box girder (1003). Then, the cranes under the remaining bridge-building units (3003) lower the steel box girder stabilizing rope (4005b) to the transport ship (1006), which is fixedly connected to the transport ship (1006) and buckled into the steel box girder (1003) through the lifting rings around the steel box girder (1003). The steel box girder stabilizing rope (4005b) and the specific rope direction and the steel box girder transportation direction can be adjusted according to the actual situation; during lifting, the transport ship (1006) below maintains a vertical line with the bridge-building mechanism above, so that the steel box girder (1003) will not be blown to the offset track by the strong wind during the transportation process, and then the winch is used to pull the left first traction rope (4002a) and the right first traction rope (4003b) to make the bridge-building mechanism move on the cable, and the transport ship (1006) below moves synchronously to ensure the stability of the steel box girder. After moving to the steel box girder installation position, the steel box girder is lowered, and the construction mechanical arm is dropped by the crane on the track of the remaining bridge-building units (3003) to measure, locate and install the steel box girder; until all the steel box girders are hoisted, the entire cross-sea suspension bridge construction is completed.
