High-strength full-thread suspender for building and mounting method of high-strength full-thread suspender
By introducing a clamping seat and a transverse tensioning mechanism into the all-wire boom, and using high-strength transverse braces and the winding and tightening mechanism of the steel wire rope, the problem of insufficient stability and strength of the existing full-wire boom is solved, and a full-length full-wire boom is achieved. High-strength connection between wire booms and stable lifting.
Patent Information
- Application Number
- CN202411234722.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-09-04
AI Technical Summary
Due to the lack of lateral connections after installation of the existing all-wire boom, the boom is easily pulled and swayed by the hanging object, causing deformation and looseness, and lacks stability and strength.
Design a high-strength full-wire boom that uses a clamping seat and a transverse tensioning mechanism. Through the winding and tightening mechanism of high-strength transverse tensioning parts and steel wire ropes, the horizontal and vertical connections between the full-wire booms are realized and the boom is strengthened. tensile strength and stability.
Through the design of the transverse tensioning mechanism, the tensile connection between the full-wire booms is enhanced, preventing hanging objects from swinging a single boom, improving the stability and strength of the boom, and avoiding deformation and looseness.
Smart Images

Figure CN118793910A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a high-strength full-thread hanger rod for a building and an installation method thereof, belonging to the technical field of full-thread hangers. Background Art
[0002] The full-thread suspension rod is actually just a long bolt with threads all over the body. The so-called through-thread means that the whole body is threaded. The position of the nut can be adjusted freely. The so-called suspension rod is a hanging screw rod. It is called a "suspender rod" when used vertically. The upper end of the suspension rod is connected to the top structure, and the lower end is hung down. It can generally be used to tie the keel of the ceiling, the pipes of the fire sprinkler, etc. The significance of using the through-thread is that it can freely adjust the height of the suspended object.
[0003] After installation, the full-thread hanger rods are all single and there is no horizontal connection between the hangers, which makes the hanger rods easily pulled and swayed by the hanging objects, causing the hanger rods to deform and loosen. The stability of the hanger rods is very poor. In view of the above shortcomings, the present invention proposes a high-strength full-thread hanger rod for construction and an installation method thereof. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention aims to provide a high-strength all-wire hanger rod for a building and an installation method thereof to solve the existing problems.
[0005] In order to achieve the above-mentioned object, the present invention is realized by the following technical scheme: a high-strength all-wire hanger for a building, comprising an all-wire hanger, and a clamping seat is arranged in the middle of the all-wire hanger, and the all-wire hanger and the clamping seat are an integrated structure, a transverse tensioning mechanism is movably sleeved on the clamping seat from bottom to top, and one side of the top surface of the transverse tensioning mechanism is movably clamped with the circumference of the upper end of the clamping seat; The chuck seat is composed of a chuck, a rotating column and a screw seat, and the diameter of the rotating column is 1 mm larger than the diameter of the screw seat; The transverse tensioning mechanism comprises a winding disc and a nut, a clamping member group is arranged on one side of the top surface of the winding disc, and a high-strength transverse tensioning member is wound on the winding disc; When the winding disc is put on the rotating column and the nut is used to screw and lock it on the screw seat, a gap is left between the top surface of the winding disc and the bottom surface of the chuck, so that the winding disc can be rotated on the rotating column to wind the high-strength cross-pull member horizontally and tighten it. After the winding is tightened horizontally, the clamping assembly cooperates with the periphery of the chuck to automatically clamp and position it. The winding disc member comprises a winding disc, and a plurality of knobs are arranged on the circumference of the upper end of the winding disc, and a hook column is arranged on one side of the top surface of the winding disc; The clamping member group includes a rotating shaft and a clamping member sleeved on the rotating shaft. A tension spring is hooked on one side of the clamping member, and the other end of the tension spring is hooked on the hook column. An anti-dropping strip for fixing the clamping member is inserted through the upper end of the rotating shaft.
[0006] As a further improvement, a plurality of slots for engaging with the clamping piece are equidistantly arranged in a circular array around the chuck, and a plurality of clamping seats for directly hooking one end of the high-strength cross-pull piece are arranged on the top surface of the chuck.
[0007] A further improvement is that a rotating column sleeve is provided in the middle of the winding disk, a winding groove is provided around the winding disk, and a plurality of hanging openings for hanging high-strength cross-pull members are provided through the winding groove, and a rotating shaft screw hole is provided next to the hook column on the top surface of the winding disk.
[0008] A further improvement is that the hanging opening is composed of a clamping slot and a wire rope opening connected to each other.
[0009] As a further improvement, a screw hole matching the screw seat is provided in the middle of the nut member, and a plurality of knobs are provided on the bottom surface of the nut member.
[0010] As a further improvement, the rotating shaft comprises a rotating shaft body, and a mounting stud matched with the rotating shaft screw hole is arranged on the bottom surface of the rotating shaft body, and an anti-slip strip opening for inserting the anti-slip strip is opened at the upper end of the rotating shaft body.
[0011] As a further improvement, the card includes a card body, a shaft opening opened on the card body, a tension spring hanger is provided at the upper left end of the card body, and a swing handle is provided at the lower left end of the card body.
[0012] A further improvement is that the high-strength cross-bracing member is formed by connecting a steel wire rope, a first hanging block and a second hanging block.
[0013] A further improvement is that each card hanging seat is provided with a hanging opening.
[0014] A method for installing a high-strength all-wire hanger for a building, the installation steps are as follows: S1: First, install the transverse tensioning mechanism on the clamping seat in advance, and the high-strength transverse pull member does not need to be installed in advance; S2: All the full-thread hangers are installed vertically on the keels installed on the top surface of the building floor or on the expansion screws installed on the top surface of the building floor in an equidistant arrangement, and the keels and expansion screws are all existing technologies; S3: High-strength cross-pull members of suitable length are installed in the horizontal rows between the single equidistant full-thread hangers. During installation, a full-thread hanger in the middle of the horizontal row is used as the starting point, and then connected to both sides. Another high-strength cross-pull member is installed on the seat on the full-thread hanger at the end of the two sides of the horizontal row, and the other end is fixed to the side wall of the building. A high-strength cross-pull member is installed longitudinally between the horizontal rows to connect the two horizontal rows, so as to obtain high-strength horizontal connection and tension between the full-thread hangers in the horizontal row, and the two adjacent horizontal rows are also connected longitudinally.
[0015] The beneficial effects of the present invention are: The present invention provides a high-strength all-wire hanger for buildings and an installation method thereof. A high-strength all-wire hanger is formed by a structural combination design in the middle of the all-wire hanger, which includes a clamping seat composed of a chuck, a rotating column and a screw seat, and a transverse tensioning mechanism composed of a winding disc, a nut, a clamping member group and a high-strength transverse pull member. The transverse tensioning mechanism transversely connects adjacent all-wire hangers through a steel wire rope on the high-strength transverse pull member, and tightens the steel wire rope through the coordinated cooperation of the winding disc, the clamping member group and the chuck, so that each all-wire hanger has mutual tension to form a whole, thereby enhancing the transverse tension strength of the all-wire hanger, and preventing the hanging object at the lower end of the all-wire hanger from pulling the single all-wire hanger to swing when a force is generated, thereby preventing the all-wire hanger from deformation and loosening, and enhancing the hoisting stability of the all-wire hanger. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A schematic diagram of a high-strength all-wire hanger structure of a building according to the present invention; Figure 2 This is a schematic diagram of the structure of the card holder of the present invention; Figure 3 It is a schematic diagram of the structure of the transverse tensioning mechanism of the present invention; Figure 4 It is a schematic diagram of the structure of the winding disc of the present invention; Figure 5 It is a schematic diagram of the structure of the nut member of the present invention; Figure 6 This is a schematic diagram of the structure of the card assembly of the present invention; Figure 7 This is a schematic diagram of the structure of the high-strength cross-bracing member of the present invention; Figure 8 It is a schematic diagram of the installation effect of the full-wire suspension rod of the present invention. DETAILED DESCRIPTION
[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0018] See also Figure 1-Figure 8 The present invention provides a high-strength all-wire suspension rod for a building: It includes a full-wire hanger 1, and a clamping seat 2 is arranged in the middle of the full-wire hanger 1, and the full-wire hanger 1 and the clamping seat 2 are an integrated structure. A transverse tensioning mechanism 3 is movably sleeved on the clamping seat 2 from bottom to top, and one side of the top surface of the transverse tensioning mechanism 3 is movably embedded with the upper end periphery of the clamping seat 2.
[0019] The clamping seat 2 is formed by integrating a chuck 21 , a rotating post 22 and a screw seat 23 . The diameter of the rotating post 22 is 1 mm larger than that of the screw seat 23 .
[0020] The chuck 21 is provided with a plurality of slots 211 for engaging with the clamping member 332 at equal intervals in a circular array around its periphery, and a plurality of clamping seats 212 for directly hooking one end of the high-strength cross-pull member 34 are provided on the top surface of the chuck 21 .
[0021] The transverse tensioning mechanism 3 includes a winding disc 31 and a nut 32 . A clamping member group 33 is arranged on one side of the top surface of the winding disc 31 , and a high-strength transverse tensioning member 34 is wound around the winding disc 31 .
[0022] When the winding disc 31 is put on the rotating column 22 and is threadedly locked on the screw seat 23 with the nut 32, a gap is left between the top surface of the winding disc 31 and the bottom surface of the chuck 21, so that the winding disc 31 can be rotated on the rotating column 22 to wind the high-strength cross-tension member 34 to tighten it laterally. After winding and tightening it laterally, the clamping member group 33 cooperates with the periphery of the chuck 21 to automatically engage and position it.
[0023] The winding member 31 includes a winding disk 311 , and a plurality of knobs 312 are arranged on the circumference of the upper end of the winding disk 311 , and a hook column 313 is arranged on one side of the top surface of the winding disk 311 .
[0024] A rotating column sleeve 3111 is provided in the middle of the winding disc 311, and a winding groove 3112 is provided around the winding disc 3111. The winding groove 3112 is provided with a plurality of hanging openings 3113 for hanging high-strength cross-pull members 34, and a rotating shaft screw hole 3114 is provided next to the hook column 313 on the top surface of the winding disc 311.
[0025] The hanging opening 3113 is composed of a slot 31131 and a wire rope opening 31132 connected to each other.
[0026] A screw hole 321 adapted to the screw seat 23 is formed in the middle of the nut member 32 , and a plurality of knobs 322 are disposed on the bottom surface of the nut member 32 .
[0027] The clamping member group 33 includes a rotating shaft 331 and a clamping member 332 sleeved on the rotating shaft 331. A tension spring 333 is hooked on one side of the clamping member 332, and the other end of the tension spring 333 is hooked on the hook column 313. An anti-dropping strip 334 for fixing the clamping member 332 is inserted on the upper end of the rotating shaft 331.
[0028] The rotating shaft 331 includes a rotating shaft body 3311 , and a mounting stud 3312 matched with the rotating shaft screw hole 3114 is disposed on the bottom surface of the rotating shaft body 3311 , and an anti-slip strip opening 3313 for the anti-slip strip 334 to be inserted is opened at the upper end of the rotating shaft body 3311 .
[0029] The clamp 332 includes a clamp body 3321 and a shaft opening 3322 opened on the clamp body 3321 . A tension spring hanger 3323 is disposed at the upper left end of the clamp body 3321 , and a swing handle 3324 is disposed at the lower left end of the clamp body 3321 .
[0030] The high-strength cross-bracing member 34 is formed by connecting a steel wire rope 341 , a first hanging block 342 , and a second hanging block 343 .
[0031] The installation method is as follows: S1: First, the transverse tensioning mechanism 3 is mounted on the clamping seat 2 in advance, while the high-strength transverse pull member 34 does not need to be installed in advance.
[0032] Because the diameter of the rotating column 22 is 1 mm larger than the diameter of the screw seat 23, the rotating column sleeve 3111 on the winding disk member 31 can directly pass through the screw seat 23, and then the nut member 32 is locked on the screw seat 23 and tightened, so that the winding disk member 31 can rotate between the chuck 21 and the nut member 32, and at this time, the clamping member 332 on the clamping member group 33 and one of the clamping members 211 on the edge of the chuck 21 are automatically engaged with each other.
[0033] S2: All the full-thread hangers 1 are arranged equidistantly and vertically mounted on the keels installed on the top surface of the building floor or on the expansion screws installed on the top surface of the building floor. The keels and expansion screws are all existing technologies.
[0034] S3: High-strength cross-pull members 34 of suitable length are installed in the horizontal rows between the single equidistant full-thread hangers 1. During installation, a full-thread hanger 1 in the middle of the horizontal row is used as the starting point, and then connected to both sides. Another high-strength cross-pull member 34 is installed on the positioning seat 2 on the full-thread hanger 1 at the end of the two sides of the horizontal row. The other end is fixed to the side wall of the building, and a high-strength cross-pull member 34 is installed longitudinally between the horizontal rows to connect the two horizontal rows, so as to obtain high-strength transverse connection and tension between the full-thread hangers 1 in the horizontal row, and the two adjacent horizontal rows are also longitudinally connected.
[0035] The installation of the high-strength cross brace 34 between the two hangers is explained in detail in the attached Figure 8First of all, it should be said that when the suspension rod a1 is the starting point, the first hanging block 342 on the high-strength cross-pull member 34 is installed on the hanging opening of a hanging seat 212 on the same side, and the second hanging block 343 is installed in the hanging opening 3113 on the winding disc member 31 of the side suspension rod a2. At this time, the wire rope 341 is in a loose state, and then by rotating the winding disc member 31, under the action of the tension spring 333, the clamping member 332 on the clamping member group 33 is in contact with the periphery of the clamping disc 21. One of the slots 211 will automatically re-engage to position the winding disc 31 after the steel wire rope 341 is wound and tightened. The tightening connection of other suspension rods in the horizontal row is the same as the above operation. The suspension rod a2 at the tail of the other horizontal row is fixedly connected to the building side wall by adding a high-strength cross-pull member 34, and the front side of the suspension rod a1 also needs to be fixedly connected to the front building side wall with a high-strength cross-pull member 34, and is wound and tightened through the winding disc 31.
[0036] When the second horizontal row is to be connected longitudinally with the first horizontal row, the first hanging block 342 is installed on the hanging seat 212 on the same side of the suspension rod a1, and then the second hanging block 343 is installed on the winding disc 31 of the suspension rod a3, and the tightening and winding operation of the wire rope 341 is the same as above.
[0037] The selection of the horizontal and vertical rows described above is determined by the length and width of the building floor, the width of the floor being the horizontal rows and the length being the vertical rows.
[0038] When the tension of the wire rope 341 needs to be relaxed, the winding disk 311 is rotated a little bit to disengage the engagement between the latch 211 and the clamp 332. At this time, the swing handle 3324 is pulled outward to disengage the clamp 332 from the action of the tension spring 333 and away from the automatic resistance against the edge of the clamp 21. In this way, the winding disk 311 can be rotated in the opposite direction to loosen the wire rope 341.
[0039] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0040] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A high-strength all-wire suspension rod for buildings, characterized in that: The invention comprises a full-thread suspension rod (1), wherein a clamping seat (2) is arranged in the middle of the full-thread suspension rod (1), and the full-thread suspension rod (1) and the clamping seat (2) are an integrated structure, a transverse tensioning mechanism (3) is movably sleeved on the clamping seat (2) from bottom to top, and one side of the top surface of the transverse tensioning mechanism (3) is movably clamped with the upper peripheral edge of the clamping seat (2); The clamping seat (2) is formed by integrating a chuck (21), a rotating column (22) and a screw seat (23); the diameter of the rotating column (22) is 1 mm larger than the diameter of the screw seat (23).
2. The transverse tensioning mechanism (3) comprises a winding disc (31) and a nut (32), a clamping member group (33) is arranged on one side of the top surface of the winding disc (31), and a high-strength transverse tensioning member (34) is wound around the winding disc (31); When the winding disc (31) is sleeved on the rotating column (22) and is threadedly locked on the screw seat (23) by the nut (32), a gap is left between the top surface of the winding disc (31) and the bottom surface of the chuck (21), so that the winding disc (31) can be rotated on the rotating column (22) to wind the high-strength cross-tension member (34) transversely and tighten it. After the winding is transversely tightened, the clamping member group (33) cooperates with the peripheral edge of the chuck (21) to automatically engage and position. The winding disc member (31) comprises a winding disc (311), a plurality of button handles (312) are arranged on the circumference of the upper end of the winding disc (311), and a hook column (313) is arranged on one side of the top surface of the winding disc (311); The clamping member group (33) comprises a rotating shaft (331), a clamping member (332) sleeved on the rotating shaft (331), a tension spring (333) being hooked on one side of the clamping member (332), and the other end of the tension spring (333) being hooked on a hook column (313), and an anti-dropping strip (334) for fixing the clamping member (332) is inserted through the upper end of the rotating shaft (331).
3. The high-strength all-wire suspension rod for buildings according to claim 1, characterized in that: The chuck (21) is provided with a plurality of equidistantly arranged snap-in openings (211) in a circular array for engaging with the snap-in member (332), and the top surface of the chuck (21) is provided with a plurality of snap-in seats (212) for directly hooking one end of the high-strength horizontal pull member (34).
4. The high-strength all-wire suspension rod for buildings according to claim 2, characterized in that: A rotating column sleeve (3111) is provided in the middle of the winding disc (311), a winding groove (3112) is provided on the periphery of the winding disc (311), and a plurality of hanging openings (3113) for hanging high-strength cross-pull members (34) are provided through the winding groove (3112), and a rotating shaft screw hole (3114) is provided next to the hook column (313) on the top surface of the winding disc (311).
5. The high-strength all-wire suspension rod for buildings according to claim 3, characterized in that: The hanging opening (3113) is composed of a connecting slot (31131) and a wire rope opening (31132).
6. The high-strength all-wire suspension rod for buildings according to claim 4, characterized in that: A screw hole (321) adapted to the screw seat (23) is provided in the middle of the nut member (32), and a plurality of knobs (322) are provided on the bottom surface of the nut member (32).
7. The high-strength all-wire suspension rod for buildings according to claim 5, characterized in that: The rotating shaft (331) comprises a rotating shaft body (3311), and a mounting stud (3312) adapted to the rotating shaft screw hole (3114) is arranged on the bottom surface of the rotating shaft body (3311), and an anti-slip strip opening (3313) for inserting the anti-slip strip (334) is provided at the upper end of the rotating shaft body (3311).
8. The high-strength all-wire suspension rod for buildings according to claim 6, characterized in that: The clamp (332) comprises a clamp body (3321), a rotating shaft opening (3322) opened on the clamp body (3321), a tension spring hanging block (3323) is arranged at the upper left end of the clamp body (3321), and a swing handle (3324) is arranged at the lower left end of the clamp body (3321).
9. The high-strength all-wire suspension rod for buildings according to claim 7, characterized in that: The high-strength cross-pull member (34) is composed of a steel wire rope (341), a first hanging block (342), and a second hanging block (343) connected together; A method for installing a high-strength all-wire hanger rod for a building using any one of claims 1 to 8, characterized in that: The installation steps are as follows: S1: First, the transverse tensioning mechanism (3) is mounted on the clamping seat (2) in advance, while the high-strength transverse tensioning member (34) does not need to be installed in advance; S2: The full-thread hangers (1) are arranged equidistantly and vertically mounted on the keels installed on the top surface of the building floor or on the expansion screws installed on the top surface of the building floor, wherein the keels and expansion screws are both of the prior art; S3: High-strength cross-pull members (34) of suitable length are installed in horizontal rows between the single all-thread hangers (1) at equal distances. During installation, a full-thread hanger (1) in the middle of the horizontal row is used as the starting point, and then connected to both sides. Another high-strength cross-pull member (34) is installed on the retaining seat (2) on the full-thread hanger (1) at the end of the two sides of the horizontal row, and the other end is fixed to the side wall of the building. A high-strength cross-pull member (34) is installed longitudinally between the horizontal rows to connect the two horizontal rows, so that the high-strength cross-pull members (1) in the horizontal row are connected and tightened, and the two adjacent horizontal rows are also connected longitudinally.
Citation Information
Patent Citations
Article hanging system, slidable wire holder, detachable wire holder, wire hook and wire gripper
CA2467211A1
Connecting device for drawing detection of expansion bolt special for suspended ceiling and detection method
CN103792136A
Road crash barrier
CN111576285A
Anti-deformation and anti-falling assembly type buckle plate suspended ceiling
CN114412046A
Anti-seismic suspended ceiling structure
CN209397816U