Advanced geological prediction method and system under complex TBM tunneling condition

Through the three-dimensional geological prediction method and system, combined with the neural network model, the problem of inaccurate prediction of surrounding rock and groundwater conditions under complex geological conditions in TBM construction has been solved, and more efficient construction safety and efficiency have been achieved.

CN118795568APending Publication Date: 2024-10-18SINOHYDRO BUREAU 5
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410777726.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

TBM construction faces problems such as unstable construction progress, sudden geological disasters, and inaccurate prediction of surrounding rock classification under complex geological conditions, resulting in safety risks and low efficiency.

Method used

The three-dimensional geological prediction method and system is used to detect the surrounding rock and groundwater conditions through seismic wave method, complex frequency conductivity method and geological radar respectively. It is combined with the neural network model to predict the surrounding rock classification, determine unfavorable geological locations in advance and carry out advance drilling detection.

Benefits of technology

It improves the accuracy of surrounding rock classification prediction, reduces the risk of accidents, and ensures the safety and efficiency of TBM construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118795568A_ABST
    Figure CN118795568A_ABST
Patent Text Reader

Abstract

The invention discloses an advanced geological prediction method and system under complex TBM tunneling conditions, and the method comprises the steps: carrying out first prediction to detect the overall surrounding rock condition of a tunnel tunneling route region, determining a first geological abnormal section, and obtaining TBM tunneling parameters of the section according to the detected surrounding rock parameters, the surrounding rock classification is obtained by inputting the TBM tunneling parameters into the neural network model for prediction; second prediction is carried out to detect the overall groundwater condition of the tunneling route area, and a geological second abnormal section is determined; third prediction is carried out to detect surrounding rock and water content conditions of an unexcavated section in front of the tunnel face, a third geological abnormal section is determined, and the detection distance of the third prediction to the front of the tunnel face is smaller than that of the first prediction and the second prediction; when the third abnormal section coincides with the first abnormal section and / or the second abnormal section, third prediction is carried out again, and whether the unexcavated section in front of the tunnel face has the unfavorable geology or not is determined according to the obtained data. The method can more accurately predict the geological condition in front of tunneling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of geological prediction in tunnel construction, and in particular to a method and system for advanced geological prediction under complex conditions of TBM excavation. Background Art

[0002] TBM (full-section tunnel boring machine) construction has many advantages such as fast excavation speed, safety and high efficiency. TBM construction is increasingly being used in tunnel construction in my country. In recent years, pumped-storage power stations have started the application of trenchless technology production research for small-section and large-curvature TBM drainage corridors, and inclined shaft TBM and vertical shaft SBM construction technologies are also beginning to be explored and tested. In the construction of pumped-storage power station tunnels, especially in western my country, TBM construction often encounters unfavorable geology such as fault fracture zones, weak strata, karst caves, and underground rivers, and often faces extremely complex geological conditions.

[0003] However, due to the poor geological adaptability of TBM, the construction progress is restricted by geological conditions and fluctuates greatly. For example, when TBM excavation passes through poor geological development sections such as water-conducting faults and water-filled karst caves, it is very easy to induce sudden geological disasters such as sudden water and mud, causing the TBM to get stuck, or even causing the entire TBM to be scrapped and casualties. For example, when the prediction accuracy of the surrounding rock classification of the unexcavated section during TBM excavation is unreasonable, it will result in low excavation efficiency. Most of these factors that affect the construction progress of TBM are caused by insufficient prediction of the geological conditions ahead of TBM excavation during construction.

[0004] Due to the complexity of the TBM construction tunnel environment, it is very difficult to carry out advanced geological prediction methods for tunnel construction using traditional drilling and blasting methods in such tunnels. In addition, the prediction effect will also be affected by many interference sources. The advanced geological prediction is not accurate enough and it is difficult to provide technical guidance for the safe excavation of TBM. Summary of the invention

[0005] The purpose of the present invention is to provide a method and system for advanced geological prediction under complex conditions of TBM excavation in order to ensure the construction safety and construction efficiency of TBM excavation, which can more accurately predict the geological conditions ahead of the excavation, including the unfavorable geology and surrounding rock classification ahead of the excavation, so that construction preparations and construction plans can be made in advance, thereby ensuring the safety of TBM construction and the progress of excavation.

[0006] The present invention is achieved through the following technical solutions:

[0007] In a first aspect, the present invention provides a method for advanced geological prediction under complex conditions for TBM excavation, comprising the following steps:

[0008] Conducting a first prediction of the geology of the tunneling route area, the first prediction is used to detect the overall surrounding rock conditions in the tunneling route area, determine the first geological abnormal section, and obtain TBM excavation parameters of this section based on the detected surrounding rock parameters, and obtain the surrounding rock classification by inputting the TBM excavation parameters into the neural network model prediction;

[0009] Conducting a second prediction of the geology of the tunneling route area, the second prediction being used to detect the overall groundwater conditions in the tunneling route area and determine a second geological anomaly section;

[0010] A third prediction is conducted for the unexcavated geology in front of the tunnel face, and the detection distance of the third prediction in front of the tunnel face is smaller than the detection distances of the first prediction and the second prediction. The third prediction is used to simultaneously detect the surrounding rock and water content of the unexcavated section in front of the tunnel face to determine the third abnormal geological section;

[0011] When the third abnormal section coincides with the first abnormal section and / or the second abnormal section, the third prediction is performed again, and it is determined whether the unexcavated section in front of the tunnel face has unfavorable geology based on the acquired data.

[0012] In some embodiments, the first prediction uses a seismic wave method to detect the entire construction tunnel from front to back in multiple times, and each time obtains a surrounding rock wave velocity distribution map and a geological structure offset map based on the detection data.

[0013] In some embodiments, when using the seismic wave method for detection, multiple receiving holes and multiple excitation holes are set behind the TBM shield; wherein the multiple receiving holes are located on a horizontal plane below the tunnel axis and are symmetrically arranged on both sides of the excavation tunnel axis; along the tunnel excavation direction, multiple excitation holes are located behind the multiple receiving holes, and the multiple excitation holes are distributed on two horizontal planes above and below the tunnel axis, and the multiple excitation holes on each horizontal plane are symmetrically arranged on both sides of the excavation tunnel axis.

[0014] In some embodiments, the second prediction uses a complex frequency conductivity method to detect the entire construction tunnel from front to back in multiple times, and each time coherent imaging is performed based on the detection data to obtain water content offset imaging and relative dielectric constant.

[0015] In some embodiments, when using the complex frequency conductivity method for detection, receiving electrodes and transmitting electrodes are sequentially arranged behind the tunnel face; wherein, there are multiple receiving electrodes, two receiving electrodes form a group and are symmetrically arranged on both sides of the tunnel axis, and multiple groups are arranged at intervals along the tunnel axis; there are two transmitting electrodes, which are symmetrically arranged on both sides of the tunnel axis.

[0016] In some embodiments, the third prediction uses geological radar to detect the unexcavated section in front of the tunnel face, and obtains a three-dimensional image and wave velocity distribution of the geological structure in front of the tunnel face.

[0017] In some embodiments, surrounding rock conditions include at least rock type, rock strength, and rock integrity.

[0018] In some embodiments, it also includes: after conducting the third prediction again, when it is determined based on the detection situation that the unexcavated section in front of the face has poor geology, direct advance drilling detection is performed on the third predicted section to obtain poor geological exploration data.

[0019] In some embodiments, when implementing advance drilling detection, the location and number of advance drilling holes are determined based on the location and scale of the adverse geology.

[0020] In the second aspect, the present invention provides an advanced geological prediction system under complex conditions of TBM excavation, including a first prediction system, a second prediction system and a third prediction system; the first prediction system detects the condition of the surrounding rock of the unexcavated section in front of the tunnel face by a seismic wave method, the second prediction system detects the water content of the surrounding rock of the unexcavated section in front of the tunnel face by a complex frequency conductivity method, and the third prediction system detects the surrounding rock and water content of the unexcavated section in front of the tunnel face by a geological radar; the first prediction system and the second prediction system are arranged behind the TBM shield, and the third prediction system is set on the TBM cutterhead.

[0021] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0022] The present invention performs a first prediction and a second prediction on the geology of the tunnel excavation route area to respectively detect the overall surrounding rock conditions and groundwater conditions in the tunnel excavation route area, and determine the first geological abnormal section and the second geological abnormal section; then performs a third prediction on the geology of the unexcavated section in front of the tunnel face to be excavated, and the detection distance of the third prediction in front of the tunnel face is smaller than the detection distances of the first prediction and the second prediction, and the third prediction is used to simultaneously detect the surrounding rock and water conditions of the unexcavated section in front of the tunnel face to determine the third geological abnormal section; when the third abnormal section coincides with the first abnormal section and / or the second abnormal section, the third prediction is performed again, and the first abnormal section and the second abnormal section are determined according to the acquired data. Whether the unexcavated section in front of the face has poor geology; at the same time, since the surrounding rock parameters are detected in the first prediction, the TBM excavation parameters of this section can be obtained according to the surrounding rock parameters, and then the TBM excavation parameters are input into the neural network model to predict the surrounding rock classification, which greatly improves the prediction accuracy of the surrounding rock classification, and thus enables the TBM to operate at a higher excavation efficiency; this method can more accurately predict the geological conditions ahead of TBM excavation, has a high prediction accuracy, and can make construction preparations and construction plans in advance for poor geology, reducing the risk of sudden accidents during TBM construction and ensuring TBM construction safety and excavation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0024] Figure 1 This is a flow chart of the advanced geological prediction method under complex conditions of TBM excavation in the present invention;

[0025] Figure 2 This is the first prediction workflow diagram of the present invention;

[0026] Figure 3 A side view of the arrangement of receiving holes and excitation holes in the first prediction of the present invention;

[0027] Figure 4 A top view of the arrangement of receiving holes and excitation holes in the first prediction of the present invention;

[0028] Figure 5 is a second prediction workflow diagram in the present invention;

[0029] Figure 6 It is a schematic diagram of the arrangement of transmitting electrodes and receiving electrodes in the second prediction of the present invention.

[0030] Marks and corresponding parts names in the attached drawings:

[0031] 1-receiving hole, 2-excitation hole, 3-receiving electrode, 4-transmitting electrode. DETAILED DESCRIPTION

[0032] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.

[0034] In the description of the embodiments of the present application, technical terms such as "first" and "second" are only used to distinguish different objects and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features.

[0035] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0036] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists, A and B exist at the same time, and B exists. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0037] In the embodiments of the present application, the same reference numerals represent the same components, and for the sake of brevity, detailed descriptions of the same components are omitted in different embodiments. It should be understood that the thickness, length, width and other dimensions of various components in the embodiments of the present application shown in the drawings, as well as the overall thickness, length, width and other dimensions of the integrated device are only exemplary descriptions and should not constitute any limitation to the present application.

[0038] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces), unless otherwise clearly and specifically defined.

[0039] In the description of the embodiments of the present application, the technical terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the embodiments of the present application.

[0040] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0041] Please refer to Figures 1 to 6 , a method for advanced geological prediction under complex conditions for TBM excavation provided in an embodiment of the present application comprises the following steps:

[0042] Conducting a first prediction of the geology of the tunneling route area, the first prediction is used to detect the overall surrounding rock conditions in the tunneling route area, determine the first geological abnormal section, and obtain TBM excavation parameters of this section based on the detected surrounding rock parameters, and obtain the surrounding rock classification by inputting the TBM excavation parameters into the neural network model prediction;

[0043] Conducting a second prediction of the geology of the tunneling route area, the second prediction being used to detect the overall groundwater conditions in the tunneling route area and determine a second geological anomaly section;

[0044] A third prediction is conducted for the unexcavated geology in front of the tunnel face, and the detection distance of the third prediction in front of the tunnel face is smaller than the detection distances of the first prediction and the second prediction. The third prediction is used to simultaneously detect the surrounding rock and water content of the unexcavated section in front of the tunnel face to determine the third abnormal geological section;

[0045] When the third abnormal section coincides with the first abnormal section and / or the second abnormal section, the third prediction is performed again, and it is determined whether the unexcavated section in front of the tunnel face has unfavorable geology based on the acquired data.

[0046] According to some embodiments of the present application, the first prediction uses the seismic wave method to detect the entire construction tunnel from front to back in multiple times, and each time obtains the surrounding rock wave velocity distribution map and the geological structure offset map based on the detection data. Due to the use of geological interface images and wave velocity distribution, the reliability and accuracy of the forecast are greatly improved. Specifically, the seismic wave detection distance each time is at least 100m ahead, that is, excavation construction is carried out after each detection. When the excavation is close to the end position of the first detection, the excavation construction is stopped first, and then the next seismic wave detection is carried out.

[0047] It should be noted that the seismic wave method uses a seismic source to excite elastic waves (seismic waves, sound waves). When the elastic waves encounter an inhomogeneous medium surface, transmission and reflection occur at the interface due to the difference in elastic wave impedance. The received elastic wave signal is processed to extract the forward reflection information and invert the mechanical properties of the surrounding rock in front. There are two types of seismic sources currently used. One is a passive seismic source, such as the vibration signal generated when the cutterhead breaks the rock; the other is an active seismic source, which is mostly a mechanical seismic source. The cutterhead vibration signal has weak energy and a short detection distance, so it cannot meet the long-distance prediction requirements. In this embodiment, a controllable impact source is used to directly excite the bare rock surface.

[0048] According to some embodiments of the present application, when using the seismic wave method for detection, a plurality of receiving holes 1 and a plurality of excitation holes 2 are set behind the TBM shield; wherein, the plurality of receiving holes 1 are located on a horizontal plane below the tunnel axis, and are symmetrically arranged on both sides of the excavation tunnel axis; along the tunnel excavation direction, the plurality of excitation holes 2 are located behind the plurality of receiving holes 1, the plurality of excitation holes 2 are distributed on two horizontal planes above and below the tunnel axis, and the plurality of excitation holes 2 on each horizontal plane are symmetrically arranged on both sides of the excavation tunnel axis.

[0049] It should be noted that when arranging the detection equipment, each geophone is respectively set at the receiving hole 1, and the vibration signal output by the source is connected to each excitation hole 2 to form an excitation point. Due to the arrangement of the above-mentioned multiple receiving holes 1 and multiple excitation holes 2, the unique double-sided excitation and receiving array observation method can effectively determine the wave velocity distribution of surrounding rocks at different mileages, which can not only accurately determine the location of the surrounding rock interface, but also provide a reliable wave velocity basis for rock mass engineering classification.

[0050] According to some embodiments of the present application, the second prediction uses the complex frequency conductivity method to detect the entire construction tunnel from front to back in multiple times, and each time coherent imaging is performed based on the detection data to obtain water content offset imaging and relative dielectric constant. Specifically, the detection distance of each complex frequency conductivity method is at least 100m ahead, that is, tunneling construction is carried out after each detection, and when the tunneling is close to the end position of the first detection, the tunneling construction is stopped first, and then the next complex frequency conductivity method detection is carried out.

[0051] It should be noted that the complex frequency conductivity method is to emit electromagnetic waves to the surrounding rock in front during detection. When the electromagnetic waves are incident on the non-uniform water-bearing surrounding rock, they are reflected due to the difference in electromagnetic wave impedance between the two interfaces. The reflected waves are enhanced as the difference in water content increases. Since the incident wave and the reflected wave will interfere when the receiving point is located at a quarter wavelength, spectral coherence analysis is performed on multiple sets of electromagnetic wave data at different receiving positions. By maximizing the energy of the offset image of the electromagnetic wave velocity, the optimal electromagnetic wave velocity and the optimal offset image are obtained, and the relative dielectric constant of the surrounding rock section can be obtained. The relative dielectric constant is used to judge the overall water content of the surrounding rock section, and the offset image is used to reflect the water content characteristics of the surrounding rock, so as to predict the location of the water-rich zone and the degree of water content difference of the surrounding rock.

[0052] According to some embodiments of the present application, when the complex frequency conductivity method is used for detection, a receiving electrode 3 and a transmitting electrode 4 are sequentially arranged behind the tunnel face; wherein, there are multiple receiving electrodes 3, and each two receiving electrodes 3 form a group and are symmetrically arranged on both sides of the tunnel axis, and multiple groups are arranged at intervals along the tunnel axis direction; there are two transmitting electrodes 4, which are symmetrically arranged on both sides of the tunnel axis. The receiving electrode 3 and the transmitting electrode 4 are buried in the surrounding rock on both sides of the tunnel, which can avoid electromagnetic interference such as metal tools in the tunnel. By arranging the transmitting electrode 4 and multiple pairs of parallel receiving electrodes 3 in the surrounding rock of the tunnel side wall, an array observation method is formed, and the sensitivity of the 100kHz to 10MHz frequency band to the difference in wave impedance of dry and wet rock mass is used to perform electromagnetic wave reflection and coherence measurement. After normalization of the transmission spectrum, the coherence spectrum of each receiving point is obtained. The coherence spectrum of all receiving points is jointly imaged, the position of the water body is determined by the coherence frequency, and the amount of water content is determined by the coherence intensity.

[0053] According to some embodiments of the present application, the third prediction uses a geological radar to detect the unexcavated section in front of the face, and obtains a three-dimensional image and wave velocity distribution of the geological structure in front of the face. The geological radar can detect the geological structure within 30m in front of the face, including lithology, structure, boulders, karst, structures and water content of surrounding rocks. The third predicted detection distance satisfies one excavation construction cycle. Specifically, two sets of transmitting and receiving antennas can be set on the cutterhead, and electromagnetic waves are emitted to the front of the face by rotating the cutterhead. When the electromagnetic wave propagates and encounters an interface with changing wave impedance, it is reflected and received, thereby realizing three-dimensional data collection of the geological body in front. After professional processing such as offset imaging and velocity scanning of the three-dimensional radar data, the three-dimensional image and wave velocity distribution of the geological structure within 30m in front are obtained in real time.

[0054] According to some embodiments of the present application, the method for obtaining TBM excavation parameters based on the first prediction is: based on the conditions of the existing TBM tunneling engineering projects, actual data on surrounding rock conditions and TBM excavation parameters are collected to determine the feasible range of TBM excavation parameters under different surrounding rock conditions; based on the surrounding rock parameters detected in the first prediction, the surrounding rock conditions that are relatively close in previous TBM tunneling projects are compared to determine the TBM excavation parameters.

[0055] According to some embodiments of the present application, the method for predicting surrounding rock classification based on TBM excavation parameters is as follows: a neural network model is established based on the actual surrounding rock classification of the built project and the TBM excavation parameter data, wherein the input neurons in the neural network model are TBM excavation parameters: propulsion speed, cutter head speed, cutter head torque, thrust, and penetration; and the output neurons are surrounding rock classification. The TBM excavation parameters obtained according to the first prediction are input into the neural network model, and the surrounding rock classification of the unexcavated section is output. The surrounding rock classification predicted by this method is more accurate, which is conducive to ensuring the efficiency of TBM excavation.

[0056] According to some embodiments of the present application, surrounding rock conditions include at least rock type, rock strength, and rock integrity.

[0057] According to some embodiments of the present application, it also includes: after the third prediction is carried out again, when it is determined according to the detection situation that the unexcavated section in front of the face has poor geology, the third predicted section is directly detected by advance drilling to obtain poor geological exploration data. Specifically, the advance drilling is a horizontal drilling from the face to the front, and the depth of the advance drilling is the same as the detection distance of the third prediction. The poor geological exploration data includes at least one of the following data: rock type, rock strength, rock integrity, underground water inflow, and water pressure data of the inflow.

[0058] According to some embodiments of the present application, when implementing advance drilling detection, the location and number of advance drilling holes are determined according to the location and scale of the unfavorable geology. Specifically, a down-the-hole drill can be used for advance drilling, and at least one advance drilling hole corresponds to the unfavorable geology location during construction.

[0059] An advanced geological prediction system for TBM excavation under complex conditions provided in an embodiment of the present application is used to implement the prediction method described above, including a first prediction system, a second prediction system and a third prediction system; the first prediction system detects the surrounding rock conditions of the unexcavated section in front of the face by a seismic wave method, the second prediction system detects the water content of the surrounding rock of the unexcavated section in front of the face by a complex frequency conductivity method, and the third prediction system detects the surrounding rock and water content of the unexcavated section in front of the face by a geological radar; the first prediction system and the second prediction system are arranged behind the TBM shield, and the third prediction system is arranged on the TBM cutterhead. Specifically, the first prediction system includes a seismic signal collector, a detector and a source; the second prediction system includes a transmitter, a receiver, a transmitting electrode and a receiving electrode; the third prediction system includes a geological radar, and transmitting and receiving antennas integrated on the TBM cutterhead.

[0060] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for advanced geological prediction under complex conditions for TBM excavation. It is characterized in that The following steps are involved: Conducting a first prediction of the geology of the tunneling route area, the first prediction is used to detect the overall surrounding rock conditions in the tunneling route area, determine the first geological abnormal section, and obtain TBM excavation parameters of this section based on the detected surrounding rock parameters, and obtain the surrounding rock classification by inputting the TBM excavation parameters into the neural network model prediction; Conducting a second prediction of the geology of the tunneling route area, the second prediction being used to detect the overall groundwater conditions in the tunneling route area and determine a second geological anomaly section; A third prediction is conducted for the unexcavated geology in front of the tunnel face, and the detection distance of the third prediction in front of the tunnel face is smaller than the detection distances of the first prediction and the second prediction. The third prediction is used to simultaneously detect the surrounding rock and water content of the unexcavated section in front of the tunnel face to determine the third abnormal geological section; When the third abnormal section coincides with the first abnormal section and / or the second abnormal section, the third prediction is performed again, and it is determined whether the unexcavated section in front of the tunnel face has unfavorable geology based on the acquired data.

2. The method for advanced geological prediction under complex conditions of TBM excavation according to claim 1, It is characterized in that The first prediction uses the seismic wave method to detect the entire construction tunnel from front to back in multiple times, and each time obtains the surrounding rock wave velocity distribution map and the geological structure offset map based on the detection data.

3. The method for advanced geological prediction under complex conditions of TBM excavation according to claim 2, It is characterized in that When using the seismic wave method for detection, multiple receiving holes and multiple excitation holes are set behind the TBM shield; wherein, the multiple receiving holes are located on a horizontal plane below the tunnel axis and are symmetrically arranged on both sides of the excavation tunnel axis; along the tunnel excavation direction, the multiple excitation holes are located behind the multiple receiving holes, the multiple excitation holes are distributed on two horizontal planes above and below the tunnel axis, and the multiple excitation holes on each horizontal plane are symmetrically arranged on both sides of the excavation tunnel axis.

4. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 1, It is characterized in that The second prediction uses the complex frequency conductivity method to detect the entire construction tunnel from front to back in multiple times, and each time coherent imaging is performed based on the detection data to obtain water content offset imaging and relative dielectric constant.

5. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 4, It is characterized in that When using the complex frequency conductivity method for detection, receiving electrodes and transmitting electrodes are arranged in sequence behind the tunnel face; among them, there are multiple receiving electrodes, two receiving electrodes form a group and are symmetrically arranged on both sides of the tunnel axis, and multiple groups are arranged at intervals along the tunnel axis; there are two transmitting electrodes, which are symmetrically arranged on both sides of the tunnel axis.

6. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 1, It is characterized in that The third prediction uses geological radar to detect the unexcavated section in front of the tunnel face, and obtains a three-dimensional image and wave velocity distribution of the geological structure in front of the tunnel face.

7. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 1, It is characterized in that The surrounding rock conditions include at least rock type, rock strength, and rock integrity.

8. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 1, It is characterized in that Also includes: After the third prediction is carried out again, when it is determined based on the detection situation that the unexcavated section in front of the tunnel face has unfavorable geology, advance drilling is carried out on the third predicted section to directly detect and obtain unfavorable geological exploration data.

9. The method for advanced geological prediction under complex conditions for TBM excavation according to claim 8, It is characterized in that When implementing advance drilling exploration, the location and number of advance drilling holes are determined based on the location and scale of unfavorable geology.

10. A system for advanced geological prediction under complex conditions for TBM excavation. It is characterized in that It includes a first prediction system, a second prediction system and a third prediction system; the first prediction system detects the surrounding rock condition of the unexcavated section in front of the tunnel face by using a seismic wave method, the second prediction system detects the water content of the surrounding rock of the unexcavated section in front of the tunnel face by using a complex frequency conductivity method, and the third prediction system detects the surrounding rock and water content of the unexcavated section in front of the tunnel face by using a geological radar; the first prediction system and the second prediction system are arranged behind the TBM shield, and the third prediction system is set on the TBM cutterhead.

Citation Information

Cited By

  • TBM front jamming risk evaluation method and computer device

    CN119849915A

  • Advanced geological forecasting method and system

    CN120314934A

  • Tunnel fracture zone detection method and system based on geological radar

    CN121934179A

  • A tunnel fractured zone detection method and system based on ground penetrating radar

    CN121934179B