A method for calculating the upper limit of the control domain of water level regulation in a reservoir group during flood season based on storage capacity substitution

By establishing a reservoir group model based on the role of reservoir capacity replacement, the analytical problem of flood control reservoir capacity replacement relationships in the upper and lower reaches of the cascade reservoir group is solved, the optimization scheduling of additional flood control reservoir capacity and the quantification of water level replacement relationships is realized, and the flood control efficiency of reservoir group is improved and resource utilization benefits.

CN118798489BActive Publication Date: 2024-11-15DALIAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411270329.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-15
Estimated Expiration
2044-09-11

AI Technical Summary

Technical Problem

The existing technology has not fully considered the optimization and scheduling of additional flood control storage capacity and the water level replacement relationship between multiple reservoirs. Especially in the cascade reservoir group, it is difficult to effectively analyze the flood control storage capacity replacement relationship between upstream and downstream reservoirs.

Method used

A method for estimating the upper limit of the water level control area of ​​the reservoir group based on the substitution of reservoir capacity is proposed. By establishing a model that does not reduce the flood control standards, comprehensively considering the hydraulic connection and storage impact of reservoirs, the additional flood control capacity of the upstream and downstream reservoirs is calculated. The upper limit of operating water level is achieved to quantify the role of replacing the storage capacity.

Benefits of technology

On the premise of ensuring that the flood control standards are not reduced, make full use of additional flood control reservoir capacity, reduce the flood control pressure of downstream reservoirs, improve the capacity of Xingli water storage, and improve the flood control efficiency and comprehensive resource utilization efficiency of the cascade reservoir group.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798489B_ABST
    Figure CN118798489B_ABST
Patent Text Reader

Abstract

The present invention provides a method for deriving the upper limit of the control domain of the flood season water level of a reservoir group based on the function of reservoir capacity substitution, and belongs to the technical field of reservoir scheduling. The hydraulic connection and regulation and storage influence of the reservoir are comprehensively considered to realize the flood control capacity substitution function in the complex reservoir group. After the upstream reservoir performs the capacity substitution, its own discharge process, the inflow and discharge process of the intermediate reservoir, and the inflow and discharge process of the downstream reservoir are sequentially changed. In order to ensure that the flood control high water level after the reservoir capacity substitution is consistent with the flood limit water level when it is adjusted, the discharge of the upstream reservoir group is carried out, and the floating value of the downstream reservoir is also calculated cyclically to ensure that the additional flood control storage capacity is fully utilized. In the process of solving the storage capacity substitution relationship, the present invention follows the principle of not reducing the flood control standard, can make full use of the additional flood control storage capacity, and ensure that the flood control high water level of each reservoir after the storage capacity substitution remains consistent with the flood limit water level when it is adjusted; the operating upper limit of the replaced reservoir water level under different additional flood control storage capacities can be quantified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of reservoir regulation, and relates to a method for deriving an upper limit of a control domain for regulating water levels of a reservoir group during flood season based on storage capacity substitution. Background Art

[0002] In order to ensure the flood control safety of the river basin and take into account the comprehensive utilization of water resources such as power generation, shipping, water supply, and ecological environment protection, a large number of water conservancy projects have been built in various river basins to form a cascade reservoir group system. When planning and designing the flood control of the cascade reservoir group system, each reservoir uses the flood limit water level as the starting water level to ensure the flood control safety of the project when encountering various typical design floods, and determine the flood control characteristic water level and corresponding storage capacity of each reservoir. However, in actual operation, the operating water level of each reservoir may be lower than the flood limit water level, and the typical flood may not be the most unfavorable typical, so there is additional flood control storage capacity and potential for flood resource utilization. The cascade reservoirs jointly undertake the downstream flood control task. When the upstream reservoir has additional flood control storage capacity, it can replace the downstream reservoir to undertake the flood control task, so that the flood control storage capacity required by the downstream reservoir is reduced, and then part of the flood control storage capacity can be used to store water for benefit; conversely, the downstream reservoir can also replace the upstream reservoir to undertake the flood control task, and the upstream reservoir can use part of the flood control storage capacity to store water for benefit, thereby improving the benefit of the system. The key to utilizing this extra storage capacity is to analyze the storage capacity substitution relationship, that is, when the upstream reservoir has 100 million extra flood control storage capacity, the downstream reservoir can reduce the flood control storage capacity.

[0003] Most existing studies implicitly consider substitution effects into optimization models through hydraulic connections or constraints (Ding, W, et al. Flood Risk Quantification, Transmission, and Propagation Analysis for Flood Water Utilization of Parallel Reservoirs, J HYDROL, 2023, 618, 129202.). For example, Jia et al. (2013) and Zhou et al. (2018) established the substitution relationship of the water level rise space in the upstream and downstream reservoirs during the forecast period through hydraulic connection, providing boundary conditions for the optimization model (Jia, B, et al. Decomposition–coordination model of reservoir group and flood storage basin for real-timeflood control operation, HYDROL RES, 2015, 46(1), 11-25. Zhou, Y, et al. Methodology that improves water utilization and hydropower generation without increasing flood risk in mega cascade reservoirs, ENERGY, 2018, 143, 785-796.). A small number of studies have quantified the substitution relationship of flood control storage capacity. Tan et al. (2017) first quantitatively analyzed the substitution relationship of flood control storage capacity of upstream and downstream reservoirs in a cascade reservoir group with a common flood control task while ensuring that the system flood control standard remains unchanged (Tan, Q, et al. The Dynamic Control Bound of flood-limited Water Level Considering Capacity Compensation Regulation and Flood Spatial Pattern Uncertainty, WATER RESOUR MANAG, 2017, 31(1), 143-158.).Xiong et al. (2023) and Xie et al. (2024) further analyzed the impact of flood type on the substitution relationship of flood prevention storage capacity (Xiong, F, et al. Equivalent Relationship between Flood Prevention Storage of Cascade Reservoirs in the Downstream Jinsha River and Three Gorges Reservoir, J WATERRES PLAN MAN, 2023, 149(8), 5023005. Xie, Y, et al. Optimal allocation of flood prevention storage and dynamic operation of water levels to increase cascade reservoir hydropower generation, RENEW ENERG, 2024, 228, 120676.). However, the above studies are all focused on flood control scheduling, and the substitution relationship of additional flood prevention storage capacity has not been studied. Existing patents such as the "Method for determining the dynamic flood limit water level in flood season based on the pre-discharge rule" determine the flood limit water level by finely dividing the flood season and combining the flood process line. Although it improves the response capability of flood control needs, its limitation is that it fails to fully consider the optimization scheduling problem when additional flood control storage capacity appears, as well as the water level substitution relationship between multiple reservoirs. The "Method for formulating dynamic flood limit water level for reservoirs" enhances the flexibility of flood control scheduling rules by performing pre-discharge optimization through cluster analysis and introducing integer variables, but this method mainly focuses on the dynamic control of a single reservoir, and the research on the joint scheduling of multiple reservoirs and the substitution relationship of flood control storage capacity is still insufficient. This patent constructs a solution model for the substitution relationship of additional flood control storage capacity, and derives the upper limit of the flood season water level control domain of the downstream (upstream) reservoir when there is additional flood control storage capacity in the upstream (downstream) reservoir of the cascade reservoir group. Summary of the invention

[0004] In order to solve the problems existing in the prior art, the present invention provides a method for deriving the upper limit of the control domain of the flood season water level of a reservoir group based on the reservoir capacity substitution effect. This method aims at the situation where the water level of a reservoir in the cascade reservoir group is lower than the flood limit water level, and the utilization method of the additional flood control storage capacity. It comprehensively considers the hydraulic connection and regulation and storage impact of the reservoir, realizes the flood control storage capacity substitution effect in the complex reservoir group, and can quantify the upper limit of the operation of the replaced reservoir water level under different additional flood control storage capacities. The rationality of the present invention is verified by taking the Three Gorges cascade reservoir group in the lower reaches of the Jinsha River as an example.

[0005] To achieve the above object, the technical solution of the present invention is as follows:

[0006] A method for calculating the upper limit of reservoir operating water level based on the function of reservoir capacity substitution. In the process of solving the reservoir capacity substitution relationship, the principle of not reducing flood control standards must be followed. In order to make full use of the additional flood control storage capacity, the flood control high water level of each reservoir after the reservoir capacity substitution is guaranteed to be consistent with the flood limit water level when it is adjusted. Figure 1 As shown in the figure, after the upstream reservoir replaces its storage capacity, it will change its own discharge process, the inflow and discharge process of the intermediate reservoir, and the inflow and discharge process of the downstream reservoir in turn. In order to ensure that the flood control high water level after the reservoir capacity replacement is consistent with the flood limit water level at the beginning of the regulation, it is necessary to perform a cyclic trial calculation on the discharge of the upstream reservoir group and the floating value of the downstream reservoir to ensure that the additional flood control storage capacity is fully utilized. The model solution flow chart is shown in the attached figure. Figure 2 As shown, the method for calculating the upper limit of the reservoir operating water level includes the following steps:

[0007] Step 1: Starting from the flood limit water level, use the designed joint dispatching rules to calculate the regulation of each reservoir;

[0008] 1.1) Set the starting water level of each reservoir as the flood limit water level, take the designed flood process as input, and simulate the outflow process and water level process of each reservoir according to the designed joint dispatching rules.

[0009] The designed joint dispatching rules are determined by known methods according to specific circumstances, usually according to current reservoir operation and power station operation dispatching regulations.

[0010] 1.2) Based on the water level process regulated in 1.1), determine the flood control high water level Z of each reservoir max,0 , as the standard for subsequent storage capacity replacement.

[0011] 1.3) Determine the water level rise process of each reservoir and calculate the total power generation of each reservoir and system under this scheme.

[0012] Step 2: Calculate the discharge from the replacement reservoir using the additional flood control storage capacity;

[0013] 2.1) Set the starting water level of the alternative reservoir below the flood limit water level as Z up1,c , use formula (1) to calculate the additional flood control storage capacity ,

[0014] (1)

[0015] In the formula, For additional flood control storage capacity, is the flood limit water level, Adjust the water level. is the water level storage capacity function.

[0016] 2.2) Determine the discharge process of the alternative reservoir using the additional flood control storage capacity to intercept floods. In order to ensure that the flood control standards are not reduced and the upstream reservoir can intercept and store as much flood water as possible, the additional flood control storage capacity is evenly distributed during the period of rising water levels in the reservoir, effectively reducing the flood control pressure of the downstream reservoir and maximizing the substitution effect. The discharge calculation formula after the alternative reservoir uses the additional flood control storage capacity to intercept floods is shown in formula (2).

[0017] (2)

[0018] In the formula, Consider the discharge volume of the upstream replacement reservoir to replace the storage capacity; The discharge of the upstream alternative reservoir determined in step 1 when the flood limit water level is adjusted; is the additional flood control storage capacity of the upstream alternative reservoir calculated in 2.1); The period of rising flood dispatch period for upstream alternative reservoirs is long.

[0019] 2.3) Substitute the discharge of the alternative reservoir after the reduction of the additional flood control storage capacity into the flood regulation simulation model of the reservoir to obtain the flood regulation high water level, and calculate the difference between this water level and the flood regulation high water level Z set at the flood limit water level in step 1. max,0 The corresponding flood control reservoir tolerance value .like If it is greater than the calculation accuracy deviation, Superimpose the original additional flood control storage capacity As the new additional flood control storage capacity value, repeat 2.2) until the deviation requirement is met; the accuracy deviation is set to 0.01 billion m 3 The flood regulation simulation model is established according to the joint dispatching rules in Section 1.1.

[0020] Step 3: Simulate the regulating effect of the reservoir between the replacement reservoir and the replaced reservoir;

[0021] 3.1) When there are other reservoirs between the replacement reservoir and the replaced reservoir, the discharge of the upstream reservoir will also be regulated by the intermediate reservoir. After the discharge of the replacement reservoir is reduced, the inflow of the intermediate reservoir will be reduced. According to the design rules, simulation calculations are performed to obtain the outflow process and the flood control high water level. This water level will be lower than the flood control high water level of the reservoir (the water level is calculated by 1.2)), and the corresponding flood control reservoir tolerance value is calculated. .

[0022] 3.2) The water level rise period is evenly distributed to the intermediate reservoir, and the adjusted discharge is calculated as shown in Equation (3).

[0023] (3)

[0024] In the formula, is the adjusted leakage flow, is the specific discharge value of the outflow process simulated in step 3.1, T up2 The water level rise period of the intermediate reservoir during the flood dispatch period is long.

[0025] 3.3) Substitute the discharge after the intermediate reservoir regulation into the flood regulation simulation model of the reservoir to obtain the flood regulation high water level, and calculate the difference between this water level and the flood regulation high water level Z in step 1. max,0 The corresponding flood control reservoir tolerance value .like If it is greater than the calculation accuracy deviation, Superimpose the original additional flood control storage capacity As the new additional flood control storage capacity value, repeat 3.2) until the deviation requirement is met. The accuracy deviation is set to 0.01 billion m 3 .

[0026] Step 4: Calculate the upper limit of the flood season water level of the replaced reservoir;

[0027] 4.1) Set the initial value of the replacement storage capacity of the downstream replaced reservoir to zero, that is, =0.

[0028] 4.2) Determine the inflow of the downstream replaced reservoir based on the discharge of the intermediate reservoir determined in 3.3) to replace the storage capacity The corresponding water level after superimposing the flood limit water level is used as the starting water level. According to the design rules (here, the joint dispatching rules designed in 1.1)), simulation calculation is performed to obtain the outflow process and flood high water level of the downstream replaced reservoir. Calculate the flood control reservoir tolerance value between the flood high water level and the flood limit water level as the starting water level (the water level is calculated in 1.2) .

[0029] 4.3) If If it is greater than the calculation accuracy deviation, Superposition of alternative storage capacity As the new replacement storage capacity value, repeat 4.2) until the deviation requirement is met; the accuracy deviation is set to 0.01 billion m 3 .

[0030] Step 5: Evaluate the effect of flood control storage capacity replacement;

[0031] 5.1) Calculate alternative flood control storage capacity (storage capacity at increased operating water level);

[0032] (4)

[0033] In the formula, the definition is the replacement flood control storage capacity of the replaced reservoir, The storage capacity corresponding to the highest water level that the replaced reservoir can rise to after being replaced by the upstream reservoir. The reservoir capacity corresponds to the flood limit water level.

[0034] 5.2) Calculate the replacement ratio;

[0035] (5)

[0036] In the formula, is the replacement storage capacity of the replaced reservoir, is the additional flood control storage capacity of the replacement reservoir. k is the replacement ratio of the upstream replacement reservoir to the replaced reservoir. The larger the value, the higher the replacement effect. The specific meaning is that when the upstream reservoir has 100 million additional flood control storage capacity, it can replace the k billion additional flood control storage capacity of the downstream reservoir, that is, the operating water level of the downstream reservoir can be increased by k billion.

[0037] 5.3) Calculate the additional power generation;

[0038] (6)

[0039] In the formula, the definition Increase the power generation of the system. is the total power generation under alternative dispatch when the system has additional flood control storage capacity, The power generation when the system has the same additional flood control storage capacity without replacement.

[0040] The beneficial effects of the present invention are:

[0041] The present invention establishes a reservoir capacity substitution model, introduces the dispatching rules of additional flood control reservoir capacity, analyzes the flood control reservoir capacity substitution effect of the upstream and downstream reservoirs in the cascade reservoir group, and deduces the upper limit of the downstream reservoir's water level when there is additional flood control reservoir capacity in the upstream reservoir. By comprehensively considering the hydraulic connection and regulation and storage effect of the reservoir, it is ensured that the additional flood control reservoir capacity is fully utilized without lowering the flood control standard, reducing the flood control pressure of the downstream reservoir and improving the water storage capacity for benefits. The method for deriving the upper limit of the control domain of the flood season water level of a reservoir group based on the reservoir capacity substitution effect provided by the present invention improves the flood control efficiency and comprehensive resource utilization benefits of the cascade reservoir group, especially in power generation and water supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 This is a schematic diagram of a reservoir group taking the three-reservoir system as an example.

[0043] Figure 2 It is a schematic diagram of the calculation process based on the reservoir capacity substitution model in the present invention.

[0044] Figure 3This is a relationship diagram between the discharge reduction value and the additional flood control storage capacity when the Xiluodu Reservoir is used as an alternative reservoir.

[0045] Figure 4 This is the relationship diagram between the discharge reduction value and the additional flood control storage capacity when the Baihetan Reservoir is used as an alternative reservoir.

[0046] Figure 5 This is the relationship diagram between the discharge reduction value and the additional flood control storage capacity when the Xiluodu Reservoir is used as an intermediate reservoir.

[0047] Figure 6 Figure 2 is a diagram showing the reservoir capacity substitution relationship in the application example, where (a) is the reservoir capacity substitution relationship diagram of Xiluodu to the Three Gorges in the application example; (b) is the reservoir capacity substitution relationship diagram of Baihetan to the Three Gorges in the application example. DETAILED DESCRIPTION

[0048] The present invention is further described below in conjunction with specific embodiments.

[0049] The present invention proposes a method for calculating the upper limit of reservoir operating water level based on storage capacity substitution. The Jinxia-Three Gorges cascade reservoir group in the upper and middle reaches of the Yangtze River is selected as a research example, and the Jinsha River 100-year Three Gorges 100-year flood (upstream 100-year flood) is used as input, with an allowable error of 0.01 billion m³. The storage capacity substitution relationship of the Bai and Xi reservoirs to the Three Gorges Reservoir and the upper limit of the Three Gorges operating water level are calculated.

[0050] The main steps are as follows:

[0051] Step 1: Start with the flood limit water level and use the designed joint dispatching rules to calculate the regulation of each reservoir

[0052] 1.1) The starting water levels of Wudongde, Baihetan, Xiluodu, Xiangjiaba and Three Gorges were set at their flood limit water levels of 952m, 785m, 560m, 370m and 145m respectively. The outflow process and water level process of each reservoir were simulated according to the design joint dispatching rules, with the upstream 100-year design flood as input.

[0053] 1.2) Determine the high water level Z for flood control of each reservoir max,0 , as the standard for subsequent storage capacity replacement.

[0054] 1.3) Determine the water level The water level rise process and duration of each reservoir are shown in Table 1.

[0055] Table 1 Flood control standards and water level rise time.

[0056]

[0057] Step 2: Calculate the discharge from the replacement reservoir using additional flood control capacity

[0058] 2.1) The initial water levels of Baihetan and Xiluodu were discretized at 1m intervals between the dead water level and the flood limit water level. Both Baihetan and Xiluodu were discretized into 21 initial water levels. The additional flood control storage capacity corresponding to the discretized water level was calculated according to formula (1).

[0059] 2.2) Calculate the reduction in discharge after flood control by using the additional flood control reservoir capacity according to formula (2).

[0060] 2.3) Substitute the discharge of the alternative reservoir after the reduction of the additional flood control storage capacity into the flood regulation simulation model of the reservoir to obtain the flood regulation high water level, and iteratively calculate the flood regulation high water level Z based on the flood limit water level. max,0 The corresponding flood control reservoir tolerance value satisfies the calculation deviation, and the calculation result is as follows Figure 3 , Figure 4 shown.

[0061] Step 3: Simulate the regulating effect of the reservoir between the replacement reservoir and the replaced reservoir;

[0062] 3.1) When the Baihetan Reservoir has additional flood control storage capacity, the discharge from the upstream reservoir Baihetan will also be regulated by the intermediate reservoir Xiluodu. After the discharge from the alternative reservoir Baihetan is reduced, the inflow of the intermediate reservoir Xiluodu will be reduced. According to the design rules, simulation calculations are performed to obtain the outflow process and the flood control high water level. This water level will be lower than the flood control high water level of the reservoir (calculated in step 1) and the corresponding flood control reservoir capacity difference value is calculated. .

[0063] 3.2) The water level rise period of Xiluodu, the intermediate reservoir, is evenly distributed, and the adjusted discharge is calculated according to formula (3).

[0064] 3.3) Substitute the reduced discharge after considering the impact of the intermediate reservoir into the model to obtain the high flood control water level of the intermediate reservoir. Calculate the difference between this water level and the original flood control standard ,Will Overlay As updated , iterate until the error requirement is met and stop. The calculation results are as follows Figure 5 shown.

[0065] Step 4: Calculate the upper limit of the flood season water level of the replaced reservoir;

[0066] 4.1) Set the initial value of the replacement storage capacity of the downstream replaced reservoir, the Three Gorges, to zero, that is, =0.

[0067] 4.2) Determine the inflow of the downstream replaced reservoir Three Gorges based on the discharge of the intermediate reservoir Xiluodu determined in the previous step to replace the reservoir capacity The corresponding water level after superimposing the flood limit water level is used as the starting water level. According to the design rules, simulation calculation is performed to obtain the outflow process and flood control high water level of the downstream replaced reservoir Three Gorges. Calculate the flood control reservoir tolerance value between the flood control high water level and the flood control high water level (calculated in step 1) when the flood limit water level is used as the starting water level .

[0068] 4.3) If If it is greater than the calculation accuracy deviation, Superposition of alternative storage capacity As the new alternative storage capacity value, repeat step b until the deviation requirement is met, and the deviation is set to 0.01 billion m 3 .

[0069] Step 5: Evaluate the effect of flood control storage capacity replacement;

[0070] For example, the replacement capacity and replacement ratio of Xiluodu and Baihetan to the Three Gorges Figure 6 As shown. Figure 6 As shown in Figure (a), the replacement capacity of Xiluodu for the Three Gorges increases with the increase of the additional flood control capacity, and the replacement ratio is less than 1, fluctuating in the range of [0.8, 0.94]. The upper limit of the Three Gorges flood control capacity replacement is obtained at the maximum value of the additional flood control capacity, which is 1.565 billion m³, which can make the Three Gorges float 3.1 meters. After the flood limit water level of the Three Gorges Reservoir is raised, the maximum additional power generation during the flood season is 1.9 billion kWh. Figure 6 As shown in Figure (b), the replacement capacity of Baihetan for the Three Gorges increases with the increase of additional flood control storage capacity, and the replacement ratio is less than 1, fluctuating in the range of [0.8, 0.91]. The upper limit of the Three Gorges flood control storage capacity replaced is obtained at the maximum value of the additional flood control storage capacity, which is 2.65 billion m³, which can make the Three Gorges float 5.2m for operation. After the flood limit water level of the Three Gorges Reservoir is raised, the maximum additional power generation during the flood season is 3 billion kWh. This result shows that the reservoirs in the lower reaches of the Jinsha River have a high storage capacity replacement effect on the Three Gorges, and can efficiently replace the Three Gorges flood control storage capacity. After considering the storage capacity replacement effect, the system can store more flood resources and increase power generation benefits without increasing the flood control risk during the flood season. The above results show that the method for deriving the upper limit of the reservoir operating water level based on the storage capacity replacement effect proposed in the present invention can improve the operating water level of the reservoir without increasing the flood control risk of the reservoir group, and can significantly increase the power generation of the reservoir group. In actual scheduling, it can be controlled in real time according to the water level upper limit relationship to increase power generation benefits.

[0071] The above-described embodiments only represent a specific implementation of the present invention and cannot be regarded as limiting the scope of the patent right of the present invention. It should be emphasized that technical professionals in this field may still make various modifications and improvements without departing from the basic principles of the present invention, which are all included in the scope of the patent right of the present invention.

Claims

1. A method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect, characterized in that: The derivation method comprises the following steps: Step 1: Starting from the flood limit water level, use the designed joint dispatching rules to calculate the regulation of each reservoir; Step 2: Calculate the discharge from the replacement reservoir using the additional flood control storage capacity; 2.1) Set the starting water level of the alternative reservoir below the flood limit water level as Z up1,c , use formula (1) to calculate the additional flood control storage capacity , (1) In the formula, For additional flood control storage capacity, is the flood limit water level, Adjust the water level. is the water level storage capacity function; 2.2) Determine the discharge process of the replacement reservoir using the additional flood control storage capacity to intercept floodwaters; in order to ensure that the flood control standards are not lowered and the upstream reservoir can intercept and store as much floodwater as possible, the additional flood control storage capacity is evenly distributed during the period of rising water levels in the reservoir to maximize the substitution effect; 2.3) Substitute the discharge of the alternative reservoir after the reduction of the additional flood control storage capacity into the flood regulation simulation model of the reservoir to obtain the flood regulation high water level, and calculate the difference between this water level and the flood regulation high water level Z set at the flood limit water level in step 1. max,0 The corresponding flood control reservoir tolerance value ;like If it is greater than the calculation accuracy deviation, Superimpose the original additional flood control storage capacity As the new additional flood control storage capacity value, repeat 2.2) until the deviation requirements are met; Step 3: Simulate the regulating effect of the reservoir between the replacement reservoir and the replaced reservoir; 3.1) When there are other reservoirs between the replacement reservoir and the replaced reservoir, the discharge of the upstream reservoir will also be regulated by the intermediate reservoir; simulate and calculate according to the design rules to obtain the outflow process and the flood control high water level. This water level will be lower than the flood control high water level of the reservoir based on the flood limit water level, and calculate the corresponding flood control reservoir tolerance value ; 3.2) The water level rise period evenly distributed to the intermediate reservoir is used to calculate the adjusted discharge, as shown in Equation (3); (3) In the formula, is the adjusted leakage flow, is the discharge value of the simulated outflow process in step 3.1, T up2 The water level rise period of the intermediate reservoir during flood dispatch is long; 3.3) Substitute the discharge after the intermediate reservoir regulation into the flood regulation simulation model of the reservoir to obtain the flood regulation high water level, and calculate the difference between this water level and the flood regulation high water level Z in step 1. max,0 The corresponding flood control reservoir tolerance value ;like If it is greater than the calculation accuracy deviation, Superimpose the original additional flood control storage capacity As the new additional flood control storage capacity value, repeat 3.2) until the deviation requirements are met; Step 4: Calculate the upper limit of the flood season water level of the replaced reservoir; 4.1) Set the initial value of the replacement storage capacity of the downstream replaced reservoir to zero, that is, =0; 4.2) Determine the inflow of the downstream replaced reservoir based on the discharge of the intermediate reservoir determined in 3.3) to replace the storage capacity The corresponding water level after superimposing the flood limit water level is used as the starting water level. According to the joint dispatching rule of step 1, simulation calculation is performed to obtain the outflow process and flood control high water level of the downstream replaced reservoir; the flood control reservoir tolerance value between the flood control high water level and the flood limit water level as the starting water level is calculated. ; 4.3) If If it is greater than the calculation accuracy deviation, Superposition of alternative storage capacity As the new alternative storage capacity value, repeat 4.2) until the deviation requirements are met; Step 5: Evaluate the effect of flood control reservoir capacity replacement.

2. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: The step 5 is specifically as follows: 5.1) Calculate the alternative flood control storage capacity, i.e. the storage capacity at the operating water level; (4) In the formula, the definition is the replacement flood control storage capacity of the replaced reservoir, The storage capacity corresponding to the highest water level that the replaced reservoir can rise to after being replaced by the upstream reservoir. The reservoir capacity corresponding to the flood limit water level; 5.2) Calculate the replacement ratio; (5) In the formula, is the replacement storage capacity of the replaced reservoir, is the additional flood control storage capacity of the replacement reservoir; k is the replacement ratio of the upstream replacement reservoir to the replaced reservoir; 5.3) Calculate the additional power generation; (6) In the formula, the definition Increase the power generation of the system. is the total power generation under alternative dispatch when the system has additional flood control storage capacity, The power generation when the system has the same additional flood control storage capacity without replacement.

3. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: The step 1 is specifically as follows: 1.1) Set the water level of each reservoir as the flood limit water level, take the designed flood process as input, and simulate the outflow process and water level process of each reservoir according to the designed joint dispatching rules; The joint dispatching rules of the design are determined according to the current reservoir operation and power station operation dispatching regulations; 1.2) Based on the water level process regulated in 1.1), determine the flood control high water level Z of each reservoir max,0 , as the standard for subsequent storage capacity replacement; 1.3) Determine the water level rise process of each reservoir and calculate the total power generation of each reservoir and system under this scheme.

4. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: In 2.2), the discharge calculation formula of the alternative reservoir after using the additional flood control storage capacity to block the flood is shown in formula (2); (2) Where, Consider the discharge volume of the upstream replacement reservoir to replace the storage capacity; The discharge of the upstream alternative reservoir determined in step 1 when the flood limit water level is adjusted; is the additional flood control storage capacity of the upstream alternative reservoir calculated in 2.1); The period of rising flood dispatch period for upstream alternative reservoirs is long.

5. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: In 2.3), the accuracy deviation is set to 0.01 million m 3 .

6. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: In 3.3), the accuracy deviation is set to 0.01 million m 3 .

7. The method for calculating the upper limit of the control domain of the flood season water level of a reservoir group based on the storage capacity substitution effect according to claim 1 is characterized in that: In 4.2), the accuracy deviation is set to 0.01 million m 3 .