Data intelligent verification method based on power distribution network planning tense digital model

Through the intelligent data verification method of the temporal digital model of distribution network planning, the problem of insufficient data consistency in distribution network construction is solved, accurate guidance and verification of data is achieved, and the accuracy and accuracy of distribution network planning are improved. Standardization improves the reliability of power grid.

CN118798539APending Publication Date: 2024-10-18ZHAOTONG POWER SUPPLYING BUREAU OF YUNNAN POWER GRID
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410803263.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Due to low data consistency in distribution network construction, the data acquisition methods are unclear, data homology is lacking, data review mechanisms and verification skills are lacking, which makes it difficult to effectively manage and update data, affecting the safe and stable operation of the power grid.

Method used

An intelligent data verification method based on the temporal digital model of distribution network planning is adopted to verify the uniqueness, homology, accuracy and normativeness of static and dynamic data, form a problem library and perform visual display, and automatically verify process to reduce manual intervention and improve work efficiency.

Benefits of technology

It achieves precise guidance, uniqueness and accuracy of data, ensures data homology, improves the accuracy and standardization of distribution network planning, saves a lot of labor costs, and improves work efficiency and grid power supply reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798539A_ABST
    Figure CN118798539A_ABST
Patent Text Reader

Abstract

The invention relates to a data intelligent verification method based on a power distribution network planning tense digital model, and belongs to the technical field of power distribution network planning. According to the method, power distribution network planning data is divided into static data and dynamic data, the static data and the dynamic data are associated through a device ID and a GIS system ID, versions are stored monthly, and a power distribution network planning tense digital model is formed. And performing uniqueness, homology, accuracy and normalization verification on the obtained power distribution network planning data. And related problems which do not pass the verification are recorded in a problem library. Finally, the found problems are counted monthly and penetrate to a power supply station from a power supply bureau, a verification result is visually displayed, users of the power supply station are supervised and urged to rectify data with quality problems, and the power supply reliability of the distribution network is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of distribution network planning, and in particular relates to a data intelligent verification method based on a temporal digital model of distribution network planning. Background Art

[0002] With the acceleration of urbanization, the problem of tight distribution network corridor resources has gradually emerged. The delay in the construction of urban distribution networks will lead to a large increase in the number of heavily overloaded substations, posing a major challenge to the safe and stable operation of the power grid.

[0003] A large part of the problem of the lag in distribution network construction is the low consistency of data in various business modules. Therefore, the key task of future distribution network construction will be to transform the work mode that relies on manual analysis of data quality into intelligent tools and assist planners in using digital means to improve data quality.

[0004] The basic planning data involves multiple departments and comes from different data platforms. The same data may have different results when exported from different systems, which will interfere with subsequent planning work. Currently, there are the following problems:

[0005] (1) There is a lack of verification guidance, which cannot accurately guide the way to obtain each data, determine the scope, and unify the export, and cannot guarantee the uniqueness and accuracy of the data.

[0006] (2) There is a lack of communication between departments, and the data homogeneity cannot be guaranteed, resulting in the inability of data management departments such as the Biotechnology Department and the Control Center to properly manage and update data.

[0007] (3) There is a lack of data review mechanism. When the basic data reported by the district and county bureaus are in doubt, there is no corresponding personnel to verify on-site to ensure the quality of the verification and avoid ambiguous situations; there is also the problem that problematic data cannot be corrected in a timely manner.

[0008] (4) District and county bureau staff lack basic data verification skills, functional departments lack an assessment mechanism, and grassroots planning personnel do not conduct basic data verification work.

[0009] Therefore, how to overcome the shortcomings of the prior art is a problem that urgently needs to be solved in the current technical field. Summary of the invention

[0010] The purpose of the present invention is to solve the deficiencies of the prior art and to provide a data intelligent verification method based on a temporal digital model of distribution network planning.

[0011] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0012] The data intelligent verification method based on the temporal digital model of distribution network planning includes the following steps:

[0013] S001, constructing a temporal digital model for distribution network planning:

[0014] The distribution network planning data is divided into static data and dynamic data. The dynamic data is stored in the production system; the static data is stored in the GIS system. The static data and dynamic data are associated through the production system ID and GIS system ID of the equipment, and then saved to the database to form a temporal digital model of the distribution network planning.

[0015] S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data:

[0016] (1) Uniqueness verification: Statistics are collected for each device in the distribution network planning. If there is a duplicate device, the device is registered in the problem database; the problem database includes the problem type, discovery time, creator, device ID, department, power supply station, and rectification time;

[0017] (2) Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the problem database.

[0018] (3) Accuracy check: Perform accuracy check on the fields involved in the business rules. If the check fails, it will be registered in the question library;

[0019] (4) Compliance check: Compliance check is performed on fields related to power grid specifications. During the verification, these fields are checked according to the power grid specifications. If they do not meet the specifications, they are registered in the problem database.

[0020] S003, visualize the verification results:

[0021] According to the problem database formed after S002 verification, the problems found are counted and then visualized.

[0022] Further, preferably, in S001, the static data includes basic information data of substations, basic information data of lines, basic information data of large electricity users and basic information data of power plants;

[0023] Among them, the basic information data of substations include name, voltage level, substation capacity and operation mode; the basic information data of lines include name, voltage level, conductor model, line length and grid to which they belong; the basic information data of large electricity users include user name, nature of electricity consumption, load level and reported capacity; the basic information data of power plants include name of power plant, nature of power plant and address of power plant.

[0024] Further, preferably, in S001, the dynamic data includes substation operation data, transformer operation data, line operation data, large user power consumption data, large user load data and power plant load data;

[0025] Among them, substation operation data includes main transformer model, main transformer capacity and main transformer compliance; transformer operation data includes current, voltage and active power; line operation data includes current, voltage and active power; large user power consumption data includes user name and power consumption; large user load data includes user name and user load; power plant load data includes power plant name and power plant load.

[0026] Further, preferably, in S002, the fields related to the business rules include line load rate, capacity-load ratio, line power supply radius qualification rate, overload distribution transformer ratio, and average power supply reliability rate.

[0027] Further, preferably, the line load rate calculation formula is as follows:

[0028]

[0029] Where: T——line load rate, %;

[0030] P——Line capacity corresponding to line safety current limit, kVA;

[0031] M——reserved spare capacity of the line, kVA.

[0032] Furthermore, preferably, the capacity-load ratio calculation formula is as follows:

[0033]

[0034] Where: R S ——Capacity load ratio, %;

[0035] P max ——The maximum load supplied by this voltage level;

[0036] ∑S ei ——The sum of the main transformer capacities of public substations within the voltage level. Further, preferably, the formula for calculating the line power supply radius qualification rate is as follows:

[0037]

[0038] Where: R P ——Qualification rate of line power supply radius;

[0039] N1——Number of power supply radius of the line supply line that meets the requirements;

[0040] N——Total number of medium voltage public lines.

[0041] Further, preferably, the heavy load distribution transformer ratio calculation formula is as follows:

[0042]

[0043] Where: R R ——Proportion of heavy-load distribution transformers;

[0044] N2——Number of heavy-load distribution transformers;

[0045] N R ——Total number of distribution transformers.

[0046] Furthermore, preferably, the average power supply reliability rate is calculated as follows:

[0047]

[0048] Where: R ai ——Average power supply reliability rate;

[0049] T po — average power outage time;

[0050] T S ——Statistical period time.

[0051] Further, preferably, the fields related to the power grid specification include voltage level, power supply zone, conductor model, line length, distribution transformer capacity and power supply amount.

[0052] Dynamic data includes current, voltage, power, etc., which are stored in the production system. Static data includes longitude and latitude, installation location, and equipment records, which are stored in the GIS system.

[0053] Because the distribution network planning indicators are basically monthly indicators, the latest version of the data is saved to the database at the end of each month to form a distribution network planning temporal digital model. The model contains the static and dynamic data of the distribution network planning every month.

[0054] The present invention verifies the distribution network planning data based on the distribution network planning temporal digital model, compares the data of different months, obtains the difference before and after, fills in the planning project according to the difference, and solves the power grid problems caused by the difference.

[0055] In the present invention, the distribution network planning data includes basic information data of substations (including those in operation and under construction), basic information data of lines (including those in operation and under construction), progress and schedule data of infrastructure projects, basic information data of large electricity users, early project progress data, basic information data of power plants (including new energy), substation operation data (date, month, year), transformer operation data (date, month, year), line operation data (date, month, year), large user electricity consumption data, and large user load data (date, month, year).

[0056] The present invention performs accuracy verification on fields related to business rules, such as bus voltage, maximum current, load rate, capacity-load ratio, line power supply radius, proportion of overload distribution transformers, and average power supply reliability.

[0057] The present invention avoids the link of manual confirmation through accuracy verification, and solidifies the process of manual verification into the system for automatic verification, thus saving a lot of manpower costs and improving work efficiency.

[0058] In the present invention, when calculating the load rate, M is the reserved spare capacity (kVA) of the line, that is, the maximum load that may be transferred when the other interconnection lines fail to operate.

[0059] The determination of capacity-load ratio should take into account the influence of major factors such as load dispersion coefficient, average power factor, transformer load rate, reserve factor, and load growth rate.

[0060] The line power supply radius qualification rate refers to the ratio of the number of 10kV public line power supply radii that meet the requirements to the total number of 10kV public lines.

[0061] The recommended power supply radius of 10kV lines in A+ and Class A power supply zones is less than or equal to 3 kilometers; the recommended power supply radius of 20kV lines in A+ and Class A power supply zones is less than or equal to 6 kilometers; the recommended power supply radius of 10kV lines in B and Class C power supply zones is less than or equal to 6 kilometers; the recommended power supply radius of 10kV lines in Class D power supply zones is less than or equal to 15 kilometers; the power supply radius of Class E 10kV lines should be determined by calculation according to needs.

[0062] The proportion of heavy-load distribution transformers refers to the proportion of heavy-load distribution transformers to the total number of distribution transformers. Under normal operating conditions, heavy-load distribution transformers refer to distribution transformers with an annual maximum load rate of ≥80%. For distribution transformers equipped with distribution transformer monitoring terminals, heavy-load statistics of distribution transformers are calculated on a monthly basis.

[0063] The average power supply reliability rate refers to the ratio of the number of hours of effective power supply to users during the statistical period to the number of hours during the statistical period.

[0064] The present invention performs normative verification on fields related to power grid specifications, such as voltage level, power supply partition, conductor model, line length, distribution transformer capacity, and power supply. These fields are verified according to the power grid specifications, and if they do not meet the specifications, they are registered in the problem library. For example, the voltage level unit is kV, the capacity is kVA, and the line and substation names start with the voltage level plus kV. If the voltage level in the database is KV or kv, the verification fails.

[0065] In S003 of the present invention, the problems found are counted monthly to obtain the number of problems left over from the previous period (the total number of problems that were verified by S02 last month and still exist as of this month), the number of problems in this period (the total number of problems that were verified by S002 this month), the number of new problems in this period (the total number of problems that did not exist before and were discovered through S002 verification this month), year-on-year growth (compared with the growth rate of problems in the same period last year), month-on-month growth (compared with the growth rate of problems last month), and other statistical results, and the results are classified and summarized by problem type and problem solving status. From the power supply bureau to the power supply station, the verification results are visualized, the number of problems in each county bureau is counted in the form of charts, historical problems are displayed, and the problem details are displayed in the form of tables. An assessment mechanism is established to send early warning information to users through message push mechanisms such as elink and text messages, and urge power supply station users to rectify data with quality problems and improve the reliability of distribution network power supply.

[0066] In the process of verifying the uniqueness, homology, accuracy and standardization of data, the present invention can increase the verification of indicators such as rationality, precision, timeliness and matching, and ultimately achieve the purpose of guiding distribution network planning with basic data and improving the reliability of distribution network power supply.

[0067] Compared with the prior art, the present invention has the following beneficial effects:

[0068] The intelligent data verification method based on the temporal digital model of distribution network planning of the present invention can accurately guide the acquisition path of each data, determine the scope, and unify the export, ensure the uniqueness and accuracy of the data, and ensure that the planning personnel of the district and county bureaus can make good use of online monitoring systems such as energy systems and metering automation systems to implement data statistics; ensure data homology, urge the data management departments such as the biotechnology department and the control center to do a good job in data management and updating, and regularly publish confirmed data; ensure data accuracy, and lay a solid foundation for subsequent planning work such as distribution network rolling planning.

[0069] Before this, power supply users needed to manually compare the dynamic and static data of each power grid device, a task that took a month to complete. Now, the verification tool can be used to automatically complete the task, saving a lot of time and greatly improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 It is a flow chart of the data intelligent verification method based on the temporal digital model of distribution network planning of the present invention;

[0071] Figure 2 Schematic diagram of a temporal digital model for distribution network planning. DETAILED DESCRIPTION

[0072] The present invention is further described in detail below in conjunction with embodiments.

[0073] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.

[0074] Example 1

[0075] like Figure 1 As shown, the data intelligent verification method based on the temporal digital model of distribution network planning is characterized by comprising the following steps:

[0076] S001, constructing a temporal digital model for distribution network planning:

[0077] The distribution network planning data is divided into static data and dynamic data. The dynamic data is stored in the production system; the static data is stored in the GIS system. The static data and dynamic data are associated through the production system ID and GIS system ID of the equipment, and then saved to the database to form a temporal digital model of the distribution network planning.

[0078] S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data:

[0079] (1) Uniqueness verification: Statistics are collected for each device in the distribution network planning. If there is a duplicate device, the device is registered in the problem database; the problem database includes the problem type, discovery time, creator, device ID, department, power supply station, and rectification time;

[0080] (2) Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the problem database.

[0081] (3) Accuracy check: Perform accuracy check on the fields involved in the business rules. If the check fails, it will be registered in the question library;

[0082] (4) Compliance check: Compliance check is performed on fields related to power grid specifications. During the verification, these fields are checked according to the power grid specifications. If they do not meet the specifications, they are registered in the problem database.

[0083] S003, visualize the verification results:

[0084] According to the problem database formed after S002 verification, the problems found are counted and then visualized.

[0085] Example 2

[0086] like Figure 1 As shown, the data intelligent verification method based on the temporal digital model of distribution network planning is characterized by comprising the following steps:

[0087] S001, constructing a temporal digital model for distribution network planning:

[0088] The distribution network planning data is divided into static data and dynamic data. The dynamic data is stored in the production system; the static data is stored in the GIS system. The static data and dynamic data are associated through the production system ID and GIS system ID of the equipment, and then saved to the database to form a temporal digital model of the distribution network planning.

[0089] S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data:

[0090] (1) Uniqueness verification: Statistics are collected for each device in the distribution network planning. If there is a duplicate device, the device is registered in the problem database; the problem database includes the problem type, discovery time, creator, device ID, department, power supply station, and rectification time;

[0091] (2) Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the problem database.

[0092] (3) Accuracy check: Perform accuracy check on the fields involved in the business rules. If the check fails, it will be registered in the question library;

[0093] (4) Compliance check: Compliance check is performed on fields related to power grid specifications. During the verification, these fields are checked according to the power grid specifications. If they do not meet the specifications, they are registered in the problem database.

[0094] S003, visualize the verification results:

[0095] According to the problem database formed after S002 verification, the problems found are counted and then visualized.

[0096] The data intelligent verification method based on the temporal digital model of distribution network planning is characterized by comprising the following steps:

[0097] S001, constructing a temporal digital model for distribution network planning:

[0098] The distribution network planning data is divided into static data and dynamic data. The dynamic data is stored in the production system; the static data is stored in the GIS system. The static data and dynamic data are associated through the production system ID and GIS system ID of the equipment, and then saved to the database to form a temporal digital model of the distribution network planning.

[0099] S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data:

[0100] (1) Uniqueness verification: Statistics are collected for each device in the distribution network planning. If there is a duplicate device, the device is registered in the problem database; the problem database includes the problem type, discovery time, creator, device ID, department, power supply station, and rectification time;

[0101] (2) Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the problem database.

[0102] (3) Accuracy check: Perform accuracy check on the fields involved in the business rules. If the check fails, it will be registered in the question library;

[0103] (4) Compliance check: Compliance check is performed on fields related to power grid specifications. During the verification, these fields are checked according to the power grid specifications. If they do not meet the specifications, they are registered in the problem database.

[0104] S003, visualize the verification results:

[0105] According to the problem database formed after S002 verification, the problems found are counted and then visualized.

[0106] In S001, static data includes basic information data of substations, basic information data of lines, basic information data of large electricity users and basic information data of power plants;

[0107] Among them, the basic information data of substations include name, voltage level, substation capacity and operation mode; the basic information data of lines include name, voltage level, conductor model, line length and grid to which they belong; the basic information data of large electricity users include user name, nature of electricity consumption, load level and reported capacity; the basic information data of power plants include name of power plant, nature of power plant and address of power plant.

[0108] In S001, dynamic data includes substation operation data, transformer operation data, line operation data, large user power consumption data, large user load data and power plant load data;

[0109] Among them, substation operation data includes main transformer model, main transformer capacity and main transformer compliance; transformer operation data includes current, voltage and active power; line operation data includes current, voltage and active power; large user power consumption data includes user name and power consumption; large user load data includes user name and user load; power plant load data includes power plant name and power plant load.

[0110] In S002, the fields involved in business rules include line load rate, capacity load ratio, line power supply radius qualification rate, heavy-load distribution transformer ratio, and average power supply reliability rate.

[0111] The line load factor calculation formula is as follows:

[0112]

[0113] Where: T——line load rate, %;

[0114] P——Line capacity corresponding to line safety current limit, kVA;

[0115] M——reserved spare capacity of the line, kVA.

[0116] The formula for calculating the capacity load ratio is as follows:

[0117]

[0118] Where: R S ——Capacity load ratio, %;

[0119] P max ——The maximum load supplied by this voltage level;

[0120] ∑S ei ——The sum of the main transformer capacities of public substations within this voltage level.

[0121] The formula for calculating the qualified rate of line power supply radius is as follows:

[0122]

[0123] Where: R P ——Qualification rate of line power supply radius;

[0124] N1——Number of power supply radius of the line supply line that meets the requirements;

[0125] N——Total number of medium voltage public lines.

[0126] The calculation formula for the proportion of heavy-load distribution transformer is as follows:

[0127]

[0128] Where: R R ——Proportion of heavy-load distribution transformers;

[0129] N2——Number of heavy-load distribution transformers;

[0130] N R ——Total number of distribution transformers.

[0131] The calculation formula for average power supply reliability is as follows:

[0132]

[0133] Where: R ai ——Average power supply reliability rate;

[0134] T po — average power outage time;

[0135] T S ——Statistical period time.

[0136] The fields involved in the grid specifications include voltage level, power supply zone, conductor model, line length, distribution transformer capacity and power supply.

[0137] Example 3

[0138] like Figure 1 As shown, the data intelligent verification method based on the temporal digital model of distribution network planning includes the following steps:

[0139] S001: Construct a temporal digital model for distribution network planning.

[0140] The distribution network planning data is divided into static data and dynamic data. Dynamic data includes current, voltage, power, etc., which are stored in the production system. Static data includes longitude and latitude, installation location, and equipment ledger, which are stored in the GIS system. Static data and dynamic data are associated through the equipment's production system ID and GIS system ID. Because distribution network planning indicators are basically monthly indicators, the latest version of data is saved to the database at the end of each month to form a temporal digital model of distribution network planning. This model contains the static and dynamic data of the distribution network planning every month. Figure 2 shown.

[0141] Specifically, static data includes basic information data of substations, basic information data of lines, basic information data of large electricity users and basic information data of power plants; among them, the basic information data of substations include name, voltage level, substation capacity and operation mode, the basic information data of lines include name, voltage level, conductor model, line length and grid to which they belong; the basic information data of large electricity users include user name, nature of electricity consumption, load level and reported capacity; the basic information data of power plants include name of power plant, nature of power plant and address of power plant.

[0142] Specifically, dynamic data includes substation operation data, transformer operation data, line operation data, large-user electricity consumption data, large-user load data and power plant load data; among them, substation operation data includes main transformer model, main transformer capacity and main transformer compliance; transformer operation data includes current, voltage and active power; line operation data includes current, voltage and active power; large-user electricity consumption data includes user name and electricity consumption; large-user load data includes user name and user load; power plant load data includes power plant name and power plant load.

[0143] S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data.

[0144] According to the distribution network planning temporal digital model, the distribution network planning data is verified, and the data of different months are compared to obtain the differences before and after. The planning items are reported according to the differences to solve the power grid problems caused by the differences.

[0145] The distribution network planning data includes basic information data of substations (including those in operation and under construction), basic information data of lines (including those in operation and under construction), progress and schedule data of infrastructure projects, basic information data of large electricity users, early project progress data, basic information data of power plants (including new energy), substation operation data (date, month, year), transformer operation data (date, month, year), line operation data (date, month, year), large user electricity consumption data, large user load data (date, month, year), etc.

[0146] Uniqueness check: Statistics are collected for each equipment in the distribution network planning. If there is a duplicate equipment, the equipment is registered in the problem database. The problem database contains the problem type, discovery time, creator, equipment ID, department, power supply station, and rectification time.

[0147] Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the question library.

[0148] Accuracy check: Check the accuracy of fields related to business rules, such as bus voltage, maximum current, load rate, capacity-to-load ratio, line power supply radius, heavy-load distribution transformer ratio, and average power supply reliability. Use the accuracy check algorithm to check these fields, and if they do not meet the specifications, they will be registered in the problem library. Load rate calculation formula:

[0149]

[0150] Where: T——line load rate, %;

[0151] P——Line capacity corresponding to line safety current limit, kVA;

[0152] M——reserved spare capacity of the line, kVA.

[0153] The determination of capacity-load ratio should take into account the influence of major factors such as load dispersion coefficient, average power factor, transformer load rate, reserve factor, load growth rate, etc. The calculation formula is as follows:

[0154]

[0155] Where: R S ——capacity ratio;

[0156] P max ——The annual maximum load of the entire grid or power supply area at this voltage level;

[0157] ∑S ei ——The sum of the main transformer capacities of public substations in the entire grid or power supply area of ​​this voltage level.

[0158] The qualified rate of line power supply radius refers to the proportion of the number of 10(20)kV public line power supply radius that meets the requirements to the total number of 10(20)kV public lines. The recommended power supply radius of 10kV lines in A+ and A power supply zones is less than or equal to 3 kilometers; the recommended power supply radius of 20kV lines in A+ and A power supply zones is less than or equal to 6 kilometers; the recommended power supply radius of 10kV lines in B and C power supply zones is less than or equal to 6 kilometers; the recommended power supply radius of 10kV lines in D power supply zones is less than or equal to 15 kilometers; the power supply radius of 10kV lines in E class should be determined by calculation according to needs. The calculation formula is as follows:

[0159]

[0160] Where: R P ——Qualification rate of line power supply radius;

[0161] N1——Number of power supply radius of the line supply line that meets the requirements;

[0162] N——Total number of medium voltage public lines.

[0163] The proportion of heavy-load distribution transformers refers to the proportion of heavy-load distribution transformers to the total number of distribution transformers. Under normal operating conditions, heavy-load distribution transformers refer to distribution transformers with an annual maximum load rate of ≥80%. For distribution transformers equipped with distribution transformer monitoring terminals, heavy-load statistics of distribution transformers are calculated on a monthly basis. The calculation formula is as follows:

[0164]

[0165] Where: R R ——Proportion of heavy-load distribution transformers;

[0166] N2——Number of heavy-load distribution transformers;

[0167] NR ——Total number of distribution transformers.

[0168] The average power supply reliability rate refers to the ratio of the number of hours of effective power supply to users during the statistical period to the number of hours during the statistical period. The calculation formula is as follows:

[0169]

[0170] Where: R ai ——Average power supply reliability rate;

[0171] T po — average power outage time;

[0172] T S ——Statistical period time.

[0173] Through accuracy verification, the manual confirmation link is avoided, and the manual verification process is solidified into the system for automatic verification, which saves a lot of manpower costs and improves work efficiency. Normative verification: Perform normative verification on fields related to power grid specifications, such as voltage level, power supply division, conductor model, line length, distribution transformer capacity, power supply and other fields. Verify these fields according to the power grid specifications, and register them in the problem library if they do not meet the specifications. For example, the voltage level unit is kV, the capacity is kVA, and the line and substation names start with the voltage level plus kV. If the database is KV or kv, the verification fails.

[0174] S003: Visualize the verification results.

[0175] According to the problem database formed after S002 verification, the problems found are counted monthly to obtain the number of problems left over from the previous period (the total number of problems that passed the S02 verification last month and still exist as of this month), the number of problems in this period (the total number of problems that passed the S02 verification this month), the number of new problems in this period (the total number of problems that did not exist before but were discovered through the S02 verification this month), year-on-year growth (compared with the growth rate of problems in the same period last year), month-on-month growth (compared with the growth rate of problems last month), and other statistical results, and the results are classified and summarized by problem type and problem resolution status. From the power supply bureau to the power supply station, the number of problems in each county and district bureau is counted in the form of charts, historical problems are displayed, and problem details are displayed in the form of tables.

[0176] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A data intelligent verification method based on a temporal digital model of distribution network planning, characterized in that: The steps include: S001, constructing a temporal digital model for distribution network planning: The distribution network planning data is divided into static data and dynamic data. The dynamic data is stored in the production system; the static data is stored in the GIS system. The static data and dynamic data are associated through the production system ID and GIS system ID of the equipment, and then saved to the database to form a temporal digital model of the distribution network planning. S002: Verify the uniqueness, homology, accuracy and standardization of distribution network planning data: (1) Uniqueness verification: Statistics are collected for each device in the distribution network planning. If there is a duplicate device, the device is registered in the problem database; the problem database includes the problem type, discovery time, creator, device ID, department, power supply station, and rectification time; (2) Homogeneity verification: Track the source of distribution network planning data. If the sources of the same type of data are inconsistent, register the data of this type in the problem database. (3) Accuracy check: Perform accuracy check on the fields involved in the business rules. If the check fails, it will be registered in the question library; (4) Compliance check: Compliance check is performed on fields related to power grid specifications. During the verification, these fields are checked according to the power grid specifications. If they do not meet the specifications, they are registered in the problem database. S003, visualize the verification results: According to the problem database formed after S002 verification, the problems found are counted and then visualized.

2. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 1 is characterized in that: In S001, static data includes basic information data of substations, basic information data of lines, basic information data of large electricity users and basic information data of power plants; Among them, the basic information data of substations include name, voltage level, substation capacity and operation mode; the basic information data of lines include name, voltage level, conductor model, line length and grid to which they belong; the basic information data of large electricity users include user name, nature of electricity consumption, load level and reported capacity; the basic information data of power plants include name of power plant, nature of power plant and address of power plant.

3. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 1 is characterized in that: In S001, dynamic data includes substation operation data, transformer operation data, line operation data, large user power consumption data, large user load data and power plant load data; Among them, substation operation data includes main transformer model, main transformer capacity and main transformer compliance; transformer operation data includes current, voltage and active power; line operation data includes current, voltage and active power; large user power consumption data includes user name and power consumption; large user load data includes user name and user load; power plant load data includes power plant name and power plant load.

4. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 1 is characterized in that: In S002, the fields involved in business rules include line load rate, capacity load ratio, line power supply radius qualification rate, heavy-load distribution transformer ratio, and average power supply reliability rate.

5. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 4 is characterized in that: The line load factor calculation formula is as follows: Where: T——line load rate, %; P——Line capacity corresponding to line safety current limit, kVA; M——reserved spare capacity of the line, kVA.

6. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 4 is characterized in that: The formula for calculating the capacity load ratio is as follows: Where: R S ——Capacity load ratio, %; P max ——The maximum load supplied by this voltage level; ∑S ei ——The sum of the main transformer capacities of public substations within this voltage level.

7. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 4 is characterized in that: The formula for calculating the qualified rate of line power supply radius is as follows: Where: R P ——Qualified rate of power supply radius of lines; N1——Number of power supply radius of the line supply line that meets the requirements; N——Total number of medium voltage public lines.

8. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 4 is characterized in that: The calculation formula for the proportion of heavy-load distribution transformer is as follows: Where: R R ——Proportion of heavy-load distribution transformers; N2——Number of heavy-load distribution transformers; N R ——Total number of distribution transformers.

9. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 4 is characterized in that: The calculation formula for average power supply reliability is as follows: Where: R ai ——Average power supply reliability rate; T po — average power outage time; T S ——Statistical period time.

10. The data intelligent verification method based on the temporal digital model of distribution network planning according to claim 1 is characterized in that: The fields involved in the grid specifications include voltage level, power supply zone, conductor model, line length, distribution transformer capacity and power supply.