Method and device for determining use condition of engineering vehicle

Through segmentation and pseudo-damage analysis of the load data of engineering vehicles, a working condition matrix is ​​constructed, which solves the problem of manual record dependence in the existing technology and improves the accuracy of working condition determination and resource utilization efficiency.

CN118798552APending Publication Date: 2024-10-18SINO TRUK JINAN POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410870250.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the existing technology, the scheduling and usage of engineering vehicles mainly rely on manual records and empirical judgments, resulting in untimely information updates, low data accuracy, difficulty in fully grasping the working status and location information of vehicles, and inability to effectively predict and plan vehicle demand. This leads to resource waste, low work efficiency and increased maintenance costs.

Method used

By obtaining the total load data of various types of engineering vehicles during operation, segmenting it into load segmented data according to a preset method, calculating numerical pseudo-damage, determining the index level based on the pseudo-damage, and constructing a working condition matrix based on these levels to achieve multi-dimensional, Multi-angle working condition analysis.

Benefits of technology

It improves the accuracy of the results of determining the working conditions of engineering vehicles, enables more detailed analysis of the impact of uneven or time-varying load patterns on structures or materials, optimizes resource utilization and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798552A_ABST
    Figure CN118798552A_ABST
Patent Text Reader

Abstract

The invention provides a method and a device for determining the use condition of an engineering vehicle. The method comprises the following steps: acquiring total data of various loads in the running process of a target engineering vehicle within a period of time; for each type of total load data, segmenting the total load data according to a preset splitting method, and determining at least one piece of load segment data; numerical value pseudo damage of each piece of load segment data is calculated; for each piece of load segment data, determining an index grade corresponding to the load segment data according to the numerical value pseudo damage of the load segment data; and permutation and combination are carried out based on the index grades corresponding to all the load segment data, and a working condition matrix of the target engineering vehicle is determined. By analyzing the use condition of the engineering vehicle in a multi-dimensional and multi-angle manner, the accuracy of the determination result of the use condition of the engineering vehicle can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of data analysis, and in particular to a method and device for determining the operating conditions of an engineering vehicle. Background Art

[0002] In the field of modern engineering construction, engineering vehicles are indispensable equipment. Their efficient and orderly use is of great significance to ensuring project progress, controlling costs and ensuring operational safety. With the improvement of the level of project management informatization, the methods for determining the use of engineering vehicles are also constantly evolving, aiming to maximize the use of vehicle resources through scientific and reasonable means.

[0003] In the past, the dispatch and use of engineering vehicles mainly relied on manual records and experience. This method has many shortcomings, such as untimely information updates, low data accuracy, difficulty in fully grasping the working status and location information of vehicles, and inability to effectively predict and plan vehicle needs. These factors often lead to waste of resources, low work efficiency and increased maintenance costs.

[0004] With the continuous advancement of science and technology and the continuous development of vehicle engineering technology, data processing and analysis are becoming more and more important in the automotive industry. Data processing and analysis methods in the use of engineering vehicles can help automobile manufacturers, engineers and other personnel better understand vehicle performance and behavior, so it is crucial to propose an accurate solution for determining vehicle usage conditions. Summary of the invention

[0005] In view of this, the purpose of the present application is to provide a method and device for determining the operating conditions of engineering vehicles, which can effectively improve the accuracy of the results of determining the operating conditions of engineering vehicles by analyzing the operating conditions of engineering vehicles from multiple dimensions and angles.

[0006] The present application embodiment provides a method for determining the use condition of an engineering vehicle, the method comprising:

[0007] Obtain the total data of various loads during the operation of the target engineering vehicle over a period of time;

[0008] For each type of total load data, the total load data is segmented according to a preset segmentation method to determine at least one load segmentation data;

[0009] Calculate the numerical pseudo-damage for each load segment data;

[0010] For each load segment data, according to the numerical pseudo damage of the load segment data, determine the index level corresponding to the load segment data;

[0011] Based on the index levels corresponding to all load segmentation data, the working condition matrix of the target engineering vehicle is determined.

[0012] Optionally, the various total load data include at least: engineering vehicle axle head position acceleration load data, engineering vehicle suspension displacement load data, engineering vehicle suspension leaf spring strain load data, vehicle speed, vehicle load and road slope.

[0013] Optionally, for each type of total load data, segmenting the total load data according to a preset segmentation method to determine at least one load segmentation data includes:

[0014] For each type of total load data, starting from the starting position, the total load data is divided into equal intervals according to the preset driving distance to determine at least one load segment data.

[0015] Optionally, the calculating of the numerical pseudo damage of each load segment data includes:

[0016] For each load segment data, the standard SN curve and Miner linear damage accumulation criterion are used in combination with the load segment data to determine the numerical pseudo damage of the load segment data.

[0017] Optionally, for each load segment data, determining the index level corresponding to the load segment data according to the numerical pseudo damage of the load segment data includes:

[0018] For each load segment data, according to the load type to which the load segment data belongs, determining at least one pseudo damage value interval under the load type;

[0019] Identify the target pseudo-damage value interval to which the numerical pseudo-damage of the load segment data belongs;

[0020] The index level corresponding to the target pseudo damage value interval is determined as the index level corresponding to the load segmentation data.

[0021] Optionally, when the target pseudo damage numerical interval is an interval divided after logarithmic processing, the target pseudo damage numerical interval to which the numerical pseudo damage of the load segment data belongs to is identified, including:

[0022] Performing logarithmic processing on the numerical pseudo damage of the load segment data to determine the logarithm of the numerical pseudo damage of the load segment data;

[0023] A target pseudo-damage value interval to which the numerical pseudo-damage logarithm belongs is identified.

[0024] Optionally, at least one pseudo damage value interval for each load type is determined by the following steps:

[0025] For each load type, the fluctuation range of the numerical pseudo damage is determined according to the numerical pseudo damage of multiple load segmentation data under the load type;

[0026] Based on the fluctuation range interval, sub-interval segmentation processing is performed according to a preset segmentation rule to determine at least one pseudo damage value interval of this load type.

[0027] The embodiment of the present application also provides a device for determining the working condition of an engineering vehicle, the device comprising:

[0028] An acquisition module is used to acquire various total load data during the operation of a target engineering vehicle over a period of time;

[0029] A segmentation module is used to segment each type of total load data according to a preset segmentation method to determine at least one load segmentation data;

[0030] A calculation module, used to calculate the numerical pseudo damage of each load segment data;

[0031] A first determination module is used to determine, for each load segment data, an index level corresponding to the load segment data according to the numerical pseudo damage of the load segment data;

[0032] The second determination module is used to determine the working condition matrix of the target engineering vehicle based on the arrangement and combination of the indicator levels corresponding to all the load segmentation data.

[0033] Optionally, the various total load data include at least: engineering vehicle axle head position acceleration load data, engineering vehicle suspension displacement load data, engineering vehicle suspension leaf spring strain load data, vehicle speed, vehicle load and road slope.

[0034] Optionally, when the segmentation module is used to segment each type of total load data according to a preset segmentation method to determine at least one load segmentation data, the segmentation module is used to:

[0035] For each type of total load data, starting from the starting position, the total load data is divided into equal intervals according to the preset driving distance to determine at least one load segment data.

[0036] Optionally, when the calculation module is used to calculate the numerical pseudo damage of each load segment data, the calculation module is used to:

[0037] For each load segment data, the standard SN curve and Miner linear damage accumulation criterion are used in combination with the load segment data to determine the numerical pseudo damage of the load segment data.

[0038] Optionally, when the first determining module is used to determine, for each load segment data, the index level corresponding to the load segment data according to the numerical pseudo-damage of the load segment data, the first determining module is used to:

[0039] For each load segment data, according to the load type to which the load segment data belongs, determining at least one pseudo damage value interval under the load type;

[0040] Identify the target pseudo-damage value interval to which the numerical pseudo-damage of the load segment data belongs;

[0041] The index level corresponding to the target pseudo damage value interval is determined as the index level corresponding to the load segmentation data.

[0042] Optionally, when the target pseudo damage numerical interval is an interval divided after logarithmic processing, when the first determination module is used to identify the target pseudo damage numerical interval to which the numerical pseudo damage of the load segment data belongs, the first determination module is used to:

[0043] Performing logarithmic processing on the numerical pseudo damage of the load segment data to determine the logarithm of the numerical pseudo damage of the load segment data;

[0044] A target pseudo-damage value interval to which the numerical pseudo-damage logarithm belongs is identified.

[0045] Optionally, the determining device is used to determine at least one pseudo damage value interval for each load type by the following steps:

[0046] For each load type, according to the numerical pseudo damage of multiple load segment data under the load type, the fluctuation range of the numerical pseudo damage is determined;

[0047] Based on the fluctuation range interval, sub-interval segmentation processing is performed according to a preset segmentation rule to determine at least one pseudo damage value interval of this load type.

[0048] An embodiment of the present application also provides an electronic device, comprising: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate through the bus, and when the machine-readable instructions are executed by the processor, the steps of the determination method as described above are performed.

[0049] An embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the determination method described above are executed.

[0050] The embodiment of the present application provides a method and device for determining the working condition of an engineering vehicle, the method comprising: obtaining a plurality of total load data during the operation of a target engineering vehicle within a period of time; for each type of total load data, segmenting the total load data according to a preset splitting method to determine at least one load segmentation data; calculating the numerical pseudo-damage of each load segmentation data; for each load segmentation data, determining the index level corresponding to the load segmentation data according to the numerical pseudo-damage of the load segmentation data; and determining the working condition matrix of the target engineering vehicle based on the arrangement and combination of the index levels corresponding to each of the load segmentation data. By analyzing the working condition of the engineering vehicle in multiple dimensions and angles, the accuracy of the results of determining the working condition of the engineering vehicle can be effectively improved.

[0051] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0053] Figure 1 A flowchart of a method for determining an operating condition of an engineering vehicle provided in an embodiment of the present application;

[0054] Figure 2 Examples of various load total data provided for this application;

[0055] Figure 3 A schematic diagram of the total load data segmentation result provided in this application;

[0056] Figure 4 A schematic diagram of the structure of a determination device provided in an embodiment of the present application;

[0057] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0058] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application usually described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, each other embodiment obtained by those skilled in the art without making creative work belongs to the scope of protection of the present application.

[0059] In the past, the dispatch and use of engineering vehicles mainly relied on manual records and experience. This method has many shortcomings, such as untimely information updates, low data accuracy, difficulty in fully grasping the working status and location information of vehicles, and inability to effectively predict and plan vehicle needs. These factors often lead to waste of resources, low work efficiency and increased maintenance costs.

[0060] With the continuous advancement of science and technology and the continuous development of vehicle engineering technology, data processing and analysis are becoming more and more important in the automotive industry. Data processing and analysis methods in the use of engineering vehicles can help automobile manufacturers, engineers and other personnel better understand vehicle performance and behavior, so it is crucial to propose an accurate solution for determining vehicle usage conditions.

[0061] Based on this, an embodiment of the present application provides a method and device for determining the operating conditions of engineering vehicles, which can effectively improve the accuracy of the results of determining the operating conditions of engineering vehicles by analyzing the operating conditions of engineering vehicles from multiple dimensions and angles.

[0062] See also Figure 1 , Figure 1 This is a flow chart of a method for determining the working condition of an engineering vehicle provided in an embodiment of the present application. Figure 1 As shown in , the determination method provided in the embodiment of the present application includes:

[0063] S101. Obtaining various total load data during the operation of a target engineering vehicle over a period of time.

[0064] In this step, the total load data of various key focus positions during the operation of the target engineering vehicle over a period of time are obtained.

[0065] The engineering vehicles include various types of special vehicles that serve the different needs of engineering operations. Vehicles play an important role in many fields such as construction, road construction, mining, emergency rescue, etc. For example, the following vehicles may be included:

[0066] (1) Heavy-duty transport vehicles: such as trucks, heavy-duty dump trucks, and heavy-duty tractors, used to transport heavy goods or construction materials;

[0067] (2) Large cranes: including cranes and gantry cranes, used for lifting heavy objects;

[0068] (3) Excavator: It is divided into earthmoving excavator, mining excavator, etc., used for excavating soil, minerals, etc.;

[0069] (4) Bulldozers: There are crawler-type and tire-type bulldozers, which are used to level the ground and move soil and rocks;

[0070] (5) Rollers: such as vibratory rollers and asphalt concrete pavers, used to compact road materials;

[0071] (6) Loaders: such as bucket loaders, used for shoveling and transporting bulk materials;

[0072] (7) Power repair vehicle: dedicated to emergency repair of power lines;

[0073] (8) Off-road engineering vehicles: engineering vehicles adapted to harsh terrain;

[0074] (9.) Others include lifting machinery, industrial vehicles, elevators and escalators, compaction machinery, pile-driving machinery, rock drilling machinery, pneumatic tools, concrete machinery, steel and prestressed machinery, decoration machinery, municipal engineering and sanitation machinery, road machinery, railway machinery, military engineering machinery, and special parts for engineering machinery.

[0075] The period of time may be a period of time including several working cycles.

[0076] In one embodiment provided in the present application, the various total load data include at least: engineering vehicle axle head position acceleration load data, engineering vehicle suspension displacement load data, engineering vehicle suspension leaf spring strain load data, vehicle speed, vehicle load and road slope.

[0077] Here, the acceleration load data of the axle head position of the engineering vehicle can be obtained by installing an acceleration sensor at the axle head position of the target engineering vehicle.

[0078] The displacement load data of the suspension of the target engineering vehicle is obtained by installing a displacement sensor at the suspension position of the target engineering vehicle.

[0079] The strain load data of the suspension leaf spring of the target engineering vehicle is obtained by installing a strain sensor at the position of the suspension leaf spring of the target engineering vehicle.

[0080] For examples, see Figure 2 , Figure 2Examples of various load total data provided for this application. Figure 2 As shown, the data formats of the acceleration load data of the axle head position of the engineering vehicle, the displacement load data of the suspension of the engineering vehicle, the strain load data of the leaf spring of the suspension of the engineering vehicle, the vehicle speed, the vehicle load and the road slope are provided here.

[0081] S102: For each type of total load data, segment the total load data according to a preset segmentation method to determine at least one load segment data.

[0082] In an embodiment provided in the present application, for each type of total load data, the total load data is divided according to a preset splitting method to determine at least one load segmentation data, including: for each type of total load data, starting from a starting position, the total load data is divided into equal intervals according to a preset driving distance to determine at least one load segmentation data.

[0083] It should be noted that the total load data is divided into at least one load segment data, and each load segment data is regarded as an independent analysis object. This can more finely analyze the impact of uneven or time-varying load patterns on structures or materials.

[0084] By way of example, the process of determining the load segmentation data is described through the following content. Assuming that the total load data is the acceleration load data of the axle head position of the target engineering vehicle traveling 1 km (i.e., the acceleration change curve), and the preset driving distance is 100m, then a load segmentation data is divided every 100m from the starting position, so that it is determined that the total load data includes 10 load segmentation data.

[0085] It should be noted that if the total load data is not an integer multiple of the preset driving distance, the last load segment data, for example, can be supplemented according to the preset driving distance.

[0086] For examples, see Figure 3 , Figure 3 This is a schematic diagram of the total load data segmentation result provided in this application. Here, the suspension displacement load data is taken as an example to illustrate the total load data segmentation process. Figure 3 As shown in the figure, the total mileage of this segment of data obtained by speed integration is about 57km. Assuming the segmentation interval is 100m, it can be segmented into 570 segments of load segment data, where Figure 3 10 example diagrams are shown in Figure 2.

[0087] S103, calculating the numerical pseudo damage of each load segment data.

[0088] It should be noted that numerical pseudo-damage of load data is an engineering analysis method used to estimate the fatigue damage degree of materials or structures under cyclic loads. However, this method does not directly predict the actual remaining life or exact damage state of the structure, but gives a relative damage index in a simplified way.

[0089] In one embodiment provided in the present application, the calculation of the numerical pseudo-damage of each load segment data includes: for each load segment data, using the standard SN curve and Miner linear damage accumulation criterion, and combining the load segment data, determining the numerical pseudo-damage of the load segment data.

[0090] Here, the SN curve is the stress-life (SN) curve, which is a basic tool in fatigue strength analysis. It shows the number of cycles (life) that a material or structure can withstand under different stress levels. High stress levels correspond to short life, and low stress levels correspond to long life. Using the SN curve, the maximum stress (or equivalent stress) in each section of load data can be converted into the corresponding number of cycles or fatigue life.

[0091] Miner's criterion is a theory that assumes that fatigue damage can be accumulated linearly. It holds that if a material or structure is subjected to a certain number of cycles at different stress levels, the total fatigue damage is equal to the sum of the damage at each stress level. Specifically, the damage ratio at each stress level is proportional to the number of cycles it occurs, and the total damage is the weighted sum of these ratios.

[0092] When using the standard SN curve and Miner linear damage accumulation criterion, combined with the load segment data, to determine the numerical pseudo-damage of the load segment data, the example is: combining the above two steps, for each load segment data, first convert the maximum stress of the segment into the expected fatigue life (or directly convert it into a damage value) according to the SN curve, and then apply the Miner criterion to accumulate these damage values, so as to obtain the comprehensive damage metric of the entire load segment data, that is, the numerical pseudo-damage. This "pseudo-damage" is a relative quantity used to characterize the contribution of the load segment data to the fatigue life of the material or structure.

[0093] S104 . For each load segment data, determine the index level corresponding to the load segment data according to the numerical pseudo-damage of the load segment data.

[0094] Here, when identifying the target pseudo-damage numerical range, it includes performing numerical pseudo-damage calculation on the acceleration, displacement and strain channels that reflect the load characteristics of the vehicle structure to obtain the numerical pseudo-damage of each load segment data, and then taking the logarithm of the numerical pseudo-damage of each load segment data, calculating the numerical distribution of the logarithm of the numerical pseudo-damage of each load segment data according to the cumulative probability density distribution function, and then dividing it into multiple range intervals according to the preset value.

[0095] For data such as vehicle speed and load that reflect the driving status of the vehicle and slope that reflects the road quality, there is no need to perform numerical pseudo-damage calculation, and segmentation can be performed directly according to the preset segmentation rules.

[0096] In an implementation manner provided in the present application, for each load segment data, determining the index level corresponding to the load segment data according to the numerical pseudo-damage of the load segment data includes:

[0097] S1041. For each load segment data, according to the load type to which the load segment data belongs, determine at least one pseudo damage value interval under the load type.

[0098] S1042: Identify the target pseudo-damage numerical range to which the numerical pseudo-damage of the load segment data belongs.

[0099] S1043. Determine the index level corresponding to the target pseudo damage value interval as the index level corresponding to the load segmentation data.

[0100] For step S1041, illustratively, the load types include acceleration, displacement, leaf spring strain, vehicle speed, load, and slope.

[0101] Each load type includes at least one pseudo damage value interval.

[0102] In one embodiment provided in the present application, at least one pseudo damage value interval for each load type is determined by the following steps:

[0103] S201 . For each load type, determine a fluctuation range of the numerical pseudo damage according to numerical pseudo damages of a plurality of load segment data under the load type.

[0104] S202: Based on the fluctuation range interval, perform sub-interval segmentation processing according to a preset segmentation rule to determine at least one pseudo damage value interval of the load type.

[0105] For step S201, the multiple load segmentation data under this load type can be determined by dividing the total load data of this load type for the same engineering vehicle under the same operating environment; or can be determined by dividing the total load data of each load type of the same model of engineering vehicles under the same operating environment.

[0106] When determining the fluctuation range of the numerical pseudo-damage according to the numerical pseudo-damage of multiple load segment data under this load type, it specifically includes: determining the minimum value and the maximum value according to the numerical pseudo-damage of the multiple load segment data; and determining the fluctuation range of the numerical pseudo-damage according to the determined minimum value and the maximum value.

[0107] With respect to step S202, the preset segmentation rule specifies the number of sub-intervals to be segmented or the value range of each sub-interval.

[0108] For example, the process of determining the pseudo-damage numerical range is illustrated by the following content: Each load type is represented by the following symbols: acceleration A, displacement D, leaf spring strain S, vehicle speed V, load L, slope P. Each load type can be divided into 2 to 3 intervals according to its own distribution. Specifically, the vehicle speed is V1: 0-20km / h, V2: 20-60km / h, V3: 60km / h and above; the vehicle load L is L1 empty and L2 full load; the road slope P is P1, P2, P3. For example, for 570 load segmented data, the acceleration A is divided into 6 intervals A1, A2, A3, A4, A5, and A6 according to the logarithmic distribution of the numerical pseudo-damage; the suspension displacement D is divided into 6 intervals D1, D2, D3, D4, D5, and D6 according to the logarithmic distribution of the numerical pseudo-damage; the engineering vehicle suspension leaf spring strain S is divided into 6 intervals S1, S2, S3, S4, S5, and S6 according to the logarithmic distribution of the numerical pseudo-damage.

[0109] For step S1042, when the target pseudo-damage numerical interval is an interval divided after logarithmic processing, the identification of the target pseudo-damage numerical interval to which the numerical pseudo-damage of the load segment data belongs includes: performing logarithmic processing on the numerical pseudo-damage of the load segment data to determine the logarithm of the numerical pseudo-damage of the load segment data; and identifying the target pseudo-damage numerical interval to which the numerical pseudo-damage logarithm belongs.

[0110] S105 , determining the working condition matrix of the target engineering vehicle based on the arrangement and combination of the index levels corresponding to all the load segmentation data.

[0111] In this step, for each type of total load data, the index levels corresponding to all load segmentation data under this type of total load data are used to perform numerical arrangement and combination to obtain the working condition matrix of the target engineering vehicle.

[0112] The operating condition matrix indicates the operating condition of the target engineering vehicle.

[0113] In addition, after the operating condition matrix of the target engineering vehicle is determined, the target engineering vehicle can be evaluated.

[0114] The embodiment of the present application provides a method for determining the working condition of an engineering vehicle, the method comprising: obtaining a plurality of total load data during the operation of a target engineering vehicle within a period of time; for each type of total load data, segmenting the total load data according to a preset splitting method to determine at least one load segmentation data; calculating the numerical pseudo-damage of each load segmentation data; for each load segmentation data, determining the index level corresponding to the load segmentation data according to the numerical pseudo-damage of the load segmentation data; and determining the working condition matrix of the target engineering vehicle based on the arrangement and combination of the index levels corresponding to each of the load segmentation data. By analyzing the working condition of the engineering vehicle in multiple dimensions and angles, the accuracy of the results of determining the working condition of the engineering vehicle can be effectively improved.

[0115] See also Figure 4 , Figure 4 This is a schematic diagram of the structure of a determination device provided in an embodiment of the present application. Figure 4 As shown in , the determining device 200 includes:

[0116] The acquisition module 210 is used to acquire various total load data of the target engineering vehicle during operation within a period of time;

[0117] A segmentation module 220 is used to segment each type of total load data according to a preset segmentation method to determine at least one load segmentation data;

[0118] A calculation module 230, used for calculating the numerical pseudo damage of each load segment data;

[0119] A first determination module 240 is used to determine, for each load segment data, an indicator level corresponding to the load segment data according to the numerical pseudo damage of the load segment data;

[0120] The second determination module 250 is used to determine the working condition matrix of the target engineering vehicle based on the arrangement and combination of the index levels corresponding to all the load segmentation data.

[0121] Optionally, the various total load data include at least: engineering vehicle axle head position acceleration load data, engineering vehicle suspension displacement load data, engineering vehicle suspension leaf spring strain load data, vehicle speed, vehicle load and road slope.

[0122] Optionally, when the segmentation module 220 is used to segment each type of total load data according to a preset segmentation method to determine at least one load segmentation data, the segmentation module 220 is used to:

[0123] For each type of total load data, starting from the starting position, the total load data is divided into equal intervals according to the preset driving distance to determine at least one load segment data.

[0124] Optionally, when the calculation module 230 is used to calculate the numerical pseudo damage of each load segment data, the calculation module 230 is used to:

[0125] For each load segment data, the standard SN curve and Miner linear damage accumulation criterion are used in combination with the load segment data to determine the numerical pseudo damage of the load segment data.

[0126] Optionally, when the first determining module 240 is used to determine, for each load segment data, the index level corresponding to the load segment data according to the numerical pseudo-damage of the load segment data, the first determining module 240 is used to:

[0127] For each load segment data, according to the load type to which the load segment data belongs, determining at least one pseudo damage value interval under the load type;

[0128] Identify the target pseudo-damage value interval to which the numerical pseudo-damage of the load segment data belongs;

[0129] The index level corresponding to the target pseudo damage value interval is determined as the index level corresponding to the load segmentation data.

[0130] Optionally, when the target pseudo damage numerical interval is an interval divided after logarithmic processing, when the first determination module 240 is used to identify the target pseudo damage numerical interval to which the numerical pseudo damage of the load segment data belongs, the first determination module 240 is used to:

[0131] Performing logarithmic processing on the numerical pseudo damage of the load segment data to determine the logarithm of the numerical pseudo damage of the load segment data;

[0132] A target pseudo-damage value interval to which the numerical pseudo-damage logarithm belongs is identified.

[0133] Optionally, the determining device 200 is used to determine at least one pseudo damage value interval for each load type through the following steps:

[0134] For each load type, according to the numerical pseudo damage of multiple load segment data under the load type, the fluctuation range of the numerical pseudo damage is determined;

[0135] Based on the fluctuation range interval, sub-interval segmentation processing is performed according to a preset segmentation rule to determine at least one pseudo damage value interval of this load type.

[0136] See also Figure 5 , Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 5 As shown in , the electronic device 300 includes a processor 310 , a memory 320 and a bus 330 .

[0137] The memory 320 stores machine-readable instructions executable by the processor 310. When the electronic device 300 is running, the processor 310 communicates with the memory 320 via the bus 330. When the machine-readable instructions are executed by the processor 310, the above-mentioned Figure 1 The specific implementation of the steps of the determination method in the method embodiment shown can be found in the method embodiment, and will not be repeated here.

[0138] The present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the computer program can execute the above-mentioned Figure 1 The specific implementation of the steps of the determination method in the method embodiment shown can be found in the method embodiment, and will not be repeated here.

[0139] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0140] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.

[0141] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0142] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0143] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application can essentially be embodied in the form of a software product, or in other words, the part that contributes to the prior art or the part of the technical solution. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0144] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A method for determining the working condition of an engineering vehicle, characterized in that: The determination method comprises: Obtain the total data of various loads during the operation of the target engineering vehicle over a period of time; For each type of total load data, the total load data is segmented according to a preset segmentation method to determine at least one load segmentation data; Calculate the numerical pseudo-damage for each load segment data; For each load segment data, according to the numerical pseudo damage of the load segment data, determine the index level corresponding to the load segment data; Based on the index levels corresponding to all load segmentation data, the working condition matrix of the target engineering vehicle is determined.

2. The determination method according to claim 1, characterized in that: The various types of total load data include at least: engineering vehicle axle head position acceleration load data, engineering vehicle suspension displacement load data, engineering vehicle suspension leaf spring strain load data, vehicle speed, vehicle load and road slope.

3. The determination method according to claim 1, characterized in that: The method of dividing each type of total load data according to a preset splitting method to determine at least one load segmentation data includes: For each type of total load data, starting from the starting position, the total load data is divided into equal intervals according to the preset driving distance to determine at least one load segment data.

4. The determination method according to claim 1, characterized in that: The calculating of the numerical pseudo damage of each load segment data comprises: For each load segment data, the standard SN curve and Miner linear damage accumulation criterion are used in combination with the load segment data to determine the numerical pseudo damage of the load segment data.

5. The determination method according to claim 1, characterized in that: The step of determining, for each load segment data, an indicator level corresponding to the load segment data according to the numerical pseudo damage of the load segment data, includes: For each load segment data, according to the load type to which the load segment data belongs, determining at least one pseudo damage value interval under the load type; Identify the target pseudo-damage value interval to which the numerical pseudo-damage of the load segment data belongs; The index level corresponding to the target pseudo damage value interval is determined as the index level corresponding to the load segmentation data.

6. The determination method according to claim 1, characterized in that: When the target pseudo-damage numerical interval is an interval divided after logarithmic processing, the target pseudo-damage numerical interval to which the numerical pseudo-damage of the load segment data belongs to is identified, including: Performing logarithmic processing on the numerical pseudo damage of the load segment data to determine the logarithm of the numerical pseudo damage of the load segment data; A target pseudo-damage value interval to which the numerical pseudo-damage logarithm belongs is identified.

7. The determination method according to claim 5, characterized in that: Determine at least one pseudo-damage value interval for each load type by following the steps below: For each load type, the fluctuation range of the numerical pseudo damage is determined according to the numerical pseudo damage of multiple load segmentation data under the load type; Based on the fluctuation range interval, sub-interval segmentation processing is performed according to a preset segmentation rule to determine at least one pseudo damage value interval of this load type.

8. A device for determining the working condition of an engineering vehicle, characterized in that: The determining device comprises: An acquisition module is used to acquire various total load data during the operation of a target engineering vehicle over a period of time; A segmentation module is used to segment each type of total load data according to a preset segmentation method to determine at least one load segmentation data; A calculation module, used to calculate the numerical pseudo damage of each load segment data; A first determination module is used to determine, for each load segment data, an index level corresponding to the load segment data according to the numerical pseudo damage of the load segment data; The second determination module is used to determine the working condition matrix of the target engineering vehicle based on the arrangement and combination of the indicator levels corresponding to all the load segmentation data.

9. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate through the bus, and the machine-readable instructions are executed by the processor to perform the steps of the determination method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the determination method according to any one of claims 1 to 7 are executed.