Virtual power plant two-stage optimization scheduling method considering demand side resource main body
Through the two-stage optimal dispatching method, the successful dispatch probability model of the demand-side resource subject and the optimization model of the virtual power plant are established, the dispatching process is decomposed, the problem of ineffective resource scheduling within the virtual power plant is solved, and the virtual power plant and resource subject are maximized. Improved profitability and economy.
Patent Information
- Application Number
- CN202410897794.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-18
AI Technical Summary
Existing virtual power plant scheduling methods mainly focus on revenue optimization and fail to effectively consider the participation of multiple internal demand-side resource entities, resulting in ineffective resource scheduling within the virtual power plant.
A two-stage optimal dispatching method is proposed. First, a successful dispatch probability model of demand-side resource entities is established, and consensus among resource entities is achieved through broadcast communication. Then the reverse induction method is used to decompose the dispatching process into a single-stage optimization problem to optimize the virtual power plant. The resource price and the scheduling capacity of the resource subject.
Maximize the benefits of virtual power plants and resource entities, improve the economics of resource dispatching in virtual power plants, and achieve effective dispatching of internal resources in virtual power plants.
Smart Images

Figure CN118798559A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power system resource scheduling, and in particular relates to a two-stage optimization scheduling method for a virtual power plant taking into account demand-side resource entities. Background Art
[0002] With the implementation of low-carbon, clean, safe and efficient energy strategies, the proportion of renewable energy in the power grid continues to increase. The volatility and randomness of renewable energy output puts serious pressure on the balance of supply and demand in the power system. The balancing resources on the supply side of the power system are becoming saturated, and the resources on the demand side are gradually becoming highly potential dispatchable resources for the power system. The demand-side resources of the power system usually include distributed photovoltaics, distributed wind power, air-conditioning loads, electric vehicles and energy storage batteries. Due to the small capacity of individual units and the dispersed geographical locations, it is not easy for the generalized demand-side resource entities to directly participate in the dispatch of power resources. In this context, virtual power plants have become an effective form of aggregation management of multiple entities on the generalized demand-side resources. Studying the optimal dispatching method between virtual power plants and multiple internal generalized demand-side resource entities is of great significance to improving the operating income of virtual power plants.
[0003] Existing related research mainly focuses on the revenue optimization of virtual power plants, but lacks consideration of the optimization of the scheduling revenue of virtual power plants with the participation of multiple internal entities, thus failing to achieve effective scheduling of internal resources of virtual power plants.
[0004] Therefore, a new technical solution is urgently needed in the prior art to solve this problem. Summary of the invention
[0005] The technical problem to be solved by the present invention is: to provide a two-stage optimization scheduling method for virtual power plants taking into account demand-side resource entities to solve the technical problem that the existing optimization scheduling method between virtual power plants and multiple internal generalized demand-side resource entities mainly focuses on the profit optimization of virtual power plants, lacks consideration of the optimization of the scheduling benefits of multiple internal entities participating in the virtual power plant, and thus fails to achieve effective scheduling of internal resources of virtual power plants.
[0006] A two-stage optimization scheduling method for a virtual power plant taking into account demand-side resource entities includes the following steps, and the following steps are performed in sequence:
[0007] Step 1: Establish a generalized demand-side resource multi-agent successful dispatch probability model based on virtual power plants;
[0008] The probability of each generalized demand-side resource entity successfully participating in the virtual power plant dispatch is expressed as:
[0009]
[0010] In the formula, is the probability that the generalized demand-side resource entity i successfully participates in the virtual power plant scheduling, is the relative hash power of the generalized demand-side resource entity i, is the request failure probability of the generalized demand-side resource entity i, is the holding scheduling capacity of the generalized demand-side resource entity i, and 螜 is the set of generalized demand-side resource entities, satisfying and is the data volume of the schedulable plan submitted by entity i, and T is the expected value of the data transmission time; is the holding scheduling capacity of the generalized demand-side resource entity j, where j≠i; G1 is the channel capacity of data transmission, and G2 is the coding gain of data transmission;
[0011] Among them, and satisfy and
[0012] In the formula, Δt(d i ) is the relative submission time of data d i , and Δt(d i ) = t(d i ) - t(0), where t(d i ) is the submission time of data volume d i , and t(0) is the data communication delay;
[0013] In the virtual power plant, the generalized demand-side resource entity notifies other resource entities of its own schedulable plan within the scheduling period through broadcast communication, so as to achieve the consensus of each resource entity on the optimal scheduling of the virtual power plant;
[0014] After the generalized demand-side resource entity i successfully reports its own schedulable plan and accepts the virtual power plant scheduling, the resource entity obtains two parts of income: the reward R for successful transaction i and the transaction fee A i ;
[0015] The net income of the generalized demand-side resource entity is obtained through formula (7)
[0016]
[0017] In the formula, p o is the unit cost of the generalized demand-side resource entity through the virtual power plant scheduling;
[0018] The net income of the virtual power plant is obtained through formula (8)
[0019]
[0020] In the formula, δ o Unit costs of aggregating generalized demand-side resources for virtual power plants;
[0021] Step 2: Establish a two-stage operation optimization dispatch model of virtual power plants taking into account multiple entities of generalized demand-side resources;
[0022] The resource scheduling between the virtual power plant and each resource entity is modeled as a two-stage optimization process. In the first stage, the virtual power plant determines the unit price p of the scheduling resource. o , benefiting from the aggregated optimization scheduling of resources of each resource subject; in the second stage, each generalized demand-side resource subject determines the scheduling capacity to participate in, and the two-stage optimization process is as follows:
[0023] ①The first stage: the unit price p of scheduling resources o optimization:
[0024] Objective function:
[0025]
[0026] Constraints:
[0027]
[0028] In the formula, and are the maximum and minimum values of the scheduling resource prices respectively;
[0029] ②The second stage: optimal scheduling of resource main body capacity:
[0030] Objective function:
[0031]
[0032] Constraints:
[0033]
[0034] In the formula, and They are the maximum dispatchable capacity and the minimum dispatchable capacity of multiple generalized demand-side resource entities respectively;
[0035] Step 3: Decompose the two-stage optimization process into two single-stage optimization problems using the reverse induction method and solve them;
[0036] Given a resource price p o , solve the resource subject capacity optimization objective function of the second stage, and obtain the optimal solution of the resource subject scheduling capacity in the second stage
[0037]
[0038] In the formula, By taking the first-order derivative of formula (11), we can obtain:
[0039]
[0040] Based on the optimal solution of resource subject dispatch capacity in the second stage, the net profit of the virtual power plant in the first stage is expressed as formula (15):
[0041]
[0042] Formula (15) is solved by the Karush-Kuhn-Tucker (KKT) method, and formula (24) is obtained as the optimal solution of the first stage:
[0043]
[0044] Thus, a two-stage optimal scheduling of virtual power plants taking into account the main resource on the demand side is optimized.
[0045] In the step 1, the generalized demand-side resource subject informs other subjects of its own dispatchable plan within the dispatch period by means of broadcast communication, including the following situations: the distributed photovoltaic resource subject submits the predicted photovoltaic output data and dispatchable capacity data within the dispatch period; the distributed wind power resource subject submits the predicted wind power output data and dispatchable capacity data within the dispatch period; the air-conditioning load resource subject submits the planned electricity consumption data and dispatchable capacity data within the dispatch period; the electric vehicle resource subject submits the planned charging and discharging power data and dispatchable capacity data within the dispatch period; the energy storage resource subject submits the planned charging and discharging power data and dispatchable capacity data within the dispatch period.
[0046] In step 3, the process of solving equation (15) by using the Karush-Kuhn-Tucker (KKT) method is as follows:
[0047] Based on formula (15), the scheduling resource price optimization decision in the first stage is a convex optimization problem, which can be solved by KKT conditions and the Lagrangian function can be written as follows through formula (16):
[0048]
[0049] Through the Karush-Kuhn-Tucker condition, we get equations (17) to (23):
[0050]
[0051] λ1≥0 (20);
[0052] λ2 ≥ 0 (21);
[0053]
[0054] In the formula, N is the number of generalized demand-side resource entities, λ1 and λ2 are The Lagrange multiplier of .
[0055] Through the above design scheme, the present invention can bring the following beneficial effects:
[0056] The present invention proposes a two-stage optimization scheduling method for virtual power plants taking into account the main body of demand-side resources. First, the scheduling success probability of different generalized demand-side resource entities participating in the scheduling of virtual power plants is calculated; on this basis, a two-stage operation optimization scheduling model of virtual power plants taking into account multiple main bodies of generalized demand-side resources is established. The first stage is the optimization decision problem of the scheduling resource price inside the virtual power plant, and the second stage is the scheduling capacity optimization scheduling problem of each generalized demand-side resource entity in the virtual power plant. Finally, the reverse induction method is used to decompose the two-stage optimization problem into a single-stage optimization problem, and solve each single-stage optimization to obtain the overall optimization.
[0057] When solving the price and capacity of the optimal scheduling of multiple subjects of generalized demand-side resources within the virtual power plant, the present invention maximizes the benefits of the virtual power plant and the multiple subjects within it. In the first stage, the price of the multi-subject scheduling resources is solved with the goal of maximizing the benefits of the virtual power plant; in the second stage, the scheduling capacity of each subject is solved with the goal of maximizing the benefits of multiple subjects of generalized demand-side resources, thereby improving the economic efficiency of the virtual power plant resource scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] The present invention is further described below with reference to the accompanying drawings and specific embodiments:
[0059] Figure 1 It is a flowchart of a two-stage optimization scheduling method of a virtual power plant taking into account the resource subject on the demand side of the present invention;
[0060] Figure 2 This is a flow chart of solving a two-stage problem using a reverse induction method in a two-stage optimization scheduling method for a virtual power plant taking into account demand-side resource entities in the present invention. DETAILED DESCRIPTION
[0061] like Figure 1 As shown, the present invention proposes a two-stage optimization scheduling method for a virtual power plant taking into account the resource subject on the demand side, including: establishing a generalized demand side resource multi-subject successful scheduling probability model based on the virtual power plant, on this basis, establishing a two-stage operation optimization scheduling model for the virtual power plant taking into account the multi-subject of generalized demand side resources, and finally, using the reverse induction method to decompose the two-stage optimization process into two single-stage optimization problems and solve them. The specific steps are as follows:
[0062] S1. Establish a multi-agent successful dispatch probability model for generalized demand-side resources based on virtual power plants.
[0063] For each generalized demand-side resource entity, the probability of being successfully dispatched by a virtual power plant is By relative hash power and request failure probability Decide.
[0064] Relative hash power refers to the ratio of the dispatchable capacity of the subject to the dispatchable capacity of all generalized demand-side resource subjects in the virtual power plant, that is:
[0065]
[0066] In the formula, is the scheduling capacity held by each generalized demand-side resource subject, and Ι is the set of generalized demand-side resource subjects. Formula (1) satisfies and
[0067] In a virtual power plant, any generalized demand-side resource subject must inform other subjects of its own dispatchable plan within the dispatch period through broadcast communication, so as to achieve consensus among all resource subjects on the optimal dispatch of the virtual power plant. Distributed photovoltaic resource subjects submit predicted photovoltaic output data and dispatchable capacity data within the dispatch period; distributed wind power resource subjects submit predicted wind power output data and dispatchable capacity data within the dispatch period; air conditioning load resource subjects submit planned power consumption data and dispatchable capacity data within the dispatch period; electric vehicle resource subjects submit planned charge and discharge power data and dispatchable capacity data within the dispatch period; energy storage resource subjects submit planned charge and discharge power data and dispatchable capacity data within the dispatch period.
[0068] When the dispatch efficiency of the generalized demand-side resource subject is low and the speed of submitting dispatchable plans is slow, the subject will have a high delay in accepting the optimized dispatch management of the virtual power plant. In this case, the subject may not participate in the virtual power plant dispatch and think that the dispatch service request is invalid. Assuming that the time for each subject to submit dispatchable plans follows a Poisson distribution, the probability of service request failure is:
[0069]
[0070] Where, d i is the amount of data that can be scheduled by subject i, and T is the expected value of data transmission time. i ) is the data d i The relative submission time is shown in formula (3):
[0071] Δt(d i )=t(d i)-t(0) (3);
[0072] In the formula, t(d i ) is the data volume d i The submission time is t(0), and t(0) is the data communication delay.
[0073] Using formula (4), t(d i ) is expanded by the first order Taylor, and we get
[0074]
[0075] In the formula, according to the Shannon-Hartley law, G1 is the channel capacity for data transmission, and G2 is the coding gain for data transmission.
[0076] Data i The relative submission time Δt(d i ) can be expressed as formula (5):
[0077] Δt(d i ) = d i / G1G2 (5);
[0078] Therefore, as shown in formula (6), the probability that each generalized demand-side resource entity successfully participates in the virtual power plant dispatch is It is expressed as:
[0079]
[0080] When the generalized demand-side resource subject successfully reports the dispatchable plan and accepts the virtual power plant dispatch, the subject will receive two parts of income: the reward for successful transaction R i and transaction fee A i The net income of the generalized demand-side resource entity is obtained through formula (7):
[0081]
[0082] In the formula, p o It is the unit cost of dispatching the broad demand-side resource entities through virtual power plants.
[0083] The net benefit of the virtual power plant is obtained through formula (8):
[0084]
[0085] In the formula, δ o Unit costs of aggregating generalized demand-side resources for virtual power plants.
[0086] S2. Establish a two-stage operation optimization scheduling model for virtual power plants that takes into account multiple entities of generalized demand-side resources.
[0087] The resource scheduling between the virtual power plant and various entities can be modeled as a two-stage optimization process. In the first stage, the virtual power plant determines the unit price p of the scheduling resource. o , benefiting from the aggregated optimized scheduling of each subject's resources; in the second stage, each generalized demand-side resource subject determines the scheduling capacity to participate. Figure 2 As shown, the two-stage optimization process is as follows:
[0088] Phase 1: Scheduling resource price optimization decision
[0089] Objective function:
[0090]
[0091] Constraints:
[0092]
[0093] In the formula, and are the maximum and minimum prices of scheduling resources respectively.
[0094] Phase 2: Optimized scheduling of resource capacity
[0095] Objective function:
[0096]
[0097] Constraints:
[0098]
[0099] In the formula, and They are the maximum dispatchable capacity and minimum dispatchable capacity of multiple generalized demand-side resource entities respectively.
[0100] S3. Use the backward induction method to decompose the two-stage optimization process into two single-stage optimization problems and solve them.
[0101] S3.1. Given a resource price p o , solve the resource principal capacity optimization scheduling problem in phase 2.
[0102] Taking the first-order derivative of formula (11), we can get:
[0103]
[0104] Using formula (14) to obtain the optimal solution of the second stage
[0105]
[0106] S3.2. Based on the optimal solution of resource subject dispatch capacity in stage 2, the net profit of the virtual power plant in stage 1 is expressed as formula (15):
[0107]
[0108] Based on formula (15), the scheduling resource price optimization decision in stage 1 is a convex optimization problem, which can be solved by KKT conditions. The Lagrangian function is written as:
[0109]
[0110] Through the Karush-Kuhn-Tucker condition, we get equations (17) to (23):
[0111]
[0112] λ1≥0 (20);
[0113] λ2 ≥ 0 (21);
[0114]
[0115] The optimal solution of stage 1 is obtained by formula (24):
[0116]
[0117] Thus, a two-stage optimal scheduling of virtual power plants taking into account the main resource on the demand side is optimized.
Claims
1. A two-stage optimization scheduling method for a virtual power plant taking into account the main resource on the demand side, characterized by: The method comprises the following steps, and the following steps are performed in sequence: Step 1: Establish a generalized demand-side resource multi-agent successful dispatch probability model based on virtual power plants; The probability of each generalized demand-side resource entity successfully participating in the virtual power plant dispatch is expressed as: In the formula, is the probability that the generalized demand-side resource subject i successfully participates in the virtual power plant dispatch, is the relative hash power of generalized demand-side resource subject i, is the request failure probability of generalized demand-side resource subject i, is the scheduling capacity held by resource subject i on the generalized demand side, is a collection of generalized demand-side resource entities, satisfying and d i is the amount of data that can be scheduled by subject i, and T is the expected value of data transmission time; is the scheduling capacity held by the generalized demand-side resource subject j, where j≠i; G1 is the channel capacity for data transmission, and G2 is the coding gain for data transmission; in, And meet and Where Δt(d i ) is the data d i The relative submission time, and Δt(d i )=t(d i )-t(0), where t(d i ) is the data volume d i The submission time, t(0) is the data communication delay; In a virtual power plant, the generalized demand-side resource subject informs other resource subjects of its own dispatchable plan within the dispatch period through broadcast communication, thereby achieving consensus among all resource subjects on the optimal dispatch of the virtual power plant; After the generalized demand-side resource subject i successfully reports its dispatchable plan and accepts the dispatch of the virtual power plant, the resource subject obtains two parts of income: the reward R for successful transaction and i and transaction fee A i ; The net income of the generalized demand-side resource entity is obtained through formula (7): In the formula, p o The unit cost of the generalized demand-side resource entity dispatched by the virtual power plant; The net benefit of the virtual power plant is obtained by formula (8): In the formula, δ o Unit costs of aggregating generalized demand-side resources for virtual power plants; Step 2: Establish a two-stage operation optimization dispatch model of virtual power plants taking into account multiple entities of generalized demand-side resources; The resource scheduling between the virtual power plant and each resource entity is modeled as a two-stage optimization process. In the first stage, the virtual power plant determines the unit price p of the scheduling resource. o , benefiting from the aggregated optimization scheduling of resources of each resource subject; in the second stage, each generalized demand-side resource subject determines the scheduling capacity to participate in, and the two-stage optimization process is as follows: ①The first stage: the unit price p of scheduling resources o optimization: Objective function: Constraints: In the formula, and are the maximum and minimum values of the scheduling resource prices respectively; ②The second stage: optimal scheduling of resource main body capacity: Objective function: Constraints: In the formula, and They are the maximum dispatchable capacity and the minimum dispatchable capacity of multiple generalized demand-side resource entities respectively; Step 3: Decompose the two-stage optimization process into two single-stage optimization problems using the reverse induction method and solve them; Given a resource price p o , solve the resource subject capacity optimization objective function of the second stage, and obtain the optimal solution of the resource subject scheduling capacity in the second stage In the formula, By taking the first-order derivative of formula (11), we can obtain: Based on the optimal solution of resource subject dispatch capacity in the second stage, the net profit of the virtual power plant in the first stage is expressed as formula (15): Formula (15) is solved by the Karush-Kuhn-Tucker (KKT) method, and formula (24) is obtained as the optimal solution of the first stage: Thus, a two-stage optimal scheduling of virtual power plants taking into account the main resource on the demand side is optimized.
2. According to claim 1, a two-stage optimization scheduling method for a virtual power plant taking into account the resource subject on the demand side is characterized by: In the step 1, the generalized demand-side resource subject informs other subjects of its own dispatchable plan within the dispatch period by means of broadcast communication, including the following situations: the distributed photovoltaic resource subject submits the predicted photovoltaic output data and dispatchable capacity data within the dispatch period; the distributed wind power resource subject submits the predicted wind power output data and dispatchable capacity data within the dispatch period; the air conditioning load resource subject submits the planned power consumption data and dispatchable capacity data within the dispatch period; the electric vehicle resource subject submits the planned charging and discharging power data and dispatchable capacity data within the dispatch period; The energy storage resource entity submits the planned charging and discharging power data and dispatchable capacity data during the scheduling period.
3. According to claim 1, a two-stage optimization scheduling method for a virtual power plant taking into account the resource subject on the demand side is characterized by: In step 3, the process of solving equation (15) by using the Karush-Kuhn-Tucker (KKT) method is as follows: Based on formula (15), the scheduling resource price optimization decision in the first stage is a convex optimization problem, which can be solved by KKT conditions and the Lagrangian function can be written as follows through formula (16): Through the Karush-Kuhn-Tucker condition, we get equations (17) to (23): λ1≥0 (20); λ2 ≥ 0 (21); In the formula, N is the number of generalized demand-side resource entities, λ1 and λ2 are The Lagrange multiplier of .
Citation Information
Cited By
Power-carbon coupling market large-scale virtual power plant resource dynamic aggregation and operation method and system
CN121192667A