A one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence

Through the one-click acceptance system for power transmission line infrastructure projects based on artificial intelligence, the problems of low efficiency and low accuracy of traditional acceptance methods are solved, and efficient and fine data collection and analysis of power transmission line infrastructure projects are achieved, and quality is discovered and solved in a timely manner and safety issues to ensure project quality and safety.

CN118798589BActive Publication Date: 2024-12-03福建省亿力建设工程有限公司
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411270387.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-03
Estimated Expiration
2044-09-11

AI Technical Summary

Technical Problem

The traditional transmission line infrastructure project acceptance methods are inefficient and low in accuracy, and cannot achieve in-depth data analysis and potential problem discovery. The system lacks integration and coordination, which leads to difficulty in data sharing and affects acceptance efficiency and safety.

Method used

Adopt a one-click acceptance system for power transmission line infrastructure projects based on artificial intelligence, and conduct comprehensive data acquisition, analysis and analysis through regional division modules, infrastructure engineering structure data acquisition and analysis modules, electrical equipment data acquisition and analysis modules, comprehensive analysis modules and early warning modules. Comprehensive abnormality index calculation to achieve real-time monitoring and early warning.

Benefits of technology

It improves the precision and efficiency of acceptance, can promptly discover and solve quality and safety issues, and ensures the quality and safety of transmission line infrastructure projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798589B_ABST
    Figure CN118798589B_ABST
Patent Text Reader

Abstract

The present invention discloses a one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence, which specifically relates to the field of artificial intelligence technology, including a regional division module, a capital construction project structure data acquisition module, a capital construction project structure data analysis module, an electrical equipment data acquisition module, an electrical equipment data analysis module, a comprehensive analysis module, and an early warning module. The present invention significantly improves the efficiency and accuracy of acceptance through the comprehensive collaboration of multiple modules. The regional division module ensures the precise positioning of data, the capital construction project structure data acquisition and analysis module provides a scientific basis for project quality assessment, the electrical equipment data acquisition and analysis module ensures the evaluation of the working status and safety of electrical equipment, and the coordinated use of the comprehensive analysis module and the early warning module enables the present invention to timely discover potential quality problems and issue early warnings, thereby ensuring the quality and safety of power transmission line infrastructure projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and more specifically, to an artificial intelligence-based one-key acceptance system for power transmission line infrastructure projects. Background Art

[0002] Transmission line infrastructure projects are an important part of the power system. Their quality and safety directly affect the stable operation of the power system. With the rapid development of the power industry, the scale and number of transmission line infrastructure projects are increasing, and the requirements for project acceptance are becoming higher and higher.

[0003] The traditional acceptance method of power transmission line infrastructure projects mainly relies on manual inspection and experience judgment, which has problems such as low efficiency, low accuracy, and easy human error. Therefore, a more efficient, accurate and comprehensive acceptance method for power transmission line infrastructure projects is needed. The existing acceptance system for power transmission line infrastructure projects mainly adopts a combination of manual inspection and data analysis to evaluate the quality and safety of the project. These systems usually include modules such as data collection, data analysis, and report generation, which can realize the collection, processing and analysis of project data and generate corresponding acceptance reports.

[0004] However, there are still some shortcomings in its actual use. For example, the existing system mainly adopts traditional data analysis methods, which makes it difficult to achieve in-depth analysis and mining of engineering data and unable to discover potential quality problems and safety hazards. The existing system is usually composed of multiple independent modules and lacks effective integration and collaboration, which leads to difficulties in data sharing and interaction, affecting acceptance efficiency and quality. The existing system is difficult to achieve real-time monitoring and early warning of engineering quality and safety, and is unable to discover and solve problems in a timely manner, posing a major safety hazard. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence, which solves the problems raised in the above-mentioned background technology through the following scheme.

[0006] To achieve the above object, the present invention provides the following technical solution: a one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence, comprising:

[0007] Area division module: used to determine the target transmission line infrastructure project area as the target area, divide the target area into sub-areas by equal area division, and mark them as 1, 2...n in sequence;

[0008] Infrastructure engineering structure data acquisition module: used to collect geological and tower foundation stability data of each sub-area, line corridor environmental data and structure installation accuracy data, and transmit the collected data to the infrastructure engineering structure data analysis module;

[0009] Infrastructure engineering structure data analysis module: including geological and tower foundation stability data analysis unit, line corridor environment data analysis unit and structure installation accuracy data analysis unit, used to analyze the data transmitted by the infrastructure engineering structure data acquisition module and transmit the analysis results to the comprehensive analysis module;

[0010] Electrical equipment data acquisition module: used to collect electrical performance and loss data, electromagnetic compatibility and interference data, and safety and lightning protection data of each sub-area, and transmit the collected data to the electrical equipment data analysis module;

[0011] Electrical equipment data analysis module: including electrical performance and loss data analysis unit, electromagnetic compatibility and interference data analysis unit and safety and lightning protection data analysis unit, used to analyze the data transmitted by the electrical equipment data acquisition module and transmit the analysis results to the comprehensive analysis module;

[0012] Comprehensive analysis module: used to establish a comprehensive analysis model, import the data transmitted by the infrastructure engineering structure data analysis module and the electrical equipment data analysis module into the comprehensive analysis model, calculate the comprehensive abnormal index of the target area, and transmit it to the early warning module;

[0013] Early warning module: used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target area through the preset value of the comprehensive abnormality index, and issue an early warning signal based on the judgment result.

[0014] Preferably, the geological and tower foundation stability data include soil bearing capacity of tower base geological exploration, groundwater level depth below tower foundation, soil equal pore pressure ratio, and geological fault slip rate around tower foundation, marked as Tc, Td, Tp, and Tv respectively; the line corridor environment data include vegetation coverage in the line corridor, number of obstacles in the line corridor, safe distance between the line and the nearest building, and maximum temperature in the line corridor, marked as Lv, Lb, Ls, and Le respectively; the structural installation accuracy data include average coaxiality deviation at the connection of each section of the tower body, conductor tension, suspension angle deviation of the insulator string, and tower body weld defect rate, marked as Fc, Fe, Fh, and Fw respectively.

[0015] Preferably, the geological and tower foundation stability data analysis unit is used to establish a geological and tower foundation stability data analysis model, import the geological and tower foundation stability data transmitted by the infrastructure engineering structure data acquisition module into the geological and tower foundation stability data analysis model, and calculate the tower foundation geological safety assessment value of each sub-area, which is specifically expressed as: ,ST i represents the geological safety assessment value of the tower base in the ith sub-area, Tc i represents the soil bearing capacity of the tower base geological exploration in the ith sub-area, Td i represents the groundwater level depth below the tower foundation in the ith sub-area, Tp i represents the soil equal pore pressure ratio in the ith sub-region, Tv i Tc represents the slip rate of the geological fault around the tower base in the ith sub-area, max It represents the maximum soil bearing capacity of the tower base geological exploration in the target area, Tc min It indicates the minimum soil bearing capacity for tower base geological exploration in the target area.

[0016] Preferably, the line corridor environment data analysis unit is used to establish a line corridor environment data analysis model, import the line corridor environment data transmitted by the infrastructure engineering structure data acquisition module into the line corridor environment data analysis model, and calculate the line corridor environment composite evaluation value of each sub-area, which is specifically expressed as: , SL i represents the composite evaluation value of the line corridor environment in the ith sub-area, Lv i represents the vegetation coverage rate within the line corridor of the ith sub-area, Lb i Indicates the number of obstacles in the line corridor of the ith sub-area, Ls i Le represents the safe distance between the line in the ith sub-area and the nearest building. i represents the maximum temperature of the line corridor in the ith sub-area, Ls max Indicates the maximum safe distance between the line in the target area and the nearest building.

[0017] Preferably, the structural installation accuracy data analysis unit is used to establish a structural installation accuracy data analysis model, import the structural installation accuracy data transmitted by the infrastructure engineering structural data acquisition module into the structural installation accuracy data analysis model, and calculate the structural installation quality assessment value of each sub-area, which is specifically expressed as: , S.F. i represents the structural installation quality assessment value of the ith sub-area, Fc i It represents the average coaxiality deviation of the tower body joints in the ith sub-area, Fe i represents the wire tension in the ith sub-region, Fh i represents the suspension angle deviation of the insulator string in the ith sub-region, Fw i represents the tower weld defect rate in the ith sub-area.

[0018] Preferably, the infrastructure engineering structure data analysis module calculates the comprehensive assessment value of the infrastructure engineering structure in the i-th sub-area through the tower base geological safety assessment value of the i-th sub-area, the line corridor environment composite assessment value of the i-th sub-area, and the structural installation quality assessment value of the i-th sub-area, which is specifically expressed as: , κ i represents the comprehensive evaluation value of the infrastructure project structure in the ith sub-region, and µ1 represents other influencing factors of the comprehensive evaluation value of the infrastructure project structure.

[0019] Preferably, the electrical performance and loss data include the corona loss of the conductor, the equivalent inductance of the line, the voltage drop of the line under full load, and the harmonic distortion rate of the line, which are marked as Cl, Cd, Cv, and Ch, respectively; the magnetic compatibility and interference data include the electromagnetic interference level of the line to the electronic equipment, the power frequency electric field of the line, the magnetic field strength of the line, and the induced voltage of the line to the communication line, which are marked as Mc, Mf, Ms, and Mv, respectively; the safety and lightning protection data include the lightning resistance level of the line, the grounding resistance of the grounding device, the discharge current of the arrester, and the automatic reclosing success rate of the line, which are marked as Pl, Pg, Pd, and Pf, respectively.

[0020] Preferably, the electrical performance and loss data analysis unit is used to establish an electrical performance and loss data analysis model, import the electrical performance and loss data transmitted by the electrical equipment data acquisition module into the electrical performance and loss data analysis model, and calculate the electrical loss and performance evaluation value of each sub-area, which is specifically expressed as: , E.C. i represents the electrical loss and performance evaluation value of the ith sub-region, Cl i represents the corona loss of the conductor in the ith sub-area, Cd i represents the equivalent inductance of the line in the ith sub-area, Cv i represents the voltage drop of the line in the ith sub-area under full load, Ch i represents the harmonic distortion rate of the line in the ith sub-area, Cv max Indicates the maximum voltage drop of the line in the target area when it is fully loaded.

[0021] Preferably, the magnetic compatibility and interference data analysis unit is used to establish a magnetic compatibility and interference data analysis model, import the magnetic compatibility and interference data transmitted by the electrical equipment data acquisition module into the magnetic compatibility and interference data analysis model, and calculate the electromagnetic environment and interference evaluation value of each sub-area, which is specifically expressed as: , E.M. i represents the electromagnetic environment and interference assessment value of the ith sub-area, Mc i Mf represents the electromagnetic interference level of the line in the i-th sub-area to the electronic equipment, irepresents the power frequency electric field of the line in the ith sub-area, Ms i represents the magnetic field strength of the line in the ith sub-area, Mv i Represents the induced voltage of the line in the i-th sub-area on the communication line.

[0022] Preferably, the safety and lightning protection data analysis unit is used to establish a safety and lightning protection data analysis model, import the safety and lightning protection data transmitted by the electrical equipment data acquisition module into the safety and lightning protection data analysis model, and calculate the safety assessment value of each sub-area, which is specifically expressed as: , E.P. i represents the safety assessment value of the i-th sub-area, Pl i Pg represents the lightning resistance level of the line in the ith sub-area, i represents the grounding resistance of the grounding device in the ith sub-area, Pd i represents the discharge current of the arrester in the ith sub-area, Pf i represents the automatic reclosing success rate of the line in the ith sub-area, Pg min Indicates the minimum ground resistance of the grounding device in the target area.

[0023] Preferably, the electrical equipment data analysis module calculates the comprehensive evaluation value of the electrical equipment in the ith sub-area through the electrical loss and performance evaluation value of the ith sub-area, the electromagnetic environment and interference evaluation value of the ith sub-area, and the safety evaluation value of the ith sub-area, which is specifically expressed as: , τ i represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and µ2 represents other influencing factors of the comprehensive evaluation value of electrical equipment.

[0024] Preferably, the comprehensive analysis model is specifically expressed as: , η represents the comprehensive abnormality index of the target area, κ i represents the comprehensive evaluation value of the infrastructure engineering structure in the i-th sub-region, represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and λ represents other influencing factors of the comprehensive abnormality index.

[0025] Preferably, the preset value of the comprehensive abnormality index is marked as η Def , when η Def ≥η, it means that the comprehensive abnormality index of the target area is less than or equal to the preset value of the comprehensive abnormality index, indicating that the quality of the target transmission line infrastructure project is good, then the collection and analysis of the quality data of the target transmission line infrastructure project is maintained. Def When <η, it means that the comprehensive abnormality index of the target area is greater than the preset value of the comprehensive abnormality index, indicating that the quality of the infrastructure project of the target transmission line is poor, and an early warning signal is sent to the management terminal.

[0026] Technical effects and advantages of the present invention:

[0027] The present invention determines the target transmission line infrastructure project area as the target area through the area division module, and divides it into various sub-areas, so that subsequent data collection and analysis can be more accurately located in each sub-area, thereby improving the precision and efficiency of acceptance; the geological and tower foundation stability data, line corridor environmental data and structural installation accuracy data of each sub-area are comprehensively collected through the infrastructure engineering structure data collection module, providing comprehensive data support for subsequent infrastructure engineering structure data analysis; the collected data is analyzed through the infrastructure engineering structure data analysis module, and the tower foundation geological safety assessment value, line corridor environmental composite assessment value and structural installation quality assessment value of each sub-area can be obtained, providing a scientific basis for evaluating the quality of transmission line infrastructure projects; the electrical performance and loss data, electromagnetic compatibility and Interference data, safety and lightning protection data provide a comprehensive data source for electrical equipment data analysis; the electrical equipment data analysis module analyzes the collected electrical equipment data to calculate the electrical loss and performance evaluation values, electromagnetic environment and interference evaluation values, and safety evaluation values ​​of each sub-area, providing data support for evaluating the working status and safety of electrical equipment; a comprehensive analysis model is established through the comprehensive analysis module to comprehensively analyze the results of the infrastructure project structure data analysis and the electrical equipment data analysis, calculate the comprehensive abnormality index of the target area, and provide a decision-making basis for the early warning module; the early warning module establishes a preset comprehensive abnormality index value to judge the comprehensive abnormality index of the target area. Once an abnormality is found, a warning signal can be sent to the management personnel in a timely manner, and measures can be taken in time to solve the problem to ensure the quality and safety of the transmission line infrastructure project. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] refer to Figure 1 The one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence shown includes a regional division module, an infrastructure project structure data acquisition module, an infrastructure project structure data analysis module, an electrical equipment data acquisition module, an electrical equipment data analysis module, a comprehensive analysis module, and an early warning module.

[0031] The area division module is used to determine the target power transmission line infrastructure project area as the target area, divide the target area into various sub-areas by equal area division, and mark them as 1, 2...n in sequence.

[0032] The infrastructure engineering structural data acquisition module is used to collect geological and tower foundation stability data of each sub-area, line corridor environmental data and structural installation accuracy data, and transmit the collected data to the infrastructure engineering structural data analysis module.

[0033] The geological and tower foundation stability data include the soil bearing capacity of the tower base geological exploration, the depth of the groundwater level below the tower base, the soil equal pore pressure ratio, and the slip rate of the geological faults around the tower base, which are marked as Tc, Td, Tp, and Tv respectively. The line corridor environment data include the vegetation coverage rate in the line corridor, the number of obstacles in the line corridor, the safe distance between the line and the nearest building, and the maximum temperature in the line corridor, which are marked as Lv, Lb, Ls, and Le respectively. The structural installation accuracy data include the average coaxiality deviation at the connection of each section of the tower body, the conductor tension, the suspension angle deviation of the insulator string, and the tower body weld defect rate, which are marked as Fc, Fe, Fh, and Fw respectively.

[0034] The infrastructure engineering structural data analysis module includes a geological and tower foundation stability data analysis unit, a line corridor environment data analysis unit and a structural installation accuracy data analysis unit, which are used to analyze the data transmitted by the infrastructure engineering structural data acquisition module and transmit the analysis results to the comprehensive analysis module.

[0035] The geological and tower foundation stability data analysis unit is used to establish a geological and tower foundation stability data analysis model, import the geological and tower foundation stability data transmitted by the infrastructure engineering structure data acquisition module into the geological and tower foundation stability data analysis model, and calculate the tower foundation geological safety assessment value of each sub-area, which is specifically expressed as: ,ST i represents the geological safety assessment value of the tower base in the ith sub-area, Tc i represents the soil bearing capacity of the tower base geological exploration in the ith sub-area, Td i represents the groundwater level depth below the tower foundation in the ith sub-area, Tp i represents the soil equal pore pressure ratio in the ith sub-region, Tv i Tc represents the slip rate of the geological fault around the tower base in the ith sub-area, max It represents the maximum soil bearing capacity of the tower base geological exploration in the target area, Tc min It indicates the minimum soil bearing capacity for tower base geological exploration in the target area.

[0036] The line corridor environment data analysis unit is used to establish a line corridor environment data analysis model, import the line corridor environment data transmitted by the infrastructure engineering structure data acquisition module into the line corridor environment data analysis model, and calculate the line corridor environment composite evaluation value of each sub-area, which is specifically expressed as: , SL i represents the composite evaluation value of the line corridor environment in the ith sub-area, Lv i represents the vegetation coverage rate within the line corridor of the ith sub-area, Lb i Indicates the number of obstacles in the line corridor of the ith sub-area, Ls i Le represents the safe distance between the line in the ith sub-area and the nearest building. i represents the maximum temperature of the line corridor in the ith sub-area, Ls max Indicates the maximum safe distance between the line in the target area and the nearest building.

[0037] The structural installation accuracy data analysis unit is used to establish a structural installation accuracy data analysis model, import the structural installation accuracy data transmitted by the infrastructure engineering structural data acquisition module into the structural installation accuracy data analysis model, and calculate the structural installation quality evaluation value of each sub-area, which is specifically expressed as: , S.F. i represents the structural installation quality assessment value of the ith sub-area, Fc i It represents the average coaxiality deviation of the tower body joints in the ith sub-area, Fe i represents the wire tension in the ith sub-region, Fh i represents the suspension angle deviation of the insulator string in the ith sub-region, Fw i represents the tower weld defect rate in the ith sub-area.

[0038] The infrastructure engineering structure data analysis module calculates the comprehensive evaluation value of the infrastructure engineering structure in the ith sub-region through the tower base geological safety evaluation value of the ith sub-region, the line corridor environment composite evaluation value of the ith sub-region, and the structural installation quality evaluation value of the ith sub-region, which is specifically expressed as: , κ i represents the comprehensive evaluation value of the infrastructure project structure in the ith sub-region, and µ1 represents other influencing factors of the comprehensive evaluation value of the infrastructure project structure.

[0039] The electrical equipment data acquisition module is used to collect electrical performance and loss data, electromagnetic compatibility and interference data, and safety and lightning protection data of each sub-area, and transmit the collected data to the electrical equipment data analysis module.

[0040] The electrical performance and loss data include the corona loss of the conductor, the equivalent inductance of the line, the voltage drop of the line under full load, and the harmonic distortion rate of the line, which are marked as Cl, Cd, Cv, and Ch respectively. The magnetic compatibility and interference data include the electromagnetic interference level of the line to electronic equipment, the power frequency electric field of the line, the magnetic field strength of the line, and the induced voltage of the line to the communication line, which are marked as Mc, Mf, Ms, and Mv respectively. The safety and lightning protection data include the lightning resistance level of the line, the grounding resistance of the grounding device, the discharge current of the lightning arrester, and the automatic reclosing success rate of the line, which are marked as Pl, Pg, Pd, and Pf respectively.

[0041] The electrical equipment data analysis module includes an electrical performance and loss data analysis unit, an electromagnetic compatibility and interference data analysis unit, and a safety and lightning protection data analysis unit, which are used to analyze the data transmitted by the electrical equipment data acquisition module and transmit the analysis results to the comprehensive analysis module.

[0042] The electrical performance and loss data analysis unit is used to establish an electrical performance and loss data analysis model, import the electrical performance and loss data transmitted by the electrical equipment data acquisition module into the electrical performance and loss data analysis model, and calculate the electrical loss and performance evaluation value of each sub-area, which is specifically expressed as: , E.C. i represents the electrical loss and performance evaluation value of the ith sub-region, Cl i represents the corona loss of the conductor in the ith sub-area, Cd i represents the equivalent inductance of the line in the ith sub-area, Cv i represents the voltage drop of the line in the ith sub-area under full load, Ch i represents the harmonic distortion rate of the line in the ith sub-area, Cv max Indicates the maximum voltage drop of the line in the target area when it is fully loaded.

[0043] The magnetic compatibility and interference data analysis unit is used to establish a magnetic compatibility and interference data analysis model, import the magnetic compatibility and interference data transmitted by the electrical equipment data acquisition module into the magnetic compatibility and interference data analysis model, and calculate the electromagnetic environment and interference evaluation value of each sub-area, which is specifically expressed as: , E.M. i represents the electromagnetic environment and interference assessment value of the ith sub-area, Mc i Mf represents the electromagnetic interference level of the line in the i-th sub-area to the electronic equipment, i represents the power frequency electric field of the line in the ith sub-area, Ms i represents the magnetic field strength of the line in the ith sub-area, Mv i Represents the induced voltage of the line in the i-th sub-area on the communication line.

[0044] The safety and lightning protection data analysis unit is used to establish a safety and lightning protection data analysis model, import the safety and lightning protection data transmitted by the electrical equipment data acquisition module into the safety and lightning protection data analysis model, and calculate the safety assessment value of each sub-area, which is specifically expressed as: , E.P. i represents the safety assessment value of the i-th sub-area, Pl i Pg represents the lightning resistance level of the line in the ith sub-area, i represents the grounding resistance of the grounding device in the ith sub-area, Pd i represents the discharge current of the arrester in the ith sub-area, Pf i represents the automatic reclosing success rate of the line in the ith sub-area, Pg min Indicates the minimum ground resistance of the grounding device in the target area.

[0045] The electrical equipment data analysis module calculates the comprehensive evaluation value of electrical equipment in the ith sub-area through the electrical loss and performance evaluation value of the ith sub-area, the electromagnetic environment and interference evaluation value of the ith sub-area, and the safety evaluation value of the ith sub-area, which is specifically expressed as: , τ i represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and µ2 represents other influencing factors of the comprehensive evaluation value of electrical equipment.

[0046] The comprehensive analysis module is used to establish a comprehensive analysis model, import the data transmitted by the infrastructure engineering structure data analysis module and the electrical equipment data analysis module into the comprehensive analysis model, calculate the comprehensive abnormality index of the target area, and transmit it to the early warning module.

[0047] The comprehensive analysis model is specifically expressed as: , η represents the comprehensive abnormality index of the target area, κ i represents the comprehensive evaluation value of the infrastructure engineering structure in the i-th sub-region, represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and λ represents other influencing factors of the comprehensive abnormality index.

[0048] The early warning module is used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target area through the preset value of the comprehensive abnormality index, and issue an early warning signal according to the judgment result.

[0049] The preset value of the comprehensive abnormality index is marked as η Def , when η Def ≥η, it means that the comprehensive abnormality index of the target area is less than or equal to the preset value of the comprehensive abnormality index, indicating that the quality of the target transmission line infrastructure project is good, then the collection and analysis of the quality data of the target transmission line infrastructure project is maintained.Def When <η, it means that the comprehensive abnormality index of the target area is greater than the preset value of the comprehensive abnormality index, indicating that the quality of the infrastructure project of the target transmission line is poor, and an early warning signal is sent to the management terminal.

[0050] The present invention determines the target transmission line infrastructure project area as the target area through the area division module, and divides it into various sub-areas, so that subsequent data collection and analysis can be more accurately located in each sub-area, thereby improving the precision and efficiency of acceptance; the geological and tower foundation stability data, line corridor environmental data and structural installation accuracy data of each sub-area are comprehensively collected through the infrastructure engineering structure data collection module, providing comprehensive data support for subsequent infrastructure engineering structure data analysis; the collected data is analyzed through the infrastructure engineering structure data analysis module, and the tower foundation geological safety assessment value, line corridor environmental composite assessment value and structural installation quality assessment value of each sub-area can be obtained, providing a scientific basis for evaluating the quality of transmission line infrastructure projects; the electrical performance and loss data, electromagnetic compatibility and Interference data, safety and lightning protection data provide a comprehensive data source for electrical equipment data analysis; the electrical equipment data analysis module analyzes the collected electrical equipment data to calculate the electrical loss and performance evaluation values, electromagnetic environment and interference evaluation values, and safety evaluation values ​​of each sub-area, providing data support for evaluating the working status and safety of electrical equipment; a comprehensive analysis model is established through the comprehensive analysis module to comprehensively analyze the results of the infrastructure project structure data analysis and the electrical equipment data analysis, calculate the comprehensive abnormality index of the target area, and provide a decision-making basis for the early warning module; the early warning module establishes a preset comprehensive abnormality index value to judge the comprehensive abnormality index of the target area. Once an abnormality is found, a warning signal can be sent to the management personnel in a timely manner, and measures can be taken in time to solve the problem to ensure the quality and safety of the transmission line infrastructure project.

[0051] In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the case of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0052] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence, characterized in that: include: Area division module: used to determine the target transmission line infrastructure project area as the target area, divide the target area into sub-areas by equal area division, and mark them as 1, 2...n in sequence; Infrastructure engineering structure data acquisition module: used to collect geological and tower foundation stability data of each sub-area, line corridor environmental data and structure installation accuracy data, and transmit the collected data to the infrastructure engineering structure data analysis module; The geological and tower foundation stability data include the soil bearing capacity of the tower foundation geological exploration, the depth of the groundwater level below the tower foundation, the soil equal pore pressure ratio, and the slip rate of the geological fault around the tower foundation, which are marked as Tc, Td, Tp, and Tv respectively. The line corridor environment data include the vegetation coverage rate in the line corridor, the number of obstacles in the line corridor, the safe distance between the line and the nearest building, and the maximum temperature in the line corridor, which are marked as Lv, Lb, Ls, and Le respectively. The structural installation accuracy data include the average coaxiality deviation of the connection between each section of the tower body, the conductor tension, the suspension angle deviation of the insulator string, and the tower body weld defect rate, which are marked as Fc, Fe, Fh, and Fw respectively. Infrastructure engineering structure data analysis module: including geological and tower foundation stability data analysis unit, line corridor environment data analysis unit and structure installation accuracy data analysis unit, used to analyze the data transmitted by the infrastructure engineering structure data acquisition module and transmit the analysis results to the comprehensive analysis module; The geological and tower foundation stability data analysis unit is used to establish a geological and tower foundation stability data analysis model, import the geological and tower foundation stability data transmitted by the infrastructure engineering structure data acquisition module into the geological and tower foundation stability data analysis model, and calculate the tower foundation geological safety assessment value of each sub-area, which is specifically expressed as: ,ST i represents the geological safety assessment value of the tower base in the ith sub-area, Tc i represents the soil bearing capacity of the tower base geological exploration in the ith sub-area, Td i represents the groundwater level depth below the tower foundation in the ith sub-area, Tp i represents the soil equal pore pressure ratio in the ith sub-region, Tv i Tc represents the slip rate of the geological fault around the tower base in the ith sub-area, max It represents the maximum soil bearing capacity of the tower base geological exploration in the target area, Tc min Indicates the minimum soil bearing capacity for tower base geological exploration in the target area; The line corridor environment data analysis unit is used to establish a line corridor environment data analysis model, import the line corridor environment data transmitted by the infrastructure engineering structure data acquisition module into the line corridor environment data analysis model, and calculate the line corridor environment composite evaluation value of each sub-area, which is specifically expressed as: , SL i represents the composite evaluation value of the line corridor environment in the ith sub-area, Lv i represents the vegetation coverage rate in the line corridor of the ith sub-area, Lb i Indicates the number of obstacles in the line corridor of the ith sub-area, Ls i Le represents the safe distance between the line in the ith sub-area and the nearest building. i represents the maximum temperature of the line corridor in the ith sub-area, Ls max Indicates the maximum safe distance between the line in the target area and the nearest building; The structural installation accuracy data analysis unit is used to establish a structural installation accuracy data analysis model, import the structural installation accuracy data transmitted by the infrastructure engineering structural data acquisition module into the structural installation accuracy data analysis model, and calculate the structural installation quality evaluation value of each sub-area, which is specifically expressed as: , SF i represents the structural installation quality assessment value of the ith sub-area, Fc i It represents the average coaxiality deviation of the tower body joints in the ith sub-area, Fe i represents the wire tension in the ith sub-region, Fh i represents the suspension angle deviation of the insulator string in the ith sub-region, Fw i represents the tower weld defect rate in the ith sub-area; The infrastructure engineering structure data analysis module calculates the comprehensive evaluation value of the infrastructure engineering structure in the ith sub-region through the tower base geological safety evaluation value of the ith sub-region, the line corridor environment composite evaluation value of the ith sub-region, and the structural installation quality evaluation value of the ith sub-region, which is specifically expressed as: , κ i represents the comprehensive evaluation value of the infrastructure engineering structure in the ith sub-region, and µ1 represents other influencing factors of the comprehensive evaluation value of the infrastructure engineering structure; Electrical equipment data acquisition module: used to collect electrical performance and loss data, electromagnetic compatibility and interference data, and safety and lightning protection data of each sub-area, and transmit the collected data to the electrical equipment data analysis module; The electrical performance and loss data include the corona loss of the conductor, the equivalent inductance of the line, the voltage drop of the line under full load, and the harmonic distortion rate of the line, which are marked as Cl, Cd, Cv, and Ch, respectively. The magnetic compatibility and interference data include the electromagnetic interference level of the line to the electronic equipment, the power frequency electric field of the line, the magnetic field strength of the line, and the induced voltage of the line to the communication line, which are marked as Mc, Mf, Ms, and Mv, respectively. The safety and lightning protection data include the lightning resistance level of the line, the grounding resistance of the grounding device, the discharge current of the lightning arrester, and the automatic reclosing success rate of the line, which are marked as Pl, Pg, Pd, and Pf, respectively. Electrical equipment data analysis module: including electrical performance and loss data analysis unit, electromagnetic compatibility and interference data analysis unit and safety and lightning protection data analysis unit, used to analyze the data transmitted by the electrical equipment data acquisition module and transmit the analysis results to the comprehensive analysis module; The electrical performance and loss data analysis unit is used to establish an electrical performance and loss data analysis model, import the electrical performance and loss data transmitted by the electrical equipment data acquisition module into the electrical performance and loss data analysis model, and calculate the electrical loss and performance evaluation value of each sub-area, which is specifically expressed as: , E.C. i represents the electrical loss and performance evaluation value of the ith sub-region, Cl i represents the corona loss of the conductor in the ith sub-area, Cd i represents the equivalent inductance of the line in the ith sub-area, Cv i represents the voltage drop of the line in the ith sub-area under full load, Ch i represents the harmonic distortion rate of the line in the ith sub-area, Cv max Indicates the maximum voltage drop of the line in the target area under full load; The magnetic compatibility and interference data analysis unit is used to establish a magnetic compatibility and interference data analysis model, import the magnetic compatibility and interference data transmitted by the electrical equipment data acquisition module into the magnetic compatibility and interference data analysis model, and calculate the electromagnetic environment and interference evaluation value of each sub-area, which is specifically expressed as: , E.M. i represents the electromagnetic environment and interference assessment value of the ith sub-area, Mc i Mf represents the electromagnetic interference level of the line in the i-th sub-area to the electronic equipment, i represents the power frequency electric field of the line in the ith sub-area, Ms i represents the magnetic field strength of the line in the ith sub-area, Mv i represents the induced voltage of the line in the ith sub-area on the communication line; The safety and lightning protection data analysis unit is used to establish a safety and lightning protection data analysis model, import the safety and lightning protection data transmitted by the electrical equipment data acquisition module into the safety and lightning protection data analysis model, and calculate the safety assessment value of each sub-area, which is specifically expressed as: , E.P. i represents the safety assessment value of the i-th sub-area, Pl i Pg represents the lightning resistance level of the line in the ith sub-area, i represents the grounding resistance of the grounding device in the ith sub-area, Pd i represents the discharge current of the arrester in the ith sub-area, Pf i represents the automatic reclosing success rate of the line in the ith sub-area, Pg min Indicates the minimum ground resistance of the grounding device in the target area; The electrical equipment data analysis module calculates the comprehensive evaluation value of electrical equipment in the ith sub-area through the electrical loss and performance evaluation value of the ith sub-area, the electromagnetic environment and interference evaluation value of the ith sub-area, and the safety evaluation value of the ith sub-area, which is specifically expressed as: , τ i represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and µ2 represents other influencing factors of the comprehensive evaluation value of electrical equipment; Comprehensive analysis module: used to establish a comprehensive analysis model, import the data transmitted by the infrastructure engineering structure data analysis module and the electrical equipment data analysis module into the comprehensive analysis model, calculate the comprehensive abnormal index of the target area, and transmit it to the early warning module; Early warning module: used to establish a preset value of the comprehensive abnormality index, judge the comprehensive abnormality index of the target area through the preset value of the comprehensive abnormality index, and issue an early warning signal based on the judgment result.

2. According to claim 1, a one-key acceptance system for power transmission line infrastructure projects based on artificial intelligence is characterized by: The comprehensive analysis model is specifically expressed as: , η represents the comprehensive abnormality index of the target area, κ i represents the comprehensive evaluation value of the infrastructure engineering structure in the i-th sub-region, represents the comprehensive evaluation value of electrical equipment in the ith sub-area, and λ represents other influencing factors of the comprehensive abnormality index.

Citation Information

Patent Citations

  • Health assessment method for 500 kV high-voltage power transmission line in mountain land occurrence environment

    CN104268791A

  • Laser radar-based intelligent early-warning evaluation method and system for power transmission line

    CN105244805A

  • Method for evaluating reliability of 750kV iron tower in gobi environment in perennial wind area

    CN113792956A

  • Industrial enterprise electrical intelligent management system and method based on artificial intelligence

    CN117811219A

  • Fault intelligent monitoring and control system of electric power communication line

    CN118249518A