Power transmission and transformation project construction safety risk analysis and supervision system
By applying three-dimensional simulation and artificial intelligence technology to the construction safety risk analysis and supervision system at the construction site of power transmission and transformation projects, problems in the existing technology such as construction safety distance verification and ground wire erection have been solved, achieving a more efficient and more efficient Safe construction management.
Patent Information
- Application Number
- CN202410779698.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-18
AI Technical Summary
In the construction of power transmission and transformation projects, the in-depth application of three-dimensional design results is insufficient, especially in on-site construction operations such as safety distance verification of auxiliary power transformation projects, safety distance verification of transmission line projects, and ground wire erection, which results in high inspection costs. Moreover, the accuracy cannot be guaranteed, which affects the safety and efficiency of the project.
A safety risk analysis and supervision system for power transmission and transformation project construction is designed, including a central processor, A/D conversion module, data monitoring module, three-dimensional visualization module, risk warning assessment module and decision support module. Through three-dimensional simulation technology and artificial intelligence and other means to realize the simulation and optimization of safety distance verification, construction plan optimization and ground conductor erection process at the construction site.
This system can effectively improve the safety and quality of construction sites, reduce safety hazards, realize safe distance verification for live work and transmission line construction, optimize construction plans, reduce construction cycles and costs, and improve the visual management capabilities of construction sites.
Smart Images

Figure CN118798636A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of unmanned remote intelligent control, and in particular to a safety risk analysis and supervision system for power transmission and transformation project construction. Background Art
[0002] In the era of "digital economy", the energy and power industry urgently needs to use digital transformation to upgrade the physical power grid to the digital power grid. As the core method of digital transformation of the power grid, the digital twin power grid will play a strong supporting role in power grid planning, construction, operation and other links as the Internet of Things, big data, artificial intelligence and other technologies become more mature. In order to deepen the twin application of the three-dimensional design results of power transmission and transformation projects in the field of infrastructure, focusing on the key technology system of the new digital smart grid, further explore the beneficial exploration of the digital construction site and the panoramic real-time dynamic two-way interactive technology of the construction site during the engineering construction stage, so as to realize the observable, measurable, knowable and controllable panoramic information and real-time status of the construction site.
[0003] With the continuous development and intelligent progress of power systems, the construction, management and maintenance of substations have become increasingly complex. In order to improve the operating efficiency and visual management capabilities of substations, more and more substations have begun to adopt GIM standards for 3D modeling. The use of GIM standard modeling has become a development trend in the construction of power transmission and transformation projects. In the 3D design process, the modeling depth, modeling method, model level, attribute detail, export configuration, etc. may affect the quality of GIM results. The cost of manual inspection is high and the inspection accuracy cannot be guaranteed. The 3D design results can effectively help the project safety risk verification, discover potential problems and solve them in time. At the same time, the visualized 3D scene is conducive to solving the key and difficult points in construction and optimizing the site layout.
[0004] At present, the in-depth application of 3D design results in the construction of power transmission and transformation projects needs to be strengthened, especially in the field construction operations such as safety distance verification of auxiliary power transformation projects, safety distance verification of power transmission line projects, and ground wire installation. Safety distance verification of construction operations and optimized site layout are important guarantees for high-quality and efficient construction of projects, and play a vital role in the smooth progress of projects. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the shortcomings of the prior art, the present invention provides a power transmission and transformation project construction safety risk analysis and supervision system, which has the advantages of being able to handle and optimize on-site construction operations such as safety distance verification of auxiliary substation projects, safety distance verification of transmission line projects, and installation of ground wires, thereby solving the problems raised in the above-mentioned background technology.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a power transmission and transformation project construction safety risk analysis and supervision system, comprising a risk analysis and supervision system, the risk analysis and supervision system comprising a central processing unit, the input end of the central processing unit is electrically connected to the output end of an A / D conversion module, the input end of the A / D conversion module is electrically connected to the output end of a data monitoring module, the output end of the central processing module is electrically connected to the input end of a three-dimensional visualization module, the output end of the central processing unit is electrically connected to the input end of a data management and analysis module, the central processing unit is electrically connected to the input end of a risk warning and assessment module, the output end of the three-dimensional visualization module is electrically connected to the input end of a risk warning and assessment module, the input end of the risk assessment module is electrically connected to the output end of a cloud data module, the output end of the central processing unit is electrically connected to the input end of a decision support module, the output end of the central processing unit is electrically connected to the input end of a data management and analysis module, the output end of the data management and analysis module is electrically connected to the input end of the central processing unit, the output end of the decision support module is electrically connected to a communication module, and the output end of the communication module is connected to a user-end signal.
[0009] Preferably, the data monitoring module includes a monitoring unit and a sensing unit.
[0010] Preferably, the three-dimensional visualization module includes a BIM unit and a three-dimensional GIS unit.
[0011] Preferably, the data analysis management module includes a digital management unit, a data analysis unit and a data visualization display unit.
[0012] Preferably, the risk warning assessment module includes a live working verification module, a live construction verification module, an all-terrain optimization module and a ground wire installation simulation module.
[0013] Preferably, the decision support module includes a plan formulation unit and a construction plan optimization unit.
[0014] Preferably, the live working verification module includes a three-dimensional safety clearance verification unit and an operating safety distance verification unit.
[0015] Preferably, the live construction verification module includes a construction scheme planning simulation unit and a construction scheme optimization design unit.
[0016] Preferably, the all-terrain optimization module includes a terrain information data processing unit and a cableway optimization layout unit.
[0017] Preferably, the ground wire installation simulation module includes a construction process simulation unit and a three-dimensional scene layout optimization unit.
[0018] (III) Beneficial effects
[0019] Compared with the prior art, the present invention provides a power transmission and transformation project construction safety risk analysis and supervision system, which has the following beneficial effects:
[0020] The power transmission and transformation project construction safety risk analysis and supervision system can realize the functions of checking the safe distance of live operations in key links in the three-dimensional scene of the transformation project, checking the safe distance of live construction near the transmission line, realizing the all-terrain optimization design of cableway layout, and realizing the simulation of the ground wire installation process. It can solve the key and difficult problems in the construction, improve the quality of the construction site, reduce the safety hazards of the construction site, and play a positive role in creating a refined and standardized construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The overall system diagram of the power transmission and transformation project construction safety risk analysis and supervision system provided for this application;
[0022] Figure 2 Schematic diagram of the live work verification module of the power transmission and transformation project construction safety risk analysis and supervision system provided for this application;
[0023] Figure 3 Schematic diagram of live construction verification module of the power transmission and transformation project construction safety risk analysis and supervision system provided for this application;
[0024] Figure 4 Schematic diagram of the all-terrain optimization module of the power transmission and transformation project construction safety risk analysis and supervision system provided for this application;
[0025] Figure 5 Schematic diagram of the ground wire installation simulation module of the power transmission and transformation project construction safety risk analysis and supervision system provided for this application. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1 - Figure 5The present invention provides a technical solution: a power transmission and transformation engineering construction safety risk analysis and supervision system, including a risk analysis and supervision system, the risk analysis and supervision system including a central processing unit, the input end of the central processing unit is electrically connected to the output end of an A / D conversion module, the input end of the A / D conversion module is electrically connected to the output end of a data monitoring module, the output end of the central processing module is electrically connected to the input end of a three-dimensional visualization module, the output end of the central processing unit is electrically connected to the input end of a data management and analysis module, the central processing unit is electrically connected to the input end of a risk warning and assessment module, the output end of the three-dimensional visualization module is electrically connected to the input end of a risk warning and assessment module, the input end of the risk assessment module is electrically connected to the output end of a cloud data module, the output end of the central processing unit is electrically connected to the input end of a decision support module, the output end of the central processing unit is electrically connected to the input end of a data management and analysis module, the output end of the data management and analysis module is electrically connected to the input end of the central processing unit, the output end of the decision support module is electrically connected to a communication module, and the output end of the communication module is connected to a user-end signal.
[0028] The data monitoring module includes a monitoring unit and a sensing unit.
[0029] The three-dimensional visualization module includes a BIM unit and a three-dimensional GIS unit.
[0030] The data analysis management module includes a digital management unit, a data analysis unit and a data visualization display unit.
[0031] The risk warning and assessment module includes a live working verification module, a live construction verification module, an all-terrain optimization module and a ground wire installation simulation module.
[0032] The decision support module includes a plan making unit and a construction plan optimization unit.
[0033] The live working verification module includes a three-dimensional safety clearance verification unit and an operation safety distance verification unit. The live working verification module is used to verify the live working safety distance of key links of the substation project.
[0034] Using visualization technology and 3D simulation technology, dynamic simulation of the installation process of the main equipment of the substation is realized, and the digital deduction of the construction process and process of the main equipment installation is realized. The safety verification work is carried out using 3D space distance measurement and other technologies to identify risks, and the power outage construction plan is determined according to the process simulation estimate. Finally, the overall optimization of the construction process and process of the main equipment installation is realized, the safety and quality of the construction work are improved, and the construction period and cost waste are reduced;
[0035] The electrical distance is verified according to the equipment size and live parts, equipment layout and connection wires, and different types of three-dimensional safety clearances such as live points, live wires and live bodies are automatically marked in the three-dimensional model. At the same time, a safety static distance editing page is provided to support dynamic adjustment of the safety static distance according to the specific construction process and machinery usage during construction plan design;
[0036] Construct a safety mechanical skeleton model of the main equipment of the substation, and simulate the approach trajectory of mechanical equipment in different environments, construction operation simulation, and safety distance verification with adjacent live equipment and facilities in a three-dimensional simulation environment. According to the actual situation of environmental factors and based on safe operation considerations, intelligent risk identification and automatic reminders are realized in the mechanized construction process of the substation. When mechanical equipment operation does not meet the specifications and the machinery collides with the surrounding during the construction simulation, the system promptly predicts the safety risk points and gives warnings; based on the risk point situation, the power outage scope of live construction is given, the power outage transformation time is estimated, and the power outage transformation plan of the substation is realized in the optimization design stage. The simulation system is used to realize the process preview of the mechanized construction process of the substation, so as to prevent risks, assist decision-making, and reduce safety accidents during construction.
[0037] The live construction verification module includes a construction scheme planning simulation unit and a construction scheme optimization design unit. The live construction verification module is used to verify the safety distance of live construction near the transmission line;
[0038] Using 3D simulation technology to carry out construction plan simulation can reduce the impact of construction on the operating lines. By building a local construction simulation scene of the line, using spatial analysis technology to determine whether power outage construction is needed, optimizing the power outage construction plan, and minimizing the frequency and duration of power outage construction;
[0039] The specific implementation steps are as follows:
[0040] (1) Based on the 3D design results, carry out safety distance marking of the tower near the live body and determine the construction risk level
[0041] The objects for identifying live bodies include the main body of the proposed transmission line project and the scope of the project channel. Live bodies can be identified based on the three-dimensional design results by reading the attributes of each part of the model. First, load and parse the three-dimensional design model results of the adjacent lines, and decompose the live parts according to the model objects, including cables, hardware and accessories. By extracting live parts from the digital model, the system's intelligent recognition and automatic identification functions are realized, providing data basis for the safety distance verification of live bodies.
[0042] After completing the identification of charged objects in adjacent spaces, it is necessary to automatically mark the safety distance and determine the risk level according to relevant regulations and specifications.
[0043] Based on the identification of charged bodies in the project and combined with the regulations on safe distances for charged bodies during construction operations, the boundaries of safe operations are marked on the surface of the charged body model in the three-dimensional scene.
[0044] The LEC safety risk assessment is used to determine the risk level of the construction of adjacent live pole towers. The LEC method is a semi-quantitative safety assessment method for hazardous sources in potentially dangerous working environments. This method uses the product of three indicators related to the system risk rate to evaluate the risk of casualties in the system. The three aspects are: L is the possibility of an accident; E is the frequency of human exposure to this dangerous environment; C is the loss consequences that will be caused if an accident occurs.
[0045] Risk value D = L × E × C. The larger the D value, the more dangerous the system is, and it is necessary to increase safety measures, change the possibility of accidents, reduce the frequency of human exposure to dangerous environments, or reduce accident losses until it is adjusted to the allowable range.
[0046] It is worth noting that the classification of hazard levels by the LEC risk assessment method is based on experience to a certain extent. Its limitations need to be considered when applying it and it should be modified according to actual conditions.
[0047] The calculation process of risk value is as follows:
[0048] The probability of an accident risk or risk time occurring (L):
[0049] Fractional value Likelihood of Occurrence 10 Very likely 6 More likely 3 Possibility not often 1 Low probability, totally unexpected 0.5 Almost impossible, but conceivable 0.2 Very unlikely 0.1 Impossible
[0050] Frequency of risk events (E):
[0051] Fractional value Frequency of risk events 10 continuous 6 Daily working hours 3 Once a week 2 Monthly 1 Several times a year 0.5 rare
[0052] Consequences of risk events (C):
[0053]
[0054]
[0055] Relationship table between risk value D and risk level:
[0056]
[0057] The above-mentioned risk rating method is used to implement risk rating of the construction work of assembling pole towers near live bodies from construction preparation, pole tower transportation, and assembly process.
[0058] (2) Based on information such as tower type and tonnage, a reasonable calculation of the power outage period is formed
[0059] Based on the results of the three-dimensional design of the project, the information on the model, type, tonnage and other information of the target tower is extracted, and the basic planning of the tower assembly is formed in combination with the topography and geology of the construction site. It includes site planning, tower material transportation, assembly plan, etc. Then, based on the collected data, the construction time, safety measures, personnel, machinery and auxiliary facilities of the tower are analyzed. Then, based on the analysis results, a detailed construction plan is formulated, including the tasks, time nodes, personnel and equipment requirements of each stage.
[0060] After completing the above construction plan, you can arrange a reasonable power outage time according to the construction plan and actual conditions to ensure smooth construction. Of course, when formulating a power outage plan, you need to consider external factors, such as weather, traffic conditions, and the impact of other projects. Finally, when forming the calculation results, you need to pay attention to other related matters, such as coordinating with other units and handling relevant procedures. In the process of formulating the plan, continuously optimize and improve the plan to adapt to various changes and needs.
[0061] (3) Based on the matching relationship between foundation and construction machinery, intelligently identify the safe distance and construction risk level of construction work in the case of offline tower erection
[0062] In the case of offline tower erection, the planning and design of the tower foundation form, foundation construction plan, foundation construction materials + equipment entry, foundation construction technology and method, and the realization of a series of processes, and matching the necessary space range required for the foundation construction machinery operation can form the minimum space range for construction operations. New technologies such as artificial intelligence and big data are used to intelligently check the safe distance from the working space to the live body and evaluate the risk level of the construction process.
[0063] After the engineering foundation design and construction planning parties have determined a complete set of foundation forms and construction plans, they will combine the on-site construction conditions to prepare the construction entry plan, construction site layout, construction machinery operation plan, etc. During the entire process of foundation construction, the intelligent space recording and merging processing technology is used to form a spatial area envelope for offline operations in a three-dimensional environment. Combined with the safe operating range formed in this section (1), the intelligent space measurement technology is applied to obtain the distance between the envelope space and the charged body.
[0064] (4) Based on the tower assembly process, clarify the power outage threshold for live work near the line
[0065] Similar to the process in (3), according to the on-site construction conditions, the tower assembly plan and assembly process simulation are compiled, and the spatial area envelope of the entire tower assembly process is formed in the three-dimensional scene through intelligent spatial record merging and processing technology. The distance between the envelope space and the live body is obtained by applying intelligent spatial measurement technology. Under the existing construction technology conditions, the optimal distance value is finally obtained by continuously optimizing the tower assembly process. Referring to the specified value of the minimum safe distance between mechanical equipment and overhead lines, the power outage threshold for live operations near the line is clarified.
[0066] The all-terrain optimization module includes a terrain information data processing unit and a cableway optimization layout unit, and the all-terrain optimization module is used for all-terrain optimization design of cableway layout;
[0067] The cableway design based on 3D design technology has the advantages of intuitiveness, accuracy, efficiency, visualization and predictability. It can greatly improve the efficiency and accuracy of cableway design and provide better technical support and guarantee for cableway projects.
[0068] The ground wire erection simulation module includes a construction process simulation unit and a three-dimensional scene layout optimization unit, and the ground wire erection simulation module is used to simulate the ground wire erection process;
[0069] With the help of 3D visual design and the advantages of multiple scheme simulation and comparison, scientific construction planning and process simulation can be achieved in the early stage of construction, effectively reducing the construction risk level, planning and configuring suitable tools, and ensuring the safe and smooth progress of support and wiring construction.
[0070] The relevant modules involved in this system are all hardware system modules or functional modules that combine computer software programs or protocols with hardware in the prior art. The computer software programs or protocols involved in the functional modules are themselves technologies that are well known to those skilled in the art and are not improvements of this system. The improvements of this system are the interaction or connection relationships between the modules, that is, improvements to the overall structure of the system to solve the corresponding technical problems to be solved by this system.
[0071] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A power transmission and transformation project construction safety risk analysis and supervision system, including a risk analysis and supervision system, characterized in that: The risk analysis and supervision system includes a central processing unit, an input end of the central processing unit is electrically connected to an output end of an A / D conversion module, an input end of the A / D conversion module is electrically connected to an output end of a data monitoring module, an output end of the central processing module is electrically connected to an input end of a three-dimensional visualization module, an output end of the central processing unit is electrically connected to an input end of a data management and analysis module, the central processing unit is electrically connected to an input end of a risk warning and assessment module, an output end of the three-dimensional visualization module is electrically connected to an input end of a risk warning and assessment module, an input end of the risk assessment module is electrically connected to an output end of a cloud data module, an output end of the central processing unit is electrically connected to an input end of a decision support module, an output end of the central processing unit is electrically connected to an input end of a data management and analysis module, an output end of the data management and analysis module is electrically connected to an input end of the central processing unit, an output end of the decision support module is electrically connected to a communication module, and an output end of the communication module is connected to a user-end signal.
2. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 1, characterized in that: The data monitoring module includes a monitoring unit and a sensing unit.
3. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 1, characterized in that: The three-dimensional visualization module includes a BIM unit and a three-dimensional GIS unit.
4. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 1, characterized in that: The data analysis management module includes a digital management unit, a data analysis unit and a data visualization display unit.
5. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 1, characterized in that: The risk warning and assessment module includes a live working verification module, a live construction verification module, an all-terrain optimization module and a ground wire installation simulation module.
6. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 1, characterized in that: The decision support module includes a plan making unit and a construction plan optimization unit.
7. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 5, characterized in that: The live working verification module includes a three-dimensional safety clearance verification unit and an operating safety distance verification unit.
8. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 5, characterized in that: The live construction verification module includes a construction scheme planning simulation unit and a construction scheme optimization design unit.
9. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 5, characterized in that: The all-terrain optimization module includes a terrain information data processing unit and a cableway optimization layout unit.
10. A power transmission and transformation project construction safety risk analysis and supervision system according to claim 5, characterized in that: The ground wire erection simulation module includes a construction process simulation unit and a three-dimensional scene layout optimization unit.