Server product life cycle management method and device, equipment and medium
By monitoring and managing engineering change activities in the server product life cycle management platform, the problem of poor connection between operation and maintenance and engineering change activities is solved, improving the service quality of server products and the accuracy and timeliness of problem solving, and reducing labor costs. Participate in the waste of resources.
Patent Information
- Application Number
- CN202410865477.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-18
AI Technical Summary
There is poor process connection between operation and maintenance and engineering change activities within the server product life cycle, resulting in inaccurate impact between operation and maintenance BOM and production BOM, resulting in insufficient accuracy and timeliness of engineering changes, and insufficient reliability in solving operation and maintenance problems. and low efficiency.
By monitoring engineering change activities in the server product life cycle management platform, we obtain the production BOM, determine the impact of the change problem, issue engineering change tasks to the corresponding nodes, and synchronize information to update the operation and maintenance BOM to ensure engineering changes and operation and maintenance. Accuracy and timeliness of activities.
It improves the service quality of server products, improves the accuracy of engineering change activities and the reliability and timeliness of operation and maintenance problem solving, and reduces execution leakage and resource waste caused by human participation.
Smart Images

Figure CN118798729A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a server product lifecycle management method, device, equipment and medium. Background Art
[0002] During the life cycle of a server product, it will go through activities such as development, production, change, and operation and maintenance to maintain its stable operation. This means that various activities during the life cycle will have an impact on the stable operation of the server product during its life cycle, especially when engineering change (EC) activities and operation and maintenance activities occur.
[0003] However, currently, in the life cycle of server products, various activities have the following problems: 1. The current operation and maintenance activities are relatively independent of other activities, especially change activities, and have an impact on the server product BOM, making the operation and maintenance BOM (Bill Of Material) different from the production BOM. In addition, the change activity mainly focuses on the execution of its R&D demand changes on the production side. Since its execution on the client side cannot confirm whether the screened production BOM has operation and maintenance activities, it is necessary to pull the operation and maintenance personnel offline to screen the production BOM again to determine whether an operation and maintenance activity has occurred. Finally, after screening out the scope of the operation and maintenance BOM that needs to be introduced into the engineering change, it is determined how to introduce the engineering change activity. The above method lacks accurate consideration of the impact of the operation and maintenance activities on the hardware and software engineering changes caused by the production BOM, which makes the scope of the production BOM and operation and maintenance BOM that need to be introduced into the engineering change activity inaccurate, resulting in a lack of accuracy in the accuracy of the engineering change, resulting in unnecessary waste of manpower and other resources. 2. Compared with operation and maintenance activities, current engineering change activities are one-off and short-term. Moreover, when operation and maintenance activities encounter problems that have been solved in engineering change activities, there is a lack of timely acquisition of engineering change activity information, especially problems and solutions. As a result, operation and maintenance personnel need to contact relevant persons in charge one by one to confirm and solve operation and maintenance problems, which leads to poor timeliness of operation and maintenance. In addition, problem-solving measures lack multi-dimensional considerations such as execution quality, procureability, and producibility in engineering change activities, resulting in a lack of reliability in solving operation and maintenance problems. 3. Production, engineering changes, operation and maintenance activities in the life cycle of server products are interrelated, especially the impact of engineering change activities and operation and maintenance activities on the BOM of server products. However, the processes of various activities in the current server product life cycle have poor connectivity, which seriously restricts the quality of server products. Summary of the invention
[0004] In view of this, the purpose of this application is to provide a server product lifecycle management method, device, equipment and medium, which can solve the problem of poor connectivity in the processes of various activities in the lifecycle, improve the service quality of server products, and improve the accuracy of engineering change activities and their subsequent activities and the reliability and timeliness of solving operation and maintenance problems, and reduce execution omissions caused by human participation. The specific scheme is as follows:
[0005] In a first aspect, the present application discloses a server product lifecycle management method, which is applied to a server product lifecycle management platform, including:
[0006] When an engineering change activity is detected, the production BOM of the current target server product is obtained, and the components that have undergone engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues;
[0007] Determine the problem impact degree corresponding to the target change problem to obtain the target impact degree;
[0008] Determine a target engineering change node according to the target impact degree, and issue an engineering change task for the target component to the target engineering change node;
[0009] After receiving the review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are screened from the production BOM according to the model number of the target server product and the component number of the target component, to obtain a machine PN information list;
[0010] The operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product.
[0011] Optionally, determining the problem impact degree corresponding to the target change problem to obtain the target impact degree includes:
[0012] The impact degree of the problem corresponding to the target change problem is determined according to the preset grading rules to obtain the target impact degree; the grading rules are rules formulated based on the impact degree and probability of occurrence of historical engineering change problems and corresponding abnormal phenomena on the performance of server products.
[0013] Optionally, determining a target engineering change node according to the target impact degree, and issuing an engineering change task for the target component to the target engineering change node includes:
[0014] Respectively obtain the engineering change tasks to be executed at each current engineering change node, and obtain the change tasks to be executed at each engineering change node;
[0015] Determine the impact degree of the engineering change problem corresponding to the pending change task of each engineering change node according to the level classification rule, and obtain the impact degree of the problem corresponding to each pending change task;
[0016] Counting the number of tasks whose priority of the problem impact degree in the change tasks to be executed at each engineering change node is higher than or equal to the engineering change task priority of the target component, respectively, to obtain the number of tasks corresponding to each engineering change node;
[0017] Calculate the execution time of the tasks whose priority of the problem impact degree is higher than or equal to the priority of the engineering change task of the target component among the change tasks to be executed at each engineering change node in order of the number of tasks from small to large;
[0018] A minimum value is determined from the execution times corresponding to the engineering change nodes, and an engineering change task for the target component is issued to the engineering change node corresponding to the minimum value.
[0019] Optionally, the structures of the production BOM and the operation and maintenance BOM consist of a model level, a machine level, and a specification level; the structure of the product BOM consists of a model level, a machine level, a specification level, an alternative level, and a component level; and the attributes of the production BOM, the operation and maintenance BOM, and the product BOM include any multiple of the level number attribute of the corresponding level, the level PN attribute, the installed software attribute, the quantity attribute, the error code attribute, the engineering change problem attribute, the engineering change phenomenon attribute, the solution attribute corresponding to the engineering change problem, and the customer confidentiality attribute.
[0020] Optionally, synchronizing the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product includes:
[0021] When the attribute option corresponding to the customer confidentiality attribute is a non-confidential option, information synchronization is performed on the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0022] Optionally, synchronizing the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product includes:
[0023] When the attribute option corresponding to the client confidentiality attribute is a hierarchical processing option, determining whether the target impact degree is higher than a preset impact degree;
[0024] If the target impact level is higher than the preset impact level, the attribute information corresponding to the production BOM is imported to solve the target engineering change problem, and the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product;
[0025] If the target impact level is not higher than the preset impact level, a prompt message is generated asking whether to import the data;
[0026] After receiving the import response to the prompt information, import the attribute information corresponding to the production BOM to solve the target engineering change problem, and synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0027] Optionally, the server product lifecycle management method further includes:
[0028] If no review approval response for the engineering change task is received from the target engineering change node within the preset time, the engineering change task for the target component is issued to the engineering change node of the upper-level impact level corresponding to the target impact level, so that the engineering change task of the target component is reviewed through the engineering change node of the upper-level impact level.
[0029] In a second aspect, the present application discloses a server product lifecycle management device, which is applied to a server product lifecycle management platform, including:
[0030] The acquisition module is used to obtain the production BOM of the current target server product when an engineering change activity is detected;
[0031] A first determination module is used to determine the components that have undergone engineering changes and the corresponding engineering change issues from the production BOM, and obtain the target components and the corresponding target change issues;
[0032] The second determination module is used to determine the problem impact degree corresponding to the target change problem to obtain the target impact degree;
[0033] A third determination module is used to determine a target engineering change node according to the target impact degree;
[0034] A task issuing module, used for issuing the engineering change task for the target component to the target engineering change node;
[0035] A screening module, configured to, upon receiving a review pass response for the engineering change task returned by the target engineering change node, screen the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number from the production BOM according to the model number of the target server product and the component number of the target component, to obtain a machine PN information list;
[0036] The information synchronization module is used to synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0037] In a third aspect, the present application discloses an electronic device, comprising a processor and a memory; wherein the processor implements the aforementioned server product lifecycle management method when executing a computer program stored in the memory.
[0038] In a fourth aspect, the present application discloses a computer-readable storage medium for storing a computer program; wherein, when the computer program is executed by a processor, the aforementioned server product lifecycle management method is implemented.
[0039] It can be seen that the present application is applied to a server product lifecycle management platform. When an engineering change activity is monitored, the production BOM of the current target server product is first obtained, and the components where the engineering change occurs and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues. Then, the problem impact degree corresponding to the target change issue is determined to obtain the target impact degree. Then, the target engineering change node is determined according to the target impact degree, and an engineering change task for the target component is issued to the target engineering change node. After receiving a review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are screened from the production BOM according to the model number of the target server product and the component number of the target component to obtain a machine PN information list. Then, the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product. This application manages the entire life cycle of server products through a pre-created server product life cycle management platform. When an engineering change activity is monitored, the production BOM of the current server product is first obtained, and the components and corresponding engineering change issues that have undergone engineering changes are determined therefrom. The impact of the problem corresponding to the change issue is then determined. The target engineering change node is determined based on the impact, and the engineering change task is assigned to the target engineering change node. After receiving the review approval response, the corresponding target machine number and target machine PN are screened from the production BOM based on the model number and part number of the server product to obtain a machine PN information list. Finally, the current operation and maintenance BOM is checked based on the machine PN information list. Information is synchronized to obtain the product BOM of the server product. It can be seen that this application can uniformly manage the engineering change activities and operation and maintenance activities within the life cycle of the server product through the server product life cycle management platform, thereby solving the problem of poor connectivity in the processes of various activities within the life cycle and improving the service quality of the server product. At the same time, by establishing the correlation between operation and maintenance activities and engineering change activities, the accuracy of engineering change activities and their subsequent activities and the reliability and timeliness of solving operation and maintenance problems are improved. In addition, the entire life cycle management process involves less human participation, thereby improving the timeliness and accuracy of operation and maintenance activities and engineering change activities, and reducing execution omissions caused by human participation, as well as labor costs and time costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0041] Figure 1 A flow chart of a server product lifecycle management method disclosed in this application;
[0042] Figure 2 A schematic diagram of the BOM conversion relationship of a specific server product disclosed in this application;
[0043] Figure 3 A schematic diagram of the BOM structure of a specific server product developed in this application;
[0044] Figure 4 A schematic diagram of the development BOM of a specific server product disclosed in this application;
[0045] Figure 5 A schematic diagram of the production BOM of a specific server product disclosed in this application;
[0046] Figure 6 A schematic diagram of the production BOM of a specific server product disclosed in this application;
[0047] Figure 7 A schematic diagram of the production BOM of a specific server product disclosed in this application;
[0048] Figure 8 This is a schematic diagram of the operation and maintenance BOM of a specific server product disclosed in this application;
[0049] Fig. 9 A schematic diagram of engineering change screening results for a specific server product disclosed in this application;
[0050] Fig.10 A flow chart of a specific server product lifecycle management method disclosed in this application;
[0051] Fig.11 This is a schematic diagram of the structure of a server product lifecycle management device disclosed in this application;
[0052] Fig.12 This is a structural diagram of an electronic device disclosed in this application. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0054] The present application embodiment discloses a server product lifecycle management method, which is applied to a server product lifecycle management platform. Figure 1 As shown, the method includes:
[0055] Step S11: when an engineering change activity is detected, the production BOM of the current target server product is obtained, and the components with engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues.
[0056] It should be pointed out that the server product lifecycle management solution proposed in this application is applied to the server product lifecycle management platform. When the platform detects an engineering change activity, it first obtains the production BOM of the target server product to be currently managed for the lifecycle, and then determines the components that have undergone engineering changes and the corresponding engineering change issues from the production BOM, and obtains the corresponding target components and the corresponding target change issues; wherein the components include but are not limited to memory, CPU (central processing unit), GPU (graphics processing unit), motherboard and backplane, etc.; the engineering change issues include but are not limited to Open Error, Run Error, etc. It can be understood that the solutions to software engineering change issues with the same error code are the same.
[0057] Understandably, see Figure 2As shown in the figure, there is a conversion relationship between the development BOM, operation and maintenance BOM and production BOM of server products; among them, the production BOM and operation and maintenance BOM are the direct sources of the product BOM of server products. The development BOM can be transformed into the production BOM through internal sales, production, engineering change and other activities, and will also have an indirect impact on the product BOM of server products. At the same time, production activities, operation and maintenance activities, and engineering change activities will also have an impact on the product BOM of server products. The latest product BOM of server products is also a consideration for operation and maintenance activities and engineering change activities. Therefore, the product BOM of server products will also have an impact on operation and maintenance activities and engineering change activities, that is, the two are mutually influential. Specifically, the development BOM can be transformed into the production BOM through production activities, and the production BOM can also be transformed into the operation and maintenance BOM under the influence of operation and maintenance activities. Further, when encountering problems and requiring engineering change activities, the latest operation and maintenance BOM can be combined with the development BOM to affect the subsequent production BOM and operation and maintenance BOM, and the updated production BOM and operation and maintenance BOM can be obtained.
[0058] In addition, it should be pointed out that, compared with the traditional production BOM, operation and maintenance BOM and product BOM, the present application sets up the structure of each BOM, wherein the structure of the production BOM and operation and maintenance BOM consists of a model level, a machine level and a specification level, and the structure of the product BOM consists of a model level, a machine level, a specification level, a replacement level and a component level, and the attributes of the production BOM, operation and maintenance BOM and product BOM specifically include any multiple of the corresponding level's level number attribute, level PN (Part Number, part number, component number or material number) attribute, installed software attribute, quantity attribute, error code attribute, engineering change problem attribute, engineering change phenomenon attribute, engineering change problem corresponding solution attribute and customer confidentiality attribute. For details, see Figure 3 As shown, the product BOM specifically includes five levels: model level, machine level, specification level, alternative level and component level. The priority of each level is: model level > machine level > specification level > alternative level > component level; among them, the model level, machine level and specification level correspond to sales activities; the specification level, alternative level and component level correspond to production activities. In addition, there can be multiple specification levels under the machine level to meet different configuration requirements of the same machine; there can be multiple alternative levels under the specification level to meet production-related procurement and delivery requirements; there can be multiple components under the alternative level, and the content in the alternative level can be empty. For details, see Figure 4 As shown, Figure 4 The following figure shows the development BOM of a server product of model 001. After sales and production activities, the development BOM can be changed to the following: Figure 5 , Figure 6 , Figure 7 The production BOM of the three server products of model 001 shown in the figure is as follows: Figure 6 After the production BOM in the system was replaced with motherboard 04 due to a problem (BIOS Run Error), Figure 6 The production BOM can be changed to Figure 8 The model shown is an operation and maintenance BOM of the server product 001. In this case, the product BOM of the server product corresponding to machine JQ0200002002 is Figure 8 The content shown.
[0059] In addition, the attributes of each BOM specifically include any multiple of the corresponding layer's layer number attribute, layer PN attribute, installed software attribute, quantity attribute, error code attribute, engineering change problem attribute, engineering change phenomenon attribute, corresponding solution attribute of engineering change problem, and customer confidentiality attribute. In a specific implementation, the attributes of the product BOM include the layer number attribute, layer PN attribute, installed software attribute, quantity attribute, error code attribute, engineering change problem attribute, engineering change phenomenon attribute, corresponding solution attribute of engineering change problem, and customer confidentiality attribute of the five layers of model layer, machine layer, specification layer, component layer, and replacement layer; wherein the customer confidentiality attribute may correspond to three options of confidentiality, non-confidentiality, and graded processing, and before performing server product lifecycle management, the customer may select and modify the corresponding option at any time according to needs. When the confidentiality option is selected, the relevant information of the engineering change activity will not interact with the machines of the corresponding model, that is, the BOM information will not be synchronized; when the non-confidentiality option is selected, the relevant information of the engineering change activity will interact with the machines of the corresponding model in real time, that is, the BOM information will be synchronized; when the hierarchical processing option is selected, information synchronization, task node dispatch or information non-processing can be performed at different levels according to the impact of the problems in the engineering change activity.
[0060] In a specific implementation, the attributes of the production BOM specifically include the layer number attributes of the model level, machine level, and component level, the layer PN attributes, the installed software attributes, and the quantity attributes; the attributes of the operation and maintenance BOM specifically include the layer number attributes of the model level, machine level, and component level, the layer PN attributes, the installed software attributes, the quantity attributes, the error code attributes, the engineering change problem attributes, the engineering change phenomenon attributes, the solution attributes corresponding to the engineering change problem, and the customer confidentiality attributes.
[0061] It should be pointed out that the purpose of the server product lifecycle management platform in this application is to manage the production, engineering changes, operation and maintenance and other activities of the server product BOM, so as to establish the association between the development, production, engineering changes, operation and maintenance and other activities on the development BOM, production BOM, and operation and maintenance BOM, so as to achieve the acquisition and timely update of the product BOM of the server product. In addition, when there is no operation and maintenance activity, the production BOM is the latest product BOM of the server product; when there is an operation and maintenance activity, the operation and maintenance BOM is the latest product BOM of the server product.
[0062] Step S12: Determine the problem impact degree corresponding to the target change problem to obtain the target impact degree.
[0063] In this embodiment, after determining the components that have undergone engineering changes and the corresponding engineering change issues from the production BOM, the problem impact degree corresponding to the above-mentioned target change problem is further determined to obtain the corresponding target impact degree.
[0064] Specifically, determining the degree of impact of the problem corresponding to the target change problem and obtaining the target impact degree may include: determining the degree of impact of the problem corresponding to the target change problem according to a preset level classification rule to obtain the target impact degree; the level classification rule is a rule formulated based on the degree of impact of historical engineering change problems and corresponding abnormal phenomena on the performance of server products and the probability of occurrence. In this embodiment, the level classification rules can be located in the above-mentioned database, and are rules formulated based on the degree of impact of engineering change problems and corresponding abnormal phenomena on the performance of server products and the probability of occurrence within the collected historical time range (such as within the past year). For example, according to the degree of impact of engineering change problems and the probability of occurrence, they are divided into four levels: fatal (such as 100% inability to boot), serious (such as 100% inability to work for some functions of the server product), general (such as slow response time of some functions of the server product), and prompt (such as some functions of the server product prompt errors), and fatal level>serious level>general level>prompt level, and each level corresponds to a different engineering change node, so that personnel at different levels can review and process them in a timely manner. The priority order of review and processing is fatal level>serious level>general level>prompt level. Based on the above-mentioned level classification rules, the degree of impact of the corresponding engineering change problem and the order of review and processing of the corresponding problem can be determined.
[0065] Step S13: determining a target engineering change node according to the target impact degree, and issuing an engineering change task for the target component to the target engineering change node.
[0066] In this embodiment, after determining the target impact level corresponding to the target change problem, a target engineering change node for reviewing and processing the problem can be determined based on the above target impact level, and then an engineering change task for the above target component (i.e., a processing task for the engineering change problem) is issued to the target engineering change node, so that the corresponding node person in charge can conduct a multi-dimensional review of execution quality, procureability, producibility, etc. after receiving the engineering change task.
[0067] In a specific implementation, the target engineering change node is determined according to the target impact degree, and the engineering change task for the target component is issued to the target engineering change node, which may specifically include: respectively obtaining the engineering change tasks to be executed at each current engineering change node, and obtaining the change tasks to be executed at each engineering change node; respectively determining the problem impact degree of the engineering change problem corresponding to the change tasks to be executed at each engineering change node according to the level classification rule, and obtaining the problem impact degree corresponding to each change task to be executed; respectively counting the number of tasks whose priority of the problem impact degree in the change tasks to be executed at each engineering change node is higher than or equal to the engineering change task priority of the target component, and obtaining the number of tasks corresponding to each engineering change node; sequentially calculating the execution time of the tasks whose priority of the problem impact degree in the change tasks to be executed at each engineering change node is higher than or equal to the engineering change task priority of the target component in the order of the number of tasks from small to large; determining the minimum value from the execution time corresponding to each engineering change node, and issuing the engineering change task for the target component to the engineering change node corresponding to the minimum value. In this embodiment, all the engineering change tasks to be executed at each current engineering change node are first obtained respectively to obtain all the change tasks to be executed at each engineering change node, and then the problem impact degrees of the engineering change problems corresponding to all the change tasks to be executed at each engineering change node are determined respectively according to the above-mentioned level classification rule, and then the number of tasks whose priority of the problem impact degree is higher than or equal to the engineering change task priority of the target component among all the change tasks to be executed at each engineering change node is counted respectively, so as to obtain the task number of all the change tasks to be executed at each engineering change node; for example, the number of change tasks to be executed at a certain engineering change node is 10, of which there are 2 tasks of the fatal level, 3 tasks of the serious level, 3 tasks of the general level, and 2 tasks of the prompt level, and the number of tasks whose priority is higher than or equal to the engineering change task priority (serious level) of the target component is 5. Furthermore, the execution duration of the tasks whose priority of problem impact is higher than or equal to the priority of the engineering change task of the current target component among all the change tasks to be executed at each engineering change node is calculated in order from small to large according to the above-mentioned task quantity. It should be pointed out that in order to enable tasks with high priority to be executed first, the average execution duration of tasks of different levels can be set in advance to predict the time when the current task is triggered. Finally, the minimum value is determined from the execution durations corresponding to each engineering change node, and the engineering change task for the target component is issued to the engineering change node corresponding to the minimum value, so that the current engineering change task can be assigned to the engineering change node that is triggered first. Among them, the engineering change task can be reviewed and processed by the node person in charge of the corresponding level position.
[0068] It should be pointed out that during the review and processing of the engineering change node corresponding to the minimum value, if there are pending change tasks of the same level as the current engineering change task, the tasks with earlier execution time will be executed first, and then the current engineering change task with later execution time will be executed. For pending change tasks that are before the current moment and have a lower priority than the current engineering change task, they can be withdrawn to the background and wait for the current engineering change task to be executed before being retriggered, thereby ensuring that the tasks with a higher priority level are processed. In addition, the node owner can query the tasks queued in the background through the task interface, and can reallocate the task nodes according to the number of tasks, thereby ensuring the timeliness of each task processing.
[0069] Step S14: After receiving the review approval response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are filtered from the production BOM according to the model number of the target server product and the component number of the target component to obtain a machine PN information list.
[0070] In this embodiment, after receiving the review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number can be screened from the production BOM according to the model number of the target server product (such as model 001) and the component number of the target component (mainboard 03), and a machine PN information list can be obtained. For example, see Fig. 9 As shown, Figure 5 , Figure 6 and Figure 7 After screening, a list of machine PN information including the target machine numbers (i.e., machine 02 and machine 03) and the corresponding target machine PNs (i.e., JQ0200000001 and JQ0200000003) is obtained. The list also includes information such as engineering change issues, engineering change phenomena, and corresponding solutions at the corresponding level. It should be noted that when screening, the operation and maintenance BOM of machine 02: JQ0200002001, which has been replaced by the operation and maintenance activity to the motherboard 04 due to the problem (Run Error), will be automatically excluded, thereby reducing the additional workload required for confirmation by the operation and maintenance personnel and improving the accuracy of the engineering change activities.
[0071] In addition, it may also include: if the review pass response for the engineering change task returned by the target engineering change node is not received within the preset time, the engineering change task for the target component is issued to the engineering change node of the upper level of impact corresponding to the target impact degree, so as to review the engineering change task of the target component through the engineering change node of the upper level of impact. In this embodiment, if the review pass response for the engineering change task returned by the target engineering change node is not received within the preset time, it indicates that the current engineering change task has not been reviewed in time, which may be caused by the fact that the person in charge corresponding to the target engineering change node has too many tasks or the current person in charge cannot review the current engineering change task. At this time, the engineering change task for the target component can be issued to the engineering change node of the upper level of impact corresponding to the target impact degree, so that the engineering change task of the target component is reviewed by the engineering change node of the upper level of impact (such as the person in charge corresponding to the node). By setting a preset time and reviewing engineering change tasks through the engineering change nodes of the previous level of impact, the task priority level will automatically rise by one level when the preset time is exceeded, and the task will automatically rise to the previous level of engineering change node for processing, thus avoiding the problem handler's long-term non-processing affecting the timeliness of the overall problem solving, and thus avoiding the task's long-term non-processing affecting the timeliness of the overall lifecycle management.
[0072] Step S15: Synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0073] In this embodiment, after filtering the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number from the production BOM to obtain a machine PN information list, the operation and maintenance BOM of the current target server product can be synchronized according to the information in the above machine PN information list to obtain the product BOM of the current target server product.
[0074] Specifically, the information synchronization of the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product may include: when the attribute option corresponding to the customer confidentiality attribute is a non-confidential option, the information synchronization of the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product. In this embodiment, when the attribute option corresponding to the customer confidentiality attribute is a non-confidential option, information related to the engineering change activity will be exchanged with the machine of the corresponding model. Specifically, the information synchronization of the operation and maintenance BOM of the current target server product can be performed according to the information in the machine PN information list to obtain the product BOM of the target server product.
[0075] In addition, it should be pointed out that if before the current engineering change task is processed, there is a task with a higher priority than the current node task, the task of the node with a higher priority can be automatically triggered to the corresponding node person in charge, and the original node task can be withdrawn to the background and wait for the task with a higher priority to be executed before being triggered again, thereby ensuring that the task with a higher priority is processed first.
[0076] It can be seen that the embodiment of the present application is applied to a server product lifecycle management platform. When an engineering change activity is monitored, the production BOM of the current target server product is first obtained, and the components that have undergone engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues. Then, the problem impact degree corresponding to the target change issues is determined to obtain the target impact degree. Then, the target engineering change node is determined according to the target impact degree, and the engineering change task for the target component is issued to the target engineering change node. After receiving the review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are screened from the production BOM according to the model number of the target server product and the component number of the target component to obtain a machine PN information list. Then, the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product. The embodiment of the present application manages the entire life cycle of the server product through a pre-created server product life cycle management platform. When an engineering change activity is monitored, the production BOM of the current server product is first obtained, and the components and corresponding engineering change issues that have undergone engineering changes are determined therefrom. The impact degree of the problem corresponding to the change issue is then determined. The target engineering change node is determined based on the impact degree, and the engineering change task is assigned to the target engineering change node. After receiving the review pass response, the corresponding target machine number and target machine PN are screened from the production BOM based on the model number and component number of the server product to obtain a machine PN information list. Finally, the current operation and maintenance BOM is checked based on the machine PN information list. Information is synchronized to obtain the product BOM of the server product. It can be seen that the embodiment of the present application can uniformly manage the engineering change activities and operation and maintenance activities within the life cycle of the server product through the server product life cycle management platform, thereby solving the problem of poor connectivity in the processes of various activities within the life cycle and improving the service quality of the server product. At the same time, by establishing the correlation between operation and maintenance activities and engineering change activities, the accuracy of engineering change activities and their subsequent activities and the reliability and timeliness of solving operation and maintenance problems are improved. In addition, the entire life cycle management process involves less human participation, thereby improving the timeliness and accuracy of operation and maintenance activities and engineering change activities, and reducing execution omissions caused by human participation, as well as labor costs and time costs.
[0077] The present application embodiment discloses a specific server product lifecycle management method, which is applied to a server product lifecycle management platform. Fig.10 As shown, the method includes:
[0078] Step S21: When an engineering change activity is detected, the production BOM of the current target server product is obtained, and the components that have undergone engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues.
[0079] Step S22: Determine the problem impact degree corresponding to the target change problem to obtain the target impact degree.
[0080] Step S23: determining a target engineering change node according to the target impact degree, and issuing an engineering change task for the target component to the target engineering change node.
[0081] Step S24: After receiving the review approval response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are filtered from the production BOM according to the model number of the target server product and the component number of the target component to obtain a machine PN information list.
[0082] Step S25: When the attribute option corresponding to the client confidentiality attribute is a hierarchical processing option, it is determined whether the target impact level is higher than a preset impact level.
[0083] In this embodiment, when the attribute option corresponding to the client confidentiality attribute is a graded processing option, it is determined whether the target impact level is higher than a preset impact level, such as determining whether the target impact level is higher than a general level.
[0084] It should be pointed out that when selecting the level-by-level processing options, different problem processing options can be generated for different levels of problem impact, such as "import immediately", "prompt to choose whether to import", and "do not import". Specifically, fatal-level problems and serious-level problems can correspond to the "import immediately" option, and general-level problems and prompt-level problems can correspond to the "prompt to choose whether to import" option. By setting the corresponding problem processing options, the background can synchronize information, distribute task nodes (such as to the client or operation and maintenance personnel) or not process information according to the level of problem impact of the engineering change activity. If you choose to import related options, you can send the corresponding engineering change problems, engineering change phenomena and corresponding solutions (replacing motherboard 03 with motherboard 05) to the client or operation and maintenance end so that the corresponding person in charge can handle the corresponding problems.
[0085] Step S26: If the target impact level is higher than the preset impact level, the attribute information corresponding to the production BOM is imported to solve the target engineering change problem, and the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product.
[0086] In this embodiment, if the above-mentioned target impact level is higher than the preset impact level (such as the general level), it indicates that the current target engineering change problem needs to be processed immediately. At this time, the attribute information corresponding to the production BOM can be imported, such as installed software attributes, quantity attributes, error code attributes, engineering change problem attributes, engineering change phenomenon attributes, and engineering change problem corresponding solution attributes, etc., so as to solve the above-mentioned target engineering change problem according to these attributes, and then synchronize the operation and maintenance BOM of the current target server product according to the information in the above-mentioned machine PN information list, and then obtain the product BOM of the target server product. For example, when the target engineering change issue is a software engineering change issue, the background can automatically perform software upgrades; and for engineering change issues that require hardware parts to be replaced, the number of parts to be replaced can be calculated based on the number of screened machines, and compared with the number of corresponding parts in the operation and maintenance inventory to determine whether the number of parts required to be replaced is met. If the number of corresponding parts in the operation and maintenance inventory meets the quantity requirement, an operation and maintenance task containing information such as the engineering change issue, the required number of parts, the engineering change phenomenon and the corresponding solutions can be sent to the corresponding operation and maintenance terminal, so that the corresponding operation and maintenance personnel can handle the engineering change issue in a timely manner. After the problem is handled, the operation and maintenance BOM of the current target server product can be refreshed based on the information in the machine PN information list, as well as the model number, machine PN, parts, software error code, engineering change issue, engineering change phenomenon and corresponding solutions, thereby obtaining the product BOM of the target server product.
[0087] It should be pointed out that when sending operation and maintenance tasks to the corresponding operation and maintenance terminals, the same as the issuance of engineering change tasks, the corresponding operation and maintenance terminals need to be determined in the priority order of fatal level > severe level > general level > prompt level, so that the corresponding operation and maintenance personnel can deal with the engineering change issues in a timely manner, and if the engineering change issue is not handled within the preset time, an operation and maintenance terminal with a higher priority can be selected to issue and handle the engineering change issue. In addition, the operation and maintenance personnel can query the background queued tasks through the task interface, and reallocate the task nodes according to the number of tasks to ensure the timely handling of engineering change issues. For the pending engineering change issues that have been withdrawn to the background, they can wait to be triggered again, so as to ensure that high-priority engineering change issues are handled first, avoiding the problem person not handling them for a long time and affecting the timeliness of the overall problem solving.
[0088] Step S27: If the target impact level is not higher than the preset impact level, a prompt message is generated asking whether to import.
[0089] In this embodiment, if the target impact level is not higher than the preset impact level, a prompt message of whether to import is generated, such as a prompt option of "prompting to select whether to import".
[0090] Step S28: After receiving the import response to the prompt information, import the attribute information corresponding to the production BOM to solve the target engineering change problem, and synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0091] In this embodiment, after receiving the import response to the above prompt information, the attribute information corresponding to the production BOM is imported to solve the target engineering change problem, and then the operation and maintenance BOM of the current target server product is synchronized according to the above machine PN information list to obtain the product BOM of the target server product. The specific problem solving process can be found in the description in step S26 and will not be repeated here.
[0092] For more specific processing procedures of the above steps S21 to S24, reference may be made to the corresponding contents disclosed in the above embodiments, which will not be described in detail here.
[0093] It can be seen that the embodiment of the present application can uniformly manage the engineering change activities and operation and maintenance activities within the life cycle of the server product through a unified server product life cycle management platform, thereby solving the problem of poor connectivity in the processes of various activities within the life cycle of the server product and improving the service quality of the server product. In addition, the present application establishes the mutual relationship between the operation and maintenance activities and the engineering change activities, and can automatically complete the acquisition and transmission of BOM information according to the rules, thereby improving the accuracy of the engineering change and its subsequent execution activities and the reliability and timeliness of the solution of operation and maintenance problems. In addition, the present application sets the structure and attributes of the BOM, which can realize automated life cycle management, thereby reducing execution omissions caused by human participation, improving the timeliness and accuracy of operation and maintenance activities and engineering change activities, and saving manpower costs and time costs.
[0094] Correspondingly, the embodiment of the present application also discloses a server product lifecycle management device, which is applied to a server product lifecycle management platform, see Fig.11 As shown, the device comprises:
[0095] The acquisition module 11 is used to acquire the production BOM of the current target server product when an engineering change activity is detected;
[0096] A first determination module 12 is used to determine the components that have undergone engineering changes and the corresponding engineering change issues from the production BOM, and obtain the target components and the corresponding target change issues;
[0097] The second determination module 13 is used to determine the problem impact degree corresponding to the target change problem to obtain the target impact degree;
[0098] A third determination module 14 is used to determine a target engineering change node according to the target impact degree;
[0099] A task issuing module 15, used for issuing the engineering change task for the target component to the target engineering change node;
[0100] A screening module 16 is used for, after receiving a review pass response for the engineering change task returned by the target engineering change node, screening the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number from the production BOM according to the model number of the target server product and the component number of the target component, to obtain a machine PN information list;
[0101] The information synchronization module 17 is used to synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0102] Among them, the specific working processes of the above-mentioned modules can refer to the corresponding contents disclosed in the aforementioned embodiments, which will not be repeated here.
[0103] It can be seen that the embodiment of the present application is applied to a server product lifecycle management platform. When an engineering change activity is monitored, the production BOM of the current target server product is first obtained, and the components that have undergone engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues. Then, the problem impact degree corresponding to the target change issues is determined to obtain the target impact degree. Then, the target engineering change node is determined according to the target impact degree, and the engineering change task for the target component is issued to the target engineering change node. After receiving the review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are screened from the production BOM according to the model number of the target server product and the component number of the target component to obtain a machine PN information list. Then, the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product. The embodiment of the present application manages the entire life cycle of the server product through a pre-created server product life cycle management platform. When an engineering change activity is monitored, the production BOM of the current server product is first obtained, and the components and corresponding engineering change issues that have undergone engineering changes are determined therefrom. The impact degree of the problem corresponding to the change issue is then determined. The target engineering change node is determined based on the impact degree, and the engineering change task is assigned to the target engineering change node. After receiving the review pass response, the corresponding target machine number and target machine PN are screened from the production BOM based on the model number and component number of the server product to obtain a machine PN information list. Finally, the current operation and maintenance BOM is checked based on the machine PN information list. Information is synchronized to obtain the product BOM of the server product. It can be seen that the embodiment of the present application can uniformly manage the engineering change activities and operation and maintenance activities within the life cycle of the server product through the server product life cycle management platform, thereby solving the problem of poor connectivity in the processes of various activities within the life cycle and improving the service quality of the server product. At the same time, by establishing the correlation between operation and maintenance activities and engineering change activities, the accuracy of engineering change activities and their subsequent activities and the reliability and timeliness of solving operation and maintenance problems are improved. In addition, the entire life cycle management process involves less human participation, thereby improving the timeliness and accuracy of operation and maintenance activities and engineering change activities, and reducing execution omissions caused by human participation, as well as labor costs and time costs.
[0104] In some specific embodiments, the second determining module 13 may specifically include:
[0105] The impact degree determination unit is used to determine the impact degree of the problem corresponding to the target change problem according to a preset level classification rule to obtain the target impact degree; the level classification rule is a rule formulated based on the historical engineering change problems and the corresponding abnormal phenomena on the performance of the server product and the probability of occurrence.
[0106] In some specific embodiments, the third determining module 14 may specifically include:
[0107] The task acquisition unit is used to respectively acquire the engineering change tasks to be executed at each current engineering change node, and obtain the change tasks to be executed at each engineering change node;
[0108] An impact degree determination unit, used to determine the impact degree of the engineering change problem corresponding to the pending change task of each engineering change node according to the level classification rule, and obtain the impact degree of the problem corresponding to each pending change task;
[0109] A statistical unit, for respectively counting the number of tasks whose priority of the problem impact degree in the change tasks to be executed at each engineering change node is higher than or equal to the engineering change task priority of the target component, to obtain the number of tasks corresponding to each engineering change node;
[0110] A duration calculation unit, for calculating, in order of the number of tasks from small to large, the execution duration of the tasks whose priority of the problem impact degree is higher than or equal to the priority of the engineering change task of the target component among the change tasks to be executed at each engineering change node;
[0111] A minimum value determination unit, used to determine a minimum value from the execution durations corresponding to each engineering change node;
[0112] Accordingly, the task issuing module 15 may specifically include:
[0113] The first task issuing unit is used to issue the engineering change task for the target component to the engineering change node corresponding to the minimum value.
[0114] In some specific embodiments, the structures of the production BOM and the operation and maintenance BOM consist of a model level, a machine level, and a specification level; the structure of the product BOM consists of a model level, a machine level, a specification level, an alternative level, and a component level; and the attributes of the production BOM, the operation and maintenance BOM, and the product BOM include any multiple of the level number attribute of the corresponding level, the level PN attribute, the installed software attribute, the quantity attribute, the error code attribute, the engineering change problem attribute, the engineering change phenomenon attribute, the solution attribute corresponding to the engineering change problem, and the customer confidentiality attribute.
[0115] In some specific embodiments, the information synchronization module 17 may specifically include:
[0116] The first information synchronization unit is used to synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product when the attribute option corresponding to the customer confidentiality attribute is a non-confidential option.
[0117] In some specific embodiments, the information synchronization module 17 may specifically include:
[0118] A judging unit, configured to judge whether the target impact degree is higher than a preset impact degree when the attribute option corresponding to the client confidentiality attribute is a graded processing option;
[0119] A second information synchronization unit is configured to import the attribute information corresponding to the production BOM to solve the target engineering change problem if the target impact level is higher than the preset impact level, and synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product;
[0120] a prompt information generating unit, configured to generate prompt information on whether to import if the target impact degree is not higher than the preset impact degree;
[0121] The third information synchronization unit is used to import the attribute information corresponding to the production BOM after receiving the import response to the prompt information to solve the target engineering change problem, and synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
[0122] In some specific embodiments, the server product lifecycle management device may specifically include:
[0123] The second task issuing unit is used to issue the engineering change task for the target component to the engineering change node of the upper-level impact level corresponding to the target impact level if no review approval response for the engineering change task is received from the target engineering change node within a preset time, so as to review the engineering change task of the target component through the engineering change node of the upper-level impact level.
[0124] Furthermore, the present application also discloses an electronic device. Fig.12 This is a structural diagram of an electronic device 20 according to an exemplary embodiment. The content in the diagram cannot be regarded as any limitation on the scope of use of the present application.
[0125] Fig.12 A schematic diagram of the structure of an electronic device 20 provided in an embodiment of the present application. The electronic device 20 may specifically include: at least one processor 21, at least one memory 22, a power supply 23, a communication interface 24, an input / output interface 25, and a communication bus 26. The memory 22 is used to store a computer program, which is loaded and executed by the processor 21 to implement the relevant steps in the server product lifecycle management method disclosed in any of the aforementioned embodiments. In addition, the electronic device 20 in this embodiment may specifically be an electronic computer.
[0126] In this embodiment, the power supply 23 is used to provide working voltage for each hardware device on the electronic device 20; the communication interface 24 can create a data transmission channel between the electronic device 20 and the external device, and the communication protocol it follows is any communication protocol that can be applied to the technical solution of the present application, and is not specifically limited here; the input and output interface 25 is used to obtain external input data or output data to the outside world, and its specific interface type can be selected according to specific application needs and is not specifically limited here.
[0127] In addition, the memory 22, as a carrier for storing resources, can be a read-only memory, a random access memory, a disk or an optical disk, etc. The resources stored thereon can include an operating system 221, a computer program 222, etc., and the storage method can be temporary storage or permanent storage.
[0128] The operating system 221 is used to manage and control the hardware devices on the electronic device 20 and the computer program 222, which can be Windows Server, Netware, Unix, Linux, etc. In addition to including a computer program that can be used to complete the server product lifecycle management method performed by the electronic device 20 disclosed in any of the aforementioned embodiments, the computer program 222 can further include a computer program that can be used to complete other specific tasks.
[0129] Furthermore, the present application also discloses a computer-readable storage medium for storing a computer program; wherein the computer program, when executed by a processor, implements the server product lifecycle management method disclosed above. The specific steps of the method can refer to the corresponding contents disclosed in the above embodiments, and will not be repeated here.
[0130] Furthermore, an embodiment of the present application also discloses a computer program product, including a computer program / instruction, which, when executed by a processor, implements the steps of the server product lifecycle management method disclosed above.
[0131] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0132] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0133] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
[0134] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0135] The above is a detailed introduction to a server product lifecycle management method, device, equipment and medium provided by the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A server product life cycle management method, characterized in that: Applied to the server product lifecycle management platform, including: When an engineering change activity is detected, the production BOM of the current target server product is obtained, and the components that have undergone engineering changes and the corresponding engineering change issues are determined from the production BOM to obtain the target components and the corresponding target change issues; Determine the problem impact degree corresponding to the target change problem to obtain the target impact degree; Determine a target engineering change node according to the target impact degree, and issue an engineering change task for the target component to the target engineering change node; After receiving the review pass response for the engineering change task returned by the target engineering change node, the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number are screened from the production BOM according to the model number of the target server product and the component number of the target component, to obtain a machine PN information list; The operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product.
2. The server product lifecycle management method according to claim 1, characterized in that: The determining the problem impact degree corresponding to the target change problem to obtain the target impact degree includes: The impact degree of the problem corresponding to the target change problem is determined according to the preset grading rules to obtain the target impact degree; the grading rules are rules formulated based on the impact degree and probability of occurrence of historical engineering change problems and corresponding abnormal phenomena on the performance of server products.
3. The server product lifecycle management method according to claim 2, characterized in that: The step of determining a target engineering change node according to the target impact degree, and issuing an engineering change task for the target component to the target engineering change node includes: Respectively obtain the engineering change tasks to be executed at each current engineering change node, and obtain the change tasks to be executed at each engineering change node; Determine the impact degree of the engineering change problem corresponding to the pending change task of each engineering change node according to the level classification rule, and obtain the impact degree of the problem corresponding to each pending change task; Counting the number of tasks whose priority of the problem impact degree in the change tasks to be executed at each engineering change node is higher than or equal to the engineering change task priority of the target component, respectively, to obtain the number of tasks corresponding to each engineering change node; Calculate the execution time of the tasks whose priority of the problem impact degree is higher than or equal to the priority of the engineering change task of the target component among the change tasks to be executed at each engineering change node in order of the number of tasks from small to large; A minimum value is determined from the execution times corresponding to the engineering change nodes, and an engineering change task for the target component is issued to the engineering change node corresponding to the minimum value.
4. The server product lifecycle management method according to claim 1, characterized in that: The structures of the production BOM and the operation and maintenance BOM consist of a model level, a machine level, and a specification level; the structure of the product BOM consists of a model level, a machine level, a specification level, a replacement level, and a component level; and the attributes of the production BOM, the operation and maintenance BOM, and the product BOM include any multiple of the level number attribute of the corresponding level, the level PN attribute, the installed software attribute, the quantity attribute, the error code attribute, the engineering change problem attribute, the engineering change phenomenon attribute, the solution attribute corresponding to the engineering change problem, and the customer confidentiality attribute.
5. The server product lifecycle management method according to claim 4, characterized in that: The step of synchronizing the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product includes: When the attribute option corresponding to the customer confidentiality attribute is a non-confidential option, information synchronization is performed on the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
6. The server product lifecycle management method according to claim 4, characterized in that: The step of synchronizing the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product includes: When the attribute option corresponding to the client confidentiality attribute is a hierarchical processing option, determining whether the target impact degree is higher than a preset impact degree; If the target impact level is higher than the preset impact level, the attribute information corresponding to the production BOM is imported to solve the target engineering change problem, and the operation and maintenance BOM of the current target server product is synchronized according to the machine PN information list to obtain the product BOM of the target server product; If the target impact level is not higher than the preset impact level, a prompt message is generated asking whether to import the data; After receiving the import response to the prompt information, import the attribute information corresponding to the production BOM to solve the target engineering change problem, and synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
7. The server product lifecycle management method according to any one of claims 1 to 6, characterized in that: Also includes: If no review approval response for the engineering change task is received from the target engineering change node within the preset time, the engineering change task for the target component is issued to the engineering change node of the upper-level impact level corresponding to the target impact level, so that the engineering change task of the target component is reviewed through the engineering change node of the upper-level impact level.
8. A server product lifecycle management device, characterized in that: Applied to the server product lifecycle management platform, including: The acquisition module is used to obtain the production BOM of the current target server product when an engineering change activity is detected; A first determination module is used to determine the components that have undergone engineering changes and the corresponding engineering change issues from the production BOM, and obtain the target components and the corresponding target change issues; The second determination module is used to determine the problem impact degree corresponding to the target change problem to obtain the target impact degree; A third determination module is used to determine a target engineering change node according to the target impact degree; A task issuing module, used for issuing the engineering change task for the target component to the target engineering change node; A screening module, configured to, upon receiving a review pass response for the engineering change task returned by the target engineering change node, screen the target machine number corresponding to the target server product and the target machine PN corresponding to the target machine number from the production BOM according to the model number of the target server product and the component number of the target component, to obtain a machine PN information list; The information synchronization module is used to synchronize the operation and maintenance BOM of the current target server product according to the machine PN information list to obtain the product BOM of the target server product.
9. An electronic device, characterized in that: It comprises a processor and a memory; wherein, when the processor executes the computer program stored in the memory, the server product lifecycle management method as claimed in any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium, characterized in that: Used to store computer programs; wherein, when the computer program is executed by a processor, the server product lifecycle management method according to any one of claims 1 to 7 is implemented.