Warm-up control system, warm-up control method and non-transient computer readable storage medium
By using timing and control circuits in the wafer test device to decide whether to perform preheating, the problems of unstable temperature and increased measurement time of the wafer test device are solved, and productivity is improved.
Patent Information
- Application Number
- CN202310838774.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-04-12
- Filing Date
- 2023-07-10
- Publication Date
- 2024-10-18
AI Technical Summary
The temperature of the wafer test equipment is unstable after being idle, resulting in inaccurate measurement results, and preheating is performed every time a wafer batch is placed, resulting in increased measurement time and reduced throughput.
A preheating control system is designed. The timing circuit calculates the batch change time, and the control circuit determines whether to perform device preheating based on the batch change time and the standard batch change time to avoid performing preheating every time a wafer batch is exchanged. .
The wafer test time is reduced and the wafer throughput is increased. By only performing preheating when the batch change time is greater than the preset time, unnecessary preheating processes are avoided.
Smart Images

Figure CN118800682A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to preheating control of a wafer testing device, and in particular to a preheating control system, a preheating control method and a non-transient computer-readable storage medium. Background Art
[0002] Nowadays, wafer testing devices are often used to measure the electrical properties and yield of wafer lots. However, if the wafer testing device is idle for too long, the device temperature of the wafer testing device will become unstable, resulting in inaccurate measurement results. Therefore, the wafer testing device usually includes a preheating system to maintain the device temperature of the wafer testing device at a preset temperature.
[0003] However, since the wafer test device performs device preheating each time a wafer batch is placed in the wafer test device, the total measurement time of each wafer batch will increase, resulting in a decrease in productivity. Therefore, how to efficiently control the preheating system is one of the issues in this field. Summary of the invention
[0004] The present invention provides a preheating control system, comprising a test device and a processor. The test device is used to perform wafer testing on a wafer batch and perform device preheating on the test device. The processor is coupled to the test device and comprises a timing circuit and a control circuit. The timing circuit is used to calculate a batch change time, wherein the batch change time is equal to the difference between the time when the previous wafer batch is removed from the test device and the time when the wafer batch is placed into the test device. The control circuit is used to control the test device to perform wafer testing, and control the test device to perform device preheating according to the batch change time and the standard batch change time.
[0005] In some embodiments of the preheating control system, the testing device includes a camera for capturing a plurality of wafer images of a space accommodating a wafer lot and a previous wafer lot.
[0006] In some embodiments of the preheating control system, the processor is further used to receive a first wafer image among multiple wafer images, wherein the first wafer image shows that a previous wafer batch was removed from a testing device, and the processor determines the time when the previous wafer batch was removed from the testing device based on the first wafer image, and the processor is further used to receive a second wafer image among multiple wafer images, wherein the second wafer image shows that a wafer batch was placed in a testing device, and the processor determines the time when the wafer batch was placed in the testing device based on the second wafer image.
[0007] In some embodiments of the preheating control system, when the lot change time is less than or equal to the standard lot change time, the control circuit controls the test device to omit device preheating and perform wafer testing after the wafer lot is placed in the test device.
[0008] In some embodiments of the preheating control system, when the lot change time is greater than the standard lot change time, the control circuit controls the test device to perform device preheating and wafer testing after the wafer lot is placed in the test device.
[0009] In some embodiments of the preheat control system, device preheat is performed prior to wafer testing.
[0010] In some embodiments of the preheat control system, the standard batch change time is between fifteen minutes and thirty minutes.
[0011] In some embodiments of the preheating control system, the preheating control system further comprises a storage device for storing a standard batch change time.
[0012] The present invention provides a preheating control method, which is applicable to a preheating control system including a test device and a processor. The preheating control method includes: (a) calculating a batch change time through a timing circuit of a processor, wherein the batch change time is equal to the difference between the time when a previous wafer batch is removed from the test device and the time when the wafer batch is placed into the test device; (b) comparing the batch change time with a standard batch change time through the processor to determine whether to control the test device through a control circuit of the processor to perform device preheating on the test device; and (c) controlling the test device through the control circuit to perform wafer testing on the wafer batch.
[0013] In some embodiments of the preheating control method, step (a) includes: taking multiple wafer images of a space accommodating a wafer batch and a previous wafer batch through a camera of a testing device; receiving a first wafer image from the multiple wafer images through a processor, wherein the first wafer image shows that the previous wafer batch is removed from the testing device; judging, through the processor, the time when the previous wafer batch is removed from the testing device based on the first wafer image; receiving a second wafer image from the multiple wafer images through the processor, wherein the second wafer image shows that the wafer batch is placed into the testing device; judging, through the processor, the time when the wafer batch is placed into the testing device based on the second wafer image; and calculating the batch change time through a timing circuit based on the time when the previous wafer batch is removed from the testing device and the time when the wafer batch is placed into the testing device.
[0014] In some embodiments of the preheating control method, step (b) includes: in response to the batch change time being less than or equal to the standard batch change time, after the wafer batch is placed in the test device, controlling the test device to omit device preheating and perform wafer testing through a control circuit.
[0015] In some embodiments of the preheating control method, step (b) further includes: in response to the batch change time being greater than the standard batch change time, after the wafer batch is placed in the test device, controlling the test device to perform device preheating and wafer testing through a control circuit.
[0016] In some embodiments of the preheating control method, step (b) is performed earlier than step (c).
[0017] In some embodiments of the preheating control method, the standard batch change time is between fifteen minutes and thirty minutes.
[0018] The present invention provides a non-transitory computer-readable storage medium storing a plurality of computer-readable instructions. When the plurality of computer-readable instructions are executed by one or more processors to control a preheating control system including a test device, the one or more processors are used to perform the following operations: (a) calculating a batch change time, wherein the batch change time is equal to the difference between the time when the previous wafer batch is removed from the test device and the time when the wafer batch is placed into the test device; (b) comparing the batch change time with a standard batch change time to determine whether to control the test device to perform device preheating on the test device; and (c) controlling the test device to perform wafer testing on the wafer batch.
[0019] In some embodiments of a non-transitory computer-readable storage medium, operation (a) includes: controlling a camera of a testing device to capture multiple wafer images of a space accommodating a wafer lot and a previous wafer lot; receiving a first wafer image among the multiple wafer images, wherein the first wafer image shows that the previous wafer lot is removed from the testing device; determining the time when the previous wafer lot is removed from the testing device based on the first wafer image; receiving a second wafer image among the multiple wafer images, wherein the second wafer image shows that the wafer lot is placed into the testing device; determining the time when the wafer lot is placed into the testing device based on the second wafer image; and calculating the lot change time based on the time when the previous wafer lot is removed from the testing device and the time when the wafer lot is placed into the testing device.
[0020] In some embodiments of the non-transitory computer readable storage medium, operation (b) includes: in response to the lot change time being less than or equal to the standard lot change time, after the wafer lot is placed in the test device, controlling the test device to omit device preheating and perform wafer testing.
[0021] In some embodiments of the non-transitory computer readable storage medium, operation (b) further includes: in response to the lot change time being greater than the standard lot change time, after the wafer lot is placed into the test device, controlling the test device to perform device preheating and wafer testing.
[0022] In some embodiments of the transitory computer-readable storage medium, operation (b) is performed earlier than operation (c).
[0023] In some embodiments of the non-transitory computer readable storage medium, the standard batch change time is between fifteen minutes and thirty minutes.
[0024] Through the preheating control system, preheating control method and non-transitory computer-readable storage medium of the present invention, the testing device can perform device preheating only when the exchange time of different wafer batches is greater than a preset time length, rather than performing device preheating every time the wafer batches are exchanged, thereby reducing the time spent on wafer testing and thus improving the wafer production capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to make the above and other objects, features, advantages and embodiments of the present invention more clearly understood, the accompanying drawings are described as follows:
[0026] Figure 1 is a functional block diagram of a preheating control system according to an embodiment of the present invention; and
[0027] Figure 2 4 is a flow chart of a preheating control method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The embodiments of the present invention will be described below with reference to the accompanying drawings. In the accompanying drawings, the same reference numerals represent the same or similar elements or method flows.
[0029] Figure 1 1 is a functional block diagram of a preheating control system 100 according to an embodiment of the present invention. In some embodiments, the preheating control system 100 includes a test device 110, a processor 120, and a storage device 130. The test device 110 is coupled to the processor 120 and includes a probe device 112 and a preheating device 114.
[0030] The probe device 112 is used to perform wafer testing on the wafer lot WL. In operation, when the test device 110 receives a test instruction TI from the processor 120, the probe device 112 measures characteristics (eg, electrical properties or yield) of the wafer lot WL.
[0031] In some embodiments, the probe device 112 includes a camera 112 a. The camera 112 a is used to capture a plurality of wafer images W of a space containing a wafer lot. The plurality of wafer images W are transmitted to the processor 120 to confirm whether the wafer lot WL is properly placed in / moved out of the testing device 110 .
[0032] The preheating device 114 is used to perform device preheating on the test device 110. In operation, when the test device 110 receives the preheating instruction PHI from the processor 120, the preheating device 114 performs device preheating for a preheating period on the test device 110 to maintain the device temperature of the test device 110 at a preset temperature. In some embodiments, the preheating period is approximately fifteen minutes.
[0033] The processor 120 is coupled to the test device 110 and the storage device 130 to control the test device 110 to perform wafer testing and device preheating. In some embodiments, the processor 120 is coupled to the test device 110 via a general purpose interface bus (GPIB).
[0034] In some embodiments, the processor 120 may be implemented by a central processing unit (CPU), a multi-processor, a distributed computing system, an application specific integrated circuit (ASIC), other devices with processing functions, or any combination thereof.
[0035] In some embodiments, the processor 120 includes a timing circuit 122 and a control circuit 124. The timing circuit 122 is used to calculate the lot change time, where the lot change time is equal to the difference between the time when the previous wafer lot WL is removed from the test device 110 and the time when the wafer lot WL is placed into the test device 110.
[0036] The control circuit 124 is used to transmit the test instruction TI to the test device 110 to perform wafer testing according to the batch change time and the standard batch change time, and transmit the preheating instruction PHI to the test device 110 to perform device preheating. In some embodiments, the standard batch change time is between fifteen minutes and thirty minutes. The method of controlling the test device 110 by the control circuit 124 will be described in detail in the following paragraphs.
[0037] The storage device 130 is coupled to the processor 120. In some embodiments, the storage device 130 is used to store the preheating period and the standard batch change time. In some embodiments, the storage device 130 can be implemented by a random access memory (RAM), a read-only memory (ROM), a flash memory, a hard disk, other devices with storage functions, or any combination thereof.
[0038] Figure 2 FIG. 2 is a flow chart of a preheating control method 200 according to an embodiment of the present invention. In some embodiments, the preheating control method 200 includes steps 210 , 220 , 230 , 240 , 250 and 260 .
[0039] In step 210, the camera 112a captures a wafer image W of the space accommodating the wafer lot, and transmits the wafer image W to the processor 120 to confirm whether the previous wafer lot is properly removed from the test device 110. When the processor 120 determines that the previous wafer lot is properly removed from the test device 110 based on the wafer image W, the timing circuit 122 records the time when the previous wafer lot is removed from the test device 110 (for example, the time when the wafer image W showing the previous wafer lot being removed is captured).
[0040] In step 220, the camera 112a captures another wafer image W of the space accommodating the wafer lot, and transmits the wafer image W to the processor 120 to confirm whether the wafer lot WL is properly placed in the test device 110. When the processor 120 determines that the wafer lot WL is properly placed in the test device 110 based on the wafer image W, the timing circuit 122 records the time when the wafer lot WL is placed in the test device 110 (for example, the time when the wafer image W showing the wafer lot WL being placed is captured).
[0041] In step 230, the timing circuit 122 calculates the lot change time, where the lot change time is equal to the difference between the time when the previous wafer lot WL is removed from the test device 110 (i.e., the time obtained in step 210) and the time when the wafer lot WL is placed into the test device 110 (i.e., the time obtained in step 220).
[0042] In step 240, the processor 120 compares the batch change time with the standard batch change time. When the batch change time is greater than the standard batch change time, steps 250 and 260 are executed in sequence. On the other hand, when the batch change time is less than or equal to the standard batch change time, step 250 is omitted and step 260 is directly executed.
[0043] In step 250 , the control circuit 124 transmits a preheating instruction PHI to the test device 110 , so that the preheating device 114 performs a preheating period on the test device 110 , thereby maintaining the device temperature of the test device 110 at a preset temperature.
[0044] In step 260 , the control circuit 124 transmits the test instruction TI to the probe device 112 , so that the probe device 112 performs a wafer test on the wafer lot WL and obtains the characteristics (eg, electrical properties or yield) of the wafer lot WL.
[0045] In an embodiment where the standard batch change time is fifteen minutes, if the previous wafer batch is removed from the test device 110 at ten o'clock in the morning, and the wafer batch WL is placed into the test device 110 at ten twenty in the morning, since the batch change time is twenty minutes, which is longer than the standard batch change time, step 250 will be executed earlier than step 260.
[0046] In another embodiment where the standard batch change time is fifteen minutes, if the previous wafer batch is removed from the test device 110 at ten o'clock in the morning, and the wafer batch WL is placed into the test device 110 at ten ten in the morning, since the batch change time is ten minutes, which is less than the standard batch change time, step 250 will be omitted and step 260 will be directly executed.
[0047] Then, after the measurement of the wafer lot WL is completed (ie, step 260 is completed), step 210 is performed again. In other words, the wafer lot WL is removed from the test device 110, and the next wafer lot is placed in the test device 110 to perform wafer testing.
[0048] It should be understood that the preheating control method 200 described in the present invention may include more Figure 2 More or fewer steps are depicted, and steps 210, 220, 230, 240, 250, and 260 may be performed in any order as appropriate.
[0049] The present invention provides a non-transitory computer-readable storage medium storing a plurality of computer-readable instructions. When these computer-readable instructions are executed by one or more processors, the one or more processors are used to execute steps 210, 220, 230, 240, 250 and 260 in the aforementioned preheating control method 200.
[0050] Through the preheating control system 100, preheating control method 200 and non-transitory computer-readable storage medium of the present invention, the testing device 110 can perform device preheating only when the batch change time is greater than the standard batch change time, rather than performing device preheating every time the wafer batch is exchanged, thereby reducing the time spent on wafer testing and improving wafer production capacity.
[0051] In the specification and claims of the present invention, specific terms are used to represent specific components. However, those skilled in the art will understand that the same components may be referred to by different terms. The specification and claims of the present invention do not use the difference in terms as a way to distinguish components, but use the functional differences of the components as the basis for distinction. In addition, it should be understood that the term "comprising" in the specification and claims of the present invention is open-ended, i.e., including but not limited to. In addition, the term "coupling" in the present invention includes any direct and indirect connection methods. Therefore, if a first component is described as being coupled to a second component, it means that the first component can be directly connected to the second component through an electrical connection or a signal connection (including wireless transmission, optical transmission and the like), or the first component can be indirectly electrically connected or signal connected to the second component via other components or connection methods.
[0052] It should be understood that the description method of "and / or" used in the present invention and claims includes any combination of one or more of the listed items. Unless otherwise specified in the specification, any singular term also includes the plural meaning.
[0053] Although the present invention has been described in detail with reference to specific embodiments, other embodiments are also possible. Therefore, the spirit and scope of the following claims should not be limited to the embodiments described in the present invention. It is obvious to those skilled in the art that various modifications and changes are made to the structure of the present invention without departing from the scope or spirit of the present invention. In view of the foregoing, the present invention is intended to cover modifications and changes of the present invention as long as they fall within the scope of the claims and their equivalents.
[0054]
Explanation of symbols
[0055] 100: Preheating control system
[0056] 110: Test device
[0057] 112: Probe device
[0058] 112a: Camera
[0059] 114: Preheating device
[0060] 120: Processor
[0061] 122: Timing circuit
[0062] 124: Control circuit
[0063] 130: Storage device
[0064] 200: Preheating control method
[0065] 210,220,230: Steps
[0066] 240,250,260: Steps
[0067] W: Wafer Image
[0068] WL: Wafer Lot
[0069] TI:Test Instructions
[0070] PHI: Preheat instruction.
Claims
1. A preheating control system, characterized in that: Include: A test device for performing wafer testing on a wafer lot and performing device preheating on the test device; and A processor, coupled to the testing device, comprises: A timing circuit for calculating a batch change time, wherein the batch change time is equal to a difference between a time when a previous wafer batch is removed from the test device and a time when the wafer batch is placed into the test device; as well as The control circuit is used to control the test device to perform the wafer test, and to control the test device to perform the device preheating according to the batch change time and the standard batch change time.
2. The preheating control system according to claim 1, characterized in that: The testing device comprises a camera, which is used for taking a plurality of wafer images of a space accommodating the wafer batch and the previous wafer batch.
3. The preheating control system according to claim 2, characterized in that: The processor is also used to receive a first wafer image among the plurality of wafer images, wherein the first wafer image shows that the previous wafer batch is removed from the testing device, and the processor determines the time when the previous wafer batch is removed from the testing device according to the first wafer image, and The processor is further used for receiving a second wafer image among the plurality of wafer images, wherein the second wafer image shows that the wafer batch is placed in the testing device, and the processor determines the time when the wafer batch is placed in the testing device according to the second wafer image.
4. The preheating control system according to claim 1, characterized in that: When the lot change time is less than or equal to the standard lot change time, the control circuit controls the test device to skip the device preheating and perform the wafer test after the wafer lot is placed in the test device.
5. The preheating control system according to claim 4, characterized in that: When the lot change time is greater than the standard lot change time, the control circuit controls the test device to perform the device preheating and the wafer test after the wafer lot is placed in the test device.
6. The preheating control system according to claim 5, characterized in that: The device preheating is performed prior to the wafer testing.
7. The preheating control system according to claim 1, characterized in that: The standard batch change time is between fifteen minutes and thirty minutes.
8. The preheating control system according to claim 1, characterized in that: It also includes a storage device for storing the standard batch change time.
9. A preheating control method, characterized in that: Applicable to a preheating control system including a test device and a processor, the preheating control method includes: (a) calculating, by a timing circuit of the processor, a batch change time, wherein the batch change time is equal to a difference between a time when a previous wafer batch is removed from the test device and a time when the wafer batch is placed into the test device; (b) comparing the batch change time with a standard batch change time by the processor to determine whether to control the test device to perform device preheating on the test device by a control circuit of the processor; and (c) controlling the test device to perform wafer testing on the wafer batch through the control circuit.
10. The preheating control method according to claim 9, characterized in that: Step (a) comprises: Using a camera of the testing device, capturing a plurality of wafer images of a space containing the wafer lot and the previous wafer lot; Receiving, by the processor, a first wafer image of the plurality of wafer images, wherein the first wafer image shows that the previous wafer lot is removed from the testing device; Determining, by the processor, the time when the previous wafer batch was moved out of the testing device according to the first wafer image; Receiving, by the processor, a second wafer image from among the plurality of wafer images, wherein the second wafer image shows that the wafer lot is placed in the testing device; Determining, by the processor, a time when the wafer batch is placed in the testing device according to the second wafer image; as well as The timing circuit is used to calculate the batch changing time according to the time when the previous wafer batch is removed from the testing device and the time when the wafer batch is placed into the testing device.
11. The preheating control method according to claim 9, characterized in that: Step (b) comprises: In response to the lot change time being less than or equal to the standard lot change time, after the wafer lot is placed in the test device, the control circuit controls the test device to omit the device preheating and perform the wafer test.
12. The preheating control method according to claim 11, characterized in that: Step (b) further comprises: In response to the lot change time being greater than the standard lot change time, after the wafer lot is placed in the test device, the test device is controlled by the control circuit to perform the device preheating and the wafer test.
13. The preheating control method according to claim 9, characterized in that: Step (b) is performed before step (c).
14. The preheating control method according to claim 9, characterized in that: The standard batch change time is between fifteen minutes and thirty minutes.
15. A non-transitory computer-readable storage medium, characterized in that: The device is used to store a plurality of computer-readable instructions, wherein when the plurality of computer-readable instructions are executed by one or more processors to control a preheating control system including a test device, the one or more processors are used to perform the following operations: (a) calculating a batch change time, wherein the batch change time is equal to the difference between the time when the previous wafer batch is removed from the test device and the time when the wafer batch is placed into the test device; (b) comparing the batch change time with a standard batch change time to determine whether to control the test device to perform device preheating on the test device; and (c) controlling the test device to perform wafer testing on the wafer lot.
16. The non-transitory computer-readable storage medium of claim 15, wherein: Operation (a) includes: Controlling the camera of the testing device to capture a plurality of wafer images of a space accommodating the wafer lot and the previous wafer lot; receiving a first wafer image of the plurality of wafer images, wherein the first wafer image shows that the previous wafer lot is removed from the testing device; Determining the time when the previous wafer batch was moved out of the testing device according to the first wafer image; receiving a second wafer image from among the plurality of wafer images, wherein the second wafer image shows that the wafer lot is placed in the testing device; Determining the time when the wafer batch is placed in the testing device according to the second wafer image; as well as The lot change time is calculated according to the time when the previous wafer lot is removed from the testing device and the time when the wafer lot is placed into the testing device.
17. The non-transitory computer-readable storage medium of claim 15, wherein: Operation (b) comprises: In response to the lot change time being less than or equal to the standard lot change time, after the wafer lot is placed in the test device, the test device is controlled to omit the device preheating and perform the wafer test.
18. The non-transitory computer-readable storage medium of claim 17, wherein: Operation (b) further includes: In response to the lot change time being greater than the standard lot change time, after the wafer lot is placed in the test device, the test device is controlled to perform the device preheating and the wafer test.
19. The non-transitory computer-readable storage medium of claim 15, wherein: Operation (b) is performed before operation (c).
20. The non-transitory computer-readable storage medium of claim 15, wherein: The standard batch change time is between fifteen minutes and thirty minutes.