Power distribution network operation configuration information determination method and device, electronic equipment and storage medium
By combining the prediction model of the first distribution network simulation environment and the second prediction model, operating configuration information that adapts to real-time changes in the distribution network is generated, which solves the problem of NLP technology being difficult to adapt to real-time changes in the distribution network and improves efficiency. The efficiency and accuracy of distribution network operation reduce energy waste.
Patent Information
- Application Number
- CN202410811440.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-18
AI Technical Summary
NLP technology is difficult to adapt to real-time changes in distribution network operation auxiliary decision-making, resulting in low accuracy of distribution network operation configuration information recommendations and inability to effectively meet efficient and accurate management needs.
A prediction model composed of the first distribution network simulation environment and the second prediction model is used to simulate and evaluate the current operating status of the distribution network to generate operation configuration information that adapts to real-time changes and improve the efficiency of distribution network operation. and avoid energy waste.
Real-time adaptation of distribution network operation configuration information is achieved, operation efficiency is improved, the problem in the existing technology that configuration information does not meet operation requirements is solved, and energy waste is reduced.
Smart Images

Figure CN118801351A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and in particular to a method, device, electronic device and storage medium for determining distribution network operation configuration information. Background Art
[0002] With the increasing scale and complexity of distribution networks, traditional operation methods can no longer meet the needs of efficient and accurate management. Therefore, it is particularly necessary to use natural language processing (NLP) technology to assist the operation of distribution networks. NLP technology can realize the intelligent processing and analysis of operation text data, extract valuable knowledge and rules from massive information, and provide decision support for operation and maintenance personnel. Through NLP technology, fault reports can be automatically identified and classified, problems can be quickly located, and the efficiency and accuracy of fault handling can be improved. At the same time, NLP technology can also mine and analyze operation data, discover potential operation risks and optimization space, and provide strong guarantees for the safe and stable operation of distribution networks. However, the application of NLP technology in auxiliary decision-making for distribution network operation faces challenges at multiple levels, such as data, technology, and application. In particular, NLP technology cannot adapt well to the real-time changes of the distribution network, resulting in low accuracy in the recommendation of distribution network operation configuration information. Summary of the invention
[0003] The present invention provides a method, device, electronic device and storage medium for determining distribution network operation configuration information, so as to solve the problem of low accuracy in recommending distribution network operation configuration information.
[0004] According to one aspect of the present invention, a method for determining distribution network operation configuration information is provided, comprising:
[0005] Determining operating data of the target distribution network, wherein the operating data of the target distribution network is used to characterize the operating state of the target distribution network in the current period;
[0006] The target operation configuration information is determined by a first prediction model according to the operation data of the target distribution network. The target operation configuration information is a scheme for adjusting the operation status of the target distribution network under the power consumption status of the target distribution network. The first prediction model is composed of a first distribution network simulation environment and a second prediction model. The first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network. The first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network. The sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network. The second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation result of the first operation configuration information. The simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
[0007] According to another aspect of the present invention, there is provided a device for determining distribution network operation configuration information, comprising:
[0008] An operation data determination module, used to determine the operation data of the target distribution network, wherein the operation data of the target distribution network is used to characterize the operation state of the target distribution network in the current period;
[0009] An operation configuration information determination module is used to determine the target operation configuration information through a first prediction model according to the operation data of the target distribution network, the target operation configuration information is a plan for adjusting the operation status of the target distribution network under the power consumption status of the target distribution network, the first prediction model is composed of a first distribution network simulation environment and a second prediction model, the first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network, the first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network, the sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network, the second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation result of the first operation configuration information, and the simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
[0010] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0011] at least one processor; and
[0012] a memory communicatively connected to the at least one processor; wherein,
[0013] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining distribution network operation configuration information described in any embodiment of the present invention.
[0014] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for determining distribution network operation configuration information described in any embodiment of the present invention when executed.
[0015] The technical solution of the embodiment of the present invention is to determine the operating data of the target distribution network; and determine the target operating configuration information through the first prediction model according to the operating data of the target distribution network. The method can generate target operating configuration information adapted to the target distribution network through the first prediction model according to the operating data of the target distribution network, so that the acquired target operating configuration information can adapt to the real-time changes in the operating state of the target distribution network, and at the same time, the operating efficiency of the target distribution network is improved to a greater extent, and the problem that the target operating configuration information acquired by the prior art does not conform to the operation of the target distribution network is solved. In addition, the target distribution network operates according to the target operating configuration information, which can also avoid energy waste to a greater extent.
[0016] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0018] Figure 1 A flow chart of a method for determining distribution network operation configuration information provided by an embodiment of the present invention;
[0019] Figure 2 A schematic diagram of a medium and low voltage distribution network provided by an embodiment of the present invention;
[0020] Figure 3 A schematic diagram of a first prediction model provided by an embodiment of the present invention;
[0021] Figure 4 A framework diagram of a third prediction model provided by an embodiment of the present invention;
[0022] Figure 5 A schematic diagram of the structure of a device for determining distribution network operation configuration information provided by an embodiment of the present invention;
[0023] Figure 6 A schematic diagram of the structure of an electronic device for implementing the method for determining distribution network operation configuration information according to an embodiment of the present invention. DETAILED DESCRIPTION
[0024] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] Figure 1 This is a flow chart of a method for determining distribution network operation configuration information provided by an embodiment of the present invention. This embodiment can be applied to the case where the adapted operation configuration information is determined according to the operation state of the distribution network. The method can be executed by a distribution network operation configuration information determination device. The distribution network operation configuration information determination device can be implemented in the form of hardware and / or software. The distribution network operation configuration information determination device can be configured in any electronic device with network communication function. Figure 1 As shown, the method includes:
[0027] S110: Determine operating data of the target distribution network.
[0028] The operating data of the target distribution network is used to characterize the operating status of the target distribution network in the current period.
[0029] Furthermore, the operation data of the target distribution network includes: historical operation data, source-load trend data and target text data.
[0030] Furthermore, historical operation data is the metering data history record of the operation status of each node in the distribution network, including active power, reactive power, voltage, current, and power factor; source-load trend data is the forecast data of the operation status of each power source and load node, also including active power, reactive power, voltage, current, and power factor; target text data is the data obtained after preprocessing the original text data, wherein the preprocessing is the processing method of screening, keyword extraction, and text conversion of the original text data. The original text data is the data in the original operation data of the target distribution network.
[0031] Specifically, original operation data of the target distribution network is obtained, original text data is obtained from the original operation data of the target distribution network, and the original text data is preprocessed to obtain the operation data of the target distribution network.
[0032] For example, it is assumed that the target distribution network is a medium and low voltage distribution network, such as Figure 2 As shown in Figure 2, the topology of the target distribution network can be regarded as a graph G = (V, E), where V is the vertex set and E is the edge set. Figure 2 The edge set is the set of nodes or vertices in the , and the edge set is the set of connecting lines between nodes or vertices. Each vertex or node i∈V can be connected to a common transformer, user load, distributed power supply, or an on-load tap changer (OLTC), or a simple connection point. ij ∈E represents the connection line between nodes i and j. The output voltage of OLTC can be changed with the gear adjustment.
[0033] S120. Determine target operation configuration information through a first prediction model according to operation data of the target distribution network.
[0034] Among them, the target operation configuration information is a plan for adjusting the operation status of the target distribution network under the power consumption status of the target distribution network. The first prediction model is composed of a first distribution network simulation environment and a second prediction model. The first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network. The first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network. The sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network. The second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation results of the first operation configuration information. The simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
[0035] Furthermore, the second prediction model includes: a first network and a second network, wherein the first network is used to generate distribution network operation configuration information according to the operation status of the distribution network; and the second network is used to evaluate the distribution network operation configuration information generated by the first network.
[0036] Furthermore, the second prediction model can adopt the A3C (Asynchronous Advantage Actor-Critic) algorithm model. The A3C algorithm model is an extension and improvement of the Deep Q Network (DQN) model in traditional DRL, and has excellent performance in processing large-scale continuous action space and high-dimensional state space. Figure 3 As shown in the figure, the Actor-Critic network is divided into two networks, namely the Actor network and the Critic network, where the Actor network is the first network in the second prediction model; the Critic network is the second network in the second prediction model. The Actor network is responsible for selecting actions based on the current state, that is, generating a distribution network operation strategy. It achieves this function by learning a policy function π(a|s; θ) through a deep neural network, where s is the current state of the distribution network, a represents the action selected by the Actor based on the current state, and θ is a parameter of the Actor network. The strategy π(a|s; θ) represents the probability of selecting action a under the current state s. During the training process, the Actor network will continuously update its parameters θ to maximize the expected cumulative reward R:
[0037]
[0038] Where γ∈(0,1] is the discount factor.
[0039] The Critic network is responsible for evaluating the value of the action selected by the Actor, that is, predicting the expected cumulative reward after taking a specific action in a given state. It achieves this function by learning a value function V(s;ω) through a deep neural network, where s is the state and ω is the parameter of the Critic network. The value function V(s;ω) represents the expected reward that can be obtained by taking a certain action in the current state s.
[0040] Furthermore, if Figure 3 As shown in the figure, multiple Actor-Critic networks are trained locally and in parallel in their respective environments, and the parameters of the Actor and Critic networks are continuously adjusted to maximize the cumulative reward. The parameters of each Actor-Critic network are then synchronized to the public Actor-Critic network.
[0041] Specifically, the simulation environment of the first distribution network is updated according to the operating data of the target distribution network, and then the trained second prediction model is used to output the optimal operating configuration information of the target distribution network under the current operating environment, that is, the target operating configuration information.
[0042] Exemplarily, the operating data of the target distribution network is input into the first prediction model, the simulation environment of the second distribution network simulates the operating status data of the target distribution network according to the operating data of the target distribution network, the third prediction model determines the emotion corresponding to the operating configuration information of the current target distribution network according to the operating data of the target distribution network, the determined first operating status data of the target distribution network and the emotion corresponding to the operating configuration information of the current target distribution network are sent to the second prediction model, the second network in the second prediction model evaluates the operating configuration information of the current target distribution network, if the evaluation result does not meet the preset requirements, the evaluation result is fed back to the first network, the first network generates the first operating configuration information according to the evaluation result and the first operating status data of the target distribution network, and sends the first operating configuration information to the simulation environment of the first distribution network, the simulation environment of the first distribution network receives After the first operation configuration information is obtained, the simulation environment of the second distribution network is used to perform simulation according to the first operation configuration information to generate second operation status data of the target distribution network. The third prediction model determines the emotion corresponding to the first operation configuration information according to the first operation configuration information, and sends the obtained second operation status data of the target distribution network and the emotion corresponding to the first operation configuration information to the second prediction model. The second network evaluates the first operation configuration information. If the evaluation result does not meet the preset requirements, the evaluation result is fed back to the first network. The first network generates second operation configuration information according to the evaluation result and the second operation status data of the target distribution network, and sends the second configuration information to the simulation environment of the first distribution network for simulation until the evaluation result of the generated operation configuration information meets the preset requirements. The operation configuration information corresponding to the preset requirements is used as the target operation configuration information.
[0043] Optionally, determining the operating data of the target distribution network includes steps A1-A4:
[0044] Step A1: Obtain original text data of the target distribution network.
[0045] The original text data is text information generated after analyzing the operating status of the distribution network, and the original text data is used to represent event information generated during the operation of the target distribution network.
[0046] Furthermore, the original text data includes: operation reports, fault analysis reports, feedback reports, etc.
[0047] Specifically, original operation data of the target distribution network is obtained, and original text data of the target distribution network is extracted from the original operation data of the target distribution network.
[0048] Step A2: Perform word segmentation on the original text data of the target distribution network to obtain the word information to be extracted.
[0049] Among them, word segmentation refers to splitting the original text data of the target distribution network into small word units.
[0050] Specifically, use the word splitting algorithm to perform word segmentation on the original text data of the target distribution network, and regard each separated word as the word information to be extracted.
[0051] Among them, the word splitting algorithm is an algorithm that splits the long text data in the original text data of the target distribution network into word units. Exemplarily, the word splitting algorithm can adopt the THU Chinese Part-of-Speech Analysis Toolkit (THU Lexical Analyzer for Chinese, THULAC).
[0052] The above step of performing word segmentation on the original text data of the target distribution network is to split the long text data into smaller units, which can facilitate the subsequent keyword extraction.
[0053] Step A3: Perform part-of-speech tagging and keyword extraction on the word information to be extracted, and remove stop words to obtain the word data to be transformed.
[0054] Among them, stop words are words that connect keywords in the word information to be extracted and have nothing to do with the operation of the target distribution network, and keywords are words related to the operation of the target distribution network and changes in its operating state.
[0055] Furthermore, stop words can be connecting words such as "of", "is", etc. that have nothing to do with the operation of the target distribution network, or other words that have nothing to do with the operation of the distribution network, such as "among them", "elaborate", etc.
[0056] Specifically, perform part-of-speech tagging on the word information to be extracted. After completion, obtain words related to the operating state and changes in the operating state of the target distribution network, and remove stop words from the obtained keywords. Use the language information after removing stop words as the word data to be transformed.
[0057] Step A4: Convert the word data to be transformed into a text vector, and use the text vector as the target text data.
[0058] Specifically, use the word embedding algorithm to convert the word data to be transformed into a text vector and capture the semantic relationship between words.
[0059] Among them, the word embedding algorithm can map text data to a low-dimensional vector space and obtain the semantic information between words and the connection between contexts. Exemplarily, the word embedding algorithm can adopt the Word2Vec model, and the core idea of the Word2Vec model is to learn the vector representation of words through the context information of words.
[0060] Exemplarily, a word splitting algorithm is used to segment the original text data of the target distribution network to obtain each word in the sentence, and part-of-speech tagging and keyword extraction are performed, and stop words that do not contribute much to the operation of the distribution network and appear frequently are removed to obtain word data to be converted, and a word embedding algorithm is used to convert the word data to be converted into a target text vector.
[0061] Optionally, the process of constructing the first prediction model includes steps B1-B5:
[0062] Step B1: Determine reference distribution network data.
[0063] The reference text data is data obtained after preprocessing the original text data, wherein the preprocessing is a processing method of screening, extracting keywords and converting text on the original text data.
[0064] Specifically, original operation data of the reference distribution network is obtained, and the original operation data of the reference distribution network is processed to obtain operation data of the reference distribution network.
[0065] Step B2: Build a model space based on reference distribution network data.
[0066] The model space is used to characterize the operating state of the reference distribution network and the corresponding actions of the operating state changes. The model space includes: action space and state space.
[0067] Specifically, the operating status data of the reference distribution network and the action data corresponding to the operating status change are obtained from the reference distribution network data, and the model space is built according to the obtained data.
[0068] Step B3: Build a simulation environment for the second distribution network based on the model space and key fields.
[0069] Among them, the key field is the information corresponding to the key naming body label, and the key naming body label is used to represent the words corresponding to the change of the operating state of the reference distribution network.
[0070] Specifically, the model space is supplemented according to the words corresponding to the changes in the operating status of the reference distribution network in the key fields and the changes in the operating status of the distribution network brought about by the words, and the operating status of the reference distribution network is simulated according to the supplemented model space, thereby obtaining the simulation environment of the second distribution network.
[0071] Furthermore, after executing an action on the simulation environment of the second distribution network, a new operating state and a reward for the action corresponding to the operating state may be returned.
[0072] Exemplarily, the simulation environment of the second distribution network mainly includes: the operation mechanism and constraint conditions of the reference distribution network.
[0073] Further constraints mainly include:
[0074] Power flow constraints:
[0075]
[0076] Where P j (t),Q j (t) is the node j∈V, P ij (t),Q ij (t) is the line l ij ∈E active power, reactive power, N - (j),N + (j) is the set of upstream nodes and downstream nodes of node j, that is, the current flows from i to j, and then from j to k, l ij ,l ik ∈E.
[0077] Node power balance:
[0078]
[0079] Voltage balance:
[0080]
[0081] Apparent power constraint:
[0082]
[0083] The maximum reactive power constraint of the photovoltaic inverter (for the photovoltaic node i∈V):
[0084]
[0085] in, It is the maximum reactive power that the photovoltaic inverter can provide when participating in reactive voltage regulation. is the maximum power factor angle allowed for photovoltaics, is the rated capacity of photovoltaic power.
[0086] OLTC scheduling restrictions (for OLTC node i∈V):
[0087]
[0088] in, is the minimum and maximum safe voltage of node i, K min ,K max is the minimum and maximum transformation ratio of OLTC. Assume K min ,K max ,K i (t) The corresponding OLTC gears are b min ,b max ,b i (t), then:
[0089]
[0090] Among them, ΔK s is the ratio difference between gears s and s-1. In other words, K i (t) in K min With K max The changes between them are discrete and can only take certain specific values, such as the maximum and minimum values or extreme values after discretization. In addition, the gear change of OLTC gear in the operation cycle cannot exceed the maximum number of times
[0091]
[0092] Among them, δ(·,·) is defined as:
[0093]
[0094] Voltage and current safety constraints:
[0095]
[0096] in, For line l ij The maximum safe current.
[0097] Step B4: The second distribution network simulation environment and the third prediction model are integrated to obtain the first distribution network simulation environment.
[0098] Among them, the third prediction model is constructed by reference distribution network data, reference operation configuration information and the emotions corresponding to the reference operation configuration information, and is used to characterize the relationship between the distribution network operation configuration information and the emotions corresponding to the distribution network operation configuration information.
[0099] Specifically, the second distribution network simulation environment and the third prediction model are integrated together to obtain the first distribution network simulation environment.
[0100] Step B5: merge the first distribution network simulation environment with the second prediction model to obtain a first prediction model.
[0101] Specifically, the first distribution network simulation environment and the second prediction model are integrated according to the corresponding relationship between the two to obtain the first prediction model.
[0102] Furthermore, the correspondence between the first distribution network simulation environment and the second prediction model is that the first distribution network simulation environment provides the second prediction model with the operating status data of the reference distribution network, and performs simulation according to the distribution network operation configuration information generated by the first network in the second prediction model; the first network of the second prediction model generates the distribution network operation configuration information according to the operating status data of the reference distribution network and the evaluation result of the second network on the current operation configuration information of the reference distribution network; the first network of the second prediction model evaluates the distribution network operation configuration information generated by the first network and generates an evaluation result.
[0103] Optionally, a model space is constructed according to reference distribution network data, including steps C1-C3:
[0104] Step C1: Acquire state data from reference distribution network data, and construct a state space according to the state data.
[0105] Among them, the status data is used to characterize the operating status of the reference distribution network.
[0106] Specifically, state data is extracted from reference distribution network data, the state data is standardized, the state data is converted into data in a unified format, the data in the unified format is encoded and quantized, and a state space is generated based on the processed data.
[0107] Exemplarily, the state space S contains the set of all possible states. In the operation of the distribution network, the state s∈S reflects all the key information of the current operation status and operation requirements of the distribution network at time t, including the encoding and quantification of the following information: the active power P at the head end of the distribution network 0 (t), reactive power Q 0 (t), voltage U 0 (t); the operating status measurement value of each node i∈V, including the photovoltaic active power P i pv (t), photovoltaic reactive power Load active power Load reactive power Voltage U i (t); each line l ij ∈E operating status measurement value, mainly the current I ij (t), resistance R ij Reactance X ij ; Transformation ratio K of OLTC node i (t), high voltage side voltage Low voltage side voltage Normal transformer input voltage Output voltage Active power output of distributed power generation Reactive power Load active power Reactive power Distribution network topology G = (V, E).
[0108] Step C2: Acquire action data from the reference distribution network data, and construct an action space according to the action data.
[0109] The action data refers to the corresponding action when the operating state of the reference distribution network changes.
[0110] For example, the action space A contains the set of all actions, and the action a∈A refers to the operation mode that the reference distribution network may take at time t under a specific state, including the following actions: adjusting the inverter of the distributed power source, adjusting its reactive power output Switch the transformer tap position τ(t) and adjust the transformer set voltage.
[0111] Step C3: Optimize the actions corresponding to the changes in the operating state of the reference distribution network according to the reward function.
[0112] Among them, the reward function corresponds to the optimization goal of the distribution network operation, which is used to evaluate the actions corresponding to the operating state of the reference distribution network and optimize the actions to ensure that the established model space can fit the changes of the actual reference distribution network.
[0113] Furthermore, the distribution network operation objectives include: voltage quality, impact of power outages, line loss, station loss, etc.
[0114] Exemplarily, the reward function can be expressed as follows:
[0115]
[0116] Among them, w 1 ,w 2 ,w 3 ,w 4 is the weight corresponding to each optimization target, f 1 (t) is the average voltage deviation, f 1 (t) can be expressed by the following formula:
[0117]
[0118] in, is the rated voltage of node i.
[0119] f 2 (t) is the duration of power outage, f 2(t) can be expressed by the following formula:
[0120] f 2 (t) = δ OLTC (t)T OLTC ,
[0121] Among them, δ OLTC (t) indicates whether the OLTC gear is switched at time t. If it is switched, δ OLTC (t)=1, otherwise δ OLTC (t) = 0; T OLTC The time required for gear switching is set as a constant.
[0122] f 3 (t) is line loss and platform loss, f 3 (t) can be expressed by the following formula:
[0123]
[0124] in, is the line loss, It can be expressed by the following formula:
[0125]
[0126] η loss is the line loss constant in the area, η loss It can be expressed by the following formula:
[0127]
[0128] in, is the transformer loss, It can be expressed by the following formula:
[0129]
[0130] in, is the transformer no-load loss, is the rated load loss of the transformer, is the rated current of the transformer, both are given values; I i (t) is the transformer load current, which can be expressed by the following formula:
[0131]
[0132] Among them, N + (i) is the set of nodes downstream of node i, i.e., the current flows from i to j, l ij ∈E.
[0133] f 4 (t) is the evaluation result after the third prediction model evaluates the operating configuration information of the reference distribution network generated by the second network.
[0134] For example, Figure 4 As shown, the Naive Bayes model is trained by referring to the distribution network data, the reference operation configuration information and the emotions corresponding to the reference operation configuration information, the Naive Bayes model that meets the preset requirements is used as the third prediction model, and the emotion corresponding to the operation configuration information generated by the second network is predicted by the third prediction model to obtain the evaluation result of the operation configuration information generated by the second network.
[0135] Optionally, a simulation environment of the second distribution network is established according to the model space and the key fields, including steps D1-D2:
[0136] Step D1: Simulate the operation status of the distribution network according to the corresponding relationship between the state space and the action space.
[0137] The corresponding relationship is used to characterize the change of the operating state caused by the operating action of the distribution network.
[0138] Specifically, the change in the operating state of the distribution network in the state space caused by the change in the action of the distribution network in the action space is matched, and the operating state of the distribution network is simulated according to the corresponding relationship between the two.
[0139] Step D2: supplement the operating status of the simulated distribution network through key fields to obtain a simulated environment of the second distribution network.
[0140] Specifically, the operating status of the simulated distribution network is supplemented according to the change information of the operating status of the distribution network reflected in the key field, and the supplemented simulated distribution network is used as the simulation environment of the second distribution network.
[0141] Optionally, the determination of key fields includes steps E1-E3:
[0142] Step E1: Determine the named entity recognition tag and the corresponding field of the named entity recognition tag through a recognition algorithm according to the reference text data.
[0143] Specifically, the reference text receipt is input into the recognition algorithm, the recognition algorithm classifies the text information in the reference text data, matches the corresponding named entity recognition tags according to the classified data, and outputs the obtained named entity recognition tags and the corresponding fields of the named entity recognition tags as a table.
[0144] Step E2: determining a key named entity tag from the named entity identification tags according to a preset key tag.
[0145] The preset key tags are tags established in advance based on words in the actual operation results of the reference distribution network that have a great impact on the operation of the reference distribution network.
[0146] Furthermore, the preset key tags may be: line name, fault, voltage, etc.
[0147] Specifically, the named body identification tags are screened according to the preset key tags, and the screened tags are used as key named body tags.
[0148] Step E3: Determine the key field from the corresponding field of the named body identification tag according to the key named body tag.
[0149] Specifically, the fields corresponding to the keyword named body tags are filtered from the corresponding fields of the named body identification tags according to the keyword named body tags, and the obtained fields are used as key fields.
[0150] Exemplarily, key fields can be determined using a named entity recognition algorithm, that is, inputting reference text data, outputting named entity tags corresponding to the reference text data, and extracting fields corresponding to key named entity tags (such as line name, fault, voltage, etc.) as key data.
[0151] Among them, the purpose of the named entity recognition algorithm is to identify words with specific meanings from reference text data. Exemplarily, the named entity recognition algorithm can adopt the BERT-BiLSTM-CRF model.
[0152] Optionally, the second prediction model includes: a first network and a second network, and the first distribution network simulation environment is integrated with the second prediction model, including steps F1-F6:
[0153] Step F1: The first distribution network simulation environment determines the operating state of the first reference distribution network according to the current operating configuration information of the reference distribution network.
[0154] Specifically, the first distribution network simulation environment simulates the operating state of the reference distribution network according to the current operating configuration information of the reference distribution network, and uses the simulated state as the operating state of the first reference distribution network.
[0155] Step F2: determining first reference operation configuration information through the first network according to the operation status of the first reference distribution network.
[0156] Among them, the first network is used to generate distribution network operation configuration information according to the operation status of the distribution network.
[0157] Specifically, the second network evaluates the current operation configuration information of the reference distribution network. If the evaluation result does not meet the preset requirements, the evaluation result is sent to the first network. The first network generates the first reference operation configuration information according to the operation status of the first reference distribution network and the evaluation result.
[0158] Step F3: The first distribution network simulation environment is simulated according to the first reference operation configuration information to obtain the second reference distribution network operation state.
[0159] Specifically, the first network sends the first reference operation configuration information to the first distribution network simulation environment, and the first distribution network simulation environment simulates the first reference operation configuration information, and uses the simulated operation state as the second reference distribution network operation state.
[0160] Step F4: The second network evaluates the first reference operation configuration information according to the operation status of the second reference distribution network, and feeds back the evaluation result of the first reference operation configuration information to the first network.
[0161] The second network is used to evaluate the distribution network operation configuration information generated by the first network.
[0162] Specifically, the second network evaluates the first reference operation configuration information according to the operation status of the second reference distribution network. If the evaluation result of the first reference operation configuration information does not meet the preset requirements, the evaluation result of the first reference operation configuration information is fed back to the first network; if the evaluation result feedback of the first reference operation configuration information meets the preset requirements, no further feedback is required.
[0163] Step F5: The first network generates second reference operation configuration information according to the evaluation result of the first reference operation configuration information.
[0164] Specifically, the first network generates the second reference operation configuration information according to the evaluation result of the first reference operation configuration information and the operation status of the second reference distribution network.
[0165] Step F6: The first distribution network simulation environment is simulated according to the second reference operation configuration information.
[0166] Specifically, the first network sends the second reference operation configuration information to the first distribution network simulation environment, and the first distribution network simulation environment simulates the second reference operation configuration information.
[0167] Furthermore, the above steps F1-F6 complete the fusion of the first distribution network simulation environment and the second prediction model through the transmission and feedback of information between the first distribution network simulation environment and the second prediction model, thereby obtaining the first prediction model.
[0168] Optionally, the construction process of the third prediction model includes steps G1-G3:
[0169] Step G1: Define emotion labels.
[0170] Specifically, the range of the emotion label is selected as [-1, 1]. When the emotion label is between [-1, -0.5), it is regarded as a negative emotion; when the emotion label is between [-0.5, 0.5), it is regarded as an intermediate emotion; when the emotion label is between [0.5, 1], it is regarded as a positive emotion.
[0171] Among them, negative emotions indicate that the reference operation configuration information cannot meet the daily operation of the reference distribution network, which is likely to cause energy loss; neutral emotions indicate that the reference operation configuration information can meet the daily operation of the reference distribution network, but cannot save energy; positive emotions indicate that the reference operation configuration information can not only meet the daily operation of the reference distribution network, but also save energy.
[0172] Step G2: obtain reference operation configuration information of the reference distribution network, and extract text data corresponding to the reference operation configuration information from the reference distribution network data, use the obtained reference operation configuration information and text data as data to be predicted, and annotate the sentiment label of the text data according to the text content in the data to be predicted.
[0173] Step G3: using the data to be predicted as the input of the Naive Bayes model, using the emotion label corresponding to the data to be predicted as the output of the Naive Bayes model, training the Naive Bayes model, and using the Naive Bayes model whose training results meet the requirements as the third prediction model.
[0174] Specifically, the data to be predicted and the emotion label corresponding to the data to be predicted are input into the Naive Bayes model, the accuracy of the Naive Bayes model is determined according to the prediction label output by the Naive Bayes model, the Naive Bayes model is iteratively trained until the accuracy of the Naive Bayes model is greater than or equal to a preset accuracy threshold, the training of the Naive Bayes model is stopped, and the Naive Bayes model that meets the preset accuracy threshold is used as the third prediction model, and the trained third prediction model is used to determine the emotion corresponding to the data to be predicted according to the input data to be predicted.
[0175] The technical solution of this embodiment is to determine the operating data of the target distribution network; and determine the target operating configuration information through the first prediction model based on the operating data of the target distribution network. This method can generate target operating configuration information adapted to the target distribution network through the first prediction model based on the operating data of the target distribution network, so that the acquired target operating configuration information can adapt to the real-time changes in the operating state of the target distribution network, while improving the operating efficiency of the target distribution network to a greater extent, and also solving the problem that the target operating configuration information acquired by the prior art does not conform to the operation of the target distribution network. In addition, the target distribution network operates according to the target operating configuration information, which can also avoid energy waste to a greater extent.
[0176] Figure 5The present invention provides a schematic diagram of a structure of a device for determining the operation configuration information of a distribution network. This embodiment is applicable to the case where the operation configuration information of a distribution network is determined. The device for determining the operation configuration information of a distribution network can be implemented in the form of hardware and / or software. The device for determining the operation configuration information of a distribution network can be configured in any electronic device with a network communication function. Figure 5 As shown, the device includes: an operation data determination module 210 and an operation configuration information determination module 220, wherein:
[0177] Operation data determination module 210: used to determine the operation data of the target distribution network, where the operation data of the target distribution network is used to characterize the operation status of the target distribution network in the current period;
[0178] Determine the operation configuration information module 220: It is used to determine the target operation configuration information through the first prediction model according to the operation data of the target distribution network. The target operation configuration information is a plan for adjusting the operation status of the target distribution network under the power consumption condition of the target distribution network. The first prediction model is composed of a first distribution network simulation environment and a second prediction model. The first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network. The first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network. The sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network. The second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation result of the first operation configuration information. The simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
[0179] Optionally, the operation data determination module 210 includes:
[0180] The original text data determination unit is used to obtain the original text data of the target distribution network. The original text data is text information generated after analyzing the operating status of the distribution network. The original text data is used to represent event information generated during the operation of the target distribution network.
[0181] The unit for determining the word information to be extracted is used to perform word segmentation processing on the original text data of the target distribution network to obtain the word information to be extracted;
[0182] The unit for determining the word data to be converted is used to perform part-of-speech tagging and keyword extraction on the word information to be extracted, and to remove stop words to obtain the word data to be converted. The stop words are words that connect the keywords in the word information to be extracted and are irrelevant to the operation of the target distribution network. The keywords are words related to the operation and operation status change of the target distribution network.
[0183] Target text data determination unit: used to convert the word data to be converted into a text vector and use the text vector as the target text data.
[0184] Optionally, determining the running configuration information module 220 includes:
[0185] Reference distribution network data determination unit: used to determine reference distribution network data;
[0186] Model space building unit: used to build a model space according to the reference distribution network data. The model space is used to represent the operating state of the reference distribution network and the corresponding actions of the operating state change. The model space includes: action space and state space;
[0187] A simulation environment building unit for the second distribution network: used to build a simulation environment for the second distribution network according to the model space and key fields, where the key fields are information corresponding to key named body tags, and the key named body tags are used to represent words corresponding to changes in the operating state of the reference distribution network;
[0188] A first distribution network simulation environment determination unit: used for fusing the second distribution network simulation environment and the third prediction model to obtain the first distribution network simulation environment, wherein the third prediction model is constructed by reference distribution network data, reference operation configuration information and the emotion corresponding to the reference operation configuration information, and is used for characterizing the relationship between the distribution network operation configuration information and the emotion corresponding to the distribution network operation configuration information;
[0189] The first prediction model building unit is used to integrate the first distribution network simulation environment with the second prediction model to obtain the first prediction model.
[0190] Optional, model space building unit, including:
[0191] State space construction subunit: used to obtain state data from the reference distribution network data and construct the state space according to the state data, and the state data is used to characterize the operating state of the reference distribution network;
[0192] Action space construction subunit: used to obtain action data from the reference distribution network data and construct an action space according to the action data, where the action data is the action corresponding to the change in the operating state of the reference distribution network;
[0193] Optimization subunit: used to optimize the actions corresponding to the changes in the operating state of the reference distribution network according to the reward function.
[0194] Optionally, a simulation environment building unit for the second distribution network includes:
[0195] The operating status determination subunit of the distribution network is used to simulate the operating status of the distribution network according to the corresponding relationship between the state space and the action space, and the corresponding relationship is used to characterize the change of the operating status caused by the operating action of the distribution network;
[0196] The simulation environment determination subunit of the second distribution network is used to supplement the operation status of the simulated distribution network through key fields, so as to obtain the simulation environment of the second distribution network.
[0197] Optionally, a simulation environment building unit for the second distribution network includes:
[0198] A named body identification tag determination subunit: used to determine the named body identification tag and the corresponding field of the named body identification tag through a recognition algorithm according to the reference text data;
[0199] The key named body tag determination subunit is used to determine the key named body tag from the named body identification tag according to the preset key tag;
[0200] Key field determination subunit: used to determine the key field from the corresponding field of the named body identification tag according to the key named body tag.
[0201] Optionally, the second prediction model includes: a first network and a second network, and a first distribution network simulation environment determination unit includes:
[0202] The first reference distribution network operation state determination subunit is used for the first distribution network simulation environment to determine the first reference distribution network operation state according to the current operation configuration information of the reference distribution network;
[0203] A first reference operation configuration information determination subunit: configured to determine the first reference operation configuration information through the first network according to the operation state of the first reference distribution network, the first network being configured to generate the distribution network operation configuration information according to the operation state of the distribution network;
[0204] A second reference distribution network operation state determination subunit: used for simulating the first distribution network simulation environment according to the first reference operation configuration information to obtain the second reference distribution network operation state;
[0205] Evaluation subunit: used for the second network to evaluate the first reference operation configuration information according to the operation status of the second reference distribution network, and to feed back the evaluation result of the first reference operation configuration information to the first network, and the second network is used to evaluate the distribution network operation configuration information generated by the first network;
[0206] A second reference operation configuration information determination subunit: used for the first network to generate second reference operation configuration information according to the evaluation result of the first reference operation configuration information;
[0207] Simulation subunit: used for simulating the first distribution network simulation environment according to the second reference operation configuration information.
[0208] The distribution network operation configuration information determination device provided in the embodiment of the present invention can execute the distribution network operation configuration information determination method provided in any embodiment of the present invention mentioned above, and has the corresponding functions and beneficial effects of executing the distribution network operation configuration information determination method. For detailed process, please refer to the relevant operations of the distribution network operation configuration information determination method in the aforementioned embodiment.
[0209] Figure 6 A schematic diagram of the structure of an electronic device for implementing a method for determining distribution network operation configuration information according to an embodiment of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0210] like Figure 6 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0211] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0212] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a method for determining distribution network operation configuration information.
[0213] In some embodiments, the method for determining the operation configuration information of the distribution network may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the method for determining the operation configuration information of the distribution network described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the method for determining the operation configuration information of the distribution network by any other appropriate means (e.g., by means of firmware).
[0214] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0215] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0216] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0217] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0218] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0219] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0220] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0221] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for determining distribution network operation configuration information, characterized in that: include: Determining operating data of the target distribution network, wherein the operating data of the target distribution network is used to characterize the operating state of the target distribution network in the current period; The target operation configuration information is determined by a first prediction model according to the operation data of the target distribution network. The target operation configuration information is a scheme for adjusting the operation status of the target distribution network under the power consumption status of the target distribution network. The first prediction model is composed of a first distribution network simulation environment and a second prediction model. The first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network. The first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network. The sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network. The second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation result of the first operation configuration information. The simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
2. The method according to claim 1, characterized in that: The step of determining the operating data of the target distribution network includes: Acquire original text data of the target distribution network, wherein the original text data is text information generated after analyzing the operating status of the distribution network, and the original text data is used to characterize event information generated during the operation of the target distribution network; Perform word segmentation on the original text data of the target distribution network to obtain the word information to be extracted; Performing part-of-speech tagging and keyword extraction on the word information to be extracted, and removing stop words to obtain word data to be converted, wherein the stop words are words in the word information to be extracted that connect the keywords and are irrelevant to the operation of the target distribution network, and the keywords are words related to the operation and operation status change of the target distribution network; The word data to be converted is converted into a text vector, and the text vector is used as the target text data.
3. The method according to claim 1, characterized in that The process of constructing the first prediction model includes: Determine reference distribution network data; A model space is constructed according to the reference distribution network data, wherein the model space is used to characterize the operation state of the reference distribution network and the corresponding action of the operation state change, and the model space includes: an action space and a state space; A simulation environment of a second distribution network is established according to the model space and key fields, wherein the key fields are information corresponding to key named body tags, and the key named body tags are used to represent words corresponding to changes in the operating state of the reference distribution network; The second distribution network simulation environment and the third prediction model are integrated to obtain the first distribution network simulation environment, wherein the third prediction model is constructed by reference distribution network data, reference operation configuration information, and the emotion corresponding to the reference operation configuration information, and is used to characterize the relationship between the distribution network operation configuration information and the emotion corresponding to the distribution network operation configuration information; The first distribution network simulation environment is integrated with the second prediction model to obtain a first prediction model.
4. The method according to claim 3, characterized in that The step of building a model space according to the reference distribution network data includes: Acquire state data from reference distribution network data, and construct a state space according to the state data, wherein the state data is used to characterize the operating state of the reference distribution network; Acquire action data from reference distribution network data, and construct an action space according to the action data, wherein the action data is an action corresponding to a change in the operating state of the reference distribution network; The actions corresponding to the changes in the operating state of the reference distribution network are optimized according to the reward function.
5. The method according to claim 3 or 4, characterized in that: The step of building a simulation environment for the second distribution network according to the model space and key fields includes: Simulating the operating status of the distribution network according to the corresponding relationship between the state space and the action space, wherein the corresponding relationship is used to characterize the change of the operating status caused by the operating action of the distribution network; The operating status of the simulated distribution network is supplemented by the key fields, thereby obtaining a simulated environment of the second distribution network.
6. The method according to claim 3, characterized in that The determination of the key fields includes: Determine the named entity identification tag and the corresponding field of the named entity identification tag through a recognition algorithm according to the reference text data; Determining a key named entity tag from the named entity identification tags according to a preset key tag; A key field is determined from a corresponding field of the named entity identification tag according to the key named entity tag.
7. The method according to claim 3, characterized in that The second prediction model includes: a first network and a second network, and the first distribution network simulation environment is integrated with the second prediction model, including: The first distribution network simulation environment determines the operating state of the first reference distribution network according to the current operating configuration information of the reference distribution network; Determining first reference operation configuration information through a first network according to the first reference distribution network operation state, wherein the first network is used to generate distribution network operation configuration information according to the operation state of the distribution network; The first distribution network simulation environment performs simulation according to the first reference operation configuration information to obtain an operation state of a second reference distribution network; The second network evaluates the first reference operation configuration information according to the operation status of the second reference distribution network, and feeds back the evaluation result of the first reference operation configuration information to the first network, wherein the second network is used to evaluate the distribution network operation configuration information generated by the first network; The first network generates second reference operation configuration information according to an evaluation result of the first reference operation configuration information; The first distribution network simulation environment is simulated according to the second reference operation configuration information.
8. A device for determining distribution network operation configuration information, characterized in that: include: An operation data determination module, used to determine the operation data of the target distribution network, wherein the operation data of the target distribution network is used to characterize the operation state of the target distribution network in the current period; An operation configuration information determination module is used to determine the target operation configuration information through a first prediction model according to the operation data of the target distribution network, the target operation configuration information is a plan for adjusting the operation status of the target distribution network under the power consumption status of the target distribution network, the first prediction model is composed of a first distribution network simulation environment and a second prediction model, the first distribution network simulation environment is used to provide the second prediction model with the current operation status of the distribution network, the first distribution network simulation environment is used to characterize the operation status of the distribution network during actual operation and the sentiment towards the current operation strategy of the distribution network, the sentiment of the current operation strategy of the distribution network is used to characterize the quality of the current operation configuration information of the distribution network, the second prediction model is used to generate the first operation configuration information according to the current operation status of the distribution network and evaluate the operation result of the first operation configuration information, and the simulation environment of the second distribution network is used to simulate the operation status of the distribution network during actual operation.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining distribution network operation configuration information according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for determining distribution network operation configuration information according to any one of claims 1 to 7 when executed.