Coordination control and parameter optimization method for normally-straight double-side FLC and hydropower primary frequency modulation

Through the coordinated control method of normal-direction bilateral FLC and hydropower primary frequency regulation, the control parameters are optimized, which solves the problem of weakening the frequency adjustment capability of the synchronous grid after asynchronous networking, achieves frequency stability and adaptability of the DC system, avoids frequency oscillation, and complies with Actual grid operation requirements.

CN118801418AInactive Publication Date: 2024-10-18KUNMING UNIV OF SCI & TECH

Patent Information

Application Number
CN202411281975.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

After asynchronous networking, the scale of the synchronous power grid is reduced, the system inertia is significantly reduced, and the frequency adjustment capability is weakened. When the existing technology introduces a DC frequency limit controller, it is easy to introduce high-frequency noise, leading to oscillation, and it is difficult to achieve effective frequency through optimization of control parameters. coordination.

Method used

Adopting the coordinated control method of normal-direction bilateral FLC and hydropower primary frequency regulation, through preset control logic algorithm and double-layer optimization objective function model, combined with particle swarm optimization algorithm and multi-objective particle swarm optimization algorithm, the FLC control link parameters and hydropower unit PID are optimized. Speed ​​regulator parameters ensure the stability and adaptability of frequency adjustment.

Benefits of technology

The frequency of the DC system interconnected grid is mutually supported, reducing the frequency peak fluctuation of the sending and receiving end grids, improving the frequency stability of the interconnected grid, adapting to high-power step disturbances, avoiding frequency oscillation, and meeting the actual grid operation requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118801418A_ABST
    Figure CN118801418A_ABST
Patent Text Reader

Abstract

The invention relates to a normally-straight double-side FLC and hydropower primary frequency modulation coordination control and parameter optimization method, and belongs to the technical field of power system control. Frequency additional control of a rectification side and an inversion side is introduced into the direct-current power transmission system, so that the direct-current power transmission system jointly provides inertia and primary frequency modulation supporting capacity for power grids on the two sides; the system frequency difference is limited to a double-side FLC dead zone, a speed regulator responds to the unit output adjusted by the frequency difference to preferentially release the double-side FLC adjusting quantity, and then the frequency is recovered to a quasi-steady state; establishing a double-layer optimization objective function model to determine a selection range of a constant-direct double-side FLC controller, a dead zone parameter and a hydroelectric generating set PID speed regulator parameter so as to improve a control effect of the controller parameter on a frequency coordination control function; and performing parameter optimization based on a particle swarm optimization algorithm and a multi-target particle swarm optimization algorithm. The invention aims to solve the problems that the grid scale of a synchronous power grid after asynchronous networking is reduced, the rotational inertia of a system is greatly reduced, and the frequency regulation capability is weakened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system control, and in particular to a method for coordinated control of a normal direct current double-side FLC and a hydropower primary frequency regulation and a parameter optimization method thereof. Background Art

[0002] Asynchronous networking can solve stability problems such as power and voltage caused by failures of large-scale AC / DC parallel power grids. However, after asynchronous networking, the grid scale of the synchronous power grid is reduced, the system's rotational inertia is greatly reduced, and the frequency regulation capability is weakened.

[0003] In the related technical solutions, in order to solve this problem, some scholars proposed to add a DC frequency limit controller (FLC) to the DC control system to allow DC to participate in the regulation of the grid frequency. DC FLC is essentially a frequency additional control of the high-voltage DC transmission system, which can be divided into two categories, one is FLC based on the proportional-integral (PI) link, and the other is FLC based on the first-order inertia link.

[0004] However, both introduce frequency deviation signals, simulating the primary frequency modulation characteristics of synchronous generators, but this will introduce high-frequency noise and may cause system oscillation.

[0005] With the development of power grids, both sides of asynchronous interconnected systems need the DC system to participate in frequency regulation, and the optimization of control parameters is also needed. The controller parameters have a decisive effect on the control effect of the frequency coordination control function. Unreasonable control parameters will affect the convergence effect of the controller and even lead to the failure of control convergence. Therefore, a method of coordinated control and parameter optimization of FLC and primary frequency regulation of hydropower on both sides of the DC is needed to overcome the problems of reduced grid size, significantly reduced system moment of inertia, and weakened frequency regulation capability of the synchronous power grid after asynchronous interconnection without introducing high-frequency noise of the frequency.

[0006] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0007] The main purpose of the present invention is to provide a method for coordinated control of the FLC on both sides of the normal direct current and the primary frequency regulation of hydropower and its parameter optimization, aiming to solve the problem of how to overcome the problem of reduced grid scale, significant decrease in system rotational inertia and weakened frequency regulation capability of the synchronous power grid after asynchronous networking.

[0008] To achieve the above object, the present invention provides a method for coordinated control of a normal direct current double-side FLC and a hydropower primary frequency regulation and its parameter optimization, the method comprising:

[0009] Calling a preset normally direct double-sided FLC control logic algorithm to control the normally direct double-sided FLC, wherein the preset normally direct double-sided FLC control logic algorithm includes a rectifier side frequency additional control algorithm, an inverter side frequency additional control algorithm and a double-end frequency coordination control algorithm;

[0010] Calling a two-layer optimization objective function model, wherein the first layer of the two-layer optimization objective function model is a parameter optimization layer for the FLC control link on both sides of the direct current, and the second layer is a parameter optimization layer for the FLC dead zone parameters on both sides of the direct current and the PID speed regulator parameters of the hydropower unit;

[0011] Based on the time domain simulation analysis results, the particle swarm optimization algorithm is used to solve the parameters of the constant straight double-sided FLC control link in the first layer; and,

[0012] The multi-objective particle swarm optimization algorithm is used to solve the dead zone parameters of the FLC on both sides of the second layer and the PID speed regulator parameters of the hydropower unit. The PID speed regulator parameters are iteratively calculated using the eigenvalue sensitivity method with the fastest single-machine step response time as the target and the damping ratio greater than zero as the constraint.

[0013] Optionally, the rectifier side frequency additional control algorithm includes:

[0014] Obtain the AC frequency of the power grid at the sending end and the rated frequency of the power grid;

[0015] Subtract the AC frequency of the power grid at the sending end from the rated frequency of the power grid to obtain a frequency deviation value of the power grid at the sending end;

[0016] The difference between the frequency deviation value of the power grid at the sending end and the dead zone at the sending end is input into the PI controller to calculate the frequency at the rectifier side;

[0017] Additional control is performed based on the rectifier-side frequency.

[0018] Optionally, the inverter side frequency additional control algorithm includes:

[0019] Obtain the AC frequency of the receiving-end power grid and the rated frequency of the power grid;

[0020] Subtracting the AC frequency of the receiving-end power grid from the rated frequency of the power grid to obtain a frequency deviation of the receiving-end power grid;

[0021] The difference between the receiving-end grid frequency deviation and the receiving-end dead zone is input into a PI controller to calculate the inverter-side frequency;

[0022] Additional control is performed based on the inverter-side frequency.

[0023] Optionally, the two-terminal frequency coordination control algorithm includes:

[0024] Get the double-end frequencies and calculate the frequency difference between the two sides;

[0025] Based on the frequency difference on both sides, the difference in power adjustment amount is calculated,

[0026] The system frequency difference is suppressed to within the difference of the power adjustment amount, so as to suppress the system frequency difference within the double-sided FLC dead zone.

[0027] Optionally, the objective function of the parameter optimization layer of the normally straight double-sided FLC control link includes:

[0028]

[0029]

[0030] in, is the simulation duration; It is the parameter of the FLC control link on both sides of the normal straight line; It is the sum of the absolute value of the frequency deviation of the power grid at the sending end and the absolute value of the frequency deviation of the power grid at the receiving end; It is the magnitude adjustment factor to avoid the "overlap" phenomenon caused by magnitude differences during optimization; The absolute value of the difference between the FLC power regulation at the sending end and the FLC power regulation at the receiving end; is the FLC power regulation value at the sending end; is the FLC power adjustment value at the receiving end; is the frequency deviation of the power grid at the sending end; is the receiving grid frequency deviation.

[0031] Optionally, the objective function of the optimization layer of the FLC dead zone parameters on both sides of the constant direct current and the PID speed regulator parameters of the hydropower unit includes:

[0032]

[0033]

[0034]

[0035]

[0036] in, It is the lower limit of the bilateral FLC dead zone; is the upper limit of the bilateral FLC dead zone; n is the total sampling frequency; is the measured frequency of the power grid at the sending end at the kth sampling time, is the actual frequency of the receiving power grid at the kth sampling time, is the rated frequency of the power grid at the sending end at the kth sampling time, is the sampling time interval, is the power adjustment amount of the FLC on both sides at the kth sampling time, It is the time for calling the hydropower unit for frequency regulation standby.

[0037] Optionally, the step of solving the parameters of the normally straight double-sided FLC control link in the first layer by using a particle swarm optimization algorithm based on the time domain simulation analysis result specifically includes:

[0038] S1, set the initial values ​​of model parameters and optimization algorithm parameters;

[0039] S2, calculate the target value of each particle;

[0040] S3, updating the speed, position and weight parameters of each particle based on the target value;

[0041] S4, update the latest particle parameters to controller parameters , ;

[0042] S5, determine the updated controller parameters , Whether the iteration accuracy requirement is met, if yes, execute step S7, if no, execute step S6;

[0043] S6, update the controller parameters , Input into the PSCAD electromagnetic transient simulation tool to obtain the model parameters required for the objective function model calculation, and then return to step S2;

[0044] S7, output the current controller parameter value as the final constant direct double-sided FLC control link parameter.

[0045] Optionally, the step of solving the FLC dead zone parameters on both sides of the constant straight line and the PID speed regulator parameters of the hydropower unit in the second layer by using a multi-objective particle swarm optimization algorithm includes:

[0046] S10, population initialization;

[0047] S20, determine the individual optimum and the group optimum;

[0048] S30, updating the inertia weight;

[0049] S40, the speed and position of the latest particle;

[0050] S50, crossover mutation operation;

[0051] S60, calculate the fitness of the particles and update the Pareto optimal solution set;

[0052] S70, update group optimum and individual optimum;

[0053] S80, determine whether the preset number of iterations is met, if so, output the result, if not, return to step 30.

[0054] Optionally, the step of calculating the PID speed regulator parameters includes:

[0055] S100, initialize PID speed regulator parameters ;

[0056] S200, solve the eigenvalue with the largest real part according to the state space equation , and find the corresponding damping ratio ;

[0057] in, is the attenuation factor of the system, is the angular frequency;

[0058] S300, based on the eigenvalue sensitivity analysis algorithm, calculates the eigenvalue sensitivity corresponding to each PID speed regulator parameter , according to the set step size L, we get ,Right now:

[0059]

[0060] Where L is the step size, rand1, rand2, and rand3 are random numbers (0, 1);

[0061] S400, judgment If yes, update the PID speed regulator parameters to:

[0062]

[0063] in, , , The upper limit time of the integral. is the output value of the system at time t, is the steady-state value, is the open-loop transfer function of the turbine system, is a complex variable, is the steady-state gain coefficient;

[0064] S500, repeat S200~S400 until the damping ratio Less than the preset damping ratio threshold , or until the number of iterations reaches the preset number, the current PID speed regulator parameters are output as the final PID speed regulator parameters.

[0065] In addition, to achieve the above-mentioned objectives, the present invention also provides a hydropower system, which includes: a memory, a processor, and a program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization, which is stored in the memory and can be run on the processor. When the program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization is executed by the processor, the steps of the method for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization are implemented as described in any of the above items.

[0066] The beneficial effects of the present invention are as follows: the present invention can not only realize the mutual support of the frequency of the interconnected power grid of the DC system, but also fully consider the influence of the control parameters. The frequency peak fluctuation degree of the power grids at the sending and receiving ends under the high-power step disturbance is reduced, providing frequency support for the power grid on the disturbance side, without expanding the scope of the accident, and improving the frequency stability of the interconnected power grid. Under the condition of high-power step disturbance, the effective regulation of the frequency of the sending and receiving end power grids by the double-sided FLC can be guaranteed, with good adaptability, and the basic principle of the frequency control of the AC system will not be changed, which meets the operation requirements of the actual power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] Figure 1 A schematic diagram of the architecture of the hardware operating environment of the hydropower system involved in an embodiment of the present invention;

[0068] Figure 2 It is a flow chart of the first embodiment of the coordinated control of the FLC on both sides of the normal direct current and the primary frequency regulation of hydropower and its parameter optimization method of the present invention;

[0069] Figure 3 This is a double-sided FLC control block diagram involved in an embodiment of the present invention;

[0070] Figure 4 It is a block diagram of a double-layer optimization objective function model involved in an embodiment of the present invention;

[0071] Figure 5 A flow chart of the particle swarm optimization algorithm optimization strategy involved in an embodiment of the present invention;

[0072] Figure 6 It is a flow chart of the optimization strategy of the multi-objective particle swarm optimization algorithm involved in the embodiment of the present invention;

[0073] Figure 7 It is a schematic diagram of stability comparison results of frequency optimization parameters of the sending-end power grid under the Luxi LCC single-pole DC blocking 400MW working condition involved in the embodiment of the present invention;

[0074] Figure 8 It is a schematic diagram of the stability comparison results of the receiving-end power grid frequency optimization parameters under the Luxi LCC single-pole DC locking 400MW working condition involved in an embodiment of the present invention.

[0075] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0076] In order to better understand the above technical solution, exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0077] As an implementation plan, Figure 1 It is a schematic diagram of the architecture of the hardware operating environment of the hydropower system involved in the embodiment of the present invention.

[0078] like Figure 1 As shown, the hydropower system may include: a processor 1001, such as a CPU, a memory 1005, a user interface 1003, a network interface 1004, and a communication bus 1002. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface). The memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.

[0079] Those skilled in the art will understand that Figure 1 The hydropower system architecture shown in the figure does not constitute a limitation on the hydropower system, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.

[0080] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a program for coordinating and controlling the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization. Among them, the operating system is a program for managing and controlling the hardware and software resources of the hydropower system, the operation of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization program, and other software or programs.

[0081] exist Figure 1In the hydropower system shown, the user interface 1003 is mainly used to connect to the terminal and communicate data with the terminal; the network interface 1004 is mainly used for the background server and communicates data with the background server; the processor 1001 can be used to call the normally direct double-sided FLC and hydropower primary frequency regulation coordinated control and its parameter optimization program stored in the memory 1005.

[0082] In this embodiment, the hydropower system includes: a memory 1005, a processor 1001, and a program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization stored in the memory and executable on the processor, wherein:

[0083] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0084] Calling a preset normally direct double-sided FLC control logic algorithm to control the normally direct double-sided FLC, wherein the preset normally direct double-sided FLC control logic algorithm includes a rectifier side frequency additional control algorithm, an inverter side frequency additional control algorithm and a double-end frequency coordination control algorithm;

[0085] Calling a two-layer optimization objective function model, wherein the first layer of the two-layer optimization objective function model is a parameter optimization layer for the FLC control link on both sides of the direct current, and the second layer is a parameter optimization layer for the FLC dead zone parameters on both sides of the direct current and the PID speed regulator parameters of the hydropower unit;

[0086] Based on the time domain simulation analysis results, the particle swarm optimization algorithm is used to solve the parameters of the constant straight double-sided FLC control link in the first layer; and,

[0087] The multi-objective particle swarm optimization algorithm is used to solve the dead zone parameters of the FLC on both sides of the second layer and the PID speed regulator parameters of the hydropower unit. The PID speed regulator parameters are iteratively calculated using the eigenvalue sensitivity method with the fastest single-machine step response time as the target and the damping ratio greater than zero as the constraint.

[0088] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0089] Obtain the AC frequency of the power grid at the sending end and the rated frequency of the power grid;

[0090] Subtract the AC frequency of the power grid at the sending end from the rated frequency of the power grid to obtain a frequency deviation value of the power grid at the sending end;

[0091] The difference between the frequency deviation value of the power grid at the sending end and the dead zone at the sending end is input into the PI controller to calculate the frequency at the rectifier side;

[0092] Additional control is performed based on the rectifier-side frequency.

[0093] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0094] Obtain the AC frequency of the receiving-end power grid and the rated frequency of the power grid;

[0095] Subtracting the AC frequency of the receiving-end power grid from the rated frequency of the power grid to obtain a frequency deviation of the receiving-end power grid;

[0096] The difference between the receiving-end grid frequency deviation and the receiving-end dead zone is input into a PI controller to calculate the inverter-side frequency;

[0097] Additional control is performed based on the inverter-side frequency.

[0098] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0099] Get the double-end frequencies and calculate the frequency difference between the two sides;

[0100] Based on the frequency difference on both sides, the difference in power adjustment amount is calculated,

[0101] The system frequency difference is suppressed to within the difference of the power adjustment amount, so as to suppress the system frequency difference within the double-sided FLC dead zone.

[0102] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0103] S1, set the initial values ​​of model parameters and optimization algorithm parameters;

[0104] S2, calculate the target value of each particle;

[0105] S3, updating the speed, position and weight parameters of each particle based on the target value;

[0106] S4, update the latest particle parameters to controller parameters , ;

[0107] S5, determine the updated controller parameters , Whether the iteration accuracy requirement is met, if yes, execute step S7, if no, execute step S6;

[0108] S6, update the controller parameters , Input into the PSCAD electromagnetic transient simulation tool to obtain the model parameters required for the objective function model calculation, and then return to step S2;

[0109] S7, output the current controller parameter value as the final constant direct double-sided FLC control link parameter.

[0110] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0111] S10, population initialization;

[0112] S20, determine the individual optimum and the group optimum;

[0113] S30, updating the inertia weight;

[0114] S40, the speed and position of the latest particle;

[0115] S50, crossover mutation operation;

[0116] S60, calculate the fitness of the particles and update the Pareto optimal solution set;

[0117] S70, update group optimum and individual optimum;

[0118] S80, determine whether the preset number of iterations is met, if so, output the result, if not, return to step 30.

[0119] When the processor 1001 calls the coordinated control and parameter optimization program of the normal direct current double-side FLC and the hydropower primary frequency regulation stored in the memory 1005, the following operations are performed:

[0120] S100, initialize PID speed regulator parameters ;

[0121] S200, solve the eigenvalue with the largest real part according to the state space equation , and find the corresponding damping ratio ;

[0122] in, is the attenuation factor of the system, is the angular frequency;

[0123] S300, based on the eigenvalue sensitivity analysis algorithm, calculates the eigenvalue sensitivity corresponding to each PID speed regulator parameter , according to the set step size L, we get ,Right now:

[0124]

[0125] Where L is the step size, rand1, rand2, and rand3 are random numbers (0, 1);

[0126] S400, judgment If yes, update the PID speed regulator parameters to:

[0127]

[0128] in, , , The upper limit time of the integral. is the output value of the system at time t, is the steady-state value, is the open-loop transfer function of the turbine system, is a complex variable, is the steady-state gain coefficient;

[0129] S500, repeat S200~S400 until the damping ratio Less than the preset damping ratio threshold , or until the number of iterations reaches the preset number, the current PID speed regulator parameters are output as the final PID speed regulator parameters.

[0130] Based on the hardware architecture of the hydropower system of the above-mentioned power system control technology, an embodiment of the coordinated control of the FLC on both sides of the normal direct current and the primary frequency regulation of hydropower and its parameter optimization method of the present invention is proposed.

[0131] Reference Figure 2 In the first embodiment, the method for coordinated control of the FLC on both sides of the DC power plant and the primary frequency regulation of hydropower and its parameter optimization includes the following steps:

[0132] Step 1, calling a preset normally direct double-sided FLC control logic algorithm to control the normally direct double-sided FLC, wherein the preset normally direct double-sided FLC control logic algorithm includes a rectifier side frequency additional control algorithm, an inverter side frequency additional control algorithm and a double-end frequency coordination control algorithm;

[0133] In this embodiment, first, refer to Figure 3The double-sided FLC control block diagram shown in the figure makes methodological improvements based on the traditional frequency control technology. It introduces additional frequency control on the rectifier side and the inverter side in the DC transmission system, so that the power transmitted by the DC transmission system has the ability to provide inertia and primary frequency regulation support for the rectifier side sending system and the inverter side receiving system. At the same time, double-end frequency coordinated control is introduced, and the coordinated relationship between the double-sided FLC and the primary frequency regulation is considered. The double-sided FLC quickly outputs the adjustment amount, and the system frequency difference is limited to the vicinity of the double-sided FLC dead zone. The unit output of the speed regulator in response to the frequency difference adjustment will give priority to releasing the double-sided FLC adjustment amount, and then restore the frequency to a quasi-steady state.

[0134] Optionally, the additional frequency control algorithm on the rectifier side specifically includes: Rated frequency of the power grid The frequency deviation of the power grid at the sending end is obtained by subtraction, and the frequency value of the inverter side is calculated by passing the difference between the frequency deviation of the power grid at the sending end and the dead zone at the sending end through PI. , additional control is performed based on the inverter side frequency value.

[0135] Optionally, the inverter side frequency additional control algorithm specifically includes: Rated frequency of the power grid The frequency deviation of the receiving grid is obtained by subtracting The frequency deviation of the receiving grid and the difference between the receiving dead zone are calculated after PI. .

[0136] Optionally, the dual-end frequency coordination control algorithm includes: obtaining the dual-end frequencies and calculating the frequency difference on both sides; based on the frequency difference on both sides, calculating the difference in power regulation amount, and suppressing the system frequency difference to within the difference in power regulation amount, so as to suppress the system frequency difference within the dual-sided FLC dead zone.

[0137] It should be noted that in a multi-DC asynchronous transmission system with double-sided FLC function, the dynamic process after a large power disturbance can be briefly described as follows: the double-sided FLC quickly outputs the adjustment amount, limiting the system frequency difference to near the double-sided FLC dead zone, and the speed regulator responds to the unit output of the frequency difference adjustment and will give priority to releasing the double-sided FLC adjustment amount, and then restore the frequency to a quasi-steady state.

[0138] Therefore, the setting of the double-sided FLC dead zone determines the effective capacity of the primary frequency regulation reserve, and the PID parameters of the unit speed regulator determine the calling speed of the primary frequency regulation reserve. When the disturbance power is large, if the double-sided FLC dead zone is too small or the speed regulator responds too slowly, it may cause the output regulation of the speed regulation system to be limited, and the regulation of the double-sided FLC cannot be released in time, causing the system frequency deviation to be clamped in the double-sided FLC dead zone for a long time, and the DC is running for a long time and in an overload state, which is not conducive to equipment safety; if the double-sided FLC dead zone is set reasonably or the speed regulation system itself moves faster, the double-sided FLC regulation can be released quickly, and the frequency difference clamping time will also be shortened.

[0139] Step 2, calling a two-layer optimization objective function model, wherein the first layer of the two-layer optimization objective function model is the optimization layer of the parameters of the FLC control link on both sides of the direct current, and the second layer is the optimization layer of the dead zone parameters of the FLC on both sides of the direct current and the PID speed regulator parameters of the hydropower unit;

[0140] In this embodiment, refer to Figure 4 The double-layer optimization objective function model block diagram is shown. The double-layer optimization objective function model is established in advance. After calling the preset direct-current dual-side FLC control logic algorithm to control the direct-current dual-side FLC, the double-layer optimization objective function model is called to optimize the controller parameters to achieve better control effect of the frequency coordination control function. Among them, the first layer of the double-layer optimization objective function model is the direct-current dual-side FLC control link parameter optimization layer, which is used to determine the direct-current dual-side FLC controller Parameters and The second layer is the optimization layer of the dead zone parameters of the FLC on both sides of the direct current and the PID speed regulator parameters of the hydropower unit, which is used to determine the selection range of the dead zone parameters and the speed regulator parameters of the hydropower unit.

[0141] Optionally, the double-sided FLC controller can be optimized by using the PSCAD electromagnetic transient simulation tool and a multi-objective dual-level optimization algorithm. , Parameters, dead zone parameters and PID speed regulator parameters of hydropower units are optimized in layers.

[0142] Optionally, in the first layer, the objective function of the parameter optimization layer of the normally straight double-sided FLC control link includes:

[0143] Minimize the parameters of the normally straight double-sided FLC control link:

[0144]

[0145] in,

[0146]

[0147] In the formula, is the simulation duration; It is the parameter of the FLC control link on both sides of the normal straight line; It is the sum of the absolute value of the frequency deviation of the power grid at the sending end and the absolute value of the frequency deviation of the power grid at the receiving end; It is the magnitude adjustment factor to avoid the "overlap" phenomenon caused by magnitude differences during optimization; The absolute value of the difference between the FLC power regulation at the sending end and the FLC power regulation at the receiving end; is the FLC power regulation value at the sending end; is the FLC power adjustment value at the receiving end; is the frequency deviation of the power grid at the sending end; is the receiving grid frequency deviation.

[0148] Optionally, in the second layer, the objective function of the optimization layer of the FLC dead zone parameters on both sides of the normal and direct current and the PID speed regulator parameters of the hydropower unit includes:

[0149] 1. Minimize the standard deviation of the sending-end grid frequency:

[0150]

[0151] in, It is the lower limit of the bilateral FLC dead zone; is the upper limit of the bilateral FLC dead zone; n is the total sampling frequency; is the measured frequency of the power grid at the sending end at the kth sampling time; is the rated frequency of the power grid at the sending end at the kth sampling time.

[0152] 2. Minimize the standard deviation of the receiving grid frequency:

[0153]

[0154] Where n is the total sampling frequency; is the actual frequency of the receiving power grid at the kth sampling time.

[0155] 3. Minimize the total duration of the straight bilateral FLC action:

[0156]

[0157] in, is the sampling time interval, is the power adjustment amount of the double-sided FLC at the kth sampling time.

[0158] 4. Minimize the time of calling the hydropower unit for frequency regulation and standby:

[0159]

[0160] Step 3, based on the time domain simulation analysis results, a particle swarm optimization algorithm is used to solve the parameters of the normally straight double-sided FLC control link in the first layer; and,

[0161] Step 4, using a multi-objective particle swarm optimization algorithm, the dead zone parameters of the FLC on both sides of the second layer and the PID speed regulator parameters of the hydropower unit are solved, wherein the PID speed regulator parameters are iteratively calculated using the eigenvalue sensitivity method with the fastest single-machine step response time as the target and the damping ratio greater than zero as the constraint condition.

[0162] In this embodiment, after determining the value ranges of the four parameters, based on the time domain simulation analysis results, the particle swarm optimization algorithm is used to solve the parameters of the constant direct double-sided FLC control link in the first layer, and the multi-objective particle swarm optimization algorithm is used to solve the constant direct double-sided FLC dead zone parameters in the second layer and the PID speed regulator parameters of the hydropower unit.

[0163] It is understandable that step 3 and step 4 may be performed simultaneously or sequentially based on certain rules.

[0164] Optionally, refer to Figure 5 The particle swarm optimization algorithm optimization strategy flow chart shown in the figure shows how to solve the parameters of the FLC control link on both sides of the straight line. The specific steps are as follows:

[0165] S1, set the initial values ​​of model parameters and optimization algorithm parameters;

[0166] S2, calculate the target value of each particle;

[0167] S3, updating the speed, position and weight parameters of each particle based on the target value;

[0168] S4, update the latest particle parameters to controller parameters , ;

[0169] S5, determine the updated controller parameters , Whether the iteration accuracy requirement is met, if yes, execute step S7, if no, execute step S6;

[0170] S6, update the controller parameters , Input into the PSCAD electromagnetic transient simulation tool to obtain the model parameters required for the objective function model calculation, and then return to step S2;

[0171] S7, output the current controller parameter value as the final constant direct double-sided FLC control link parameter.

[0172] Optionally, refer to Figure 6 The multi-objective particle swarm optimization algorithm optimization strategy flow chart is shown. The specific steps for solving the FLC dead zone parameters on both sides of the normal and direct current and the PID speed regulator parameters of the hydropower unit are as follows:

[0173] S10, population initialization;

[0174] S20, determine the individual optimum and the group optimum;

[0175] S30, updating the inertia weight;

[0176] S40, the speed and position of the latest particle;

[0177] S50, crossover mutation operation;

[0178] S60, calculate the fitness of the particles and update the Pareto optimal solution set;

[0179] S70, update group optimum and individual optimum;

[0180] S80, determine whether the preset number of iterations is met, if so, output the result, if not, return to step 30.

[0181] Optionally, the preset number of iterations may be 500 times.

[0182] In addition, in step 4, the PID speed regulator parameters are iteratively calculated using the eigenvalue sensitivity method with the fastest single-machine step response time as the target and the damping ratio greater than zero as the constraint condition. Specifically and optionally, the specific steps are as follows:

[0183] S100, initialize PID speed regulator parameters ;

[0184] S200, solve the eigenvalue with the largest real part according to the state space equation , and find the corresponding damping ratio ;

[0185] in, is the attenuation factor of the system, is the angular frequency;

[0186] S300, based on the eigenvalue sensitivity analysis algorithm, calculates the eigenvalue sensitivity corresponding to each PID speed regulator parameter , according to the set step size L, we get ,Right now:

[0187]

[0188] Where L is the step size, rand1, rand2, and rand3 are random numbers (0, 1);

[0189] S400, judgment If yes, update the PID speed regulator parameters to:

[0190]

[0191] in, , , The upper limit time of the integral. is the output value of the system at time t, is the steady-state value, is the open-loop transfer function of the turbine system, is a complex variable, is the steady-state gain coefficient;

[0192] S500, repeat S200~S400 until the damping ratio Less than the preset damping ratio threshold , or until the number of iterations reaches the preset number, the current PID speed regulator parameters are output as the final PID speed regulator parameters.

[0193] Optionally, the preset number of times may be 500 times.

[0194] In the technical solution provided in this embodiment, on the basis of the traditional frequency control technology, the method is improved, and the additional frequency control on the rectifier side and the additional frequency control on the inverter side are introduced in the DC transmission system, so that the power transmitted by the DC transmission system has the ability to provide inertia and primary frequency regulation support for the rectifier side sending end system and the inverter side receiving end system; secondly, the coordination and cooperation relationship between the double-side FLC and the primary frequency regulation is considered, and the double-side FLC quickly outputs the adjustment amount to limit the system frequency difference to the vicinity of the double-side FLC dead zone. The unit output of the speed regulator in response to the frequency difference adjustment will give priority to releasing the double-side FLC adjustment amount, and then restore the frequency to a quasi-steady state; finally, in order to achieve a better control effect of the controller parameters on the frequency coordination control function, it is proposed to establish a double-layer optimization objective function model to determine the selection range of the constant direct double-side FLC controller, the dead zone parameters and the hydropower unit speed regulator parameters; it can enable the asynchronously interconnected two-end power grid to provide inertia and primary frequency regulation support to each other under the premise of considering its own carrying capacity and ensuring that the frequency does not exceed the lower limit, thereby enhancing the frequency stability of the asynchronously interconnected power grid; and provide an effective reference for the design and optimization operation of the frequency coordination control method of the asynchronously interconnected two-end system of the DC system.

[0195] Second embodiment

[0196] Based on the first embodiment, this embodiment further illustrates the method in combination with an application scenario example:

[0197] According to the actual PSCAD model data of power grid operation and the multi-objective double-layer optimization algorithm, the optimal parameters of the FLC control function on both sides of Luxi are obtained as shown in Table 1:

[0198] Table 1. Analysis of the stability effect of control parameters

[0199]

[0200] Figure 7 , 8 The stability comparison results of the optimized parameters and initial parameters under the Luxi LCC single-pole DC blocking 400MW operating condition are given.

[0201] It can be seen that by adopting multi-objective double-layer optimization parameters, the frequency of Yunnan power grid enters the dead zone after 14s, the frequency of the main grid enters the dead zone after 16s, and the DC power in western Shandong converges quickly without power oscillation divergence. The parameters have the best stability effect, which verifies the effectiveness of the strategy.

[0202] According to the proposed method, the speed governor parameters of the main hydropower plants in Yunnan power grid are optimized. The comparison of parameters and response time before and after optimization is shown in Table 2.

[0203] Table 2 Response before and after parameter optimization

[0204]

[0205] It can be seen that the proposed optimization method can significantly reduce the response time of the speed regulator, optimize its dynamic performance, and accelerate the recovery of the system frequency while meeting the system stability.

[0206] In addition, it can be understood by those skilled in the art that all or part of the processes in the method for implementing the above embodiment can be completed by instructing the relevant hardware through a computer program. The computer program includes program instructions, and the computer program can be stored in a storage medium, which is a computer-readable storage medium. The program instructions are executed by at least one processor in the hydropower system to implement the process steps of the embodiment of the above method.

[0207] Therefore, the present invention also provides a computer-readable storage medium, which stores a program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization. When the program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization is executed by a processor, the various steps of the method for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization as described in the above embodiment are implemented.

[0208] The computer-readable storage medium may be a USB flash drive, a mobile hard disk, a read-only memory (ROM), a magnetic disk, or an optical disk, etc., which are computer-readable storage media that can store program codes.

[0209] It should be noted that since the storage medium provided in the embodiment of the present application is the storage medium used to implement the method of the embodiment of the present application, based on the method introduced in the embodiment of the present application, the person skilled in the art can understand the specific structure and deformation of the storage medium, so it is not repeated here. All storage media used in the method of the embodiment of the present application belong to the scope of protection of this application.

[0210] It should be understood by those skilled in the art that the embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0211] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0212] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0213] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0214] It should be noted that in the claims, any reference signs placed between parentheses shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by one and the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0215] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0216] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for coordinated control of FLC on both sides of a normal direct current and primary frequency regulation of hydropower and its parameter optimization, It is characterized in that The method comprises the following steps: Calling a preset normally direct double-sided FLC control logic algorithm to control the normally direct double-sided FLC, wherein the preset normally direct double-sided FLC control logic algorithm includes a rectifier side frequency additional control algorithm, an inverter side frequency additional control algorithm and a double-end frequency coordination control algorithm; Calling a two-layer optimization objective function model, wherein the first layer of the two-layer optimization objective function model is a parameter optimization layer for the FLC control link on both sides of the direct current, and the second layer is a parameter optimization layer for the FLC dead zone parameters on both sides of the direct current and the PID speed regulator parameters of the hydropower unit; Based on the time domain simulation analysis results, the particle swarm optimization algorithm is used to solve the parameters of the constant straight double-sided FLC control link in the first layer; and, The multi-objective particle swarm optimization algorithm is used to solve the dead zone parameters of the FLC on both sides of the second layer and the PID speed regulator parameters of the hydropower unit. The PID speed regulator parameters are iteratively calculated using the eigenvalue sensitivity method with the fastest single-machine step response time as the target and the damping ratio greater than zero as the constraint.

2. The method according to claim 1, It is characterized in that The rectifier side frequency additional control algorithm includes: Obtain the AC frequency of the power grid at the sending end and the rated frequency of the power grid; Subtract the AC frequency of the power grid at the sending end from the rated frequency of the power grid to obtain a frequency deviation value of the power grid at the sending end; The difference between the frequency deviation value of the power grid at the sending end and the dead zone at the sending end is input into the PI controller to calculate the frequency at the rectifier side; Additional control is performed based on the rectifier-side frequency.

3. The method according to claim 1, It is characterized in that The inverter side frequency additional control algorithm includes: Obtain the AC frequency of the receiving-end power grid and the rated frequency of the power grid; Subtracting the AC frequency of the receiving-end power grid from the rated frequency of the power grid to obtain a frequency deviation of the receiving-end power grid; The difference between the receiving-end grid frequency deviation and the receiving-end dead zone is input into a PI controller to calculate the inverter-side frequency; Additional control is performed based on the inverter-side frequency.

4. The method according to claim 1, It is characterized in that The two-terminal frequency coordination control algorithm includes: Get the double-end frequencies and calculate the frequency difference between the two sides; Based on the frequency difference on both sides, the difference in power adjustment amount is calculated, The system frequency difference is suppressed to within the difference of the power adjustment amount, so as to suppress the system frequency difference within the double-sided FLC dead zone.

5. The method according to claim 1, It is characterized in that The objective function of the parameter optimization layer of the constant straight double-sided FLC control link includes: ; ; in, is the simulation duration; It is the parameter of the FLC control link on both sides of the normal straight line; It is the sum of the absolute value of the frequency deviation of the power grid at the sending end and the absolute value of the frequency deviation of the power grid at the receiving end; It is the magnitude adjustment factor to avoid the "overlap" phenomenon caused by magnitude differences during optimization; The absolute value of the difference between the FLC power regulation at the sending end and the FLC power regulation at the receiving end; is the FLC power regulation value at the sending end; is the FLC power adjustment value at the receiving end; is the frequency deviation of the power grid at the sending end; is the receiving grid frequency deviation.

6. The method according to claim 1, It is characterized in that The objective function of the optimization layer of the FLC dead zone parameters on both sides of the constant and direct current and the PID speed regulator parameters of the hydropower unit includes: ; ; ; ; in, It is the lower limit of the bilateral FLC dead zone; is the upper limit of the bilateral FLC dead zone; n is the total sampling frequency; is the measured frequency of the power grid at the sending end at the kth sampling time, is the actual frequency of the receiving power grid at the kth sampling time, is the rated frequency of the power grid at the sending end at the kth sampling time, is the sampling time interval, is the power adjustment amount of the FLC on both sides at the kth sampling time, It is the time for calling the hydropower unit for frequency regulation standby.

7. The method according to claim 1, It is characterized in that The step of solving the parameters of the normally straight double-sided FLC control link in the first layer by using a particle swarm optimization algorithm based on the time domain simulation analysis result specifically includes: S1, set the initial values ​​of model parameters and optimization algorithm parameters; S2, calculate the target value of each particle; S3, updating the speed, position and weight parameters of each particle based on the target value; S4, update the latest particle parameters to controller parameters , ; S5, determine the updated controller parameters , Whether the iteration accuracy requirement is met, if yes, execute step S7, if no, execute step S6; S6, update the controller parameters , Input into the PSCAD electromagnetic transient simulation tool to obtain the model parameters required for the objective function model calculation, and then return to step S2; S7, output the current controller parameter value as the final constant direct double-sided FLC control link parameter.

8. The method according to claim 1, It is characterized in that The step of solving the FLC dead zone parameters on both sides of the constant straight line and the PID speed regulator parameters of the hydropower unit in the second layer by using the multi-objective particle swarm optimization algorithm includes: S10, population initialization; S20, determine the individual optimum and the group optimum; S30, updating the inertia weight; S40, the speed and position of the latest particle; S50, crossover mutation operation; S60, calculate the fitness of the particles and update the Pareto optimal solution set; S70, update group optimum and individual optimum; S80, determine whether the preset number of iterations is met, if so, output the result, if not, return to step 30.

9. The method according to claim 1, It is characterized in that The calculation steps of the PID speed regulator parameters include: S100, initialize PID speed regulator parameters ; S200, solve the eigenvalue with the largest real part according to the state space equation , and find the corresponding damping ratio ; in, is the attenuation factor of the system, is the angular frequency; S300, based on the eigenvalue sensitivity analysis algorithm, calculates the eigenvalue sensitivity corresponding to each PID speed regulator parameter , according to the set step size L, we get ,Right now: ; Where L is the step size, rand1, rand2, and rand3 are random numbers (0, 1); S400, judgment If yes, update the PID speed regulator parameters to: ; in, , , The upper limit time of the integral. is the output value of the system at time t, is the steady-state value, is the open-loop transfer function of the turbine system, is a complex variable, is the steady-state gain coefficient; S500, repeat S200~S400 until the damping ratio Less than the preset damping ratio threshold , or until the number of iterations reaches the preset number, the current PID speed regulator parameters are output as the final PID speed regulator parameters.

10. A hydroelectric system, It is characterized in that The hydropower system includes: a memory, a processor, and a program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization, which is stored in the memory and can be run on the processor. When the program for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization is executed by the processor, the steps of the method for coordinated control of the FLC on both sides of the direct current and the primary frequency regulation of hydropower and its parameter optimization are implemented as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Coordinated control method and system for asynchronous operation sending-end power grid in double control areas

    CN117595309A

  • Direct current system double-end frequency coordination control method and system considering power grid bearing capacity

    CN118017544A

Cited By

  • Water turbine primary frequency modulation control method based on intelligent optimization algorithm

    CN120657799A

  • Hydraulic turbine primary frequency modulation control method based on intelligent optimization algorithm

    CN120657799B