Wind power plant power reserve coordination distribution method considering rotation kinetic energy maximization

By optimizing the wind farm power reserve allocation method and using linear programming models and key operating status information, the problem of insufficient utilization of rotational kinetic energy and frequent pitch movements is solved, and the wind farm's rotational kinetic energy is maximized and pitch movements are minimized. Enhanced system stability and reduced mechanical losses.

CN118801468APending Publication Date: 2024-10-18POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410554032.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing wind farm power reserve allocation methods fail to fully consider the problems of rotational kinetic energy utilization and frequent pitch movements, resulting in insufficient utilization of rotational kinetic energy and too frequent pitch movements, affecting system stability.

Method used

A wind farm power reserve coordinated allocation method that considers the maximization of rotational kinetic energy is adopted. By obtaining the key operating status information of the wind turbine unit, the maximum power reserve and the average change rate of rotational speed power are calculated, and the decision is made to adopt overspeed control or overspeed and pitch coordinated control. , the linear programming model is used to optimize the power reserve command to ensure that the rotational kinetic energy is maximized and the pitch action is minimized.

Benefits of technology

It effectively maximizes the rotational kinetic energy of the wind farm and minimizes the pitch action, increases the rotational reserve capacity of the wind farm, reduces mechanical losses, and ensures safe and stable operation when the system power deficit is disturbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118801468A_ABST
    Figure CN118801468A_ABST
Patent Text Reader

Abstract

The invention discloses a wind power plant power reserve coordination distribution method considering rotation kinetic energy maximization, and the method aims at the power reserve distribution problem in the wind power plant power reserve control implementation process, and calculates the power reserve reference value of a wind turbine generator by defining the rotation speed power average change rate and adopting a linear programming method. Coordinated distribution of power reserve of the wind power plant is realized. Compared with the existing method, the method has the advantages that in the process of deciding the power standby distribution instruction, the factors such as the rotating kinetic energy and the variable pitch action are fully considered, so that when the wind power plant power standby control mode is executed, the rotating kinetic energy maximization and the variable pitch action minimization of the wind power plant can be effectively realized, the rotating standby of the wind power plant is increased, and the mechanical loss is reduced. In addition, when power shortage disturbance occurs in the system, the method plays a positive role in guaranteeing safe and stable operation of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind power generation, and in particular relates to a method for coordinated allocation of wind farm power reserves taking into account maximization of rotational kinetic energy. Background Art

[0002] With the continuous increase in wind power penetration, the power system faces some new challenges, especially in terms of active power balance and frequency stability. There are two main reasons for this. First, the volatility and uncertainty of wind power output make the system power balance present a probabilistic trend. Second, wind power generation systems generally use power electronic equipment to access the grid, which decouples the system frequency and reduces the system inertia. Therefore, the frequency variation of the power system is more serious.

[0003] At present, according to the different energy sources and maintenance time, wind power participation in frequency regulation can be divided into short-term wind power frequency regulation based on rotational kinetic energy and long-term wind power frequency regulation based on power reserve. The former provides additional active support by temporarily releasing the rotational kinetic energy stored in the rotational inertia. However, the additional active support energy that can be provided is limited, and after the frequency support ends, the speed recovery process is prone to cause a secondary drop in frequency. The latter participates in frequency regulation based on the reserved active reserve by sacrificing the active output under normal operation. Therefore, power reserve control is the premise and basis for wind power to participate in long-term frequency regulation, which is of great significance for maintaining safe and stable operation of the system.

[0004] Existing research on wind farm power reserve allocation methods is still relatively limited. Some literature allocates power reserves according to the wind speed of the wind turbine. The higher the wind speed, the more power reserves the wind turbine bears. In addition, some literature allocates wind farm power reserves considering load factors. However, the methods in existing literature rarely consider the operating characteristics of the wind turbine itself, which can easily lead to the problem of insufficient utilization of rotational kinetic energy but frequent pitch changes. Therefore, it is necessary to optimize the allocation of wind farm power reserves. Summary of the invention

[0005] The purpose of the present invention is to overcome the problem that the above-mentioned prior art easily causes insufficient utilization of rotational kinetic energy but relatively frequent pitch change actions, and to provide a wind farm power reserve coordinated allocation method with the goal of maximizing rotational kinetic energy.

[0006] In order to achieve the above-mentioned invention object, the present method adopts the following technical scheme:

[0007] A method for coordinated allocation of wind farm power reserve considering maximization of rotational kinetic energy comprises the following steps:

[0008] Step S1: When receiving the power reserve instruction ΔP from the upper dispatch centerres,wf When , the wind farm control center will start the power reserve coordination allocation program and execute the wind farm power reserve control mode; at the same time, it will obtain the key operating status information of the wind turbines in the field, including the output active power P of the i-th wind turbine in the optimal operating state. opt,ithwtg , the speed under the best operating condition ω opt,ithwtg , Maximum power reserve ΔP provided by overspeed control alone rocmax,ithwtg And the average rate of change of speed and power α ithwtg .

[0009] Step S2, calculate the maximum power reserve ΔP provided by the entire wind farm only by overspeed control rocmax,wf , the calculation formula is as follows:

[0010]

[0011] Where n is the number of wind turbines in the field.

[0012] Step S3: based on the power reserve instruction ΔP received by the wind farm res,wf and the maximum power reserve ΔP provided by the wind farm only by overspeed control rocmax,wf The size of is determined, and the power reserve control of the wind farm is realized by overspeed control or overspeed and pitch coordination control. The power reserve instruction of the i-th wind turbine is calculated as follows:

[0013]

[0014] Among them, ΔP res,ithwtg is the power reserve instruction of the i-th wind turbine, ΔP roc,ithwtg is the power reserve provided by the overspeed control of the i-th wind turbine, ΔP pac,ithwtg is the power reserve provided by the pitch control of the i-th wind turbine. res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be realized only by the overspeed control of the wind turbines, and the power reserve of each wind turbine is equal to the power reserve provided by the overspeed control; and when ΔP res,wf Greater than ΔP rocmax,wf The power reserve of the wind farm can be achieved by coordinated control of overspeed and pitch control of wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by overspeed control plus the power reserve provided by pitch control.

[0015] Step S4: Send the calculated power reserve instruction to each corresponding wind turbine generator set for execution.

[0016] Furthermore, in step S1, the key operating status information ΔP of the wind turbines in the field to be obtained rocmax,ithwtg and α ithwtgThe definition is as follows:

[0017] ΔP rocmax,ithwtg The maximum power reserve provided by the i-th wind turbine only by overspeed control is defined as follows:

[0018]

[0019] Among them, P ωmax,ithwtg is the output active power of the i-th wind turbine when it runs at the maximum speed, v ωmax is the cut-in wind speed corresponding to the constant speed area of ​​the wind turbine.

[0020] α ithwtg is the average rate of change of the maximum speed increase of the i-th wind turbine with respect to the maximum power reduction, which is defined as follows:

[0021]

[0022] Among them, Δω max,ithwtg is the maximum speed increase of the i-th wind turbine. max,ithwtg The definition is as follows:

[0023]

[0024] Among them, ω max,ithwtg is the maximum speed of the i-th wind turbine.

[0025] Furthermore, in step 3, the power reserve instruction calculation process of the wind turbine generator set is specifically as follows:

[0026] When ΔP res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be achieved only by the overspeed control of the wind turbines. The power reserve of each wind turbine is equal to the power reserve provided by the overspeed control, which is expressed as follows:

[0027]

[0028] Among them, ΔP roc,ithwtg The decision of is realized by a linear programming mathematical model to maximize the rotational kinetic energy of the wind farm, where the decision variable is ΔP roc,ithwtg , the objective function is:

[0029] max{ΔKE wf} (7)

[0030] Among them, ΔKE wf is the change in rotational kinetic energy of the entire wind farm. Assuming that the wind turbines in the wind farm are of the same model, ΔKE wf It can be expressed as follows:

[0031]

[0032] Among them, ΔKE ithwtg is the change in rotational kinetic energy of the i-th wind turbine, H wtg is the inertia time constant of the wind turbine, Δω ithwtg is the speed change of the i-th wind turbine.

[0033] Furthermore, in calculating the change in rotational kinetic energy of the entire wind farm, the constraint condition is:

[0034]

[0035] The linear programming problem formed by the above formulas (7) to (9) can be solved by the linprog function in Matlab.

[0036] Furthermore, when ΔP res,wf Greater than ΔP rocmax,wf The power reserve of the wind farm can be achieved by the coordinated control of overspeed and pitch control of the wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by the overspeed control plus the power reserve provided by the pitch control, which is expressed as follows:

[0037]

[0038] Among them, ΔP pac,ithwtg The decision-making process takes into account the available wind power of the wind turbine to ensure the safe and stable operation of the wind turbine. The specific process is as follows:

[0039]

[0040] The beneficial effects of the present invention are as follows: due to the adoption of the technical solution of the present invention, by defining the average rate of change of speed power and using a linear programming method, the power reserve reference value of the wind turbine is calculated, thereby realizing the coordinated allocation of wind farm power reserve. Compared with the existing methods, this method fully considers factors such as rotational kinetic energy and pitch action in the process of deciding the power reserve allocation instruction. Therefore, when executing the wind farm power reserve control mode, it can effectively maximize the wind farm's rotational kinetic energy and minimize the pitch action, thereby increasing the wind farm's rotational reserve and reducing mechanical losses. In addition, when the system is disturbed by a power shortage, this method plays a positive role in ensuring the safe and stable operation of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 The present invention proposes a working flow chart of a wind farm power reserve coordinated allocation method considering the maximization of rotational kinetic energy.

[0042] Figure 2This is the schematic diagram for the coordination of overspeed control and pitch control of a wind turbine.

[0043] Figure 3 Schematic diagram of the maximum power reserve provided for a wind turbine relying solely on overspeed control as a function of wind speed.

[0044] Figure 4 Schematic diagram of the maximum speed increase of a wind turbine as the wind speed changes.

[0045] Figure 5 This is a structural diagram of the wind farm model built based on the EMTP-RV simulation environment.

[0046] Figure 6 shows the simulation waveforms of each row of wind turbines, which are the speed waveform, pitch angle waveform, output active waveform and rotational kinetic energy change waveform from top to bottom. Figure 6-1 Including the simulation waveform diagram of the 1st to 3rd row of wind turbines, Figure 6-2 Includes simulation waveforms of the 4th and 5th rows of wind turbines.

[0047] Figure 7 It is the total pitch angle waveform of the wind farm.

[0048] Figure 8 This is the total output active power waveform of the wind farm.

[0049] Fig. 9 This is the waveform diagram of the total rotational kinetic energy change of the wind farm. DETAILED DESCRIPTION

[0050] In order to describe the present invention more specifically, the technical solution of the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0051] The present invention is a wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy, and its working flow diagram is as follows: Figure 1 As shown, the specific steps include:

[0052] Step S1: When receiving the power reserve instruction ΔP from the upper dispatch center res,wf When , the wind farm control center will start the power reserve coordination allocation program and execute the wind farm power reserve control mode; at the same time, it will obtain the key operating status information of the wind turbines in the field, including the output active power P of the i-th wind turbine in the optimal operating state. opt,ithwtg , the speed under the best operating condition ω opt,ithwtg , Maximum power reserve ΔP provided by overspeed control alone rocmax,ithwtg And the average rate of change of speed and power α ithwtg .

[0053] Furthermore, in step S1, the key operating status information ΔP of the wind turbines in the field to be obtained rocmax,ithwtg and α ithwtg The definition is as follows:

[0054] ΔP rocmax,ithwtg The maximum power reserve provided by the i-th wind turbine only by overspeed control is defined as follows:

[0055]

[0056] Where P ωmax,ithwtg is the output active power of the i-th wind turbine when it runs at the maximum speed, v ωmax is the cut-in wind speed corresponding to the constant speed area of ​​the wind turbine.

[0057] α ithwtg is the average rate of change of the maximum speed increase of the i-th wind turbine with respect to the maximum power reduction, which is defined as follows:

[0058]

[0059] In the formula, Δω max,ithwtg is the maximum speed increase of the i-th wind turbine. max,ithwtg The definition is as follows:

[0060]

[0061] In the formula, ω max,ithwtg is the maximum speed of the i-th wind turbine.

[0062] like Figure 2 As shown, point A represents the working point of the wind turbine in the optimal operating state, and point B represents the working point of the wind turbine in the maximum speed operation. Therefore, point A corresponds to the state information P opt,ithwtg and ω opt,ithwtg , point B corresponds to the state information P ωmax,ithwtg and ω max,ithwtg , the power difference between point A and point B corresponds to the state information ΔP rocmax,ithwtg , the negative reciprocal value of the slope between point A and point B corresponds to the state information α ithwtg .

[0063] like Figure 3 As shown, as the wind speed increases, ΔP rocmax,ithwtg Will gradually decrease. When the wind speed is greater than v ωmax , ΔP rocmax,ithwtg is 0, which means that overspeed control cannot be used to provide power backup.

[0064] like Figure 4 As shown, as the wind speed increases, Δω max,ithwtgWill gradually decrease. When the wind speed is greater than v ωmax , Δω max,ithwtg It is 0, which means that there is no margin for the speed to rise and overspeed control cannot be used to provide power backup.

[0065] Step S2, calculate the maximum power reserve ΔP provided by the entire wind farm only by overspeed control rocmax,wf , the calculation formula is as follows:

[0066]

[0067] Where n is the number of wind turbines in the field.

[0068] Step S3: based on the power reserve instruction ΔP received by the wind farm res,wf and the maximum power reserve ΔP provided by the wind farm only by overspeed control rocmax,wf The size of is determined, and the power reserve control of the wind farm is realized by overspeed control or overspeed and pitch coordination control. The power reserve instruction of the i-th wind turbine is calculated as follows:

[0069]

[0070] In the formula, ΔP res,ithwtg is the power reserve instruction of the i-th wind turbine, ΔP roc,ithwtg is the power reserve provided by the overspeed control of the i-th wind turbine, ΔP pac,ithwtg is the power reserve provided by the pitch control of the i-th wind turbine. res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be realized only by the overspeed control of the wind turbines, and the power reserve of each wind turbine is equal to the power reserve provided by the overspeed control; and when ΔP res,wf Greater than ΔP rocmax,wf The power reserve of the wind farm can be achieved by coordinated control of overspeed and pitch control of wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by overspeed control plus the power reserve provided by pitch control.

[0071] Furthermore, in step 3, the power reserve instruction calculation process of the wind turbine generator set is specifically as follows:

[0072] When ΔP res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be achieved only by the overspeed control of the wind turbines. The power reserve of each wind turbine is equal to the power reserve provided by the overspeed control, which is expressed as follows:

[0073]

[0074] Among them, ΔP roc,ithwtgThe decision is implemented by a linear programming mathematical model to maximize the rotational kinetic energy of the wind farm, and the decision variable is ΔP roc,ithwtg , objective function:

[0075] max{ΔKE wf} (18)

[0076] Among them, ΔKE wf is the change in rotational kinetic energy of the entire wind farm. Assuming that the wind turbines in the wind farm are of the same model, ΔKE wf It can be expressed as follows:

[0077]

[0078] Among them, ΔKE ithwtg is the change in rotational kinetic energy of the i-th wind turbine, H wtg is the inertia time constant of the wind turbine, Δω ithwtg is the speed change of the i-th wind turbine.

[0079] In calculating the change in rotational kinetic energy of the entire wind farm, the constraints are:

[0080]

[0081] The linear programming problem formed by the above formulas (18) to (20) can be solved by the linprog function in Matlab.

[0082] When ΔP res,wf Greater than ΔP rocmax,wf The power reserve of the wind farm can be achieved by the coordinated control of overspeed and pitch control of the wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by the overspeed control plus the power reserve provided by the pitch control, which is expressed as follows:

[0083]

[0084] Among them, ΔP pac,ithwtg The decision-making process takes into account the available wind power of the wind turbine to ensure the safe and stable operation of the wind turbine. The specific process is as follows:

[0085]

[0086] Step S4: Send the calculated power reserve instruction to each wind turbine generator set for execution.

[0087] In order to verify the effectiveness of the proposed method, a wind farm model was built based on the EMTP-RV simulation environment. Figure 5As shown in the figure, 50 5MW direct-drive permanent magnet synchronous wind turbines are evenly distributed in 5 rows. In order to improve the simulation rate, it is assumed that the wind speed of each row of wind turbines is the same, and each row of wind turbines is aggregated into one wind turbine. In addition, the wind speeds of each row of wind turbines are 6m / s, 7m / s, 8m / s, 9m / s and 10m / s respectively.

[0088] The simulation results are shown in Figures 6 to Fig. 9 As shown, FIG6 is a simulation waveform diagram of each row of wind turbines, which are respectively a speed waveform diagram, a pitch angle waveform diagram, an output active power waveform diagram and a rotational kinetic energy change waveform diagram from top to bottom. Figure 6-1 Including the simulation waveform diagram of the 1st to 3rd row of wind turbines, Figure 6-2 Including the simulation waveform diagram of the 4th to 5th rows of wind turbines; refer to Figure 6-1 and Figure 6-2 It is easy to know that when the wind farm power reserve coordination allocation method proposed in the present invention is adopted, the wind farm power reserve control can be effectively realized, such as Figure 8 Moreover, compared with the traditional power reserve control method, the method of the present invention can maximize the rotational kinetic energy of the wind farm, such as Figure 7 As shown; At the same time, the wind farm pitch action is minimized, as shown Fig. 9 As shown; therefore, the rotational kinetic energy is effectively increased and the mechanical loss is reduced.

[0089] The above description of the embodiments is to facilitate the understanding and application of the present invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to the above embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made to the present invention by those skilled in the art based on the disclosure of the present invention should be within the scope of protection of the present invention.

Claims

1. A wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy, It is characterized in that The method specifically comprises the following steps: Step S1: When receiving the power reserve instruction ΔP from the upper dispatch center res,wf When , the wind farm control center will start the power reserve coordination allocation program and execute the wind farm power reserve control mode; at the same time, it will obtain the key operating status information of the wind turbines in the field, including the output active power P of the i-th wind turbine in the optimal operating state. opt,ithwtg , the speed under the best operating condition ω opt,ithwtg , Maximum power reserve ΔP provided by overspeed control alone rocmax,ithwtg And the average speed power change ratio α ithwtg ; Step S2, calculate the maximum power reserve ΔP provided by the entire wind farm only by overspeed control rocmax,wf , the calculation formula is as follows: Where n is the number of wind turbines in the field; Step S3: based on the power reserve instruction ΔP received by the wind farm res,wf and the maximum power reserve ΔP provided by the wind farm only by overspeed control rocmax,wf The size of is determined, and the power reserve control of the wind farm is realized by overspeed control or overspeed and pitch coordination control. The power reserve instruction of the i-th wind turbine is calculated as follows: Among them, ΔP res,ithwtg is the power reserve instruction of the i-th wind turbine, ΔP roc,ithwtg is the power reserve provided by the overspeed control of the i-th wind turbine, ΔP pac,ithwtg is the power reserve provided by the pitch control of the i-th wind turbine. res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be realized only by the overspeed control of the wind turbines, and the power reserve of each wind turbine is equal to the power reserve provided by the overspeed control; and when ΔP res,wf Greater than ΔP rocmax,wf , the power reserve of the wind farm can be achieved by the coordinated control of overspeed and pitch control of wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by overspeed control plus the power reserve provided by pitch control; Step S4: sending the calculated power reserve instruction to each corresponding wind turbine generator set for execution.

2. The wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy according to claim 1, Features: In step S1, the key operating status information of the wind turbines in the field to be obtained is ΔP rocmax,ithwtg and α ithwtg The definition is as follows: ΔP rocmax,ithwtg The maximum power reserve provided by the i-th wind turbine group only by overspeed control is defined as follows: Among them, P ωmax,ithwtg is the output active power of the i-th wind turbine when it runs at the maximum speed, v ωmax It is the cut-in wind speed corresponding to the constant speed area of ​​the wind turbine, that is, the starting wind speed point of the constant speed operation area of ​​the wind turbine. α ithwtg is the average change ratio of the maximum speed increase of the i-th wind turbine to the maximum power reduction, which is defined as follows: Among them, Δω max,ithwtg is the maximum speed increase of the i-th wind turbine, Δω max,ithwtg The definition is as follows: Among them, ω max,ithwtg is the maximum speed of the i-th wind turbine.

3. The wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy according to claim 1, Features: In step 3, the power reserve instruction calculation process of the wind turbine generator system includes: When ΔP res,wf Less than or equal to ΔP rocmax,wf , the power reserve of the wind farm can be achieved only by the overspeed control of the wind turbines. The power reserve of each wind turbine is equal to the power reserve provided by the overspeed control, which is expressed as follows: Among them, ΔP roc,ithwtg The decision of is realized by a linear programming mathematical model to maximize the rotational kinetic energy of the wind farm, where the decision variable is ΔP roc,ithwtg , the objective function is: max{ΔKE wf } (7) Among them, ΔKE wf is the change in rotational kinetic energy of the entire wind farm. Assuming that the wind turbines in the wind farm are of the same model, ΔKE wf It can be expressed as follows: Among them, ΔKE ithwtg is the change in rotational kinetic energy of the i-th wind turbine, H wtg is the inertia time constant of the wind turbine, Δω ithwtg is the speed change of the i-th wind turbine.

4. The wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy according to claim 3, Features: In calculating the change in rotational kinetic energy of the entire wind farm, the constraints are: The linear programming problem formed by the above formulas (7) to (9) can be solved by the linprog function in Matlab.

5. The wind farm power reserve coordination allocation method considering the maximization of rotational kinetic energy according to claim 3, Features: In the step S3, the power reserve instruction calculation process of the wind turbine generator set further includes: When ΔP res,wf Greater than ΔP rocmax,wf The power reserve of the wind farm can be achieved by the coordinated control of overspeed and pitch control of the wind turbines. The power reserve of each wind turbine is equal to the maximum power reserve provided by the overspeed control plus the power reserve provided by the pitch control, which is expressed as follows: Among them, ΔP pac,ithwtg The decision of takes into account the available wind power of the wind turbine to ensure the safe and stable operation of the wind turbine, which is specifically expressed as follows: