A system for controlling the operation of an overhead crane

By segmenting the Tianche tracks and using interval servers and traffic light mechanisms, efficient path planning and scheduling services are realized, which solves the problems of low scheduling efficiency and interruption during program update in the existing technology of Tianche, which improves the system Stability and efficiency.

CN118802083BActive Publication Date: 2024-12-03华芯(嘉兴)智能装备有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411260512.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-03
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The existing Tianche scheduling system is inefficient in high concurrency environments, the path planning takes a long time, and the scheduling control needs to be suspended when the program is updated, which affects production efficiency.

Method used

Adopting the idea of ​​shard management and mutual backup, the trolley running track is divided into multiple intervals, and independent path planning is carried out through the interval server and traffic light mechanism to ensure that the scheduling service is not interrupted, and the routing server and state server are used to realize the track interval. Real-time management and mutual preparation.

Benefits of technology

It greatly shortens the path planning time, improves the efficiency of Tianche scheduling, ensures the continuous operation of the system when the interval server program is updated or failed, and enhances the system's robustness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118802083B_ABST
    Figure CN118802083B_ABST
Patent Text Reader

Abstract

The present application provides a system for controlling the operation of an overhead crane. The system divides the complete track network for the operation of the overhead crane into several track sections. The scheduling request of the overhead crane in each track section is processed by the corresponding server running the respective path scheduling algorithm, and the interconnected track sections are controlled by traffic lights. The scheduling request processing status of two interconnected track sections is shared in real time through a communication mechanism, so that when a server in one of the sections performs a program update, the section server of the previous track section takes over its scheduling request processing service in real time. The system provided by the present invention not only improves the efficiency of each path planning (only the state of the overhead crane in the corresponding track section needs to be considered), but also can facilitate the uninterrupted scheduling of the operation of the overhead crane when the scheduling program algorithm needs to be updated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of semiconductor production equipment / system, and in particular to a system for controlling the operation of an overhead crane. Background Art

[0002] Overhead crane operation system is a critical system in the field of semiconductor manufacturing and packaging. Since semiconductor manufacturing has high requirements for environmental cleanliness, it is generally required to be unmanned as much as possible, and wafers need to rely on overhead crane systems for transportation between each process. Existing overhead crane scheduling systems usually include control servers, signal base stations, overhead cranes, and overhead crane tracks. The overhead crane and the control server forward data (mainly path planning requests and response data) in the form of broadcasts through the signal base station. In the actual production environment, a large number of overhead cranes are running on the same track network (usually a semiconductor factory has hundreds or thousands of overhead cranes running at the same time). The control server needs to respond to the received scheduling requests one by one according to a certain response priority algorithm for path planning, and then send the corresponding control instructions for scheduling.

[0003] At present, when the control server is planning the path of the overhead crane, it needs the real-time situation of the location of other overhead cranes. Not only does it need to share the location of each overhead crane in real time between the control servers; but also, since the execution of the same path planning algorithm on the entire track network needs to consider all possible paths from the current location of the overhead crane to the target destination, as well as the corresponding real-time location of the overhead crane, each round of path planning takes a long time (the longer and more paths are involved, the more time it takes to execute a round of path planning). In practice, when hundreds or thousands of overhead cranes are running at the same time, it takes more time and is less efficient. More importantly, when the control server needs to update the program (for example, the path planning algorithm), it has to suspend / interrupt the scheduling control of the overhead crane. Summary of the invention

[0004] In order to improve the efficiency of overhead crane dispatching and facilitate updating the dispatching program without interruption / pause of overhead crane dispatching, the present invention provides a system for controlling the operation of an overhead crane. Based on the idea of ​​shard management and mutual backup, the system divides the overhead crane operation track into several track sections and sets corresponding section servers. Combined with the traffic light mechanism and the data sharing mechanism, each track section can perform independent path planning. When one of the section servers needs to update the program, the section server of the adjacent track section will take over in real time to ensure uninterrupted dispatching service for the overhead crane.

[0005] The system for controlling the operation of an overhead crane provided by the present invention comprises: a plurality of interval servers, a routing server, a plurality of signal transceiver base stations, an overhead crane operation track network and an overhead crane operating thereon. The overhead crane operation track network is divided into a plurality of track intervals, each track interval is composed of a plurality of track segments, each track interval entrance has only one track segment as the entrance segment of the track interval, and a traffic light is arranged at the junction of the entrance segment of each track interval and any track segment of the previous track interval as an exit.

[0006] Different interval servers are associated with different track intervals, and are used to control the traffic lights at the entrances of the associated track intervals, respond to the scheduling requests sent by the overhead traveling vehicle in the associated track intervals, and perform scheduling processing with the entrance section of the next track interval as the terminal.

[0007] Each overhead crane sends identification information of the current track segment when entering a track segment, and the overhead crane obtains the identification information of the current track segment by scanning the QR code set on the track segment.

[0008] The routing server is used to receive the scheduling request sent by the overhead crane through the signal transceiver base station, route the scheduling request to the corresponding interval server according to the track segment identifier carried in the scheduling request received from the overhead crane; and forward the response data to the signal transceiver base station corresponding to the track interval associated with the interval service for broadcasting based on the interval server identifier carried in the response data from the interval server. Each interval server can correspond to one or more associated track intervals.

[0009] Furthermore, each interval server performs scheduling processing based only on the real-time status of the overhead travelling vehicle in the track interval corresponding to the track segment identifier in the scheduling request it receives; the scheduling processing includes path planning. Obviously, since the operation status of overhead travelling vehicles in other track intervals does not need to be considered when performing path planning, the time for each round of path planning can be greatly shortened, thereby improving efficiency.

[0010] Furthermore, the path planning algorithms running on servers in different intervals may be the same or different.

[0011] Furthermore, each interval server sets the access identification information of whether the entrance section of its associated track interval allows the overhead travelling vehicle to enter based on the real-time status of the entrance section of the track interval; the access identification information of the entrance section of each track interval is shared in real time among the interval servers.

[0012] Furthermore, when the overhead travelling vehicle encounters a red light at the exit section of the current track section, it sends a dispatch request carrying the identification information of the exit section of the current track section to the corresponding section server and waits for response data. Each section server places the dispatch request carrying the identification information of the exit section of the same track section in a FIFO queue, and processes the dispatch requests in the FIFO queue in sequence when the traffic identification information of the entrance section of the next track section is that the overhead travelling vehicle is allowed to enter.

[0013] Furthermore, each interval server also stores a track map of the next track interval of its associated track interval. The system also includes a status server, which detects and records the status of each interval server in real time. When the status server detects that the interval server of a certain track interval is undergoing a program update or is down, the settings of the routing server are modified so that the scheduling request sent by the overhead crane in the certain track interval is forwarded to the interval server of the previous track interval, and the interval server of the previous track interval is notified to process the scheduling request sent by the overhead crane in a certain track interval. When the status server detects that the interval server of a certain track interval resumes normal operation, the settings of the routing server are restored, and the interval server of the previous track interval is notified to stop processing the scheduling request sent by the overhead crane in the certain track interval.

[0014] Preferably, the interval server of the previous track interval determines the track interval corresponding to the operation of the overhead travelling vehicle based on the received scheduling request; and performs scheduling processing with the entrance section of the certain track interval as the end point based on the identification information of the current track section where the corresponding overhead travelling vehicle is located. At the same time, based on the real-time status of the overhead travelling vehicle at the entrance section of the previous track interval, the access identification information of whether the entrance section of the previous track interval allows the overhead travelling vehicle to enter is set; based on the real-time status of the entrance section of the certain track interval, the access identification information of whether the entrance section of the certain track interval allows the overhead travelling vehicle to enter is set. When the interval server of the certain track interval completes the program update and starts running, the access identification information of the entrance section of the certain track interval is re-managed. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The figure is a schematic diagram of the composition of the server side part in the system for controlling the operation of the overhead crane provided by the present invention in one embodiment. DETAILED DESCRIPTION

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Generally, the components of the embodiments of the present invention described and shown in the accompanying drawings here can be arranged and designed in various different configurations.

[0017] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.

[0018] The system for controlling the operation of an overhead travelling vehicle provided by the present invention comprises: a plurality of interval servers, a routing server, a status server, a plurality of signal transceiver base stations, an overhead travelling vehicle operation track network and an overhead travelling vehicle operating thereon. Figure 1 As shown, in one embodiment, the system for controlling the operation of an overhead traveling vehicle provided by the present invention comprises, at the server end, an interval server 1, an interval server 2, ..., an interval server N, a routing server, and a status server.

[0019] According to the actual situation, the overhead crane operation track network is divided into several track sections according to the following standards: each track section is composed of several track segments, each track section entrance has only one track segment as the entrance section of the track section, and traffic lights are set at the connection between the entrance section of each track section and any track segment of the previous track section as the exit. Different interval servers are associated with different track sections, and are used to control the traffic lights at the entrance of the track section they are associated with, respond to the scheduling request sent by the overhead crane in the track section they are associated with, and perform scheduling processing with the entrance section of the next track section as the terminal. For example, the track section associated with interval server 1 is different from the track section associated with interval server 2.

[0020] Each overhead crane sends identification information of the current track segment when entering a track segment, and the overhead crane obtains the identification information of the current track segment by scanning the QR code set on the track segment.

[0021] The routing server is used to receive the scheduling request sent by the overhead crane through the signal transceiver base station, route the scheduling request to the corresponding interval server according to the track segment identifier carried in the scheduling request currently received from the overhead crane; and forward the response data to the signal transceiver base station corresponding to the track interval associated with the interval service for broadcasting based on the interval server identifier carried in the response data from the interval server. Each interval server can be associated with one or more track intervals.

[0022] Preferably, the routing server stores the correspondence between the identification information of each track segment on the overhead traveling vehicle track network-the interval server-the signal transceiver base station in the form of a modifiable configuration file.

[0023] Each interval server performs scheduling processing only based on the real-time status of the overhead travelling vehicle in the track interval corresponding to the track segment identifier in the scheduling request it receives, without considering the operation status of overhead travelling vehicles in other track intervals. The scheduling processing performed by the interval server includes at least path planning. Since the interval server does not need to consider the operation status of overhead travelling vehicles in other track intervals when performing path planning, the time for each round of path planning can be greatly shortened and efficiency can be improved. Since the track intervals associated with each interval server are different, the path planning algorithms running on different interval servers can be the same or different.

[0024] Furthermore, each interval server sets the access identification information of whether the entrance section allows the overhead travelling vehicle to enter based on the real-time status of the entrance section of the associated track section (mainly the operation status of the overhead travelling vehicle); the access identification information of the entrance section of each track section is shared in real time among the interval servers. Preferably, the access identification information of the entrance section of each track section can be synchronized to the status server so as to be shared among the interval servers.

[0025] Furthermore, in order to ensure that there is no collision when the overhead travelling vehicle crosses from one track section to another track section, it is set that when the overhead travelling vehicle encounters a red light at the exit section of the current track section, it sends a dispatch request carrying the identification information of the exit section of the current track section to the current section server and waits for corresponding response data. The current section server places the dispatch request carrying the identification information of the exit section of the same track section separately in a FIFO queue, and when the traffic identification information of the entrance section of the next track section is that the overhead travelling vehicle is allowed to enter, the dispatch request in the FIFO queue is processed in sequence.

[0026] Furthermore, each interval server also stores the track map of the next track interval of its associated track interval. The state server detects and records the status of each interval server in real time. When it is detected that the interval server of a certain track interval is undergoing a program update or is down, the settings of the routing server are modified so that the scheduling request sent by the overhead crane in the certain track interval is forwarded to the interval server of the previous track interval, and the interval server of the previous track interval is notified to process the scheduling request sent by the overhead crane in a certain track interval. When the state server detects that the interval server of the certain track interval resumes normal operation, the settings of the routing server are restored, and the interval server of the previous track interval is notified to stop processing the scheduling request sent by the overhead crane in the certain track interval.

[0027] Through the above settings, a certain degree of mutual backup is formed between the interval servers. Since the path planning algorithm itself has no restrictions on the topological form of the track interval, some only have different track path planning efficiencies for different topological forms. Therefore, the interval server of the adjacent track interval can replace the overhead crane dispatching function of the interval server that has a fault or software update.

[0028] Before the overhead crane's dispatch request is responded to, the relevant dispatch request will be sent periodically until the interval server responds; therefore, the backup interval server can ignore the unprocessed dispatch request on the interval server that is down or undergoing software update.

[0029] Preferably, the interval server of the previous track interval determines the track interval in which the corresponding overhead crane is running based on the received scheduling request; and performs scheduling processing with the entrance section of the certain track interval as the end point based on the identification information of the current track section where the corresponding overhead crane is located. At the same time, based on the real-time status of the overhead crane at the entrance section of the previous track interval, the access identification information of whether the entrance section of the previous track interval allows the overhead crane to enter is set; based on the real-time status of the entrance section of the certain track interval, the access identification information of whether the entrance section of the certain track interval allows the overhead crane to enter is set. When the interval server of the certain track interval completes the program update and starts running, the access identification information of the entrance section of the certain track interval is re-managed. The communication identification information can be set on the status server for real-time sharing by each interval server.

[0030] Obviously, the above-mentioned mutual backup scheme of interval servers can ensure that the scheduling of the overhead crane is not interrupted when any interval server fails or the program is updated, thereby improving the robustness of the entire system.

[0031] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A system for controlling the operation of an overhead crane, characterized in that: The system includes: a number of interval servers, a state server, a routing server, a number of signal transceiver base stations, an overhead traveling vehicle running track network and an overhead traveling vehicle running thereon; The overhead travelling track network is divided into a number of track sections, each of which is composed of a number of track segments. Each track section entrance has only one track segment as the entrance section of the track section, and a traffic light is provided at the junction of the entrance section of each track section and any track segment of the previous track section as the exit; Each overhead crane sends identification information of the current track segment when entering a track segment. The overhead crane obtains the identification information of the current track segment by scanning the QR code set on the track segment. Different interval servers are associated with different track intervals, and are used to control the traffic lights at the entrances of the associated track intervals, respond to the dispatching request sent by the overhead travelling vehicle in the associated track interval, and perform dispatching processing with the entrance section of the next track interval as the terminal; each interval server sets the access identification information of whether the overhead travelling vehicle is allowed to enter the entrance section based on the real-time status of the overhead travelling vehicle at the entrance section of the associated track interval; the access identification information of the entrance section of each track interval is shared in real time among the interval servers; The routing server is used to receive the scheduling request sent by the overhead traveling vehicle through the signal transceiver base station, route the scheduling request to the corresponding interval server according to the track segment identifier carried in the scheduling request currently received from the overhead traveling vehicle; and forward the response data to the signal transceiver base station corresponding to the track interval associated with the interval service for broadcasting based on the interval server identifier carried in the response data; Each of the interval servers also stores the track map of the next track interval of its associated track interval; the status server detects and records the status of each interval server in real time, and when it is detected that the interval server of a certain track interval is undergoing program update or is down, the setting of the routing server is modified so that the scheduling request sent by the overhead crane in the certain track interval is forwarded to the interval server of its previous track interval, and the interval server of its previous track interval is notified to process the scheduling request sent by the overhead crane in a certain track interval; when it is detected that the interval server of a certain track interval resumes normal operation, the setting of the routing server is restored and the interval server of its previous track interval is notified to stop processing the scheduling request sent by the overhead crane in the certain track interval.

2. The system for controlling the operation of an overhead travelling crane according to claim 1, characterized in that: Each interval server performs scheduling processing only based on the real-time status of the overhead travelling vehicle in the track interval corresponding to the track segment identifier in the scheduling request it receives; the scheduling processing includes path planning.

3. The system for controlling the operation of an overhead travelling crane according to claim 2, characterized in that: The path scheduling algorithms run by servers in different intervals may be the same or different.

4. The system for controlling the operation of an overhead travelling crane according to claim 3, characterized in that: Each interval server is associated with one or more track intervals.

5. The system for controlling the operation of an overhead travelling crane according to claim 4, characterized in that: When the overhead crane encounters a red light at the exit section of the current track section, it sends a scheduling request carrying the identification information of the exit section of the current track section to the corresponding section server and waits for response data; each section server places the scheduling request carrying the exit section identification information of the same track section separately in a FIFO queue, and when the pass identification information of the entrance section of the next track section is to allow the overhead crane to enter, it processes the scheduling requests in the FIFO queue in turn.

6. The system for controlling the operation of an overhead travelling crane according to claim 5, characterized in that: The interval server of the previous track interval determines the track interval in which the corresponding overhead crane is running based on the received scheduling request; performs scheduling processing with the entrance section of the certain track interval as the end point based on the identification information of the current track section where the corresponding overhead crane is located; at the same time, based on the real-time status of the overhead crane at the entrance section of the previous track interval, sets the access identification information of whether the entrance section of the previous track interval allows the overhead crane to enter; based on the real-time status of the entrance section of the certain track interval, sets the access identification information of whether the entrance section of the certain track interval allows the overhead crane to enter.

7. The system for controlling the operation of an overhead travelling crane according to claim 6, characterized in that: When the interval server of the certain track interval completes program update and starts running, the access identification information of the entrance segment of the certain track interval is re-managed.

Citation Information

Patent Citations

  • Crown block control method and system, crown block system, server and storage medium

    CN117263037A

  • Crown block scheduling data transmission method and readable storage medium

    CN117376984A