Tube bundle type desulfurization system and tube bundle opening and closing method thereof

By installing movable tube covers in the tube bundle desulfurization system and using a waterway control device to drive its opening and closing, and dynamically adjusting the number of tube bundles according to the flue gas volume, the problem of poor flue gas dust removal under changes in boiler load is solved and a stable and efficient system is achieved. flue gas treatment and water resource utilization.

CN118807374APending Publication Date: 2024-10-22SHAOXING ZONGHENG POLYSTER CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411019055.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

When the boiler production load is reduced in the existing tube bundle desulfurization tower, flue gas emissions decrease, resulting in reduced mobility of flue gas within the tube bundle, poor dust removal effect, and inability to meet emission requirements.

Method used

A movable tube cover is installed at the inlet end of each tube bundle, and the tube cover is driven to open and close through the waterway control device. The number of openings of the tube bundle is controlled according to the amount of smoke incoming, ensuring that the flue gas can pass through the open tube bundle at high speed for dust removal.

Benefits of technology

Through the dynamic opening and closing control of the tube cover, the dust removal treatment quality of flue gas is stably improved, the emission requirements are met, and the comprehensive utilization of water resources is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118807374A_ABST
    Figure CN118807374A_ABST
Patent Text Reader

Abstract

The invention discloses a tube bundle type desulfurization system which comprises a desulfurization tower, a tube bundle dust remover, a water path control device and a water pool, a wavy flue gas circulation path is formed in the desulfurization tower, spraying devices are mounted in a first cavity and a third cavity in the desulfurization tower, the tube bundle dust remover is mounted in a second cavity, and the water path control device is mounted in the water pool. The pipe bundle dust remover comprises a plurality of pipe bundles which are vertically installed, a pipe cover is movably installed at the inlet end of each pipe bundle, each pipe bundle is provided with a pipe cover opening and closing mechanism, the water path control device is connected with all the pipe cover opening and closing mechanisms through pipelines, and the water pool is connected with the spraying device through a pipeline. The opening number of the pipe bundles can be controlled according to the smoke inlet amount, it is ensured that enough smoke can pass through the opened pipe bundles at a high speed, the dust removal treatment quality of the smoke is stably controlled, and the emission requirement can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of textile smoke treatment equipment, and more specifically, to a tube bundle desulfurization system and a tube bundle opening and closing method thereof. Background Art

[0002] A large amount of high-temperature water and high-temperature steam are needed in the production process of the textile industry. Therefore, general textile enterprises are equipped with boiler equipment to meet production needs. Textile boiler equipment mostly uses coal-fired models, which will produce a large amount of coal smoke exhaust gas during its use. These flue gases are mixed with a large amount of toxic and harmful particulate matter and cannot be discharged normally without treatment.

[0003] At present, the company uses a bundle desulfurization tower to treat boiler flue gas. A bundle dust collector is installed in the bundle desulfurization tower. The bundle is a flue gas pipeline with a special structure. When the flue gas passes through the bundle, it relies on the high-speed swirl and rotation of the airflow, as well as the centrifugal force and gravity to separate and capture dust and droplets in the flue gas. The company's existing bundle desulfurization tower has a total bundle designed according to the maximum emission of boiler flue gas. In actual production, it is found that the boiler production load cannot always be 100%. When the boiler production load is reduced, its flue gas emissions will also be significantly reduced. However, since the total bundle is unchanged, the flue gas passing through each bundle will become less, and the mobility of the flue gas in the bundle will be reduced (unable to maintain high speed), which leads to poor flue gas dust removal effect. The treated flue gas cannot meet the emission requirements. Therefore, the operation and maintenance department proposed to carry out technical transformation and upgrading of the bundle desulfurization tower equipment, and this case was born. Summary of the invention

[0004] The object of the present invention is to overcome the deficiencies of the above-mentioned prior art and to provide a tube bundle desulfurization system and a tube bundle opening and closing method thereof. In the system, a movable tube cover is installed at the inlet end of each tube bundle. When the tube cover falls, the tube bundle is closed. When the tube cover is flipped up, the tube bundle is opened. The number of tube bundles opened is controlled according to the amount of smoke intake to ensure that a sufficient amount of smoke can pass through the opened tube bundles at high speed. In this way, the dust removal treatment quality of the flue gas is stably controlled to meet the emission requirements.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A tube bundle desulfurization system, comprising a desulfurization tower, a tube bundle dust collector, a waterway control device and a water pool, wherein a first chamber, a second chamber and a third chamber are arranged in the desulfurization tower, wherein the upper ends of the first chamber and the second chamber are connected, and the lower ends of the second chamber and the third chamber are connected, and the first chamber, the second chamber and the third chamber are combined to form a wavy flue gas flow path, and the desulfurization tower is connected to a smoke inlet pipe and a smoke outlet pipe, wherein the smoke inlet pipe is connected to the first chamber, and the smoke outlet pipe is connected to the third chamber, and the first chamber and the third chamber are connected to each other. A spray device is installed in each chamber. The tube bundle dust collector is installed in the second chamber. The tube bundle dust collector includes a plurality of vertically installed tube bundles. Both ends of the tube bundles are open. A tube cover is movably installed at the inlet end of each tube bundle. Each tube bundle is installed with a tube cover opening and closing mechanism. The tube cover opening and closing mechanism is used to drive the opening and closing movement of the tube cover. The water circuit control device is connected to all the tube cover opening and closing mechanism pipelines. The water circuit control device provides power for the tube cover opening and closing mechanism. The water pool is connected to the spray device pipeline.

[0007] Furthermore, the pipe cover opening and closing mechanism includes a water jacket and a buoyancy ring, the water jacket is welded to the outer wall of the inlet end of the tube bundle, the buoyancy ring is matched and installed in the water jacket, the upper end surface of the buoyancy ring is connected to a top cover tube, the water jacket is provided with a first pipe opening and a second pipe opening, the first pipe opening is connected to the bottom of the water jacket, the second pipe opening is connected to the top of the side wall of the water jacket, the first pipe opening pipeline is connected to the waterway control device, the first pipe opening can push the buoyancy ring and the top cover tube to rise after water enters, the top cover tube can move upward and partially extend to the outside of the water jacket, and the top cover tube can push the pipe cover to flip up and open.

[0008] Furthermore, the water circuit control device includes a main water pipe, one end of which is connected to a water inlet pipeline, a main water inlet valve is installed on the water inlet pipeline, the main water pipe is connected to a plurality of water control branches, the water control branches are arranged in a one-to-one correspondence with the tube bundle, the water control branch pipelines are connected to the first pipe opening of the water jacket, and each of the water control branches is installed with a sub-control valve.

[0009] Furthermore, the other end of the main water pipe is connected to a drainage pipeline, and the drainage pipeline is installed with a main drainage valve.

[0010] Furthermore, the tube bundle dust collector also includes a water tank, which is a hollow box body. The water tank covers the outside of all tube bundle inlet ends, the water jacket portion of the tube bundle inlet end is installed in the water tank, the second pipe port of the water jacket is arranged in the water tank, and the outlet end pipeline of the water tank is connected to the water pool.

[0011] Furthermore, the water pool is equipped with a water replenishing device.

[0012] A tube bundle opening method, applied in a tube bundle desulfurization system, comprises the following steps:

[0013] (a) Close the main drain valve, open the main water inlet valve, and flow water into the main water pipe;

[0014] (b) Open the sub-control valve on the water control branch pipe to pass water to the water jacket on the tube bundle. Water enters from the first pipe port, pushing the buoyancy ring and the top cover pipe up. The rise of the top cover pipe can lift the pipe cover, forming an opening effect at the inlet end of the tube bundle. Continuous water supply is used to keep the tube bundle open. Each time a water control branch pipe is passed through, a tube bundle is opened. The number of water control branches to be passed through is selected according to the number of tube bundles to be opened.

[0015] A tube bundle closing method, applied in a tube bundle desulfurization system, comprises the following steps:

[0016] (a) Close the main water inlet valve to cut off the water inlet from the main water pipe;

[0017] (b) For the pipe bundles that need to remain open, the sub-control valves on the corresponding water control branches are closed one by one;

[0018] (c) Open the main drain valve, and the water control branch pipe opened by the sub-control valve forms a pumping and draining effect. The water in the water jacket is pumped away, and the buoyancy ring and the top cover pipe lose their buoyancy and fall naturally under the action of gravity. The pipe cover loses its upward force and automatically turns down, forming a sealing and closing effect on the inlet end of the pipe bundle.

[0019] The beneficial effects of the present invention are:

[0020] 1. The present invention installs a movable tube cover at the inlet end of each tube bundle. When the tube cover falls, the tube bundle is closed, and when the tube cover is turned up, the tube bundle is opened. The number of tube bundles opened is controlled according to the amount of smoke intake to ensure that a sufficient amount of smoke can pass through the opened tube bundles at a high speed. In this way, the dust removal quality of the smoke is stably controlled and can meet the emission requirements.

[0021] 2. The present invention designs a pipe cover opening and closing mechanism to control the opening and closing of the pipe cover. The pipe cover opening and closing mechanism cleverly adopts a hydraulic drive mode to operate. The present invention can achieve the individual control effect of the pipe covers on all pipe bundles. The water supply line of the pipe cover opening and closing mechanism can be integrated with the water supply line of the spray device to realize the comprehensive utilization of water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 : is a structural principle diagram of a tube bundle desulfurization system in this embodiment;

[0023] Figure 2 Schematic diagram of the structure of the tube bundle dust collector in this embodiment;

[0024] Figure 3 is a schematic diagram of the structure of the tube bundle in this embodiment when the inlet is closed;

[0025] Figure 4 is a schematic diagram of the structure of the tube bundle in this embodiment when the inlet is open;

[0026] Figure 5 Schematic diagram of the connection of the waterway control device in this embodiment.

[0027] Figure numerals: desulfurization tower 1, first chamber 11, second chamber 12, third chamber 13, smoke inlet pipe 14, smoke outlet pipe 15, flue gas flow path 2, spray device 3, tube bundle dust collector 4, tube bundle 41, pipe cover 42, water tank 43, pipe cover opening and closing mechanism 5, water jacket 51, buoyancy ring 52, top cover pipe 53, first pipe opening 54, second pipe opening 55, water channel control device 6, main water pipe 61, water inlet pipeline 62, water inlet main valve 621, drainage pipeline 63, drainage main valve 631, water control branch pipe 64, sub-control valve 641, water tank 7, water replenishment device 71. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] like Figure 1-Figure 5A tube bundle desulfurization system is shown, comprising a desulfurization tower 1, a tube bundle dust collector 4, a waterway control device 6 and a water pool 7. A first chamber 11, a second chamber 12 and a third chamber 13 are arranged in the desulfurization tower 1. The upper ends of the first chamber 11 and the second chamber 12 are connected, and the lower ends of the second chamber 12 and the third chamber 13 are connected. The first chamber 11, the second chamber 12 and the third chamber 13 are combined to form a wavy flue gas flow path 2. The wavy flue gas flow path 2 can increase the movement stroke of the flue gas in the desulfurization tower 1 and enhance the flue gas treatment effect. The desulfurization tower 1 is connected to a smoke inlet pipe 14 and a smoke outlet pipe 15. The smoke inlet pipe 14 is connected to the first chamber 11, and the smoke outlet pipe 15 is connected to the third chamber 13. The first chamber 11 and the third chamber 13 are all equipped with a spray device 3, and the tube bundle dust collector 4 is installed in the second chamber 12. The flue gas enters from the first chamber 11, first undergoes a spray dust removal, then comes to the second chamber 12 to receive the tube bundle dust removal, and finally goes to the third chamber 13 for a second spray dust removal, and finally is discharged from the smoke outlet pipe 15. Under the above structure, the flue gas must undergo three dust removal treatments to ensure a good treatment effect. The treated flue gas can reach the dischargeable level. The tube bundle dust collector 4 includes a plurality of vertically installed tube bundles 41. Both ends of the tube bundle 41 are open. The flue gas passes through the tube bundle 41 to complete the dust removal treatment operation. When the desulfurization tower 1 is constructed, the number of tube bundles 41 is designed according to the maximum load production of the boiler. When the boiler is not working at full load, the amount of flue gas generated The smoke volume in each tube bundle 41 is significantly reduced. When a small amount of smoke passes through a fixed number of tube bundles 41, the smoke volume in each tube bundle 41 is greatly reduced. The reduced smoke volume leads to reduced mobility of the smoke in the tube bundle 41, and the dust removal effect of the smoke passing through the tube bundle 41 will also be weakened. It is found in actual production that in this case, the treated smoke cannot meet the emission requirements. To address this problem, when the total number of tube bundles 41 is fixed, the operating number of the tube bundles 41 can only be adjusted by controlling the opening and closing of the tube bundles 41. In this way, the smoke volume in a single tube bundle 41 can be controlled to keep the smoke treatment quality stable. In the present invention, a tube cover 42 is movably installed at the inlet end of each tube bundle 41, and each tube bundle 41 is installed with a tube cover opening and closing mechanism 5. The tube cover opening and closing mechanism 5 It is used to drive the opening and closing movement of the pipe cover 42. After the pipe cover 42 is flipped up and opened, the tube bundle 41 is also in an open state and can operate to treat flue gas. After the pipe cover 42 falls down, the tube bundle 41 can be closed, and the flue gas cannot pass through the tube bundle 41. In this way, the flue gas will be concentrated in the opened tube bundle 41 to pass through, ensuring that the smoke intake in the opened tube bundle 41 meets the treatment requirements. The present invention is designed with a water circuit control device 6, which is connected to all the pipe cover opening and closing mechanisms 5 by pipelines. The water circuit control device 6 provides power for the pipe cover opening and closing mechanisms 5 through the design of water inlet and water discharge, so that it can control the opening and closing movement of the pipe cover 42. The water pool 7 is connected to the spray device 3 by pipeline. The water pool 7 is arranged on the outside of the desulfurization tower 1. The water pool 7 can provide operating water for the spray device 3.

[0030] like Figure 3 and Figure 4 As shown, the pipe cover opening and closing mechanism 5 includes a water jacket 51 and a buoyancy ring 52. The water jacket 51 is welded to the outer wall of the inlet end of the tube bundle 41, and the buoyancy ring 52 is matched and installed in the water jacket 51. The buoyancy ring 52 can move vertically up and down inside the water jacket 51. The upper end surface of the buoyancy ring 52 is connected to a top cover pipe 53. The water jacket 51 is provided with a first pipe opening 54 and a second pipe opening 55. The first pipe opening 54 is connected to the bottom of the water jacket 51, and the second pipe opening 55 is connected to the top of the side wall of the water jacket 51. The first pipe opening 54 is connected to the waterway control device 6. The pipe cover 42 blocks the rising path of the top cover pipe 53. Since the first pipe opening 54 is below the water jacket 51, when the waterway control device 6 supplies water to the water jacket 51, water enters from the first pipe opening 54. After the first pipe opening 54 enters water, it can push the buoyancy ring 52 and the top cover pipe 53 to rise. The top of the water jacket 51 is provided with a movement opening of the top cover pipe 53, and the top cover pipe 53 can move upward and When the water in the water jacket 51 is drained, the buoyancy ring 52 and the top cover tube 53 lose their buoyancy. Under the action of gravity, the buoyancy ring 52 and the top cover tube 53 naturally fall down, and the top cover tube 53 is re-stored in the water jacket 51. The pipe cover 42 naturally turns down, and the pipe bundle 41 is switched to the closed state. The flue gas can be introduced to perform dust removal. When the buoyancy ring 52 and the top cover tube 53 rise to the limit, the second pipe port 55 is connected, and water flows out from the second pipe port 55. Therefore, the first pipe port 54 can continuously take in water to keep the pipe bundle 41 in the open state. When the water in the water jacket 51 is drained, the buoyancy ring 52 and the top cover tube 53 lose their buoyancy. Under the action of gravity, the buoyancy ring 52 and the top cover tube 53 naturally fall down, and the top cover tube 53 is re-stored in the water jacket 51. The pipe cover 42 naturally turns down, and the pipe bundle 41 is switched to the closed state.

[0031] like Figure 5 As shown, the water circuit control device 6 includes a main water pipe 61, one end of which is connected to a water inlet pipeline 62, and a water inlet main valve 621 is installed on the water inlet pipeline 62, and the water inlet main valve 621 controls the opening and closing of the water inlet pipeline 62. The main water pipe 61 is connected to a plurality of water control branches 64, and the water control branches 64 are arranged in a one-to-one correspondence with the tube bundle 41. Each tube bundle 41 is equipped with a water control branch 64, and the water control branch 64 is connected to the first pipe port 54 of the water jacket 51. Each water control branch pipe 64 is equipped with a sub-control valve 641, which is used to control the opening and closing of the water control branch pipe 64. After the main water inlet valve 621 is opened, water flows through the main water pipe 61. Each time a sub-control valve 641 is opened, it means that the water control branch pipe 64 where the sub-control valve 641 is located is opened for water to flow, and water can enter the corresponding water jacket 51, which can control the top cover pipe 53 to rise, so as to lift up the pipe cover 42 on the corresponding pipe bundle 41, and the pipe bundle 41 corresponding to the water control branch pipe 64 is in an open state.

[0032] Since the second pipe opening 55 is located higher than the first pipe opening 54 on the water jacket 51, water will still remain in the water jacket 51 after the sub-control valve 641 is directly closed, and the top cover pipe 53 cannot be lowered and reset, and the tube bundle 41 cannot be switched to a closed state. Therefore, the present invention needs to solve the drainage problem in the water jacket 51 so that the tube bundle 41 can be closed. Figure 5 As shown, in the present invention, a drainage pipeline 63 is connected to the other end of the main water pipe 61, and a main drainage valve 631 is installed in the drainage pipeline 63. The main drainage valve 631 is used to control the opening and closing of the drainage pipeline 63. After the main drainage valve 631 is opened, it can form a pumping and drainage effect on the main water pipe 61 and the (opened) water control branch pipe 64, and can suck away the residual water in the water jacket 51, so that the top cover pipe 53 and the pipe cover 42 will fall naturally, and the tube bundle 41 is switched to a closed state.

[0033] like Figure 2 and Figure 5 As shown, the tube bundle dust collector 4 also includes a water tank 43, which is a hollow box body. The water tank 43 covers the outside of the inlet end of all the tube bundles 41. The water jacket 51 at the inlet end of the tube bundle 41 is partially installed in the water tank 43. The second pipe opening 55 of the water jacket 51 is arranged in the water tank 43. The outlet end pipeline of the water tank 43 is connected to the water pool 7. In the present invention, the tube bundle dust collector 4 requires water control, and the spray device 3 also has water requirements. The present invention cleverly uses the above two points to integrate the water circuit of the tube cover opening and closing mechanism 5 into the water circuit of the spray device 3. The present invention uses the water circuit control device 6 as the water inlet starting point. The water circuit control device 6 is used as the water inlet starting point. After the device 6 supplies water to the water jacket 51, it can control the tube bundle 41 to open. At the same time, the water in the water jacket 51 can be continuously output from the second pipe port 55 and fall into the water tank 43, and then transported to the water pool 7 through the outlet end pipeline of the water tank 43. The water pool 7 is used as a water source for the spray device 3 to supply water. In the process of controlling the opening of the tube bundle 41, the water channel control device 6 will continue to supply water to the water jacket 51, so that water continues to enter the water tank 43, and can continuously supply water to the water pool 7 and the spray device 3. When the number of tube bundles 41 opened is small, the water supply is small, which may cause the water level of the water pool 7 to drop rapidly and cannot meet the use requirements. Therefore, if Figure 1 As shown, the water pool 7 is installed with a float and a water replenishing device 71. When the water level is too low, treated water is replenished through the water replenishing device 71 to maintain the water level.

[0034] A tube bundle opening method, applied in a tube bundle desulfurization system, comprises the following steps:

[0035] (a) Close the main drain valve 631, open the main water inlet valve 621, and pass water to the main water pipe 61;

[0036] (b) Open the sub-control valve 641 on the water control branch pipe 64 to pass water to the water jacket 51 on the tube bundle 41. Water enters from the first pipe opening 54 to push the buoyancy ring 52 and the top cover pipe 53 upward. The rising top cover pipe 53 can lift up the tube cover 42, forming an opening effect at the inlet end of the tube bundle 41. Water is continuously supplied to keep the tube bundle 41 in an open state. Each time a water control branch pipe 64 is passed through, it means that a tube bundle 41 is opened. The number of water control branches 64 to pass water is selected according to the number of tube bundles 41 that are opened.

[0037] The method for opening the tube bundle 41 is relatively simple. It is only necessary to calculate in advance how many tube bundles 41 need to be opened, and then open the corresponding number of sub-control valves 641 on the water control branch pipes 64 .

[0038] A tube bundle closing method, applied in a tube bundle desulfurization system, comprises the following steps:

[0039] (a) Close the main water inlet valve 621 to cut off the water inlet of the main water pipe 61;

[0040] (b) The sub-control valves 641 on the corresponding water control branch pipes 64 of the tube bundles 41 that need to be kept open are closed one by one;

[0041] (c) Open the main drain valve 631, and the water control branch pipe 64 opened by the sub-control valve 641 forms a pumping and draining effect. The water in the water jacket 51 is pumped away, and the buoyancy ring 52 and the top cover pipe 53 lose their buoyancy and naturally fall down under the action of gravity. The pipe cover 42 loses its upward force and automatically turns down, and the pipe cover 42 forms a sealing and closing effect on the inlet end of the tube bundle 41.

[0042] During the use of the system, the boiler will have a load change and decrease. When the boiler load decreases, the smoke output decreases. At this time, a certain number of tube bundles 41 need to be closed. The closing operation of the tube bundle 41 is relatively complicated. First, determine how many tube bundles 41 need to remain open (set as 1# tube bundle 41 group). The sub-control valve 641 on the water control branch pipe 64 corresponding to the 1# tube bundle 41 group needs to be closed to ensure that the water in the water jacket 51 of the 1# tube bundle 41 group will not be pumped away, and the tube bundle 41 can remain open. Then open the main drainage valve 631, and the remaining tube bundles that need to be closed are closed. The bundle 41 (set as the 2# tube bundle 41 group) will form a pumping effect, the water in its water jacket 51 will be pumped out, the pipe cover 42 loses the upward force of the top cover pipe 53 and automatically flips down, and the pipe cover 42 forms a sealing and closing effect on the inlet end of the tube bundle 41. After confirming that the 2# tube bundle 41 group is closed, the main drainage valve 631 is closed, and the sub-control valves 641 on the water control branch pipe 64 corresponding to the main drainage valve 631 are closed, and all the sub-control valves 641 of the 1# tube bundle 41 group and the water inlet main valve 621 are opened to supply water again. At this time, only the 1# tube bundle 41 group is in the open state, meeting the production demand.

[0043] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A tube bundle desulfurization system, characterized in that: The invention comprises a desulfurization tower (1), a tube bundle dust collector (4), a water channel control device (6) and a water pool (7); the desulfurization tower (1) is provided with a first chamber (11), a second chamber (12) and a third chamber (13); the first chamber (11) and the second chamber (12) are connected at their upper ends, and the second chamber (12) and the third chamber (13) are connected at their lower ends; the first chamber (11), the second chamber (12) and the third chamber (13) are combined to form a wavy flue gas flow path (2); the desulfurization tower (1) is connected to a smoke inlet pipe (14) and a smoke outlet pipe (15); the smoke inlet pipe (14) is connected to the first chamber (11), the smoke outlet pipe (15) is connected to the third chamber (13); the first chamber (11) and the second chamber (12) are connected to the third chamber (13); A spray device (3) is installed in each of the first and second chambers (11) and the third chamber (13). The tube bundle dust collector (4) is installed in the second chamber (12). The tube bundle dust collector (4) comprises a plurality of vertically installed tube bundles (41). Both ends of the tube bundles (41) are open. A tube cover (42) is movably installed at the inlet end of each tube bundle (41). Each tube bundle (41) is installed with a tube cover opening and closing mechanism (5). The tube cover opening and closing mechanism (5) is used to drive the opening and closing movement of the tube cover (42). The water channel control device (6) is connected to the pipelines of all the tube cover opening and closing mechanisms (5). The water channel control device (6) provides power for the tube cover opening and closing mechanisms (5). The water pool (7) is connected to the spray device (3) through a pipeline.

2. A tube bundle desulfurization system according to claim 1, characterized in that: The pipe cover opening and closing mechanism (5) comprises a water jacket (51) and a buoyancy ring (52). The water jacket (51) is welded to the outer wall of the inlet end of the pipe bundle (41). The buoyancy ring (52) is matched and installed in the water jacket (51). The upper end surface of the buoyancy ring (52) is connected to a top cover pipe (53). The water jacket (51) is provided with a first pipe opening (54) and a second pipe opening (55). The first pipe opening (54) is connected to the bottom of the water jacket (51). The second pipe opening (55) is connected to the top of the side wall of the water jacket (51). The first pipe opening (54) is connected to a waterway control device (6). After water enters the first pipe opening (54), the buoyancy ring (52) and the top cover pipe (53) can be pushed upward. The top cover pipe (53) can move upward and partially extend to the outside of the water jacket (51). The top cover pipe (53) can push the pipe cover (42) to flip up and open.

3. A tube bundle desulfurization system according to claim 2, characterized in that: The water circuit control device (6) comprises a main water pipe (61), one end of the main water pipe (61) is connected to a water inlet pipeline (62), a water inlet main valve (621) is installed on the water inlet pipeline (62), the main water pipe (61) is connected to a plurality of water control branch pipes (64), the water control branch pipes (64) and the tube bundle (41) are arranged in a one-to-one correspondence, the water control branch pipes (64) are connected to the first pipe opening (54) of the water jacket (51), and each of the water control branch pipes (64) is installed with a sub-control valve (641).

4. A tube bundle desulfurization system according to claim 3, characterized in that: The other end of the main water pipe (61) is connected to a drainage pipeline (63), and the drainage pipeline (63) is installed with a main drainage valve (631).

5. The tube bundle desulfurization system according to claim 2, characterized in that: The tube bundle dust collector (4) further comprises a water tank (43), the water tank (43) being a hollow box body, the water tank (43) covering the outside of the inlet ends of all the tube bundles (41), the water jacket (51) at the inlet end of the tube bundle (41) being partially installed in the water tank (43), the second pipe opening (55) of the water jacket (51) being arranged in the water tank (43), and the outlet end pipeline of the water tank (43) being connected to a water pool (7).

6. The tube bundle desulfurization system according to claim 1, characterized in that: The water pool (7) is equipped with a water replenishing device (71).

7. A method for opening a tube bundle, applied in a tube bundle desulfurization system as claimed in claim 4, characterized in that: The steps include: (a) Close the main drain valve (631), open the main water inlet valve (621), and pass water through the main water pipe (61); (b) opening the sub-control valve (641) on the water control branch pipe (64) to pass water through the water jacket (51) on the tube bundle (41). Water enters from the first pipe opening (54) to push the buoyancy ring (52) and the top cover pipe (53) upward. The upward movement of the top cover pipe (53) can lift up the tube cover (42), thereby forming an opening effect at the inlet end of the tube bundle (41). Water is continuously supplied to keep the tube bundle (41) in an open state. Each time a water control branch pipe (64) is passed through, it means that a tube bundle (41) is opened. The number of water control branch pipes (64) to be passed through is selected according to the number of tube bundles (41) to be opened.

8. A tube bundle closing method, applied in a tube bundle desulfurization system as claimed in claim 4, characterized in that: The steps include: (a) Close the main water inlet valve (621) to cut off the water inlet of the main water pipe (61); (b) The sub-control valves (641) on the corresponding water control branch pipes (64) of the tube bundles (41) that need to be kept open are closed one by one; (c) The main drainage valve (631) is opened, and the water control branch pipe (64) opened by the sub-control valve (641) forms a pumping and draining effect, the water in the water jacket (51) is pumped away, the buoyancy ring (52) and the top cover pipe (53) lose buoyancy and naturally fall down under the action of gravity, the pipe cover (42) loses the upward force and automatically turns downward, and the pipe cover (42) forms a sealing and closing effect on the inlet end of the pipe bundle (41).

Citation Information

Patent Citations

  • Integral energy-saving desulfurizer suitable for medium and small-sized boilers

    CN102600711A

  • Dedusting and demisting desulfurization tower

    CN111905554A

  • Integration desulfurization dust collecting equipment

    CN205650015U

  • Be applied to stream speed adjusting festival subassembly in tube bank defroster

    CN208275188U

  • Flue gas flow velocity auxiliary adjusting device of tube bundle demister

    CN212680349U