Pipe die closing method
By using a vision camera and a multi-axis robotic arm in the pipe mold clamping system, the tightening mechanism is automatically adjusted to ensure the accurate tightening of the mold clamping bolts, which solves the problems of instability and low automation of manual tightening in the existing technology, and achieves The reliable automatic operation of pipe mold clamping is achieved.
Patent Information
- Application Number
- CN202411137937.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-10-22
AI Technical Summary
The existing pipe mold closing technology has high manual labor intensity, high noise hazards, high safety risks, and lacks automation and informatization. As a result, the clamping screws are not tightened firmly and are easily missed or incompletely tightened.
A pipe mold clamping system is adopted, including a main control unit, a vision sub-control unit, a multi-axis robotic arm and an encoder with a fixed installation position. Three-dimensional images are collected through a vision camera to obtain mold clamping bolt position data, and the multi-axis robotic arm compensates according to the following position. Adjust the tightening mechanism to ensure that the bolt sleeve and the mold clamping bolt are coaxial to achieve automatic tightening.
It realizes the automated and unmanned operation of pipe mold closing, reduces the labor intensity of workers, improves the degree of automation, ensures the accuracy and safety of bolt tightening, and improves the level of production informatization.
Smart Images

Figure CN118809799A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated pile production, in particular to a pipe mold closing method. Background Art
[0002] In the production of pipe piles in the precast pile industry, pipe molds are needed to produce pipe piles. Pipe molds are divided into bottom molds (i.e., lower molds) and cover molds (i.e., upper molds). In the production process of pipe piles, the cage reinforcement of the pipe pile is first placed in the bottom mold, and concrete is injected; then the cover mold is covered, and the mold screws (or mold bolts) that lock the bottom mold and the cover mold are quickly tightened to complete the mold clamping; then the pipe piles are obtained after tensioning, centrifugation, steaming, demoulding and other processes in sequence. The clamping of the bottom mold and the cover mold prevents the concrete from leaking out of the gap between the bottom mold and the cover mold during the centrifugation process of the pipe mold, thereby ensuring the quality of the pipe piles.
[0003] When the tube mold is being closed, the bottom mold of the tube mold is set to remain on the flat car. After the cover mold is closed, the flat car moves along the track in the workshop to the tightening station in the workshop; at the tightening station, there are workers holding air guns on both sides of the flat car. The workers observe the position of the clamping screws on the tube mold with their eyes, and use the air gun to put the sleeve at the end of the air gun on the nut of the clamping screw, and then open the air gun until the clamping screws are tightened; the flat car moves while tightening the clamping screws manually until all the clamping screws on the tube mold are tightened. This clamping method has the following disadvantages: 1. The on-site manual labor intensity is high, the noise hazard is large, and the safety risk is high; 2. Because the tightening of the clamping screws is manually determined, the tightening time and tightening torque of the clamping screws are not fixed; 3. Manual tightening may cause the problem of missing the clamping screws; 4. The tightening of the clamping screws during the entire clamping process depends entirely on manual judgment, lacks data communication, and has a low degree of automation and informatization.
[0004] In response to the above problems, the Chinese invention patent application with application number 202410558715.2 discloses an automatic locking system for pipe pile mold bolts and an automatic mold closing method for pipe molds, which is equipped with a visual camera for obtaining three-dimensional image information of mold bolts, a follow-up encoder for obtaining position information of mold bolts, a fastening assembly for tightening mold bolts, and a central processing unit. After receiving the information obtained by the visual camera and the follow-up encoder, the central processing unit sends an operation instruction to the fastening assembly to realize the automatic tightening of the mold bolts during the pipe mold closing process. In addition, its specification records that: the movement parameters of the pipe mold are obtained according to the numerical value of the follow-up encoder and sent to the control assembly, and the control assembly thereby obtains the bolt position of the pipe mold, and adjusts the posture of the fastening assembly through the initial position of the fastening assembly. Obviously, the prior art determines the bolt position of the pipe mold only based on the numerical value of the follow-up encoder, which is a theoretical value calculated by the control assembly. However, due to factors such as the positioning error of the tube mold on the flat car and the movement error of the tube mold driven forward by the flat car, there is a certain deviation between the actual value of the bolt position and the theoretical value. The existing technology adjusts the posture of the fastening component according to the calculated theoretical value, which can easily lead to the fastening component being unable to effectively align with the bolt, ultimately resulting in the undesirable phenomenon that the bolt is not fully tightened. Summary of the invention
[0005] In view of the above-mentioned shortcomings of the prior art, an object of the present invention is to provide a tube mold clamping method, which can reliably ensure that the tightening mechanism is aligned with the clamping bolt and the two are coaxial.
[0006] To achieve the above object, the present invention provides a tube mold clamping method for automatically tightening a plurality of clamping bolts passing through the grooves on both sides of the tube mold. The tube mold clamping method comprises the following steps in sequence:
[0007] S1. Configure a tube mold clamping system, the tube mold clamping system includes a main control unit, a visual sub-control unit, an execution unit and an encoder with a fixed installation position; the visual sub-control unit includes a visual camera, a visual controller connected to the visual camera for communication, and a visual industrial computer connected to the visual controller for communication; the execution unit includes a fixedly installed multi-axis mechanical arm, and a tightening mechanism installed at the output terminal of the multi-axis mechanical arm, the output terminal of the tightening mechanism is a rotatable bolt sleeve; the encoder is used to contact the flat car carrying the tube mold; a communication connection is established between the main control unit, the visual sub-control unit, the multi-axis mechanical arm and the encoder;
[0008] S2, a detection point position and a preparation point position are set on the forward route of the flat car driving the tube mold to move;
[0009] S3, the tube mold clamping system receives a start signal, and the flat car drives the tube mold to move forward;
[0010] When the tube mold moves forward to the detection point, the main control unit triggers the visual sub-control unit, and the visual camera collects the three-dimensional image of the tube mold and sends it to the visual industrial computer. The visual industrial computer obtains the position data of each clamping bolt on the tube mold and the deflection angle data of the tube mold according to the three-dimensional image of the tube mold;
[0011] S4, the flat car drives the tube mold to continue moving forward;
[0012] When it is determined according to the data of the encoder that the tube mold has moved forward to the preparation point position, the output terminal of the multi-axis robot arm moves to the preparation station, and the multi-axis robot arm requests the position data of the first mold clamping bolt on the tube mold and the deflection angle data of the tube mold from the visual industrial control computer; at the same time, the multi-axis robot arm requests the follow-up motion trigger signal of the first mold clamping bolt on the tube mold and the follow-up position compensation value B1 in the forward direction, and the follow-up motion trigger signal of the first mold clamping bolt includes the theoretical start follow-up position An1 in the forward direction;
[0013] S5, the flat car drives the tube mold to continue moving forward;
[0014] The multi-axis robot arm controls the output terminal to move to the tightening station according to the position data of the first mold clamping bolt, the deflection angle data of the tube mold and the follow-up motion trigger signal of the first mold clamping bolt, and adjusts the posture of the output terminal and the tightening mechanism; at the same time, the multi-axis robot arm obtains the instantaneous data C of the encoder when the output terminal moves to the tightening station, then the follow-up position compensation value B1 of the first mold clamping bolt is: B1=An1-f(C), and the multi-axis robot arm corrects the position of its output terminal in the forward direction according to the follow-up position compensation value B1, so that the bolt sleeve of the tightening mechanism is coaxial with the first mold clamping bolt;
[0015] S6, the bolt sleeve of the tightening mechanism is inserted into the first mold clamping bolt, and the first mold clamping bolt is tightened. At the same time, the output terminal of the multi-axis robot arm moves forward synchronously with the tube mold, and the multi-axis robot arm requests the position data of the next i-th mold clamping bolt on the tube mold and the deflection angle data of the tube mold from the visual industrial control computer, i=2,3,4...;
[0016] S7: After the current mold clamping bolt is tightened, the multi-axis robot drives the bolt sleeve of the tightening mechanism to disengage from the current mold clamping bolt. At the same time, the multi-axis robot requests the follow-up motion trigger signal of the next i-th mold clamping bolt and the follow-up position compensation value B in the forward direction. i The following motion trigger signal of the next i-th clamping bolt includes the theoretical starting following position An in the forward direction. i , B i =An i -f(C);
[0017] S8, the multi-axis robot arm moves according to the position data of the next i-th clamping bolt, the deflection angle data of the tube mold, the follow-up motion trigger signal of the next i-th clamping bolt and the follow-up position compensation value B in the forward direction i Controlling the output terminal to move to the tightening station, and adjusting the position of the output terminal and the tightening mechanism so that the bolt sleeve of the tightening mechanism is coaxial with the next i-th clamping bolt;
[0018] S9, repeat the above steps S6 to S8 until the last clamping bolt on the tube mold is tightened, and the multi-axis robot arm is reset.
[0019] The preferred scheme of the above technical scheme is: the tube mold clamping method also includes step S10 executed after step S9, the flat car drives the tube mold to move backward, the visual camera collects the three-dimensional image of each clamping bolt on the tube mold, and sends it to the visual industrial control computer, the visual industrial control computer obtains the height of each clamping bolt from the tube mold tongue and groove plane according to the three-dimensional image of each clamping bolt, and the visual industrial control computer determines whether each clamping bolt is tightened or not tightened according to the height of each clamping bolt from the tube mold tongue and groove plane.
[0020] The preferred solution of the above technical solution is: the main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robotic arm, and the PLC controller is directly connected to the visual controller, the visual industrial computer, the encoder and the multi-axis robotic arm respectively;
[0021] In step S4 and step S7, the multi-axis robot arm requests the PLC controller for a follow-up motion trigger signal of each clamping bolt and a follow-up position compensation value B in the forward direction. i The PLC controller calculates the theoretical starting follow position An of each clamping bolt in the forward moving direction according to the request of the multi-axis robot arm. i and following position compensation value B i .
[0022] The preferred solution of the above technical solution is: the main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robotic arm, the PLC controller is directly connected to the visual industrial computer, and the multi-axis robotic arm is directly connected to the visual controller and the encoder respectively;
[0023] In step S4 and step S7, the multi-axis robot arm requests the visual controller for a follow-up motion trigger signal of each mold clamping bolt, and the multi-axis robot arm internally calculates a theoretical start follow-up position An of each mold clamping bolt in the forward moving direction. i and following position compensation value B i .
[0024] The preferred solution of the above technical solution is: the main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robot arm, the PLC controller is directly connected to the visual industrial computer, and the visual industrial computer is also directly connected to the visual controller and the encoder respectively;
[0025] In step S4 and step S7, the multi-axis robot arm requests the visual industrial computer for the follow-up motion trigger signal of each clamping bolt and the follow-up position compensation value B in the forward direction. i The visual industrial computer calculates the theoretical starting follow position An of each mold clamping bolt in the forward moving direction according to the request of the multi-axis robot arm. i and follow-up position compensation value B i .
[0026] The preferred solution of the above technical solution is: when the tube mold moves forward to the preparation point position and the output terminal of the multi-axis robot moves to the preparation station, the visual camera scans the starting position of the tube mold. At this time, the distance between the central axis of the output terminal of the multi-axis robot and the starting position of the tube mold in the forward moving direction of the tube mold is L, and the distance between the i-th clamping bolt on the tube mold and the starting position of the tube mold in the forward moving direction of the tube mold is X. i , the data of the encoder is N, then the theoretical starting follow position An of each clamping bolt on the tube mold in the forward direction is i For: i =L+X i +f(N).
[0027] A preferred embodiment of the above technical solution is as follows: the tube mold clamping system further comprises a point laser sensor, which is arranged at the detection point position and is communicatively connected with the main control unit.
[0028] A preferred embodiment of the above technical solution is as follows: there are two groups of execution units, there are two visual cameras, and the two groups of execution units and the two visual cameras are arranged opposite to each other along the radial direction of the tube mold.
[0029] As described above, the tube mold closing method according to the present invention has the following beneficial effects:
[0030] The present application can automatically tighten several mold-closing bolts that penetrate through the tongues and grooves on both sides of the tube mold to realize automatic mold-closing of the tube mold. In particular, during the mold-closing process, the multi-axis robot arm will correct the position of its output terminal in the forward moving direction of the tube mold in real time according to the follow-up position compensation value of each mold-closing bolt, eliminate the deviation between the theoretical starting follow-up position of the multi-axis robot arm in the forward moving direction of the tube mold and the instantaneous position of the current mold-closing bolt, and make the output terminal of the multi-axis robot arm strictly aligned with the current mold-closing bolt, that is, strictly ensure that the bolt sleeve of the tightening mechanism is strictly aligned with the current mold-closing bolt, and ensure that the bolt sleeve is accurately inserted into and tightened the current mold-closing bolt. Ultimately, the present application reliably realizes the automation and unmanned operation of tube mold clamping, reduces the labor intensity of workers, improves the working environment, and improves the degree of automation; and also realizes the acquisition of production data, which is conducive to assisting production arrangements and improving the degree of informatization of workshops. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is the hardware network topology diagram of the first embodiment of the tube mold clamping system of the present application.
[0032] Figure 2 This is a schematic diagram of the tube mold in this application moving forward to the preparation point position and the output terminal of the multi-axis robot arm moving to the preparation station.
[0033] Figure 3 Schematic diagram of the calculation of the deflection angle of the tube mold in this application.
[0034] Figure 4 This is the hardware network topology diagram of the second embodiment of the tube mold clamping system of the present application.
[0035] Figure 5 This is the hardware network topology diagram of the third embodiment of the tube mold clamping system of the present application.
[0036] Component number description
[0037] 10 Encoder
[0038] 21 Vision Camera
[0039] 22 Vision Controller
[0040] 23 Visual Industrial Computer
[0041] 31 Multi-axis Robotic Arm
[0042] 32 Tightening mechanism
[0043] 40 Flat car
[0044] 50 PLC controller DETAILED DESCRIPTION
[0045] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0046] It should be noted that the structures, proportions, sizes, etc. drawn in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0047] It should also be noted that when an element is referred to as being "fixed on" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element at the same time. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or may be indirectly connected to the other element through an intermediate element.
[0048] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0049] The present application provides a tube mold clamping method for automatically tightening a plurality of clamping bolts passing through the grooves on both sides of the tube mold. Figure 1 or Figure 4 or Figure 5 As shown, the tube mold is positioned and placed on a flat car 40, and the flat car 40 moves along the length direction of the tube mold to transport the tube mold. For the convenience of description, the length direction of the tube mold is defined as the front-to-back direction, and the flat car 40 moves along the front-to-back direction to transport the tube mold forward or backward. The left and right sides of the tube mold are both tongue-and-groove, and several clamping bolts passing through the tongue-and-groove on the left and right sides of the tube mold are spaced and distributed in the front-to-back direction, and the several clamping bolts are perpendicular to the tongue-and-groove surface of the tube mold.
[0050] The present application is also provided with a tube mold clamping system for implementing the tube mold clamping method, and the tube mold clamping system is a hardware part. Figure 1 or Figure 4 or Figure 5As shown, the tube mold clamping system includes a main control unit, a visual sub-control unit, an execution unit and an encoder 10 with a fixed installation position. Among them, the main control unit includes a PLC controller 50. The visual sub-control unit includes a visual camera 21, a visual controller 22 connected to the visual camera 21, and a visual industrial computer 23 connected to the visual controller 22. The visual camera 21 is used to scan the tube mold and obtain a three-dimensional image of the tube mold. The execution unit includes a fixedly installed multi-axis mechanical arm 31 and a tightening mechanism 32 installed at the output terminal of the multi-axis mechanical arm 31. The output terminal of the multi-axis mechanical arm 31 is a flange structure, and the output terminal of the tightening mechanism 32 is a rotatable bolt sleeve, and the tightening mechanism 32 has a jackhammer for driving the bolt sleeve to rotate. The encoder 10 is used to contact the flat car 40 carrying the tube mold, and obtain the position information of the flat car 40 according to the data of the encoder 10, and then obtain the position information of the tube mold and the position information of each clamping bolt on the tube mold.
[0051] Furthermore, a communication connection is established between the main control unit, the visual sub-control unit, the multi-axis robot arm 31 and the encoder 10. In addition, the PLC controller 50 is directly connected to the visual industrial computer 23 via a two-way communication line, and the visual industrial computer 23 is directly connected to the multi-axis robot arm 31 via a communication line. There are multiple network topologies between the visual sub-control unit, the multi-axis robot arm 31 and the encoder 10. The multi-axis robot arm 31 can communicate with the visual controller 22 and the encoder 10 through the PLC controller 50, or the multi-axis robot arm 31 can communicate with the visual controller 22 and the encoder 10 through the visual industrial computer 23, or the multi-axis robot arm 31 can communicate directly with the visual controller 22 and the encoder 10. Therefore, based on the different network topologies between the visual sub-control unit, the multi-axis robot arm 31 and the encoder 10, the tube mold clamping system and the tube mold clamping method have different embodiments. The following provides three preferred embodiments of the tube mold clamping method.
[0052] Tube mold clamping method embodiment 1
[0053] Embodiment 1 of the tube mold closing method includes the following steps.
[0054] Step S1, configuration as follows Figure 1 In the embodiment 1 of the tube mold clamping system shown, the multi-axis robot 31 communicates with the visual controller 22 and the encoder 10 through the PLC controller 50, and the PLC controller 50 is directly connected to the visual controller 22, the encoder 10 and the multi-axis robot 31. The embodiment 1 of the tube mold clamping method adopts the PLC controller 50 as the main control and the visual industrial computer 23 as the visual sub-control.
[0055] Step S2, a detection point position and a preparation point position are set on the forward route of the flat car 40 to drive the tube mold to move; in the initial state, the tube mold on the flat car 40 is distributed on the rear side of the detection point position; in the subsequent mold closing process, the flat car 40 drives the tube mold to move forward, and the tube mold first passes through the detection point position and then passes through the preparation point position. Preferably, the tube mold closing system is provided with a point laser sensor at the detection point position, and the point laser sensor is connected to the PLC controller 50 for communication, and the point laser sensor is used to detect whether the tube mold reaches the detection point position.
[0056] Step S3, the tube mold clamping system receives the start signal, and the flat car 40 drives the tube mold forward; when the tube mold moves forward to the detection point position, the output signal of the point laser sensor changes and is fed back to the PLC controller 50; the PLC controller 50 triggers the visual sub-control unit, and the visual controller 22 controls the visual camera 21 to collect the three-dimensional image of the tube mold, and sends the collected three-dimensional image signal to the visual industrial control computer 23, and the visual industrial control computer 23 obtains the position data of each clamping bolt on the tube mold and the deflection data of the tube mold according to the three-dimensional image of the tube mold. The position data of each clamping bolt is the three-dimensional coordinate data of each clamping bolt. At the same time, the visual industrial control computer 23 also saves the position data of each clamping bolt on the tube mold and the deflection data of the tube mold in a fixed memory.
[0057] Step S4, the flat car 40 drives the tube mold to continue to move forward, and the visual controller 22 controls the visual camera 21 to continuously collect the three-dimensional image of the tube mold and send it to the visual industrial computer 23; when it is judged that the tube mold moves forward to the preparation point position (that is, the set specific position) according to the data of the encoder 10, the PLC controller 50 triggers the multi-axis robot arm 31, and the output terminal of the multi-axis robot arm 31 moves to the preparation station, and the multi-axis robot arm 31 requests the position data of the first clamping bolt on the tube mold and the deflection angle data of the tube mold from the visual industrial computer 23; at the same time, the multi-axis robot arm 31 requests the PLC controller 50 for the follow-up motion trigger signal of the first clamping bolt on the tube mold and the follow-up position compensation value B1 in the forward direction (that is, the tube mold movement direction), and the follow-up motion trigger signal of the first clamping bolt includes the theoretical start follow-up position An1 in the forward direction. The PLC controller 50 calculates the theoretical starting following position An1 and the following position compensation value B1 of the first mold clamping bolt according to the request timing of the multi-axis robot arm 31, and sends the theoretical starting following position An1 and the following position compensation value B1 of the first mold clamping bolt to the multi-axis robot arm 31; the visual industrial computer 23 sends the position data of the first mold clamping bolt and the deflection angle data of the tube mold to the multi-axis robot arm 31.
[0058] Step S5, the flat car 40 drives the tube mold to continue to move forward; the multi-axis robot arm 31 controls its output terminal to move to the tightening station according to the position data of the first mold clamping bolt, the deflection angle data of the tube mold and the follow-up motion trigger signal of the first mold clamping bolt, and adjusts the posture of its output terminal, that is, adjusts the posture of the tightening mechanism 32, so that the bolt sleeve of the tightening mechanism 32 is perpendicular to the tongue and groove surface of the tube mold; at the same time, the multi-axis robot arm 31 obtains the instantaneous data C of the encoder 10 when its output terminal moves to the tightening station, then the instantaneous position of the first mold clamping bolt in the forward movement direction of the tube mold at this time is f(C), and the follow-up position compensation value B1 of the first mold clamping bolt calculated by the PLC controller 50 is: B1=An1-f(C); the multi-axis robot arm 31 corrects the position of its output terminal in the forward movement direction of the tube mold according to the follow-up position compensation value B1, so that the bolt sleeve of the tightening mechanism 32 is coaxial with the first mold clamping bolt, and the two are strictly aligned.
[0059] Step S6, the bolt sleeve of the tightening mechanism 32 is inserted into the first mold clamping bolt, and the first mold clamping bolt is tightened; during the tightening process, the output terminal of the multi-axis robot 31 moves forward synchronously with the tube mold, and at the same time, the multi-axis robot 31 requests the position data of the next (i.e., the second) mold clamping bolt on the tube mold and the deflection angle data of the tube mold from the visual industrial computer 23, and the visual industrial computer 23 sends the position data of the first mold clamping bolt and the deflection angle data of the tube mold to the multi-axis robot 31.
[0060] Step S7, after the current mold clamping bolt is tightened, the multi-axis robot 31 drives the bolt sleeve of the tightening mechanism 32 to disengage from the current mold clamping bolt. At the same time, the multi-axis robot 31 requests the PLC controller 50 for the following motion trigger signal of the next second mold clamping bolt and the following position compensation value B2 in the forward direction. The following motion trigger signal of the next second mold clamping bolt includes the theoretical starting following position An2 in the forward direction. The PLC controller 50 calculates the theoretical starting following position An2 and the following position compensation value B2 of the second mold clamping bolt according to the request timing of the multi-axis robot 31, B2=An2-f(C). The PLC controller 50 sends the theoretical starting following position An2 and the following position compensation value B2 of the second mold clamping bolt to the multi-axis robot 31.
[0061] Step S8, the multi-axis robot arm 31 controls the movement of its output terminal to the tightening station according to the position data of the next second mold clamping bolt, the deflection angle data of the tube mold, the follow-up motion trigger signal of the next second mold clamping bolt and the follow-up position compensation value B2 in the forward direction, and adjusts the posture of its output terminal and the tightening mechanism 32 so that the bolt sleeve of the tightening mechanism 32 is coaxial with the next second mold clamping bolt.
[0062] Step S9, repeat the above steps S6 to S8, and complete the automatic tightening of the second mold clamping bolt, the third mold clamping bolt, ..., and the last mold clamping bolt on the tube mold in sequence. When the last mold clamping bolt on the tube mold is tightened, the multi-axis robot arm 31 is reset.
[0063] Step S10, the flat car 40 and the tube mold return, that is, the flat car 40 drives the tube mold to move backward, and the visual controller 22 controls the visual camera 21 to collect the three-dimensional image of each mold bolt on the tube mold and send it to the visual industrial computer 23. The visual industrial computer 23 obtains the height of each mold bolt from the tongue and groove plane of the tube mold according to the three-dimensional image of each mold bolt. The visual industrial computer 23 determines whether each mold bolt is tightened or not tightened according to the height of each mold bolt from the tongue and groove plane of the tube mold, and sends the tightening and not tightening detection results to the PLC controller 50.
[0064] The present application can automatically tighten several mold-closing bolts that penetrate through the grooves on both sides of the tube mold to realize automatic mold-closing of the tube mold. In particular, during the mold-closing process, the multi-axis robot arm 31 will correct the position of its output terminal in the forward moving direction of the tube mold in real time according to the follow-up position compensation value of each mold-closing bolt, eliminate the deviation between the theoretical starting follow-up position of the multi-axis robot arm 31 and the instantaneous position of the current mold-closing bolt in the forward moving direction of the tube mold, and make the output terminal of the multi-axis robot arm 31 strictly aligned with the current mold-closing bolt, that is, strictly ensure that the bolt sleeve of the tightening mechanism 32 is strictly aligned with the current mold-closing bolt, and ensure that the bolt sleeve is accurately inserted into and tightened the current mold-closing bolt. Finally, the present application reliably realizes the automation and unmanned operation of tube mold clamping, reduces the labor intensity of workers, improves the working environment, and improves the degree of automation; and also realizes the acquisition of production data, which is conducive to assisting production arrangements and improving the degree of informatization of workshops.
[0065] Preferably, if Figure 1 As shown, in the first embodiment of the tube mold clamping system, the multi-axis mechanical arm 31 and the tightening mechanism 32 are configured with two groups, and the two groups of multi-axis mechanical arms 31 and the tightening mechanism 32 are arranged on the left and right sides of the tube mold along the radial direction of the tube mold; the visual cameras 21 are also configured with two, and the two visual cameras 21 are arranged on the left and right sides of the tube mold along the radial direction of the tube mold. During the entire tightening process, the multi-axis mechanical arms 31, the tightening mechanism 32 and the visual camera 21 on the left and right sides of the tube mold work simultaneously, and the multi-axis mechanical arm 31, the tightening mechanism 32 and the visual camera 21 on the left side of the tube mold are used to tighten several tube mold bolts in the left tongue of the tube mold, and the multi-axis mechanical arm 31, the tightening mechanism 32 and the visual camera 21 on the right side of the tube mold are used to tighten several tube mold bolts in the right tongue of the tube mold. In this way, the flat car 40 drives the tube mold back and forth once, and the automatic tightening of the clamping bolts on the left and right sides of the tube mold, as well as the detection of tightening and missing tightening, can be completed, thereby improving efficiency.
[0066] Furthermore, in the first embodiment of the tube mold clamping method, the PLC controller 50 calculates the theoretical starting follow-up position An of the i-th clamping bolt. i The preferred method is as follows: when the tube mold moves forward to the preparation point position and the output terminal of the multi-axis robot 31 moves to the preparation station, the visual camera 21 scans the tube mold starting position, which is also the front end position of the tube mold. At this time, Figure 2 As shown, the distance between the central axis of the output terminal of the multi-axis robot 31 and the starting position of the tube mold in the forward moving direction of the tube mold is L, and the distance between the i-th clamping bolt on the tube mold and the starting position of the tube mold in the forward moving direction of the tube mold is X i , the current data of encoder 10 is N, then the theoretical starting following position of the i-th clamping bolt on the tube mold in the tube mold forward moving direction is An i For: i =L+X i +f(N); and, the following position compensation value B of the i-th clamping bolt on the tube mold in the forward moving direction of the tube mold i For: B i =An i -f(C); i = 1, 2, 3, 4 ... The data L is calculated by the PLC controller 50 according to the preparation station information of the output terminal of the multi-axis robot 31 and the preparation point position of the tube mold, and the data X i The visual industrial computer 23 calculates the three-dimensional image of the tube mold and sends it to the PLC controller 50. Therefore, the theoretical starting follow position An1 and the follow position compensation value B1 of the first clamping bolt in the tube mold forward moving direction are: An1 = L + X1 + f (N), B1 = An1-f (C); the theoretical starting follow position An2 and the follow position compensation value B2 of the second clamping bolt in the tube mold forward moving direction are: An2 = L + X2 + f (N), B2 = An2-f (C); the theoretical starting follow position An3 and the follow position compensation value B3 of the third clamping bolt in the tube mold forward moving direction are: An3 = L + X3 + f (N), B3 = An3-f (C); and so on.
[0067] Furthermore, in the above step S3, the method in which the visual industrial computer 23 obtains the position data of each clamping bolt on the tube mold according to the three-dimensional image of the tube mold is preferably:
[0068] First, the visual industrial computer 23 automatically segments the three-dimensional image of the tube mold according to the spacing of the mold bolts. For example: after the PLC controller 50 detects that the tube mold reaches the detection point position according to the signal of the point laser sensor, the PLC controller 50 triggers the visual sub-control unit according to the in-place signal, and the visual camera 21 starts to collect the three-dimensional image of the tube mold; the length of the first three-dimensional image of the tube mold collected by the visual camera 21 is about 300mm, and the spacing of the mold bolts is 250mm, then the visual industrial computer 23 identifies the starting position of the tube mold in the first three-dimensional image of the tube mold, and cuts the subsequent three-dimensional images of the tube mold at intervals of 250mm according to the starting position of the tube mold, and obtains multiple cut images, and each cut image has at least one mold bolt.
[0069] Second, the visual industrial computer 23 identifies the position of the mold bolts in the cutting image: the visual industrial computer 23 searches for the characteristic points of the mold bolts in the cutting image (such as hexagonal nuts), and then identifies the three-dimensional coordinate values (X, Y, Z) of the characteristic points of the mold bolts in the field of view of the visual camera 21; through the hand-eye calibration of the visual camera 21 and the multi-axis robotic arm 31, the end position of the multi-axis robotic arm 31 is calibrated in the visual coordinate system, and then the position of the first mold bolt is set to the origin (0,0,0), and then the position of the subsequent i-th mold bolt is compared with the position of the first mold bolt, and the three-dimensional coordinate value of the subsequent i-th mold bolt can be calculated. In this way, the position data of each mold bolt on the tube mold is obtained.
[0070] Furthermore, in the above step S3, the method in which the visual industrial computer 23 obtains the pipe mold deflection angle data according to the three-dimensional image of the pipe mold is preferably: 1. The pipe model number is input to the visual industrial computer 23 in advance, and the visual industrial computer 23 obtains the spacing P between the clamping bolts on the left and right sides of the pipe mold according to the pipe model number, such as Figure 3 As shown; 2. The visual industrial computer 23 obtains the plane height of the mold bolt positions corresponding to the tongue and groove on the left and right sides of the tube mold according to the three-dimensional image of the tube mold, and then calculates the plane height difference H of the mold bolts corresponding to the tongue and groove on the left and right sides, thereby calculating the deflection angle of the tube mold, which is the tube mold deflection angle data.
[0071] Furthermore, in the above-mentioned steps S5 and S8, the adjustment basis of the posture of the multi-axis robot arm 31 is as follows: when the visual industrial computer 23 obtains the position data of each mold bolt on the tube mold according to the three-dimensional image of the tube mold, the visual camera 21 and the multi-axis robot arm 31 are hand-eye calibrated, so that the three-dimensional coordinate value of the multi-axis robot arm 31 is consistent with the three-dimensional coordinate value calibrated by the visual industrial computer 23; according to the deflection angle of the tube mold, the multi-axis robot arm 31 adjusts the posture of its output terminal and the tightening mechanism 32, so that the bolt sleeve of the tightening mechanism 32 and the tongue and groove surface of the tube mold remain relatively vertical; thereafter, according to the three-dimensional coordinates of the mold bolt, the theoretical starting follow position and the follow position compensation value, the multi-axis robot arm 31 adjusts the posture of its output terminal and the tightening mechanism 32, so that the bolt sleeve of the tightening mechanism 32 is strictly aligned with the mold bolt, so that the bolt sleeve of the tightening mechanism 32 is smoothly inserted into the nut of the mold bolt, and the tightening of the mold bolt is completed.
[0072] Tube mold clamping method embodiment 2
[0073] The main difference between the second embodiment of the tube mold clamping method and the first embodiment of the tube mold clamping method is that the multi-axis robot 31 directly communicates with the visual controller 22 and the encoder 10. Therefore, in the second embodiment of the tube mold clamping system configured in the second embodiment of the tube mold clamping method, Figure 4 As shown, the multi-axis robot 31 is directly connected to the visual controller 22 and the encoder 10 respectively. Therefore, in the second embodiment of the tube mold clamping method, the multi-axis robot 31 requests the position data of each clamping bolt on the tube mold and the deflection data of the tube mold from the visual industrial control computer 23; at the same time, the multi-axis robot 31 requests the follow-up motion trigger signal of each clamping bolt from the visual controller 22, obtains each data, and then calculates the theoretical starting follow-up position An of each clamping bolt in the forward moving direction internally by the multi-axis robot 31 i and following position compensation value B i Finally, the multi-axis robot 31 adjusts the position of its output terminal and the tightening mechanism 32 according to the position data of the mold clamping bolt, the deflection angle data of the tube mold, and the theoretical starting follow-up position and the follow-up position compensation value in the forward moving direction of the mold clamping bolt, inserts and tightens the mold clamping bolt.
[0074] Tube mold clamping method embodiment 3
[0075] The main difference between the third embodiment of the tube mold clamping method and the first embodiment of the tube mold clamping method is that the multi-axis robot arm 31 communicates with the visual controller 22 and the encoder 10 through the visual industrial computer 23. Therefore, in the third embodiment of the tube mold clamping system configured in the third embodiment of the tube mold clamping method, Figure 5As shown, the visual industrial computer 23 is also directly connected to the visual controller 22 and the encoder 10. Therefore, in the third embodiment of the tube mold clamping method, the multi-axis robot 31 requests the visual industrial computer 23 for the position data of each clamping bolt on the tube mold and the deflection data of the tube mold; at the same time, the multi-axis robot 31 requests the visual industrial computer 23 for the follow-up motion trigger signal of each clamping bolt and the follow-up position compensation value B in the forward moving direction of the tube mold. i The visual industrial computer 23 calculates the theoretical starting position An of each mold clamping bolt in the forward moving direction according to the request of the multi-axis robot arm 31. i and follow-up position compensation value B i , and sent to the multi-axis robot 31. Finally, the multi-axis robot 31 adjusts the position of its output terminal and the tightening mechanism 32 according to the position data of the mold clamping bolt, the deflection angle data of the tube mold, and the theoretical starting follow position and the follow position compensation value in the forward moving direction of the mold clamping bolt, inserts and tightens the mold clamping bolt.
[0076] In summary, the present invention effectively overcomes various shortcomings of the prior art and has high industrial utilization value.
[0077] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A tube mold clamping method for automatically tightening a plurality of clamping bolts passing through the grooves on both sides of the tube mold. Features: The tube mold clamping method comprises the following steps in sequence: S1. Configure a tube mold clamping system, the tube mold clamping system includes a main control unit, a visual sub-control unit, an execution unit and an encoder with a fixed installation position; the visual sub-control unit includes a visual camera, a visual controller connected to the visual camera for communication, and a visual industrial computer connected to the visual controller for communication; the execution unit includes a fixedly installed multi-axis mechanical arm, and a tightening mechanism installed at the output terminal of the multi-axis mechanical arm, the output terminal of the tightening mechanism is a rotatable bolt sleeve; the encoder is used to contact the flat car carrying the tube mold; a communication connection is established between the main control unit, the visual sub-control unit, the multi-axis mechanical arm and the encoder; S2, a detection point position and a preparation point position are set on the forward route of the flat car driving the tube mold to move; S3, the tube mold clamping system receives a start signal, and the flat car drives the tube mold to move forward; When the tube mold moves forward to the detection point, the main control unit triggers the visual sub-control unit, and the visual camera collects the three-dimensional image of the tube mold and sends it to the visual industrial computer. The visual industrial computer obtains the position data of each clamping bolt on the tube mold and the deflection angle data of the tube mold according to the three-dimensional image of the tube mold; S4, the flat car drives the tube mold to continue moving forward; When it is determined according to the data of the encoder that the tube mold has moved forward to the preparation point position, the output terminal of the multi-axis robot arm moves to the preparation station, and the multi-axis robot arm requests the position data of the first clamping bolt on the tube mold and the deflection data of the tube mold from the visual industrial control computer; at the same time, the multi-axis robot arm requests the follow-up motion trigger signal of the first clamping bolt on the tube mold and the follow-up position compensation value B in the forward direction. 1 The following motion trigger signal of the first clamping bolt includes a theoretical starting following position An in the forward direction. 1 ; S5, the flat car drives the tube mold to continue moving forward; The multi-axis robot arm controls the output terminal to move to the tightening station according to the position data of the first mold clamping bolt, the deflection angle data of the tube mold and the follow-up motion trigger signal of the first mold clamping bolt, and adjusts the posture of the output terminal and the tightening mechanism; at the same time, the multi-axis robot arm obtains the instantaneous data C of the encoder when the output terminal moves to the tightening station, and the follow-up position compensation value B of the first mold clamping bolt 1 For: B 1 =An 1 -f(C), the multi-axis robot arm follows the position compensation value B 1 Correcting the position of its output terminal in the forward direction so that the bolt sleeve of the tightening mechanism is coaxial with the first mold clamping bolt; S6, the bolt sleeve of the tightening mechanism is inserted into the first mold clamping bolt, and the first mold clamping bolt is tightened. At the same time, the output terminal of the multi-axis robot arm moves forward synchronously with the tube mold, and the multi-axis robot arm requests the position data of the next i-th mold clamping bolt on the tube mold and the deflection angle data of the tube mold from the visual industrial control computer, i=2,3,4...; S7: After the current mold clamping bolt is tightened, the multi-axis robot drives the bolt sleeve of the tightening mechanism to disengage from the current mold clamping bolt. At the same time, the multi-axis robot requests the follow-up motion trigger signal of the next i-th mold clamping bolt and the follow-up position compensation value B in the forward direction. i The following motion trigger signal of the next i-th clamping bolt includes the theoretical starting following position An in the forward direction. i , B i =An i -f(C); S8, the multi-axis robot arm moves according to the position data of the next i-th clamping bolt, the deflection angle data of the tube mold, the follow-up motion trigger signal of the next i-th clamping bolt and the follow-up position compensation value B in the forward direction i Controlling the output terminal to move to the tightening station, and adjusting the position of the output terminal and the tightening mechanism so that the bolt sleeve of the tightening mechanism is coaxial with the next i-th clamping bolt; S9, repeat the above steps S6 to S8 until the last clamping bolt on the tube mold is tightened, and the multi-axis robot arm is reset.
2. The tube mold clamping method according to claim 1, Features: The method further includes step S10 executed after step S9, wherein the flat car drives the tube mold to move backward, the visual camera collects three-dimensional images of each mold bolt on the tube mold and sends the images to the visual industrial computer, the visual industrial computer obtains the height of each mold bolt from the tongue and groove plane of the tube mold according to the three-dimensional images of each mold bolt, and the visual industrial computer determines whether each mold bolt is tightened or not tightened according to the height of each mold bolt from the tongue and groove plane of the tube mold.
3. The tube mold clamping method according to claim 1, Features: The main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robotic arm, and the PLC controller is directly connected to the visual controller, the visual industrial computer, the encoder and the multi-axis robotic arm respectively; In step S4 and step S7, the multi-axis robot arm requests the PLC controller for a follow-up motion trigger signal of each clamping bolt and a follow-up position compensation value B in the forward direction. i The PLC controller calculates the theoretical starting follow position An of each clamping bolt in the forward moving direction according to the request of the multi-axis robot arm. i and follow-up position compensation value B i .
4. The tube mold clamping method according to claim 1, Features: The main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robotic arm, the PLC controller is directly connected to the visual industrial computer, and the multi-axis robotic arm is directly connected to the visual controller and the encoder respectively; In step S4 and step S7, the multi-axis robot arm requests the visual controller for a follow-up motion trigger signal of each mold clamping bolt, and the multi-axis robot arm internally calculates a theoretical start follow-up position An of each mold clamping bolt in the forward moving direction. i and follow-up position compensation value B i .
5. The tube mold clamping method according to claim 1, Features: The main control unit includes a PLC controller, the visual industrial computer is directly connected to the multi-axis robot arm, the PLC controller is directly connected to the visual industrial computer, and the visual industrial computer is also directly connected to the visual controller and the encoder respectively; In step S4 and step S7, the multi-axis robot arm requests the visual industrial computer for the follow-up motion trigger signal of each clamping bolt and the follow-up position compensation value B in the forward direction. i The visual industrial computer calculates the theoretical starting follow position An of each mold clamping bolt in the forward moving direction according to the request of the multi-axis robot arm. i and follow-up position compensation value B i .
6. The tube mold clamping method according to any one of claims 1 or 3 to 5, Features: When the tube mold moves forward to the preparation point position and the output terminal of the multi-axis robot moves to the preparation station, the visual camera scans the starting position of the tube mold. At this time, the distance between the central axis of the output terminal of the multi-axis robot and the starting position of the tube mold in the forward moving direction of the tube mold is L, and the distance between the i-th clamping bolt on the tube mold and the starting position of the tube mold in the forward moving direction of the tube mold is X. i , the data of the encoder is N, then the theoretical starting follow position An of each clamping bolt on the tube mold in the forward direction is i For: i =L+X i +f(N).
7. The tube mold clamping method according to claim 1, Features: The tube mold clamping system also includes a point laser sensor, which is arranged at a detection point position and is communicatively connected with a main control unit.
8. The tube mold clamping method according to claim 1, Features: There are two groups of execution units and two visual cameras. The two groups of execution units and the two visual cameras are arranged opposite to each other along the radial direction of the tube mold.
Citation Information
Patent Citations
Pipe pile mold bolt automatic locking system and pipe mold automatic closing method
CN118219412A
Cited By
Multi-pipe die station synchronous bolt dismounting and locking system and method
CN120421974A