Novel root pile and construction method thereof
By using barbed ribs and grouting technology in tree root piles, the problem of insufficient bearing capacity of tree root piles in deep soft soil layers has been solved, achieving higher bearing capacity and lower project cost, and improving Application performance.
Patent Information
- Application Number
- CN202411045310.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-22
AI Technical Summary
Existing tree root piles have low bearing capacity in deep soft soil layers, especially friction type tree root piles. Due to the small friction resistance of the soft soil on the side of the pile, the bearing capacity is insufficient, which affects its application efficiency and project cost.
The geogrid cage and pile filler are consolidated into the root pile holes through grouting slurry, and barbed ribs are set around the pile body. The ribs are inserted into the soft soil by pulling upward in the opposite direction. The foundation forms ribs to increase the shear strength and frictional resistance of the pile side.
By forming multiple external convex ribs to interact with the soil, the vertical bearing capacity and pull-out resistance of the tree root pile are significantly increased, the overall bearing capacity is improved, the construction process is simplified and the cost is reduced.
Smart Images

Figure CN118814747A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation treatment, and in particular to a novel tree root pile and a construction method thereof. Background Art
[0002] Tree root piles are a commonly used foundation treatment technology at present. They are widely used because of their advantages such as small construction equipment, low requirements for application site conditions, and low impact on the surrounding areas during construction. They are especially commonly used in projects such as reinforcement and renovation of existing building foundations.
[0003] In the conventional implementation process of tree root piles, there is a grouting process, which can make the pile body closely integrated with the surrounding soil, which is beneficial to improving the bearing capacity of the pile. However, the diameter of the tree root pile is small, and the bearing capacity of a single pile is generally small, especially for friction-type tree root piles located in deep soft soil layers. Because the friction resistance of the soft soil on the pile side is small, the bearing capacity of the tree root pile is even smaller. Therefore, if a new technology that can further improve the bearing capacity of tree root piles is invented, it will be of great significance to improve the application efficiency of tree root piles and save engineering costs. Summary of the invention
[0004] In view of the defects and shortcomings in the prior art, the present invention proposes a novel tree root pile and a construction method thereof to solve the problem of how to further improve the bearing capacity of the tree root pile.
[0005] The above-mentioned purpose of the present invention is achieved through the following technical solutions:
[0006] A novel tree root pile, comprising:
[0007] The main body is formed by consolidating the geogrid cage and pile filler into the root pile hole by grouting slurry; and
[0008] A plurality of thorn-like tendons distributed on the peripheral side of the main body, wherein the plurality of tendons are embedded in the soft soil foundation on the peripheral side of the main body;
[0009] The geogrid cage includes a plurality of longitudinal ribs along the length direction of the cage body and a plurality of circumferential ribs along the circumference direction of the cage body, each longitudinal rib is located between two adjacent circumferential ribs as a rib segment, and between two upper and lower adjacent circumferential ribs as a rib partition, wherein the upper and lower non-adjacent rib partitions and the non-adjacent rib segments in the same rib partition are cut near the upper circumferential rib, and the cut ends are slightly bent out of the cage, and the corresponding rib segments are constructed as barbed ribs;
[0010] When the geogrid cage is placed at the bottom of the pile hole and then pulled upward in a small stroke in the reverse direction, the end of the barbed reinforcement belt rubs against the wall of the pile hole, and the barbed reinforcement belt bends and deforms as the end of the barbed reinforcement belt is inserted into the soft foundation around the hole. Under the action of the grouting pressure, the grouting slurry flows into the insertion position along the barbed reinforcement belt inserted into the soft foundation, and forms the reinforcement thorns together with the inserted part after solidification.
[0011] Preferably, in each tendon band partition where barbed tendon bands are arranged, the barbed tendon bands are evenly distributed every 2 or 3 tendon band segments;
[0012] There is at least one reinforcement band partition where no barbed reinforcement band is arranged between the upper and lower adjacent reinforcement band partitions where barbed reinforcement bands are arranged.
[0013] Preferably, in two adjacent upper and lower rib band partitions where barbed rib bands are arranged, the barbed rib bands are staggered up and down.
[0014] Preferably, the amplitude by which the cut ends are bent out of the cage is s, and the s is larger than the gap between the geogrid cage and the wall of the pile hole after being placed in the pile hole.
[0015] Preferably, the distance that the geogrid cage is pulled upward in the reverse direction after being placed at the bottom of the pile hole is 2 / 3 to 1 times the length L of the barbed tendon strip.
[0016] Preferably, the end of the barbed tendon is pointed.
[0017] Preferably, the tendons are arranged through the pile along the length direction of the pile.
[0018] Preferably, the geogrid cage is made of plastic geogrid.
[0019] Preferably, the geogrid cage is provided with annular hoops at intervals on its outer periphery and tied and fixed.
[0020] As a general inventive concept, the present invention also provides a construction method of a novel tree root pile according to any of the above technical solutions, comprising the following steps:
[0021] S1. Hole formation;
[0022] S2. Place the pre-made geogrid cage into the pile hole until it reaches the bottom of the pile hole, avoiding pulling in the opposite direction during the process;
[0023] S3. Lift the geogrid cage upward in a small stroke in the reverse direction and then fix it;
[0024] S4. Insert the grouting pipe, put in the pile filling material, inject grout, and vibrate the pile. After the pile solidifies, cut off the part of the geogrid cage that is exposed above the ground due to the reverse upward pulling.
[0025] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0026] The present invention adopts a geogrid cage in the construction of tree root piles, and a plurality of barbed ribs are arranged at intervals on the geogrid cage. By pulling the geogrid cage that has been lowered to the bottom of the pile hole in a small stroke upward in the reverse direction, the plurality of barbed ribs can be bent and deformed and inserted into the soft soil foundation around the hole along with the end, thereby disturbing the local soil at the insertion location. The disturbed local soil is conducive to the slurry flowing into the insertion location along the inserted barbed ribs under the action of grouting pressure during the grouting process of the tree root pile. After the flowing slurry solidifies, it forms ribs together with the inserted part of the barbed ribs. Due to the reinforcement effect of the ribs, the ribs have a certain shear strength. In this way, the new tree root pile of the present invention forms a plurality of ribs protruding outward and embedded in the soft soil foundation around its body. The plurality of ribs and the body interact with the soil around the pile, greatly increasing the range of the soil around the pile that is subjected to force together with the tree root pile, increasing the soft soil friction resistance on the pile side, and helping to improve the bearing capacity (vertical bearing capacity and pull-out resistance) of the tree root pile.
[0027] The novel tree root pile of the present invention has a geogrid cage that is easy to manufacture and has low cost; the tree root pile is easy to construct and can effectively improve the bearing capacity of the tree root pile, thereby improving the application efficiency of the tree root pile, saving engineering costs, and has good application prospects.
[0028] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 A schematic elevational cross-sectional view of a novel tree stump according to an exemplary embodiment of the present invention;
[0030] Figure 2 A schematic cross-sectional view of a novel tree stump according to an exemplary embodiment of the present invention;
[0031] Figure 3 This is the general drawing of geogrid cage;
[0032] Figure 4-A , B, C show the schematic diagram of the lowering and lifting process of the geogrid cage;
[0033] Description of the reference numerals: main body 1 , geogrid cage 2 , longitudinal reinforcement belt 21 , barbed reinforcement belt 211 , annular reinforcement belt 22 , annular hoop 23 , reinforcement bar 3 , pile hole 4 . DETAILED DESCRIPTION
[0034] The drawings are for illustrative purposes only and should not be construed as limiting the present patent;
[0035] In order to better illustrate the present embodiment, some parts in the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product;
[0036] It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings;
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "set" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. It can be said that the internal connection of two elements is connected. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The orientation or position relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", etc. is based on the orientation or position relationship shown in the accompanying drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0038] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0039] like Figure 1 As shown in Figure 4, a new type of tree root pile is an exemplary embodiment of the present invention, which includes a main body 1 that is consolidated and formed in a tree root pile hole 4 by grouting a geogrid cage 2 and a pile body filler, and a plurality of thorn-like ribs 3 distributed on the side surface of the main body 1, and the plurality of ribs 3 are embedded in the soft soil foundation on the side surface of the main body 1.
[0040] The geogrid cage 2 is preferably made of a plastic geogrid with high ribbed hardness, which is pre-made and rolled into a cage shape with a diameter of d. In order to ensure that the shape of the cage is fixed, an annular hoop 23 is sleeved at intervals on the outer periphery of the geogrid cage 2. The annular hoop can be made of a PVC pipe and is firmly tied to the cage to prevent loosening and dislocation during construction. It should be noted that the specific model and specification of the plastic geogrid can be determined by field pile testing in combination with factors such as the soft soil characteristics of the foundation and the diameter of the root pile.
[0041] It is understood that the cage length of the prefabricated geogrid cage 2 is consistent with or slightly greater than the depth of the pile hole 4. In addition, it is well known in the art that the cage diameter d of the geogrid cage 2 should be slightly smaller than the diameter D of the pile hole 4, so that the geogrid cage 2 can be placed in the pile hole 4, for example, the difference between the two is 2 cm to 3 cm.
[0042] The above-mentioned pre-made geogrid cage 2 includes a plurality of longitudinal ribs 21 along the length direction of the cage body and a plurality of circumferential ribs 22 along the circumference direction of the cage body, each longitudinal rib 21 is located between two adjacent circumferential ribs 22 as a rib segment, and between two upper and lower adjacent circumferential ribs 22 is a rib partition, wherein the upper and lower non-adjacent rib partitions and the non-adjacent rib segments in the same rib partition are cut near the upper circumferential rib, and the cut ends are slightly bent outside the cage, and the corresponding rib segments are constructed into barbed ribs 211.
[0043] like Figure 4-A As shown in , B, and C, when the geogrid cage 2 is put into the bottom of the pile hole 4 and then pulled upward in a small stroke in the reverse direction, the end of each barbed tendon 211 rubs against the wall of the pile hole 4, and then the barbed tendon 211 bends and deforms and is inserted into the soft soil foundation around the hole (that is, inserted into the soft soil foundation around the pile). It should be noted that the ideal state is that all barbed tendons 211 are bent to the radial direction of the cage body and inserted vertically into the soft soil foundation around the hole, but due to the unevenness of the soil, the barbed tendons 211 inserted into the soft soil foundation around the hole may present different angles and lengths of penetration.
[0044] In order to ensure that the barbed tendon 211 can be smoothly inserted into the soft soil foundation around the hole, the amplitude s of the cut end being bent out of the cage must be greater than the gap between the geogrid cage 2 and the wall of the pile hole after being placed in the pile hole 4. In some embodiments, s can be Dd, which satisfies the requirement of being greater than the gap width (Dd) / 2, so that when the geogrid cage 2 is reversely pulled, the end of the barbed tendon 211 is close to the wall of the pile hole and gradually inserted into the soil around the hole as it is pulled. Furthermore, the end of the barbed tendon 211 can be cut into a pointed shape to facilitate insertion into the soil.
[0045] In order to facilitate the maximum insertion of the barbed reinforcement belt 211 into the soft soil foundation around the hole while avoiding being pulled out, the distance that the geogrid cage 2 is pulled upward in the reverse direction after being placed at the bottom of the pile hole 4 can be 2 / 3 to 1 times the length L of the barbed reinforcement belt 211.
[0046] The insertion of the barbed reinforcement band 211 into the soft soil foundation will disturb the local soil at the insertion point. The disturbed local soil is conducive to the slurry flowing into the insertion point along the barbed reinforcement band 211 inserted into the soft soil foundation under the action of grouting pressure during the root pile grouting process. After the flowing slurry solidifies, it will form reinforcement 3 embedded in the soft soil foundation together with the inserted part of the barbed reinforcement band.
[0047] In some embodiments, the ribs 3 are arranged through the pile along the length of the pile. In this way, the ribs 3 protruding outward around the main body 1 and embedded in the soft soil foundation interact with the soil around the pile together with the main body 1, greatly increasing the range of soil around the pile that is subjected to force together with the tree root pile, increasing the friction resistance of the soft soil on the pile side, and helping to improve the bearing capacity of the tree root pile (vertical bearing capacity and pull-out resistance).
[0048] In some embodiments, in each ribbed belt partition with barbed ribbed belts 211, the barbed ribbed belts are evenly distributed every 2 ribbed belt segments. Of course, it can also be every 3. In addition, there is at least one ribbed belt partition without barbed ribbed belts between the adjacent upper and lower ribbed belt partitions with barbed ribbed belts 211 (that is, there are at least two circumferential ribbed belts 22 between the upper and lower adjacent barbed ribbed belts 211), which is conducive to maintaining the integrity of the geogrid cage 2. If too many ribbed belt segments are cut off to form barbed ribbed belts 211, the geogrid cage 2 is not easy to maintain the cage shape. Further, in the adjacent upper and lower ribbed belt partitions with barbed ribbed belts 211, the barbed ribbed belts are staggered up and down. Such staggered arrangement can make the barbed ribbed belts 211 more evenly distributed on the geogrid cage 2, so that the formed ribs 3 are more evenly distributed around the pile, which is conducive to making full use of the soil bearing capacity on the pile side.
[0049] The present invention also provides a construction method for the novel tree root pile, which comprises the following steps:
[0050] S1. Drill holes for tree root piles and clean the holes.
[0051] S2. Place the geogrid cage 2 prepared in advance as above into the pile hole 4 until it reaches the bottom of the pile hole, avoiding pulling in the opposite direction during the process.
[0052] S3. The geogrid cage 2 is pulled upward in a small stroke in the reverse direction, and then fixed to prevent it from falling. The distance of the reverse upward pulling can be 2 / 3 to 1 times the length L of the barbed rib belt 211, so that the barbed rib belt 211 can be inserted into the soil to the greatest extent but avoid being pulled out.
[0053] S4. According to the construction process of conventional tree root piles, the steps of inserting the grouting pipe, inserting the pile body filler (such as crushed stone), grouting, vibrating the pile, etc. are completed, and after the pile body solidifies, the part of the geogrid cage exposed above the ground due to the reverse upward pulling is cut off. Among them, during grouting, the slurry will flow into the insertion position along the barbed rib belt 211 inserted into the soft soil foundation under the action of the grouting pressure, and after the inflowing slurry solidifies, it will form the barb 3 embedded in the soft soil foundation together with the inserted part of the barbed rib belt.
[0054] It should be noted that the construction process of the novel tree root pile of the present invention is similar to the construction process of the conventional tree root pile, and the parts not described in the above construction method can be referred to the prior art.
[0055] The above description is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and concepts of the present invention within the technical scope disclosed by the present invention, and they should be covered by the protection scope of the present invention.
Claims
1. A new type of tree root pile, characterized in that: include: The main body is formed by consolidating the geogrid cage and pile filler in the hole of the tree root pile through grouting slurry; and A plurality of thorn-like tendons distributed on the peripheral side of the main body, wherein the plurality of tendons are embedded in the soft soil foundation on the peripheral side of the main body; The geogrid cage includes a plurality of longitudinal ribs along the length direction of the cage body and a plurality of circumferential ribs along the circumference direction of the cage body, each longitudinal rib is located between two adjacent circumferential ribs as a rib segment, and between two upper and lower adjacent circumferential ribs as a rib partition, wherein the upper and lower non-adjacent rib partitions and the non-adjacent rib segments in the same rib partition are cut near the upper circumferential rib, and the cut ends are slightly bent out of the cage, and the corresponding rib segments are constructed as barbed ribs; When the geogrid cage is placed at the bottom of the pile hole and then pulled upward in a small stroke in the reverse direction, the end of the barbed reinforcement belt rubs against the wall of the pile hole, and the barbed reinforcement belt bends and deforms as the end of the barbed reinforcement belt is inserted into the soft foundation around the hole. Under the action of the grouting pressure, the grouting slurry flows into the insertion position along the barbed reinforcement belt inserted into the soft foundation, and forms the reinforcement thorns together with the inserted part after solidification.
2. The novel tree root pile according to claim 1, characterized in that: In each tendon band partition where barbed tendon bands are arranged, the barbed tendon bands are evenly distributed every 2 or 3 tendon band segments; There is at least one reinforcement band partition where no barbed reinforcement band is arranged between the upper and lower adjacent reinforcement band partitions where barbed reinforcement bands are arranged.
3. The novel tree root pile according to claim 1 or 2, characterized in that: In the adjacent upper and lower rib band partitions where the barbed rib bands are arranged, the barbed rib bands are staggered up and down.
4. The novel tree root pile according to claim 1, characterized in that: The sheared end is bent out of the cage by an amplitude s, and the s is larger than the gap between the geogrid cage and the wall of the pile hole after being placed in the pile hole.
5. The novel tree root stake according to claim 1, characterized in that: After the geogrid cage is placed at the bottom of the pile hole, the stroke of pulling it upward in the reverse direction is 2 / 3 to 1 times the length L of the barbed tendon strip.
6. The novel tree root stake according to claim 1, characterized in that: The end of the barbed tendon band is pointed.
7. The novel tree root stake according to claim 1, characterized in that: The tendons are arranged through the pile along the length direction of the pile.
8. The novel tree root stake according to claim 1, characterized in that: The geogrid cage is made of plastic geogrid.
9. The novel tree root stake according to claim 1, characterized in that: The outer periphery of the geogrid cage is sleeved with annular hoops at intervals and tied and fixed.
10. A construction method for a novel tree root pile as claimed in any one of claims 1 to 9, characterized in that: The steps include: S1. Hole formation; S2. Place the pre-made geogrid cage into the pile hole until it reaches the bottom of the pile hole, avoiding pulling in the opposite direction during the process; S3. Lift the geogrid cage upward in a small stroke in the reverse direction and then fix it; S4. Insert the grouting pipe, put in the pile filling material, inject grout, and vibrate the pile. After the pile solidifies, cut off the part of the geogrid cage that is exposed above the ground due to the reverse upward pulling.