Pre-constrained block beam, checking calculation method and construction method

By building pre-constrained blocks and restraint cages into structural beams and using polymers to fill the gaps, the problem of large amounts of cement and small-size sand and gravel in reinforced concrete beams is solved, resource conservation and environmental protection are achieved, and the structure is improved. mechanical properties and construction efficiency.

CN118815071APending Publication Date: 2024-10-22姚攀峰
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310437066.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-21
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

In buildings and bridge structures, a large amount of cement, small particle size sand and stone are used in the production process of reinforced concrete beams, resulting in resource consumption and environmental pollution, and making it difficult to meet engineering needs.

Method used

Using pre-constrained block beam technology, pre-constrained blocks and restraint cages are built into the structural beam, and polymers are used to fill the gaps, reducing the use of cement and small-size sand and gravel, and improving the strength of the blocks and polymers through the restraint cage. Connection mechanical properties.

Benefits of technology

It effectively reduces the amount of cement and small particle size sand and gravel, reduces the heat of hydration and dust emissions, improves the mechanical properties and construction efficiency of the structure, and realizes a green and environmentally friendly construction solution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815071A_ABST
    Figure CN118815071A_ABST
Patent Text Reader

Abstract

The invention discloses a pre-constrained block beam, a checking calculation method and a construction method. The pre-constrained block beam comprises a block, a constraint cage, a polymer and a beam steel bar, the constraint cage comprises a cage frame and constraint cage holes; the block material is arranged in the constraint cage to form a pre-constraint block material; the beam reinforcing steel bars comprise beam longitudinal reinforcing steel bars and beam transverse reinforcing steel bars; the beam transverse reinforcements are arranged at intervals along the beam longitudinal reinforcements to form a beam reinforcement cage; the constraint cage is surrounded by the beam reinforcement cage; the polymer fills the gaps in the pre-confinement block; the polymer wraps the beam reinforcement cage and fills a gap between the pre-constraint block and the beam reinforcement cage; and polymers are arranged at the holes of the restraint cage, so that the polymers in the restraint cage and the polymers outside the restraint cage are connected into a whole. According to the invention, the block material and the polymer are arranged in the constraint cage to form a pre-constraint block material polymer, so that excessive crushing of the block material is reduced, and energy consumption and pollution are reduced; the combined action of the block and the polymer is enhanced, and the bearing capacity and ductility of the pre-restrained block beam are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of structures, and in particular relates to a pre-constrained block beam, a calculation method and a construction method. Background Art

[0002] In construction projects, structural beams are an important part of building structures and bridges. Structural beams often use reinforced concrete beams, which are composed of concrete and steel bars. This requires a large amount of stone, sand, and cement materials. According to statistics, the amount of stone used in construction in my country accounts for nearly 1 / 2 of the mass of concrete, and its use is widespread in many industries such as construction, transportation, and railways. According to estimates, the annual amount of stone used in construction in the country is about more than 4 billion tons, which is the material that consumes the most natural resources. At present, the natural sand and gravel that meet the requirements of reinforced concrete structures can no longer meet the needs of engineering. In actual engineering, a large amount of machine-made sand and machine-made stone are used. Usually, natural stones are processed by vibrating feeders, jaw crushers, sand making machines, vibrating screens, and belt conveyors. Equipment such as conveyors are used to crush natural stones into small-sized gravel or sand. This process requires high consumption of electricity, transportation, and labor, and produces a lot of dust. This puts great pressure on our resources and environment. How to reduce the use of cement, small-sized sand, and stone in structural beams is of great significance to my country's engineering construction and energy conservation and environmental protection. Summary of the invention

[0003] The purpose of the present invention is to provide a pre-constrained block beam and a verification method and construction method, which solves the problem of using too much cement, small-size sand and stone in the structural beam, and solves the problem of coordinated force between the block, steel bar and polymer. The present invention effectively reduces the amount of cement, small-size sand and stone, reduces hydration heat and dust by pre-constraining blocks built into the structural beam; improves the connection and force between the block and the polymer by the constraint cage, and realizes the mechanical properties of the beam. This technology has the advantages of reliable performance, simple structure, fast construction and green environmental protection.

[0004] To achieve the above purpose, the present invention adopts the following technical solution.

[0005] A pre-constrained block beam comprises a block, a constraint cage, a polymer and beam reinforcement; the constraint cage comprises a cage frame and constraint cage holes; the block is built into the constraint cage to form a pre-constrained block; the beam reinforcement comprises a beam longitudinal reinforcement and a beam transverse reinforcement; the beam transverse reinforcement is arranged at intervals along the beam longitudinal reinforcement to form a beam reinforcement cage; the constraint cage is surrounded by the beam reinforcement cage; the polymer fills the gap in the pre-constrained block; the polymer wraps the beam reinforcement cage and fills the gap between the pre-constrained block and the beam reinforcement cage.

[0006] Preferably, the block material is a stone, a reinforced concrete block, a concrete block or a cement mortar block; the polymer is cement paste, cement mortar or concrete; the constraint cage is closed at the end; the size of the constraint cage hole is smaller than the size of the block material at that location; the cage frame includes a side wall frame and an end closure member; the end closure member is formed by extending the side wall frame or is a dedicated end closure member; the dedicated end closure member is connected to the side wall frame as a whole; there is a polymer at the constraint cage hole, so that the polymer inside the constraint cage and the polymer outside the constraint cage are connected as a whole; the pre-constrained block material is located in the middle area of ​​the beam section height.

[0007] Preferably, the restraining cage is a restraining bar cage or a mesh cage; the cage frame of the restraining bar cage is composed of restraining bars; the restraining bars are steel bars or steel wires or FRP bars; the cage frame of the mesh cage is composed of metal mesh or steel plates with holes.

[0008] Preferably, the restraining ribs include longitudinal ribs, transverse ribs and / or diagonal ribs; the end closures of the restraining rib cage are formed by fixing or bending the longitudinal ribs or diagonal ribs at the ends or are independent end closures; the independent end closures are fixedly connected to the longitudinal ribs or diagonal ribs.

[0009] Preferably, the cage has a plurality of sub-spaces; the sub-spaces are independent of each other and contain blocks of materials.

[0010] Preferably, a steel frame is provided inside the beam reinforcement cage; the steel frame is a steel section or a steel member; there is a gap between the steel frame and the pre-constrained block material and the beam reinforcement cage; and the polymer fills the gap between the pre-constrained block material, the steel frame and the beam reinforcement cage.

[0011] Preferably, the transverse reinforcement of the beam includes closed stirrups, transverse tension bars and rear closed stirrups; the rear closed stirrups are composed of open U-shaped stirrups and rear closed bars; the rear closed bars include rear closed tension bars or rear closed U-shaped stirrups; the rear closed bars are arranged correspondingly to the open U-shaped stirrups.

[0012] Preferably, a method for calculating the shear bearing capacity of a pre-constrained block beam comprises the following specific steps:

[0013] Step 1, determine the geometric size, strength and arrangement of the block material in the constraint cage; determine the arrangement of the constraint cage; determine the strength parameters of the block material polymer; determine the cross-sectional area of ​​the pre-constrained block material beam, determine the cross-sectional area of ​​the block material; determine the spacing, cross-sectional size and strength parameters of the beam stirrups; the block material polymer is a mixture of polymer and block material, or a mixture of polymer, block material and constraint cage.

[0014] Step 2: You can perform verification according to the following formula or perform detailed calculation according to the existing design specifications:

[0015] The shear section of rectangular, T-shaped and I-shaped cross-section flexural members shall meet the following conditions:

[0016] When hw / b≤4

[0017] V≤0.30ηβ c f′ c b / h0

[0018] When h w / b≥6

[0019] V≤0.25ηβ c f′ c b / h0

[0020] When 4<h w When / b<6, it is determined by linear interpolation.

[0021] Where: V is the maximum shear force design value on the inclined section of the pre-constrained block beam;

[0022] η——Influence coefficient of shear bearing capacity of pre-constrained block beam, η is 0.4~1.0;

[0023] β c ——Influence coefficient of bulk polymer strength: When the strength grade of bulk polymer does not exceed C50, β c Take 1.0; when the strength grade of the bulk polymer exceeds C40, β c Take 0.7~1.0;

[0024] f′ c ——Design value of compressive strength of bulk polymer;

[0025] b – width of rectangular section, web width of T-section or I-section;

[0026] h0——effective height of the section;

[0027] h w ——Height of the web of the section: for rectangular section, take the effective height; for T-section, take the effective height minus the flange height; for I-section, take the net height of the web.

[0028] V≤V cs

[0029]

[0030] Where: V is the shear design value of the pre-restrained block beam;

[0031] V cs ——Design value of shear bearing capacity of pre-restrained block beam;

[0032] α cv——Shear bearing capacity coefficient of oblique section block polymer, for general bending members, it is 0.5-0.8; for independent beams under concentrated load (including multiple loads, where the shear force generated by the concentrated load on the support section or node edge accounts for more than 75% of the total shear force), it is α cv for λ is the shear span ratio of the calculated section, which can be taken as a / h0. When λ is less than 1.5, it is taken as 1.5. When λ is greater than 3, it is taken as 3. a is the distance from the point of concentrated load action to the support section or node edge.

[0033] A sv ——The total cross-sectional area of ​​each limb of the stirrups arranged in the same section, that is, nA sv1 , where n is the number of stirrups in the same section, A sv1 is the cross-sectional area of ​​the single stirrup;

[0034] s——the spacing of stirrups along the length of the member;

[0035] f yv ——design value of tensile strength of stirrups;

[0036] f′ t ——the design value of tensile strength of bulk polymer;

[0037] The strength parameters in the formula are taken according to the existing national standards or through experiments, and the geometric parameters are taken according to the actual size or nominal size. Repeat steps 1 to 2, and the internal force and deformation of the pre-constrained block beam are calculated. The shear bearing capacity is compared with the maximum shear force calculated according to the actual working load of the structure. It is sufficient if it is greater than the maximum shear force.

[0038] Preferably, a construction method of a pre-constrained block beam comprises the following construction steps:

[0039] Step 1: Prepare the raw materials of beam reinforcement, restraining bars, block materials, and polymer; according to the design requirements, mix the raw materials of the polymer into one to form a polymer; process the beam reinforcement to a predetermined length and shape;

[0040] Step 2: Process the restraining ribs to a predetermined length and shape to form a restraining cage; divide the block material into blocks of predetermined sizes; remove dust from the surface of the blocks and classify the blocks according to particle size; put the blocks into the restraining cage to form pre-constrained blocks;

[0041] Step 3: Support the beam formwork;

[0042] Step 4: Tie the steel cage into beams;

[0043] Step 5: Place the pre-constrained blocks in the beam reinforcement cage;

[0044] Step 6: pouring polymer into the beam formwork, so that the pre-constrained block material, beam reinforcement and polymer are mixed into a whole, and the polymer wraps the beam reinforcement cage;

[0045] Step seven, curing the polymer to a predetermined strength so that the pre-constrained blocks, the polymer and the beam reinforcement form a whole.

[0046] When the transverse reinforcement of the beam includes closed stirrups, transverse ties and post-closed stirrups, steps 4 and 5 are modified as follows:

[0047] Step 4: Temporarily tie the closed stirrups, the lower stirrups with upper openings, and the longitudinal reinforcement of the beam; form a partial opening at the upper part of the beam;

[0048] Step 5. Place the pre-constrained block beam in the beam reinforcement cage along the local opening at the top of the beam; adjust the position of the longitudinal reinforcement at the top of the beam, and close the stirrups after arranging; and close the stirrups and the longitudinal reinforcement at the top of the beam after tying.

[0049] Compared with the prior art, the present invention has the following characteristics and beneficial effects.

[0050] 1. By setting up the constraint cage and reducing the contact area of ​​the blocks, the polymer can effectively fill the gaps between the blocks, effectively reduce quality defects, improve construction quality, and achieve structural safety.

[0051] 2. By placing blocks inside the beam, the amount of cement, sand and stone used can be reduced, the hydration heat of large beams can be reduced during construction, and energy conservation and emission reduction can be achieved.

[0052] 3. The block materials and polymers in the beam are constrained by the constraint cage inside the beam to form constrained block material polymers, thereby improving the strength and ductility of the combination of block materials and polymers and achieving the mechanical properties of pre-constrained block material beams.

[0053] 4. Pre-constrained blocks can be pre-processed in whole or in part, with high construction efficiency. Description of the drawings:

[0054] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0055] Figure 1 It is a schematic diagram of the transverse section of the pre-constrained block beam.

[0056] Figure 2 It is a schematic diagram of the longitudinal section of the pre-constrained block beam.

[0057] Figure 3 It is a schematic longitudinal cross-sectional view of the pre-constrained block 9.

[0058] Figure 4 Schematic diagram of a pre-constrained block 9 with a spacer 7 Figure 1 .

[0059] Figure 5 Schematic diagram of a pre-constrained block 9 with a spacer 7 Figure 2 .

[0060] Figure 6 It is a schematic cross-sectional view of a pre-constrained block beam having a plurality of pre-constrained blocks 9 and positioning members 8.

[0061] Figure 7 It is a schematic longitudinal section diagram of a pre-constrained block beam having a plurality of pre-constrained blocks 9 and positioning members 8.

[0062] Figure 8 It is a schematic diagram of the transverse section of a pre-constrained block beam with steel frame.

[0063] Fig. 9 It is a schematic diagram of the transverse section of a pre-restrained block beam with rear closed stirrups.

[0064] Figure numerals: 1-block, 2-restraint cage, 2.1-cage frame, 2.1.1-side wall frame, 2.1.2-end closure, 2.2-restraint cage hole, 3-polymer, 4-restraint bar, 4.1-longitudinal bar, 4.2-transverse bar, 4.3-diagonal bar, 5-beam reinforcement, 5.1-beam longitudinal reinforcement, 5.2-beam transverse reinforcement, 5.2.1-closed stirrups, 5.2.2-transverse tension bar, 5.2.3-rear closed stirrups, 5.2.4-open U-shaped stirrups, 5.2.5-rear closed bar, 6-beam reinforcement cage, 7-block spacers, 8-steel frame, 9-pre-restraint block, 10-positioning piece. Specific embodiment:

[0065] In order to better understand the purpose, technical solution and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0066] In the description of the present invention, it is to be understood that the terms "include / comprise", "consist of..." or any other variations thereof are intended to cover non-exclusive inclusion, so that a product, device, process or method including a series of elements includes not only those elements, but also other elements not explicitly listed when necessary, or also includes elements inherent to such product, device, process or method. In the absence of further restrictions, the elements defined by the phrases "include / comprise...", "consist of..." do not exclude the presence of other identical elements in the product, device, process or method including the elements.

[0067] In the present invention, unless otherwise clearly specified and limited, the term "fixed connection" should be understood in a broad sense, for example: it can be a sleeve connection, a lap joint, a welding connection, a bolt connection, or a combination of the above connections; the terms "installation", "connection", "connected" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components; the term "through-length steel bar" means that the steel bar is continuous without disconnection, or the steel bar is disconnected but the disconnected steel bars are fixedly connected. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0068] It should also be understood that terms such as “upper”, “lower”, “front”, “back”, “left”, “right”, “top”, “bottom”, “inside” and “outside” to indicate directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings and are only used to facilitate the description of the present invention and simplify the description. They do not indicate or imply that the device, component or structure referred to must have a specific direction, be constructed or operate in a specific direction, and should not be understood as a limitation on the present invention.

[0069] The following describes the implementation of the present invention in detail with reference to the accompanying drawings using preferred embodiments.

[0070] like Figure 1 , Figure 2 As shown, a pre-constrained block beam includes a block 1, a constraint cage 2, a polymer 3 and a beam reinforcement 5, wherein the constraint cage 2 includes a cage frame 2.1 and a constraint cage hole 2.2; the block 1 is built into the constraint cage 2 to form a pre-constrained block 9; the beam reinforcement 5 includes a beam longitudinal reinforcement 5.1 and a beam transverse reinforcement 5.2; the beam transverse reinforcement 5.2 is arranged at intervals along the beam longitudinal reinforcement 5.1 to form a beam reinforcement cage 6; the constraint cage 2 is surrounded by the beam reinforcement cage 6; the polymer 3 fills the gap in the pre-constrained block 9; the polymer 3 wraps the beam reinforcement cage 6 and fills the gap between the pre-constrained block 9 and the beam reinforcement cage 6.

[0071] Since the present invention uses a block material 1 with a larger particle size in the pre-constrained block beam, compared with ordinary concrete beams, the amount of cement and small-particle sand and gravel in the beam can be effectively reduced, which is energy-saving and environmentally friendly. When the sand and gravel in the beam uses artificial graded sand and gravel, the pre-constrained block beam can further reduce the high energy consumption and high dust caused by artificial graded sand and gravel.

[0072] Due to the presence of block material 1, the shrinkage creep of pre-constrained block material beam is smaller than that of ordinary concrete beam, thus avoiding the defect that ordinary concrete is prone to cracks during large-volume construction. Block material 1 can greatly reduce the amount of cement used and reduce the hydration heat during construction. For large-volume concrete, hydration heat will cause concrete cracking, resulting in a decrease in the mechanical properties of concrete and a reduction in the service life of the beam component. For pre-constrained block material beams, hydration heat can be reduced, and block material 1 can effectively absorb the hydration heat generated by the surrounding polymer 3, reduce the temperature difference with the surrounding area, and effectively avoid the hydration heat generated by the temperature difference.

[0073] The pre-constrained block beam constrains the block 1 in the cage and the polymer 3 in the constraint cage through the constraint cage 2 in the beam, thereby improving the strength and ductility of the combination of the block 1 and the polymer 3 in the constraint cage, and forming a block polymer with a constraint effect; the constraint cage 2 simultaneously connects the polymer 3 in the constraint cage and the polymer 3 outside the constraint cage, and there is polymer 3 at the constraint cage hole 2.2, so that the polymer 3 in the constraint cage 2 and the polymer 3 outside the constraint cage 2 are connected as a whole; the constraint cage 2 increases the reinforcement content of the pre-constrained block beam, and as a block polymer with a constraint effect, it bears the corresponding force, so that the polymer 3, the constraint cage 2 and the steel bars of the pre-constrained block beam are subjected to force together, and the overall mechanical properties of the pre-constrained block beam are achieved.

[0074] Moreover, during construction, the block material 1 is placed in the constraint cage 2 to form a pre-constrained block material 9, and multiple blocks can be hoisted and transported at one time, thereby improving construction efficiency; the constraint cage 2 can control the contact mode, contact area and shape of the block material 1 during construction, so that the polymer 3 can effectively fill the gaps between the blocks 1, effectively reduce quality defects, improve construction quality, and achieve structural safety.

[0075] In the present invention, the block material 1 can be a stone, a reinforced concrete block, a concrete block or a cement mortar block; the polymer 3 is cement paste, cement mortar or concrete; the concrete includes grouting material, self-compacting concrete, high-fluidity concrete, fiber concrete, organic polymer concrete and ultra-high performance concrete HEPA, etc. The restraining cage 2 is closed at the end; the size of the restraining cage hole 2.2 is smaller than the size of the block 1 at that location; the cage frame 2.1 includes a side wall frame 2.1.1 and an end closure 2.1.2; the end closure 2.1.2 is formed by extending the side wall frame 2.1.1 or is a dedicated end closure 2.1.2; the dedicated end closure 2.1.2 is connected to the side wall frame 2.1.1 as a whole; there is a polymer 3 at the restraining cage hole 2.2, so that the polymer 3 in the restraining cage 2 and the polymer 3 outside the restraining cage 2 are connected as a whole; the cage frame 2.1 can fix the position of the block 1, and the end closure 2.1.2 can close the cage frame 2.1 to prevent the block 1 from falling off from the end; the end closure 2.1.2 is formed by extending the side wall frame 2.1.1, and the two are integrated, which is beneficial to improving the strength and ductility of the pre-constrained block 9; the dedicated end closure 2.1.2 and the side wall frame 2.1.1 are combined for easy production.

[0076] The pre-constrained block 9 is located in the middle area of ​​the beam cross-section height. The distance between the pre-constrained block 9 and the upper and lower surfaces of the beam is not less than 10% of the beam height, which can improve the bending resistance of the beam.

[0077] In the present invention, the block material 1 and the polymer 3 do not undergo a chemical reaction that reduces strength or durability; the surface of the block material 1 is a rough surface; the rough surface of the block material 1 is tightly combined with the polymer 3. The particle size of the block material is 60mm to 400mm (small block material, including 400mm); 400mm to 800mm (medium block material, including 800mm); 800mm to 2000mm (large block material); large blocks and medium blocks can be used for large-section beams (beams with a cross-sectional size greater than 1500m), medium blocks can be used for medium-section beams (beams with a cross-sectional size of 800 to 1500mm, including beams with a cross-sectional size of 1500mm), and small blocks can be used for beams of various cross-sections. Reasonable configuration of blocks of different particle sizes and corresponding cross-sectional beams is conducive to improving the bearing capacity of the beams.

[0078] The mud content of the block is less than 0.7%, and it is not allowed to be concentrated in a few areas. The difference between the block particle size and the average block particle size is not more than 30% of the average particle size. The small difference in block particle size makes it easier to control the contact mode between blocks or reduce their contact area.

[0079] In the present invention, Figure 3 As shown, the restraint cage 2 is a restraint bar cage, and the cage frame 2.1 of the restraint bar cage is composed of restraint bars 4; the restraint bars 4 are steel bars or steel wires or FRP bars; the cage frame 2.1 of the grid cage is composed of metal mesh or steel plates with holes.

[0080] The restraining ribs 4 include longitudinal ribs 4.1, transverse ribs 4.2 and / or diagonal ribs 4.3; the end closures 2.1.2 of the restraining rib cage are formed by fixed connection or bending of the longitudinal ribs 4.1 or the diagonal ribs 4.3 at the ends or are independent end closures 2.1.2; the independent end closures 2.1.2 are fixedly connected to the longitudinal ribs 4.1 or the diagonal ribs 4.3; the fixed connection method is bolting, welding or binding connection.

[0081] The shape of the restraining cage 2 can be cylindrical, spherical, ellipsoidal, etc.

[0082] The distribution spacing of the restraining ribs 4 at the lower part of the restraining cage 2 is smaller than the distribution spacing at the upper part of the restraining cage 2; the grid size formed by the longitudinal ribs 4.1 and the transverse ribs 4.2 is smaller than the size of the block placed at the grid, preventing the block 1 from falling off.

[0083] In the present invention, the block material 1 is an old reinforced concrete block or an old concrete block, which is located in the middle of the beam and has little effect on the mechanical properties of the beam and can be recycled.

[0084] Polymer 3 is high-flow concrete, which includes self-compacting concrete and high-flow concrete. High-flow concrete requires sufficient powder content, and the coarse aggregate can be 5-15mm or 5-25mm in particle size. High-flow concrete is more conducive to filling the gaps between blocks and ensuring the overall compactness of pre-constrained block beams.

[0085] The cage 2.1 is made of steel, and the strength of the steel is not less than 300Mpa; the volume ratio of the block 1 to the constraint cage 2 is 5% to 85%; the volume ratio of the block 1 to the polymer 3 is 5% to 300%; the volume ratio of the cage 2.1 to the constraint cage 2 is 0.02% to 3%. This can improve the strength and ductility of the pre-constrained block beam.

[0086] In the present invention, Figure 4 , Figure 5 As shown, the cage 2.1 of the pre-constrained block beam has multiple sub-spaces; the sub-spaces are independent of each other and contain blocks 1. The sub-spaces are formed by the cage 2.1 being divided by block spacers 7 or external constraints or welds or constraint ribs 4; or the lateral connectors are hooped together by external constraint ribs to form multiple sub-spaces.

[0087] The multiple subspaces divide the block material into multiple parts, which can increase the bonding strength and ductility between the block material 1 and the polymer 3 and facilitate production and transportation.

[0088] The block spacer 7 is composed of a steel mesh or a perforated steel plate, and is fixedly connected to the side wall frame 2.1.1; the gaps in the steel mesh are smaller than the size of the block 1; the hole size of the perforated steel plate is smaller than the size of the block 1; the block spacer 7 is arranged longitudinally and / or transversely and / or vertically.

[0089] In the present invention, Figure 6 , Figure 7 As shown, there are multiple pre-constrained blocks 9 in the pre-constrained block beam; positioning members 10 are arranged between the pre-constrained blocks 9; and the polymer 3 fills the gaps between the pre-constrained blocks 9.

[0090] A plurality of pre-constrained blocks 9 can reduce the amount of polymer 3 used, and the positioning member 10 can effectively fix the pre-constrained blocks 9 to prevent or reduce adverse effects such as displacement or tilting caused by pouring the polymer 3 during construction.

[0091] The clearance of the pre-constrained block material 9 is not less than 15 mm, so that the polymer 3 and the pre-constrained block material 9 can be closely combined.

[0092] In the present invention, Figure 8 As shown, a steel frame 8 is provided inside the beam reinforcement cage 6; the steel frame 8 is a steel section or a steel component; there is a gap between the steel frame 8 and the pre-constrained block material 9 and the beam reinforcement cage 6; the polymer 3 fills the gap between the pre-constrained block material 9, the steel frame 8 and the beam reinforcement cage 6.

[0093] In the present invention, Fig. 9 As shown, the transverse reinforcement 5.2 of the beam includes closed stirrups 5.2.1, transverse tension bars 5.2.2 and rear closed stirrups 5.2.3; the rear closed stirrups 5.2.3 are composed of open U-shaped stirrups 5.2.4 and rear closed bars 5.2.5; the rear closed bars 5.2.5 include rear closed tension bars or rear closed U-shaped stirrups; the rear closed bars 5.2.5 are arranged correspondingly to the open U-shaped stirrups 5.2.4.

[0094] During the construction, the pre-constrained block material 9 is put into the opening, and the net distance between the pre-constrained block material 9 and the beam reinforcement cage 6 is not less than 20 mm; after the construction, it is closed and the polymer 3 is poured.

[0095] The present invention provides a method for calculating the shear bearing capacity of a pre-constrained block beam, and the specific steps are as follows:

[0096] Step 1, determine the geometric size, strength and arrangement of block material 1 in the constraint cage 2; determine the arrangement of the constraint cage 2; determine the strength parameters of the block material polymer; determine the cross-sectional area of ​​the pre-constrained block material beam, determine the cross-sectional area of ​​block material 1; determine the spacing, cross-sectional size and strength parameters of the beam stirrups; the block material polymer is a mixture of polymer 3 and block material 1, or a mixture of polymer 3, block material 1 and constraint cage 2.

[0097] Step 2: You can perform verification according to the following formula or perform detailed calculation according to the existing design specifications:

[0098] The shear section of rectangular, T-shaped and I-shaped cross-section flexural members shall meet the following conditions:

[0099] When h w / b≤4

[0100] V≤0.30ηβ c f′ c b / h0

[0101] When h w / b≥6

[0102] V≤0.25ηβ c f′ c b / h0

[0103] When 4<h w When / b<6, it is determined by linear interpolation.

[0104] Where: V is the maximum shear force design value on the inclined section of the pre-constrained block beam;

[0105] η——Influence coefficient of shear bearing capacity of pre-constrained block beam, η is 0.4~1.0;

[0106] β c ——Influence coefficient of bulk polymer strength: When the strength grade of bulk polymer does not exceed C50, β c Take 1.0; when the strength grade of the bulk polymer exceeds C40, β c Take 0.7~1.0;

[0107] f′ c ——Design value of compressive strength of bulk polymer;

[0108] b – width of rectangular section, web width of T-section or I-section;

[0109] h0——effective height of the section;

[0110] h w ——Height of the web of the section: for rectangular section, take the effective height; for T-section, take the effective height minus the flange height; for I-section, take the net height of the web.

[0111] V≤V cs

[0112]

[0113] Where: V is the shear design value of the pre-restrained block beam;

[0114] V cs ——Design value of shear bearing capacity of pre-restrained block beam;

[0115] α cv——Shear bearing capacity coefficient of oblique section block polymer, for general bending members, it is 0.5-0.8; for independent beams under concentrated load (including multiple loads, where the shear force generated by the concentrated load on the support section or node edge accounts for more than 75% of the total shear force), it is α cv for λ is the shear span ratio of the calculated section, which can be taken as a / h0. When λ is less than 1.5, it is taken as 1.5. When λ is greater than 3, it is taken as 3. a is the distance from the point of concentrated load action to the support section or node edge.

[0116] A sv ——The total cross-sectional area of ​​each limb of the stirrups arranged in the same section, that is, nA sv1 , where n is the number of stirrups in the same section, A sv1 is the cross-sectional area of ​​the single stirrup;

[0117] s——the spacing of stirrups along the length of the member;

[0118] f yv ——design value of tensile strength of stirrups;

[0119] f′ t ——the design value of tensile strength of bulk polymer;

[0120] The strength parameters in the formula are taken according to the existing national standards or through experiments, and the geometric parameters are taken according to the actual size or nominal size. Repeat steps 1 to 2, and the internal force and deformation of the pre-constrained block beam are calculated. The shear bearing capacity is compared with the maximum shear force calculated according to the actual working load of the structure. It is sufficient if it is greater than the maximum shear force.

[0121] The shear bearing capacity verification method of the present invention is a corresponding calculation method given for pre-constrained block beams. It has a clear idea and provides a theoretical basis for checking the shear bearing capacity of pre-constrained block beams, which is convenient for engineering personnel to perform design calculation and analysis.

[0122] The present invention provides a construction method for a pre-constrained block beam, and the construction steps are as follows:

[0123] Step 1: prepare the raw materials of beam reinforcement 5, restraining reinforcement 4, block material 1, and polymer 3; the polymer (3) is cement paste, cement mortar or concrete; according to the design requirements, mix the raw materials of polymer 3 into one to form polymer 3; process the beam reinforcement 5 to a predetermined length and shape;

[0124] Step 2: Process the restraining ribs 4 to a predetermined length and shape to form a restraining cage 2; divide the block material into blocks 1 of a predetermined size; remove dust from the surface of the blocks 1 and classify the blocks 1 according to particle size; put the blocks 1 into the restraining cage 2 to form pre-constrained blocks 9;

[0125] Step 3: Support the beam formwork;

[0126] Step 4: Binding the beam reinforcement cage 6;

[0127] Step 5: Place the pre-constrained block in the beam reinforcement cage 6;

[0128] Step 6: pouring polymer 3 into the beam formwork, so that the pre-constrained block material 9, beam reinforcement 5 and polymer 3 are mixed into a whole, and the polymer 3 wraps the beam reinforcement cage 6;

[0129] Step seven, curing the polymer 3 to a predetermined strength, so that the pre-constrained block 9, the polymer 3 and the beam reinforcement 5 form a whole.

[0130] When the beam transverse reinforcement 5.2 includes closed stirrups 5.2.1, transverse tension bars 5.2.2 and rear closed stirrups 5.2.3, steps 4 and 5 are modified as follows:

[0131] Step 4: Temporarily tie the closed stirrups 5.2.1, the lower stirrups with upper openings and the beam longitudinal reinforcement 5.1; form a partial opening in the upper part of the beam;

[0132] Step 5: Place the pre-constrained block beam in the beam reinforcement cage 6 along the local opening at the upper part of the beam; adjust the position of the longitudinal reinforcement at the upper part of the beam, and arrange the closed stirrups 5.2.3; and tie the closed stirrups 5.2.3 and the longitudinal reinforcement at the upper part of the beam.

[0133] The construction method of the present invention is a corresponding construction method given for pre-constrained block beams. The process is concise and clear, provides a reference for the construction of pre-constrained block beams, is convenient for engineering personnel to perform actual operations, and improves construction quality.

[0134] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical scope disclosed in the present invention should be covered by the protection scope of the present invention.

Claims

1. A pre-constrained block beam, characterized in that: The pre-constrained block beam comprises a block (1), a constraint cage (2), a polymer (3) and a beam reinforcement (5); the constraint cage (2) comprises a cage frame (2.1) and a constraint cage hole (2.2); the block (1) is built into the constraint cage (2) to form a pre-constrained block (9); the beam reinforcement (5) comprises a beam longitudinal reinforcement (5.1) and a beam transverse reinforcement (5.2); the beam transverse reinforcement (5.2) is arranged at intervals along the beam longitudinal reinforcement (5.1) to form a beam reinforcement cage (6); the constraint cage (2) is surrounded by the beam reinforcement cage (6); the polymer (3) fills the gap in the pre-constrained block (9); the polymer (3) wraps the beam reinforcement cage (6) and fills the gap between the pre-constrained block (9) and the beam reinforcement cage (6).

2. The pre-constrained block beam according to claim 1, characterized in that: The block material (1) is a stone, a reinforced concrete block, a concrete block or a cement mortar block; the polymer (3) is cement paste, cement mortar or concrete; the constraint cage (2) is closed at the end; the size of the constraint cage hole (2.2) is smaller than the size of the block material (1) at that location; the cage frame (2.1) comprises a side wall frame (2.1.1) and an end closing piece (2.1.2); the end closing piece (2.1.2) is formed by extending the side wall frame (2.1.1) or is a dedicated end closing piece (2.1.2); the dedicated end closing piece (2.1.2) is connected to the side wall frame (2.1.1) as a whole; the constraint cage hole (2.2) has a polymer (3) so that the polymer (3) inside the constraint cage (2) and the polymer (3) outside the constraint cage (2) are connected as a whole; the pre-constrained block material (9) is located in the middle area of ​​the beam cross-section height.

3. The pre-constrained block beam according to claim 1, characterized in that: The restraining cage (2) is a restraining bar cage or a grid cage; the cage frame (2.1) of the restraining bar cage is composed of restraining bars (4); the restraining bars (4) are steel bars or steel wires or FRP bars; the cage frame (2.1) of the grid cage is composed of metal mesh or steel plates with holes.

4. The pre-constrained block beam according to claim 3, characterized in that: The restraining ribs (4) include longitudinal ribs (4.1), transverse ribs (4.2) and / or oblique ribs (4.3); the end closures (2.1.2) of the restraining rib cage are formed by fixedly connecting or bending the longitudinal ribs (4.1) or the oblique ribs (4.3) at the ends, or are independent end closures (2.1.2); the independent end closures (2.1.2) are fixedly connected to the longitudinal ribs (4.1) or the oblique ribs (4.3).

5. The pre-constrained block beam according to claim 1, characterized in that: The cage (2.1) has a plurality of sub-spaces; the sub-spaces are independent of each other and contain block materials (1).

6. The pre-constrained block beam according to claim 1, characterized in that: The beam reinforcement cage (6) is provided with a steel frame (8) inside; the steel frame (8) is a steel section or a steel component; there is a gap between the steel frame (8), the pre-constrained block material (9), and the beam reinforcement cage (6); the polymer (3) fills the gap between the pre-constrained block material (9), the steel frame (8), and the beam reinforcement cage (6).

7. The pre-constrained block beam according to claim 1, characterized in that: The transverse reinforcement (5.2) of the beam comprises closed stirrups (5.2.1), transverse tension bars (5.2.2) and rear closed stirrups (5.2.3); the rear closed stirrups (5.2.3) are composed of open U-shaped stirrups (5.2.4) and rear closed bars (5.2.5); the rear closed bars (5.2.5) comprise rear closed tension bars or rear closed U-shaped stirrups; the rear closed bars (5.2.5) are arranged correspondingly to the open U-shaped stirrups (5.2.4).

8. The method for calculating the shear bearing capacity of a pre-constrained block beam according to any one of claims 1 to 7, characterized in that: The specific steps are as follows: Step 1, determining the geometric dimensions, strength and arrangement of the block material (1) in the constraint cage (2); determining the arrangement of the constraint cage (2); determining the strength parameters of the block material polymer; determining the cross-sectional area of ​​the pre-constrained block material beam, determining the cross-sectional area of ​​the block material (1); determining the spacing, cross-sectional dimensions and strength parameters of the beam stirrups; the block material polymer is a mixture of a polymer (3) and a block material (1), or a mixture of a polymer (3) and a block material (1) and a constraint cage (2). Step 2: You can perform verification according to the following formula or perform detailed calculation according to the existing design specifications: The shear section of rectangular, T-shaped and I-shaped cross-section flexural members shall meet the following conditions: When h w / b≤4 V≤0.30ηβ c f′ c b / h0 When h w / b≥6 V≤0.25ηβ c f′ c b / h0 When 4<h w When / b<6, it is determined by linear interpolation. Where: V is the maximum shear force design value on the inclined section of the pre-constrained block beam; η——Influence coefficient of shear bearing capacity of pre-constrained block beam, η is 0.4~1.0; β c ——Influence coefficient of bulk polymer strength: When the strength grade of bulk polymer does not exceed C50, β c Take 1.0; when the strength grade of the bulk polymer exceeds C40, β c Take 0.7~1.0; f′ c ——Design value of compressive strength of bulk polymer; b – width of rectangular section, web width of T-section or I-section; h0——effective height of the section; h w ——Height of the web of the section: for rectangular section, take the effective height; for T-section, take the effective height minus the flange height; for I-section, take the net height of the web. V≤V cs Where: V is the shear design value of the pre-restrained block beam; V cs ——Design value of shear bearing capacity of pre-restrained block beam; α cv ——Shear bearing capacity coefficient of oblique section block polymer, for general bending members, it is 0.5-0.8; for independent beams under concentrated load (including multiple loads, where the shear force generated by the concentrated load on the support section or node edge accounts for more than 75% of the total shear force), it is α cv for λ is the shear span ratio of the calculated section, which can be taken as α / h0. When λ is less than 1.5, it is taken as 1.

5. When λ is greater than 3, it is taken as 3. α is the distance from the point of concentrated load action to the support section or node edge. A sv ——The total cross-sectional area of ​​each limb of the stirrups arranged in the same section, that is, nA sv1 , where n is the number of stirrups in the same section, A sv1 is the cross-sectional area of ​​the single stirrup; s——the spacing of stirrups along the length of the member; f yv ——design value of tensile strength of stirrups; f′ t ——the design value of tensile strength of bulk polymer; The strength parameters in the formula are taken according to the existing national standards or through experiments, and the geometric parameters are taken according to the actual size or nominal size. Repeat steps 1 to 2, and the internal force and deformation of the pre-constrained block beam are calculated. The shear bearing capacity is compared with the maximum shear force calculated according to the actual working load of the structure. It is sufficient if it is greater than the maximum shear force.

9. A construction method for pre-constrained block beams, characterized in that: The construction steps are as follows: Step 1: prepare beam reinforcement (5), restraining bars (4), raw materials of block material (1), and raw materials of polymer (3); according to design requirements, mix the raw materials of polymer (3) into one to form polymer (3); process the beam reinforcement (5) to a predetermined length and shape; Step 2: Processing the restraining ribs (4) to a predetermined length and shape to form a restraining cage (2); dividing the block material into blocks (1) of predetermined size; removing dust from the surface of the blocks (1) and classifying the blocks (1) according to particle size; placing the blocks (1) into the restraining cage (2) to form pre-restrained blocks (9); Step 3: Support the beam formwork; Step 4: Binding to form a beam reinforcement cage (6); Step 5: placing the pre-constrained block material in the beam reinforcement cage (6); Step 6: pouring the polymer (3) into the beam formwork, so that the pre-constrained block material (9), the beam reinforcement (5) and the polymer (3) are mixed into a whole, and the polymer (3) wraps the beam reinforcement cage (6); Step seven, curing the polymer (3) to a predetermined strength, so that the pre-constrained block (9), the polymer (3) and the beam reinforcement (5) form a whole. When the beam transverse reinforcement (5.2) includes closed stirrups (5.2.1), transverse ties (5.2.2) and rear closed stirrups (5.2.3), steps 4 and 5 are modified as follows: Step 4: temporarily tie the closed stirrups (5.2.1), the lower stirrups with upper openings and the longitudinal reinforcement of the beam (5.1); form a partial opening at the upper part of the beam; Step 5: Place the pre-constrained block beam in the beam reinforcement cage (6) along the local opening at the upper part of the beam; adjust the position of the longitudinal reinforcement at the upper part of the beam, arrange the rear closed stirrups (5.2.3); tie the rear closed stirrups (5.2.3) and the longitudinal reinforcement at the upper part of the beam.