By designing a tunnel boring machine with multiple degrees of freedom, partitioned excavation and synchronous support are realized, which solves the problem of collapse risk and ground disturbance when the raise drill bit reverses the expansion excavation, improves construction safety and efficiency, and reduces construction costs. and damage to the surface.
Patent Information
- Application Number
- CN202411109974.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-22
AI Technical Summary
When the raise drill bit pulls back and expands, the expanded hole is formed at once. The expansion operation area is large and there is a risk of collapse. It also causes disturbance to the ground during shallow well construction, increases the engineering volume and damages the surface environment.
A tunnel boring machine is designed, including a shield system, an excavation system and an undercarriage system. It realizes multi-degree of freedom movement through cutting parts and driving components, partitions excavation and synchronous support to avoid soil collapse, and uses the undercarriage system to Movement reduces disturbance to the surface.
It improves construction safety, avoids soil collapse, reduces surface damage and engineering volume, realizes bottom-up construction, and saves construction costs and cycles.
Smart Images

Figure CN118815480A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shaft construction equipment, and in particular to a tunnel boring machine. Background Art
[0002] In the fields of underground resource development and urban infrastructure construction, shaft construction plays a vital role. Shafts are not only important channels connecting underground spaces, but also carry multiple functions such as ventilation, drainage, and material transportation. Therefore, efficient and safe shaft construction methods are of great significance to ensuring project quality and progress.
[0003] In the prior art, a reverse well construction method is usually adopted to build a vertical shaft, wherein before the reverse well construction, auxiliary equipment needs to be built in the upper horizontal hole of the vertical shaft or on the surface, and then a reverse drilling rig is used to drill a guide hole connected to the lower horizontal hole from top to bottom, so that the auxiliary equipment is connected to the reverse well drill bit installed in the lower horizontal hole through the guide hole, and the reverse well drill bit is used to reversely pull and expand the excavation to complete the vertical shaft construction.
[0004] However, when the reverse drilling bit is pulled back to expand the excavation, the excavation opening is formed at one time, the excavation operation area is large, and there is a risk of collapse. Summary of the invention
[0005] The present application provides a tunnel boring machine for solving the problems that the current hole opening is formed in one step when the reverse well drill is pulled back to expand the excavation, the excavation operation area is large, and there is a risk of collapse.
[0006] In order to achieve the above purpose, the technical solution of this application is as follows:
[0007] The present application provides a tunnel boring machine, including a shield system, an excavation system and a chassis system, wherein a lifting platform is installed on the chassis system, and the lifting platform is used to transport pipe segments; the excavation system includes a cutting piece and a first drive assembly connected to the cutting piece, the first drive assembly is used to drive the cutting piece to move along a first direction and a second direction, and to drive the cutting piece to rotate around a second direction and a third direction, wherein the first direction, the second direction and the third direction intersect each other; the shield system includes a first shield, a plurality of second shields and a plurality of second drive assemblies, the first shield is used to support the inner wall of the shaft, the first shield Connected to the first drive assembly; the second drive assembly is hinged to the second shield one by one, and each second drive assembly is hinged to the first shield. The second drive assembly is used to drive the second shield to move relative to the first shield so that the second shield can switch between a closed position, an avoidance position and a support position. In the closed position, one side of the second shield contacts one side of the first shield; in the avoidance position, the second shield flips toward the first shield to form an exit and entrance for the cutting piece to extend or retract the shield system; in the support position, the second shield rises relative to the first shield to support the inner top wall of the shaft.
[0008] In one possible implementation, the tunnel boring machine provided by the present application, the second drive assembly includes two first drive members and a second drive member located between the two first drive members, the fixed end of the first drive member is connected to the first shield, and the output end of the first drive member is connected to an end of the second shield close to the first shield; the fixed end of the second drive member is connected to the first shield, and the output end of the second drive member is connected to an end of the second shield away from the first shield.
[0009] In one possible implementation, the tunnel boring machine provided in the present application, the first drive assembly includes a first displacement member, a second displacement member, a rotating member and a first lifting member, the first displacement member is fixedly connected to the inner wall of the first shield; the rotating member is hinged to the cutting member, and the rotating member is connected to the second displacement member, the rotating member is used to drive the cutting member to rotate around a third direction; one end of the first lifting member is hinged to the cutting member, and the other end is hinged to the rotating member, the first lifting member is used to drive the cutting member to rotate around the hinge point between the cutting member and the rotating member; the second displacement member is slidably connected to the first displacement member, and the second displacement member is configured to slide along the extension direction of the first displacement member or the extension direction of the second displacement member to drive the cutting member to move along the first direction or the second direction.
[0010] In one possible implementation, in the tunnel boring machine provided in the present application, a jacking system is connected between the bottom of the first shield and the chassis system, and the jacking system is used to drive the shield system and the excavation system to rise or fall relative to the chassis system.
[0011] In a possible implementation, the tunnel boring machine provided in the present application has a chassis system including a first support member and a moving member connected to the first support member, wherein the moving member is located at the bottom of the first support member and is used to drive the first support member to move.
[0012] In one possible implementation, the tunnel boring machine provided in the present application also includes a slag discharge system, which includes a slag receiving part, a slag sliding part and a transport part. The slag receiving part is located below the cutting part, and the projection of the slag receiving part toward the cutting part covers the cutting part; one end of the slag sliding part is connected to the slag receiving part, and the other end is connected to the first support part; the transport part is installed on the first support part, and a transition receiving part is arranged between the slag sliding part and the transport part, so that the slag dropped after the operation of the cutting part can fall on the transport part in sequence through the slag receiving part, the slag sliding part and the transition receiving part.
[0013] In a possible implementation, in the tunnel boring machine provided in the present application, the slag sliding member includes a plurality of slag sliding sleeves which are sequentially sleeved, and each slag sliding sleeve is slidably connected in sequence.
[0014] In one possible implementation, the tunnel boring machine provided in the present application has a second lifting member connected between two adjacent slag sleeves, and the second lifting member is configured to drive the two adjacent slag sleeves to move toward or in the opposite direction so that the slag receiving member can descend or ascend following the excavation system through the slag sleeve.
[0015] In a possible implementation, in the tunnel boring machine provided in the present application, a plurality of second support members are disposed at the bottom of the first support member, and the second support members are used to support between the first support member and the ground.
[0016] In a possible implementation, the tunnel boring machine provided in the present application has a jacking system including a plurality of jacking members, wherein a fixed end of the jacking member is fixedly connected to the first support member, and an output end of the jacking member is connected to the bottom of the first shield.
[0017] The tunnel boring machine provided in the present application is provided with a chassis system to drive the overall movement of the tunnel boring machine. A lifting platform is installed on the chassis system, and the transportation of the pipe segments is realized by the lifting platform. By providing a cutting head and a first driving assembly connected to the cutting head, the cutting head can move along the first direction and the second direction under the drive of the first driving assembly, and can rotate around the second direction and the third direction, so as to realize the multi-degree-of-freedom movement of the cutting head to complete the shaft excavation operation in different areas. By providing a first shield, the support of the inner wall of the shaft is realized, and by providing multiple second driving assemblies to drive each second shield to switch between the closed position, the avoidance position and the support position, the second shield can avoid the cutting head and support the top wall of the shaft in real time. Therefore, through the zoning excavation of the cutting piece and the synchronization and zoning support of the excavation system, soil collapse is avoided and construction safety is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 A schematic diagram of the structure of a tunnel boring machine provided in an embodiment of the present application;
[0020] Figure 2 for Figure 1 How to use the medium shield system Figure 1 ;
[0021] Figure 3 for Figure 1 How to use the medium shield system Figure 2 ;
[0022] Figure 4 A schematic diagram of a second shield in a closed position provided in an embodiment of the present application;
[0023] Figure 5A schematic diagram of a second shield in an avoidance position provided in an embodiment of the present application;
[0024] Figure 6 A schematic diagram of a second shield in a supporting position provided in an embodiment of the present application;
[0025] Figure 7 for Figure 1 Structural diagram of the mid-excavation system;
[0026] Figure 8 for Figure 1 Structural diagram of the slag discharge system;
[0027] Fig. 9 for Figure 1 Structural diagram of the mid-chassis system, lifting platform and jacking system;
[0028] Fig.10 A schematic diagram of step 1 of the vertical shaft construction method provided in an embodiment of the present application;
[0029] Fig.11 A schematic diagram of step 2 of the vertical shaft construction method provided in an embodiment of the present application;
[0030] Fig.12 A schematic diagram of step three of the shaft construction method provided in an embodiment of the present application;
[0031] Fig.13 A schematic diagram of step 4 of the shaft construction method provided in an embodiment of the present application;
[0032] Fig.14 A schematic diagram of step 5 of the shaft construction method provided in an embodiment of the present application;
[0033] Fig.15 A schematic diagram of step 6 of the shaft construction method provided in an embodiment of the present application;
[0034] Fig.16 A schematic diagram of step seven of the shaft construction method provided in an embodiment of the present application;
[0035] Fig.17 A schematic diagram of step eight of the shaft construction method provided in an embodiment of the present application;
[0036] Fig.18 Schematic diagram of step nine of the shaft construction method provided in an embodiment of the present application.
[0037] Description of reference numerals:
[0038] 100: Shield system;
[0039] 110: First Shield;
[0040] 120: Second shield;
[0041] 130: second driving assembly; 131: first driving member; 132: second driving member;
[0042] 140: Entrance and exit;
[0043] 200: Excavation system;
[0044] 210: cutting piece;
[0045] 220: first driving assembly; 221: first displacement member; 222: second displacement member; 223: rotating member; 224: first lifting member;
[0046] 300: Chassis system;
[0047] 310: first support member;
[0048] 320: moving parts;
[0049] 330: second supporting member;
[0050] 400: lifting platform;
[0051] 500: slag discharge system;
[0052] 510: slag receiving parts;
[0053] 520: slag sliding piece; 521: slag sliding sleeve;
[0054] 530: Transport parts;
[0055] 540: Transition piece;
[0056] 550: second lifting member;
[0057] 600: Lifting system;
[0058] 610: Lifting piece.
[0059] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0060] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution in the embodiment of the present application will be described in more detail below in conjunction with the drawings in the preferred embodiment of the present application. Obviously, the described embodiment is only a part of the embodiment of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0061] It should be noted that in the description of the embodiments of the present application, XYZ is a three-axis vertical coordinate system formed in space. The first direction is the left-right direction, corresponding to the X-axis direction in the drawings; the second direction is the front-back direction, corresponding to the Y-axis direction in the drawings; the third direction is the up-down direction, corresponding to the Z-axis direction in the drawings. This is only for the convenience of description, and does not indicate or imply that the device or component must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present application.
[0062] In addition, it should be noted that the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0063] In this application, unless otherwise clearly specified and limited, the terms "installation", "connection", "fixation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0064] In the fields of underground resource development and urban infrastructure construction, shaft construction plays a vital role. Shafts are not only important channels connecting underground spaces, but also carry multiple functions such as ventilation, drainage, and material transportation. Therefore, efficient and safe shaft construction methods are of great significance to ensuring project quality and progress.
[0065] In the prior art, the vertical shaft is usually constructed by the reverse well construction method, wherein before the reverse well construction, it is necessary to first construct auxiliary equipment in the upper horizontal hole of the vertical shaft or on the ground surface, and then use a reverse drilling machine to drill a guide hole connected to the lower horizontal hole from top to bottom, so that the auxiliary equipment is connected to the reverse well drill bit installed in the lower horizontal hole through the guide hole, and the reverse well drill bit is used to reversely pull and expand the excavation to complete the vertical shaft construction. However, when the reverse well drill bit is reversed and expanded, the excavation opening is formed at one time, the expansion operation area is large, and there is a risk of collapse. In addition, when constructing a shallow well, auxiliary equipment is built on the surface or in the upper horizontal hole of the vertical shaft, which increases the amount of work and is prone to disturbing the ground and causing damage to the surface environment.
[0066] In view of this, the tunnel boring machine provided in the present application is provided with a chassis system to drive the overall movement of the tunnel boring machine. A lifting platform is installed on the chassis system, and the transportation of the pipe segments is realized by the lifting platform. By providing a cutting head and a first driving assembly connected to the cutting head, the cutting head can move along the first direction and the second direction under the drive of the first driving assembly, and can rotate around the second direction and the third direction, so as to realize the multi-degree-of-freedom movement of the cutting head to complete the shaft excavation operation in different areas. By providing a first shield, the support of the inner wall of the shaft is realized, and by providing multiple second driving assemblies to drive each second shield to switch between the closed position, the avoidance position and the support position, the second shield can avoid the cutting head and support the top wall of the shaft in real time. Therefore, through the zoning excavation of the cutting piece and the synchronization and zoning support of the excavation system, soil collapse is avoided and construction safety is improved.
[0067] The present application is described in detail below with reference to the accompanying drawings and specific embodiments.
[0068] Figure 1 A schematic diagram of the structure of a tunnel boring machine provided in an embodiment of the present application; Figure 2 for Figure 1 How to use the medium shield system Figure 1 ; Figure 3 for Figure 1 How to use the medium shield system Figure 2 ; Figure 4 A schematic diagram of a second shield in a closed position provided in an embodiment of the present application; Figure 5 A schematic diagram of a second shield in an avoidance position provided in an embodiment of the present application; Figure 6 A schematic diagram of a second shield in a supporting position provided in an embodiment of the present application; Figure 7 for Figure 1 Schematic diagram of the structure of the mid-excavation system.
[0069] See also Figures 1 to 7The present application provides a tunnel boring machine, including a shield system 100, an excavation system 200 and a chassis system 300, wherein a lifting platform 400 is installed on the chassis system 300, and the lifting platform 400 is used to transport pipe segments; the excavation system 200 includes a cutting piece 210 and a first drive assembly 220 connected to the cutting piece 210, the first drive assembly 220 is used to drive the cutting piece 210 to move along a first direction and a second direction, and to drive the cutting piece to rotate around a second direction and a third direction, wherein the first direction, the second direction and the third direction intersect each other; the shield system 100 includes a first shield 110, a plurality of second shields 120 and a plurality of second drive assemblies 130, the first shield 110 is used to support the inner wall of the shaft, the first shield 110 The second drive assembly 130 is connected to the second shield 120 in a one-to-one correspondence, and each second drive assembly 130 is hinged to the first shield 110. The second drive assembly 130 is used to drive the second shield 120 to move relative to the first shield 110 so that the second shield 120 switches between a closed position, an avoidance position and a support position. In the closed position, one side of the second shield 120 contacts one side of the first shield 110; in the avoidance position, the second shield 120 flips toward the first shield 110 to form an exit 140 for the cutting piece 210 to extend or retract the shield system 100; in the support position, the second shield 120 rises relative to the first shield 110 to support the inner top wall of the shaft.
[0070] It is understandable that the function of the chassis system 300 is to realize the movement of the tunnel boring machine and avoid the secondary assembly of the tunnel boring machine. During the excavation process, the chassis system 300 can be fixed in the current position to improve the stability of the device. With such a design, the tunnel boring machine provided in the embodiment of the present application can move to the working area by itself for construction, and can move out of the working area by itself after the construction is completed, without affecting the subsequent work.
[0071] In the present application, the cutting member 210 is used to break and cut the rock formation to realize the excavation of the shaft. The cutting member 210 can be a cutting head, which breaks the rock formation by high-speed rotation and cutting. The cutting head generally has a plurality of cutting teeth, which contact the rock formation during the rotation process, and through cutting, breaking and other actions, the rock is converted into easy-to-handle fragments.
[0072] In some embodiments, the first drive assembly 220 is used to drive the cutting member 210 to achieve multi-degree-of-freedom motion. That is, the first drive assembly 220 can drive the cutting member 210 to move along the first direction (such as the left-right direction) or the second direction (such as the front-back direction), and can also drive the cutting member 210 to rotate around the second direction or the third direction (such as up and down pitch or left and right rotation) to adjust the posture, so that the cutting member 210 can flexibly respond to various excavation requirements and achieve precise zoning excavation operations.
[0073] In the present application, the first shield 110 is used as the core support structure. The first shield 110 directly supports the inner wall of the shaft, effectively preventing collapse caused by soil or rock pressure during excavation, and improving operation safety. The shape and size of the first shield 110 match the shape and size of the preset construction shaft, so that the first shield 110 can fit the inner wall of the shaft more closely during excavation to improve the support effect of the first shield 110.
[0074] In specific implementation, in order to cooperate with the cutting piece 210 in the partitioned excavation at different positions and angles and realize the synchronous partitioned support function of the shield system 100, the shield system 100 includes multiple second shields 120, and each second shield 120 adopts a partitioned design. Different partitions are designed according to the shape of the shaft excavation surface, and each second shield 120 located in different areas is hinged with a second drive assembly 130, and each second drive assembly 130 is hinged to the first shield 110.
[0075] Among them, each second shield 120 can be freely switched between the closed position, the avoidance position and the support position according to actual needs through the drive of the second drive assembly 130, so as to achieve targeted support for different areas. That is to say, when the second shield 120 is in the closed position, one side of the second shield 120 contacts the first shield 110, and the first shield 110 and the second shield 120 are in a closed state; when the cutting piece 210 starts to dig into the shaft, the second drive assembly 130 in the corresponding area drives the second shield 120 in the corresponding area to flip toward the first shield 110 to form an entrance and exit 140, and the second shields 120 in the remaining areas are in the closed position, and the cutting piece 210 is driven by the first drive assembly 220 to move to the prepared excavation area, The excavation system 200 is extended through the entrance 140 to construct the area. After the cutting piece 210 is completed in the area, the first drive assembly 220 drives the cutting piece 210 to be retracted into the excavation system 200. At this time, the second drive assembly 130 in the area drives the second shield 120 in the area to switch to the support position, that is, the second drive assembly 130 drives the second shield 120 to rise relative to the first shield 110 to support the area, effectively preventing the soil in the area from collapsing during the excavation and advancement of the cutting piece 210 in other areas. Therefore, compared with the prior art in which the reverse well drill bit is reversed and the excavation opening is formed at one time, the embodiment of the present application avoids soil collapse and improves construction safety through the zoning excavation of the cutting piece 210 and the synchronization and zoning support of the excavation system 200. At the same time, the excavation machine provided by the embodiment of the present application is set in the lower flat tunnel to excavate the vertical shaft from bottom to top. In shallow well construction, compared with the construction of a vertical shaft by the reverse well construction method, the tunnel boring machine provided by the embodiment of the present application does not need to build auxiliary equipment in the upper flat hole of the vertical shaft or on the surface, thereby reducing the disturbance to the surface and reducing the damage to the surface environment. In addition, there is no need to first use a reverse drilling machine to drill a pilot hole from top to bottom and then reversely expand the hole, and the vertical shaft construction can be completed directly from bottom to top, which can meet the requirements of continuous construction and save construction costs and cycles.
[0076] Furthermore, as the cutting piece 210 continues to dig the shaft upward, the lifting platform 400 transports the pipe segments to the bottom of the shaft, and the pipe segments are installed along the inner wall of the shaft in a timely manner by manual or machine, and anchor rods are inserted. After pouring concrete, permanent support of the inner wall of the shaft is achieved.
[0077] It can be understood that the lifting platform 400 is composed of a platform and a lifting drive component. The lifting drive component can use a hydraulic cylinder or an electric screw to adjust to different heights to achieve the transportation of people or materials.
[0078] See also Figures 4 to 6In the embodiment of the present application, the second driving assembly 130 includes two first driving members 131 and a second driving member 132 located between the two first driving members 131. The fixed end of the first driving member 131 is connected to the first shield 110, and the output end of the first driving member 131 is connected to the second shield
[0079] 120 is connected to one end of the first shield 110; the fixed end of the second driving member 132 is connected to the first shield 110, and the output end of the second driving member 132 is connected to one end of the second shield 120 away from the first shield 110.
[0080] In a specific implementation, the two first driving members 131 are symmetrically distributed and work together to ensure the stability and synchronization of the second shield 120 during the movement, thereby reducing the deviation caused by uneven force on one side and improving the reliability of the shield system 100.
[0081] Furthermore, the second driving member 132 is located between the two first driving members 131, and the output end of the first driving member 131 is connected to the end of the second shield 120 close to the first shield 110, and the output end of the second driving member 132 is connected to the end of the second shield 120 away from the first shield 110. The second driving member 132 provides an additional support point for the second shield 120, effectively improving the support effect of the second shield 120. At the same time, such a design facilitates the second shield 120 to flip toward the first shield 110 or the second shield 120 to rise relative to the first shield 110 through the coordinated adjustment of the first driving member 131 and the second driving member 132. That is, when it is necessary to quickly switch the support position or the avoidance position, the coordinated work of the first driving member 131 and the second driving member 132 can quickly respond and adjust the state of the second shield 120, ensuring the continuity and efficiency of the excavation operation.
[0082] Exemplarily, the first driving member 131 can be an up and down pushing cylinder, and the second driving member 132 can be a flipping cylinder. By using the up and down pushing cylinder and the flipping cylinder in coordination, the second driving assembly 130 can drive the second shield 120 to switch between the closed position, the avoidance position and the supporting position.
[0083] See also Figure 1 and Figure 7In the embodiment of the present application, the first driving assembly 220 includes a first displacement member 221, a second displacement member 222, a rotating member 223 and a first lifting member 224. The first displacement member 221 is fixedly connected to the inner side wall of the first shield 110; the rotating member 223 is hinged to the cutting member 210, and the rotating member 223 is connected to the second displacement member 222. The rotating member 223 is used to drive the cutting member 210 to rotate around the third direction; one end of the first lifting member 224 is hinged to the cutting member 210, and the other end is hinged to the rotating member 223. The first lifting member 224 is used to drive the cutting member 210 to rotate around the hinge point between the cutting member 210 and the rotating member 223; the second displacement member 222 is slidably connected to the first displacement member 221, and the second displacement member 222 is configured to slide along the extension direction of the first displacement member 221 or the extension direction of the second displacement member 222 to drive the cutting member 210 to move along the first direction or the second direction.
[0084] In some embodiments, the first displacement member 221 serves as a fixed base for the first driving assembly 220 . The first displacement member 221 is fixedly connected to the inner wall of the first shield 110 , providing a stable working platform for other components.
[0085] Furthermore, the extension direction of the first displacement member 221 is the first direction, and the extension direction of the first displacement member 221 provides a clear path for the second displacement member 222 to slide in the first direction. By sliding the second displacement member 222 along the extension direction of the first displacement member 221, the position of the cutting member 210 in the first direction can be adjusted.
[0086] It should be noted that the second displacement member 222 is slidably connected to the first displacement member 221, and the extension direction of the second displacement member 222 is the second direction, so that the second displacement member 222 can slide along the extension direction of the first displacement member 221 or the extension direction of the second displacement member 222. Thus, the cutting member 210 can move freely in the first direction and the second direction, thereby improving the flexibility of the cutting operation.
[0087] Exemplarily, the first displacement member 221 and the second displacement member 222 may be driven by a ball screw, a gear rack, etc., in order to enable the second displacement member 222 to slide along the extension direction of the first displacement member 221 or the extension direction of the second displacement member 222 itself, which is not limited in this embodiment.
[0088] When the rotating member 223 is started, it rotates around the third direction to drive the cutting member 210 to rotate around the third direction, so that the cutting member 210 can adjust its working angle as needed to better adapt to excavation surfaces of different shapes and sizes.
[0089] Specifically, the rotating member 223 may be in the form of a rotating support structure, or other structures that can drive the cutting member 210 to rotate around the third direction, which is not limited in this embodiment.
[0090] Furthermore, one end of the first lifting member 224 is hinged to the cutting member 210, and the other end is hinged to the rotating member 223. By adjusting the extension or contraction of the first lifting member 224, the cutting member 210 can be driven to rotate around the hinge point between the cutting member 210 and the rotating member 223 to achieve lifting or lowering movement. When encountering hard rock formations, the cutting member 210 can be lifted to reduce cutting resistance.
[0091] It is understandable that the first lifting member 224 may be a lifting cylinder, or other structures that can drive the cutting member 210 to rotate around the second direction, and this embodiment is not limited here.
[0092] Thus, the first displacement member 221, the second displacement member 222, the rotating member 223 and the first lifting member 224 work together to provide the cutting member 210 with multi-degree-of-freedom motion control capabilities. Such a design not only improves the efficiency and accuracy of the excavation operation, but also enhances the adaptability of the excavator to complex geological conditions.
[0093] Fig. 9 for Figure 1 Schematic diagram of the structure of the mid-chassis system, lifting platform and jacking system.
[0094] See also Figure 1 and Fig. 9 In the embodiment of the present application, a jacking system 600 is connected between the bottom of the first shield 110 and the chassis system 300, and the jacking system 600 is used to drive the shield system 100 and the excavation system 200 to rise or fall relative to the chassis system 300.
[0095] In the present application, through the flexible operation of the jacking system 600, the height of the shield system 100 and the excavation system 200 can be quickly adjusted according to the actual working conditions, so as to realize the bottom-up excavation advancement of the excavation system 200 and the real-time support of the shield system 100.
[0096] See also Figure 1 and Fig. 9 In the embodiment of the present application, the chassis system 300 includes a first support member 310 and a moving member 320 connected to the first support member 310 , the moving member 320 is located at the bottom of the first support member 310 , and the moving member 320 is used to drive the first support member 310 to move.
[0097] It should be noted that the first support member 310 is used to stably support the structure above the first support member 310 (such as the shield system 100, the excavation system 200 and the lifting platform 400). The first support member 310 is made of high-strength material to provide a stable and reliable support platform.
[0098] Furthermore, the moving member 320, as a component driving the first supporting member 310 to move, can adopt a crawler design, thereby reducing the ground pressure ratio and ensuring that the tunnel boring machine can stably walk and position in complex terrain and unstable formations. When facing harder formations, the crawler design can be replaced with a wheeled chassis to meet the movement requirements of the device.
[0099] Figure 8 for Figure 1 Schematic diagram of the structure of the slag discharge system.
[0100] See also Figure 1 and Figure 8 In the embodiment of the present application, a slag discharge system 500 is also included, and the slag discharge system 500 includes a slag receiving member 510, a slag sliding member 520 and a transport member 530. The slag receiving member 510 is located below the cutting member 210, and the projection of the slag receiving member 510 toward the cutting member 210 covers the cutting member 210; one end of the slag sliding member 520 is connected to the slag receiving member 510, and the other end is connected to the first support member 310; the transport member 530 is installed on the first support member 310, and a transition material receiving member 540 is arranged between the slag sliding member 520 and the transport member 530, so that the slag dropped after the operation of the cutting member 210 can fall on the transport member 530 in sequence through the slag receiving member 510, the slag sliding member 520 and the transition material receiving member 540.
[0101] In specific implementation, the slag receiving piece 510 is located below the cutting piece 210, and the projection of the slag receiving piece 510 toward the cutting piece 210 completely covers the cutting area to ensure that all the debris generated by the cutting operation can be accurately and completely received, avoiding the pollution and damage to the working environment and surrounding equipment caused by the scattered debris, thereby improving the safety of the work site.
[0102] Furthermore, one end of the slag sliding member 520 is seamlessly connected to the slag receiving member 510, and the other end is connected to the first support member 310, so that the slag can slide smoothly along the slag sliding member 520, reducing resistance and accumulation, and improving the efficiency of slag transmission. The length of the slag sliding member 520 can be adjusted according to actual operation requirements, so that the slag receiving member 510 can rise with the cutting member 210, so that the slag receiving member 510 and the excavation area of the cutting member 210 maintain a relative position, thereby improving the efficiency of slag connection.
[0103] The transport member 530 is a structure for transporting slag, and can quickly collect and transport the slag delivered by the slag slide member 520 away from the operation area, thereby ensuring continuous cleanliness and efficient operation of the operation site. For example, the transport member 530 can be a belt conveyor or other structure for transporting slag, which is not limited in this embodiment.
[0104] It should be noted that the transition material connection piece 540 is installed on the slag sliding piece 520. The transition material connection piece 540 serves as a bridge between the slag sliding piece 520 and the transport piece 530, ensuring a smooth transition of the slag from the slag sliding piece 520 to the transport piece 530, reducing the risk of slag spilling and accumulation. With such a design, through the coordinated use of the shield system 100, the excavation system 200 and the slag discharge system 500, support, excavation and slag discharge are carried out simultaneously, thereby improving construction efficiency.
[0105] See also Figure 8 In the embodiment of the present application, the slag sliding member 520 includes a plurality of slag sliding sleeves 521 which are sequentially sleeved, and each slag sliding sleeve 521 is slidably connected in sequence.
[0106] In some embodiments, in order to allow the slag receiving member 510 to rise along with the cutting member 210 and maintain a relative position with the excavation area of the cutting member 210, thereby improving the slag receiving efficiency of the slag receiving member 510, the slag sliding member 520 is designed as a structure in which a plurality of slag sliding sleeves 521 are sequentially connected. According to the different heights of the cutting member 210, the slag sliding sleeves 521 can slide against each other to increase or decrease the height of the slag sliding member 520, thereby driving the height of the slag receiving member 510 to increase or decrease.
[0107] See also Figure 8 In an embodiment of the present application, a second lifting member 550 is connected between two adjacent slag sleeves 521, and the second lifting member 550 is configured to drive the two adjacent slag sleeves 521 to move toward or in the opposite direction, so that the slag receiving member 510 follows the excavation system 200 to descend or ascend through the slag sliding member 520.
[0108] In the present application, by providing the second lifting member 550, the slag sliding member 520 is not only a static slag material transmission channel, but also a flexible component that can be dynamically adjusted according to the motion state of the excavation system 200. By controlling the extension and retraction of the second lifting member 550, the overall length of the slag sliding member 520 can be adjusted in real time to ensure that the slag receiving member 510 can closely follow the lifting and lowering movement of the excavation system 200, thereby reducing the problem of slag material spilling or accumulation caused by height mismatch.
[0109] Exemplarily, the second lifting member 550 may be a lifting cylinder, or other structures that can drive two adjacent slag sliding sleeves 521 to move toward or in the opposite direction, and this embodiment is not limited thereto.
[0110] See also Figure 1 and Fig. 9 In the embodiment of the present application, a plurality of second support members 330 are disposed at the bottom of the first support member 310 , and the second support members 330 are used to support between the first support member 310 and the ground.
[0111] In specific implementation, when the position of the chassis system 300 needs to be fixed, the second support member 330 can be supported on the hardened ground to fix the chassis system 300 and improve the stability of the device. When the chassis system 300 needs to be moved, the second support member 330 can be lifted to move the chassis system 300.
[0112] It should be noted that the second support member 330 may adopt a cylinder structure, and support or move away from the hardened ground through the extension and contraction of the cylinder.
[0113] Furthermore, four second support members 330 may be provided to fix the chassis system 300. The number and layout of the second support members 330 are only given for example, and may be specifically provided according to actual needs, and this embodiment is not limited thereto.
[0114] See also Figure 1 and Fig. 9 In the embodiment of the present application, the lifting system 600 includes a plurality of lifting members 610 , a fixed end of the lifting member 610 is fixedly connected to the first support member 310 , and an output end of the lifting member 610 is connected to the bottom of the first shield 110 .
[0115] It can be understood that the lifting member 610, as a key component connecting the first shield 110 and the first support member 310, can synchronously drive the shield system 100 and the excavation system 200 to rise relative to the chassis system 300, so that the excavation system 200 and the shield system 100 can continue to work and adapt to different excavation surface heights. At the same time, the lifting member 610 is designed to have sufficient bearing capacity to cope with various load requirements during the construction process, to stably support the weight of the shield system 100 and the excavation system 200, and to ensure that no tilting or collapse occurs during the lifting process.
[0116] Exemplarily, the jacking member 610 may be a jacking cylinder, and four jacking cylinders may be provided to stably support the weight of the shield system 100 and the excavation system 200 .
[0117] The embodiment of the present application also provides a shaft construction method, which uses the above-mentioned tunnel boring machine to perform shaft construction, and specifically includes the following steps:
[0118] S101. Expand the cavern before assembling the tunnel boring machine.
[0119] Fig.10This is a schematic diagram of step 1 of the vertical shaft construction method provided in the embodiment of the present application. Fig.10 , dig a cavern capable of accommodating the tunnel boring machine below the vertical shaft to be excavated.
[0120] S102, ground hardening.
[0121] Fig.11 This is a schematic diagram of step 2 of the shaft construction method provided in the embodiment of the present application. Fig.11 Before assembling the TBM, the ground of the cavern is hardened, for example by constructing a foundation to meet the initial requirements for supporting the TBM.
[0122] Fig.12 Schematic diagram of step three of the shaft construction method provided in an embodiment of the present application.
[0123] S103, assembling the tunnel boring machine.
[0124] Specifically, see Fig.12 , the chassis system 300, the slag discharge system 500, the jacking system 600, the excavation system 200, the shield system 100 and the lifting platform 400 are assembled.
[0125] Fig.13 Schematic diagram of step 4 of the shaft construction method provided in an embodiment of the present application.
[0126] S104, moving the assembled tunnel boring machine to the bottom of the shaft to be excavated via the chassis system 300.
[0127] Understandably, see Fig.13 The moving part 320 of the chassis system 300 drives the tunnel boring machine to move to the working position as a whole, and then the tunnel boring machine is fixed at the current position through the second supporting part 330.
[0128] Fig.14 A schematic diagram of step 5 of the shaft construction method provided in an embodiment of the present application; Fig.15 A schematic diagram of step 6 of the shaft construction method provided in an embodiment of the present application; Fig.16 A schematic diagram of step seven of the shaft construction method provided in an embodiment of the present application; Fig.17 Schematic diagram of step eight of the shaft construction method provided in an embodiment of the present application.
[0129] S105 , the jacking system 600 pushes upward, and the cutting member 210 excavates the shaft to be excavated.
[0130] Specifically, see Figures 14 to 17, the corresponding second drive assembly 130 drives the second shield 120 located in the center area to switch to the avoidance position, the first drive assembly 220 drives the cutting piece 210 to move to the center area and extend the shield system 100, and then the cutting piece 210 is used to excavate the center area of the shaft to be excavated. After the excavation of the center area is completed, the cutting piece 210 is retracted into the shield system 100. At this time, the corresponding second drive assembly 130 drives the second shield 120 located in the edge area to switch to the avoidance position, the first drive assembly 220 drives the cutting piece 210 to move to the edge area and extend the shield system 100, and then the cutting piece 210 is used to excavate the edge area of the shaft to be excavated. In this process, as the cutting piece 210 excavates, the jacking system 600 cooperates with the excavation system 200 and the shield system 100 to push upward, so as to achieve excavation and support, prevent soil collapse, and improve construction safety until the excavation of the shaft is completed.
[0131] S106. Provide permanent support for the inner wall of the shaft.
[0132] Specifically, during the upward movement of the excavation system 200 and the shield system 100, the pipe segments are transported upward by the lifting platform 400, and then installed on the inner wall of the excavated shaft manually or by machine, and after the anchor rods are inserted, concrete is poured to achieve permanent support for the shaft.
[0133] Fig.18 Schematic diagram of step nine of the shaft construction method provided in an embodiment of the present application.
[0134] S107, moving the tunnel boring machine out of the working area.
[0135] It should be noted that see Fig.18 At this time, the tunnel boring machine has completed the shaft excavation operation, and the shield system 100 and the excavation system 200 are driven to descend through the jacking system 600, and the lifting platform 400 is also lowered at the same time, and then the chassis system 300 drives the tunnel boring machine as a whole to move out of the working area to complete the construction.
[0136] In summary, the tunnel boring machine provided in the present application drives the overall movement of the tunnel boring machine by setting a chassis system 300. A lifting platform 400 is installed on the chassis system 300, and the transportation of the pipe segment is realized by the lifting platform 400. By setting a cutting piece 210 and a first driving assembly 220 connected to the cutting piece 210, the cutting piece 210 can move along the first direction and the second direction under the drive of the first driving assembly 220, and can rotate around the second direction and the third direction, so as to realize the multi-degree-of-freedom movement of the cutting piece 210 to complete the shaft excavation operation in different areas. By setting a first shield 110, support for the inner wall of the shaft is realized, and by setting a plurality of second driving assemblies 130 to drive each second shield 120 to switch between the closed position, the avoidance position and the support position, the second shield 120 can avoid the cutting piece 210 and provide real-time support for the top wall of the shaft. Therefore, through the zonal excavation of the cutting piece 210 and the synchronous and zonal support of the excavation system 200, soil collapse is avoided and construction safety is improved.
[0137] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A tunnel boring machine, It is characterized in that The invention comprises a shield system (100), an excavation system (200) and a chassis system (300), wherein a lifting platform (400) is installed on the chassis system (300), and the lifting platform (400) is used to transport pipe segments; The excavation system (200) comprises a cutting member (210) and a first driving assembly (220) connected to the cutting member (210), wherein the first driving assembly (220) is used to drive the cutting member (210) to move along a first direction and a second direction, and to drive the cutting member (210) to rotate around a second direction and a third direction, wherein the first direction, the second direction and the third direction intersect each other; The shield system (100) comprises a first shield (110), a plurality of second shields (120) and a plurality of second drive assemblies (130), wherein the first shield (110) is used to support the inner wall of the shaft, and the first shield (110) is connected to the first drive assembly (220); The second drive assembly (130) is hinged to the second shield (120) in a one-to-one correspondence, and each of the second drive assemblies (130) is hinged to the first shield (110). The second drive assembly (130) is used to drive the second shield (120) to move relative to the first shield (110) so that the second shield (120) switches between a closed position, an avoidance position and a support position. In the closed position, one side of the second shield (120) contacts one side of the first shield (110); in the avoidance position, the second shield (120) flips toward the first shield (110) to form an entrance (140) for the cutting piece (210) to extend or retract the shield system (100); in the support position, the second shield (120) rises relative to the first shield (110) to support the inner top wall of the shaft.
2. The tunnel boring machine according to claim 1, It is characterized in that The second driving assembly (130) comprises two first driving members (131) and a second driving member (132) located between the two first driving members (131), the fixed end of the first driving member (131) is connected to the first shield (110), and the output end of the first driving member (131) is connected to an end of the second shield (120) close to the first shield (110); The fixed end of the second driving member (132) is connected to the first shield (110), and the output end of the second driving member (132) is connected to an end of the second shield (120) away from the first shield (110).
3. The tunnel boring machine according to claim 1, It is characterized in that The first driving assembly (220) comprises a first displacement member (221), a second displacement member (222), a rotating member (223) and a first lifting member (224); the first displacement member (221) is fixedly connected to the inner side wall of the first shield (110); The rotating member (223) is hinged to the cutting member (210), and the rotating member (223) is connected to the second displacement member (222), and the rotating member (223) is used to drive the cutting member (210) to rotate around the third direction; One end of the first lifting member (224) is hinged to the cutting member (210), and the other end is hinged to the rotating member (223), and the first lifting member (224) is used to drive the cutting member (210) to rotate around the hinge point between the cutting member (210) and the rotating member (223); The second displacement member (222) is slidably connected to the first displacement member (221), and the second displacement member (222) is configured to slide along the extension direction of the first displacement member (221) or the extension direction of the second displacement member (222) to drive the cutting member (210) to move along the first direction or the second direction.
4. The tunnel boring machine according to any one of claims 1 to 3, It is characterized in that A lifting system (600) is connected between the bottom of the first shield (110) and the chassis system (300), and the lifting system (600) is used to drive the shield system (100) and the excavation system (200) to rise or fall relative to the chassis system (300).
5. The tunnel boring machine according to claim 4, It is characterized in that The chassis system (300) comprises a first support member (310) and a moving member (320) connected to the first support member (310); the moving member (320) is located at the bottom of the first support member (310); and the moving member (320) is used to drive the first support member (310) to move.
6. The tunnel boring machine according to claim 5, It is characterized in that The invention also comprises a slag discharge system (500), wherein the slag discharge system (500) comprises a slag receiving part (510), a slag sliding part (520) and a transport part (530), wherein the slag receiving part (510) is located below the cutting part (210), and a projection of the slag receiving part (510) toward the cutting part (210) covers the cutting part (210); One end of the slag sliding member (520) is connected to the slag receiving member (510), and the other end is connected to the first supporting member (310); The transport member (530) is installed on the first support member (310), and a transition material receiving member (540) is provided between the slag sliding member (520) and the transport member (530), so that the slag falling after the cutting member (210) is operated will fall onto the transport member (530) through the slag receiving member (510), the slag sliding member (520) and the transition material receiving member (540) in sequence.
7. The tunnel boring machine according to claim 6, It is characterized in that The slag sliding member (520) comprises a plurality of slag sliding sleeves (521) which are sleeved in sequence, and each of the slag sliding sleeves (521) is slidably connected in sequence.
8. The tunnel boring machine according to claim 7, It is characterized in that A second lifting member (550) is connected between two adjacent slag sliding sleeves (521), and the second lifting member (550) is configured to drive the two adjacent slag sliding sleeves (521) to move toward or in the opposite direction, so that the slag receiving member (510) follows the excavation system (200) to descend or ascend through the slag sliding member (520).
9. The tunnel boring machine according to claim 5, It is characterized in that A plurality of second support members (330) are arranged at the bottom of the first support member (310), and the second support members (330) are used to be supported between the first support member (310) and the ground.
10. The tunnel boring machine according to claim 5, It is characterized in that The lifting system (600) comprises a plurality of lifting members (610), wherein a fixed end of each lifting member (610) is fixedly connected to the first support member (310), and an output end of each lifting member (610) is connected to the bottom of the first shield (110).