Capacity double-layer optimization method for polar region clean comprehensive energy system
Through a double-layer optimization model, combined with the Kepler algorithm and the CPLEX solver, the capacity of wind power, photovoltaic, hydrogen energy storage and electrochemical energy storage equipment in the polar clean integrated energy system is coordinated and optimized, and the local optimal and electrochemical energy storage equipment capacity in the existing technology is solved. The problem of slow convergence speed is solved and the continuous and reliable energy supply of green energy is achieved.
Patent Information
- Application Number
- CN202410830172.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-22
AI Technical Summary
Existing technologies have problems with local optimal states, slow convergence speeds, and lack of population diversity in polar clean integrated energy systems, resulting in poor energy system optimization results.
Using a two-layer optimization model, the upper-layer economic configuration optimization model is based on the Kepler algorithm and the lower-layer reliable operation optimization model uses the CPLEX solver to coordinate and iterate to obtain the optimal configuration plan.
It achieves the optimized ratio of the capacities of wind power generation, photovoltaic power generation, hydrogen energy storage and electrochemical energy storage, ensuring the continuous and reliable energy supply of green renewable energy, avoiding local optimal conditions and improving the convergence speed.
Smart Images

Figure CN118822005A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind-solar-hydrogen storage capacity optimization configuration, and in particular to a capacity double-layer optimization method for a polar clean integrated energy system. Background Art
[0002] At present, almost all scientific research stations on the Antarctic continent rely on diesel generators for power supply, which has caused serious environmental pollution and brought serious impacts on the native organisms and ecological environment of Antarctica. On the other hand, in extremely low temperature environments, the efficiency of diesel generators has dropped significantly, and maintenance and cleaning work has become extremely difficult.
[0003] The wind in the Antarctic region is strong, the polar day can last for several months, and there is plenty of sunlight during the polar day. Wind power and photovoltaic power generation technologies have the advantages of zero emissions, renewable energy, and abundant resources. They can effectively reduce carbon emissions in the Antarctic region and protect the environment. Hydrogen, as a clean energy carrier, has the advantages of convenient storage and high energy density. Using surplus wind and solar resources to generate electricity for hydrogen preparation and storage can effectively solve the problem of insufficient seasonal energy supply in the Antarctic region. Combined with a chemical battery device that can be flexibly charged and discharged, a set of complementary green energy systems can be constructed to ensure that the Antarctic research station can obtain a stable power supply under any weather conditions and improve the reliability and stability of the power supply system.
[0004] In the capacity optimization problem for polar clean integrated energy systems, metaheuristic algorithms have many problems and defects, such as being prone to falling into local optimal states, slow convergence, and lack of population diversity. The electrolyzer for hydrogen production requires a certain power threshold to ensure reliable startup and maintenance of the electrolysis process. The equipment takes a certain amount of time to start and stop, and the fuel cell in the hydrogen energy storage system does not have the function of fast charging and discharging like a battery, so it is more suitable for power supply after large-scale storage.
[0005] Therefore, the present invention aims to provide a two-layer capacity optimization method for the polar clean integrated energy system, which optimizes the capacity ratio of each element of wind power generation, photovoltaic power generation, hydrogen energy storage and electrochemical energy storage in the system, and realizes continuous and reliable energy supply relying solely on green renewable energy. Summary of the invention
[0006] In order to overcome the technical defects of the metaheuristic algorithm in the existing energy system capacity optimization method, such as being prone to falling into a local optimal state, slow convergence speed, and lack of population diversity, the present invention provides a two-layer capacity optimization method for a polar clean integrated energy system. The method described in the present invention uses a two-layer optimization model, and performs economic configuration optimization and reliable operation optimization through the upper and lower layers respectively, wherein the upper-layer economic configuration optimization model is solved based on the Kepler algorithm, and the lower-layer reliable operation optimization model is solved using the CPLEX solver, and the upper-layer economic configuration optimization model and the lower-layer reliable operation optimization model are coordinated and cooperated, and the optimal configuration scheme is obtained by continuous iteration.
[0007] The present invention provides a capacity double-layer optimization method for a polar clean integrated energy system, comprising the following steps:
[0008] Step S1, obtaining daily load data, wind speed data, light data and temperature data in polar regions;
[0009] Step S2, constructing a mathematical model of each device within the integrated energy system;
[0010] Step S3: construct a two-layer optimization model of the integrated energy system according to the structure of the integrated energy system; the two-layer optimization model includes an upper-layer economic configuration optimization model and a lower-layer reliable operation optimization model; the upper-layer economic configuration optimization model configures the system equipment capacity with the goal of minimizing the system investment and operation cost, and the lower-layer reliable operation optimization model optimizes the system operation state with the goal of minimizing the system wind and solar power abandonment penalty and load shedding penalty;
[0011] The optimization goal of the upper-level economic configuration optimization model is:
[0012] Objective=F qfh ·365+F qfg ·365+C IN ,
[0013] Objective is the investment and operation cost, including the annual load shedding penalty F qfh , Annualized penalty for abandoned wind power F qfg and total investment cost C IN ;
[0014] Among them, C IN =C If P wMax +C Ig P vMax +C Ix Q XMax +C Iq Q qMax +C Id P djMax +C Ir PrlMax ,
[0015] C If =C f ·r·(1+r) Yf / ((1+r) Yf -1);
[0016] C Ig =C g ·r·(1+r) Yg / ((1+r) Yg -1);
[0017] C Ix =C x ·r·(1+r) Yx / ((1+r) Yx -1);
[0018] C Ir =C r ·r·(1+r) Yr / ((1+r) Yr -1);
[0019] C Id =C d ·r·(1+r) Yd / ((1+r) Yd -1);
[0020] C Iq =C q ·r·(1+r) Yq / ((1+r) Yq -1);
[0021] Total investment cost C IN Including the investment cost of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, depending on the model and capacity of the equipment; wMax , P vMax , Q XMax , P rlMax , P djMax , Q qMax are the purchased capacities of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. If , C Ig , C Ix , C Ir , C Id , C Iq are the annualized investment costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. f , C g , C x , Cr , C d , C q are the purchase costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively; r is the interest rate; Yf, Yg, Yx, Yr, Yd, and Yq are the expected lifespans of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively;
[0022] The constraints of the upper-level economic configuration optimization model include:
[0023] Photovoltaic power generation power constraint: 0≤P v ≤P vMax ,
[0024] Wind power generation power constraint: 0≤P w ≤P wMax ,
[0025] Battery capacity constraint: 0≤Q x ≤Q xMax ,
[0026] Electrolyzer power constraint: 0.5·P djMax ≤P dj ≤P djMax ,
[0027] Fuel cell power constraint: 0.5·P rlMax ≤p rl ≤P rlMax ,
[0028] Hydrogen storage tank capacity constraint: 0≤Q q ≤Q qMax ,
[0029] P v is the current power generation of photovoltaic power, P w is the current power generation of the wind turbine, Q X is the current capacity of the battery, P dj is the current working power of the electrolyzer, P rl is the current working power of the fuel cell, Q q is the current capacity of the hydrogen storage tank. The above formula considers that the electrolyzer and fuel cell operate at efficiencies between 50% and 100% and the threshold power is 50%;
[0030] The optimization goal of the lower layer reliable operation optimization model is:
[0031] F qfh =σ qfh (P load -P L );
[0032]
[0033] F qfh is the load shedding penalty, F qfg Punishment for abandoning scenery, σ qfh is the load shedding penalty factor, σ qfg is the penalty factor for abandoning wind power, P load is the predicted load power, P L is the actual load power;
[0034] The constraints of the lower-level reliable operation optimization model include:
[0035] Power balance constraints:
[0036] P w +P v +P rl +P dsg =P Load -P Lcur +P dj +P chg ,
[0037] P Load is the predicted load power, P Lcur is the load shedding power, P chg is the current charging power of the battery, P dsg is the current discharge power of the battery;
[0038] Battery charging and discharging power constraints:
[0039] 0≤P chg ≤P chgMax ·U e ,
[0040] 0≤P dsg ≤P dsgMax ·(1-U e ),
[0041] P chgMax is the maximum charging power of the battery, P dsgMax is the maximum discharge power of the battery; U e Indicates the charging and discharging status of the battery, and its value is complementary 0 or 1;
[0042] Battery energy storage state constraints at the initial moment:
[0043] Q X0 =0.5·Q XMax ;
[0044] Q X0 is the initial capacity of the battery;
[0045] Battery energy storage state constraints at other times:
[0046]
[0047] Q X (t) is the battery capacity at time t, Q X (t-1) is the battery capacity at time (t-1), η chg is the charging efficiency, η dsg is the discharge efficiency, P chg (t) is the battery charging power at time t, P dsg (t) is the battery discharge power at time t;
[0048] The energy storage state constraints of the hydrogen storage tank at the initial moment:
[0049] Q q0 =0.5·Q qMax ,
[0050] Q q0 is the initial capacity of the hydrogen storage tank;
[0051] Hydrogen tank status constraints at other times:
[0052] Q q (t) = Q q (t-1)+Q E (t)-Q H (t),
[0053] Q q (t) is the capacity of the hydrogen storage tank at time t, Q q (t-1) is the capacity of the hydrogen storage tank at time (t-1), Q E (t) is the amount of hydrogen produced by the electrolyzer at time t, Q H (t) is the hydrogen intake amount of the fuel cell at time t;
[0054] Step S4: Solve the two-layer optimization model in step 3 based on the acquired daily load data, wind speed data, light data and temperature data in the polar region to obtain the optimal capacity configuration result of the integrated energy system.
[0055] Preferably, in step S2, each device inside the integrated energy system includes a wind turbine, a photovoltaic panel, a battery, a fuel cell, an electrolyzer and a hydrogen tank. Preferably, in step S4, the upper economic configuration optimization model is solved based on the Kepler algorithm, and the generated equipment capacity is input into the lower reliable operation optimization model as a constraint condition of the lower model; the lower reliable operation optimization model is solved by the CPLEX solver, with the system abandonment of wind and light penalties and the lowest load shedding penalty as the goal, outputs the operation results, returns to the upper economic configuration optimization model, and updates the capacity configuration plan. The method described in the present invention introduces the Kepler optimization algorithm (KOA), which is a new and reliable physics-based meta-heuristic algorithm for the laws of planetary motion. The search strategy of the Kepler algorithm is inspired by the laws of celestial motion, and its convergence speed is relatively fast. It can find a better solution in a shorter time, and has a strong global search capability during the search process, which can effectively avoid falling into a local optimal state and help to find a better solution.
[0056] Preferably, in step S4, the sub-steps for solving the upper-layer economic configuration optimization model and the lower-layer reliable operation optimization model are:
[0057] Step S4.1, input the acquired daily load data, wind speed data, light data and temperature data of the polar region, determine the population size and the maximum number of iterations, use different capacity configuration schemes to represent different planetary positions in the upper economic configuration optimization model, initialize the positions of each planet and the global optimal value, where the global optimal value is the position of the sun;
[0058] Step S4.2, updating the speed and position of each planet in the upper economic configuration optimization model;
[0059] Step S4.3, bringing the speed and position of each planet in the upper economic configuration optimization model into the lower reliable operation optimization model, running the lower reliable operation optimization model, and returning the obtained fitness value of the lower reliable operation optimization model to the upper economic configuration optimization model;
[0060] Step S4.4, using the fitness value transmitted by the lower reliable operation optimization model, calculate the fitness value of each planet in the upper economic configuration optimization model, that is, the investment and operation cost of the integrated energy system;
[0061] Step S4.5, updating the optimal value of each planet and the global optimal value in the upper economic configuration optimization model;
[0062] Step S4.6, determine whether the maximum number of iterations of the upper-level economic configuration optimization model has been reached. If not, return to step S4.2; if reached, proceed to step S4.7;
[0063] Step S4.7: Output the optimal capacity configuration result.
[0064] Compared with the prior art, the technical solution provided by the present invention has the following technical effects: the method described in the present invention uses a two-layer optimization model, and coordinates the upper-layer economic configuration optimization model and the lower-layer reliable operation optimization model to continuously iterate and obtain the optimal configuration solution; the method described in the present invention starts from the load demand, and according to the characteristics of polar wind and light resources and the performance of power generation and energy storage units, optimizes the capacity of each element of wind power generation, photovoltaic power generation, hydrogen energy storage and electrochemical energy storage in the polar-oriented clean integrated energy system, so that each link can operate in a coordinated manner to achieve continuous and reliable energy supply relying solely on green renewable energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0066] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0067] Figure 1 A flowchart of a capacity double-layer optimization method for a polar clean integrated energy system in a certain embodiment of the present invention;
[0068] Figure 2 A schematic diagram of the coordination between the upper-layer economic configuration optimization model and the lower-layer reliable operation optimization model in a certain embodiment of the present invention;
[0069] Figure 3 It is a schematic diagram of the optimization solution process of the upper-layer economic configuration optimization model and the lower-layer reliable operation optimization model in a certain embodiment of the present invention;
[0070] Figure 4 This is a diagram showing the operation results of the capacity optimization configuration of the integrated energy system on a typical polar day in a certain embodiment;
[0071] Figure 5 This is a diagram showing the operation result of the capacity optimization configuration of the comprehensive energy system on the day with the maximum annual sunlight amplitude in a certain embodiment;
[0072] Figure 6 This is a diagram showing the operation results of the capacity optimization configuration of the comprehensive energy system on a typical day of polar night in a certain embodiment;
[0073] Figure 7 This is a diagram showing the operation result of the integrated energy system capacity optimization configuration on the day with the largest wind force throughout the year in a certain embodiment;
[0074] Figure 8 This is the optimal configuration of the capacity of the comprehensive energy system for the day with the highest load throughout the year and considering 20% wind turbine failures in a certain embodiment. DETAILED DESCRIPTION
[0075] In order to more clearly understand the above-mentioned objectives, features and advantages of the present invention, the scheme of the present invention will be further described below. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0076] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present invention, rather than all of the embodiments.
[0077] The following is combined with Figures 1 to 8 The specific embodiments of the present invention are described in detail.
[0078] In one embodiment, Figure 1 As shown, a capacity two-layer optimization method for polar clean integrated energy system includes the following steps:
[0079] Step S1, obtaining daily load data, wind speed data, light data and temperature data in polar regions;
[0080] Step S2, constructing a mathematical model of each device within the integrated energy system;
[0081] Since the low temperature environment has a certain influence on the actual output of the wind turbine, the output power of the wind turbine is corrected, and the correction coefficient is 0.7, then the mathematical model of the wind turbine is:
[0082]
[0083] P W is the output power of the wind turbine, P N is the rated output power of the wind turbine, v is the wind speed at that time, V ci is the cut-in wind speed of the wind turbine, V co is the cut-out wind speed of the wind turbine, V N is the rated wind speed of the wind turbine;
[0084] The influence of low temperature environment on the output characteristics of photovoltaic panels is negligible, and the mathematical model of photovoltaic panels is:
[0085]
[0086] P v (t) is the output power of the photovoltaic panel, P STCis the output power of the photovoltaic panel under rated conditions, G(t) is the actual light radiation intensity on the photovoltaic panel, G STC is the rated light intensity, T(t) is the actual temperature of the photovoltaic panel, T STC is the rated temperature of the photovoltaic panel, k is the temperature variation coefficient of the photovoltaic panel;
[0087] The mathematical model of the battery is:
[0088]
[0089] Q X (t) is the battery capacity at time t, Q X (t-1) is the battery capacity at time (t-1), η chg is the charging efficiency, η dsg is the discharge efficiency, P chg (t) is the battery charging power at time t, P dsg (t) is the battery discharge power at time t;
[0090] The mathematical model of the fuel cell is:
[0091] P rl =η rl Q H / μ,
[0092] P rl is the power of the fuel cell, η rl is the fuel cell efficiency, Q H is the amount of hydrogen intake, μ is the amount of hydrogen required for the fuel cell to produce 1kW·h of electricity;
[0093] The mathematical model of the electrolyzer is:
[0094] Q E =η dj P dj ξ,
[0095] Q E is the amount of hydrogen produced, η dj is the electrolyzer efficiency, P dj is the input power of the electrolyzer, ξ is the amount of hydrogen produced by 1kW·h of electricity; the capacity of the hydrogen storage tank at time t is Q q (t) is:
[0096] Q q (t) = Q q (t-1)+Q E (t)-Q H (t),
[0097] Q q (t-1) is the capacity of the hydrogen storage tank at time (t-1), QE (t) is the amount of hydrogen produced by the electrolyzer at time t, Q H (t) is the hydrogen intake amount of the fuel cell at time t;
[0098] Step S3: construct a two-layer optimization model of the integrated energy system according to the structure of the integrated energy system; the two-layer optimization model includes an upper-layer economic configuration optimization model and a lower-layer reliable operation optimization model; the upper-layer economic configuration optimization model configures the system equipment capacity with the goal of minimizing the system investment and operation cost, and the lower-layer reliable operation optimization model optimizes the system operation state with the goal of minimizing the system wind and solar power abandonment penalty and load shedding penalty;
[0099] The optimization goal of the upper-level economic configuration optimization model is:
[0100] Objective=F qfh ·365+F qfg ·365+C IN ,
[0101] Objective is the investment and operation cost, including the annual load shedding penalty F qfh , Annualized penalty for abandoned wind power F qfg and total investment cost C IN ;
[0102] Among them, C IN =C If P wMax +C Ig P vMax +C Ix Q XMax +C Iq Q qMax +C Id P djMax +C Ir P rlMax ,
[0103] C If =C f ·r·(1+r) Yf / ((1+r) Yf -1);
[0104] C Ig =C g ·r·(1+r) Yg / ((1+r) Yg -1);
[0105] C Ix =C x ·r·(1+r) Yx / ((1+r) Yx -1);
[0106] C Ir =C r ·r·(1+r) Yr / ((1+r) Yr -1);
[0107] C Id =C d ·r·(1+r) Yd / ((1+r) Yd -1);
[0108] C Iq =C q ·r·(1+r) Yq / ((1+r) Yq -1);
[0109] Total investment cost C IN Including the investment cost of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, depending on the model and capacity of the equipment; wMax , P vMax , Q XMax , P rlMax , P djMax , Q qMax are the purchased capacities of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. If , C Ig , C Ix , C Ir , C Id , C Iq are the annualized investment costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. f , C g , C x , C r , C d , C q are the purchase costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively; r is the interest rate; Yf, Yg, Yx, Yr, Yd, and Yq are the expected lifespans of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively;
[0110] The constraints of the upper-level economic configuration optimization model include:
[0111] Photovoltaic power generation power constraint: 0≤P v ≤P vMax ,
[0112] Wind power generation power constraint: 0≤P w ≤P wMax ,
[0113] Battery capacity constraint: 0≤Q X ≤Q XMax ,
[0114] Electrolyzer power constraint: 0.5·P djMax ≤P dj ≤P djMax ,
[0115] Fuel cell power constraint: 0.5·P rlMax ≤P rl ≤P rlMax,
[0116] Hydrogen storage tank capacity constraint: 0≤Q q ≤Q qMax ,
[0117] P v is the current power generation of photovoltaic power, P w is the current power generation of the wind turbine, Q X is the current capacity of the battery, P dj is the current working power of the electrolyzer, P rl is the current working power of the fuel cell, Q q is the current capacity of the hydrogen storage tank. The above formula considers that the efficiency of the electrolyzer and fuel cell is between 50% and 100%, and the threshold power is 50%;
[0118] The optimization goal of the lower layer reliable operation optimization model is:
[0119] F qfh =σ qfh (P load -P L );
[0120]
[0121] F qfh is the load shedding penalty, F qfg Punishment for abandoning scenery, σ qfh is the load shedding penalty factor, σ qfg is the penalty factor for abandoning wind power, P load is the predicted load power, P L is the actual load power;
[0122] The constraints of the lower-level reliable operation optimization model include:
[0123] Power balance constraints:
[0124] P w +P v +P rl +P dsg =PLoad -P Lcur +P dj +P chg ,
[0125] P Load is the predicted load power, P Lcur is the load shedding power, P chg is the current charging power of the battery, P dsg is the current discharge power of the battery;
[0126] Battery charging and discharging power constraints:
[0127] 0≤P chg ≤P chgMax ·U e ,
[0128] 0≤P dsg ≤P dsgMax ·(1-U e ),
[0129] P chgMax is the maximum charging power of the battery, P dsgMax is the maximum discharge power of the battery; U e Indicates the charging and discharging status of the battery, and its value is complementary 0 or 1;
[0130] Battery energy storage state constraints at the initial moment:
[0131] Q X0 =0.5·Q XMax ;
[0132] Q X0 is the initial capacity of the battery;
[0133] Battery energy storage state constraints at other times:
[0134]
[0135] Q X (t) is the battery capacity at time t, Q X (t-1) is the battery capacity at time (t-1), η chg is the charging efficiency, η dsg is the discharge efficiency, P chg (t) is the battery charging power at time t, P dsg (t) is the battery discharge power at time t;
[0136] The energy storage state constraints of the hydrogen storage tank at the initial moment:
[0137] Q q0 =0.5·Q qMax ,
[0138] Q q0 is the initial capacity of the hydrogen storage tank;
[0139] Hydrogen tank status constraints at other times:
[0140] Q q (t) = Q q (t-1)+Q E (t)-Q H (t),
[0141] Q q (t) is the capacity of the hydrogen storage tank at time t, Q q (t-1) is the capacity of the hydrogen storage tank at time (t-1), Q E (t) is the amount of hydrogen produced by the electrolyzer at time t, Q H (t) is the hydrogen intake amount of the fuel cell at time t;
[0142] Step S4, solve the two-layer optimization model in step 3 based on the daily load data, wind speed data, light data and temperature data of the polar regions that have been obtained, and obtain the optimal capacity configuration result of the integrated energy system. Specifically, the upper economic configuration optimization model is solved based on the Kepler algorithm, and the generated equipment capacity is input into the lower reliable operation optimization model as the constraint condition of the lower model; the lower reliable operation optimization model is solved by the CPLEX solver, with the system abandonment wind abandonment penalty and load shedding penalty as the minimum goal, output the operation result, return to the upper economic configuration optimization model, and update the capacity configuration plan. The method described in the present invention introduces the Kepler optimization algorithm (KOA), which is a new and reliable physics-based meta-heuristic algorithm for the laws of planetary motion. The search strategy of the Kepler algorithm is inspired by the laws of celestial motion, and its convergence speed is relatively fast. It can find a better solution in a shorter time, and has a strong global search capability during the search process, which can effectively avoid falling into a local optimal state and help to find a better solution.
[0143] Based on the above embodiments, in a preferred embodiment, Figure 3 As shown, the sub-steps for solving the upper economic configuration optimization model and the lower reliable operation optimization model in step S4 are:
[0144] Step S4.1, input the acquired daily load data, wind speed data, light data and temperature data of the polar region, determine the population size and the maximum number of iterations, use different capacity configuration schemes to represent different planetary positions in the upper economic configuration optimization model, initialize the positions of each planet and the global optimal value, where the global optimal value is the position of the sun;
[0145] Step S4.2, updating the speed and position of each planet in the upper economic configuration optimization model;
[0146] Step S4.3, bringing the speed and position of each planet in the upper economic configuration optimization model into the lower reliable operation optimization model, running the lower reliable operation optimization model, and returning the obtained fitness value of the lower reliable operation optimization model to the upper economic configuration optimization model;
[0147] Step S4.4, using the fitness value transmitted by the lower reliable operation optimization model, calculate the fitness value of each planet in the upper economic configuration optimization model, that is, the investment and operation cost of the integrated energy system;
[0148] Step S4.5, updating the optimal value of each planet and the global optimal value in the upper economic configuration optimization model;
[0149] Step S4.6, determine whether the maximum number of iterations of the upper-level economic configuration optimization model has been reached. If not, return to step S4.2; if reached, proceed to step S4.7;
[0150] Step S4.7: Output the optimal capacity configuration result.
[0151] In a specific embodiment, an independent, clean, integrated energy system is established with Zhongshan Station in Antarctica as the background to supply power to three types of loads: the heating system within the station, scientific research equipment, and electricity for the team members' daily use.
[0152] Zhongshan Station in Antarctica is located in the eastern part of the Antarctic continent, with geographical coordinates of approximately 69.38 degrees south latitude and 76.37 degrees east longitude. It is in polar night in April, May, June, July and August every year, with light intensity of 0 and stronger winds.
[0153] According to the polar environment, the life cycle of the integrated energy system is set at 30 years in this experiment. The unit power investment cost of the wind turbine equipment used is 25,000 yuan / kW, the expected life is 30 years, the rated power is 10kW, the hub height is 16m, the cut-in wind speed is 2.75m / s, the rated wind speed is 10m / s, and the cut-out wind speed is 45m / s; the unit power investment cost of the photovoltaic array equipment is 34,660 yuan / kW, the expected life is 10 years, the rated output power is 230W, and the temperature variation coefficient is 0.4%; the unit power investment cost of the battery is 1,200 yuan / kW·h, and the expected life is 10 years; the unit power investment cost of the electrolyzer is 650 yuan / kW, and the expected life is 20 years; the unit power investment cost of the fuel cell is 650 yuan / kW, and the expected life is 20 years; the unit power investment cost of the hydrogen storage tank is 50 yuan / Nm3, and the expected life is 30 years. The battery charging efficiency is 0.92, the battery discharging efficiency is 0.92; the fuel cell working efficiency is 0.85, and the amount of hydrogen required to produce 1kW·h of electricity is 0.127Nm 3 The working efficiency of the electrolyzer is 0.85, and the hydrogen production per 1kW·h of electricity is 0.127Nm3 ; Set the electrolyzer to work for at least 3 hours at a time, and the fuel cell to work for at least 3 hours at a time.
[0154] The population size set for this optimization is 30, the maximum number of iterations is 100, the scheduling time is 1 hour, the scheduling cycle is 24 hours, and the decision variables are: the capacity of wind turbines, photovoltaic panels, batteries, electrolyzers, hydrogen storage tanks, and fuel cells; the fitness function is used as the objective function, and the optimal configuration combination is solved under the condition that the constraints are met, so that the objective function is minimized.
[0155] In order to study the adaptability of the capacity dual-layer optimization method proposed in this invention to the polar environment, five scenarios are set up for comparative analysis. The specific scenarios are as follows:
[0156] Scenario 1: Optimal configuration of integrated energy system capacity on a typical polar day.
[0157] Scenario 2: Optimal configuration of the capacity of the comprehensive energy system on the day with the maximum annual sunlight amplitude.
[0158] Scenario 3: Optimal configuration of integrated energy system capacity on a typical day during polar night.
[0159] Scenario 4: Optimal configuration of the integrated energy system capacity on the day with the strongest wind throughout the year.
[0160] Scenario 5: Optimal configuration of the integrated energy system capacity considering 20% wind turbine failures on the day with the highest load throughout the year.
[0161] Table 1 shows the capacity configuration results for scenarios 1-5
[0162] equipment Capacity Configuration Photovoltaic panels (KW) 80 Wind turbine generator (KW) 83 Battery (kW·h) 180 <![CDATA[Hydrogen storage tank (Nm 3 )]]> 500 Electrolyzer(KW) 79 Fuel cell (kW) 161
[0163] Figures 4 to 8 In the figure, the negative column chart represents the electrolysis hydrogen production and battery charging. When supply exceeds demand, the system is judged to be in a charging state and stores part of the electric energy so that when supply is less than demand, the energy storage system can discharge to provide electric energy for the missing load. The output of wind turbines, photovoltaic panels, fuel cells, and batteries are shown above the axis.
[0164] Figure 4The results of the optimal configuration of the integrated energy system capacity on a typical polar day corresponding to scenario 1 are shown in the following table. According to the analysis of the operating output curve, during the polar day, the system mainly stores hydrogen energy while meeting the load demand, so as to provide electricity for the insufficient load when the photovoltaic output is 0 during the polar night. The specific analysis shows that during 1-5h, the load demand is low, the photovoltaic power generation is very small, and it mainly relies on wind turbines in renewable energy to generate electricity, and the wind turbine output cannot meet all the load demand, so the battery releases electricity to supplement the shortage; 5-10h, with the sunrise in Antarctica, the photovoltaic power generation gradually increases, and the load also gradually increases. The wind and solar units supply power to the load at the same time, and the surplus electricity is used for electrolysis to prepare hydrogen; 10-15h, during this period, the wind and solar resources are abundant, and the wind and solar units supply power to the load at the same time, and the surplus electricity is used for electrolysis to prepare hydrogen and charge the battery; 15-24h, the light intensity gradually decreases. During this period, in order to ensure the long-term normal operation of the integrated energy system, sufficient wind resources and the electricity stored in the battery are used to charge the hydrogen storage system while meeting the load demand.
[0165] Figure 5 This is the operating result of the optimal configuration of the comprehensive energy system capacity on the day with the maximum annual sunlight amplitude in scenario 2. Analysis of the operating output curve shows that the system mainly stores hydrogen energy while meeting the load demand.
[0166] Figure 6 The results of the optimal configuration of the integrated energy system capacity on a typical polar night day in scenario 3 are shown in the figure. Analysis of the operating output curve shows that during the polar night, the wind speed is high and the output of the photovoltaic unit is 0. When the wind turbine output is insufficient to supply the load, the fuel cell is used as the main energy supply device. When the wind turbine output is greater than the load, the wind turbine and the battery together supply energy to the load, and the surplus electricity is used for electrolysis to produce hydrogen.
[0167] Figure 7 This is the operating result of the optimal configuration of the integrated energy system capacity on the day with the highest wind speed throughout the year corresponding to Scenario 4. Analysis of the operating output curve shows that the output power of the wind turbine remains at the maximum value throughout the day, mainly storing hydrogen energy and charging the battery while meeting the load demand.
[0168] Figure 8 For scenario 5, the day with the highest load of the year is selected, and the operating results when 20% of the wind turbines fail are considered. The load reaches the maximum during the polar night of the year. As can be seen from the figure, when the output of 20% of the wind turbines is 0, the system can still operate stably and continuously. Figure 6 , the output of the fuel cell increased significantly. It can be seen that when there is a fault in the power generation equipment, the battery and fuel cell can be used as backup energy to supply power to the load, ensuring that the life and scientific research work of the Zhongshan Station staff are not affected, thus ensuring the sustainability and reliability of the system.
[0169] Based on the above analysis, it can be concluded that the two-layer planning model of the independent integrated energy system enables the power supply system to meet the coordinated operation of various equipment under different polar environmental conditions, while selecting the most appropriate equipment capacity, minimizing the system's abandonment of wind and solar power and load shedding, and achieving optimal reliability and sustainability.
[0170] The above is only a specific implementation of the present invention, which enables those skilled in the art to understand or implement the present invention. Although detailed descriptions are given with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments, and they should all be covered by the protection scope of the claims.
Claims
1. A two-layer capacity optimization method for polar clean integrated energy systems. It is characterized in that The steps include: Step S1, obtaining daily load data, wind speed data, light data and temperature data in polar regions; Step S2, constructing a mathematical model of each device within the integrated energy system; Step S3: construct a two-layer optimization model of the integrated energy system according to the structure of the integrated energy system; the two-layer optimization model includes an upper-layer economic configuration optimization model and a lower-layer reliable operation optimization model; the upper-layer economic configuration optimization model configures the system equipment capacity with the goal of minimizing the system investment and operation cost, and the lower-layer reliable operation optimization model optimizes the system operation state with the goal of minimizing the system wind and solar power abandonment penalty and load shedding penalty; The optimization goal of the upper-level economic configuration optimization model is: Objective=F qfh ·365+F qfg ·365+C IN , Objective is the investment and operation cost, including the annual load shedding penalty F qfh , Annualized penalty for abandoned wind power F qfg and total investment cost C IN ; where C IN = C If P wMax + C Ig P vMax + C Ix Q XMax + C Iq Q qMax + C Id P djMax + C Ir P rlMax , C If = C f ·r·(1 + r) Yf / ((1 + r) Yf - 1); C Ig =C g ·r·(1+r) Yg / ((1+r) Yg -1); C Ix =C x ·r·(1+r) Yx / ((1+r) Yx -1); C Ir =C r ·r·(1+r) Yr / ((1+r) Yr -1); C Id =C d ·r·(1+r) Yd / ((1+r) Yd -1); C Iq =C q ·r·(1+r) Yq / ((1+r) Yq -1); Total investment cost C IN Including the investment cost of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, depending on the model and capacity of the equipment; wMax , P vMax , Q XMax , P rlMax , P djMax , Q qMax are the purchased capacities of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. If , C Ig , C Ix , C Ir , C Id , C Iq are the annualized investment costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively. f , C g , C x , C r , C d , C q are the purchase costs of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively; r is the interest rate; Yf, Yg, Yx, Yr, Yd, and Yq are the expected lifespans of wind turbines, photovoltaic panels, batteries, fuel cells, electrolyzers, and hydrogen storage tanks, respectively; The constraints of the upper-level economic configuration optimization model include: Photovoltaic power generation power constraint: 0≤P v ≤P vMax , Wind power generation power constraint: 0≤P w ≤P wMax , Battery capacity constraint: 0≤Q X ≤Q XMax , Electrolyzer power constraint: 0.5·P djMax ≤P dj ≤P djMax , Fuel cell power constraint: 0.5·P rlMax ≤P rl ≤P rlMax , Hydrogen storage tank capacity constraint: 0≤Q q ≤Q qMax , P v is the current power generation of photovoltaic power, P w is the current power generation of the wind turbine, Q X is the current capacity of the battery, P dj is the current working power of the electrolyzer, P rl is the current working power of the fuel cell, Q q is the current capacity of the hydrogen storage tank. The above formula considers that the electrolyzer and fuel cell operate at efficiencies between 50% and 100% and the threshold power is 50%; The optimization goal of the lower layer reliable operation optimization model is: F qfh =σ qfh (P load -P L ); F qfh is the load shedding penalty, F gfg Punishment for abandoning scenery, σ qfh is the load shedding penalty factor, σ qfg P is the penalty factor for abandoning wind power, load is the predicted load power, P L is the actual load power; The constraints of the lower-level reliable operation optimization model include: Power balance constraints: P w +P v +P rl +P dsg =P Load -P Lcur +P dj +P chg , P Load is the predicted load power, P Lcur is the load shedding power, P chg is the current charging power of the battery, P dsg is the current discharge power of the battery; Battery charging and discharging power constraints: 0≤P chg ≤P chgMax ·IN e , 0≤P dsg ≤P dsgMax ·(1-U e ), P chgMax is the maximum charging power of the battery, P dsgMax is the maximum discharge power of the battery; U e Indicates the charging and discharging status of the battery, and its value is complementary 0 or 1; Battery energy storage state constraints at the initial moment: Q X0 =0.5·Q XMax : Q X0 is the initial capacity of the battery; Battery energy storage state constraints at other times: Q X (t) is the battery capacity at time t, Q X (t-1) is the battery capacity at time (t-1), η chg is the charging efficiency, η dsg is the discharge efficiency, P chg (t) is the battery charging power at time t, P dsg (t) is the battery discharge power at time t; The energy storage state constraints of the hydrogen storage tank at the initial moment: Q q0 =0.5·Q qMax , Q q0 is the initial capacity of the hydrogen storage tank; Hydrogen tank status constraints at other times: Q q (t)=Q q (t-1)+Q E (t)-Q H (t), Q q (t) is the capacity of the hydrogen storage tank at time t, Q q (t-1) is the capacity of the hydrogen storage tank at time (t-1), Q E (t) is the amount of hydrogen produced by the electrolyzer at time t, Q H (t) is the hydrogen intake amount of the fuel cell at time t; Step S4: Solve the two-layer optimization model in step 3 based on the acquired daily load data, wind speed data, light data and temperature data in the polar region to obtain the optimal capacity configuration result of the integrated energy system.
2. According to claim 1, a capacity double-layer optimization method for polar clean integrated energy system, It is characterized in that In step S2, the internal equipment of the integrated energy system includes a wind turbine, a photovoltaic panel, a battery, a fuel cell, an electrolyzer and a hydrogen tank.
3. According to claim 2, a capacity double-layer optimization method for polar clean integrated energy system, It is characterized in that In step S4, the upper-level economic configuration optimization model is solved based on the Kepler algorithm, and the generated equipment capacity is input into the lower-level reliable operation optimization model as a constraint condition of the lower-level model; The lower-level reliable operation optimization model is solved by the CPLEX solver, with the goal of minimizing the system’s wind and solar power abandonment penalties and load shedding penalties. The operation results are output and returned to the upper-level economic configuration optimization model to update the capacity configuration plan.
4. According to claim 3, a capacity double-layer optimization method for polar clean integrated energy system, It is characterized in that In step S4, the sub-steps for solving the upper-level economic configuration optimization model and the lower-level reliable operation optimization model are: Step S4.1, input the acquired daily load data, wind speed data, light data and temperature data of the polar region, determine the population size and the maximum number of iterations, use different capacity configuration schemes to represent different planetary positions in the upper economic configuration optimization model, initialize the positions of each planet and the global optimal value, where the global optimal value is the position of the sun; Step S4.2, updating the speed and position of each planet in the upper economic configuration optimization model; Step S4.3, bringing the speed and position of each planet in the upper economic configuration optimization model into the lower reliable operation optimization model, running the lower reliable operation optimization model, and returning the obtained fitness value of the lower reliable operation optimization model to the upper economic configuration optimization model; Step S4.4, using the fitness value transmitted by the lower reliable operation optimization model, calculate the fitness value of each planet in the upper economic configuration optimization model, that is, the investment and operation cost of the integrated energy system; Step S4.5, updating the optimal value of each planet and the global optimal value in the upper economic configuration optimization model; Step S4.6, determine whether the maximum number of iterations of the upper-level economic configuration optimization model has been reached. If not, return to step S4.2; if reached, proceed to step S4.7; Step S4.7: Output the optimal capacity configuration result.
Citation Information
Cited By
Zero-carbon building integrated energy system planning method considering energy supply reliability
CN119809872A