Cascade reservoir emergency disposal method for outburst flood danger elimination

Through the cascade reservoir emergency response method for outburst floods, multi-stage and multi-scenario response strategies are used to scientifically allocate flood control resources, solving the problem of disparity in emergency flood control capabilities during outburst floods, and achieving efficient flood disaster management and resource utilization.

CN118822166APending Publication Date: 2024-10-22INST OF MOUNTAIN HAZARDS & ENVIRONMENT CHINESE ACADEMY OF SCI
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410849997.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

When facing a burst flood, the existing technology has a huge disparity in the emergency flood control capabilities of cascade reservoirs, which leads to delays in the implementation of the joint dispatch plan and cannot effectively block or reduce the risk of the flood disaster chain.

Method used

This paper proposes a cascade reservoir emergency response method for outburst floods. By obtaining basic emergency response information, it is divided into a pre-reservoir warning period and a reservoir entry scheduling period. Scheduling plans are configured according to different dispatch scenarios to ensure that the flood control resources of the task reservoir match disaster needs. , adopt a multi-stage, multi-scenario response strategy and scientifically arrange flood control resources to minimize the destructive power of floods.

Benefits of technology

It achieves efficient allocation of flood control resources in cascade reservoirs, prolongs the burst time, mitigates the impact of flood disasters to the maximum extent, and improves the efficiency of emergency decision-making and the economy of calculation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822166A_ABST
    Figure CN118822166A_ABST
Patent Text Reader

Abstract

The invention discloses a cascade reservoir emergency disposal method for outburst flood danger elimination. The invention provides a scene decision-making mechanism aiming at the defect that the prior art focuses on cascade reservoir group collaborative relevance and does not consider great difference of emergency flood control capacities of reservoirs. The method is based on the flood control capacity of a task reservoir, starts from two stages before and after flood storage, and divides three emergency scenes according to the relationship between dangerous case dynamics and flood control resources. Different operation strategies in the aspect of emergency response timeliness are configured for a task reservoir in different scenes, adaptation and connection of emergency responses of all stages are met through different designs of a scheduling target and a scheduling criterion, and dynamic adjustment and efficient implementation of an emergency decision scheme are achieved. The scheduling objective function design constructed in each scheduling scheme generalizes different scene processing tasks, and the objective requirements of reservoir emergency response in different stages are met. According to the method, flood control resources of the cascade reservoirs are highly matched with disaster situations, and emergency dispatching management of the disaster situations at different disposal stages is achieved through the same danger source background.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a flood disaster emergency response technology, in particular to an emergency coordination and dispatching technology for cascade reservoirs facing flood outbursts, belonging to the fields of flood disaster prevention and control technology, water conservancy and hydropower safety technology, and water conservancy environment management resource dispatching technology. Background Art

[0002] The cascade reservoirs in the river basin during the flood season are a typical interconnected flood control system. In the river basin, if a flood occurs that is larger than the verification standard of the upstream reservoir but smaller than the verification standard of the downstream reservoir, it may cause the upstream reservoir to burst, forming an outburst flood in the river basin. The outburst flood imposes additional excessive flood control capacity on the downstream cascade reservoirs, forcing them to assume the emergency flood control task in the face of the outburst flood.

[0003] In the field of cascade reservoir risk management, different risk management scheduling problems have different decision-making pressures and decision-making goals, and belong to different technical problems. General risk management solves the flood control problem of natural floods formed by concentrated precipitation. In essence, it is the flood control regulation of excessive floods formed along the precipitation sequence, and the overall specific sequential increasing characteristics. Accordingly, the focus of the scheduling decision problem is how the reservoir can safely pass the flood season during the precipitation period. Outburst risk management solves the flood control problem of outburst floods. Outburst floods refer to strong excess water flows directly / indirectly caused by multiple risk sources such as geological disasters and engineering failures, and the overall characteristics are rapid outbreak to excess peak. Accordingly, the key shift of the scheduling decision problem is how to effectively block / reduce the disaster chain risk of floods. Therefore, the emergency disposal of cascade reservoirs facing outburst floods is a specific problem in the management of cascade reservoirs in the basin and the prevention and control of flood disasters.

[0004] Prior art ZL2019100106441 discloses a joint emergency dispatching method for a cascade reservoir group. The method first monitors the operation of the two dispatching reservoirs, and then determines the corresponding outflow flow constraints according to the different combinations of dangerous situations, breaches or normal operations, and then determines the discharge capacity status, water inflow status and inflow flood flow of the two dispatching reservoirs in each period. Finally, the trial algorithm is used to forward derive the outflow state variables of each period to solve the water balance formula, and determine the outflow flood flow of the two dispatching reservoirs in each period and its corresponding water storage capacity. Prior art 2023113413586 discloses a flood control optimization dispatching method for a cascade reservoir group based on hierarchical dynamic dispatching rules. The method divides the water level and inflow into zones within the practically possible range according to the different upstream water levels and inflows of each reservoir at different times; determines the decision value of the downstream flow under each combination of all water level and inflow intervals, and the downstream flow decision value is the actual inflow in this period plus the corresponding relative parameters of the hierarchical dynamic scheduling rules; establishes a hierarchical flood control optimization scheduling model for cascade reservoirs, optimizes the relative parameters of the optimal hierarchical dynamic scheduling rules under all combinations of water level intervals and inflow intervals of each reservoir, and compiles the hierarchical dynamic scheduling rule table of each reservoir to control the operation of the reservoir.

[0005] The above-mentioned prior art reflects the common characteristics of the current flood control scheduling schemes for cascade reservoirs, namely, fully considering the synergistic correlation of the cascade reservoir group, combining the hydraulic connection between the units of the cascade reservoir group in the basin, and effectively playing the regulatory role of the reservoir itself and its upstream and downstream related reservoirs. However, in the emergency response of cascade reservoirs facing flood outbursts, there may be a large disparity in the emergency flood control capacity of each reservoir, and the demand and return of implementing the joint scheduling scheme are not matched, which will delay the opportunity. In such cases, the existing technologies cannot solve the corresponding technical problems. Summary of the invention

[0006] The purpose of the present invention is to provide a cascade reservoir emergency disposal method for flood bursting in view of the deficiencies of the prior art.

[0007] To achieve the above object, the technical solution of the present invention is as follows:

[0008] A method for emergency response to cascade reservoirs facing flood outbursts, characterized in that: basic emergency response information provided by the reservoir management is obtained, the basic emergency response information including cascade reservoir data, disaster data, task reservoir data, and emergency response time data; emergency response is divided into two stages, the first stage is the pre-reservoir warning period, and the flood volume value V of the outburst flood is determined. b-flood , each reservoir in the cascade reservoir releases its storage capacity to the maximum extent, and determines the storage capacity V of the task reservoir based on the storage capacity release result s-res , Available storage capacity V available; The second stage is the reservoir scheduling period, in which the scheduling scenarios are divided, and scheduling plans are configured for the task reservoirs in different scheduling scenarios. The scheduling plans include scheduling objectives and scheduling criteria; the scheduling operation of the task reservoir is directed according to the scheduling plans; in the second stage, the scheduling scenarios are divided according to the conditional combinations expressed by the equation group 1,

[0009] V b-flood ≤V available Formula 1-1

[0010] V available <V b-flood ≤kV s-res Formula 1-2

[0011] V b-flood >kV s-res Formula 1-3

[0012] Where k is the comprehensive intervention factor, dimensionless, determined based on the basic information of emergency response, or calculated based on the equation group in formula 2.

[0013]

[0014]

[0015] S-total storage capacity, unit: m 3 ,

[0016] N-The total number of dispatch periods of the total duration T of emergency response, dimensionless, determined according to the basic information of emergency response,

[0017] I n , Q n -Inflow and outflow of the nth dispatch period, unit: m 3 , determined based on basic emergency response information,

[0018] T n - Duration of the nth dispatch period, in h, determined based on the basic information of emergency response;

[0019] The conditional formula 1-1 is divided into a dispatching scenario 100, and a dispatching scheme 100 is configured. In the dispatching scheme 100, the task reservoir takes the smooth flow of its own outflow water as the dispatching target and follows the dispatching criterion of minimum water level change;

[0020] The conditions 1-2 are divided into scheduling scenarios 200, and a scheduling scheme 200 is configured. In the scheduling scheme 200, the task reservoir takes ensuring its own safety as the scheduling goal and follows the scheduling criteria of the lowest maximum water level and the shortest disaster duration;

[0021] Conditions 1-3 are divided into scheduling scenarios 300, and a scheduling scheme 300 is configured. In the scheduling scheme 300, the task reservoir takes delaying its own collapse as the scheduling goal and follows the scheduling criterion of the longest safe operation duration.

[0022] In the emergency response of cascade reservoirs facing flood outbursts, the key to the scheduling decision-making problem is to effectively block / reduce the risk of the disaster chain of floods, that is, to maximize the flood control function of the task reservoir by scientifically arranging the flood control resources that can be deployed, effectively reduce and resolve the destructive power of the huge flood that suddenly and rapidly breaks out to an excessive peak at the task reservoir node, and eliminate the disaster chain that may be induced by the flood within the cascade reservoir as much as possible. At the same time, the overall scheduling plan requires economical calculations and efficient decision-making.

[0023] The emergency disposal method of cascade reservoirs for flood outbursts of the present invention is a multi-stage, multi-scenario response strategy. Before the flood outburst enters the reservoir, it is the early warning period, during which the reservoir flood control resource configuration is completed; after the flood outburst enters the reservoir, it is the scheduling period, during which the decision-making idea of ​​scenario dependence is implemented. First, suitable scheduling scenarios are selected in combination with flood control resources and the actual situation of flood operation, and then emergency disaster reduction needs are identified based on the scheduling scenarios, and a scheduling plan including scheduling targets and scheduling criteria is provided. As a result, the technical solution enables the cascade reservoir flood control resources, the task reservoir flood control operation, and the emergency disaster reduction needs to cooperate with each other, and achieves the common goal of relieving the tense flood control situation of the reservoir or prolonging the time of outburst.

[0024] The present invention also provides an optimization scheme for the above-mentioned cascade reservoir emergency disposal method for flood bursting, which includes different technical improvement directions, which can be implemented simultaneously or independently.

[0025] Optimization 1: To save computing power and improve decision-making efficiency, Formula 2-2 is simplified to Formula 2-3.

[0026]

[0027] Where, U is the Q during the flood outburst process. n >I n The total number of time periods, u is the number of U; Q u 、T u - respectively Q of time period u n 、T n .

[0028] Optimization 2: Further subdivide scenario 200 and configure a more targeted dispatching scheme. In scenario 200, if condition 3-1 is met, it is divided into dispatching scenario 210 and dispatching scheme 210 is configured; if condition 3-2 is met, it is divided into dispatching scenario 220 and dispatching scheme 300 is configured. In dispatching scheme 210, the task reservoir prioritizes its own safety and the dispatching process takes into account the safety dispatching target of the downstream protection zone. The dispatching criteria follow the criteria of the lowest maximum water level and the shortest disaster duration.

[0029]

[0030] In the formula, Q max - Maximum discharge flow of the mission reservoir, unit: m 3 , determined according to the basic information of emergency response; Q out - The discharge flow of the mission reservoir, in m 3 ; T- total duration of emergency response, unit h, determined according to basic information of emergency response; unit- hours converted to seconds, 3600, dimensionless; AV- available capacity of mission reservoir, unit m 3 , determined based on the basic information of emergency response.

[0031] Optimization 3: In the dispatching scheme 300, the generated continuous flood is regarded as a new flood, and the emergency response basic information is updated and then the emergency response stage 1 is re-entered, and V is updated. b-flood , Update the task reservoir and its V s-res With V available , entering the second emergency response phase.

[0032] In optimization 4, scheduling scheme 100, the objective function of the task reservoir is expressed according to formula 4-1, and the water level constraint condition, boundary constraint condition, and flow constraint condition are expressed according to formula 4-2, formula 4-3, and formula 4-4 respectively.

[0033]

[0034] Z down,t <Z t <Z up,t Formula 4-2

[0035]

[0036] Q down,t ≤Q out (t)≤Q up,t Formula 4-4

[0037] Where tT is the current calculation period; ΔZ(t)-the change in the water level Z(t) of the task reservoir in period t, in m; Z t-1 , Z t- are the water level values ​​of the task reservoir at the beginning and end of time period t, in m; Z down,t , Z up,t - are the lower and upper limit water levels of the task reservoir in time period t, corresponding to the flood control limit water level and the verification water level, respectively, in m, determined according to the basic information of emergency response; Z0, Z start - are the water levels of the task reservoir at the beginning and end of the starting period, in meters, determined based on the basic information of emergency response; Z T , Z end - are the water levels of the task reservoir at the beginning and end of the end period, in m; Q down,t , Q up,t - are the upper and lower limit discharges of the task reservoir in time period t, corresponding to the ecological base flow Q base , Maximum safe discharge Q safe , unit m 3 , determined according to the basic information of emergency response; Q out (t)-the discharge flow of the task reservoir in time period t, unit: m 3 .

[0038] In Optimization Five, Dispatching Scheme 210, the objective function of the task reservoir is expressed according to Formula 5-1, and the water level constraint and flow constraint are expressed according to Formula 5-4 and Formula 5-5 respectively.

[0039]

[0040] Z down,t ≤Z(t)≤Z up,t =Z dam Formula 5-4

[0041] Q down,t ≤Q out (t)≤Q up,t =Q max Formula 5-5

[0042] Where, Z(t)-the water level of the task reservoir in time period t, unit: m; T ef -Total duration of disaster at downstream protection point; num tef - Transition factor to record whether the flood control point disaster conditions are met; unit Tstep -The time step corresponding to the flood process is determined based on the basic information of emergency response; Q out (t)-the discharge flow of the task reservoir in time period t, unit: m 3 ;Q space (t)-Q out (t) The corresponding interval flood flow is provided in real time by the reservoir management; Z dol -Dead water level of the mission reservoir, in m, determined based on basic information of emergency response; Z dam-The dam crest elevation of the mission reservoir, in meters, is determined based on the basic information of emergency response.

[0043] In optimization six, dispatching scheme 300, the objective function of the task reservoir is expressed by the equation group of formula 6, and the water level constraint condition and flow constraint condition are expressed by formula 6-4 and formula 5-5 respectively.

[0044] max{T prol Formula 6-1

[0045]

[0046] Z down,t =Z low ≤Z(t)≤Z up,t =Z weir Formula 6-4

[0047] Q down,t ≤Q out (t)≤Q up,t =Q max Formula 5-5

[0048] Where, T prol -Total time of safe operation of the reservoir; num prol -Record the transition factor of whether the reservoir meets the safe operation conditions; unit Tstep -Same as above, indicating the time step corresponding to the flood process, determined according to the basic information of emergency response; H lim - The mission reservoir limit water level that meets the evacuation requirements, in meters, determined based on the basic information of emergency response; Z low -The minimum value of the possible drop in the water level of the task reservoir during the emergency discharge phase, in meters, determined based on the basic information of emergency disposal; Z weir -The elevation of the sub-weir built on the dam top of the mission reservoir, in meters, is determined based on the basic information of emergency response.

[0049] Furthermore, we allow Z low Below dead water level Z dol .

[0050] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The prior art of emergency dispatching and handling of cascade reservoirs focuses on the coordinated dispatching and operation of reservoir groups, ignoring the problem of the disparity in the emergency flood control capabilities of each reservoir, which limits the optimal utilization of flood control resources. Especially when facing upstream flood bursts, it may happen that the reservoir with weak emergency flood control capabilities becomes a constraint on the flood control capabilities of the reservoir with strong capabilities, and the overall flood control capabilities of the reservoir group are "dragged down", missing the optimal period for emergency handling of flood bursts. To solve this problem, the present invention provides a completely different emergency dispatching concept for the emergency handling method of cascade reservoirs facing flood bursts, which is a scenario decision-making mechanism. The method is based on the flood control capacity of the task reservoir, starting from the two stages before and after the flood burst enters the reservoir, dividing the emergency scenarios according to the relationship between the dangerous situation and the flood control resources, configuring different dispatching schemes for different scenarios, seeking the common goal of the actual situation of reservoir flood control operation and the emergency disaster reduction needs, and making the flood control resources of the task reservoir and the cascade reservoir highly adaptable to the disaster situation. The scenario screening function model constructed by the method makes full use of the time difference between the warning time and the flood bursting into the reservoir. The pre-discharge plan set can free up the reservoir capacity in time, alleviate the emergency disposal pressure to the maximum extent, and meet the real-time requirements of disaster emergency response. (2) In different emergency scenarios, the operation strategy of the task reservoir emergency response time is established. Through the different designs of scheduling objectives and scheduling criteria in the scheduling plan, the adaptation and connection of emergency response work at each stage are met, and the efficient implementation and dynamic adjustment of emergency decision-making plans are guided. The design of each specific scheduling objective function solves the generalization of flood burst disposal tasks under different scenarios, meets the objective needs of reservoir emergency response at different stages, and has engineering practicality and versatility. (3) In the design of different schemes, the method of the present invention takes into account the contradictory relationship between limited flood control resources and emergency disaster reduction needs, deeply explores the storage capacity of the task reservoir, maximizes the flood interception time and flood interception volume in the reservoir emergency process, and improves the peak reduction amplitude. The flood bursting flood is guided, dispersed or weakened in a planned and orderly manner to achieve the maximum mitigation / elimination of disaster impacts, and also leaves room for the normal operation of the reservoir in the later stage. (4) The emergency response technology of the present invention is conceived around the characteristics of the upstream flood burst, which is a rapid outbreak to an excessive peak. It makes full use of the time difference between the warning time and the flood burst entering the reservoir. The pre-discharge scheme can free up the reservoir capacity in time, alleviate the emergency response pressure to the greatest extent, and meet the real-time requirements of disaster emergency response. (5) The method of the present invention can implement refined dispatching management for emergency response to disasters in different response periods under the same risk source background. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the scheduling scenario screening process for cascade reservoir emergency response plans for flood outbursts.

[0052] Figure 2 It is a schematic diagram of the simulation process of the emergency response process for outburst floods.

[0053] Figure 3 This is the flood process diagram of event A ((a) and (b) are the stages before and after the flood process, respectively).

[0054] Figure 4 This is the SJK regulation process diagram of the task reservoir for event A ((a) starting water level 2480m, (b) starting water level 2490m).

[0055] Figure 5 This is the flood process diagram of event B and event C ((a) and (b) are the stages before and after the flood process, respectively).

[0056] Figure 6 This is the SJK regulation process diagram of the task reservoir for event B ((a) pre-discharge starts 3 hours before the breach occurs, (b) pre-discharge starts 6 hours before the breach occurs).

[0057] Figure 7 It is the regulation process diagram of the task reservoir SJK for event C ((a) without pre-discharge, (b) with pre-discharge). DETAILED DESCRIPTION

[0058] The preferred embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0059] Embodiment 1

[0060] As shown in the figure, the method of the present invention is used to screen scheduling scenarios in the emergency response plan for cascade reservoirs facing outburst floods.

[0061] There are many reservoirs and dams built in the upper reaches of the Dadu River, of which four reservoirs form a cascade reservoir group, which are arranged along the river direction: XEJ, DW, PSG, and SJK. This section of the river is close to the stratum fold belt and fault zone, and the reservoir group is frequently affected by earthquakes of varying sizes. High-intensity earthquakes will damage the structural functions of the reservoirs, which will be difficult to repair in a short time and may even cause the reservoir to burst. In reservoir burst events of varying degrees, the cascade reservoirs of different sizes composed of four reservoirs often face emergency disposal issues facing burst floods.

[0062] In this example, three disaster events are simulated, among which events B and C are disaster events in different disposal periods under the same risk source background (Table 1), which are used to screen the scheduling scenarios and match the scheduling plans respectively. Figure 1 It is a schematic diagram of the scheduling scenario screening process for cascade reservoir emergency response plans for flood outbursts.

[0063] Table 1 Brief description of risk sources and disaster events

[0064]

[0065] 1. Obtain basic information on emergency response

[0066] Obtain basic emergency response information provided by the reservoir management. Basic emergency response information mainly includes cascade reservoir data, disaster data, mission reservoir data, and emergency response time data. See Table 3.

[0067] 2. Emergency response

[0068] 2.1 Phase 1: Pre-reservoir warning period

[0069] Determine the outburst flood volume V b-flood , arrange each reservoir in the cascade reservoir to release the storage capacity to the maximum extent, and determine the storage capacity V of the task reservoir according to the storage capacity release results s-res , Available storage capacity V available . See Table 3.

[0070] 2.2 Phase 2: Warehouse Scheduling Period

[0071] For each disaster event, the dispatch scenario is selected according to the conditions of the equation group 1. Event A meets the conditions of equation 1-1, so the calculation of k value is omitted. The basic information of emergency response of event C already includes the comprehensive intervention factor k=2, and the basic information of emergency response in event B does not specify the k value, so the k value is calculated according to equation group 2-1 and equation 2-2.

[0072] For event B, in order to save computing power, first simplify equation 2-2 to equation 2-3 (via equation 2-4). In equation 2-3, U is the flood process (see Figure 5 ) n >I n The total number of time periods, u is the number of U, Q u , T u Represents Q of time period u n , T n According to the flood process data, the parameters are substituted into Formula 2-1 and Formula 2-3 to calculate the k value, and k = 2. The calculated data are shown in Table 2.

[0073]

[0074] Table 2 Data related to k value calculation in event B

[0075]

[0076] The screening results of the dispatch scenarios for each disaster event are shown in Table 3.

[0077] Table 3 Partial information data of disaster events A, B and C

[0078]

[0079]

[0080] For each disaster event, a dispatching plan is configured for the task reservoir according to the dispatching scenario determined by screening. The dispatching plan includes dispatching objectives and dispatching criteria.

[0081] The dispatching scenario 100 configures the dispatching scheme 100, requiring the task reservoir to ensure the smooth flow of its own outflow water as the dispatching target and follow the dispatching criterion of minimum water level change.

[0082] Scheduling scenario 200 configures scheduling scheme 200, requiring the task reservoir to ensure its own safety as the scheduling goal and follow the scheduling criteria of the lowest maximum water level and the shortest disaster duration

[0083] The dispatching scenario 300 configures the dispatching scheme 300, requiring the task reservoir to take delaying its own breach as the dispatching goal and follow the dispatching criterion of the longest safe operation duration, that is, the water level does not exceed the limit water level for the longest time.

[0084] The reservoir management party directs the dispatching and operation of each task reservoir according to each dispatching plan.

[0085] Embodiment 2

[0086] Figure 3 is the flood process diagram of event A ((a) and (b) are the stages before and after the flood process, respectively). Figure 4 This is the SJK regulation process diagram of the task reservoir for event A ((a) starting water level 2480m, (b) starting water level 2490m).

[0087] In the first embodiment, the disaster event A (scheduling scenario 100) is designed to dispatch the task reservoir according to the scheduling plan.

[0088] The basic information of emergency disposal of the mission reservoir is obtained (Table 4), and the calculation model is established according to the equation group of formula 4.

[0089] Table 4 Partial information data of disaster event A mission reservoir SJK

[0090]

[0091]

[0092] Model solution: Within the duration T, the real-time dam water level and outflow flow are used as decision variables. The dynamic programming method is used. Based on the inflow flow and constraints, starting from the n=1 scheduling period, the state variables determined in the n-1 period and the n period are forward and reversed to obtain the value range of the current scheduling period. Based on this value range, the water level / storage capacity state variables of the current period are discretized for dynamic programming optimization until the end of the Nth scheduling period, and the feasible solution of the reservoir scheduling objective function of the emergency scenario task is obtained. Results are shown in Figure 4 . Figure 2 It is a schematic diagram of the simulation process of the emergency response process for outburst floods.

[0093] Embodiment 3

[0094] Figure 5 is the flood process diagram of event B and event C ((a) and (b) are the outburst flood process and its evolution to the mission reservoir SJK, respectively). Figure 6 This is the SJK regulation process diagram of the task reservoir for event B ((a) pre-discharge starts 3 hours before the breach occurs, (b) pre-discharge starts 6 hours before the breach occurs).

[0095] In the first embodiment, the disaster event B (scheduling scenario 200) is designed to dispatch the task reservoir according to the scheduling plan.

[0096] The basic information of emergency disposal of the task reservoir is obtained (see Table 5), and the adaptive dispatching scenario is further calculated and selected according to the equation group of formula 3. The results show that it meets the conditions of formula 3-1, belongs to dispatching scenario 210, and is adapted to dispatching scheme 210.

[0097] Table 5 Partial information data of disaster event B mission reservoir SJK

[0098]

[0099] The calculation model is established according to the equation group of formula 5. The model solution process refers to the corresponding part of Example 2, and the results are shown in Figure 6 .

[0100] Embodiment 4

[0101] Figure 5 is the flood process diagram of event B and event C, Figure 7 This is the SJK regulation process diagram of the task reservoir for event C ((a) no pre-discharge throughout the process, (b) pre-discharge begins when a breach occurs upstream).

[0102] In the first embodiment, the disaster event C (scheduling scenario 200) is designed to dispatch the task reservoir according to the scheduling plan.

[0103] Obtain the basic information of emergency disposal of the task reservoir (see Table 6), and further calculate and select the appropriate dispatching scenario according to the equation group of formula 3. The results show that it meets the conditions of formula 3-2, belongs to the dispatching scenario 220, and is suitable for the dispatching scheme 300. The calculation model is established according to the equation group of formula 5-5 and formula 6. The model solution process refers to the corresponding part of Example 2, and Z is allowed in the solution. low Below dead water level Z dol The results are shown in Figure 7 .

[0104] Table 6 Partial information data of disaster event C mission reservoir SJK

[0105]

[0106] Comparative analysis:

[0107] By comparing the simulation scheduling process of the third and fourth embodiments, it can be seen that, in the face of the same flood risk source background, the method of the present invention can first use key parameters to identify the characteristics of the disaster in different treatment periods, and adapt the appropriate emergency treatment scene for it. Furthermore, in different treatment scenes, because of different treatment strategies, different height criteria and objective functions are configured, the response results of the disaster are different. Specifically as follows:

[0108] Under ideal conditions, management personnel promptly discover and identify dangerous situations, enter the dispatching scene 200, and configure the dispatching plan 200. Figure 6 It is shown that during the regulation process of Example 3, the water level sequences of both first dropped to the lowest level (i.e., 2464.6 and 2463.7 m, respectively), and then gradually rose until reaching the peak values ​​of 2509.5 and 2509.1 m. Obviously, these two water level diagrams are slightly lower than the dam crest elevation, indicating that this emergency measure can capture sudden floods and avoid reservoir overflow damage. In addition, compared with the constant flow in Figure a, the two-stage release process in Figure b minimizes the river pressure by shortening the duration of the additional flood released, and its flow process can be regarded as an effective constraint to reduce catastrophic consequences. When the management personnel fail to respond to the dangerous situation in time, the scheduling scenario 300 is entered and the scheduling plan 300 is configured. Figure 7 The regulation process of Example 4 is shown. Figure a shows the operation process of starting the treatment when the dam-breaking flood reaches the control point of the SKJ reservoir. The regulated water level begins to rise gradually and reaches the dam crest elevation at 23:20. At this time, the SJK reservoir is overtopping. This period can be used as the minimum resistance time for the flood. Figure b shows that the SJK reservoir starts pre-discharge when the upstream burst occurs, and the storage capacity is urgently emptied with the maximum discharge capacity. Its regulated water level drops to 2471.5m at the end of the pre-discharge period. Since the amount of water released is greater than the amount of water inflow, the water level continues to drop to 2468.0m. Subsequently, the water level gradually rises and exceeds the dam crest elevation at 4:36 am the next day. This period is the longest operation time of SJK. Although these emergency measures cannot alleviate floods and their treatment effects are not as good as those of Example 3, they are useful for prolonging the overtopping damage process and maximizing time for rescue and evacuation work.

[0109] It can be seen that the method of the present invention can be used to implement refined scheduling management for disaster emergency response under the same risk source background.

Claims

1. A cascade reservoir emergency response method for flood risk relief, characterized by: Obtain basic emergency response information provided by the reservoir management party, including cascade reservoir data, disaster data, mission reservoir data, and emergency response time information; Emergency response includes two stages. The first stage is the pre-reservoir warning period to determine the flood volume V b-flood , each reservoir in the cascade reservoir releases its storage capacity to the maximum extent, and determines the storage capacity V of the task reservoir based on the storage capacity release result s-res , Available storage capacity V available ; The second stage is the reservoir entry decision period, which identifies the dispatching scenario and configures the dispatching plan for the task reservoir in different dispatching scenarios. The dispatching plan includes the dispatching target and dispatching criteria; the dispatching operation of the task reservoir is directed according to the dispatching plan; In the second stage, the scheduling scenarios are divided according to the conditional combinations expressed by the equation group 1, V b-flood ≤V available Formula 1-1 V available <V b-flood ≤kV s-res Formula 1-2 V b-flood >kV s-res Formula 1-3 Where, k is the comprehensive intervention factor, dimensionless, determined based on the basic information of emergency response, or calculated based on the equation group in formula 2. S - total storage capacity, unit: m 3 , N - the total number of dispatch periods for the total duration T of emergency response, dimensionless, determined based on the basic information of emergency response, I n , Q n - Inflow and outflow in the nth dispatching period, unit: m 3 , determined based on basic emergency response information, T n - The duration of the nth dispatching period, in units of h, is determined according to the basic information of emergency disposal; the dispatching scenario 100 is divided according to the conditional formula 1-1, and the dispatching scheme 100 is configured. In the dispatching scheme 100, the task reservoir takes the stable flow of its own outflow water as the dispatching target and follows the dispatching criterion of minimum water level change; The conditions 1-2 are divided into scheduling scenarios 200, and a scheduling scheme 200 is configured. In the scheduling scheme 200, the task reservoir takes ensuring its own safety as the scheduling goal and follows the scheduling criteria of the lowest maximum water level and the shortest disaster duration; Conditions 1-3 are divided into scheduling scenarios 300, and a scheduling scheme 300 is configured. In the scheduling scheme 300, the task reservoir takes delaying its own collapse as the scheduling goal and follows the scheduling criterion of the longest safe operation duration.

2. The emergency response method according to claim 1, characterized in that: Formula 2-2 is expressed using simplified formula 2-3, Where, U is the Q in the flood outburst process. n >I n The total number of time periods, u is the number of U, Q u , T u - are Q of time period u n , T n .

3. The emergency disposal method according to claim 1 or 2, characterized in that: The emergency response also includes stage three, which is the dynamic planning period, including in any scheduling scenario, for the task reservoir, establishing a scheduling objective function according to the scheduling objectives and scheduling criteria of the scheduling plan, within the duration T, using the real-time dam front water level and outflow flow as decision variables, and using the dynamic programming method, based on the inflow flow and constraints, starting from the n=1th scheduling period, the state variables determined in the n-1th period and the nth period are forward and reversed to obtain the value range of the current scheduling period, and based on this value range, the water level / reservoir capacity state variables of the discretized current period are dynamically planned and optimized until the end of the Nth scheduling period, and a feasible solution to the scheduling objective function of the task reservoir in the emergency scenario is obtained.

4. The emergency handling method according to claim 3, characterized in that: The scheduling scheme 200 includes: If conditional expression 3-1 is satisfied, it is divided into a scheduling scenario 210 and a scheduling scheme 210 is configured. If conditional expression 3-2 is satisfied, it is divided into a scheduling scenario 220 and a scheduling scheme 300 is configured. In the formula, Q max - Maximum discharge flow of the mission reservoir, unit: m 3 , determined based on basic emergency response information, Q out - The discharge flow of the mission reservoir, in m 3 , T - total duration of emergency response, unit: h, determined according to basic information of emergency response. unit-hours converted to seconds, 3600, dimensionless, ΔV-available capacity of mission reservoir, unit: m 3 , determined according to the basic information of emergency response; in the dispatching plan 210, the task reservoir takes its own safety as the priority and the safety of the downstream protection area is taken into account during the dispatching process, and the dispatching criteria follow the criteria of the lowest maximum water level and the shortest disaster duration.

5. The emergency disposal method according to claim 3, characterized in that: In the scheduling scheme 300, the generated continuous flood is regarded as a new flood, and the emergency response basic information is updated and then the emergency response stage 1 is re-entered, and V is updated. b-flood , Update the task reservoir and its V s-res With V available , entering the second emergency response phase.

6. The emergency disposal method according to claim 3, characterized in that: In the scheduling scheme 100, the objective function of the task reservoir is expressed according to Formula 4-1, and the water level constraint condition, boundary constraint condition, and flow constraint condition are expressed according to Formula 4-2, Formula 4-3, and Formula 4-4, respectively. Z down,t <Z t <Z up,t Formula 4-2 Q down,t ≤Q out (t)≤Q up,t Formula 4-4 Where t is the current calculation period in T, ΔZ(t) - the change in the water level Z(t) of the task reservoir in time period t, in m, Z t-1 , Z t - are the water level values ​​of the task reservoir at the beginning and end of time period t, in m, Z down,t , Z up,t - are the lower and upper limit water levels of the task reservoir in time period t, corresponding to the flood control limit water level and the verification water level, respectively, in m, determined according to the basic information of emergency response. Z0, Z start - are the water levels of the task reservoir at the beginning and end of the starting period, in meters, determined based on the basic information of emergency response. Z T , Z end - are the water levels of the task reservoir at the beginning and end of the end period, in m, Q down,t , Q up,t - are the upper and lower limit discharges of the task reservoir in time period t, corresponding to the ecological base flow Q base , Maximum safe discharge Q safe , unit m 3 , determined based on basic information on emergency response; Q out (t) - the discharge flow of the task reservoir in time period t, unit: m 3 .

7. The emergency disposal method according to claim 4, characterized in that: In the scheduling scheme 210, the task reservoir objective function is expressed according to Formula 5-1: Where, Z(t) is the water level of the task reservoir in time period t, in m. T ef - Total duration of disasters at downstream protection points, num tef - Record whether the transition factor of flood control point disaster conditions are met, unit Tstep - The time step corresponding to the flood process is determined based on the basic information of emergency response, Q out (t) - the discharge flow of the task reservoir in time period t, unit: m 3 , Q space (t)-Q out (t) The corresponding interval flood flow is provided in real time by the reservoir management. The water level constraint and flow constraint are expressed according to Formula 5-4 and Formula 5-5 respectively. Z down,t Z(t) is less than or equal to Z up,t equals Z dam Equation 5-4 Q down,t ≤Q out (t) ≤ Q up,t =Q max Equation 5-5 In the formula, Z dol - Dead water level of the mission reservoir, in m, determined based on basic emergency response information, Z dam - The dam top elevation of the mission reservoir, in meters, is determined based on the basic information of emergency response.

8. The emergency handling method according to claim 3, characterized in that: In the scheduling scheme 300, the objective function of the task reservoir is expressed according to the equation group 6: max{T prol Formula 6-1 Where, T prol - The total duration of safe operation of the reservoir, num prol - Record the transition factor of whether the reservoir meets the safe operation conditions, unit Tstep - Same as above, indicating the time step corresponding to the flood process, determined according to the basic information of emergency response, H lim - The mission reservoir limit water level that meets the evacuation requirements, in meters, is determined based on the basic information of emergency response; The water level constraint and flow constraint are expressed according to equation 6-4 and equation 5-5 respectively. Z down,t = Z low ≤ Z(t) ≤ Z up,t = Z weir Equation 6-4 Q down,t ≤Q out (t) ≤ Q up,t =Q max Equation 5-5 In the formula, Z low - The minimum value of the possible drop in the water level of the task reservoir during the emergency discharge phase, in meters, determined based on the basic information of emergency response. Z weir - The elevation of the sub-weir built on the top of the mission reservoir dam, in meters, is determined based on the basic information of emergency response.

9. The emergency disposal method according to claim 8, characterized in that: Allow Z low Below dead water level Z dol .

Citation Information

Cited By

  • Emergency resource dynamic scheduling method under emergency situation of reservoir dam

    CN119204613A