Intelligent supervision system based on intelligent vision and big data

Through intelligent vision and big data technology, it detects whether construction site personnel are wearing safety helmets and analyzes dust concentration, which solves the problem of the existing system's failure to effectively monitor construction site safety and improves construction site safety and reduces hidden dangers.

CN118822282AInactive Publication Date: 2024-10-22GUOFURUI (FUJIAN) INFORMATION TECH IND PARK CO LTD

Patent Information

Application Number
CN202411307125.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing intelligent supervision system fails to effectively monitor and control construction personnel and the environment at the construction site. Especially in areas with excessive dust, there are potential safety hazards and cannot improve safety management and control at the construction site.

Method used

Adopt an intelligent supervision system based on intelligent vision and big data, including area division module, data collection module, personnel detection module, area detection module, risk analysis module, real-time warning module and intelligent supervision module, and use convolutional neural network to detect whether personnel are wearing Safety helmets, and analyze dust concentration, provide real-time warning and intelligent control.

Benefits of technology

It improves the safety of the construction site, ensures that personnel wear safety helmets, and reduces stay in areas with low dust concentration, reduces safety hazards, and enhances safety management and control of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822282A_ABST
    Figure CN118822282A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent supervision, and discloses an intelligent vision and big data-based intelligent supervision system, which comprises a region division module, a data acquisition module, a data preprocessing module, a personnel detection module, a region detection module, a risk analysis module, a real-time early warning module, an intelligent supervision module and a man-machine interaction module. By arranging the personnel detection module and the area detection module, wearing detection of safety helmets can be carried out on personnel entering a construction site, safety monitoring is carried out before the personnel enter the construction site, personnel safety is guaranteed, meanwhile, the dust concentration of each area is analyzed, and the safety of the personnel is improved. According to the invention, an area with low safety can be known and staying in the area with low safety can be reduced, so that the safety of personnel in a construction site is further improved, the body of the personnel is protected from being influenced by high-concentration dust, the potential safety hazard is reduced, and the safety control of the construction site is improved; a safe area and a dangerous area can be distinguished so as to improve the safety guarantee for constructors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent supervision technology, and more specifically to an intelligent supervision system based on intelligent vision and big data. Background Art

[0002] Intelligent vision is a field of artificial intelligence that uses computer vision technology to process, analyze and understand images, thereby realizing intelligent recognition and tracking of people, objects and scenes. Intelligent vision technology has a wide range of applications in monitoring, security, medical and other fields.

[0003] In recent years, the scale of my country's construction industry has continued to grow, and construction safety risks have had a great impact on the construction industry. In order to achieve effective control of safety risks and upgrade and transform management methods, we actively promote the intelligent construction supervision mechanism and apply intelligent vision technology to the construction field for intelligent supervision, which improves safety during the construction process, reduces safety risks, and achieves effective control.

[0004] However, most of the existing intelligent supervision systems applied to construction sites only monitor and control construction equipment and energy consumption in real time, and do not monitor and control the personnel and environment at the construction site in real time; there are many dangerous areas at the construction site, such as areas with excessive dust, which can easily affect people's vision, so people should not appear in such areas to prevent safety accidents, and excessive dust concentration will have an impact on people's health; at the same time, construction workers should wear safety helmets correctly before entering the construction site to ensure safety; the existing intelligent supervision systems applied to construction sites do not perform intelligent supervision on this, so there are certain safety hazards, and it is impossible to improve the safety control of the construction site. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, the present invention provides an intelligent supervision system based on intelligent vision and big data to solve the problems existing in the above-mentioned background technology.

[0006] The present invention provides the following technical solutions: an intelligent supervision system based on intelligent vision and big data, comprising a region division module, a data acquisition module, a data preprocessing module, a personnel detection module, a region detection module, a risk analysis module, a real-time warning module, an intelligent supervision module and a human-computer interaction module; The area division module is used to divide the construction site into areas and mark each sub-area as 1, 2, 3...n in sequence; The data acquisition module is used to collect target data, and the data acquisition module includes an image data acquisition unit and an environment data acquisition unit; The data preprocessing module is used to preprocess the image data of the image data acquisition unit to obtain image data that can be directly used; The personnel detection module is used to receive the image data preprocessed by the data preprocessing module, analyze the personnel image data, and transmit the detection results to the intelligent management and control module; The area detection module is used to receive data from the environmental data acquisition unit, analyze the environmental conditions of each sub-area, and send an early warning instruction to the real-time early warning module based on the analysis results, and transmit the data to the risk analysis module; The risk analysis module is used to receive data from the regional detection module, evaluate the overall environmental risk of the construction site based on the weight distribution coefficient, obtain the environmental risk assessment coefficient and make a judgment, and send a warning instruction to the real-time warning module according to the judgment result; The real-time warning module is used to receive warning instructions from the area detection module and the risk analysis module, and send real-time warnings to the human-computer interaction module; The intelligent management and control module is used to receive data from the personnel detection module and intelligently manage the warning instructions of the real-time warning module; The human-computer interaction module is used to perform human-computer interaction display on the data.

[0007] Preferably, the target data includes image data and environmental data; the image data acquisition unit acquires image data through an image acquisition device; and the environmental data acquisition unit acquires environmental data, namely, dust concentration in each sub-area at different time periods, through a detector.

[0008] Preferably, the personnel detection module analyzes the personnel image data based on a convolutional neural network to obtain the personnel's safety helmet wearing results; the personnel entering the construction site are numbered, and the corresponding personnel images are marked according to the personnel numbers; the personnel's safety helmet wearing results are either worn or not worn; The convolutional neural network includes an input layer, a convolution layer, a pooling layer, an activation function layer, a fully connected layer and an output layer; the input layer is used to input a person image for safety helmet wearing detection; the convolution layer performs a two-dimensional convolution operation to extract information from the image data; the pooling layer uses a pooling function, including a linear pooling function and a nonlinear pooling function, and the nonlinear pooling function includes mean pooling and maximum pooling; the activation function layer is located after the convolution layer, responsible for generating a nonlinear output signal, and passing the transformed signal to the next layer of the network; the fully connected layer is used to capture the classification features of the target object; the output layer is used to output the final detection result.

[0009] Preferably, the process of the two-dimensional convolution operation is: If the input personnel image with the jth personnel number is recorded as I j入 , the size is H×W, where j is the personnel number; if the size of the convolution kernel K is h×w, the output image Ij出 The size is ; Convolution kernel K on input image I j入 The convolution operation on is expressed as: , where O(a,b) is the pixel value of the output image at position (a,b), I j入 (a+e,b+f) is the pixel value of the input image at position (a+e,b+f), and K(e,f) is the weight value of the convolution kernel at position (e,f).

[0010] Preferably, the area detection module analyzes the environmental conditions of each sub-area including the following steps: Step S11: Record the dust concentration of each sub-area at different time periods collected historically as X it , as sample data, where i=1, 2, 3...n; t is the tth time period; Step S12: performing dimensionless processing on the data in step S11, reducing the difference in absolute values ​​of the data, and normalizing the data; Step S13: Calculate the grey correlation coefficient of the sample data. The calculation formula of the grey correlation coefficient is expressed as: , where Y it is the grey relational coefficient, ρ is the resolution coefficient, ρ∈(0,1); The grey correlation degree of sample data is obtained by initial value standardization, and the formula is expressed as: , where r i is the grey relational degree, T is the total time period, t=1, 2, 3…T; Step S14: Record the dust concentration of each sub-area in different time periods collected in real time as X´ it Repeat steps S12 and S13 to obtain the real-time grey relational degree r´ i , the real-time grey correlation degree r´ i The grey correlation degree r of the sample data i Comparison is performed. If the difference exceeds the set threshold UI, it means that the dust concentration increases. At this time, a warning instruction is sent to the real-time warning module. Otherwise, no warning instruction is sent to the real-time warning module.

[0011] Preferably, the calculation formula of the weight distribution coefficient in the risk analysis module is: , where λ i is the weight allocation coefficient of the i-th sub-region; The calculation formula of the environmental risk assessment coefficient is: , where φ is the environmental risk assessment coefficient, μ i is the risk value index of the i-th sub-area, i=1, 2, 3...n; the calculation formula of the risk value index is: , where UI is the set threshold.

[0012] Preferably, if the environmental risk assessment coefficient satisfies φ>UK, a warning instruction is sent to the real-time warning module; if the environmental risk assessment coefficient satisfies φ≤UK, no warning instruction is sent to the real-time warning module; UK is the overall threshold, satisfying UK>60%.

[0013] Technical effects and advantages of the present invention: The present invention is provided with a personnel detection module and an area detection module, which is conducive to analyzing personnel image data to detect whether personnel are wearing safety helmets; and analyzing the environmental conditions of each sub-area, and sending a warning instruction to the real-time warning module based on the analysis result; performing safety helmet wearing detection on personnel entering the construction site, and conducting safety monitoring before entering the construction site to ensure personnel safety, and at the same time analyzing the dust concentration in each area, it is possible to know the low-safety areas and reduce the stay in the low-safety areas, further improving the safety of personnel on the construction site, and at the same time protecting the personnel from the impact of excessively high dust concentrations, reducing safety hazards, and improving the safety management and control of the construction site, and being able to distinguish between safe areas and dangerous areas to improve the safety of construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a flow chart of the intelligent monitoring system based on intelligent vision and big data of the present invention. DETAILED DESCRIPTION

[0015] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The intelligent supervision system based on intelligent vision and big data involved in the present invention is not limited to the various structures recorded in the following embodiments. All other implementations obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

[0016] like Figure 1 As shown, the present invention provides an intelligent supervision system based on intelligent vision and big data, including a region division module, a data acquisition module, a data preprocessing module, a personnel detection module, a region detection module, a risk analysis module, a real-time warning module, an intelligent supervision module and a human-computer interaction module; The area division module divides the area, the data acquisition module collects data and transmits it to the data preprocessing module and the area detection module, the data preprocessing module preprocesses the data and transmits it to the personnel detection module, the personnel detection module analyzes the situation of personnel wearing safety helmets, and transmits the analysis results to the intelligent management and control module, the area detection module analyzes the environmental conditions of each sub-area, and sends warning instructions to the real-time warning module based on the results, and transmits the data to the risk analysis module at the same time, the risk analysis module evaluates the overall environmental risks of the construction site, and sends real-time warning instructions to the real-time warning module based on the evaluation results, the real-time warning module is used to receive real-time warning instructions, the intelligent management and control module performs intelligent management based on the results of the personnel detection module and the real-time warning instructions of the real-time warning module, and the human-computer interaction module displays all data.

[0017] In this embodiment, it should be specifically explained that the area division module is used to divide the construction site into areas and mark each sub-area as 1, 2, 3...n in sequence; The data acquisition module is used to collect target data, and the target data includes image data and environmental data; the data acquisition module includes an image data acquisition unit and an environmental data acquisition unit, and the image data acquisition unit collects image data through an image acquisition device, and the image acquisition device includes but is not limited to a camera, and the image acquisition device is installed at the entrance of the construction site, and collects images of personnel when personnel enter the construction site, and the image data is the head image of the personnel entering the construction site; the environmental data acquisition unit collects environmental data through a detector, that is, the dust concentration of each sub-area in different time periods; The data preprocessing module is used to preprocess the image data of the image data acquisition unit to obtain image data that can be directly used; the preprocessing includes but is not limited to denoising and grayscale processing of the image; The personnel detection module is used to receive the image data preprocessed by the data preprocessing module, analyze the personnel image data to detect whether the personnel are wearing a safety helmet, and transmit the detection result to the intelligent management and control module; The area detection module is used to receive data from the environmental data acquisition unit, analyze the environmental conditions of each sub-area, and send an early warning instruction to the real-time early warning module based on the analysis results, and transmit the data to the risk analysis module; The risk analysis module is used to receive data from the regional detection module, evaluate the overall environmental risk of the construction site based on the weight distribution coefficient, obtain the environmental risk assessment coefficient and make a judgment, and send a warning instruction to the real-time warning module according to the judgment result; The real-time warning module is used to receive warning instructions from the area detection module and the risk analysis module, and send real-time warnings to the human-computer interaction module; The intelligent management and control module is used to receive data from the personnel detection module to intelligently monitor and manage the safety of personnel, and to intelligently manage the warning instructions of the real-time warning module; The human-computer interaction module is used to perform human-computer interaction display on the data.

[0018] In this embodiment, it should be specifically explained that the personnel detection module analyzes the personnel image data based on the convolutional neural network to obtain the personnel's safety helmet wearing results; the personnel entering the construction site are numbered, and the corresponding personnel images are marked according to the personnel numbers; the personnel's safety helmet wearing results are either worn or not worn; The convolutional neural network includes an input layer, a convolution layer, a pooling layer, an activation function layer, a fully connected layer, and an output layer; and has better performance and efficiency in object recognition in images; The input layer is used to input a person image to detect the wearing of a safety helmet; The convolution layer is the core of the convolutional neural network, which extracts specific information of the image through convolution operation. If different convolution kernels are used, different features of the image can be obtained; the convolution layer performs two-dimensional convolution operation to extract information from the image data; The pooling layer is usually placed between convolutional layers to compress data and reduce the number of parameters, and has the effect of alleviating overfitting; the pooling layer performs a pooling operation to reduce the size of the feature map, reduce the computational complexity, and has a certain balance robustness; the pooling layer uses a pooling function, including a linear pooling function and a nonlinear pooling function, and the nonlinear pooling function includes mean pooling and maximum pooling; the pooling operation reduces the size of the feature map, reduces the amount of calculation and retains effective feature information, mean pooling and maximum pooling each have their own characteristics, mean pooling can extract the average information of the local area, and maximum pooling pays more attention to the most significant features of the local area; in this embodiment, it can be selected by those skilled in the art; The activation function layer is located after the convolution layer, and is responsible for generating a nonlinear output signal and passing the transformed signal to the next layer of the network. Common activation functions include Sigmoid, Tanh, and ReLu, etc. The activation function is equivalent to a nonlinear element in the network, which provides greater flexibility and improves the ability of the network to learn complex representations. This embodiment does not specifically limit the activation function, and it can be selected by those skilled in the art. The fully connected layer is used to realize feature fusion and high-level abstract representation, which can effectively capture the classification features of the target object; The output layer is used to output the final detection result.

[0019] In this embodiment, it should be specifically explained that the two-dimensional convolution operation is also called a convolution kernel or a sliding window, which is a process of sliding on an image and applying a weighted sum pixel by pixel; If the input personnel image with the jth personnel number is recorded as I j入 , the size is H×W, where j is the personnel number; if the size of the convolution kernel K is h×w, the output image I j出 The size is ; Convolution kernel K on input image I j入 The convolution operation on is expressed as: , where O(a,b) is the pixel value of the output image at position (a,b), I j入 (a+e,b+f) is the pixel value of the input image at position (a+e,b+f), and K(e,f) is the weight value of the convolution kernel at position (e,f); The convolution kernel slides over the entire input image until it covers all possible positions and generates a corresponding complete feature map. Each convolution kernel in the convolution layer has a unique feature extraction function, such as identifying contours, positions, colors, etc. When the value of the convolution kernel in the convolution operation reaches a certain threshold, it will be activated so that the convolution neural network can extract specific features from the input image; each convolution layer can have multiple convolution kernels, and each convolution kernel will generate a specific functional feature map that represents the convolution kernel learned in the image. These individual feature maps are superimposed in the depth dimension to form the output of the entire convolution layer; The mean pooling is to slide a sliding window of size p×q on the feature map and calculate the average value of all pixel values ​​in the window as the corresponding pixel value of the output feature map; the formula is expressed as: , where O(a,b) is the pixel value of the output image at position (a,b), I j入 (a×s+e,b×s+f) is the pixel value of the input image at position (a+e,b+f), and s is the step size of the sliding window; The maximum pooling selects the maximum value of all pixel values ​​in the window as the corresponding pixel value of the output feature map, and slides a sliding window of size p×q on the feature map. The formula of maximum pooling is expressed as: , where O(a,b) is the pixel value of the output image at position (a,b), I j入 (a×s+e,b×s+f) is the pixel value of the input image at position (a+e,b+f), and s is the step size of the sliding window.

[0020] In this embodiment, it should be specifically explained that the area detection module analyzes the environmental conditions of each sub-area including the following steps: Step S11: Record the dust concentration of each sub-area at different time periods collected historically as X it , as sample data, where i=1, 2, 3...n; t is the tth time period; Step S12: performing dimensionless processing on the data in step S11, reducing the difference in absolute values ​​of the data, and normalizing the data; Step S13: Calculate the grey correlation coefficient of the sample data. The calculation formula of the grey correlation coefficient is expressed as: , where Y it is the grey relational coefficient, ρ is the resolution coefficient, ρ∈(0,1); The grey correlation degree of sample data is obtained by initial value standardization, and the formula is expressed as: , where r i is the grey relational degree, T is the total time period, t=1, 2, 3…T; Step S14: Record the dust concentration of each sub-area in different time periods collected in real time as X´ it Repeat steps S12 and S13 to obtain the real-time grey relational degree r´ i , the real-time grey correlation degree r´ i The grey correlation degree r of the sample data i For comparison, if the difference exceeds the set threshold UI, it means that the dust concentration has increased. At this time, a warning instruction is sent to the real-time warning module, indicating that the dust concentration in the area exceeds the standard and it is not suitable to enter. Therefore, construction site personnel should try to avoid the area; otherwise, no warning instruction is sent to the real-time warning module; the set threshold is set by technical personnel in this field, and this embodiment does not limit the specific difference value.

[0021] In this embodiment, it should be specifically explained that the calculation formula of the weight distribution coefficient in the risk analysis module is: , where λ i is the weight allocation coefficient of the i-th sub-region; The calculation formula of the environmental risk assessment coefficient is: , where φ is the environmental risk assessment coefficient, μ i is the risk value index of the i-th sub-area, i=1, 2, 3...n; the calculation formula of the risk value index is: , where UI is the set threshold; If the environmental risk assessment coefficient satisfies φ>UK, an early warning instruction is sent to the real-time early warning module, indicating that the overall environmental dust concentration at the construction site exceeds the threshold and an early warning is required to remind on-site personnel to strengthen self-prevention; If the environmental risk assessment coefficient satisfies φ≤UK, no warning instruction will be sent to the real-time warning module, indicating that the overall environmental dust concentration at the construction site has not exceeded the threshold and no warning is required; UK is an overall threshold value, satisfying UK>60%. This embodiment does not specifically limit the specific value of UK, which can be set by those skilled in the art.

[0022] In this embodiment, it should be specifically explained that the intelligent management and control module receives data from the personnel detection module. If the wearing result is not wearing, the entrance passage is intelligently closed at the entrance and the construction site cannot be entered. If the wearing result is worn, the entrance passage is opened and personnel can enter the construction site on their own. Only one person can enter the entrance passage at a time; this ensures that all personnel entering the construction site wear safety helmets, thereby improving personnel safety.

[0023] In the present embodiment, it should be specifically explained that the difference between the present embodiment and the prior art lies mainly in that the present embodiment is provided with a personnel detection module and an area detection module, which is conducive to analyzing personnel image data to detect whether personnel are wearing safety helmets; and analyzing the environmental conditions of each sub-area, and sending warning instructions to the real-time warning module based on the analysis results; performing safety helmet wearing detection on personnel entering the construction site, and conducting safety monitoring before entering the construction site to ensure personnel safety, and at the same time analyzing the dust concentration in each area, being able to know the low-safety areas and reduce the stay in the low-safety areas, further improving the personnel safety at the construction site, and at the same time protecting the personnel's body from the impact of excessively high dust concentrations, reducing safety hazards, and improving the safety management and control of the construction site, being able to distinguish between safe areas and dangerous areas to improve the safety of construction personnel.

[0024] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0025] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An intelligent monitoring system based on intelligent vision and big data, characterized by: It includes area division module, data acquisition module, data preprocessing module, personnel detection module, area detection module, risk analysis module, real-time warning module, intelligent supervision module and human-computer interaction module; The area division module is used to divide the construction site into areas and mark each sub-area as 1, 2, 3...n in sequence; The data acquisition module is used to collect target data, and the data acquisition module includes an image data acquisition unit and an environment data acquisition unit; The data preprocessing module is used to preprocess the image data of the image data acquisition unit to obtain image data that can be directly used; The personnel detection module is used to receive the image data preprocessed by the data preprocessing module, analyze the personnel image data, and transmit the detection results to the intelligent management and control module; The area detection module is used to receive data from the environmental data acquisition unit, analyze the environmental conditions of each sub-area, and send an early warning instruction to the real-time early warning module based on the analysis results, and transmit the data to the risk analysis module; The risk analysis module is used to receive data from the regional detection module, evaluate the overall environmental risk of the construction site based on the weight distribution coefficient, obtain the environmental risk assessment coefficient and make a judgment, and send a warning instruction to the real-time warning module according to the judgment result; The real-time warning module is used to receive warning instructions from the area detection module and the risk analysis module, and send real-time warnings to the human-computer interaction module; The intelligent management and control module is used to receive data from the personnel detection module and intelligently manage the warning instructions of the real-time warning module; The human-computer interaction module is used to perform human-computer interaction display on the data.

2. The intelligent monitoring system based on intelligent vision and big data according to claim 1 is characterized in that: The target data includes image data and environmental data; the image data acquisition unit acquires the image data through an image acquisition device; the environmental data acquisition unit acquires environmental data, ie, the dust concentration of each sub-area in different time periods, through a detector.

3. The intelligent monitoring system based on intelligent vision and big data according to claim 1 is characterized in that: The personnel detection module analyzes the personnel image data based on the convolutional neural network to obtain the personnel's safety helmet wearing results; the personnel entering the construction site are numbered, and the corresponding personnel images are marked according to the personnel numbers; the personnel's safety helmet wearing results are divided into two types: worn and not worn; The convolutional neural network includes an input layer, a convolution layer, a pooling layer, an activation function layer, a fully connected layer and an output layer; the input layer is used to input a person image for safety helmet wearing detection; the convolution layer performs a two-dimensional convolution operation to extract information from the image data; the pooling layer uses a pooling function, including a linear pooling function and a nonlinear pooling function, and the nonlinear pooling function includes mean pooling and maximum pooling; the activation function layer is located after the convolution layer, responsible for generating a nonlinear output signal, and passing the transformed signal to the next layer of the network; the fully connected layer is used to capture the classification characteristics of the target object; The output layer is used to output the final detection result.

4. The intelligent monitoring system based on intelligent vision and big data according to claim 3 is characterized by: The process of the two-dimensional convolution operation is: If the input personnel image with the jth personnel number is recorded as I j入 , the size is H×W, where j is the personnel number; if the size of the convolution kernel K is h×w, the output image I j出 The size is ; Convolution kernel K on input image I j入 The convolution operation on is expressed as: , where O(a,b) is the pixel value of the output image at position (a,b), I j入 (a+e,b+f) is the pixel value of the input image at position (a+e,b+f), and K(e,f) is the weight value of the convolution kernel at position (e,f).

5. The intelligent monitoring system based on intelligent vision and big data according to claim 1 is characterized in that: The regional detection module analyzes the environmental conditions of each sub-region and includes the following steps: Step S11: Record the dust concentration of each sub-area at different time periods collected historically as X it , as sample data, where i=1, 2, 3...n; t is the tth time period; Step S12: performing dimensionless processing on the data in step S11 to reduce the difference in absolute values ​​of the data and normalize the data; Step S13: Calculate the grey correlation coefficient of the sample data. The calculation formula of the grey correlation coefficient is expressed as: , where Y it is the grey relational coefficient, ρ is the resolution coefficient, ρ∈(0,1); The grey correlation degree of sample data is obtained by initial value standardization, and the formula is expressed as: , where r i is the grey relational degree, T is the total time period, t=1, 2, 3…T; Step S14: Record the dust concentration of each sub-area in different time periods collected in real time as X´ it Repeat steps S12 and S13 to obtain the real-time grey relational degree r´ i , the real-time grey correlation degree r´ i The grey correlation degree r of the sample data i Comparison is performed. If the difference exceeds the set threshold UI, it means that the dust concentration increases. At this time, a warning instruction is sent to the real-time warning module. Otherwise, no warning instruction is sent to the real-time warning module.

6. The intelligent monitoring system based on intelligent vision and big data according to claim 1 is characterized in that: The calculation formula of the weight distribution coefficient in the risk analysis module is: , where λ i is the weight allocation coefficient of the i-th sub-region; The calculation formula of the environmental risk assessment coefficient is: , where φ is the environmental risk assessment coefficient, μ i is the risk value index of the i-th sub-area, i=1, 2, 3...n; the calculation formula of the risk value index is: , where UI is the set threshold.

7. The intelligent monitoring system based on intelligent vision and big data according to claim 6 is characterized by: If the environmental risk assessment coefficient satisfies φ>UK, a warning instruction is sent to the real-time warning module. If the environmental risk assessment coefficient satisfies φ≤UK, no warning instruction is sent to the real-time warning module. UK is the overall threshold, satisfying UK>60%.

Citation Information

Patent Citations

  • Safety production risk assessment method and system based on multi-level grey relational analysis

    CN109242306A

  • Intelligent dust monitoring and early warning system based on working environment and human occupational health

    CN115389385A

  • Intelligent analysis algorithm for gas outburst early warning of coal mine driving working face

    CN116307158A

  • Safety helmet wearing detection and identity recognition method for construction site

    CN118230235A

  • KR20230122436A

Cited By

  • Mining coal bunker cleaning remote control system

    CN119806150A

  • A remote control system for cleaning coal bunkers in mines