Discharge order allocation method and device and storage medium

By obtaining charging station information, generating discharge orders and pushing them to target users, the power grid's peak power consumption pressure is solved, the coordination of power grid and user resources is achieved, and the operating efficiency of the grid is improved.

CN118822673AInactive Publication Date: 2024-10-22VOYAH AUTOMOBILE TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410836672.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing discharge order allocation scheme cannot perform intelligent dispatching according to grid demand and cannot effectively utilize the discharge potential of electric vehicles during grid peak periods.

Method used

By obtaining the charging information of the charging station, the discharge order is generated, and the discharge order is pushed to the target user according to the preset push rules. The vehicle discharge operation is performed based on the feedback information to achieve the coordination of the power grid and user resources.

Benefits of technology

It achieves the alleviation of power consumption during the peak period of the power grid, expands the functional boundaries of users' new energy vehicles, realizes the coordination of power grid and user resources, and improves the operating efficiency of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822673A_ABST
    Figure CN118822673A_ABST
Patent Text Reader

Abstract

The invention discloses a discharging order distribution method and device and a storage medium, and relates to the technical field of vehicle charging, and the method comprises the steps: obtaining the charging information of a charging station, and generating a discharging order according to the charging information; obtaining a target discharge user; pushing the discharge order to the target discharge user according to a preset pushing rule, and receiving feedback information of the target discharge user; and discharging is carried out on the vehicle based on the feedback information, clients with discharging potential and will can be accurately pushed, discharging orders are distributed to specific users in a targeted manner, and resource coordination of a power grid and the users is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of vehicle charging technology, and in particular to a discharge order allocation method, device and storage medium. Background Art

[0002] The current power grid operation efficiency is not very high, which is mainly related to the large amount of electricity consumption in my country, the uneven distribution of electricity demand, and the sharp difference between peak and valley electricity consumption. Although renewable energy sources such as solar energy and wind energy are connected to the power system, the instability of such energy has a serious impact on the overall operation of the power grid. At the same time, my country's new energy vehicle industry is developing rapidly, and the number of electric vehicles has increased significantly. As a distributed mobile power source, electric vehicles have significant energy supply potential. Therefore, how to coordinate and optimize the energy of electric vehicles and the operation of the power grid is a key way to achieve a balance between supply and demand in the power system and help optimize my country's energy structure.

[0003] The existing discharge order allocation scheme mainly allows vehicles to serve as backup power sources to provide external discharge during power grid outages, but it is unable to achieve intelligent scheduling based on power grid demand. Summary of the invention

[0004] The main purpose of this application is to provide a discharge order allocation method, device and storage medium, aiming to solve the technical problem that the existing technology cannot achieve intelligent scheduling according to power grid demand.

[0005] To achieve the above objectives, the present application proposes a method for distributing discharge orders, which includes:

[0006] Acquire charging information of a charging station, and generate a discharge order according to the charging information;

[0007] Get the target discharge user;

[0008] Pushing the discharge order to the target discharge user according to a preset push rule, and receiving feedback information from the target discharge user;

[0009] The vehicle is discharged based on the feedback information.

[0010] In one embodiment, the step of obtaining charging information of a charging station and generating a discharge order according to the charging information includes:

[0011] Obtaining charging information of charging stations, and obtaining peak power demand and charging station locations based on the charging information;

[0012] According to the peak electricity demand, the discharge unit price, the discharge demand amount and the discharge demand time range are set;

[0013] Setting a constrained charging site according to the location of the charging site, and setting a site discharge amount threshold of the constrained charging site;

[0014] Setting a device discharge amount threshold of the participating discharge device according to the site discharge amount threshold of the constrained charging site;

[0015] A discharge order is generated according to the discharge unit price, the discharge demand quantity, the discharge demand time range, the site discharge quantity threshold, and the equipment discharge quantity threshold.

[0016] In one embodiment, the step of obtaining charging information of a charging station and generating a discharge order according to the charging information includes:

[0017] Obtain the power consumption, electricity cost, unit price and peak time range of the park during the peak period;

[0018] Obtaining the required power according to the power consumption, and obtaining the discharge constraint time range according to the peak time range;

[0019] Acquire the associated site of the park, use the associated site as a constrained charging site, and acquire charging information of the constrained charging site;

[0020] Obtaining a charging unit price of a discharge device according to the charging information;

[0021] Obtaining a discharge unit price by using the discharge equipment charging unit price and the electricity unit price;

[0022] A discharge order is generated according to the required power, the electricity cost, the discharge constraint time range, and the discharge unit price.

[0023] In one embodiment, the target discharge user includes a first target discharge user and a second target discharge user;

[0024] The step of pushing the discharge order to the target discharge user according to the preset push rule comprises:

[0025] Pushing the discharge order to the first target discharge user, and calculating a first pushed power amount of the first target discharge user;

[0026] Obtaining order demanded electricity according to the discharge order;

[0027] When the first pushed electricity amount is less than the order required electricity amount, the discharge order is pushed to the second target discharge user according to a preset push rule.

[0028] In one embodiment, when the first pushed power is less than the order required power, the step of pushing the discharge order to the second target discharge user according to a preset push rule includes:

[0029] When the first pushed power is less than the order required power, the first pushed power and the order required power are calculated according to a preset push rule to obtain a first remaining pushed power;

[0030] The discharge order is updated according to the first remaining pushed power, and the updated discharge order is pushed to the second target discharge user.

[0031] In one embodiment, after the step of updating the discharge order by using the first remaining pushed power and pushing the updated discharge order to the second target discharge user, the method further includes:

[0032] Calculate a second pushed power amount to be pushed to the second target discharging user;

[0033] Calculate the total push power by using the first push power and the second push power;

[0034] When the pushed total power is less than the ordered power requirement, obtaining a third target discharge user;

[0035] Calculate the second remaining push power according to the total push power and the order required power;

[0036] The second remaining pushed power is pushed to the third target discharging user.

[0037] In one embodiment, when the pushed total power is less than the order required power, the step of acquiring the third target discharge user includes:

[0038] When the pushed total power is less than the ordered power requirement, obtaining the vehicle running position around the preset distance radius and the charging station;

[0039] Generate a vehicle trajectory heat map according to the vehicle running position and the preset distance radius;

[0040] Obtaining a thermal value of each user based on the vehicle trajectory thermal map;

[0041] The thermal values ​​are sorted to obtain a thermal value sorting list, and users corresponding to the thermal values ​​are selected from the thermal value sorting list as third target discharge users.

[0042] In one embodiment, the step of acquiring a target discharging user includes:

[0043] Obtain the charging times data of charging users at the constrained charging station within the historical time period;

[0044] The charging times data is screened, and charging users whose charging times are greater than a preset charging times threshold are selected as first target discharging users;

[0045] The charging user whose charging times are less than or equal to the preset charging times threshold is taken as the second target discharging user;

[0046] A target discharging user is obtained through the first target discharging user and the second target discharging user.

[0047] In one embodiment, the step of discharging the vehicle based on the feedback information includes:

[0048] Obtaining a discharge cut-off capacity based on the feedback information;

[0049] When the vehicle arrives at the charging station and is connected to the discharge device, the discharge device is controlled to discharge the vehicle, and the discharge is terminated when the vehicle reaches the discharge cut-off power.

[0050] In addition, to achieve the above-mentioned purpose, the present application also proposes a discharge order allocation device, which includes:

[0051] An acquisition module, used to acquire charging information of a charging station and generate a discharge order according to the charging information;

[0052] The acquisition module is also used to acquire the target discharging user;

[0053] A push module, used to push the discharge order to the target discharge user according to a preset push rule, and receive feedback information from the target discharge user;

[0054] A discharging module is used to discharge the vehicle based on the feedback information.

[0055] In addition, to achieve the above-mentioned purpose, the present application also proposes a discharge order allocation device, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, and the computer program is configured to implement the steps of the discharge order allocation method described above.

[0056] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the discharge order allocation method described above are implemented.

[0057] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the steps of the discharge order allocation method described above are implemented.

[0058] One or more technical solutions proposed in the present application obtain charging information of charging sites and generate discharge orders based on the charging information; obtain target discharge users; push the discharge orders to the target discharge users according to preset push rules, and receive feedback information from the target discharge users; discharge the vehicle based on the feedback information, accurately push customers with discharge potential and willingness, and allocate discharge orders to specific users in a targeted manner, thereby achieving resource coordination between the power grid and users. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0060] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0061] Figure 1 A flow chart of the first embodiment of the method for distributing a discharge order in this application;

[0062] Figure 2 This is a structural diagram of a discharge order allocation system in an embodiment of a discharge order allocation method of the present application;

[0063] Figure 3 A schematic diagram of a flow chart of generating a discharge order in an embodiment of a method for distributing discharge orders of the present application;

[0064] Figure 4 A flow chart of the second embodiment of the method for distributing discharge orders in this application;

[0065] Figure 5 This is a flow chart of discharge control after the target discharge user's vehicle arrives at the station in the first embodiment of the discharge order allocation method of the present application;

[0066] Figure 6 This is a schematic diagram of the module structure of the discharge order allocation device according to an embodiment of the present application;

[0067] Figure 7 This is a schematic diagram of the device structure of the hardware operating environment involved in the discharge order allocation method in the embodiment of the present application.

[0068] Description of Figure Numbers:

[0069] Backend management platform 11; power grid 12; user 13; charging station 14; user electric vehicle 15.

[0070] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0071] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0072] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0073] The main solution of the embodiment of the present application is: by obtaining the charging information of the charging site and generating a discharge order according to the charging information; obtaining the target discharge user; pushing the discharge order to the target discharge user according to the preset push rules, and receiving feedback information from the target discharge user; discharging the vehicle based on the feedback information.

[0074] Because the existing technology only provides discharge through the vehicle as a backup power source during power grid outages, it cannot perform intelligent scheduling according to the needs of the power grid or charging stations.

[0075] This application provides a solution that combines the power grid demand with the discharge potential of user vehicles. By locating the peak power demand of the power grid and accurately pushing users with discharge potential and willingness, it can not only alleviate the peak power demand pressure of the power grid, but also expand the functional boundaries of users' new energy vehicles and realize resource coordination between the power grid and users.

[0076] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a discharge order distribution device, etc. The following takes the discharge order distribution device as an example to illustrate this embodiment and the following embodiments.

[0077] Based on this, the embodiment of the present application provides a method for distributing discharge orders, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the discharge order allocation method of the present application.

[0078] In this embodiment, the discharge order allocation method includes steps S10 to S40:

[0079] Step S10: acquiring charging information of the charging site, and generating a discharge order according to the charging information.

[0080] It should be noted that the discharge order allocation in this embodiment is mainly for V2G devices, and the discharge order allocation method is mainly used for the discharge order allocation system, such as Figure 2 As shown, Figure 2 It is a structural diagram of the discharge order distribution system, 11 is the background management platform, which can be a cloud or a server, 12 is the power grid, 13 is the user, 14 is the charging station, the charging station 14 includes multiple V2G devices, 15 is the user's electric vehicle, there is a one-way communication interaction between the charging station 14 and the power grid 12, there is a two-way energy interaction between the charging station 14 and the background management platform 11, and there is a two-way energy interaction between the power grid 12 and the background management platform 11. The backend management platform 11 counts the actual power consumption of the park power grid 12, analyzes the expected power consumption during the peak period, generates a large demand order, and sends it to the user 13. After receiving the order, the user 13 feeds back the order information to the backend management platform 11. The user's electric vehicle 15 reaches the constraint site 14, finds the constraint device, and makes a discharge request; the discharge instruction is issued by the backend management platform 11 to the V2G device; after the discharge starts, the electric vehicle 15 transmits the power to the power grid 12 through the V2G device. During the discharge process, the site 14 and the V2G device transmit the discharge process information to the backend management platform 11, and then the backend management platform 11 transmits it to the user 13. The end discharge instruction can be automatically determined by the backend management platform 11 and sent to the V2G device; or the user 13 can send a stop instruction to the backend management platform 11, and then the backend management platform 11 sends the instruction to the V2G device.

[0081] It should be noted that the charging information of the charging station may include information such as electricity demand during peak hours, the location of the charging station, and the unit price of discharge. After obtaining the charging information, a discharge order can be generated based on the charging information. The discharge order can represent the discharge demand of the corresponding charging station in the park, and the discharge order can be formulated in advance through the background management platform.

[0082] In a feasible implementation, step S10 may include steps A11 to A15:

[0083] Step A11: Obtain charging information of the charging station, and obtain peak electricity demand and the location of the charging station according to the charging information.

[0084] It can be understood that the charging information of the charging station can be obtained, and the charging information includes information such as electricity demand during peak periods of electricity consumption and the location of the charging station. Therefore, the electricity demand during peak periods of electricity consumption and the location of the charging station can be obtained based on the charging information. The location of the charging station can be obtained based on the geographical coordinates of the park and the geographical coordinates of the charging station bound or constrained to the park.

[0085] Step A12: setting the discharge unit price, discharge demand quantity and discharge demand time range according to the peak power demand.

[0086] In a specific implementation, the discharge unit price can be manually set according to the unit price during the peak period. The discharge unit price is the unit price when discharging the vehicle. The discharge demand power and the discharge demand time range can be manually set, for example, the discharge demand time range is [8:00-22:00].

[0087] Step A13: setting a constrained charging site according to the location of the charging site, and setting a site discharge amount threshold of the constrained charging site.

[0088] It is understandable that a constrained charging site can be set according to the location of the charging site, the constrained charging site is the site that participates in the subsequent discharge, and a site discharge amount threshold of the constrained charging site is set, and the site discharge amount threshold is the upper limit of the acceptable power of the constrained charging site.

[0089] Step A14: setting a device discharge capacity threshold of the participating discharge devices according to the site discharge capacity threshold of the constrained charging site.

[0090] In a specific implementation, the constrained charging site includes multiple V2G devices, and the device discharge amount threshold of the discharge device can be set according to the site discharge amount threshold. The device discharge amount threshold is the upper limit of the discharge amount acceptable to each device.

[0091] Step A15: Generate a discharge order according to the discharge unit price, the discharge demand quantity, the discharge demand time range, the site discharge quantity threshold and the equipment discharge quantity threshold.

[0092] It is understandable that one or more of the discharge unit price, discharge demand power, discharge demand time range, site discharge threshold and equipment discharge threshold can be used as a discharge order. The above discharge order is manually set and generated by the user, and the discharge order can also be automatically generated through the background management platform.

[0093] In a feasible implementation, step S10 may include steps B11 to B16:

[0094] Step B11: Obtain the power consumption, power cost, power unit price, and peak time range of the park during the peak power consumption period.

[0095] It should be noted that the backend management platform can count the daily electricity consumption, electricity costs, unit price of electricity and peak time range during the park's peak electricity period. The electricity consumption refers to the charging electricity of vehicles in the park during the peak electricity period every day, the electricity cost refers to the total cost of vehicle charging, the unit price of electricity refers to the unit price of electricity calculated during the peak electricity consumption period, and the peak time range refers to the time zone during the peak electricity period.

[0096] Step B12: obtaining the required power according to the power consumption, and obtaining the discharge constraint time range according to the peak time range.

[0097] In a specific implementation, the power consumption can be used as the demand power, and an offset value can be set according to the peak time range, so that the discharge constraint time range can be obtained by selecting from the peak time range through the offset value. For example, if the offset value is 0.5 and the peak time range is [T1, T2], then the discharge constraint time range is [T1-0.5, T2+0.5]. The offset value can be adjusted according to the actual power consumption situation.

[0098] Step B13: Acquire the associated sites of the park, use the associated sites as constrained charging sites, and acquire charging information of the constrained charging sites.

[0099] In a specific implementation, park-associated sites may be obtained. A park may be associated with multiple sites. The obtained associated sites may be used as constrained charging sites, and charging information of the constrained charging sites may be obtained. The charging information may include information such as the charging unit price of the discharge equipment and the number of discharge equipment.

[0100] Step B14: Obtain the charging unit price of the discharge device according to the charging information.

[0101] In a specific implementation, the charging unit price of the discharge device can be obtained according to the charging information, and the charging unit price is the unit price of electricity when the vehicle is charged using the discharge device.

[0102] Step B15: Obtain the discharge unit price through the charging unit price of the discharge equipment and the electricity unit price.

[0103] It is understandable that the discharge unit price can be set according to the discharge equipment charging unit price and the electricity unit price. For example, the discharge equipment charging unit price is compared with the electricity unit price. If the electricity unit price is greater than the discharge equipment charging unit price, the middle value of the two unit prices is taken as the discharge unit price. If the electricity unit price is less than the discharge equipment charging unit price, the electricity unit price is taken as the discharge unit price.

[0104] Step B16: Generate a discharge order based on the required power, the electricity cost, the discharge constraint time range, and the discharge unit price.

[0105] In a specific implementation, one or more of the required power, electricity cost, discharge constraint time range and discharge unit price may be used as a discharge order, and the above discharge order is automatically set and generated by the background management platform.

[0106] like Figure 3 As shown, Figure 3To generate a flow chart of the discharge order, the cloud platform sets the discharge demand according to the vehicle-grid discharge demand, including the discharge unit price, required power, start time, end time, and number of required vehicles. It can also increase or decrease the participating discharge sites and set the upper limit of the site discharge. The power of the site and the park are interconnected. There are multiple charging sites around a park. It detects whether there are restrictions on the discharge equipment. If so, it increases or decreases the equipment participating in the discharge at the site, and sets the upper limit of the discharge of the discharge equipment, thereby expanding the control over the discharge equipment, avoiding the situation where all V2G devices are discharging and affecting charging, and detects whether there are restrictions on personnel and vehicles. If so, it searches for the identity information of users who can participate in the discharge and adds the identification code of the vehicle that can participate in the discharge. After completing the setting of the discharge site, a discharge order is generated. And the device constraints are performed through the V2G device, such as whether it can be discharged, the discharge limit, the discharge time range, and the unit price of discharge.

[0107] Step S20: Obtain target discharging users.

[0108] In a specific implementation, the target discharge user is a user corresponding to a vehicle that can reach a charging station for discharge, and the target discharge user can be obtained by screening users who are charging at the charging station.

[0109] In a feasible implementation, step S20 may include: obtaining charging times data of charging users at the constrained charging site within a historical time period; filtering the charging times data, and taking charging users whose charging times are greater than a preset charging times threshold as first target discharge users; taking charging users whose charging times are less than or equal to the preset charging times threshold as second target discharge users; and obtaining the target discharge user through the first target discharge user and the second target discharge user.

[0110] It should be noted that the historical time period can be set by yourself, such as the last month, the last three months, etc. The charging data of the constrained charging site in the last month can be counted, so as to obtain the charging times of users at this constrained charging site. The charging times can be unlimited, and the charging times can be counted according to the set time. For example, if the charging time is less than 1 hour, no statistics will be made.

[0111] In a specific implementation, the number of charging times of each user in the charging times data can be sorted, for example, from high to low, and the preset charging times threshold can be set according to demand, such as 4 times, 6 times, etc. The charging user whose charging times are greater than the preset charging times threshold is taken as the first target discharge user, and the first target discharge user is the preferred user when pushing discharge orders.

[0112] It is understandable that, considering that the number of first target discharge users may be small, charging users whose charging times are less than or equal to the preset charging times threshold can also be used as second target discharge users, so that the first target discharge users and the second target discharge users are jointly used as target discharge users.

[0113] Step S30: pushing the discharge order to the target discharge user according to a preset push rule, and receiving feedback information from the target discharge user.

[0114] The preset push rule is a strategy for pushing to the target discharge users, for example, all discharge orders are pushed to the first target discharge user among the target discharge users, or the discharge order is pushed to the first discharge user and the second discharge user among the target discharge users, or 1 / 3 of the discharge orders are pushed to the target discharge user, etc. This embodiment does not impose any restrictions on this.

[0115] After pushing the discharge order to the target discharge user according to the preset push rules, feedback information from the target discharge user can be received. The feedback information can be the target discharge user's order acceptance and the discharge cut-off power setting, etc., or the target discharge user's order rejection, in which case it is necessary to continue looking for other target discharge users.

[0116] Step S40: discharging the vehicle based on the feedback information.

[0117] It is understandable that after receiving the feedback information, the vehicles that can be discharged and arrive at the charging station can be discharged through the feedback information, thereby alleviating the power consumption pressure of the power grid during peak periods.

[0118] In a feasible implementation, step S40 specifically includes: obtaining a discharge cut-off power based on the feedback information; when the vehicle arrives at the charging station and is connected to the discharge device, controlling the discharge device to discharge the vehicle, and ending the discharge when the vehicle reaches the discharge cut-off power.

[0119] It should be noted that after the user accepts the order, the discharge cut-off power of the vehicle will be set, and the charging station information will be learned. When the user's vehicle arrives at the charging station and is connected to the discharge equipment, the discharge will be started to determine whether the discharge order has reached the end condition, that is, whether the discharge demand power is met. If the end condition is reached, the discharge will be terminated and the user's order will be completed. If the discharge order does not reach the end condition, it will be determined whether the discharge station and the discharge equipment have reached the upper limit of power. If so, the discharge will be terminated and the user's order will be completed. If the upper limit of power is not reached, it will be detected whether the discharge cut-off power of the vehicle has been reached or the user has manually stopped the discharge. If the discharge cut-off power of the vehicle has been reached or the user has manually stopped the discharge, the discharge will be completed. The user's vehicle function can be expanded, and it can cooperate with the power grid to discharge when the electricity price is high and charge the vehicle when the electricity price is low. The user's vehicle business capacity can be provided through the difference in electricity prices, and the effect of "peak shaving and valley filling" of electricity consumption can be achieved, reducing the operating pressure of the power grid, construction costs and resource waste.

[0120] This embodiment provides a method for allocating discharge orders, which includes acquiring charging information of charging sites and generating discharge orders according to the charging information; acquiring target discharge users; pushing the discharge orders to the target discharge users according to preset push rules, and receiving feedback information from the target discharge users; discharging vehicles based on the feedback information, accurately pushing customers with discharge potential and willingness, and allocating discharge orders to specific users in a targeted manner, thereby achieving resource coordination between the power grid and users.

[0121] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 4 , step S30 includes steps S301 to S303:

[0122] In this embodiment, the target discharge users include a first target discharge user and a second target discharge user.

[0123] Step S301: pushing the discharge order to the first target discharge user, and calculating the first pushed power amount of the first target discharge user.

[0124] It should be noted that the target discharge users are set as the first target discharge users and the second target discharge users, the generated discharge order is pushed to the first target discharge user first, and the first push power pushed to the first target hotel user is counted. For example, if there are 5 first target discharge users, and the power pushed to these 5 discharge users is 1000mAh respectively, then the first push power is 5000mAh.

[0125] Step S302: obtaining the order required electricity quantity according to the discharge order.

[0126] In a specific implementation, the order demand electricity can be obtained according to the discharge order, and the order demand electricity can be obtained according to the specific electricity demand.

[0127] Step S303: When the first pushed power amount is less than the order required power amount, the discharge order is pushed to the second target discharge user according to a preset push rule.

[0128] It is understandable that the first pushed power can be compared with the order required power. If the first pushed power is greater than or equal to the order required power, it proves that the power of the first target discharge user at this time can meet the order required power of the charging station and does not need to be pushed to other users.

[0129] If the first pushed electricity amount is less than the order required electricity amount and the discharge order needs to be pushed further, the discharge order can be pushed to the second target discharge user through the preset push rules.

[0130] In a feasible implementation, step S303 may include steps C11 to C12:

[0131] Step C11: when the first pushed power is less than the order required power, the first pushed power and the order required power are calculated according to a preset push rule to obtain a first remaining pushed power.

[0132] It should be noted that when the first pushed power is less than the order required power, the power difference between the first pushed power and the order required power, that is, the first remaining pushed power, can be calculated through the preset push rules, and the first remaining pushed power is the power that still needs to be pushed.

[0133] Step C12: updating the discharge order according to the first remaining pushed power, and pushing the updated discharge order to the second target discharge user.

[0134] In a specific implementation, the first remaining push power can be used as the latest order demand power, so as to push the latest order demand power to the second target discharge user. After receiving the order demand power, the second target discharge user can determine whether to accept the order. If the order is accepted, the dischargeable power can be set. Statistics are taken based on the dischargeable power set by the second target discharge user to determine that the push is completed. If the dischargeable power statistics of the second target discharge user are less than the first remaining push power, the remaining push power needs to continue to be pushed.

[0135] Optionally, step C12 also includes: calculating a second pushed electricity amount to be pushed to the second target discharge user; calculating a total pushed electricity amount through the first pushed electricity amount and the second pushed electricity amount; when the total pushed electricity amount is less than the order required electricity amount, obtaining a third target discharge user; calculating a second remaining pushed electricity amount based on the total pushed electricity amount and the order required electricity amount; and pushing the second remaining pushed electricity amount to the third target discharge user.

[0136] It should be noted that the second pushed power to the second target discharge user can be calculated. For example, if there are 10 second target discharge users and the power pushed to each of the 10 discharge users is 1000 mAh, the second pushed power is 10000 mAh.

[0137] In a specific implementation, the total pushed electricity can be calculated by the first pushed electricity and the second pushed electricity, and the total pushed electricity is compared with the order required electricity. If the total pushed electricity is greater than or equal to the order required electricity, the push of this discharge order is completed. If the total pushed electricity is less than the order required electricity, the difference between the order required electricity and the total pushed electricity needs to be pushed to the remaining users, so the third target discharge user is obtained, and the remaining electricity is pushed to the third target discharge user. The third target discharge user is the discharge user who meets the remaining electricity demand. The second remaining pushed electricity = order required electricity - total pushed electricity.

[0138] It should be noted that the step of acquiring the third target discharging user includes:

[0139] When the pushed total power is less than the ordered power requirement, obtain a preset distance radius and a vehicle running position around the charging station; generate a vehicle trajectory heat map according to the vehicle running position and the preset distance radius; obtain a thermal value of each user based on the vehicle trajectory heat map; sort the thermal values ​​to obtain a thermal value sorting list, and select users corresponding to the thermal values ​​from the thermal value sorting list as third target discharge users.

[0140] It should be understood that when the total amount of electricity pushed is less than the amount of electricity required by the order, a preset distance radius can be obtained, and the preset distance radius can be adjusted according to the actual location or vehicle density. For example, the preset distance radius is set to 10 kilometers, and the vehicle operating position around the charging station is obtained. The charging station is taken as the coordinate origin, and a vehicle trajectory heat map is generated with a radius of 10 kilometers based on the coordinates of the vehicle operating position. The vehicle trajectory heat map contains thermal values ​​of each user's vehicle, and the thermal values ​​can be sorted, for example, sorting the thermal values ​​from high to low to obtain a thermal value sorting list, and calculating the dischargeable electricity corresponding to each thermal value, thereby calculating the vehicle's dischargeable electricity. When the vehicle's dischargeable electricity is greater than or equal to the second remaining pushed electricity, the user corresponding to the thermal value is used as the third discharge user.

[0141] like Figure 5 As shown, Figure 5 The flow chart of discharge control after the target discharge user's vehicle arrives at the station. When the target discharge user's vehicle arrives at the charging station and the vehicle is plugged in, it can be determined whether the user has a discharge order. For example, after the user scans the code, the background checks whether the user has a discharge order. If yes, two options are displayed: start charging or start discharging. After the user chooses to start discharging, it is determined whether the discharge is possible. After the user clicks on the charging order and clicks on start discharging, it is determined whether the discharge is possible. Determining whether the discharge is possible includes determining whether the charging station is dischargeable, whether the discharge device is dischargeable, whether the current dischargeable amount of the station and the device is 0, whether the device is normal, whether the user is on the charge and discharge blacklist, and whether the order vehicle is consistent with the actual vehicle. If all are yes, it is determined that the vehicle can be discharged, the discharge cut-off power set by the user is obtained, and the discharge is started. The discharge data is recorded, and the data in the order discharge process is counted and displayed, and it is detected whether the discharge order is triggered to end. If the trigger ends, the discharge is completed, and the discharge data statistics and discharge fee (points) settlement are performed. If the user order is triggered to end, the device is controlled to stop discharging.

[0142] In this embodiment, the discharge order is pushed to the first target discharge user, and the first pushed power of the first target discharge user is calculated; the order demand power is obtained according to the discharge order; when the first pushed power is less than the order demand power, the discharge order is pushed to the second target discharge user according to the preset push rule, so that the order can be pushed to the target discharge user in a targeted manner according to the order demand power in the discharge order, thereby improving the order execution rate.

[0143] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the discharge order allocation method of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0144] This application also provides a discharge order allocation device, please refer to Figure 6 , the discharge order allocation device comprises:

[0145] The acquisition module 10 is used to acquire the charging information of the charging station and generate a discharge order according to the charging information.

[0146] The acquisition module 10 is also used to acquire target discharging users.

[0147] The push module 20 is used to push the discharge order to the target discharge user according to a preset push rule, and receive feedback information from the target discharge user.

[0148] The discharging module 30 is used to discharge the vehicle based on the feedback information.

[0149] The discharge order allocation device provided by the present application adopts the discharge order allocation method in the above embodiment, which can solve the technical problem that the prior art cannot realize intelligent scheduling according to the power grid demand. Compared with the prior art, the beneficial effects of the discharge order allocation device provided by the present application are the same as the beneficial effects of the discharge order allocation method provided by the above embodiment, and the other technical features in the discharge order allocation device are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0150] In one embodiment, the acquisition module 10 is further used to acquire charging information of the charging site, and obtain the peak electricity demand and the charging site location according to the charging information; set the discharge unit price, discharge demand quantity and discharge demand time range according to the peak electricity demand; set the constrained charging site according to the charging site location, and set the site discharge quantity threshold of the constrained charging site; set the device discharge quantity threshold of the participating discharge equipment according to the site discharge quantity threshold of the constrained charging site; generate a discharge order according to the discharge unit price, the discharge demand quantity, the discharge demand time range, the site discharge quantity threshold and the device discharge quantity threshold.

[0151] In one embodiment, the acquisition module 10 is also used to obtain the power consumption, electricity cost, electricity unit price, and peak time range of the park during the peak power consumption period; obtain the required power according to the power consumption, and obtain the discharge constraint time range according to the peak time range; obtain the associated sites of the park, use the associated sites as constrained charging sites, and obtain the charging information of the constrained charging sites; obtain the charging unit price of the discharge equipment according to the charging information; obtain the discharge unit price through the discharge equipment charging unit price and the electricity unit price; generate a discharge order through the required power, the electricity cost, the discharge constraint time range, and the discharge unit price.

[0152] In one embodiment, the target discharge users include a first target discharge user and a second target discharge user; the push module 20 is further used to push the discharge order to the first target discharge user, and calculate the first pushed power of the first target discharge user; obtain the order required power according to the discharge order; when the first pushed power is less than the order required power, push the discharge order to the second target discharge user according to a preset push rule.

[0153] In one embodiment, the push module 20 is further used to calculate the first pushed power and the order required power according to a preset push rule to obtain a first remaining pushed power when the first pushed power is less than the order required power; update the discharge order according to the first remaining pushed power, and push the updated discharge order to the second target discharge user.

[0154] In one embodiment, the push module 20 is also used to calculate the second pushed electricity to be pushed to the second target discharge user; calculate the total pushed electricity by the first pushed electricity and the second pushed electricity; when the total pushed electricity is less than the order required electricity, obtain the third target discharge user; calculate the second remaining pushed electricity based on the total pushed electricity and the order required electricity; and push the second remaining pushed electricity to the third target discharge user.

[0155] In one embodiment, the push module 20 is further used to obtain a preset distance radius and a vehicle operating position around the charging station when the pushed total power is less than the order required power; generate a vehicle trajectory heat map according to the vehicle operating position and the preset distance radius; obtain the thermal value of each user based on the vehicle trajectory heat map; sort the thermal values ​​to obtain a thermal value sorting list, and select users corresponding to the thermal values ​​from the thermal value sorting list as third target discharge users.

[0156] In one embodiment, the acquisition module 10 is further used to obtain charging times data of charging users of the constrained charging site within a historical time period; filter the charging times data, and select charging users whose charging times are greater than a preset charging times threshold as first target discharge users; select charging users whose charging times are less than or equal to the preset charging times threshold as second target discharge users; and obtain the target discharge user through the first target discharge user and the second target discharge user.

[0157] In one embodiment, the discharge module 30 is further used to obtain a discharge cut-off power based on the feedback information; when the vehicle arrives at the charging station and is connected to the discharge device, control the discharge device to discharge the vehicle, and end the discharge when the vehicle reaches the discharge cut-off power.

[0158] The present application provides a discharge order allocation device, which includes: at least one processor; and a memory that is communicatively connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the discharge order allocation method in the above-mentioned embodiment 1.

[0159] Reference below Figure 7, which shows a schematic diagram of the structure of a discharge order distribution device suitable for implementing the embodiment of the present application. The discharge order distribution device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 7 The discharge order distribution device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0160] like Figure 7 As shown, the discharge order distribution device may include a processing device 1001 (e.g., a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the discharge order distribution device are also stored. The processing device 1001, ROM1002, and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Generally, the following systems can be connected to the I / O interface 1006: an input device 1007 including, for example, a touch screen, a touch pad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; an output device 1008 including, for example, a liquid crystal display (LCD: Liquid Crystal Display), a speaker, a vibrator, etc.; a storage device 1003 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 1009. The communication device 1009 can allow the discharge order distribution device to communicate with other devices wirelessly or by wire to exchange data. Although the figure shows a discharge order distribution device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems can be implemented or have alternatively.

[0161] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0162] The discharge order allocation device provided by the present application adopts the discharge order allocation method in the above embodiment, which can solve the technical problem that the prior art cannot realize intelligent dispatch according to the power grid demand. Compared with the prior art, the beneficial effects of the discharge order allocation device provided by the present application are the same as the beneficial effects of the discharge order allocation method provided by the above embodiment, and the other technical features in the discharge order allocation device are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0163] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0164] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0165] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the discharge order allocation method in the above-mentioned embodiment.

[0166] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0167] The computer-readable storage medium may be included in the discharge order allocation device; or may exist independently without being assembled into the discharge order allocation device.

[0168] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the discharge order distribution device, the discharge order distribution device: obtains the charging information of the charging site and generates a discharge order based on the charging information; obtains the target discharge user; pushes the discharge order to the target discharge user according to the preset push rules, and receives feedback information from the target discharge user; and discharges the vehicle based on the feedback information.

[0169] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0170] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0171] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0172] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned discharge order allocation method, and can solve the technical problem that the prior art cannot realize intelligent scheduling according to the power grid demand. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the discharge order allocation method provided in the above-mentioned embodiment, and will not be repeated here.

[0173] The present application also provides a computer program product, comprising a computer program, which implements the steps of the discharge order allocation method as described above when executed by a processor.

[0174] The computer program product provided by this application can solve the technical problem that the prior art cannot realize intelligent dispatch according to the power grid demand. Compared with the prior art, the beneficial effects of the computer program product provided by this application are the same as the beneficial effects of the discharge order allocation method provided by the above embodiment, which will not be repeated here.

[0175] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for discharging order allocation, It is characterized in that The discharge order allocation method comprises: Acquire charging information of a charging station, and generate a discharge order according to the charging information; Get the target discharge user; Pushing the discharge order to the target discharge user according to a preset push rule, and receiving feedback information from the target discharge user; The vehicle is discharged based on the feedback information.

2. The method according to claim 1, It is characterized in that The step of acquiring charging information of a charging station and generating a discharge order according to the charging information includes: Obtaining charging information of charging stations, and obtaining peak power demand and charging station locations based on the charging information; According to the peak electricity demand, the discharge unit price, the discharge demand amount and the discharge demand time range are set; Setting a constrained charging site according to the location of the charging site, and setting a site discharge amount threshold of the constrained charging site; Setting a device discharge amount threshold of the participating discharge device according to the site discharge amount threshold of the constrained charging site; A discharge order is generated according to the discharge unit price, the discharge demand quantity, the discharge demand time range, the site discharge quantity threshold, and the equipment discharge quantity threshold.

3. The method according to claim 1, It is characterized in that The step of acquiring charging information of a charging station and generating a discharge order according to the charging information includes: Obtain the power consumption, electricity cost, unit price and peak time range of the park during the peak period; Obtaining the required power according to the power consumption, and obtaining the discharge constraint time range according to the peak time range; Acquire the associated site of the park, use the associated site as a constrained charging site, and acquire charging information of the constrained charging site; Obtaining a charging unit price of a discharge device according to the charging information; Obtaining a discharge unit price by using the discharge equipment charging unit price and the electricity unit price; A discharge order is generated according to the required power, the electricity cost, the discharge constraint time range, and the discharge unit price.

4. The method according to claim 1, It is characterized in that The target discharge users include a first target discharge user and a second target discharge user; The step of pushing the discharge order to the target discharge user according to the preset push rule comprises: Pushing the discharge order to the first target discharge user, and calculating a first pushed power amount of the first target discharge user; Obtaining order demanded electricity according to the discharge order; When the first pushed electricity amount is less than the order required electricity amount, the discharge order is pushed to the second target discharge user according to a preset push rule.

5. The method according to claim 4, It is characterized in that When the first pushed power is less than the order required power, the step of pushing the discharge order to the second target discharge user according to a preset push rule includes: When the first pushed power is less than the order required power, the first pushed power and the order required power are calculated according to a preset push rule to obtain a first remaining pushed power; The discharge order is updated according to the first remaining pushed power, and the updated discharge order is pushed to the second target discharge user.

6. The method according to claim 5, It is characterized in that After the step of updating the discharge order by using the first remaining pushed power and pushing the updated discharge order to the second target discharge user, the method further includes: Calculate a second pushed power amount to be pushed to the second target discharging user; Calculate the total push power by using the first push power and the second push power; When the pushed total power is less than the ordered power requirement, obtaining a third target discharge user; Calculate the second remaining push power according to the total push power and the order required power; The second remaining pushed power is pushed to the third target discharging user.

7. The method according to claim 6, It is characterized in that When the pushed total power is less than the order required power, the step of acquiring the third target discharge user includes: When the pushed total power is less than the ordered power requirement, obtaining the vehicle running position around the preset distance radius and the charging station; Generate a vehicle trajectory heat map according to the vehicle running position and the preset distance radius; Obtaining a thermal value of each user based on the vehicle trajectory thermal map; The thermal values ​​are sorted to obtain a thermal value sorting list, and users corresponding to the thermal values ​​are selected from the thermal value sorting list as third target discharge users.

8. The method according to any one of claims 1 to 7, It is characterized in that The step of acquiring the target discharging user comprises: Obtain the charging times data of charging users at the constrained charging station within the historical time period; The charging times data is screened, and charging users whose charging times are greater than a preset charging times threshold are selected as first target discharging users; The charging user whose charging times are less than or equal to the preset charging times threshold is taken as the second target discharging user; A target discharging user is obtained through the first target discharging user and the second target discharging user.

9. A discharge order distribution device, It is characterized in that The device comprises: An acquisition module, used to acquire charging information of a charging station and generate a discharge order according to the charging information; The acquisition module is also used to acquire the target discharging user; A push module, used to push the discharge order to the target discharge user according to a preset push rule, and receive feedback information from the target discharge user; A discharging module is used to discharge the vehicle based on the feedback information.

10. A storage medium, It is characterized in that The storage medium is a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the discharge order allocation method according to any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Peak load oriented V2G smart scheduling service method

    CN108054773A

  • Layered scheduling method of peak load period based on V2G technology

    CN110027440A

  • Power distribution network V2G auxiliary service day-ahead scheduling method

    CN111244990A

  • Electric vehicle charging and discharging excitation method and system

    CN115482050A

  • Electric vehicle V2G scheduling method and terminal

    CN115833201A