Thermal power plant energy management optimization method based on improved state potential game

By improving the state potential game model and dual-choice recurrent neural network prediction, combined with the opportunity constraint theory, the problems of uncertainty in new energy output and underutilization of user-side flexibility resources in the existing technology have been solved, and the energy management of thermal power plants has been realized. Efficient optimization and cost reduction.

CN118822784APending Publication Date: 2024-10-22GUANGDONG YUDEAN HUADU NATURAL GAS THERMAL POWER CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410836563.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing source-grid-load-storage interactive optimization scheduling method based on state-potential game does not fully consider the uncertainty of new energy output and user-side flexibility resources, resulting in a waste of energy resources and an increase in system costs, and is not suitable for entities with periodic constraints. Engage in energy management.

Method used

An energy management optimization method for thermal power plants based on improved state potential game is proposed. By analyzing the characteristics of thermal power plant equipment, the dual-selection recurrent neural network is used to predict the photovoltaic array output power and user load. The improved state potential game model is used to consider periodic constraints, and a complete Distributed algorithm is used to solve the problem, and a chance constraint model is introduced to reduce the fluctuation of new energy output.

Benefits of technology

It achieves the autonomy, intelligence and consistency of individual thermal power plants, reduces resource waste and system costs caused by fluctuations in new energy output, makes full use of user-side flexibility resources, and improves the consumption level of renewable energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822784A_ABST
    Figure CN118822784A_ABST
Patent Text Reader

Abstract

The invention discloses a thermal power plant energy management optimization method based on an improved state potential game, and the method comprises the steps: 1) constructing a distributed structure block diagram of a thermal power plant, and predicting an in-plant photovoltaic array and user load output condition; 2) obtaining in-plant prediction data and other related data, mapping each device in the plant as a player of a state potential game, expanding related parameters of the device as a column vector of an optimization period, performing related calculation, and constructing an improved state potential game model capable of being used for thermal power plant energy management optimization; and 3) adopting a completely distributed algorithm to obtain a game optimal solution, and distributing the game optimal solution to each device for scheduling, thereby realizing unification of local benefit maximization and overall benefit maximization in a plant. According to the method, the uncertainty of new energy and user-side flexible resources are fully considered, the equality status of all subjects is fully reflected, the privacy among all the subjects is protected, the energy storage demand is reduced, the consumption level of renewable energy sources is improved, and day-ahead optimal scheduling of economical efficiency in a plant is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power dispatch optimization, and in particular to a thermal power plant energy management optimization method based on improved state potential game. Background Art

[0002] In recent years, microgrids can efficiently integrate distributed energy and increase the penetration rate of renewable energy. With the large-scale access of renewable energy, the operating cost of microgrids will increase, and the high-quality and stable operation of microgrids will face higher challenges.

[0003] How to efficiently achieve energy management is the core of ensuring the safe, stable and economical operation of microgrids. The operation optimization methods of microgrid energy management systems mainly include traditional mathematical programming methods, intelligent optimization algorithms and game theory methods. From the perspective of traditional mathematical programming methods, the interval linear programming method is strengthened (Bai Muke, Wang Yue, Tang Wei, etc. Day-ahead optimal scheduling of regional integrated energy systems based on interval linear programming [J]. Power System Technology, 2017, 41 (12): 3963-3970.) to solve the day-ahead economic optimization scheduling model of regional integrated energy systems. The model based on mixed integer linear programming energy management method (Bakar AS, AH G. Adaptive Mixed-Integer Linear Programming-Based Energy Management System of Fast Charging Station with Nuclear–Renewable Hybrid Energy System [J]. Energies, 2023, 16 (2):) refers to the adaptive control model to achieve a wide range of performance of charging stations. The above traditional mathematical programming methods can only find the local optimal solution of the optimization problem, and the result is strongly dependent on the initial value. In contrast, intelligent optimization algorithms have global optimization performance, are more robust and versatile, and are more suitable for parallel computing. Genetic algorithms are used to solve the energy management problem of smart microgrids involving electric vehicles (Ramin T, Adrian I, Milad GA genetic algorithm optimization approach for smart energy management of microgrids [J]. Renewable Energy, 2022, 197: 852-863.), effectively reducing operating costs. Ant colony-reinforcement learning is used to optimize energy scheduling between microgrid groups (Liu Tiqian. Research on community microgrid optimization scheduling based on electricity price incentives [D]. Huazhong University of Science and Technology, 2023.). Game theory is mainly used to study how each subject can maximize its own interests by optimizing its own decisions. Compared with traditional mathematical programming methods and intelligent optimization algorithms, the difference is that the decisions between the subjects have a mutual influence. Research on distributed multi-objective optimization algorithm for source-storage-load interaction in microgrids (Wang Qiaoqiao, Zeng Jun, Liu Junfeng, et al. Research on distributed multi-objective optimization algorithm for source-storage-load interaction in microgrids [J]. Proceedings of the CSEE, 2020, 40(05): 1421-1432.) Based on potential game theory, a source-storage-load distributed optimization model is established, and the model is solved by combining the multi-objective particle swarm algorithm and constraint dominance principle.Based on the state potential game theory, a microgrid source-grid-load-storage interactive optimization model is established to effectively coordinate the consistency of individual interests and subject interests, and has higher solution accuracy and efficiency than potential game. The distributed economic dispatch method of power system based on state potential game (Liang Yile, Liu Feng, Mei Shengwei. Distributed economic dispatch method of power system based on state potential game [J]. Systems Science and Mathematics, 2016, 36(03): 413-425.) takes into account the power balance constraint of the whole network and the network transmission power limit, and at the same time minimizes the communication volume between subjects.

[0004] At present, the source-grid-load-storage interaction optimization scheduling method and system based on state potential game still have certain limitations. The method obtains relevant data of various devices in the microgrid, constructs the players of the state potential game of the microgrid individual, transforms the source-grid-load-storage interaction optimization problem into a state potential game model, and uses a fully distributed algorithm to solve the state potential game model. However, its solution: 1) does not fully consider the output uncertainty of new energy, which will cause a certain degree of energy resource waste and increase system costs; 2) does not fully consider the user-side flexibility resources, and simply considers the user load as a subject with upper and lower limits. In fact, the user load is diverse, and the load can be subdivided into basic load, interruptible load, transferable load and shiftable load; 3) It is not suitable for subjects with periodic constraints to participate in energy management. In fact, there are such devices in the system, such as shiftable load, transferable load, energy storage, electric vehicles, etc. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings and deficiencies of the prior art. A method for optimizing energy management of a thermal power plant based on an improved state potential game is proposed. A chance constraint model is introduced considering the uncertainty of wind and solar power. Finally, a distributed approach is adopted to obtain the optimal solution of the game, thereby ensuring the autonomy, intelligence and consistency of individual thermal power plants.

[0006] To achieve the above purpose, the technical solution provided by the present invention is: a thermal power plant energy management optimization method based on improved state potential game, comprising the following steps:

[0007] S1: Analyze the characteristics of energy generation, storage and conversion of each device in the thermal power plant, combine sensors, converters, controllers and managers to build a distributed structure block diagram of the thermal power plant, and use the historical data of the output power of the photovoltaic array in the thermal power plant, the historical data of the user load power consumption and the historical meteorological data as input, and obtain the predicted data of the output power of the photovoltaic array in the thermal power plant and the user load power consumption through a double selection recurrent neural network prediction model; wherein, the distributed structure block diagram of the thermal power plant shows the connection relationship between the various devices in the thermal power plant, the energy flow path and the transmission method of the control signal, and the devices include photovoltaic arrays, gas-steam combined cycle units, upper power grids, user loads, electric vehicles and energy storage;

[0008] S2: Obtain data in the thermal power plant, and map each device in the thermal power plant into a player in the state potential game. This game also includes four elements: state space, benefit function, action variable and transfer function. In order to meet the constraints of players with periodic constraints, the state potential game is improved. Specifically, its parameters and operations are expanded into a column vector with a length of 24 and operated to obtain an improved state potential game model that can be used for energy management optimization of the thermal power plant; wherein, the data includes predicted data and data related to the equipment in the thermal power plant; the related data includes the maintenance cost coefficient of each device, the maximum and minimum output power of the gas-steam combined cycle unit, the natural gas consumption coefficient, the power purchase limit from the superior power grid, the load dispatchable period and size, the capacity, initial state of charge and charging and discharging efficiency of the energy storage equipment, the capacity, power demand, initial state of charge, chargeable and dischargeable period and charging and discharging efficiency of electric vehicles;

[0009] S3: A fully distributed algorithm is used to solve the energy management optimization model of a thermal power plant based on the improved state potential game, and the optimal game solution of each device in the thermal power plant, i.e., the output plan, is obtained. According to the distributed structure block diagram of the thermal power plant, the optimal game solution is allocated to each device for scheduling to achieve efficient energy utilization and management optimization.

[0010] Further, in step S1, the user load includes transferable load, shiftable load, interruptible load and basic load; the electric vehicle, as a special equipment in the thermal power plant, acts as an energy storage device when charging, reflecting the battery function, and acts as a load when discharging, reflecting its travel function; each device in the thermal power plant transmits and communicates information through the manager, and exchanges power with the operator through a public connection point.

[0011] Further, in step S1, the specific operation steps for obtaining the prediction data are as follows:

[0012] S11: Collecting historical data and historical meteorological data on the output power of photovoltaic arrays and power consumption of user loads in the thermal power plant, wherein the meteorological data includes irradiance, temperature and humidity in the thermal power plant;

[0013] S12: Deeply integrate and preprocess the collected historical data. Specifically, through accurate data screening, ensure that the selected data can be effectively used, and divide the selected data into training sets and test sets to provide high-quality data samples for model training and verification;

[0014] S13: After the data is fused and processed, an accurate and reliable dual-selection recurrent neural network prediction model is constructed according to the demand and data characteristics of the photovoltaic array and user load;

[0015] S14: Use the screened test set and training set to fully evaluate and train the above double-selection recurrent neural network prediction model, and continuously optimize the parameters and structure of the model to ensure that it can accurately capture the patterns in the data;

[0016] S15: Use the trained double-selection recurrent neural network prediction model to perform predictions to obtain the prediction data of the photovoltaic array output power and the user load power consumption plan within 24 hours.

[0017] Further, in step S2, the specific conditions of the players, state space, benefit function, action variables and transfer function are as follows:

[0018] a. People in the game:

[0019] Each device in the thermal power plant is mapped to a player in the state game. All players in the thermal power plant are represented by a set N, N = {PV, GS, ES, EV, L inter ,L trans ,L shift ,L basic ,UG}, including photovoltaic array PV, gas steam combined cycle unit GS, energy storage ES, electric vehicle EV, interruptible load L inter , transferable load player L trans , people in the translation load bureau L shift , basic load L basic and UG from the higher-level power grid bureau;

[0020] b. State space:

[0021] The state space X of any player i i Including power variables [P i ] 24×1 and upper and lower limit estimates and[ e i ] 24×1 , i∈N, optimization period T=24h, use subscript [] 24×1 represents a column vector of length 24, as follows:

[0022] b1. Power variables:

[0023] The power variables of each player in the thermal power plant meet their own constraints. According to whether the constraints are periodic, the players are divided into two categories: one is players with only simple upper and lower limit constraints, including photovoltaic arrays, gas steam cycle units, interruptible loads, basic loads and upper power grids; the other is players with periodic constraints, including energy storage, electric vehicles, transferable loads and shiftable loads;

[0024] b2, out-of-limit estimate:

[0025] The global power balance constraints within the thermal power plant are as follows:

[0026]

[0027] In the formula, [P i ] 24×1 represents the output of player i during the optimization period, [0] 24×1 For a column vector with all elements being 0 and length 24, the equality constraint is equivalent to an inequality constraint:

[0028]

[0029] Introducing upper and lower limit estimators Quantify the degree of violation of the above two inequalities, namely:

[0030]

[0031] Therefore, the constraints of the upper and lower limit estimators are equivalent to the following formula. The above process converts the global constraints into local constraints on the local limit estimators of each player.

[0032]

[0033] c. Benefit function:

[0034] The profit function C of each person in the thermal power plant is constructed with economic income as positive and electricity consumption as negative. i , the penalty function is set according to the limit estimation of each player

[0035]

[0036] In the formula, μ is the penalty factor, are the upper and lower limit estimates of player i at time t respectively; the penalty function is added to the profit function to construct the benefit function J of player i i as follows:

[0037]

[0038] The final overall situation function Φ of the state potential game is as follows:

[0039]

[0040] d. Action variables:

[0041] The action variable a of any person i in the thermal power plant i Including the power variable correction of the people in the game [ΔP i ]24×1 and the upper and lower limit estimates of the inequality constraints that player i passes to player j and The gradient descent method is used to formulate the change in action variables:

[0042]

[0043] In the formula, ε is the iteration step size, is the change of the action variable, and the change rules of the action variable are formulated as follows:

[0044]

[0045] In the formula, They are the action variables [ΔP i ] 24×1 , and The change in C′ i (P i ) is the payoff function C of player i i The derivative of are the changes in the upper and lower limit estimates transmitted to player i by himself;

[0046] e. Transfer function, the formula is as follows:

[0047]

[0048] In the formula, They are respectively the power variable, upper limit estimator and lower limit estimator of the next iteration.

[0049] Furthermore, in step S2, since there is uncertainty in the output power of the photovoltaic array, the chance constraint theory is introduced to construct an uncertainty model of the output power of the photovoltaic array, as follows:

[0050] The actual output power of the photovoltaic array P PV,t By the predicted value W PV,t and random error composition:

[0051]

[0052] σ PV,t =0.02W PV,t +0.2E PV

[0053] In the formula, the random error follows a normal distribution, σ PV,t is the standard deviation of the normal distribution at time t, E PV is the installed capacity of the PV array;

[0054] Due to the uncertainty of the output power of the photovoltaic array, the power balance constraint will not be satisfied with the preset probability when the output is based on the predicted value. The power balance constraint under the uncertainty of the photovoltaic array output power is described by the opportunity constraint method as follows:

[0055] Pr{P PV,t +P GS,t +P UG,t -P ES,t -P EV,t -P load,t ≥0}≥η

[0056] In the formula, η is the confidence probability level, P PV,t , P GS,t , P UG,t , P ES,t , P EV,t , P load,t They are the output of photovoltaic array, gas-steam combined cycle unit, upper power grid, energy storage, electric vehicle and user load at time t respectively;

[0057] Finally, the above constraints are converted into the following inequality constraints:

[0058]

[0059] In the formula, is the inverse function of the standard normal distribution.

[0060] Further, in step S3, the specific operation steps of the fully distributed algorithm are as follows:

[0061] S31: Initialize the state space, set the decision variables, upper crossing line estimates, lower crossing line estimates and action variables of each player at the beginning of the game, and set the convergence conditions of Nash equilibrium and power balance;

[0062] S32: Update the decision variables of each player based on the decision variable formulation rule formulated by the gradient descent method;

[0063] S33: Based on the decision variables, the state space of each player is updated according to the state transfer function;

[0064] S34: Nash equilibrium judgment, judging whether the updated state space of each player reaches Nash equilibrium based on the benefit function of each player. If it is judged that the updated state space of each player reaches Nash equilibrium, the next step is executed, otherwise, the decision variables and state space are continuously updated until the convergence condition of Nash equilibrium is reached;

[0065] S35: Power balance judgment, judging whether the total power of the thermal power plant reaches power balance. If it is judged that the total power of the thermal power plant reaches power balance, the next step is executed, otherwise the penalty factor is increased, and the process goes to step S32 to continue updating the decision variables and state space until the Nash equilibrium and the convergence conditions of power balance are reached. At this point, the optimization ends and the optimal solution of the game is obtained, that is, the optimal output of each device;

[0066] S36: According to the connection relationship among the power flow, communication flow, control flow, information and data flow among the devices, i.e. the players, included in the distributed structure block diagram of the thermal power plant, the optimal solution of the game in step S35, i.e. the optimal output of each device, is distributed to each device in the thermal power plant for scheduling.

[0067] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0068] 1. The present invention takes into account the uncertainty of new energy output and introduces opportunity constraints to reduce resource waste and system costs caused by fluctuations in new energy output.

[0069] 2. The present invention fully considers the flexibility resources on the user side and divides the user load into basic load and other flexible load. The flexible load has the energy storage "charging and discharging" function in the optimization process. The energy management of the microgrid has the same function as the actual energy storage, which can effectively improve the absorption level of renewable energy and reduce the amount of abandoned wind and solar power.

[0070] 3. The present invention expands the decision variables, action variables and other related parameters and operations in the state potential game into a column vector with a length of the optimization period, thereby solving the constraints on the subjects with periodic constraints in the factory. This makes the state potential game model more suitable for systems with diverse subjects participating. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 is a flow chart of the method of the present invention.

[0072] Figure 2 It is a flow chart of photovoltaic and user load forecasting.

[0073] Figure 3 It is a distributed framework diagram of a thermal power plant.

[0074] Figure 4 It is a state potential game flow chart. DETAILED DESCRIPTION

[0075] The present invention will be further described below in conjunction with embodiments and drawings, but the embodiments of the present invention are not limited thereto.

[0076] See also Figure 1As shown, this embodiment provides a thermal power plant energy management optimization method based on improved state potential game, and the specific implementation steps are as follows:

[0077] 1) Analyze the characteristics of energy generation, storage and conversion of each device in the thermal power plant, combine sensors, converters, controllers and managers to build a distributed structure block diagram of the thermal power plant, and use the historical data of the output power of the photovoltaic array in the thermal power plant, the historical data of the user load power consumption and the historical meteorological data as input, and obtain the predicted data of the output power of the photovoltaic array in the thermal power plant and the user load power consumption through a double selection recurrent neural network prediction model; wherein, the distributed structure block diagram of the thermal power plant shows the connection relationship between the various devices in the thermal power plant, the energy flow path and the transmission method of the control signal, and the devices include photovoltaic arrays, gas-steam combined cycle units, upper power grids, user loads, electric vehicles and energy storage;

[0078] 2) Obtain data in the thermal power plant, and map each device in the thermal power plant into a player in the state potential game. This game also includes four elements: state space, benefit function, action variable and transfer function. In order to meet the constraints of players with periodic constraints, the state potential game is improved. Specifically, its parameters and operations are expanded into a column vector with a length of 24 and operated to obtain an improved state potential game model that can be used for energy management optimization of the thermal power plant; wherein, the data includes prediction data and data related to the equipment in the thermal power plant; the related data includes the maintenance cost coefficient of each device, the maximum and minimum output power of the gas-steam combined cycle unit, the natural gas consumption coefficient, the power purchase limit from the superior power grid, the load dispatchable period and size, the capacity, initial state of charge and charging and discharging efficiency of the energy storage equipment, the capacity, power demand, initial state of charge, chargeable and dischargeable period and charging and discharging efficiency of the electric vehicle;

[0079] 3) A fully distributed algorithm is used to solve the energy management optimization model of the thermal power plant based on the improved state potential game, and the optimal game solution of each equipment in the thermal power plant, that is, the output plan, is obtained. According to the distributed structure block diagram of the thermal power plant, the optimal game solution is allocated to each equipment for scheduling to achieve efficient energy utilization and management optimization.

[0080] See also Figure 2 As shown, the output power of the photovoltaic array in the thermal power plant and the user load power consumption plan are predicted to obtain the prediction data within 24 hours, including the following steps:

[0081] 1) Collect historical data on photovoltaic array output power and user load power consumption as well as historical meteorological data in the thermal power plant. The meteorological data includes irradiance, temperature, and humidity in the thermal power plant.

[0082] 2) Deeply integrate and preprocess the collected historical data. Through precise data screening, ensure that the selected data can be effectively used, and divide it into training sets and test sets to provide high-quality data samples for model training and verification.

[0083] 3) After the data is fused and processed, an accurate and reliable dual-selection recurrent neural network prediction model is constructed based on the demand and data characteristics of the photovoltaic array and user load.

[0084] 4) Use the screened test set and training set to fully evaluate and train the above-mentioned double-selection recurrent neural network prediction model, and continuously optimize the parameters and structure of the model to ensure that it can accurately capture the patterns in the data.

[0085] 5) Use the trained double-selection recurrent neural network prediction model to make predictions and obtain the forecast data of the photovoltaic array output power and user load power consumption plan within 24 hours.

[0086] The various equipment in the thermal power plant are mapped as players in the state potential game. In order to meet the constraints of players with periodic constraints, the state potential game is improved, and its parameters and operations are expanded to a column vector with a length of 24 and operated. The improved state potential game model that can be used for energy management optimization of thermal power plants is obtained, including the following steps:

[0087] 1) Map each device in the thermal power plant to the players in the state game, represented by the set N = {PV, GS, ES, EV, L inter ,L trans ,L shift ,L basic ,UG}, including photovoltaic array PV, gas steam combined cycle unit GS, energy storage ES, electric vehicle EV, interruptible load L inter , transferable load player L trans , people in the translation load bureau L shift , basic load L basic And the people in the higher-level power grid bureau.

[0088] 2) The state space X of any player i i Including power variables [P i ] 24×1 , upper and lower limit estimators and[ e i ] 24×1 , i∈N. The optimization period T = 24h, with subscript [] 24×1 Represents a column vector of length 24.

[0089] The power variables of each operator in the plant meet their own constraints. According to whether the constraints are periodic, operators are divided into two categories: one is a simple constraint category, such as photovoltaic arrays, gas steam cycle units, interruptible loads, and upper power grids. The constraints are as follows:

[0090] P i,min ≤P i,t ≤P i,max

[0091] Among them, P i,t is the power of player i at time t, P i,max and P i,min are the maximum and minimum output of player i, respectively. The other type is players with periodic constraints, such as energy storage, electric vehicles, transferable loads, and shiftable loads. The constraints of such players are listed below:

[0092] ① People in the energy storage industry:

[0093]

[0094] Among them, SOC(t) is the state of charge of the energy storage at time t; SOC(t+1) is the state of charge of the energy storage at time t+1; δ is the self-discharge rate of the energy storage, which is generally very small but cannot be ignored; E ES is the rated capacity of energy storage; η c is the charging efficiency of energy storage, P ES,t >0 indicates energy storage charging; η d is the energy storage discharge efficiency, P ES,t When <0, it indicates energy storage discharge.

[0095] ② Electric vehicles:

[0096] P EV,dis,max ≤P EV,t ≤P EV,char,max

[0097] 0≤I EV,char,t +I EV,dis,t ≤1

[0098] SOC EV,min ≤SOC EV,t ≤SOC EV,max

[0099]

[0100] Among them, P EV,char,max , P EV,dis,max are the maximum charging / discharging power of electric vehicles; I EV,char,t ,I EV,dis,t are the charging / discharging states of the electric vehicle, which are 0-1 variables.EV,char,t =1, the electric vehicle is charging, I EV,dis,t =1, the electric vehicle discharges; SOC EV,t is the state of charge of the electric vehicle at time t, SOC EV,t+1 is the state of charge of the electric vehicle at time t+1, SOC EV,min , SOC EV,max are the minimum / maximum state of charge of electric vehicles respectively; η c,EV , η d,EV are the charging and discharging efficiency of electric vehicles; E EV is the rated capacity of the electric vehicle.

[0101] ③Transferable load:

[0102] P shift,min ≤P shift ≤P shift,max

[0103]

[0104] Among them, P shift is the power consumption of the transferable load, P shift,min and P shift,max are the lower and upper limits of the transferable load demand respectively; α shift , β shift are the start and end time of the transferable load dispatchable period respectively; E shift is the total electricity demand of the transferable load.

[0105] ④Transferable load:

[0106] P trans =P trans,rate ·X trans

[0107]

[0108]

[0109] Among them, P trans is the electrical power of the movable load, P trans,rate is the rated power of the translatable load; T trans,start , T trans,end The possible start and end time of the translation load respectively; α trans , β trans are the start and end time of the output of the adjusted translatable load; T trans is the total running time; X trans,t , X trans,m and are the working states at time t and m respectively, which are 0-1 variables, i.e. standby when 0 and working when 1;trans,t It is the startup state at time t, which is also a 0-1 variable. There is only one startup time in the entire output period.

[0110] The constraints on the out-of-limit estimator are as follows:

[0111]

[0112] 3) The profit function C of each player i, i∈N in the factory i as follows:

[0113]

[0114] In the formula, C PV , C GS , C UG , C ES , They are the profit functions of photovoltaic array, gas-steam combined cycle unit, upper power grid, energy storage, interruptible load, transferable load, shiftable load and base load respectively.

[0115] Setting the penalty function Where μ is the penalty factor, are the upper and lower limit estimates of player i at time t, respectively. The benefit function of each player is constructed as follows:

[0116]

[0117] The global profit function of the state potential game is finally constructed as follows:

[0118]

[0119] 4) Action variable a of any person i in the thermal power plant i Including the power variable correction of the people in the game [ΔP i ] 24×1 and the upper and lower limit estimates of the inequality constraints that player i passes to player j and The gradient descent method is used to formulate the change in action variables:

[0120]

[0121] Among them, ε is the iteration step size, is the change of the action variable, and the action variable change rule is formulated as follows:

[0122]

[0123] In the formula, They are the action variables [ΔP i ] 24×1 , and The change in C′ i (P i ) is the payoff function C of player i i The derivative of are the changes in the upper and lower limit estimates transmitted to player i by himself;

[0124] 5) Transfer function, the formula is as follows:

[0125]

[0126] in, They are respectively the power variable, upper limit estimator and lower limit estimator of the next iteration.

[0127] The above steps improve the state potential game, expand its parameters and operations to column vectors and operations with a length of 24, and obtain an improved state potential game model that can be used for energy management optimization of thermal power plants.

[0128] In addition, due to the uncertainty of photovoltaic array output power, the chance constraint theory is introduced to construct the uncertainty model of photovoltaic array output power, as follows:

[0129] The actual output power of the photovoltaic array P PV,t By the predicted value W PV,t and random error composition:

[0130]

[0131] σ PV,t =0.02W PV,t +0.2E PV

[0132] Among them, the random error follows a normal distribution, σ PV,t is the standard deviation of the normal distribution at time t, E PV is the installed capacity of the PV array.

[0133] Due to the uncertainty of the output power of the photovoltaic array, the power balance constraint will not be met with a certain probability when the output is based on the predicted value. The power balance constraint under the uncertainty of the photovoltaic array output power is described by the opportunity constraint method as follows:

[0134] Pr{P PV,t +P GS,t +P UG,t -P ES,t -P EV,t -Pload,t ≥0}≥η

[0135] Among them, η is the confidence probability level, P PV,t , P GS,t , P UG,t , P ES,t , P EV,t , P load,t They are the output of photovoltaic array, gas-steam combined cycle unit, upper power grid, energy storage, electric vehicle and user load at time t respectively.

[0136] Finally, the above constraints are converted into the following inequality constraints:

[0137]

[0138] in, is the inverse function of the standard normal distribution.

[0139] See also Figure 3 As shown in the figure, a fully distributed optimization algorithm is used to solve the constructed in-field state potential game model to obtain the optimal solution for each device, and then the in-plant scheduling is carried out based on it. The fully distributed algorithm can be found in Figure 4 As shown, the specific steps are as follows:

[0140] 1) Initialize the state space, set the decision variables, upper and lower limit estimates, lower and upper limit estimates, and action variables of each player at the beginning of the game, and set the convergence conditions of Nash equilibrium and power balance.

[0141] 2) The decision variables formulated based on the gradient descent method are used to formulate rules to update the decision variables of each player.

[0142] 3) Based on the decision variables, the state space of each player is updated according to the state transfer function.

[0143] 4) Nash equilibrium judgment: the benefit function of each player is used to judge whether the updated state space model of each player reaches Nash equilibrium. If it is judged that the updated state space of each player reaches Nash equilibrium, the next step is executed; otherwise, the decision variables and state space are continued to be updated until the convergence conditions of Nash equilibrium are reached.

[0144] 5) Power balance judgment: judge whether the total power of the thermal power plant reaches power balance. If it is judged that the total power of the thermal power plant reaches power balance, execute the next step, otherwise increase the penalty factor and go to step 2) to continue updating the decision variables and state space until the Nash equilibrium and power balance convergence conditions are reached. At this point, the optimization is completed and the optimal solution of the game, that is, the optimal output of each device, is obtained.

[0145] 6) According to the connection relationship between the power flow, communication flow, control flow, information and data flow between the devices, i.e. the players, in the distributed structure block diagram of the thermal power plant, the optimal solution of the game, i.e. the optimal output of each device, is allocated to each device in the thermal power plant for scheduling.

[0146] The above description is only a preferred embodiment of the present invention and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in this application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in this application.

Claims

1. A thermal power plant energy management optimization method based on improved state potential game, characterized in that: The following steps are involved: S1: Analyze the characteristics of energy generation, storage and conversion of each device in the thermal power plant, combine sensors, converters, controllers and managers to build a distributed structure block diagram of the thermal power plant, and use the historical data of the output power of the photovoltaic array in the thermal power plant, the historical data of the user load power consumption and the historical meteorological data as input, and obtain the predicted data of the output power of the photovoltaic array in the thermal power plant and the user load power consumption through a double selection recurrent neural network prediction model; wherein, the distributed structure block diagram of the thermal power plant shows the connection relationship between the various devices in the thermal power plant, the energy flow path and the transmission method of the control signal, and the devices include photovoltaic arrays, gas-steam combined cycle units, upper power grids, user loads, electric vehicles and energy storage; S2: Obtain data in the thermal power plant, and map each device in the thermal power plant into a player in the state potential game. This game also includes four elements: state space, benefit function, action variable and transfer function. In order to meet the constraints of players with periodic constraints, the state potential game is improved. Specifically, its parameters and operations are expanded into a column vector with a length of 24 and operated to obtain an improved state potential game model that can be used for energy management optimization of the thermal power plant; wherein, the data includes predicted data and data related to the equipment in the thermal power plant; the related data includes the maintenance cost coefficient of each device, the maximum and minimum output power of the gas-steam combined cycle unit, the natural gas consumption coefficient, the power purchase limit from the superior power grid, the load dispatchable period and size, the capacity, initial state of charge and charging and discharging efficiency of the energy storage equipment, the capacity, power demand, initial state of charge, chargeable and dischargeable period and charging and discharging efficiency of electric vehicles; S3: A fully distributed algorithm is used to solve the energy management optimization model of a thermal power plant based on the improved state potential game, and the optimal game solution of each device in the thermal power plant, i.e., the output plan, is obtained. According to the distributed structure block diagram of the thermal power plant, the optimal game solution is allocated to each device for scheduling to achieve efficient energy utilization and management optimization.

2. The thermal power plant energy management optimization method based on improved state potential game according to claim 1 is characterized in that: In step S1, the user load includes transferable load, shiftable load, interruptible load and basic load; the electric vehicle, as a special equipment in the thermal power plant, acts as an energy storage device when charging, reflecting the battery function, and acts as a load when discharging, reflecting its travel function; each device in the thermal power plant transmits and communicates information through the manager, and exchanges power with the operator through a public connection point.

3. The thermal power plant energy management optimization method based on improved state potential game according to claim 1 is characterized in that: In step S1, the specific steps for obtaining prediction data are as follows: S11: Collecting historical data and historical meteorological data on the output power of photovoltaic arrays and power consumption of user loads in the thermal power plant, wherein the meteorological data includes irradiance, temperature and humidity in the thermal power plant; S12: Deeply integrate and preprocess the collected historical data. Specifically, through accurate data screening, ensure that the selected data can be effectively used, and divide the selected data into training sets and test sets to provide high-quality data samples for model training and verification; S13: After the data is fused and processed, an accurate and reliable dual-selection recurrent neural network prediction model is constructed according to the demand and data characteristics of the photovoltaic array and user load; S14: Use the screened test set and training set to fully evaluate and train the above double-selection recurrent neural network prediction model, and continuously optimize the parameters and structure of the model to ensure that it can accurately capture the patterns in the data; S15: Use the trained double-selection recurrent neural network prediction model to perform predictions to obtain the prediction data of the photovoltaic array output power and the user load power consumption plan within 24 hours.

4. The thermal power plant energy management optimization method based on improved state potential game according to claim 3 is characterized in that: In step S2, the specific conditions of the players, state space, benefit function, action variables and transfer function are as follows: a. People in the game: Each device in the thermal power plant is mapped to a player in the state game. All players in the thermal power plant are represented by a set N, N = {PV, GS, ES, EV, L inter ,L trans ,L shift ,L basic ,UG}, including photovoltaic array PV, gas steam combined cycle unit GS, energy storage ES, electric vehicle EV, interruptible load L inter , transferable load player L trans , people in the translation load bureau L shift , basic load L basic and UG from the higher-level power grid bureau; b. State space: The state space X of any player i i Including power variables [P i ] 24×1 and upper and lower limit estimates and[ e i ] 24×1 , i∈N, optimization period T=24h, use subscript [ ] 24×1 represents a column vector of length 24, as follows: b1. Power variables: The power variables of each player in the thermal power plant meet their own constraints. According to whether the constraints are periodic, the players are divided into two categories: one is players with only simple upper and lower limit constraints, including photovoltaic arrays, gas steam cycle units, interruptible loads, basic loads and upper power grids; the other is players with periodic constraints, including energy storage, electric vehicles, transferable loads and shiftable loads; b2, out-of-limit estimate: The global power balance constraints within the thermal power plant are as follows: In the formula, [P i ] 24×1 represents the output of player i during the optimization period, [0] 24×1 For a column vector with all elements being 0 and length 24, the equality constraint is equivalent to an inequality constraint: Introducing upper and lower limit estimators [e i ] 24×1 Quantify the degree of violation of the above two inequalities, namely: Therefore, the constraints of the upper and lower limit estimators are equivalent to the following formula. The above process converts the global constraints into local constraints on the local limit estimators of each player. c. Benefit function: The profit function C of each person in the thermal power plant is constructed with economic income as positive and electricity consumption as negative. i , the penalty function is set according to the limit estimation of each player In the formula, μ is the penalty factor, e i,t are the upper and lower limit estimates of player i at time t respectively; the penalty function is added to the profit function to construct the benefit function J of player i i as follows: The final state potential game's overall situation function φ is as follows: d. Action variables: The action variable a of any person i in the thermal power plant i Including the power variable correction of the people in the game [ΔP i ] 24×1 and the upper and lower limit estimates of the inequality constraints that player i passes to player j and The gradient descent method is used to formulate the change in action variables: In the formula, ε is the iteration step size, is the change of the action variable, and the change rules of the action variable are formulated as follows: In the formula, They are the action variables [ΔP i ] 24×1 , and The change in C' i (P i ) is the payoff function C of player i i The derivative of are the changes in the upper and lower limit estimates transmitted to player i by himself; e. Transfer function, the formula is as follows: In the formula, They are respectively the power variable, upper limit estimator and lower limit estimator of the next iteration.

5. The thermal power plant energy management optimization method based on improved state potential game according to claim 4 is characterized in that: In step S2, due to the uncertainty of the photovoltaic array output power, the chance constraint theory is introduced to construct the uncertainty model of the photovoltaic array output power, as follows: The actual output power of the photovoltaic array P PV,t By the predicted value W PV,t and random error composition: s PV,t =0.02W PV,t +0.2E PV In the formula, the random error follows a normal distribution, σ PV,t is the standard deviation of the normal distribution at time t, E PV is the installed capacity of the PV array; Due to the uncertainty of the output power of the photovoltaic array, the power balance constraint will not be satisfied with the preset probability when the output is based on the predicted value. The power balance constraint under the uncertainty of the photovoltaic array output power is described by the opportunity constraint method as follows: Pr{P PV,t +P GS,t +P UG,t -P ES,t -P EV,t -P load,t ≥0}≥η In the formula, η is the confidence probability level, P PV,t , P GS,t , P UG,t , P ES,t , P EV,t , P load,t They are the output of photovoltaic array, gas-steam combined cycle unit, upper power grid, energy storage, electric vehicle and user load at time t respectively; Finally, the above constraints are converted into the following inequality constraints: In the formula, is the inverse function of the standard normal distribution.

6. The thermal power plant energy management optimization method based on improved state potential game according to claim 5 is characterized in that: In step S3, the specific operation steps of the fully distributed algorithm are as follows: S31: Initialize the state space, set the decision variables, upper crossing line estimates, lower crossing line estimates and action variables of each player at the beginning of the game, and set the convergence conditions of Nash equilibrium and power balance; S32: Update the decision variables of each player based on the decision variable formulation rule formulated by the gradient descent method; S33: Based on the decision variables, the state space of each player is updated according to the state transfer function; S34: Nash equilibrium judgment, judging whether the updated state space of each player reaches Nash equilibrium based on the benefit function of each player. If it is judged that the updated state space of each player reaches Nash equilibrium, the next step is executed, otherwise, the decision variables and state space are continuously updated until the convergence condition of Nash equilibrium is reached; S35: Power balance judgment, judging whether the total power of the thermal power plant reaches power balance. If it is judged that the total power of the thermal power plant reaches power balance, the next step is executed, otherwise the penalty factor is increased, and the process goes to step S32 to continue updating the decision variables and state space until the Nash equilibrium and the convergence conditions of power balance are reached. At this point, the optimization ends and the optimal solution of the game is obtained, that is, the optimal output of each device; S36: According to the connection relationship among the power flow, communication flow, control flow, information and data flow among the devices, i.e. the players, included in the distributed structure block diagram of the thermal power plant, the optimal solution of the game in step S35, i.e. the optimal output of each device, is distributed to each device in the thermal power plant for scheduling.

Citation Information

Cited By

  • Distributed resource optimal regulation and control method and system considering multi-factor uncertainty

    CN119599344A

  • Industrial load management and control method based on cloud edge cooperation technology

    CN119966996A