Rapid processing method for damage of high-voltage cable
By stripping the cable layer by layer, inspecting and handling insulation damage, and using high-voltage and high-temperature insulation tape to restore the insulation layer, the problem of construction difficulty and high cost caused by insulation damage in high-voltage cable construction is solved, and fast and economical fault handling is achieved.
Patent Information
- Application Number
- CN202410799258.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-10-22
AI Technical Summary
During the transportation, laying and construction of 10kV high-voltage cables in underground environments, the cable insulation is often damaged by sharp objects, which makes the construction difficult, labor-intensive, troubleshooting time-consuming and high in material and labor costs, affecting normal production.
Through safety measures, peel off the cable layer by layer to expose the fault point, check and record the insulation damage, use soft copper wire to wrap or connect copper tubes to deal with conductor damage, and use high-voltage and high-temperature insulating tape to restore the insulation, and conduct necessary electrical tests to Verify insulation strength and continuity and ensure cables are restored to working condition.
It achieves rapid treatment of high-voltage cable damage, reduces labor input and material costs, shortens fault handling time, and improves production efficiency.
Smart Images

Figure CN118825844A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine cables, in particular to a method for quickly processing damage to a high-voltage cable. Background Art
[0002] Due to the special underground environment, 10kV high-voltage cables often cause cable insulation damage during transportation, laying, use, and construction by construction units. According to statistics, the drainage team has handled 4 similar problems this year, all of which were caused by sharp objects that damaged the single-phase insulation of the cable. The area was small and all of them were in the middle of the entire cable, far away from the cable end. If the cable head is remade, the cable surplus needs to be transferred from the cable end to the fault point. The construction is difficult, labor-intensive, and the fault handling time is long, which is very detrimental to normal production, and the material and labor costs are high. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a method for quickly handling high-voltage cable damage, which solves the problems of difficult construction, high labor consumption, long fault handling time, being very unfavorable to normal production, and high material and labor costs.
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for quickly processing high-voltage cable damage, comprising the following steps:
[0005] S1. Safety measures: first find the faulty cable, install grounding wires at both ends of the faulty cable, and then hang a warning sign prohibiting closing the switch on the control switch;
[0006] S2, cable stripping, then carefully peeling off the cable layer by layer according to standard procedures until the fault is exposed;
[0007] S3. Check the insulation damage, observe the insulation damage of the cable fault phase, and record the degree and scope of the damage;
[0008] S4. Conductor damage treatment: When the damage of the effective cross-sectional area of the conductor does not exceed 10% of the qualified cross-sectional area of the cable, use soft copper wire to wrap and bind. When the damage exceeds 10%, it is necessary to use a connecting copper tube for crimping;
[0009] S5, insulation restoration, then confirm that the insulation area of the faulty phase meets the use requirements, and use high-voltage and high-temperature insulation tape, in a semi-overlapping manner to restore the insulation;
[0010] S6. Testing and verification: After the insulation is restored, necessary electrical tests are carried out to verify the insulation strength and connectivity of the cable. After the test is passed, the cable is repackaged and restored to working condition.
[0011] Preferably, the area of the damage in step S4 is calculated as follows:
[0012] First, determine the cross-sectional area of the cable;
[0013] A=π×r 2 ;
[0014] Where A is the cross-sectional area, π is the circumference of a circle (approximately equal to 3.14159), and r 2 is the diameter of the cable;
[0015] Second, measure the diameter of the damaged area;
[0016] Measure the diameter of the damaged area by using a measuring tool;
[0017] Third, calculate the damage area;
[0018] P=π×d 2 ;
[0019] Where P is the area of the damaged area, d 2 is the diameter of the damaged area;
[0020] Fourth, compare the damaged area with the cable cross-sectional area;
[0021] Compare the calculated damage area with the cross-sectional area of the cable to calculate the area of the damage.
[0022] Preferably, in step S1, the faulty cable is detected by a cable fault detection instrument, and the detection is as follows;
[0023] Above the buried wire to be tested, detect from one end of the line to the other end, and walk forward slowly. In the line segment with good insulation to the ground, the headphones are basically silent, and the light-emitting tube is on or off. When approaching the fault point C, the sound gradually increases from small to large, and the light-emitting tube has one light, then two or three lights on. The sound is loudest at the fault point A, and the light-emitting tube is all on at this time. When passing point A and reaching point B, the sound gradually decreases and disappears, and the light-emitting tube is all on and gradually goes out completely, and then retreats to point A where the sound is loudest, which is the fault point.
[0024] Preferably, after winding in step S6, a semiconductor layer is wrapped on the surface, then wrapped with sealing tape, and after the shielding layer is restored, the steel armor tape is finally wrapped. After the insulation shaking test is qualified, the grounding wire is removed, and the warning sign is taken down for power supply.
[0025] Preferably, the crimping in step S4 is performed by using a crimping machine for pressing and fixing.
[0026] The present invention provides a method for quickly treating high-voltage cable damage. Compared with the prior art, the method has the following beneficial effects:
[0027] The rapid processing method for high-voltage cable damage is to find the faulty cable, peel off the cable layer by layer until the fault is exposed, and use soft copper wire to wrap and bind when the damage of the effective cross-sectional area of the conductor does not exceed 10% of the qualified cross-sectional area of the cable. When the damage exceeds 10%, it is necessary to use a connecting copper tube for crimping, confirm that the insulation area of the faulty phase meets the use requirements, and use high-voltage and high-temperature insulating tape, and use a semi-overlapping method to wrap and restore the insulation, so that the fault can be quickly processed. It has achieved the effect of reducing labor input, reducing the material cost used to make cable heads, and reducing the time of accident impact. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the present invention are described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1 The embodiment of the present invention provides a technical solution: a method for quickly processing high-voltage cable damage, a method for quickly processing high-voltage cable damage, comprising the following steps:
[0031] S1. Safety measures: First, use the cable fault detection instrument to detect the following:
[0032] The instrument should be self-checked. First, insert the earphone into the collimator, turn on the power switch, the power indicator light is on, indicating that it has entered the working state. Put on the earphone and press the red terminal on the top with your finger. You should hear a buzzer in the earphone, indicating that the machine is working normally. Then insert the red and black detection wires into the collimator.
[0033] Above the buried wire to be tested, detect from one end of the line to the other end, walk forward slowly, the earphone is basically silent in the line segment with good insulation to the ground, and the light-emitting tube lights up one light or is not on. When approaching the fault point C, the sound gradually increases from small to large, and the light-emitting tube lights up from one light to two or three lights. The sound is the loudest at the fault point A, and the light-emitting tube is all on at this time. When crossing point A to point B, the sound gradually decreases to disappear, and the light-emitting tube is all on and gradually turns off completely, and then retreats to point A where the sound is the loudest, which is the fault point. After finding the faulty cable, hang grounding wires at both ends of the faulty cable, and then hang a warning sign prohibiting closing the switch on the control switch;
[0034] S2. Strip the cable, and then carefully peel off the cable layer by layer according to standard procedures until the fault is exposed, taking care to protect the conductor and insulation layer in the cable to avoid further damage;
[0035] S3. Check the insulation damage, observe the insulation damage of the cable fault phase, and record the degree and scope of the damage;
[0036] S4, Conductor damage processing, first calculate the damaged area;
[0037] First, determine the cross-sectional area of the cable;
[0038] A=π×r 2 ;
[0039] Where A is the cross-sectional area, π is the circumference of a circle (approximately equal to 3.14159), and r 2 is the diameter of the cable;
[0040] Second, measure the diameter of the damaged area;
[0041] Measure the diameter of the damaged area by using a measuring tool;
[0042] Third, calculate the damage area;
[0043] P=π×d 2 ;
[0044] Where P is the area of the damaged area, d 2 is the diameter of the damaged area;
[0045] Fourth, compare the damaged area with the cable cross-sectional area;
[0046] Compare the calculated damage area with the cross-sectional area of the cable to calculate the damaged area. When the damage to the effective cross-sectional area of the conductor does not exceed 10% of the qualified cross-sectional area of the cable, use soft copper wire to wrap and tie to make up the damaged conductor area. If the damage exceeds 10%, it is necessary to connect with a connecting copper tube and use a crimping machine to crimp and fix it to ensure the connectivity of the conductor.
[0047] S5. Insulation restoration. Then confirm that the insulation area of the faulty phase meets the use requirements. Use high-voltage and high-temperature insulating tape and wrap it in a semi-overlapping manner to restore the insulation. Ensure that the insulation reaches twice the original insulation strength. Wrap a semiconductor layer on the surface, then wrap it with sealing tape, and restore the shielding layer. Finally, wrap the steel armor tape. Remove the grounding wire after the insulation shaking test is qualified.
[0048] S6. Testing and verification: After the insulation is restored, necessary electrical tests are carried out to verify the insulation strength and connectivity of the cable. After the test is passed, the cable is resealed and restored to working condition (the warning sign is removed for power supply). After the repair work is completed, the work site is cleaned up and all temporary safety measures and tools are removed.
[0049] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for quickly treating high voltage cable damage, characterized in that: The following steps are involved: S1. Safety measures: first find the faulty cable, install grounding wires at both ends of the faulty cable, and then hang a warning sign prohibiting closing the switch on the control switch; S2, cable stripping, then carefully peeling off the cable layer by layer according to standard procedures until the fault is exposed; S3. Check the insulation damage, observe the insulation damage of the cable fault phase, and record the degree and scope of the damage; S4. Conductor damage treatment: When the damage of the effective cross-sectional area of the conductor does not exceed 10% of the qualified cross-sectional area of the cable, use soft copper wire to wrap and bind. When the damage exceeds 10%, it is necessary to use a connecting copper tube for crimping; S5, insulation restoration, then confirm that the insulation area of the faulty phase meets the use requirements, and use high-voltage and high-temperature insulation tape, in a semi-overlapping manner to restore the insulation; S6. Testing and verification: After the insulation is restored, necessary electrical tests are carried out to verify the insulation strength and connectivity of the cable. After the test is passed, the cable is repackaged and restored to working condition.
2. A method for quickly treating high voltage cable damage according to claim 1, characterized in that: The area of the damage in step S4 is calculated as follows: First, determine the cross-sectional area of the cable; A=π×r 2 ; Where A is the cross-sectional area, π is the circumference of a circle (approximately equal to 3.14159), and r 2 is the diameter of the cable; Second, measure the diameter of the damaged area; Measure the diameter of the damaged area by using a measuring tool; Third, calculate the damage area; P=π×d 2 ; Where P is the area of the damaged area, d 2 is the diameter of the damaged area; Fourth, compare the damaged area with the cable cross-sectional area; Compare the calculated damage area with the cross-sectional area of the cable to calculate the area of the damage.
3. A method for quickly treating high voltage cable damage according to claim 1, characterized in that: In step S1, the faulty cable is detected by a cable fault detection instrument, and the detection is as follows; Above the buried wire to be tested, detect from one end of the line to the other end, walk forward slowly, there is no sound from the earphones in the line segment with good insulation to the ground, and the light-emitting tube lights up. When approaching the fault point C, the sound gradually increases from small to large, and one light on the light-emitting tube turns to two or three lights on. The sound is loudest at the fault point A, and the light-emitting tube is fully lit at this time. When passing point A and reaching point B, the sound gradually decreases and disappears, and the light-emitting tube is fully lit and gradually goes out completely, and then retreats to point A where the sound is loudest, which is the fault point.
4. A method for quickly treating high voltage cable damage according to claim 1, characterized in that: After winding in step S6, a semiconductor layer is wound on the surface, and then a sealing tape is used to wrap it, and after the shielding layer is restored, a steel armor tape is finally wound. After the insulation shaking test is qualified, the grounding wire is removed, and the warning sign is taken down to supply power.
5. A method for quickly treating high voltage cable damage according to claim 4, characterized in that: In step S4, the crimping is performed by using a crimping machine.