Primary frequency modulation performance examination, calculation and evaluation method for SIS system of thermal power plant

By implementing the primary frequency regulation performance assessment calculation and evaluation method in the thermal power plant SIS system, the problems of randomness and communication delay in the existing technology are solved, the accurate assessment and fairness of the primary frequency regulation performance of the thermal power plant are achieved, and the power plant is guided to optimize the frequency regulation strategy. , improve system stability and economic benefits.

CN118825971AInactive Publication Date: 2024-10-22CENT CHINA BRANCH OF CHINA DATANG CORP SCI & TECH RES INST CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410801629.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has randomness and uncertainty in the primary frequency modulation performance assessment of thermal power plants, and cannot be used as a normalized assessment method. Moreover, it is limited by communication delays, making it difficult to accurately identify the frequency modulation action moment, affecting the accuracy and fairness of the assessment.

Method used

A primary frequency regulation performance assessment calculation and evaluation method for thermal power plant SIS systems is adopted. Through data preprocessing, unit load judgment, frequency and speed change screening, disturbance type classification, calculation of primary frequency regulation contribution rate and response lag time, statistics The number of failures and the assessment power are used to achieve a comprehensive evaluation of primary frequency modulation performance.

Benefits of technology

It achieves accurate and timely assessment of primary frequency regulation performance of thermal power plants, improves the accuracy and fairness of assessments, guides power plants to adjust frequency regulation strategies, optimizes control logic, and improves response speed and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118825971A_ABST
    Figure CN118825971A_ABST
Patent Text Reader

Abstract

The invention relates to a primary frequency modulation performance assessment calculation evaluation method for a thermal power plant SIS system, and the method achieves the assessment of the primary frequency modulation and AGC function response of a thermal power generating unit by collecting the SIS real-time data of the thermal power generating unit and designing and applying a primary frequency modulation and AGC function assessment method of the thermal power generating unit. At present, a power generation enterprise lacks a means for timely finding frequency modulation and peak regulation problems of a grid-connected unit, and the method utilizes existing real-time measurement data of a thermal power generating unit SIS to calculate primary frequency modulation power in real time by building an intelligent monitoring system, so that assessment of primary frequency modulation function response of the unit is realized; the primary frequency modulation performance detection method has the advantages that various assessment indexes (primary frequency modulation contribution rate, adjustment precision, response time and the like) are comprehensively evaluated, the primary frequency modulation adjustment quality of the power plant is obtained and displayed on the intelligent monitoring platform, the power plant is guided to adjust the primary frequency modulation logic, and the primary frequency modulation performance detection method is innovative and has good social and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of primary frequency regulation in thermal power plants, and in particular to a primary frequency regulation performance assessment calculation and evaluation method for a SIS system in a thermal power plant. Background Art

[0002] With the development of clean energy, thermal power units need to frequently carry out deep peak regulation under the premise of ensuring safety and environmental protection. In order to ensure the flexible operation of thermal power units and maintain the stability of the power grid, the performance assessment standards of grid-connected generators in the country and region are becoming more and more stringent. At present, the power grid generally uses a remote control system to monitor and assess the frequency regulation and peak regulation performance of thermal power units. Power generation companies lack the means to timely discover the frequency regulation and peak regulation problems of grid-connected units. The determination of the primary frequency regulation performance of the unit adopts two methods: online monitoring based on grid frequency disturbance events and online testing of simulated frequency disturbances. Among them, the online monitoring of primary frequency regulation uses real-time measurement data or high-sampling frequency synchronous phasor measurement device (PMU) data to analyze the primary frequency regulation action power of the unit in the frequency disturbance, and calculate and evaluate the primary frequency regulation performance of the unit. The online test of primary frequency regulation with simulated frequency disturbance is issued by the dispatcher. The primary frequency regulation function of the power plant automatically accesses the simulated frequency difference signal to test and count the primary frequency regulation performance of the unit. However, the online monitoring of primary frequency regulation has high requirements for the frequency change and frequency deviation time of disturbance events. At the same time, it is affected by the grid connection of the unit, the input state of primary frequency regulation, and the AGC command. This method relies too much on large-power disturbance events, has certain randomness and uncertainty, and cannot be used as a normalized assessment method; the online test of primary frequency regulation is affected by the communication delay between the dispatching and the plant station, and it is difficult to accurately identify the action time of primary frequency regulation. Due to the differences in the delay of each plant station, the quality of its statistical indicators will directly affect the accuracy and fairness of the assessment. Therefore, its improvement and innovation are imperative. Summary of the invention

[0003] In view of the above situation, in order to overcome the defects of the prior art, the purpose of the present invention is to provide a method for evaluating the primary frequency regulation performance of a SIS system in a thermal power plant.

[0004] The technical solution provided by the present invention is:

[0005] A method for evaluating the primary frequency regulation performance of a SIS system in a thermal power plant, comprising the following steps:

[0006] 1. Data Preprocessing

[0007] (1) Detect the primary frequency regulation function input status. When the primary frequency regulation function is input, perform the evaluation. If it is not input, terminate the judgment and return the monthly assessment power F1;

[0008] (2) Collect the measurement point signals of the power plant frequency, speed, and load. If the measurement point shows bad quality, no evaluation will be performed;

[0009] 2. Determination of unit load conditions:

[0010] (1) If the actual load of the unit is lower than 0.3P n1 , then no judgment is made, where P n1 is the maximum capacity of the unit;

[0011] (2) If the actual load of the unit is greater than 0.3P n1 But less than 0.35P n1 , then the unit is calibrated to operate in low load mode, and no judgment is made when the frequency command is reduced;

[0012] 3. Determine the amplitude and duration of the change in grid frequency or speed

[0013] According to the real-time data collected by the system, effective frequency regulation performance events are screened out: when the grid frequency or speed signal exceeds 50±

[0014] 0.033HZ or 3000±2r / min, this is an effective frequency regulation performance event, read the existing SIS data of the thermal power unit, and store the data in chronological order;

[0015] Effective screening evaluation interval:

[0016] (1) Record the time t0 when the grid frequency fluctuation exceeds 50±0.033HZ or the turbine speed signal exceeds 3000±2r / min;

[0017] (2) Calculate the disturbance process time s:

[0018] Record the time t1 when the grid frequency fluctuation enters 50±0.033HZ again, or the turbine speed signal enters 3000±2r / min again, then s=t1-t0;

[0019] (3) Calculate the maximum frequency or speed change range Δf or Δr within the effective evaluation interval;

[0020] If f>50HZ or r>3000r / min, then Δf=f max -50HZ,Δr=r max -3000

[0021] If f<50HZ or r<3000r / min, then Δf=f min -50HZ,Δr=r min -3000

[0022] 4. Classification of disturbance types

[0023] (1) Large frequency difference disturbance: If Δf ≥ 0.08 Hz, or Δr ≥ 4.8 r / min, then the disturbance is a large frequency difference disturbance;

[0024] (2) Small frequency difference disturbance: If Δf≤0.08Hz, or Δr≤4.8r / min, then the disturbance is a large frequency difference disturbance;

[0025] 5. Screening for effective disturbances

[0026] (1) Large frequency difference disturbance:

[0027] If s ≥ 3 seconds, it is considered as a valid disturbance, otherwise it is considered as an invalid disturbance;

[0028] (2) Small frequency difference disturbance:

[0029] a) Determine whether the power grid frequency fluctuation is stable at 50±0.033Hz or the turbine speed is stable at 3000±2r / min within 3 seconds before time t0. If it is not within the specified range, it is judged as invalid disturbance. If it is within the specified range, proceed to the next step;

[0030] b) If the disturbance process time s ≥ 17 seconds, proceed to the next step. If the disturbance process time is within 17 seconds, it is judged as an invalid disturbance;

[0031] c) Determine whether there is a valid disturbance within 20 seconds before the disturbance occurs at time t0. If the time interval with the previous valid disturbance is ≥ 20 seconds, the disturbance is considered to be a valid disturbance. If it is not within the specified range, it is considered to be an invalid disturbance.

[0032] 6. Calculate the primary frequency modulation contribution rate K

[0033] (1) Read the actual power P0 of the unit at time t0 and take the average value of the 3 seconds before time t0;

[0034] (2) Read the actual power P of the unit at time t t ;

[0035] (3) Calculate the power contribution H of a frequency modulation action i :

[0036]

[0037] (4) Calculate the actual frequency difference and the theoretical frequency difference Δf(t) = |f(t)-50|-f 人工死区

[0038] (5) Calculate the theoretical power at time t:

[0039] (6) Calculate the theoretical primary frequency modulation contribution

[0040] (7) Calculate the primary frequency modulation contribution rate

[0041] Where: f n The rated frequency of the power grid is 50Hz; K c is the unit adjustment coefficient, generally 4%-5%; P n is the rated capacity of the thermal power unit;

[0042] 7. Record the hysteresis time t of a frequency modulation response:

[0043] (1) Record the time of a frequency regulation action: the time when the grid frequency change reaches the threshold: ±0.033Hz or ±2r / min;

[0044] (2) Record the load change time: When the grid frequency changes and triggers a frequency modulation action, record the time when the unit load starts to change;

[0045] (3) Measure the time difference: Calculate the time difference t from when the grid frequency changes to the action value to when the unit load begins to respond. This time difference is the response lag time.

[0046] 8. Calculate whether the disturbance is qualified:

[0047] According to the effective disturbance information screened, the large frequency difference disturbance and the small frequency difference disturbance are counted separately:

[0048] (1) Large frequency difference disturbance:

[0049] 1) If the primary frequency modulation action contribution rate K ≥ 0.8, the primary frequency modulation action contribution rate is qualified, otherwise it is unqualified;

[0050] 2) If the primary frequency modulation response lag time is less than 3s, the primary frequency modulation response lag time is qualified, otherwise it is unqualified;

[0051] 3) If the primary frequency modulation action contribution rate K≤1.3, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0052] 4) If the primary frequency modulation action contribution rate, primary frequency modulation response lag time, and primary frequency modulation adjustment accuracy are all qualified, then the adjustment is qualified;

[0053] (2) Small frequency difference disturbance:

[0054] 1) If the actual power of the unit is ≥0.4 of the rated power of the unit, and the primary frequency regulation action contribution rate K is ≥0.5, then the primary frequency regulation action contribution rate is qualified, otherwise it is unqualified;

[0055] 2) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, and the contribution rate of the primary frequency regulation action K ≥ 0.4, then the contribution rate of the primary frequency regulation action is qualified, otherwise it is unqualified;

[0056] 3) If the frequency fluctuation is less than 0.06Hz, and the primary frequency modulation action contribution rate K≤2.3, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0057] 4) If the frequency fluctuation is ≥0.06Hz, and the primary frequency modulation action contribution rate K≤1.5, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0058] 5) If both the contribution rate of a frequency regulation action and the adjustment accuracy of a frequency regulation are qualified, then the regulation is qualified;

[0059] IX. Statistics of the number of unqualified frequency regulation actions of the unit per month N:

[0060] Count the number of large frequency difference disturbance failures N1 and the number of small frequency difference disturbance failures N2 in the month;

[0061] 10. Calculation of power consumption for primary frequency regulation assessment:

[0062] (1) The small disturbance test power F2 is calculated as follows:

[0063] F2=δ 死区系数 ×A×P n ×N1

[0064] Where:

[0065] δ 死区系数 —If the primary frequency modulation dead zone is less than 0.04Hz, then take 1; if the primary frequency modulation dead zone is greater than or equal to 0.04Hz, then take 3;

[0066] A—0.03 hours;

[0067] N1—is the number of monthly failures under small frequency difference disturbance;

[0068] P n — is the rated capacity of the unit;

[0069] (2) The large disturbance test power F3 is calculated as follows:

[0070] F3=δ 死区系数 ×B×P n ×N2

[0071] Where:

[0072] δ 死区系数 —If the primary frequency modulation dead zone is less than 0.04Hz, then take 1; if the primary frequency modulation dead zone is greater than or equal to 0.04Hz, then take 2;

[0073] B—0.3 hours;

[0074] N2—is the number of monthly failures under large frequency difference disturbance;

[0075] P n — is the rated capacity of the unit;

[0076] XI. Primary Frequency Regulation Performance Evaluation of Thermal Power Plants

[0077] Compare the primary frequency regulation contribution rate K, the number of unstable times N, and the primary frequency regulation assessment power calculation F obtained in Steps VI, IX, and X with the regulation standards to obtain the primary frequency regulation performance quality of the thermal power plant:

[0078] (1) Large frequency deviation disturbance

[0079] 1) Performance evaluation of primary frequency regulation contribution rate

[0080] a) Read the primary frequency regulation contribution rate K of nearly 10 consecutive large frequency deviation disturbances and calculate the average value K m ,

[0081] b) If the average value of the primary frequency regulation contribution rate is 0.8 < K m , < 1.3, then the evaluation of the primary frequency regulation contribution rate is excellent and there is no need to adjust the primary frequency regulation strategy;

[0082] c) If the average value of the primary frequency regulation contribution rate is K m < 0.8 or 1.3 < K m , then the health degree Q of the primary frequency regulation adjustment contribution rate of this thermal power plant is:

[0083]

[0084] When 80 < Q < 100, remind the operating personnel to pay attention to the primary frequency regulation action;

[0085] When Q < 80, remind the operating personnel to adjust the primary frequency regulation strategy or promptly correct the valve flow characteristic curve;

[0086] 2) Performance evaluation of the number of unqualified times

[0087] a) Record the total number of unqualified times N of the primary frequency regulation large frequency deviation disturbance last month l ;

[0088] b) Record the number of unqualified times N on the current day c ;

[0089] c) If then the performance evaluation of the number of unqualified times on the current day is excellent and there is no need to adjust the primary frequency regulation strategy;

[0090] d) If then the performance evaluation of the number of unqualified times on the current day is passing, and it is necessary to promptly conduct a primary frequency regulation test, analyze the dynamic response index and the power response index to ensure that the frequency regulation response time, the actual speed不等率 (the term "不等率" seems incorrect, it might be a typo, but keeping it as is), and the frequency regulation load meet the grid requirements;

[0091] e) If If the number of unqualified times on that day is considered unqualified, the control logic of DEH (digital electro-hydraulic control system) and CCS (coordinated control system) needs to be optimized to improve the response speed and accuracy of primary frequency modulation. ;

[0092] (Additional measures or actions after evaluation)

[0093] (2) Small frequency difference disturbance

[0094] 1) Performance evaluation of primary frequency regulation contribution rate

[0095] a) Read the primary frequency modulation contribution rate K and the maximum frequency fluctuation Δf of the recent small frequency difference disturbance;

[0096] b) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf<0.06Hz, and the contribution rate of the primary frequency regulation action is 0.5≤K≤2.3, the primary frequency regulation quality of the thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy;

[0097] c) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf ≥0.06Hz, and the contribution rate of the primary frequency regulation action is 0.5≤K≤1.5, the primary frequency regulation quality of the thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy;

[0098] d) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf<0.06Hz, and the contribution rate of the primary frequency modulation action K≤0.5 or 2.3≤K. Then the score Q is:

[0099]

[0100] e) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf ≥0.06Hz, and the contribution rate of the primary frequency modulation action K ≤0.5 or 1.5 ≤ K, then the score Q is:

[0101]

[0102] f) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf<0.06Hz, and the contribution rate of primary frequency regulation action is 0.4≤K≤2.3, the primary frequency regulation quality of the thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy;

[0103] g) If 0.3 unit rated power ≤ unit actual power ≤ 0.4 unit rated power, Δf ≥ 0.06Hz, and the primary frequency regulation action contribution rate is 0.4 ≤ K ≤ 1.5, the primary frequency regulation quality of the thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy;

[0104] h) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 2.3 ≤ K, then the score Q for this time is:

[0105]

[0106] i) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 1.5 ≤ K, then the score Q for this time is:

[0107]

[0108] When 80 < Q < 100, remind the operator to pay attention to the primary frequency regulation action;

[0109] When Q < 80, remind the operator to adjust the primary frequency regulation strategy or promptly correct the valve flow characteristic curve;

[0110] 2) Performance evaluation of the number of unqualified times

[0111] a) Record the total number of unqualified times N of small frequency difference disturbances in primary frequency regulation last month m ;

[0112] b) Record the number of unqualified times N on the current day a ;

[0113] c) If then the performance evaluation of the number of unqualified times on the current day is excellent, and there is no need to adjust the primary frequency regulation strategy;

[0114] d) If then the performance evaluation of the number of unqualified times on the current day is passing, and it is necessary to promptly conduct a primary frequency regulation test, analyze the dynamic response index and power response index, and ensure that the frequency regulation response time, actual speed regulation rate, and frequency regulation load meet the grid requirements;

[0115] e) If then the performance evaluation of the number of unqualified times on the current day is failing, and it is necessary to optimize the control logic of DEH (Digital Electro-Hydraulic Control System) and CCS (Coordinated Control System) to improve the response speed and accuracy of primary frequency regulation.

[0116] The invention discloses an online monitoring and evaluation method for an AGC and a primary frequency regulation performance assessment calculation method for a power generation side. By collecting real-time data of a thermal power unit SIS, a primary frequency regulation and AGC function assessment method of the thermal power unit is designed and applied, and the assessment of the primary frequency regulation and AGC function response of the unit is realized. At present, the power grid generally adopts a remote control system to monitor and assess the frequency regulation and peak regulation performance of the thermal power unit, and the power generation enterprise lacks a means to timely discover the frequency regulation and peak regulation problems of the grid-connected units. The method of the invention utilizes the existing real-time measurement data of the SIS of the thermal power unit, calculates the primary frequency regulation power in real time by building an intelligent monitoring system, realizes the assessment of the primary frequency regulation function response of the unit, and comprehensively evaluates various assessment indicators (primary frequency regulation contribution rate, regulation accuracy, response time, etc.), obtains the primary frequency regulation quality of the power plant, and displays it on an intelligent monitoring platform, so as to guide the power plant to adjust the primary frequency regulation logic. The method is an innovation in the primary frequency regulation performance detection method, and has good social and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0117] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0118] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings.

[0119] Depend on Figure 1 A method for evaluating the primary frequency regulation performance of a SIS system in a thermal power plant is provided, comprising the following steps:

[0120] 1. Data Preprocessing

[0121] (1) Detect the primary frequency regulation function input status. When the primary frequency regulation function is input, the evaluation is performed. If it is not input, the judgment is terminated and the monthly assessment power F1 is returned:

[0122] F1=2%×3×P n

[0123] Among them, P n — is the rated capacity of the unit;

[0124] (2) Collect the measurement point signals of the power plant frequency, speed, and load. If the measurement point shows bad quality, no evaluation will be performed;

[0125] 2. Determination of unit load conditions:

[0126] (1) If the actual load of the unit is lower than 0.3P n1 , then no judgment is made, where P n1 is the maximum capacity of the unit;

[0127] (2) If the actual load of the unit is greater than 0.3P n1But less than 0.35P n1 , then the unit is calibrated to operate in low load mode, and no judgment is made when the frequency command is reduced;

[0128] 3. Determine the amplitude and duration of the change in grid frequency or speed

[0129] Based on the real-time data collected by the system, effective frequency modulation performance events are screened out:

[0130] Read the existing SIS data of the thermal power unit and store the data in chronological order to facilitate subsequent performance monitoring and determine the magnitude and duration of grid frequency or speed changes. The principles are as follows:

[0131] The principle for judging whether the frequency and speed change amplitude of the power grid meets the requirements is: the disturbance amplitude reaches the fixed value disturbance amplitude specified in the regulations "Detailed Rules for the Implementation of the Operation and Management of Power Grid Connection in Central China"; the principle for judging the duration of the set value remaining unchanged after a step is: the duration is greater than the stabilization time specified in the regulations "Detailed Rules for the Implementation of the Operation and Management of Power Grid Connection in Central China";

[0132] 3. Effective screening evaluation interval

[0133] (1) Record the time t0 when the grid frequency fluctuation exceeds 50±0.033HZ or the turbine speed signal exceeds 3000±2r / min;

[0134] (2) Calculate the disturbance process time s:

[0135] Record the time t1 when the grid frequency fluctuation enters 50±0.033HZ again, or the turbine speed signal enters 3000±2r / min again, then s=t1-t0;

[0136] (3) Calculate the maximum frequency or speed change range Δf or Δr within the effective evaluation interval;

[0137] If f>50HZ or r>3000r / min, then Δf=f max -50HZ,Δr=r max -3000

[0138] If f<50HZ or r<3000r / min, then Δf=f min -50HZ,Δr=r min -3000

[0139] 4. Classification of disturbance types

[0140] (1) Large frequency difference disturbance: If Δf ≥ 0.08 Hz, or Δr ≥ 4.8 r / min, then the disturbance is a large frequency difference disturbance;

[0141] (2) Small frequency difference disturbance: If Δf≤0.08Hz, or Δr≤4.8r / min, then the disturbance is a large frequency difference disturbance;

[0142] 5. Screening for effective disturbances

[0143] (1) Large frequency difference disturbance:

[0144] If s ≥ 3 seconds, it is considered as a valid disturbance, otherwise it is considered as an invalid disturbance. If the disturbance is valid, proceed to the next step;

[0145] (2) Small frequency difference disturbance:

[0146] a) Determine whether the power grid frequency fluctuation is stable at 50±0.033Hz or the turbine speed is stable at 3000±2r / min within 3 seconds before time t0. If it is not within the specified range, it is judged as invalid disturbance. If it is within the specified range, proceed to the next step;

[0147] b) If the disturbance process time s ≥ 17 seconds, proceed to the next step. If the disturbance process time is within 17 seconds, it is judged as an invalid disturbance;

[0148] c) Determine whether there is a valid disturbance within 20 seconds before the disturbance occurs at time t0. If the time interval with the previous valid disturbance is ≥ 20 seconds, the disturbance is considered to be a valid disturbance. If it is not within the specified range, it is considered to be an invalid disturbance.

[0149] 6. Calculate the primary frequency modulation contribution rate K

[0150] (1) Read the actual power P0 of the unit at time t0 and take the average value of the 3 seconds before time t0;

[0151] (2) Read the actual power P of the unit at time t t ;

[0152] (3) Calculate the power contribution H of a frequency modulation action i :

[0153]

[0154] (4) Calculate the actual frequency difference and the theoretical frequency difference Δf(t) = |f(t)-50|-f 人工死区

[0155] (5) Calculate the theoretical power at time t:

[0156] (6) Calculate the theoretical primary frequency modulation contribution

[0157] (7) Calculate the primary frequency modulation contribution rate

[0158] Where: fn The rated frequency of the power grid is 50Hz; K c is the unit adjustment coefficient, generally 4%-5%; P n is the rated capacity of the thermal power unit.

[0159] The maximum integral time Δt of the above formula is 60 seconds. If the frequency returns to the dead zone within 60 seconds, the integral will be continued until the moment of returning to the dead zone.

[0160] 7. Record the hysteresis time t of a frequency modulation response:

[0161] (1) Record the time of a frequency regulation action: the grid frequency change reaches a specific threshold: ±0.033Hz or ±2r / min;

[0162] (2) Record load change time: When the grid frequency changes and triggers a frequency modulation action, record the start time of the unit load change;

[0163] (3) Measure the time difference: Calculate the time difference t from when the grid frequency changes to the action value to when the unit load begins to respond. This time difference is the response lag time.

[0164] 8. Calculate whether the disturbance is qualified:

[0165] According to the effective disturbance information screened, the large frequency difference disturbance and the small frequency difference disturbance are counted separately:

[0166] (1) Large frequency difference disturbance (frequency deviation ≥ 0.08Hz or speed deviation ≥ 4.8r / min):

[0167] 6) If the primary frequency modulation action contribution rate K ≥ 0.8, the primary frequency modulation action contribution rate is qualified, otherwise it is unqualified;

[0168] 7) If the primary frequency modulation response lag time is less than 3s, the primary frequency modulation response lag time is qualified, otherwise it is unqualified;

[0169] 8) If the primary frequency modulation action contribution rate K≤1.3, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0170] 9) If the primary frequency modulation action contribution rate, primary frequency modulation response lag time, and primary frequency modulation adjustment accuracy are all qualified, then the adjustment is qualified;

[0171] (2) Small frequency difference disturbance (frequency deviation ≤ 0.08 Hz or speed deviation ≤ 4.8 r / min):

[0172] 5) If the actual power of the unit is ≥0.4 of the rated power of the unit, and the primary frequency regulation action contribution rate K is ≥0.5, then the primary frequency regulation action contribution rate is qualified, otherwise it is unqualified;

[0173] 6) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, and the contribution rate of the primary frequency regulation action K ≥ 0.4, then the contribution rate of the primary frequency regulation action is qualified, otherwise it is unqualified;

[0174] 7) If the frequency fluctuation is less than 0.06Hz, and the primary frequency modulation action contribution rate K≤2.3, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0175] 8) If the frequency fluctuation is ≥0.06Hz, and the primary frequency modulation action contribution rate K≤1.5, the primary frequency modulation adjustment accuracy is qualified, otherwise it is unqualified;

[0176] 10) If both the contribution rate of a frequency regulation action and the adjustment accuracy of a frequency regulation are qualified, then the regulation is qualified;

[0177] IX. Statistics of the number of unqualified frequency regulation actions of the unit per month N:

[0178] The statistical period starts at midnight on the first day of each month and ends at 23:59:59 on the last day of each month. The number of unqualified large frequency difference disturbances N1 and the number of unqualified small frequency difference disturbances N2 are counted in that month;

[0179] 10. Calculation of power consumption for primary frequency regulation assessment:

[0180] (1) The small disturbance test power F2 is calculated as follows:

[0181] F2=δ 死区系数 ×A×P n ×N1

[0182] Where:

[0183] δ 死区系数 —If the primary frequency modulation dead zone is less than 0.04Hz, then take 1; if the primary frequency modulation dead zone is greater than or equal to 0.04Hz, then take 3;

[0184] A—0.03 hours;

[0185] N1—is the number of monthly failures under small frequency difference disturbance;

[0186] P n — is the rated capacity of the unit;

[0187] (2) The large disturbance test power F3 is calculated as follows:

[0188] F3=δ 死区系数 ×B×P n ×N2

[0189] Where:

[0190] δ 死区系数—If the primary frequency regulation dead zone < 0.04Hz, take 1; if the primary frequency regulation dead zone ≥ 0.04Hz, take 2;

[0191] B—Take 0.3 hours;

[0192] N2—Is the monthly unqualified times under large frequency difference disturbance;

[0193] P n —Is the rated capacity of the unit;

[0194] XI. Performance Evaluation of Primary Frequency Regulation in Thermal Power Plants

[0195] Compare the primary frequency regulation contribution rate K, the unstable times N, and the primary frequency regulation assessment power calculation F calculated in Steps 6, 9, and 10 with the regulations and standards to obtain the performance quality of the primary frequency regulation in the thermal power plant: The said regulations and standards are the primary frequency regulation contribution rate, the unqualified times, and the primary frequency regulation assessment power calculation required in the "Implementation Rules for the Management of Grid-connected Operation in Central China Power Region"

[0196] (1) Large frequency difference disturbance

[0197] 1) Performance evaluation of primary frequency regulation contribution rate

[0198] a) Read the primary frequency regulation contribution rate K of the large frequency difference disturbance for the recent consecutive 10 times and calculate the average value K m ,

[0199] b) If the average value of the primary frequency regulation contribution rate is 0.8 < K m , < 1.3, then the evaluation of the primary frequency regulation contribution rate is excellent and there is no need to adjust the primary frequency regulation strategy;

[0200] c) If the average value of the primary frequency regulation contribution rate is K m < 0.8 or 1.3 < K m , then the health degree Q of the primary frequency regulation adjustment contribution rate of this thermal power plant is:

[0201]

[0202] When 80 < Q < 100, remind the operating personnel to pay attention to the primary frequency regulation action situation;

[0203] When Q < 80, remind the operating personnel to adjust the primary frequency regulation strategy or promptly correct the valve flow characteristic curve;

[0204] 2) Performance evaluation of unqualified times

[0205] a) Record the total unqualified times N of the primary frequency regulation large frequency difference disturbance in the previous month l ;

[0206] b) Record the unqualified times N on the current day c ;

[0207] c) If The performance evaluation of the number of unqualified times on that day is excellent, and there is no need to adjust the frequency regulation strategy;

[0208] d) If The performance evaluation of the number of unqualified times on that day is qualified, and a frequency regulation test is carried out in time to analyze the dynamic response index and the power response index to ensure that the frequency regulation response time, actual speed inequality rate and frequency regulation load meet the requirements of the power grid;

[0209] e) If The performance evaluation of the number of unqualified times on that day is considered unqualified, and the control logic of DEH (digital electro-hydraulic control system) and CCS (coordinated control system) is optimized to improve the response speed and accuracy of primary frequency modulation;

[0210] (2) Small frequency difference disturbance

[0211] 1) Performance evaluation of primary frequency regulation contribution rate

[0212] a) Read the primary frequency modulation contribution rate K and the maximum frequency fluctuation Δf of the recent small frequency difference disturbance;

[0213] b) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf<0.06Hz, and the contribution rate of the primary frequency regulation action is 0.5≤K≤2.3, the primary frequency regulation quality of the thermal power plant is excellent, with a score of 100 points, and there is no need to adjust the primary frequency regulation strategy;

[0214] c) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf ≥0.06Hz, and the contribution rate of the primary frequency regulation action is 0.5≤K≤1.5, the primary frequency regulation quality of the thermal power plant is excellent, with a score of 100 points, and there is no need to adjust the primary frequency regulation strategy;

[0215] d) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf<0.06Hz, and the contribution rate of the primary frequency modulation action K≤0.5 or 2.3≤K. Then the score Q is:

[0216]

[0217] e) If the actual power of the unit is ≥0.4 of the rated power of the unit, Δf ≥0.06Hz, and the contribution rate of the primary frequency modulation action K ≤0.5 or 1.5 ≤ K, then the score Q is:

[0218]

[0219] f) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action 0.4 ≤ K ≤ 2.3, the primary frequency regulation adjustment quality of this thermal power plant is excellent, with a score of 100 points, and there is no need to adjust the primary frequency regulation strategy;

[0220] g) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action 0.4 ≤ K ≤ 1.5, the primary frequency regulation adjustment quality of this thermal power plant is excellent, with a score of 100 points, and there is no need to adjust the primary frequency regulation strategy;

[0221] h) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 2.3 ≤ K, then the score Q for this time is:

[0222]

[0223] i) If 0.3 rated power of the unit ≤ actual power of the unit ≤ 0.4 rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 1.5 ≤ K, then the score Q for this time is:

[0224]

[0225] When 80 < Q < 100, remind the operating personnel to pay attention to the primary frequency regulation action;

[0226] When Q < 80, remind the operating personnel to adjust the primary frequency regulation strategy or promptly correct the valve flow characteristic curve;

[0227] 2) Performance evaluation of the number of unqualified times

[0228] a) Record the total number of unqualified times N of small frequency difference disturbances in primary frequency regulation last month m ;

[0229] b) Record the number of unqualified times N on the current day a ;

[0230] c) If then the performance evaluation of the number of unqualified times on the current day is excellent, and there is no need to adjust the primary frequency regulation strategy;

[0231] d) If then the performance evaluation of the number of unqualified times on the current day is passing, and conduct a primary frequency regulation test in a timely manner, analyze the dynamic response index and power response index to ensure that the frequency regulation response time, actual speed regulation rate, and frequency regulation load meet the grid requirements;

[0232] e) If The performance evaluation of the number of unqualified times on that day is considered unqualified. The control logic of DEH (digital electro-hydraulic control system) and CCS (coordinated control system) is optimized to improve the response speed and accuracy of primary frequency modulation.

[0233] Accuracy. ;

[0234] By applying the calculation model used in this method and comparing it with the data of the power grid, the data is shown in the following table. The power grid data comes from the statistical data of a thermal power plant that is regularly sent back by the power grid. It can be seen that this method can effectively count and evaluate the quality of primary frequency regulation in real time, guide the thermal power plant to perform logical optimization of primary frequency regulation to meet the requirements of regulations, improve the regulation quality of the system, and provide a strong guarantee for the economic and stable operation of the thermal power plant.

[0235]

Claims

1. A method for evaluating the primary frequency regulation performance of a SIS system in a thermal power plant, characterized in that: The following steps are involved:

1. Data Preprocessing (1) Detect the primary frequency regulation function input status. When the primary frequency regulation function is input, the evaluation is performed. If it is not input, the judgment is terminated and the monthly assessment power F1 is returned: F1=2%×3×P n Among them, P n — is the rated capacity of the unit; (2) Collect the measurement point signals of the power plant frequency, speed, and load. If the measurement point shows bad quality, no evaluation will be performed; 2. Determination of unit load conditions: (1) If the actual load of the unit is lower than 0.3P n1 , then no judgment is made, where P n1 is the maximum capacity of the unit; (2) If the actual load of the unit is greater than 0.3P n1 But less than 0.35P n1 , then the unit is calibrated to operate in low load mode, and no judgment is made when the frequency command is reduced; 3. Determine the amplitude and duration of the grid frequency or speed change and screen the effective evaluation interval According to the real-time data collected by the system, effective frequency regulation performance events are screened out: when the grid frequency or speed signal exceeds 50±0.033HZ or 3000±2r / min, it is an effective frequency regulation performance event, read the existing SIS data of the thermal power unit, and store the data in chronological order; (1) Record the time t0 when the grid frequency fluctuation exceeds 50±0.033HZ or the turbine speed signal exceeds 3000±2r / min; (2) Calculate the disturbance process time s: Record the time t1 when the grid frequency fluctuation enters 50±0.033HZ again, or the turbine speed signal enters 3000±2r / min again, then s=t1-t0; (3) Calculate the maximum frequency or speed change range Δf or Δr within the effective evaluation interval; If f>50HZ or r>3000r / min, then Δf=f max -50HZ,Δr=r max -3000 If f<50HZ or r<3000r / min, then Δf=f min -50HZ,Δr=r min -3000 4. Classification of disturbance types (1) Large frequency difference disturbance: If Δf ≥ 0.08 Hz, or Δr ≥ 4.8 r / min, then the disturbance is a large frequency difference disturbance; (2) Small frequency difference disturbance: If Δf≤0.08Hz, or Δr≤4.8r / min, then the disturbance is a large frequency difference disturbance; 5. Screening for effective disturbances (1) Large frequency difference disturbance: If s ≥ 3 seconds, it is considered as a valid disturbance, otherwise it is considered as an invalid disturbance; (2) Small frequency difference disturbance: a) Determine whether the power grid frequency fluctuation is stable at 50±0.033Hz or the turbine speed is stable at 3000±2r / min within 3 seconds before time t0. If it is not within the specified range, it is judged as invalid disturbance. If it is within the specified range, proceed to the next step; b) If the disturbance process time s ≥ 17 seconds, proceed to the next step. If the disturbance process time is within 17 seconds, it is judged as an invalid disturbance; c) Determine whether there is a valid disturbance within 20 seconds before the disturbance occurs at time t0. If the time interval with the previous valid disturbance is ≥ 20 seconds, the disturbance is considered to be a valid disturbance. If it is not within the specified range, it is considered to be an invalid disturbance.

6. Calculate the primary frequency modulation contribution rate K (1) Read the actual power P0 of the unit at time t0 and take the average value of the 3 seconds before time t0; (2) Read the actual power P of the unit at time t t ; (3) Calculate the power contribution H of a frequency modulation action i : (4) Calculate the actual frequency difference and the theoretical frequency difference Δf(t) = |f(t)-50|-f 人工死区 (5) Calculate the theoretical power at time t: (6) Calculate the theoretical primary frequency modulation contribution (7) Calculate the primary frequency modulation contribution rate Among them, f n is the rated frequency of the power grid; K c is the unit adjustment coefficient; P n is the rated capacity of the thermal power unit; 7. Record the hysteresis time t of a frequency modulation response: (1) Record the time of a frequency modulation action: the grid frequency change reaches the threshold: ±0.033Hz or ±2r / min; (2) Record load change time: When the grid frequency changes and triggers a frequency modulation action, record the start time of the unit load change; (3) Measure the time difference: Calculate the time difference t from when the grid frequency changes to the action value to when the unit load begins to respond. This time difference is the response lag time.

8. Calculate whether the disturbance is qualified: According to the effective disturbance information screened, the large frequency difference disturbance and the small frequency difference disturbance are counted separately: (1) Large frequency difference disturbance: 1) If the contribution rate K of primary frequency regulation action ≥ 0.8, then the contribution rate of primary frequency regulation action is qualified; otherwise, it is unqualified. 2) If the response lag time of primary frequency regulation < 3s, then the response lag time of primary frequency regulation is qualified; otherwise, it is unqualified. 3) If the contribution rate K of primary frequency regulation action ≤ 1.3, then the regulation accuracy of primary frequency regulation is qualified; otherwise, it is unqualified. 4) If the contribution rate of primary frequency regulation action, the response lag time of primary frequency regulation, and the regulation accuracy of primary frequency regulation are all qualified, then this regulation is qualified. (2) Small frequency difference disturbance: 1) If the actual power of the unit ≥ 0.4 times the rated power of the unit, and the contribution rate K of primary frequency regulation action ≥ 0.5, then the contribution rate of primary frequency regulation action is qualified; otherwise, it is unqualified. 2) If 0.3 times the rated power of the unit ≤ the actual power of the unit ≤ 0.4 times the rated power of the unit, and the contribution rate K of primary frequency regulation action ≥ 0.4, then the contribution rate of primary frequency regulation action is qualified; otherwise, it is unqualified. 3) If the frequency fluctuation < 0.06Hz, and the contribution rate K of primary frequency regulation action ≤ 2.3, then the regulation accuracy of primary frequency regulation is qualified; otherwise, it is unqualified. 4) If the frequency fluctuation ≥ 0.06Hz, and the contribution rate K of primary frequency regulation action ≤ 1.5, then the regulation accuracy of primary frequency regulation is qualified; otherwise, it is unqualified. 5) If the contribution rate of primary frequency regulation action and the regulation accuracy of primary frequency regulation are both qualified, then this regulation is qualified. IX. Statistic the number N of unqualified primary frequency regulation actions of the unit per month: Statistic the number N1 of unqualified large frequency difference disturbances and the number N2 of unqualified small frequency difference disturbances in the current month. X. Calculation of primary frequency regulation assessment power: (1) The calculation of the small disturbance assessment power f2 is as follows: F2=δ 死区系数 ×A×P n ×N1 Where: δ 死区系数 —If the primary frequency modulation dead zone is less than 0.04Hz, then take 1; if the primary frequency modulation dead zone is greater than or equal to 0.04Hz, then take 3; A — Take 0.03 hours; N1 — The number of unqualified times per month under small frequency difference disturbances; P n — is the rated capacity of the unit; (2) The calculation of the large disturbance assessment power F3 is as follows: F3=δ 死区系数 ×B×P n ×N2 Where: δ 死区系数 —If the primary frequency modulation dead zone is less than 0.04Hz, then take 1; if the primary frequency modulation dead zone is greater than or equal to 0.04Hz, then take 2; B — Take 0.3 hours; N2 — The number of unqualified times per month under large frequency difference disturbances; P n — is the rated capacity of the unit; XI. Performance evaluation of primary frequency regulation in thermal power plants Compare the primary frequency regulation contribution rate K, the number of unstable times N, and the primary frequency regulation assessment power calculation F obtained in Steps VI, IX, and X with the regulation standards to obtain the primary frequency regulation performance quality of the thermal power plant: (1) Large frequency difference disturbance 1) Performance evaluation of primary frequency regulation contribution rate a) Read the primary frequency modulation contribution rate K of the last 10 consecutive large frequency difference disturbances and calculate the mean value K m , b) If the average primary frequency modulation contribution rate is 0.8<K m ,<1.3, then the primary frequency regulation contribution rate is evaluated as excellent, and there is no need to adjust the primary frequency regulation strategy; c) If the average primary frequency modulation contribution rate is K m <0.8 or 1.3<K m , then the health degree Q of the primary frequency regulation contribution rate of the thermal power plant is: When 80 < Q < 100, remind the operator to pay attention to the primary frequency regulation action. When Q < 80, remind the operator to adjust the primary frequency regulation strategy or promptly correct the valve flow characteristic curve. 2) Performance evaluation of the number of unqualified times a) Record the total number of unqualified frequency modulation large frequency difference disturbances in the previous month N l ; b) Record the number of unqualified times N on that day c ; c) If The performance evaluation of the number of unqualified times on that day is excellent, and there is no need to adjust the frequency regulation strategy; d) If The performance evaluation of the number of unqualified times on that day is considered as passing; e) If The performance evaluation for the number of unqualified times on that day is considered as failing; (2) Small frequency difference disturbance 1) Performance evaluation of primary frequency regulation contribution rate a) Read the primary frequency regulation contribution rate K and the maximum frequency fluctuation Δf of the recent small frequency difference disturbance. b) If the actual power of the unit ≥ 0.4 times the rated power of the unit, Δf < 0.06Hz, and the primary frequency regulation action contribution rate 0.5 ≤ K ≤ 2.3, the primary frequency regulation adjustment quality of this thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy. c) If the actual power of the unit ≥ 0.4 times the rated power of the unit, Δf ≥ 0.06Hz, and the primary frequency regulation action contribution rate 0.5 ≤ K ≤ 1.5, the primary frequency regulation adjustment quality of this thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy. d) If the actual power of the unit ≥ 0.4 times the rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.5 or 2.3 ≤ K. Then the score Q for this time is: e) If the actual power of the unit ≥ 0.4 times the rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.5 or 1.5 ≤ K, then the score Q for this time is: f) If 0.3 times the rated power of the unit ≤ the actual power of the unit ≤ 0.4 times the rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action 0.4 ≤ K ≤ 2.3, the primary frequency regulation adjustment quality of this thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy; g) If 0.3 times the rated power of the unit ≤ the actual power of the unit ≤ 0.4 times the rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action 0.4 ≤ K ≤ 1.5, the primary frequency regulation adjustment quality of this thermal power plant is excellent and there is no need to adjust the primary frequency regulation strategy; h) If 0.3 times the rated power of the unit ≤ the actual power of the unit ≤ 0.4 times the rated power of the unit, Δf < 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 2.3 ≤ K, then the score Q for this time is: i) If 0.3 times the rated power of the unit ≤ the actual power of the unit ≤ 0.4 times the rated power of the unit, Δf ≥ 0.06 Hz, and the contribution rate of primary frequency regulation action K ≤ 0.4 or 1.5 ≤ K, then the score Q for this time is: When 80 < Q < 100, remind the operator to pay attention to the primary frequency regulation action; When Q < 80, remind the operator to adjust the primary frequency regulation strategy or correct the valve flow characteristic curve in time; 2) Performance evaluation of unqualified times a) Record the total number of unqualified frequency modulation small frequency difference disturbances in the previous month N m ; b) Record the number of unqualified times N on that day a ; c) If The performance evaluation of the number of unqualified times on that day is excellent, and there is no need to adjust the frequency regulation strategy; d) If If the performance evaluation of the number of unqualified times on that day is qualified, a frequency regulation test is required to analyze the dynamic response index and the power response index to ensure that the frequency regulation response time, actual speed inequality rate and frequency regulation load meet the requirements of the power grid; e) If If the performance evaluation of the number of unqualified times on that day is unsatisfactory, it is necessary to optimize the control logic of DEH and CCS to improve the response speed and accuracy of primary frequency modulation.

Citation Information

Cited By

  • Energy storage control method for optimizing frequency modulation performance of thermal power generating unit

    CN119518853A