Anchor platform jig frame, manufacturing method of anchor platform jig frame and method for assembling anchor platform in advance

By adopting precise supporting I-beam and tire frame template designs in the anchor platform tire frame, the multiple lifting and welding problems during the segmented construction of the anchor platform are solved, and the overall construction efficiency and production efficiency are improved.

CN118833367APending Publication Date: 2024-10-25CHINA MERCHANTS JINLING SHIPBUILDING (JIANGSU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411022047.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

During the construction process of the anchor platform segments, there are problems such as multiple loose lifting, small space in the welding area, many vertical welds and overhead welds, and frequent fire repair and cutting allowances, which affects the overall construction cycle.

Method used

An anchor platform tire frame design including a horizontal tire frame, a supporting tire frame and a tire frame template is adopted. Accurate section marking and projection are carried out through marine mold transfer software to ensure the accurate position of the supporting I-beam and form a tire frame template, thereby enabling early assembly. and welding to avoid repeated lifting and trimming.

Benefits of technology

It effectively improves the overall construction efficiency of anchor platform segments, shortens the overall construction time, and improves the production efficiency of the shipyard.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118833367A_ABST
    Figure CN118833367A_ABST
Patent Text Reader

Abstract

The invention provides an anchor table jig frame which comprises a horizontal jig frame, a supporting jig frame and a jig frame sample plate, the supporting jig frame is vertically arranged on the horizontal jig frame, and the supporting jig frame comprises a first jig frame supporting I-shaped beam, a second jig frame supporting I-shaped beam, a third jig frame supporting I-shaped beam and a fourth jig frame supporting I-shaped beam which are sequentially and vertically fixed on the horizontal jig frame at intervals. The height of the first jig frame supporting I-shaped beam is larger than that of the second jig frame supporting I-shaped beam, the height of the second jig frame supporting I-shaped beam is the same as that of the third jig frame supporting I-shaped beam, and the height of the fourth jig frame supporting I-shaped beam is smaller than that of the second jig frame supporting I-shaped beam. A jig frame sample plate is obliquely arranged between the first jig frame supporting I-shaped beam and the fourth jig frame supporting I-shaped beam. The invention further provides a manufacturing method of the anchor table jig frame and a method for assembling the anchor table in advance by using the anchor table jig frame, the welding workload and allowance trimming of the scattered anchor table wrapping plate on a ship body section are solved, and the overall construction period of the section is effectively shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ship engineering, and in particular relates to an anchor platform frame and a manufacturing method thereof, and a method for pre-assembling an aiming platform. Background Art

[0002] Anchor platform is generally composed of anchor lip (supplied by the manufacturer, steel casting), anchor platform panel, anchor platform bracket, anchor platform cover plate (4 to 5 pieces, divided according to the processing capacity of the shipyard). Due to the large linear shape and high precision requirements of the anchor platform segments, the traditional scattered pulling segment construction method will result in multiple scattered lifting, small welding area, many vertical welding and overhead welding, and frequent open flame cutting and trimming of the margin, which will affect the overall construction period and make the pre-installation of anchor platform segments a pain point in the construction of anchor platform segments. Summary of the invention

[0003] In view of the above problems, the present invention provides an anchor platform frame and a manufacturing method thereof, as well as a method for pre-assembling an aiming platform.

[0004] To achieve the above object, the present invention adopts the following technical solution: 14. The tire frame of claim 13, wherein the support frame comprises a first tire frame supporting an I-beam, a second tire frame supporting an I-beam, a third tire frame supporting an I-beam and a fourth tire frame supporting an I-beam, the first tire frame supporting an I-beam having a height greater than the second tire frame supporting an I-beam, the second tire frame supporting an I-beam is the same as the third tire frame supporting an I-beam, and the fourth tire frame supporting an I-beam has a height lower than the second tire frame supporting an I-beam; a tire frame template is obliquely arranged between the first tire frame supporting an I-beam and the fourth tire frame supporting an I-beam, and the lower end surface of the tire frame template abuts against the upper ends of the second tire frame supporting an I-beam and the third tire frame supporting an I-beam.

[0005] Furthermore, the horizontal tire frame includes a plurality of horizontal tire frame I-beams, and the plurality of horizontal tire frame I-beams are evenly distributed on the horizontal bottom surface in a circular shape.

[0006] Furthermore, the tire frame template is a steel plate having a linear shape consistent with the outer edge of the anchor base plate.

[0007] A method for manufacturing the above-mentioned anchor platform tire frame comprises the following steps: S1. Cut out the front view section of the anchor platform in the marine conversion software as the main section, and mark the intersection points of the tire frame template and the two ends of the anchor platform cover plate on the main section; S2. Take the center section of the anchor chain pipe on the main section and mark the intersection of the tire frame template and the two ends of the anchor base plate, the center line of the anchor chain pipe and the positioning point of the anchor base bracket on the center section of the anchor chain pipe; The projection on the anchor platform panel is the projection outline of the tire frame template and the actual outline of the anchor platform panel. This projection is used as the base surface of the anchor platform tire frame, and the projection points of the center line of the anchor chain pipe on the tire frame template and the projection points of the center line of the anchor chain pipe on the anchor platform panel are marked on the base surface, and the center line of the anchor platform panel is marked to check whether the data is accurate; S4. Select the intersection point of the center line of the anchor chain pipe and the tire frame template on the main section, perpendicular to the direction of the anchor platform panel, and take the first section, and select the intersection point of the center line of the anchor chain pipe and the upper surface of the anchor platform panel on the first section; in addition, take the second section perpendicular to the direction of the anchor platform panel; S5. Draw a tire frame diagram; S6. Based on the projection of the tire frame template cut out in S3 on the anchor platform panel, the position points of the first tire frame supporting I-beam, the second tire frame supporting I-beam, the third tire frame supporting I-beam and the fourth tire frame supporting I-beam are made. The subsequent anchor platform positioning is mainly based on these four position points, and the tire frame horizontal plane is made according to these four position points and the position of the anchor platform panel in the projection of the tire frame template on the anchor platform panel. The tire frame horizontal plane should avoid the anchor platform panel and leave enough space for the four-point support of the tire frame; after the horizontal tire frame I-beam is made, according to the projection point on the anchor platform panel of the center line of the anchor chain pipe perpendicularly intersecting the intersection line of the tire frame template and the two ends of the anchor platform package plate, the gun eye is punched on the actual horizontal tire frame I-beam where the projection point is located. The position of the gun eye is consistent with the center line of the actual anchor platform panel, where the center line of the actual anchor platform panel is made according to the arrangement of the horizontal tire frame in the projection diagram of the tire frame template on the anchor platform panel; S7. Viewed from bottom to top, in the projection of the tire frame template on the anchor platform panel, cut out the vertical mid-vertical section and the transverse center section, and punch the foreign gun hole for the height correction of the anchor platform panel in the vertical mid-vertical section. The transverse center section is the reference for the tilt angle of the tire frame template and is consistent with the linear shape of the anchor platform package; S8. Based on the projection of the tire frame template on the anchor panel, measure the installation positioning data of the horizontal tire frame, that is, the length of each horizontal tire frame I-beam that constitutes the horizontal tire frame, and the distance between each horizontal tire frame I-beam and the center line of the anchor panel; S9. Cut out the actual curve of the tire frame sample, offset 100mm to make the shape of the tire frame sample, and break it into 4 samples along the center line of the tire frame sample; S10. Cut out the actual development diagram of the anchorage panel and measure the arc length positioning value of the anchorage bracket; S11. Cut out the actual development diagram of the tire frame sample and measure the arc length positioning value of the anchor bracket; S12. Based on the three-dimensional model of the hull, unfold the anchor base plate, measure the positioning data of each bracket and the fracture, the tire frame sample line, and the actual size of the outer line of the anchor base plate; S13. Use the data of the first section and the second section taken in S4 to check the projection of the tire frame template on the anchor platform panel and the arrangement of the horizontal tire frame in the projection, the installation arc length positioning diagram of the anchor bracket on the anchor platform panel, and the installation arc length positioning diagram of the anchor bracket on the tire frame template to ensure the accuracy of the data; S14. Count the lengths of the first tire frame supporting I-beam, the second tire frame supporting I-beam, the third tire frame supporting I-beam and the fourth tire frame supporting I-beam, cut and make them; assemble them according to the drawing data to form a tire frame.

[0008] Furthermore, all the above sections are starboard sections.

[0009] Furthermore, the S5 specifically includes the following steps: S51. The frame plane is composed of a circle of 100mm high horizontal frame I-beams. On the main section, the intersection of the center line of the anchor chain pipe and the upper surface of the anchor platform panel is selected as the reference point, and the distance from this point to the two ends of the anchor platform panel is measured to check whether the projection section of the frame template on the anchor platform panel is accurate; the low intersection point A of the frame template and the anchor platform cover is selected, and the first frame support I-beam is made perpendicular to the base surface of the anchor platform panel; the high intersection point A' of the frame template and the anchor platform cover is selected, and the second I-beam is made perpendicular to the frame template surface, and the second I-beam and the end point of the anchor platform panel from the A' point are offset outward by 150mm to make a third I-beam perpendicular to the ground. The second I-beam and the third I-beam are made into a combined profile frame to form a second supporting I-beam frame; S52. Based on the first section taken in S4, select two intersection points of the frame template and the anchor base cover plate, and make the third frame support I-beam and the fourth frame support I-beam perpendicular to the anchor base plate base surface.

[0010] A method for pre-assembling an aiming platform using the above-mentioned anchor platform frame specifically comprises the following steps: The first step is to assemble the tire frame; The second step is to draw the bracket positioning line on the tire frame template according to the installation arc length positioning diagram data of the anchor bracket bracket on the template obtained in S11; Step 3: Draw the bracket positioning line on the anchor lip according to the installation arc length positioning diagram data of the bracket obtained by S10 on the anchor panel; Step 4: Draw the anchor plate break position on the frame template and anchor lip according to the anchor plate break position and positioning data obtained in S12, and verify whether the drawing position is accurate by using the bracket drawing line and the anchor plate break position and positioning data. Step 5: After the anchor table panel and the anchor lip steel casting are welded, they are placed on the tire frame and positioned according to the eyelets on the horizontal tire frame. The anchor table panel and the anchor lip steel casting are placed horizontally in the horizontal tire frame, and the horizontal height is consistent with the height of the horizontal eyelets on the vertical mid-vertical section in the projection diagram of the tire frame template on the anchor table panel; Step 6: Place the anchor plate in the anchor frame according to the line shape, and cut the anchor plate margin according to the anchor plate break position obtained by S12 and the outer ring line position of the anchor lip / outer plate in the positioning data diagram, and then spot weld the four-point support position on the support frame to the anchor plate; Step 7: Assemble the anchor bracket, and spot weld the anchor bracket according to the anchor bracket positioning line data drawn on the tire frame template and anchor lip in steps 2 and 3; Step 8: After all the parts are assembled, weld them to form an anchor platform; Step 9: Lift the upper section as a whole and weld it to the outer plate of the section.

[0011] Furthermore, the first step is specifically as follows: firstly, the four-point support positions on the supporting tire frame are welded to the tire frame template to form an anchor platform opening line, and then the supporting tire frame is welded to the horizontal tire frame.

[0012] The use of the anchor platform cradle described in the present invention to pre-install the anchor platform can effectively avoid the problems of multiple hoisting, small space in the welding area on the segment, many vertical welding and overhead welding, frequent hot work and cutting of margins, etc. in the construction method of the prior art of the scattered upper segment. The overall construction efficiency of the segment with the anchor platform is improved, the overall construction time is further shortened, and the production efficiency of the shipyard is improved. It has a positive and effective effect on improving the production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 is a schematic diagram of the anchor platform tire frame of the present invention; Figure 2 It is the main section of the anchor platform in the marine software of the present invention; Figure 3 is the central section of the anchor chain pipe of the present invention; Figure 4 It is a projection diagram of the tire frame template of the present invention on the anchor platform panel; Figure 5 is the XX section of the present invention; Figure 6 is the YY section of the present invention; Figure 7 is Figure 2 The layout of the supporting frame drawn on the main section; Figure 8 It is the layout diagram of the support frame on the XX section; Fig. 9 yes Figure 4 Layout of horizontal tire frame on the view; Fig.10 yes Fig. 9 E-viewing section and musket eye height on the basis; Fig.11 yes Fig. 9 G viewing section and sample inclination angle benchmark on the foundation; Fig.12 yes Fig. 9 Specific production dimension drawing of horizontal tire frame on the foundation; Fig.13 It is the form of the tire frame sample and the schematic diagram of the cut seam of the nesting material according to the present invention; Fig.14 It is a schematic diagram of the installation arc length positioning of the anchor bracket of the present invention on the anchor bracket panel; Fig.15 It is a schematic diagram of the installation arc length positioning of the anchor bracket bracket of the present invention on the tire frame template; Fig.16 It is a schematic diagram of the anchor platform cover plate fracture position and positioning data of the present invention; Fig.17 It is a structural schematic diagram of the anchor platform described in the present invention.

[0014] Among them, 1-anchor lip casting, 2-anchor platform panel, 3-anchor platform cover plate, 4-anchor platform elbow plate, 5-horizontal tire frame I-beam, 6-first tire frame supporting I-beam, 7-second tire frame supporting I-beam, 8-third tire frame supporting I-beam, 9-fourth tire frame supporting I-beam, 10-tire frame template, 11-foreign gun eye. DETAILED DESCRIPTION

[0015] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0016] like Figure 1As shown, an anchor platform tire frame includes a horizontal tire frame, a supporting tire frame and a tire frame template, wherein the supporting tire frame is vertically arranged on the horizontal tire frame, and the supporting tire frame includes a first tire frame supporting I-beam 6, a second tire frame supporting I-beam 7, a third tire frame supporting I-beam 8 and a fourth tire frame supporting I-beam 9 which are vertically spaced and fixed in sequence on the horizontal tire frame, wherein the height of the first tire frame supporting I-beam 6 is greater than the height of the second tire frame supporting I-beam 7, and the height of the second tire frame supporting I-beam 7 and the height of the third tire frame supporting I-beam 8 are greater than the height of the Similarly, the height of the fourth tire frame supporting I-beam 9 is lower than that of the second tire frame supporting I-beam 7; a tire frame template 10 is obliquely arranged between the first tire frame supporting I-beam 6 and the fourth tire frame supporting I-beam 9, and the lower top end surface of the tire frame template 10 is abutted against the upper end of the third tire frame supporting I-beam 8 of the second tire frame supporting I-beam 7; the horizontal tire frame includes a plurality of horizontal tire frame I-beams 5, and the plurality of horizontal tire frame I-beams 5 are evenly distributed in a circular shape on the horizontal bottom surface; the tire frame template 10 is a steel plate consistent with the outer edge line shape of the anchor base plate 3.

[0017] A method for manufacturing the above-mentioned anchor platform tire frame includes the following steps: S1. In the ship conversion software, cut out the front view section of the anchor platform as the main section (looking from right to left in the main hull). The sections in the subsequent drawings are all starboard sections, such as Figure 2 As shown, point A and point A' are the intersection points of the tire frame template 10 and the two ends of the anchor platform package 3 respectively; S2. Take the center section of the anchor chain pipe on the main section to form VIEW F, such as Figure 3 As shown, the innermost circle is the projection of the anchor chain pipe, the middle circle is the projection of the anchor platform panel, and the outermost circle is the projection of the anchor platform template. Point A and point A' correspond to the intersection points A and A' of the two ends of the tire frame template 10 and the anchor platform package plate 3 on the main section. C-C' is the center line of the anchor chain pipe perpendicular to A-A', and the two end points are respectively recorded as points C and C'. Points B, B' and D, D' are the positioning points of the anchor platform bracket. S3. Based on the main section, looking from bottom to top, cut out the projection of the tire frame template 10 on the anchor panel 2, the projection is the projection outline of the tire frame template 10 and the actual outline of the anchor panel, such as Figure 4 As shown, this projection is used as the base surface of the anchor platform frame, and the projection points of the center line of the anchor chain pipe on the frame template 10 and the projection points of the center line of the anchor chain pipe on the anchor platform panel are marked on the base surface, and the center line of the anchor platform panel is marked to check whether the data is accurate; Figure 4 Points C, C' in Figure 3 Correspondingly, it is the projection point of the center line of the anchor chain pipe perpendicularly intersecting A, A' on the tire frame template, and point E, E' is the projection point of the center line of the anchor chain pipe perpendicularly intersecting A, A' on the anchor platform panel; S4. Select the intersection of the centerline of the anchor chain pipe and the tire frame template 10 on the main section, perpendicular to the direction of the anchor platform panel 2, and take the first section, that is, XX section, such as Figure 5 As shown, the intersection of the center line of the anchor chain pipe and the upper surface of the anchor platform panel 2 is selected on the section XX; in addition, a second section, namely, the YY section, is taken in a direction perpendicular to the anchor platform panel 2, as shown in FIG. Figure 6 As shown; S5. Draw the tire frame diagram: S51. The tire frame plane is composed of a circle of 100mm high horizontal tire frame I-beams. On the main section, the intersection of the center line of the anchor chain pipe and the upper surface of the anchor platform panel 2 is selected as the reference point, and the distance from this point to the two ends of the anchor platform panel 2 is measured to check whether the projection section of the tire frame template 10 on the anchor platform panel 2 is accurate; the low intersection point A of the tire frame template 10 and the anchor platform cover 3 is selected, and the first tire frame support I-beam is made perpendicular to the base surface of the anchor platform panel; the high intersection point A' of the tire frame template 10 and the anchor platform cover 3 is selected, and the second I-beam 71 is made perpendicular to the surface of the tire frame template 10, and the second I-beam 71 and the end point of the anchor platform panel 2 at the edge of point A' are offset by 150mm to make a third I-beam 72 to make a combined profile tire frame, forming a second tire frame support I-beam 7, such as Figure 7 As shown; S52. Based on the first section taken in S4, select the two intersections of the tire frame template 10 and the anchor plate 3, perpendicular to the anchor plate base, make a second tire frame supporting I-beams and a third tire frame supporting I-beams; such as Figure 8 As shown; S6. On the basis of the projection section of the tire frame template 10 cut in S3 on the anchor platform panel, the position points of the first tire frame supporting I-beam, the second tire frame supporting I-beam, the third tire frame supporting I-beam and the fourth tire frame supporting I-beam are made. The subsequent anchor platform positioning is mainly based on these four position points, and the tire frame horizontal plane is made according to these four position points and the position of the anchor platform panel 2. The tire frame horizontal basic plane is required to avoid the anchor platform panel 2 and leave enough space for the four-point support of the supporting tire frame; after the horizontal tire frame I-beam 5 is completed, according to the projection point on the anchor platform panel of the center line of the anchor chain pipe perpendicularly intersecting the intersection line of the tire frame template and the two ends of the anchor platform package plate, the horizontal tire frame I-beam is punched at the projection point. The position of the foreign gun eye is consistent with the center line of the anchor platform panel 2, which is convenient for anchor platform positioning, such as Fig. 9 As shown, the center line of the anchor panel 2 is based on Figure 4 The arrangement of the middle horizontal tire frame is made; S7. Looking from bottom to top, Figure 4 The vertical mid-section and the horizontal center section E and G are cut out as follows: Fig.10 , Fig.11 As shown, and in the vertical mid-section Fig.10 The foreign gun eye for height correction of the anchor platform panel is punched out. Fig.11 The transverse center section is the reference for the inclination angle of the anchorage template, which is consistent with the line shape of the anchorage package 3; S8. Figure 4 Based on the measurement of the horizontal tire frame Installation positioning data, that is, the length of each horizontal tire frame I-beam that constitutes the horizontal tire frame, and the distance between each horizontal tire frame I-beam and the center line of the anchor platform panel, such as Fig.12 As shown; S9. Cut out the actual curve of the tire frame sample, offset it by 100mm to make the sample shape, and cut it into 4 samples along the center line of the tire frame sample to facilitate nesting. Cut the seam at the center line of the tire frame sample to facilitate position correction; Fig.13 As shown; S10. Cut out the actual development diagram of the anchor platform panel 2 and measure the arc length positioning value of the anchor platform bracket, such as Fig.14 shown.

[0018] S11. Cut out the actual development diagram of the tire frame sample and measure the arc length positioning value of the anchor bracket, such as Fig.15 As shown; S12. According to the three-dimensional model of the hull, the anchor plate package 3 is unfolded, the positioning data of the anchor bracket and the fracture and the tire frame template line, the actual size of the outer line of the anchor plate package, such as Fig.16 As shown; S13. Use the data of the YY section and the XX section taken in S4 to calibrate Figure 4 , Fig. 9 , Fig.14 and Fig.15 The data of several sections shown ensure the accuracy of the data; S14. Count the lengths of the first supporting I-beam, the second supporting I-beam, the third supporting I-beam and the fourth supporting I-beam, cut and manufacture them; assemble them according to the drawing data to form a tire frame.

[0019] A method for pre-assembling an aiming platform using the above-mentioned anchor platform frame specifically comprises the following steps: The first step is to assemble the tire frame: first, weld the four-point support positions on the support tire frame with the tire frame template 10 to form an anchor opening line, and then weld the support tire frame to the horizontal tire frame; The second step is based on Fig.15 The data draws the positioning line of the bracket on the tire frame template 10; Step 3: Based on Fig.14 The data draws the bracket positioning line on the anchor lip; Step 4: Based on Fig.16 The data will draw the break position of the anchor platform cover on the tire frame template 10 and the anchor lip, and draw the line with the bracket plate Fig.16 Data verification: whether the drawing line position is accurate; Step 5: After the anchor panel and the anchor lip steel casting are welded, they are placed on the tire and positioned according to the eyelets on the horizontal tire frame. The anchor panel and the anchor lip steel casting are placed horizontally in the horizontal tire frame, and the horizontal height is consistent with the height of the horizontal eyelets on the vertical mid-vertical section in the projection diagram of the tire frame template 10 on the anchor panel 2; Step 6: Place the anchor plate 3 into the anchor frame according to the line shape, and trim the remaining anchor plate 3 according to the anchor plate break position obtained in S12 and the outer ring line position of the anchor lip / outer plate in the positioning data diagram, and then spot weld the four-point support position on the support frame to the anchor plate 3 to prevent misalignment and ensure the accuracy requirement; Step 7: Assemble the anchor bracket, and spot weld the anchor according to the anchor bracket positioning line data drawn on the tire frame template and anchor lip in steps 2 and 3; Step 8: After all the parts are assembled, weld them to form an anchor platform; Step 9: Lift the upper section as a whole and weld it to the outer plate of the section.

[0020] Those skilled in the art should understand that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An anchor cradle, characterized in that: The tire frame includes a horizontal tire frame, a supporting tire frame and a tire frame template, the supporting tire frame is vertically arranged on the horizontal tire frame, the supporting tire frame includes a first tire frame supporting I-beam, a second tire frame supporting I-beam, a third tire frame supporting I-beam and a fourth tire frame supporting I-beam which are vertically fixed in sequence on the horizontal tire frame at intervals, the height of the first tire frame supporting I-beam is greater than the height of the second tire frame supporting I-beam, the height of the second tire frame supporting I-beam is the same as the height of the third tire frame supporting I-beam, and the height of the fourth tire frame supporting I-beam is lower than the height of the second tire frame supporting I-beam; a tire frame template is obliquely arranged between the first tire frame supporting I-beam and the fourth tire frame supporting I-beam, and the lower end surface of the tire frame template abuts against the upper ends of the second tire frame supporting I-beam and the third tire frame supporting I-beam.

2. The anchor cradle according to claim 1, characterized in that: The horizontal tire frame includes a plurality of horizontal tire frame I-beams, and the plurality of horizontal tire frame I-beams are circular and evenly distributed on the horizontal bottom surface.

3. An anchor cradle according to claim 2, characterized in that: The tire frame template is a steel plate that has the same linear shape as the outer edge of the anchor base plate.

4. A method for manufacturing an anchor platform tire frame according to any one of claims 1 to 3, characterized in that: The following steps are involved: S1. Cut out the front view section of the anchor platform in the marine conversion software as the main section, and mark the intersection points of the tire frame template and the two ends of the anchor platform cover plate on the main section; S2. Take the center section of the anchor chain pipe on the main section and mark the intersection of the tire frame template and the two ends of the anchor base plate, the center line of the anchor chain pipe and the positioning point of the anchor base bracket on the center section of the anchor chain pipe; S3. Based on the main section, looking from bottom to top, cut out the projection of the tire frame template on the anchor platform panel, the projection is the projection outline of the tire frame template and the actual outline of the anchor platform panel, and this projection is used as the base surface of the anchor platform tire frame, and the projection points of the center line of the anchor chain pipe on the tire frame template and the projection points of the center line of the anchor chain pipe on the anchor platform panel are marked on the base surface, and the center line of the anchor platform panel is marked to check whether the data is accurate; S4. Select the intersection point of the center line of the anchor chain pipe and the tire frame template on the main section, perpendicular to the direction of the anchor platform panel, and take the first section, and select the intersection point of the center line of the anchor chain pipe and the upper surface of the anchor platform panel on the first section; in addition, take the second section perpendicular to the direction of the anchor platform panel; S5. Draw a tire frame diagram; S6. Based on the projection of the tire frame template cut out in S3 on the anchor platform panel, the position points of the first tire frame supporting I-beam, the second tire frame supporting I-beam, the third tire frame supporting I-beam and the fourth tire frame supporting I-beam are made. The subsequent anchor platform positioning is mainly based on these four position points, and the tire frame horizontal plane is made according to these four position points and the position of the anchor platform panel in the projection of the tire frame template on the anchor platform panel. The tire frame horizontal plane should avoid the anchor platform panel and leave enough space for the four-point support of the tire frame; after the horizontal tire frame I-beam is made, according to the projection point on the anchor platform panel of the center line of the anchor chain pipe perpendicularly intersecting the intersection line of the tire frame template and the two ends of the anchor platform package plate, the gun eye is punched on the actual horizontal tire frame I-beam where the projection point is located. The position of the gun eye is consistent with the center line of the actual anchor platform panel, where the center line of the actual anchor platform panel is made according to the arrangement of the horizontal tire frame in the projection diagram of the tire frame template on the anchor platform panel; S7. Viewed from bottom to top, in the projection of the tire frame template on the anchor platform panel, cut out the vertical mid-vertical section and the transverse center section, and punch the foreign gun hole for the height correction of the anchor platform panel in the vertical mid-vertical section. The transverse center section is the reference for the tilt angle of the tire frame template and is consistent with the linear shape of the anchor platform package; S8. Based on the projection of the tire frame template on the anchor panel, measure the installation positioning data of the horizontal tire frame, that is, the length of each horizontal tire frame I-beam that constitutes the horizontal tire frame, and the distance between each horizontal tire frame I-beam and the center line of the anchor panel; S9. Cut out the actual curve of the tire frame sample, offset 100mm to make the shape of the tire frame sample, and break it into 4 samples along the center line of the tire frame sample; S10. Cut out the actual development diagram of the anchorage panel and measure the arc length positioning value of the anchorage bracket; S11. Cut out the actual development diagram of the tire frame sample and measure the arc length positioning value of the anchor bracket; S12. According to the three-dimensional model of the hull, unfold the anchor bracket plate, measure the positioning data of each bracket and the fracture, the frame template line, and the actual size of the outer line of the anchor bracket plate; 6S13. Use the data of the first section and the second section taken in S4 to check the projection of the frame template on the anchor panel and the arrangement of the horizontal frame in the projection, the installation arc length positioning diagram of the anchor bracket on the anchor panel, and the installation arc length positioning diagram of the anchor bracket on the frame template to ensure the accuracy of the data; S14. Count the lengths of the first tire frame supporting I-beam, the second tire frame supporting I-beam, the third tire frame supporting I-beam and the fourth tire frame supporting I-beam, cut and make them; assemble them according to the drawing data to form a tire frame.

5. The method for manufacturing an anchor platform frame according to claim 4, characterized in that: All the above sections are starboard sections.

6. The method for manufacturing an anchor platform frame according to claim 5, characterized in that: The S5 specifically includes the following steps: S51. The frame plane is composed of a circle of 100mm high horizontal frame I-beams. On the main section, the intersection of the center line of the anchor chain pipe and the upper surface of the anchor platform panel is selected as the reference point, and the distance from this point to the two ends of the anchor platform panel is measured to check whether the projection section of the frame template on the anchor platform panel is accurate; the low intersection point A of the frame template and the anchor platform cover is selected, and the first frame support I-beam is made perpendicular to the base surface of the anchor platform panel; the high intersection point A' of the frame template and the anchor platform cover is selected, and the second I-beam is made perpendicular to the frame template surface, and the second I-beam and the end point of the anchor platform panel from the A' point are offset outward by 150mm to make a third I-beam perpendicular to the ground. The second I-beam and the third I-beam are made into a combined profile frame to form a second supporting I-beam frame; S52. Based on the first section taken in S4, select two intersection points of the frame template and the anchor base cover plate, and make the third frame support I-beam and the fourth frame support I-beam perpendicular to the anchor base plate base surface.

7. A method for pre-assembling an aiming platform using the anchor platform cradle according to any one of claims 1 to 3, characterized in that: The specific steps include: The first step is to assemble the tire frame; The second step is to draw the bracket positioning line on the tire frame template according to the installation arc length positioning diagram data of the anchor bracket bracket on the template obtained in S11; Step 3: Draw the bracket positioning line on the anchor lip according to the installation arc length positioning diagram data of the bracket obtained by S10 on the anchor panel; Step 4: Draw the anchor plate break position on the frame template and anchor lip according to the anchor plate break position and positioning data obtained in S12, and verify whether the drawing position is accurate by using the bracket drawing line and the anchor plate break position and positioning data. Step 5: After the anchor table panel and the anchor lip steel casting are welded, they are placed on the tire frame and positioned according to the eyelets on the horizontal tire frame. The anchor table panel and the anchor lip steel casting are placed horizontally in the horizontal tire frame, and the horizontal height is consistent with the height of the horizontal eyelets on the vertical mid-vertical section in the projection diagram of the tire frame template on the anchor table panel; Step 6: Place the anchor plate in the anchor frame according to the line shape, and cut the anchor plate margin according to the anchor plate break position obtained by S12 and the outer ring line position of the anchor lip / outer plate in the positioning data diagram, and then spot weld the four-point support position on the support frame to the anchor plate; Step 7: Assemble the anchor bracket, and spot weld the anchor bracket according to the anchor bracket positioning line data drawn on the tire frame template and anchor lip in steps 2 and 3; Step 8: After all the assembling is completed, welding is performed to form an anchor platform; Step 9: Lift the upper section as a whole and weld it to the outer plate of the section.

8. A method for pre-assembling an aiming platform according to claim 7, characterized in that: The first step is specifically as follows: firstly, the four-point support positions on the supporting tire frame are welded to the tire frame template to form an anchor platform opening line shape, and then the supporting tire frame is welded to the horizontal tire frame after detection.