Overwater static sounding probe rod system improvement device and working method thereof

By using devices such as well-frames, probe rod baskets and cages in water static cone sounding, the probe rod length is increased and the installation process is simplified, solving the problem of limited probe rod length, improving construction efficiency and measurement accuracy, and reducing cost.

CN118835580APending Publication Date: 2024-10-25CHINA SHIPBUILDING IND INST OF THE ENG INVESTIGATION & DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411151631.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The length of the probe rod in water static cone sounding operations is too long, and the length of a single probe rod is limited, resulting in low construction efficiency and increased costs.

Method used

Devices such as tic-tac-toe frames, probe rod baskets and placement cages are used, and are assisted by hydraulic static penetration machines and winches to increase the length of the probe rods and simplify the installation and disassembly process. Telescopic connecting pipes and grid-like channel steel are used to fix idle Probe rod, improve the length and stability of the probe rod.

Benefits of technology

It improves the efficiency of water static penetration operations, reduces costs, achieves faster and more accurate measurement of soil physical and mechanical parameters, and saves human resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835580A_ABST
    Figure CN118835580A_ABST
Patent Text Reader

Abstract

The invention relates to an overwater static sounding feeler lever system improvement device and a working method thereof.The device comprises a working platform, a feeler lever lifting basket, a plurality of feeler levers, a #-shaped frame, a placement cage, a drilling machine and a hydraulic static sounding machine, the #-shaped frame, the placement cage, the drilling machine and the hydraulic static sounding machine are placed on the working platform, the drilling machine is provided with a winch, and a steel wire rope on the winch is wound around the top of the #-shaped frame to be connected with the feeler lever lifting basket; the hydraulic static sounding machine is used for assisting in lifting the probe rod of the static sounding, the probe rod of the static sounding is lowered into a soil layer through the hydraulic static sounding machine, and the idle probe rod is placed in the placing cage. According to the overwater static sounding feeler lever system improvement device and the working method thereof, the problems that the operation efficiency is low due to the limited length of a single feeler lever, the feeler lever is difficult to lift and lower due to the fact that the length of the feeler lever is increased, and the placing stability of the feeler lever is insufficient are solved, the overwater static sounding operation efficiency can be improved, the overwater exploration cost is reduced, and the working efficiency is improved. Manpower is saved, physical and mechanical parameters and engineering property indexes of the soil layer are provided more quickly and accurately, and the requirements of water construction project development are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of static penetration sounding, and in particular to an improved device for an above-water static penetration sounding rod system and a working method thereof. Background Art

[0002] Static penetration testing refers to the use of a pressure device to press a probing rod with a probe head into the test soil layer, and to determine certain basic physical and mechanical properties of the soil, such as the deformation modulus of the soil, the allowable bearing capacity of the soil, etc., by systematically measuring the penetration resistance of the soil.

[0003] In engineering investigation, static penetration testing is not only an in-situ testing method, but also an important exploration method. Compared with conventional exploration procedures such as drilling-sampling-indoor testing, it is fast, accurate, economical and labor-saving. It is widely used to divide soil layers, obtain engineering property indicators of each soil layer, determine pile foundation parameters, etc.

[0004] The length of the probe rod for underwater static penetration is approximately the sum of the water depth and the hole depth. In the past, when conducting static penetration at sea, if you want to penetrate into the stone block or sand and pebble layer, the hole depth needs to reach about 70 to 80 meters. Adding the water depth and platform height of about 30 meters, the total probe rod length can reach about 100 meters, and multiple punching is required. However, the specification of the probe rod for static penetration is only one meter per rod. When lowering the rod, a new rod must be connected for every meter. When lifting the rod, the rods must be removed one by one. For example, it takes 3 to 4 hours to install a 100-meter probe rod. The work efficiency is low, and the daily ship fee is expensive, which further increases the production cost of underwater static penetration operations.

[0005] The existing methods of underwater static penetration testing in my country usually include: (1) testing smaller rivers and streams through partial backfilling and artificial land creation to turn them into quasi-land exploration; (2) testing using a pilot pile platform in an engineering project. At this time, the soil layer is disturbed by the piles, and the static penetration data obtained can no longer reflect the natural condition of the soil layer, resulting in large errors; (3) testing using a special underwater static penetration test platform; and (4) conducting static penetration tests directly on an exploration vessel.

[0006] Regardless of the method used, the total length of the probe rod required is approximately the sum of the water depth and the hole depth, and the specifications of a single probe rod are also the same, which leads to a common problem that the required probe rod length is long, while the length of a single probe rod is limited. This makes the efficiency of the hydrostatic penetration test in the water low, further increasing the cost of the hydrographic survey operation. Summary of the invention

[0007] In order to solve the above problems existing in the prior art, the present invention provides an improved device for an underwater static penetration sounding probe rod system and a working method thereof, so as to solve the problem that the probe rod required for construction in the existing underwater static penetration sounding construction process is long, while the length of a single probe rod is limited.

[0008] To achieve the above object, the technical solution of the present invention is as follows:

[0009] An improved device for an underwater static penetration sounding rod system comprises a working platform, a rod lifting basket, a plurality of rods, a cross-shaped frame placed on the working platform, a placing cage, a drilling rig and a hydraulic static penetration sounding machine. The drilling rig is equipped with a winch. The steel wire rope on the winch passes around the top of the cross-shaped frame and is connected to the rod lifting basket to assist in lifting the static penetration sounding rod. The static penetration sounding rod is lowered into the soil layer by the hydraulic static penetration sounding machine, and the idle rods are placed in the placing cage.

[0010] As a preferred technical solution, a roller is provided on the top of the well frame, and a steel wire rope passes around the roller and is connected to the probe rod basket.

[0011] As a preferred technical solution, the length of the probe rod is 3 to 4 meters.

[0012] As a preferred technical solution, the top of the placement cage is opened, surrounded by horizontal and vertical steel pipes, and the bottom is a grid-like channel steel. The lower part of the idle probe rod is stuck in the gap of the grid-like channel steel.

[0013] As a preferred technical solution, a telescopic connecting pipe is provided in the vertical middle position of the placement cage, and the telescopic connecting pipe is detachably connected to the vertical steel pipe.

[0014] As a preferred technical solution, a working method of an improved device for an above-water static penetration probe rod system comprises the following steps:

[0015] Step 1: Pass the wire rope on the winch of the drilling rig around the roller on the top of the well frame and connect it to the probe basket;

[0016] Step 2: Move the work platform to the drilling position, lower the wire rope with a winch, and take the static penetration probe rod out of the placement cage through the probe rod lifting basket and place it in the hydraulic static penetration machine;

[0017] Step 3: lower the probe rod through the hydraulic static penetration machine and press the probe into the soil layer at a uniform speed;

[0018] Step 4, repeating steps 2 and 3 until the probe of the probe rod reaches the predetermined depth, completing the static penetration test in-situ data collection work;

[0019] Step 5: lift the probe rod at a constant speed by using the hydraulic static penetration machine, put the probe rod into the probe rod lifting basket, and retract the wire rope by the winch to lift the probe rod lifting basket;

[0020] Step 6: Put the probe rod back into the placement cage through the probe rod basket and clip it into the gap of the grid-shaped channel steel at the bottom of the placement cage to fix the position;

[0021] Step seven, repeat steps five and six until all probe rods are lifted, completing one static penetration test operation, moving the work platform to the next hole position, repeating steps two to seven, and performing the next static penetration test operation.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] The improved device for the underwater static penetration sounding rod system of the present invention has a simple structure, flexible installation and disassembly, and convenient transportation; the component manufacturing cycle is short, the cost is low, and it is easy to save money; the single component can be replaced, which is convenient for sustainable resource utilization. Its working method can solve the problem that the construction requires a long probe rod, while the length of a single probe rod is limited in the existing underwater static penetration sounding construction process. The device and its working method increase the length of the probe rod and solve the problems of difficulty in lifting and lowering the rod and insufficient stability of the probe rod placement caused by the increase in the length of the probe rod by using a cross frame, a basket, and a placement cage, thereby improving the efficiency of underwater static penetration sounding operations, reducing the cost of water exploration, saving manpower, and providing soil layer physical and mechanical parameters and engineering property indicators more quickly and accurately to meet the needs of the development of water construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is an operation schematic diagram of the working method of the improved device for the underwater static penetration probe rod system of the present invention;

[0025] Figure 2 It is a structural schematic diagram of a placement cage in an improved device for an above-water static penetration probe rod system of the present invention;

[0026] Figure 3 The present invention is a top view of a placement cage in an improved device for an above-water static penetration probe rod system.

[0027] In the figure: 1. working platform; 2. cross frame; 3. placement cage; 4. drilling rig; 5. hydraulic static penetration machine; 6. mud pump; 7. probe rod basket; 8. probe rod; 9. 8# channel steel; 10. φ50×5 steel pipe; 11. connecting pipe; 12. steel plate; 13. φ50×2.5 steel pipe; 14. triangle plate. DETAILED DESCRIPTION

[0028] The technical solution of the present invention is further described below in conjunction with specific implementation methods:

[0029] like Figure 1As shown, an improved device for a hydrostatic penetration sounding rod system includes a work platform 1, a rod lifting basket 7, a plurality of rods 8, a crisscross frame 2, a placement cage 3, a drilling rig 4 and a hydraulic static penetration sounding machine 5 placed on the work platform 1. The drilling rig 4 is equipped with a winch. The steel wire rope on the winch passes through the roller on the top of the crisscross frame 2 and is connected to the rod lifting basket 7 to assist in lifting the static penetration sounding rod 8. The static penetration sounding rod 8 is lowered into the soil layer by the hydraulic static penetration sounding machine 5, and the idle rods 8 are placed in the placement cage 3. The placement cage 3 is used to place and fix the rods 8, which can save space and facilitate lifting the rods 8 after shifting to the next hole position.

[0030] Figure 1 The mud pump 6 is used to cooperate with the drilling rig 4 for mud circulation and is not included in the structure of this device.

[0031] The probe rod 8 is lengthened from the original 1 meter to 3-4 meters, which can save about 2 / 3 of the installation time of the probe rod 8.

[0032] like Figure 2 As shown, the placement cage 3 is about 2.9 m high, the top of the placement cage 3 is open, and horizontal and vertical steel pipe supports are arranged around it. Figure 3 As shown, the bottom is a grid-shaped channel steel, and the lower part of the idle probe rod 8 is stuck in the gap of the grid-shaped channel steel, ensuring that the probe rod 8 is fixed without damaging the internal connection line of the probe rod 8. In this embodiment, the placement cage 3 includes: 5 8# channel steels 9, 30 φ50×5 steel pipes 10, 4 connecting pipes 11, 10 5mm steel plates 12, 10 φ50×2.5 steel pipes 13, and 10 5mm triangle plates 14. The 5mm triangle plate 14 is used to strengthen the structural strength of the placement cage 3. The 8# channel steel 9 is located at the bottom of the placement cage 3, and the gaps between the 8# channel steels 9 are used to place the probe rod 8. The remaining parts play a connecting role.

[0033] A telescopic connecting pipe 11 is provided in the middle of the placing cage 3 in the vertical direction, and the telescopic connecting pipe 11 is detachably connected to the vertical steel pipe, thereby adjusting the height of the placing cage 3 and splitting the placing cage 3 into two parts, which is convenient for transportation.

[0034] Each component can be disassembled into each group of elements, which can be connected on site after being transported to the destination. Any group of elements that are damaged can be replaced, so as to effectively extend the service life of the improved device for the hydrostatic penetration probe system.

[0035] A working method of an improved device for an underwater static penetration probe rod system comprises the following steps:

[0036] Step 1: The wire rope on the winch of the drilling rig 4 is passed around the roller at the top of the well frame 2 and connected to the probe basket 7;

[0037] Step 2: Move the work platform 1 to the drilling position, lower the wire rope with a winch, and take out the static penetration probe 8 from the placement cage 3 through the probe basket 7 and place it in the hydraulic static penetration machine 5;

[0038] Step 3, lowering the probe rod 8 through the hydraulic static penetration machine 5, and pressing the probe into the soil layer at a uniform speed;

[0039] Step 4, repeating steps 2 and 3 until the probe of the probe rod 8 reaches a predetermined depth, completing the static penetration in-situ data collection work;

[0040] Step 5: lift the probe rod 8 at a constant speed by the hydraulic static penetration machine 5, put the probe rod 8 into the probe rod lifting basket 7, and retract the wire rope by the winch to lift the probe rod lifting basket 7;

[0041] Step 6: Put the probe rod 8 back into the placement cage 3 through the probe rod basket 7, and clip it into the gap of the grid-shaped channel steel at the bottom of the placement cage 3 to fix the position;

[0042] Step seven, repeat steps five and six until all the probe rods 8 are lifted, completing one static penetration test operation, shifting the work platform 1 to the next hole position, repeating steps two to seven, and performing the next static penetration test operation.

[0043] This embodiment is only a further explanation of the invention rather than a limitation of the invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed. However, as long as they are within the scope of the claims of the invention, they are protected by the patent law.

Claims

1. An improved device for an underwater static penetration probe rod system, characterized in that: It includes a working platform, a probe rod lifting basket, a plurality of probe rods, a crisscross frame placed on the working platform, a placing cage, a drilling rig and a hydraulic static penetration tester. The drilling rig is equipped with a winch. The steel wire rope on the winch passes over the top of the crisscross frame and is connected to the probe rod lifting basket to assist in lifting the static penetration tester. The static penetration tester is lowered into the soil layer by the hydraulic static penetration tester, and the idle probe rods are placed in the placing cage.

2. The improved device for the underwater static penetration probe rod system according to claim 1 is characterized in that: A roller is arranged on the top of the well frame, and the steel wire rope passes around the roller and is connected with the probe basket.

3. The improved device for underwater static penetration probe rod system according to claim 1 is characterized in that: The length of the probe rod is 3 to 4 meters.

4. The improved device for underwater static penetration probe rod system according to claim 1 is characterized in that: The top of the placement cage is open, surrounded by horizontal and vertical steel pipes, and the bottom is a grid-shaped channel steel. The lower part of the idle probe rod is stuck in the gap of the grid-shaped channel steel.

5. The improved device for the underwater static penetration probe rod system according to claim 4 is characterized in that: A telescopic connecting pipe is provided at the middle position of the placing cage in the vertical direction, and the telescopic connecting pipe is detachably connected to the vertical steel pipe.

6. The working method of the improved device for underwater static penetration probe rod system according to any one of claims 1 to 5, characterized in that: The method comprises the following steps: Step 1: Pass the wire rope on the winch of the drilling rig around the roller on the top of the well frame and connect it to the probe basket; Step 2: Move the work platform to the drilling position, lower the wire rope with a winch, and take the static penetration probe rod out of the placement cage through the probe rod lifting basket and place it in the hydraulic static penetration machine; Step 3: lower the probe rod through the hydraulic static penetration machine and press the probe into the soil layer at a uniform speed; Step 4, repeating steps 2 and 3 until the probe of the probe rod reaches the predetermined depth, completing the static penetration test in-situ data collection work; Step 5: lift the probe rod at a constant speed by using the hydraulic static penetration machine, put the probe rod into the probe rod lifting basket, and retract the wire rope by the winch to lift the probe rod lifting basket; Step 6: Put the probe rod back into the placement cage through the probe rod basket and clip it into the gap of the grid-shaped channel steel at the bottom of the placement cage to fix the position; Step seven, repeat steps five and six until all probe rods are lifted, completing one static penetration test operation, moving the work platform to the next hole position, repeating steps two to seven, and performing the next static penetration test operation.