High-energy pipeline fracture response test method and system and terminal equipment

Through the fracture response test of high-energy pipelines in nuclear power plants, the measurement parameter change data during the accident was obtained and analyzed, which solved the problem of evaluating the design value of the breach opening time, achieved a more reasonable pipeline design, and reduced the design difficulty and safety hazards. .

CN118837221APending Publication Date: 2024-10-25CHINA NUCLEAR POWER DESIGN COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410843994.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

When a double-end shear fracture accident occurs in a medium- and high-energy pipeline in a nuclear power plant, it is difficult to effectively evaluate the rationality of the design value of the breach opening time with existing technology, resulting in an overly conservative design, increasing engineering difficulty and potential safety hazards.

Method used

By constructing a high-energy pipeline fracture response test method, the measured parameter change data during the simulated double-end shear fracture accident of the pipeline to be tested is obtained, the actual measured time for the complete opening of the breach is determined, and this is analyzed to evaluate the design of the complete opening time of the breach. Conservatism of values. The method includes obtaining pressure, metal rebound force, acceleration, stress and reaction force change data, fitting the curve to determine the maximum value, and judging whether it is less than the preset value to determine the rationality of the design value.

Benefits of technology

It provides a more comprehensive method to evaluate the design value of breach opening time, helps to design pipelines more rationally, removes redundant designs, reduces design difficulty, and improves understanding of stress conditions in high-energy pipeline fracture accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118837221A_ABST
    Figure CN118837221A_ABST
Patent Text Reader

Abstract

The invention relates to a high-energy pipeline fracture response test method and system and terminal equipment. The method comprises the following steps: acquiring measurement parameter change data of a to-be-tested pipeline in a process of simulating a double-end shear fracture accident; determining actual measurement time for completely opening the crevasse according to the measurement parameter change data; and analyzing the actual measurement time of complete opening of the crevasse and the measurement parameter change data so as to evaluate the conservative degree of the design value of the complete opening time of the crevasse according to an analysis result. According to the method, more complete reference data can be provided for the design of the crevasse opening time, so that more reasonable pipeline design is helped, redundant parts in the pipeline design are removed, and the pipeline design difficulty is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear power plant equipment testing, and in particular to a high-energy pipeline fracture response testing method and system and terminal equipment. Background Art

[0002] In nuclear power plants, high-energy pipelines are important equipment for transporting fluids (such as cooling water, steam, etc.). When a double-end shear fracture accident occurs in a high-energy pipeline, the design of the relevant pipeline system needs to be able to withstand the consequences of double-end shear. Taking the main steam pipeline system as an example, in order to avoid unacceptable impacts caused by high-energy pipeline fracture accidents, the main steam pipeline system and its components will be designed to withstand double-end shear accidents. However, due to the special layout of the main steam pipeline, the large pipe diameter and high pressure, the pipeline and other components will produce a very large response (such as stress, reaction force, acceleration, etc.) due to the influence of the metal rebound force caused by sudden fracture.

[0003] In order to ensure safety in related technologies, the design value of the breach opening time is usually set too conservatively at 1 millisecond, which results in the need for special components such as brackets or dampers to ensure that the pipeline can withstand the impact of double-end shear fracture during pipeline design. At the same time, the design requirements of components in the main steam system are higher (such as valves need to withstand greater acceleration and loads, and brackets need to withstand greater reaction forces), which makes component design difficult and the products provided by suppliers difficult to meet the requirements. But in fact, some pipeline designs are over-protected, and the installation of unnecessary brackets or dampers will increase the difficulty of project implementation. However, hastily adjusting the design value of the breach opening time will pose a safety hazard. At present, nuclear power plants are in urgent need of a technical solution that can evaluate whether the design value of the breach opening time is reasonable or conservative. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a high-energy pipeline fracture response test method and system and terminal equipment.

[0005] The technical solution adopted by the present invention to solve the technical problem is: constructing a high-energy pipeline fracture response test method, comprising the following steps:

[0006] S10, obtaining measurement parameter change data during a simulated double-end shear fracture accident of the pipeline to be tested;

[0007] S20, determining the actual measured time of the breach being fully opened according to the measured parameter change data;

[0008] S30, analyzing the measured breach full opening time and the measured parameter change data to evaluate the conservatism of the breach full opening time design value according to the analysis result.

[0009] Preferably, in said S10, said measured parameter change data comprises pressure change data indicating changes in the internal pressure of said pipeline to be measured;

[0010] The step of determining the actual measured time of the breach being fully opened according to the measured parameter change data comprises:

[0011] A measured pressure change curve is fitted based on the pressure change data, and the measured pressure change curve is analyzed to determine the moment when the pressure switches from a stable state to a changing state as the moment when the breach just opens, and the moment when the pressure switches from a changing state back to a stable state as the moment when the breach is fully opened, and the measured time when the breach is fully opened is determined based on the breach fully opened time and the moment when the breach just opens.

[0012] Preferably, in S10, the measurement parameter change data further includes metal resilience change data indicating changes in metal resilience of the pipeline to be tested, acceleration change data indicating changes in isolation valve response, stress change data indicating changes in stress of the pipeline to be tested, and reaction force change data indicating changes in reaction force of a fixture of the pipeline to be tested;

[0013] In the S30, the analysis result includes a peak analysis result, and the analysis of the measured time of the breach being fully opened and the measured parameter change data includes:

[0014] Performing curve fitting based on the metal rebound force change data, the acceleration change data, the stress change data and the reaction force change data, respectively, to obtain a metal rebound force change measured curve, an acceleration change measured curve, a stress change measured curve and a reaction force change measured curve;

[0015] Determine the maximum measured metal resilience according to the measured curve of metal resilience change;

[0016] Determining the maximum measured acceleration according to the measured acceleration change curve;

[0017] Determine the maximum measured stress according to the measured stress change curve;

[0018] Determine the maximum measured reaction force according to the measured reaction force change curve;

[0019] It is respectively determined whether the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are less than corresponding preset values ​​to obtain peak analysis results.

[0020] Preferably, in S30, evaluating the conservatism of the design value of the breach full opening time according to the analysis result includes:

[0021] The difference between the actual time for the breach to be fully opened and the design value of the breach opening time is calculated to determine the margin of the difference; if the margin is greater than the set margin, and the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are all less than the corresponding preset values, then the design value of the breach opening time is determined to be conservative; if the margin is not greater than the set margin, or at least one of the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force is not less than the corresponding preset value, then the design value of the breach opening time is determined to be non-conservative.

[0022] Preferably, in said S10, it further includes:

[0023] Providing a test pressure to the interior of the pipeline to be tested by controlling a pressurizing device;

[0024] When the pressure of the pipeline to be tested is stabilized within a preset test pressure range, the predetermined rupture position of the pipeline to be tested is cut off by controlling the cutting device to simulate a double-end shear fracture accident; wherein the cutting device is arranged at the predetermined rupture position;

[0025] The acquisition work is performed by controlling the acquisition device to obtain the measurement parameter change data.

[0026] The present invention also constructs a terminal device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the high-energy pipeline fracture response test method described above are implemented.

[0027] The present invention also constructs a high-energy pipeline fracture response test system, comprising:

[0028] A pressurizing device, which can be mechanically connected to the first end of the pipeline to be tested, and is used to provide a test pressure to the interior of the pipeline to be tested;

[0029] A closing device, which can be mechanically connected to the second end of the pipeline to be tested and is used to close the second end of the pipeline to be tested;

[0030] A cutting device may be arranged at a predetermined rupture position of the pipeline to be tested, so as to cut off the predetermined rupture position after the pressure of the pipeline to be tested is stabilized, so as to simulate a double-end shear fracture accident;

[0031] An isolation valve may be arranged at a predetermined valve position of the pipeline to be tested, so as to close after a rupture accident occurs in the pipeline to be tested, and disconnect the rupture from the upstream;

[0032] A collection device, used for collecting measurement parameter change data;

[0033] The terminal device mentioned above is electrically connected to the collection device.

[0034] Preferably, the cutting device comprises:

[0035] The detonating cord is used to be wound around the predetermined breach position.

[0036] Preferably, the high energy pipeline fracture response test system further comprises:

[0037] A first fixing member is provided at a position of the pipeline to be tested between the pressurizing device and the isolation valve to fix the input side pipeline of the isolation valve;

[0038] The second fixing member is arranged at a position of the pipeline to be tested between the isolation valve and the predetermined rupture position to constrain the output side pipeline of the isolation valve in five directions.

[0039] Preferably, the measurement parameter change data include metal resilience change data indicating changes in the metal resilience of the pipeline to be tested, acceleration change data indicating changes in the response acceleration of the isolation valve, stress change data indicating changes in the stress of the pipeline to be tested, pressure change data indicating changes in the internal pressure of the pipeline to be tested, and reaction force change data indicating changes in the reaction force of the first fixing member;

[0040] The collection device comprises:

[0041] a reaction force detection unit, electrically connected to the terminal device, disposed on the first fixing member, and used for collecting the reaction force change data;

[0042] An acceleration detection unit, electrically connected to the terminal device, disposed on the isolation valve, and used to collect the acceleration change data;

[0043] A stress detection unit, electrically connected to the terminal device and arranged on the pipeline between the second fixing member and the predetermined breach position, for collecting the stress change data;

[0044] A pressure detection unit, electrically connected to the terminal device and arranged close to the predetermined breach position, for collecting the pressure change data;

[0045] The metal resilience detection unit is electrically connected to the terminal device and can be arranged close to the predetermined breach position to collect the metal resilience change data.

[0046] The implementation of the present invention has the following beneficial effects: providing a high-energy pipeline fracture response test method, obtaining measurement parameter change data during a simulated double-end shear fracture accident of the pipeline to be tested, determining the actual measured time of the rupture fully opening according to the measurement parameter change data, analyzing the actual measured time of the rupture fully opening and the measurement parameter change data, evaluating the conservatism of the design value of the rupture fully opening time according to the analysis result, enabling staff to more fully understand the stress condition of the high-energy pipeline after a fracture accident, providing more complete reference data for the rupture opening time design, so as to help more reasonably design the pipeline, remove redundant parts in the pipeline design, and reduce the difficulty of pipeline design. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0048] Figure 1 is a flowchart of a high energy pipeline fracture response test method in some embodiments of the present invention;

[0049] Figure 2 is a circuit structure block diagram of a high energy pipeline fracture response test system in some embodiments of the present invention;

[0050] Figure 3 Schematic diagram of the structure of a high-energy pipeline fracture response test system in some embodiments of the present invention. DETAILED DESCRIPTION

[0051] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0052] It should be noted that the flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor do they have to be executed in the order described. For example, some operations / steps can be decomposed, while some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.

[0053] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.

[0054] Figure 1The following is a flowchart of the high-energy pipeline fracture response test method in some embodiments of the present invention. The implementation of this method can combine the stress test data when a double-end shear fracture accident occurs to make a more comprehensive evaluation of the conservativeness of the design value of the rupture full opening time, which plays a positive role in the rationality of the pipeline design. Figure 1 The test method includes step S10, step S20 and step S30.

[0055] Step S10 includes: obtaining the measurement parameter change data during the process of simulating the occurrence of a double-end shear fracture accident in the pipeline to be tested. In this step, the measurement parameter change data may include at least one of pressure change data indicating that the internal pressure of the pipeline to be tested changes with time, metal resilience change data indicating that the metal resilience of the pipeline to be tested changes with time, acceleration change data indicating that the response acceleration of the isolation valve changes with time, stress change data indicating that the stress of the pipeline to be tested changes with time, and reaction force change data indicating that the reaction force of the fixture of the pipeline to be tested changes. Among them, the isolation valve is set on the pipeline to be tested and closed after the double-end shear fracture accident occurs. In addition, various change data can be stored in the form of coordinates. Taking pressure change data as an example, it includes multiple pressure coordinates and multiple time coordinates corresponding to each pressure coordinate.

[0056] In some embodiments, Figure 2 As shown, the reaction force change data can be collected by the reaction force detection unit 81. In this embodiment, the reaction force detection unit 81 may include an existing force sensor or force measuring device, and by setting the reaction force detection unit 81 on a fixing device (such as the first fixing member 1) of the high-energy pipeline, the reaction force change data can be collected. In some embodiments, the acceleration change data can be collected by the acceleration detection unit 82. In this embodiment, the acceleration detection unit 82 may include an existing acceleration sensor or acceleration detection device, and by setting the acceleration detection unit 82 on the isolation valve of the pipeline to be tested, the acceleration change data can be collected.

[0057] In some embodiments, stress change data can be collected by the stress detection unit 83. In this embodiment, the stress detection unit 83 can include an existing strain gauge or stress detection device, and the stress change data can be collected by arranging the stress detection unit 83 at the second preset position of the pipeline to be tested.

[0058] In some embodiments, the pressure change data can be collected by the pressure detection unit 84. In this embodiment, the pressure detection unit 84 can include an existing force sensor or force measuring device, and the pressure change data can be collected by setting the metal resilience detection unit 85 at the third set position (close to the breach position) of the pipeline to be tested.

[0059] In some embodiments, the metal resilience change data can be collected by the metal resilience detection unit 85. In this embodiment, the metal resilience detection unit 85 can include an existing force sensor or force measuring device, and the metal resilience detection unit 85 is set at the first set position of the high-energy pipeline (i.e., the pipeline to be tested), so that the elastic force change data can be collected.

[0060] In some embodiments, in step S10, the following steps may be performed to simulate a double-end shear fracture accident in the pipeline to be tested, and obtain the measurement parameter change data:

[0061] Providing test pressure to the inside of the pipeline to be tested by controlling the pressurizing device;

[0062] When the pressure of the pipeline to be tested is stable within the preset test pressure range, the predetermined rupture position of the pipeline to be tested is cut off by controlling the cutting device to simulate a double-end shear fracture accident; wherein the cutting device is set at the predetermined rupture position;

[0063] The acquisition work is performed by controlling the acquisition device to obtain the measurement parameter change data.

[0064] In this embodiment, when the pipeline to be tested is pressurized by the pressure device and the internal pressure of the pipeline to be tested is stabilized within the preset test pressure range, the cutting device can be controlled to work, and the predetermined rupture position can be cut off to simulate the double-end shear fracture accident of the pipeline to be tested, so as to collect the measurement parameter change data. In addition, the pressure device can include an existing pipeline pressure device or equipment, such as a pressure pump or a water pump, etc.; the cutting device can include an existing detonating cord, wherein the advantage of using a detonating cord is that when cutting the pipeline to be tested, the rupture can be avoided as much as possible, reducing the impact on the leakage of the pipeline to be tested, and also reducing the interference with the metal rebound force, acceleration, stress and stress measurement, so as to simulate the real situation when the pipeline has a double-end shear fracture accident as much as possible, which is helpful to improve the credibility of the measurement parameter change data. It should be noted that the predetermined rupture position should be set as close to the isolation valve as possible, and the pipeline directly between the predetermined rupture position and the isolation valve can be provided with a five-way constrained lateral restriction to isolate the influence of the predetermined rupture position on the upstream pipeline.

[0065] Step S20 includes: determining the measured time of the breach being fully opened according to the measured parameter change data. In this step, since the force on the pipeline to be tested and its related components is stable before the breach occurs, and the force on the pipeline to be tested and its related components will begin to change after the breach occurs, and after the breach is fully opened (i.e., the pipeline is completely disconnected), the force will tend to be stable again, so by analyzing the measured parameter change data, the time from the beginning of opening to the full opening of the breach in the pipeline to be tested during the double-end shear fracture accident (i.e., the measured time of the full opening of the breach) can be determined.

[0066] In some embodiments, the measured time when the breach is fully opened can be determined by fitting a measured pressure change curve based on the pressure change data, analyzing the measured pressure change curve to determine the moment when the pressure switches from a stable state to a changing state as the moment when the breach just opens, and to determine the moment when the pressure switches from the changing state back to the stable state as the moment when the breach is fully opened, and determine the measured time when the breach is fully opened based on the breach fully opened time and the moment when the breach just opens. Specifically, before the double-end shear fracture accident occurs in the pipeline to be tested, since the pipeline to be tested is closed and the output of the pressurizing device is fixed, the internal pressure of the pipeline to be tested remains basically unchanged, that is, in this stage, the measured pressure change curve is represented by a straight line basically parallel to the time axis; and when the breach begins to open, since the closed state of the pipeline to be tested is destroyed, the pipeline begins to leak, and since the breach will gradually expand over time, the pressure in the measured pressure change curve will show an obvious downward trend in this stage; when the breach is fully opened, since the breach can no longer continue to expand, the gas or liquid leakage is stable at this time, so in this stage, the measured pressure change curve will return to a straight line basically parallel to the time axis. Therefore, based on the above principles, the moment when the pressure switches from a stable state to a changing state can be determined as the moment when the breach just opens, and the moment when the pressure switches from a changing state back to a stable state can be determined as the moment when the breach is fully opened, and then the moment when the breach is fully opened minus the moment when the breach is just opened can be obtained. The measured time of the breach being fully opened.

[0067] Step S30 includes: analyzing the measured time of the breach fully opening and the measurement parameter change data, so as to evaluate the conservatism of the design value of the breach fully opening time according to the analysis result. In this step, by analyzing the measured time of the breach fully opening and the measurement parameter change data, the relationship between the measured time of the breach fully opening and various forces (including metal rebound force, stress and valve acceleration) is clarified, so as to provide data support for judging whether the design value of the breach opening time is reasonable.

[0068] In some embodiments, the analysis result may include a peak analysis result. Accordingly, the process of analyzing the measured time of the breach being fully opened and the measured parameter change data may include:

[0069] Curve fitting is performed based on the metal rebound force change data, acceleration change data, stress change data and reaction force change data to obtain a metal rebound force change measured curve, an acceleration change measured curve, a stress change measured curve and a reaction force change measured curve;

[0070] Determine the maximum measured metal resilience according to the measured curve of metal resilience change;

[0071] Determine the maximum measured acceleration according to the measured acceleration change curve;

[0072] Determine the maximum measured stress based on the measured stress variation curve;

[0073] Determine the maximum measured reaction force according to the measured curve of reaction force variation;

[0074] It is respectively determined whether the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are less than the corresponding preset values ​​to obtain the peak analysis results.

[0075] Specifically, the existing curve fitting technology can be used to fit the measured curve of metal rebound force change, the measured curve of acceleration change, the measured curve of stress change and the measured curve of reaction force change based on the metal rebound force change data, the acceleration change data, the stress change data and the reaction force change data. For the maximum measured metal rebound force, the maximum measured stress and the maximum measured reaction force, the greater the value, the greater the risk of damage to the valves and other components on the high-energy pipeline, and the greater the maximum measured acceleration, the greater the load on the isolation valve. Therefore, the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are all less than the corresponding preset values, which means that the metal rebound force, acceleration, stress and reaction force are less harmful to the components on the high-energy pipeline, that is, there is room for relaxation of the design value of the time for the breach to be fully opened. It should be noted that the preset values ​​corresponding to various maximum measured data can be customized according to actual requirements.

[0076] Furthermore, in this embodiment, the conservatism of the design value of the breach full opening time can be evaluated according to the analysis results in the following manner: the difference between the actual measured time for the breach to be fully opened and the design value of the breach opening time is calculated to determine the margin of the difference; if the margin is greater than the set margin, and the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are all less than the corresponding preset values, then the design value of the breach opening time is determined to be conservative; if the margin is not greater than the set margin, or there is at least one maximum measured value of the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force that is not less than the corresponding preset value, then the design value of the breach opening time is determined to be non-conservative.

[0077] In some embodiments, the analysis result may also include a time difference analysis result. Accordingly, the process of analyzing the measured time of the breach being fully opened and the measured parameter change data may include:

[0078] Determine the maximum metal resilience force measured time when the maximum metal resilience force occurs according to the measured curve of metal resilience force change;

[0079] Determine the maximum acceleration measured time when the maximum measured acceleration occurs according to the measured acceleration change curve;

[0080] Determine the maximum stress measured time when the maximum measured stress appears according to the measured stress change curve;

[0081] Determine the maximum reaction force measured time when the maximum measured reaction force appears according to the reaction force change measured curve;

[0082] Determine the time difference relationship between the measured time when the breach is fully opened and the measured time of the maximum metal rebound force, the measured time of the maximum acceleration, the measured time of the maximum stress and the measured time of the maximum reaction force, so as to obtain the time difference analysis result; wherein, the time difference analysis result includes the time interval between each measured time and the measured time when the breach is fully opened.

[0083] Specifically, the time difference analysis results are used to evaluate the influence of the measured time of the maximum metal rebound force, the measured time of the maximum acceleration, the measured time of the maximum stress and the measured time of the maximum reaction force on the time of the breach to be fully opened. The time when the various forces of the high-energy pipeline appear at their maximum values ​​may be different under different test environments, and the time when the various forces appear at their maximum values ​​can evaluate the weight (or correlation) between the force and the time of the breach to be fully opened. For example, if the time interval between the measured time of a certain force and the measured time of the breach to be fully opened is within the set range, it can be inferred that the force will have a direct impact on the time of the breach to be fully opened, so the weight of the force on the time of the breach to be fully opened can be set as valid. On the contrary, if the time interval between the measured time of a certain force and the measured time of the breach to be fully opened is outside the set range, it means that the force has little impact on the time of the breach to be fully opened, so the weight of the force on the time of the breach to be fully opened can be set as invalid.

[0084] In this embodiment, the conservatism of the design value of the breach full opening time can be evaluated according to the analysis results in the following manner: the difference between the actual measured time for the breach full opening and the design value of the breach opening time is calculated to determine the margin of the difference; if the margin is greater than the set margin, and all the various maximum measured values ​​whose weights are set to be valid are less than the corresponding preset values, then the design value of the breach opening time is determined to be conservative; if the margin is not greater than the set margin, or one or two of the various maximum measured values ​​whose weights are set to be valid are not less than the corresponding preset values, then the design value of the breach opening time is determined to be non-conservative. Furthermore, if it is confirmed that the design value of the breach full opening time is conservative, it means that the current pipeline design has a large room for relaxation, and some protection measures may belong to excessive protection. Therefore, the staff can adaptively adjust the pipeline design based on the measured parameter change data. For example, if the difference margin between the actual measured time for the breach to be fully opened and the design value of the breach opening time is large, then the design value of the breach opening time can be set to a higher value, and the pipeline, bracket, valve, pipe component, equipment, etc. can be designed according to the breach opening time. The increase in the design value of the breach opening time means that some protection content can be downgraded. Therefore, some design standards in the original design content can be relaxed (such as reducing the acceleration of the isolation valve to reduce the load of the isolation valve, thereby reducing the design difficulty of the isolation valve), and even reduce the application of some equipment (such as reducing the number of brackets, dampers and other components used in certain fixed high-energy pipelines, which is beneficial to the development of the project and reduces costs).

[0085] In order to improve the credibility of the test results, in some embodiments, step S10 also includes: simulating a double-end shear fracture accident of the pipeline to be tested under a set test environment. Moreover, the high-energy pipeline fracture response test method also includes steps S40 and S50.

[0086] Step S40 includes: obtaining simulation test data; wherein the simulation test data is the test data obtained when the virtual machine simulates the double-end shear fracture accident process of the high-energy pipeline under the set test environment. In this step, the virtual machine can implement the simulation work through the existing algorithm or the existing pipeline simulation model to obtain the simulation test data.

[0087] Step S50 includes: comparing the measured parameter change data with the simulation test data to determine the credibility of the current evaluation result according to the comparison result. The comparison process may include:

[0088] According to the simulation test data, the pressure change simulation curve, the metal rebound force change simulation curve, the acceleration change simulation curve, the stress change simulation curve and the reaction force change simulation curve are fitted;

[0089] Determine the simulation time for the breach to be fully opened based on the pressure change simulation curve;

[0090] Determine the maximum simulated metal resilience according to the metal resilience change simulation curve;

[0091] Determine the maximum simulated acceleration according to the acceleration change simulation curve;

[0092] Determine the maximum simulation stress according to the stress change simulation curve;

[0093] Determine the maximum simulated reaction force according to the reaction force variation simulation curve;

[0094] Calculate the error between the actual measured time when the breach is fully opened and the simulated time when the breach is fully opened. If the error is within the set error range, the actual measured time when the breach is fully opened is determined to be credible; otherwise, the actual measured time when the breach is fully opened is determined to be unreliable.

[0095] The maximum measured values ​​of the same type (including the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force) are compared with the maximum simulated values ​​(including the maximum simulated metal rebound force, the maximum simulated acceleration, the maximum simulated stress and the maximum simulated reaction force) to determine the credibility of the metal rebound force change data, the acceleration change data, the stress change data and the reaction force change data;

[0096] If the measured time for the breach to be fully opened, the metal rebound force change data, the acceleration change data, the stress change data and the reaction force change data are all credible, then the evaluation result is judged to be credible; otherwise, the evaluation result is judged to be unreliable.

[0097] Specifically, taking the metal resilience change data as an example, if the error between the maximum measured metal resilience and the maximum simulated metal resilience is within the corresponding set error range, the metal resilience change data is determined to be credible, otherwise the metal resilience change data is determined to be unreliable.

[0098] The present invention also provides a terminal device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the high-energy pipeline fracture response test method provided in an embodiment of the present invention are implemented.

[0099] like Figure 2 As shown, the present invention further provides a high-energy pipeline fracture response test system, including a cutting device 3, a pressurizing device 4, an isolation valve 6, a closing device 7, a collection device 8 and a terminal device 9 provided in an embodiment of the present invention.

[0100] The pressurizing device 4 can be mechanically connected to the first end of the pipeline to be tested 5, and is used to provide test pressure inside the pipeline to be tested 5. The pressurizing device 4 can be an existing pressurizing device such as a pressurizing pump or a water pump.

[0101] The closing device 7 can be mechanically connected to the second end of the pipeline to be tested 5, and the closing device 7 is used to close the second end of the pipeline to be tested 5. The closing device can be an existing pipeline closing cover, etc., as long as it can close the pipeline.

[0102] The cutting device 3 can be arranged at a predetermined rupture position of the pipeline 5 to be tested. The cutting device 3 is used to cut off the predetermined rupture position when the pressure of the pipeline 5 to be tested is stable within a preset test pressure range to simulate a double-end shear fracture accident.

[0103] In some embodiments, the cutting device 3 includes a detonating cord which is wound around a predetermined rupture position and detonated after the pressure of the pipeline 5 to be tested is stabilized, thereby cutting off the predetermined rupture position and forming a double-end shear fracture accident.

[0104] The isolation valve 6 can be arranged at a predetermined valve position of the pipeline to be tested 5. The isolation valve 6 can be closed after a rupture accident occurs in the pipeline to be tested 5 to disconnect the rupture from the upstream.

[0105] The acquisition device 8 is electrically connected to the acquisition device 8, and the acquisition device 8 is used to collect measurement parameter change data.

[0106] In some embodiments, Figure 2 or Figure 3 As shown, the acquisition device 8 includes a reaction force detection unit 81 , an acceleration detection unit 82 , a stress detection unit 83 , a pressure detection unit 84 and a metal rebound force detection unit 85 .

[0107] The reaction force detection unit 81 is electrically connected to the terminal device 9. The reaction force detection unit 81 is arranged on the first fixing member 1 to collect reaction force change data. The reaction force detection unit 81 may include an existing force sensor or force measuring device.

[0108] The acceleration detection unit 82 is electrically connected to the terminal device 9. The acceleration detection unit 82 is arranged on the isolation valve 6 to collect acceleration change data. The acceleration detection unit 82 may include an existing acceleration sensor or an acceleration detection device.

[0109] The stress detection unit 83 is electrically connected to the terminal device 9. The stress detection unit 83 can be arranged on the pipeline between the second fixing member 2 and the predetermined breach position to collect stress change data. The stress detection unit 83 can include an existing strain gauge or a stress detection device.

[0110] The pressure detection unit 84 is electrically connected to the terminal device 9. The pressure detection unit 84 can be arranged near the predetermined breach position to collect pressure change data. The stress detection unit 83 can include an existing strain gauge or a stress detection device.

[0111] The metal resilience detection unit 85 is electrically connected to the terminal device 9. The metal resilience detection unit 85 can be arranged near the predetermined breach position to collect metal resilience change data. The metal resilience detection unit 85 can include an existing force sensor or force measuring device.

[0112] In some embodiments, Figure 3 As shown, the high-energy pipeline fracture response test system further includes a first fixing member 1 and a second fixing member 2 .

[0113] The first fixing member 1 is disposed on the pipeline to be tested, between the pressurizing device 4 and the isolation valve 6, to fix the pipeline on the input side of the isolation valve 6. The first fixing member 1 can be formed by connecting square or I-shaped steel beams, and its function is to fix and constrain the pipeline on the input side of the isolation valve 6.

[0114] The second fixing member 2 can be arranged at a position of the pipeline to be tested, between the isolation valve 6 and the predetermined breach position, to constrain the pipeline on the output side of the isolation valve 6 in five directions. The second fixing member 2 can be formed by connecting square or I-shaped steel beams, and its function is to realize five-direction constraints on the pipeline on the output side of the isolation valve 6, that is, the pipeline is movable in the axial direction, but constrains the other five directions, including constraining the freedom of 2 tangential directions and 3 rotation directions.

[0115] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0116] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0117] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0118] It can be understood that the above embodiments only express the preferred implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the present invention. It should be pointed out that, for ordinary technicians in this field, the above technical features can be freely combined without departing from the concept of the present invention, and several deformations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, all equivalent changes and modifications made to the scope of the claims of the present invention should belong to the coverage of the claims of the present invention.

Claims

1. A high energy pipeline fracture response test method, characterized in that: The following steps are involved: S10, obtaining measurement parameter change data during a simulated double-end shear fracture accident of the pipeline to be tested; S20, determining the actual measured time of the breach being fully opened according to the measured parameter change data; S30, analyzing the measured breach full opening time and the measured parameter change data to evaluate the conservatism of the breach full opening time design value according to the analysis result.

2. The high energy pipeline fracture response test method according to claim 1, characterized in that: In said S10, said measured parameter change data includes pressure change data indicating changes in the internal pressure of said pipeline to be measured; The step of determining the actual measured time of the breach being fully opened according to the measured parameter change data comprises: A measured pressure change curve is fitted based on the pressure change data, and the measured pressure change curve is analyzed to determine the moment when the pressure switches from a stable state to a changing state as the moment when the breach just opens, and the moment when the pressure switches from a changing state back to a stable state as the moment when the breach is fully opened, and the measured time when the breach is fully opened is determined based on the breach fully opened time and the moment when the breach just opens.

3. The high energy pipeline fracture response test method according to claim 2, characterized in that: In S10, the measured parameter change data also includes metal resilience change data indicating changes in the metal resilience of the pipeline to be tested, acceleration change data indicating changes in the response of the isolation valve, stress change data indicating changes in the stress of the pipeline to be tested, and reaction force change data indicating changes in the reaction force of the fixture of the pipeline to be tested; In the S30, the analysis result includes a peak analysis result, and the analysis of the measured time of the breach being fully opened and the measured parameter change data includes: Performing curve fitting based on the metal rebound force change data, the acceleration change data, the stress change data and the reaction force change data, respectively, to obtain a metal rebound force change measured curve, an acceleration change measured curve, a stress change measured curve and a reaction force change measured curve; Determine the maximum measured metal resilience according to the measured curve of metal resilience change; Determining the maximum measured acceleration according to the measured acceleration change curve; Determine the maximum measured stress according to the measured stress change curve; Determine the maximum measured reaction force according to the measured reaction force change curve; It is respectively determined whether the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are less than corresponding preset values ​​to obtain peak analysis results.

4. The high energy pipeline fracture response test method according to claim 3 is characterized in that: In the step S30, evaluating the conservatism of the design value of the breach full opening time according to the analysis result includes: The difference between the actual time for the breach to be fully opened and the design value of the breach opening time is calculated to determine the margin of the difference; if the margin is greater than the set margin, and the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force are all less than the corresponding preset values, then the design value of the breach opening time is determined to be conservative; if the margin is not greater than the set margin, or at least one of the maximum measured metal rebound force, the maximum measured acceleration, the maximum measured stress and the maximum measured reaction force is not less than the corresponding preset value, then the design value of the breach opening time is determined to be non-conservative.

5. The high energy pipeline fracture response test method according to any one of claims 1 to 4, characterized in that: In the S10, it also includes: Providing a test pressure to the interior of the pipeline to be tested by controlling a pressurizing device; When the pressure of the pipeline to be tested is stabilized within a preset test pressure range, the predetermined rupture position of the pipeline to be tested is cut off by controlling the cutting device to simulate a double-end shear fracture accident; wherein the cutting device is arranged at the predetermined rupture position; The acquisition work is performed by controlling the acquisition device to obtain the measurement parameter change data.

6. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the high-energy pipeline fracture response test method according to any one of claims 1 to 5 are implemented.

7. A high energy pipeline fracture response test system, characterized in that: include: A pressurizing device (4) mechanically connected to the first end of the pipeline to be tested (5) and used to provide a test pressure to the interior of the pipeline to be tested (5); A closing device (7) mechanically connected to the second end of the pipeline to be tested (5) and used to close the second end of the pipeline to be tested (5); A cutting device (3) is arranged at a predetermined rupture position of the pipeline to be tested (5) so as to cut off the predetermined rupture position after the pressure of the pipeline to be tested (5) is stabilized, so as to simulate a double-end shear fracture accident; An isolation valve (6) is arranged at a predetermined valve position of the pipeline to be tested (5); A collection device (8) for collecting measurement parameter change data; The terminal device (9) as claimed in claim 6 is electrically connected to the collection device (8).

8. The high energy pipeline fracture response test system according to claim 7, characterized in that: The cutting device (3) comprises: The detonating cord is used to be wound around the predetermined breach position.

9. The high energy pipeline fracture response test system according to claim 7 or 8, characterized in that: Also includes: A first fixing member (1) is arranged at a position of the pipeline to be tested, between the pressurizing device (4) and the isolation valve (6), so as to fix the input side pipeline of the isolation valve (6); The second fixing member (2) is arranged at a position of the pipeline to be tested, between the isolation valve (6) and the predetermined breach position, so as to constrain the output side pipeline of the isolation valve (6) in five directions.

10. The high energy pipeline fracture response test system according to claim 9, characterized in that: The measured parameter change data include metal resilience change data indicating changes in the metal resilience force of the pipeline (5) to be tested, acceleration change data indicating changes in the acceleration of the isolation valve (6) in response, stress change data indicating changes in the stress of the pipeline (5) to be tested, pressure change data indicating changes in the internal pressure of the pipeline (5) to be tested, and reaction force change data indicating changes in the reaction force of the first fixing member (1); The collecting device (8) comprises: A reaction force detection unit (81), electrically connected to the terminal device (9), disposed on the first fixing member (1), and used for collecting the reaction force change data; an acceleration detection unit (82), electrically connected to the terminal device (9), disposed on the isolation valve (6), and used for collecting the acceleration change data; A stress detection unit (83) is electrically connected to the terminal device (9) and is disposed on the pipeline between the second fixing member (2) and the predetermined rupture position, and is used to collect the stress change data; A pressure detection unit (84), electrically connected to the terminal device (9) and arranged close to the predetermined breach position, for collecting the pressure change data; A metal resilience detection unit (85) is electrically connected to the terminal device (9) and is disposed close to the predetermined breach position, and is used to collect data on changes in the metal resilience.